21113 M-00-d07 Urs Hot Water Generator ( 10 m3)-r0

13
SPECTRUM Client: M/s NAVIN FLUORINE INTERNATIONAL LTD HOT WATER GENERATOR (10M 3 ) MANUFACTURING PLANT NO.2 AT DEWAS TECHNICAL SPECIFICATION

description

URS for hot water generator in a project in Indore India

Transcript of 21113 M-00-d07 Urs Hot Water Generator ( 10 m3)-r0

  • SPECTRUM

    Client: M/s NAVIN FLUORINE INTERNATIONAL LTD

    HOT WATER GENERATOR (10M3)

    MANUFACTURING PLANT NO.2 AT DEWAS

    TECHNICAL SPECIFICATION

  • TECHNICAL SPECIFICATION

    HOT WATER GENEARTOR ( 10 M3/HR) PROJECT NO 21113 REVISION NO 00

    DOCUMENT NO M-00-D07 PAGE NO . PAGE1 OF 12

    File Location

    Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Hot Utilities system\21113 M-00-D07 URS HOT WATER GENERATOR ( 10 m3)-R0.docx

    Format No: SOP/ENG/005/02 Rev. 00 01/01/2013

    REVISION HISTORY

    REVISION EFFECTIVE DATE REASON FOR REVISION 00 02-01-2014 FIRST ISSUE

  • TECHNICAL SPECIFICATION

    HOT WATER GENEARTOR ( 10 M3/HR) PROJECT NO 21113 REVISION NO 00

    DOCUMENT NO M-00-D07 PAGE NO . PAGE2 OF 12

    File Location

    Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Hot Utilities system\21113 M-00-D07 URS HOT WATER GENERATOR ( 10 m3)-R0.docx

    Format No: SOP/ENG/005/02 Rev. 00 01/01/2013

    TABLE OF CONTENTS

    1.0 APPROVAL SIGNATURES 3 2.0 OVERVIEW 4 3.0 INSPECTION, TESTING AND DISPATCH 4 4.0 DRAWINGS & DOCUMENTS 5 5.0 PACKING 5 6.0 SPARES 6 7.0 DATASHEET 6

  • TECHNICAL SPECIFICATION

    HOT WATER GENEARTOR ( 10 M3/HR) PROJECT NO 21113 REVISION NO 00

    DOCUMENT NO M-00-D07 PAGE NO . PAGE3 OF 12

    File Location

    Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Hot Utilities system\21113 M-00-D07 URS HOT WATER GENERATOR ( 10 m3)-R0.docx

    Format No: SOP/ENG/005/02 Rev. 00 01/01/2013

    1.0 APPROVAL SIGNATURES

    This document is prepared by the SPCPL team for the project of NAVIN FLUORINE INTERNATIONAL LIMITED, DEