FEE Installation & Commissioning TPC Meeting, 21 April 2006 L. Musa
22. January 2007U. Frankenfeld1 TPC DCS Pre-commissioning Final system.
-
Upload
mary-reeves -
Category
Documents
-
view
221 -
download
0
Transcript of 22. January 2007U. Frankenfeld1 TPC DCS Pre-commissioning Final system.
![Page 1: 22. January 2007U. Frankenfeld1 TPC DCS Pre-commissioning Final system.](https://reader030.fdocuments.net/reader030/viewer/2022012916/55144f27550346284e8b5041/html5/thumbnails/1.jpg)
22. January 2007 U. Frankenfeld 1
TPC DCS
Pre-commissioningFinal system
![Page 2: 22. January 2007U. Frankenfeld1 TPC DCS Pre-commissioning Final system.](https://reader030.fdocuments.net/reader030/viewer/2022012916/55144f27550346284e8b5041/html5/thumbnails/2.jpg)
22. January 2007 U. Frankenfeld 2
Pre-commissioning HardwarePVSS Supervisory Layer / FSM
• HV– 3 Module Iseg
• LV– 2 PL500/F8
• Temperature Monitoring– 500 Sensors read-out by 18 ELMBs
• VHV– Heinzinger incl. PLC/PVSS/FSM
• FEE– 12 Readout Partitions (2 sectors)
• Laser– Laser control– Mirror control
• Gas system– GWG / IT-CO
![Page 3: 22. January 2007U. Frankenfeld1 TPC DCS Pre-commissioning Final system.](https://reader030.fdocuments.net/reader030/viewer/2022012916/55144f27550346284e8b5041/html5/thumbnails/3.jpg)
22. January 2007 U. Frankenfeld 3
Commissioning Hardwarestand alone
• Drift Velocity Monitor• FEC cooling• Pulser PS
![Page 4: 22. January 2007U. Frankenfeld1 TPC DCS Pre-commissioning Final system.](https://reader030.fdocuments.net/reader030/viewer/2022012916/55144f27550346284e8b5041/html5/thumbnails/4.jpg)
22. January 2007 U. Frankenfeld 4
Pre-commissioning Cooling System
(concept similar to final set-up)
• After water accident • All sensitive area at under
pressure• ΔT ~ 1 K in each sector• System has been optimized
for safe operation even with large leaks (silicon hose)
• Pressure in the reservoir: > 350 mbar, < 380 mbar
• Interlock: 400 mbar• Interlock action:
1. turns circulation pump off2. generates alarm3. starts procedure to turn off
electronics
Electronics Cooling System
1
2
3
4
![Page 5: 22. January 2007U. Frankenfeld1 TPC DCS Pre-commissioning Final system.](https://reader030.fdocuments.net/reader030/viewer/2022012916/55144f27550346284e8b5041/html5/thumbnails/5.jpg)
22. January 2007 U. Frankenfeld 5
1 2
3 4
![Page 6: 22. January 2007U. Frankenfeld1 TPC DCS Pre-commissioning Final system.](https://reader030.fdocuments.net/reader030/viewer/2022012916/55144f27550346284e8b5041/html5/thumbnails/6.jpg)
22. January 2007 U. Frankenfeld 6
Water spill from under pressure system?
Reservoir
Circulation Pump
Vacuum Pump
Sector
Squeezed hoseAir bubbles
Over pressure
![Page 7: 22. January 2007U. Frankenfeld1 TPC DCS Pre-commissioning Final system.](https://reader030.fdocuments.net/reader030/viewer/2022012916/55144f27550346284e8b5041/html5/thumbnails/7.jpg)
22. January 2007 U. Frankenfeld 7
Pressure (single sector)
• Bypass (or 2nd sector) needed to limit max pressure at sector
• Flow: 10 l/min– Hydrostatic pressure in
sector 13
Bypass
Valve in serial
![Page 8: 22. January 2007U. Frankenfeld1 TPC DCS Pre-commissioning Final system.](https://reader030.fdocuments.net/reader030/viewer/2022012916/55144f27550346284e8b5041/html5/thumbnails/8.jpg)
22. January 2007 U. Frankenfeld 8
Pressure drop in Sector
![Page 9: 22. January 2007U. Frankenfeld1 TPC DCS Pre-commissioning Final system.](https://reader030.fdocuments.net/reader030/viewer/2022012916/55144f27550346284e8b5041/html5/thumbnails/9.jpg)
22. January 2007 U. Frankenfeld 9
Summary Cooling
• Save operation with two sectors (opening of one hoses tested)– Hoses– Bypass (one sector)– Alarm settings
• Visual alarm– Triggered by flow meter– System stops flow in case of alarm
• Final system:– One pressure sensor at the inlet of each cooling
sector – Signal read-out by DSS system-> used as interlock to
stop circulation pump
![Page 10: 22. January 2007U. Frankenfeld1 TPC DCS Pre-commissioning Final system.](https://reader030.fdocuments.net/reader030/viewer/2022012916/55144f27550346284e8b5041/html5/thumbnails/10.jpg)
22. January 2007 U. Frankenfeld 10
Temperature Sensors
• 500 calibrated PT1000• 18 ELMBs• Display with color code
and auto scaling• Trending of selected
probes• Display of history data
![Page 11: 22. January 2007U. Frankenfeld1 TPC DCS Pre-commissioning Final system.](https://reader030.fdocuments.net/reader030/viewer/2022012916/55144f27550346284e8b5041/html5/thumbnails/11.jpg)
22. January 2007 U. Frankenfeld 11
Sensor Calibration
![Page 12: 22. January 2007U. Frankenfeld1 TPC DCS Pre-commissioning Final system.](https://reader030.fdocuments.net/reader030/viewer/2022012916/55144f27550346284e8b5041/html5/thumbnails/12.jpg)
22. January 2007 U. Frankenfeld 12
Temperature monitoring
![Page 13: 22. January 2007U. Frankenfeld1 TPC DCS Pre-commissioning Final system.](https://reader030.fdocuments.net/reader030/viewer/2022012916/55144f27550346284e8b5041/html5/thumbnails/13.jpg)
22. January 2007 U. Frankenfeld 13
History
![Page 14: 22. January 2007U. Frankenfeld1 TPC DCS Pre-commissioning Final system.](https://reader030.fdocuments.net/reader030/viewer/2022012916/55144f27550346284e8b5041/html5/thumbnails/14.jpg)
22. January 2007 U. Frankenfeld 14
Trending
Δ T ~ 1K
![Page 15: 22. January 2007U. Frankenfeld1 TPC DCS Pre-commissioning Final system.](https://reader030.fdocuments.net/reader030/viewer/2022012916/55144f27550346284e8b5041/html5/thumbnails/15.jpg)
22. January 2007 U. Frankenfeld 15
Pre-commissioning Summary
• Cooling– Additional presure sensores -> Interlock
• Temperature Monitoring– Working
• LV– Pl500 F8 used +ok
• HV– Control software for Iseg: ok– Combination PS – Chamber with serial resistor
• FEE -> next talk– Connection Intercom Layer -> PVSS installed
• Needs to be tested and debugged
![Page 16: 22. January 2007U. Frankenfeld1 TPC DCS Pre-commissioning Final system.](https://reader030.fdocuments.net/reader030/viewer/2022012916/55144f27550346284e8b5041/html5/thumbnails/16.jpg)
22. January 2007 U. Frankenfeld 16
Pre-commissioning Summary
• VHV– ok
• Laser– Laser control and tracker used– Frame grabber for cameras– Mirror control tested
• Gas system– Operated very well– Updates/bug fixes during pre-commissioning
• Drift Velocity Monitor– Put in operation
• Pulser PS– Operated manually
• Next step– Installation + Commissioning
![Page 17: 22. January 2007U. Frankenfeld1 TPC DCS Pre-commissioning Final system.](https://reader030.fdocuments.net/reader030/viewer/2022012916/55144f27550346284e8b5041/html5/thumbnails/17.jpg)
And
réA
ugustinus
Ca
vern
Insid
e m
agne
tC
ountin
g room
CR4-Z08
UX-C/D
CR4-Z08
CR4-Z08
ACC
UX-A,B,C
CR4-Y08
Chambers
ISEG
PVSS II PVSS II
Chambers
Wiener
Ethernet
User interface
Database(s)
RCU
OPCclient
DIMclient
108288
PVSS II
Chambers,detector
ELMB
2..4
500
PVSS II
HVrod
Heinzinger
1
High Voltage Low Voltage FEETemp. Monitor Very High Voltage
TPC(1)
C E
HV LV
E
C
HV
S
[FSM?]C
on
tro
l ro
om
(A
CR
)06/03/13
Ethernetswitch
E
E
DIMsrv
DD
L
HVrod
ELMB
12
VHV Curr. Monitor
C
CR3
PCI-CAN
ISEG OPCserver
PVSS IIOPC client
1
ACC1
CR3
Wiener OPCserver
PVSS IIOPC client
CR3
PCI-CAN
ELMB OPCserver
PVSS IIOPC client
18
18
CR3
[FE
D] DIMserver
DIMclient
CR3
PVSS IIDIMclient
10
216
1ACC
1
2
UX-C08/D16
Chambers
Gatingpulser
72
Calibr.pulser
CR3
PVSS IIVirtual Serial
Eth.-RS232
E
PS
2
Pulser system
216
PLC1
Modbus/TCP
E
2 6
12
![Page 18: 22. January 2007U. Frankenfeld1 TPC DCS Pre-commissioning Final system.](https://reader030.fdocuments.net/reader030/viewer/2022012916/55144f27550346284e8b5041/html5/thumbnails/18.jpg)
And
réA
ugustinus
Ca
vern
Insid
e m
agne
tC
ountin
g room
LHutLHut
LHut
CR3
[Mot
ion]
[Las
er]
CR3
SG2
CR5
SG2
CR3
UX-CUX-C
Ethernet
TPC(2)
VHV rod Cooling
ThermalScreen(s)
PLC
18?
Thermal Screen(s)Laser calibration system.
Mirrorcontrol
Videocameras
Gas system
PLC
Gas
E
HVrod
4
CoolingPlant (TS)
Detector
PVSS IIDIP
[TS/CV][GWG]
CoolingPlant (ch)
PLC
Chamber Cooling
E
Chambers,detector
40
PVSS IIModbus/TCP
TS/CVSCADA
1 1
Gas
CR3
[Vis
ion] DIMserver/
filesystemVideo In
CR3
PVSS IIDIMclient
Eth.-RS232
DIMserver
virtual serial
Mirror adj.
Mirror adj.
Spectronlaser
E
Video
Drift velocity mon.
SG2
PVSS II
RS
232
DIM
clie
ntHeinzinger
Analysis
DIMsrv
GasPVSS
Trig Board(STAR)
06/03/13
![Page 19: 22. January 2007U. Frankenfeld1 TPC DCS Pre-commissioning Final system.](https://reader030.fdocuments.net/reader030/viewer/2022012916/55144f27550346284e8b5041/html5/thumbnails/19.jpg)
GasD
CrateOROC
HV
IROC MISC
Ch.......
ROC LASERTEMPFC
TPC
GPulser
VHVRCool
Ch.......
Ch.......
Ch
TSen
Gating
PS
Ch
CalibP
....... .......
.......
CPulser
Ch
PS
Ch....... .......
Screen
SSW Cone
LaserC
PS Calib
MirrorC
Image Mirror
36x (2x) 36x 10x 98x ??x 72x ??x
+500x
GasD CO2 ROC
Detector
Hierarchy overview
GAS
D mon
FERO
ESC
ECoolLVFED
RCU.......
6x
ESC
.......36x
…
![Page 20: 22. January 2007U. Frankenfeld1 TPC DCS Pre-commissioning Final system.](https://reader030.fdocuments.net/reader030/viewer/2022012916/55144f27550346284e8b5041/html5/thumbnails/20.jpg)
GasD
Prototype
Prototype inprogress
CrateOROC
HV
IROC MISC
Ch.......
ROC LASERTEMPFC
TPC
GPulser
VHVRCool
Ch.......
Ch.......
Ch
TSen
Gating
PS
Ch
CalibP
....... .......
.......
CPulser
Ch
PS
Ch....... .......
Screen
SSW Cone
LaserC
PS Calib
MirrorC
Image Mirror
36x (2x) 36x 10x 98x ??x 72x ??x
+500x
GasD CO2 ROC
Detector
Hierarchy overview
GAS
D mon
FERO
ESC
ECoolLVFED
RCU.......
6x
ESC
.......36x
…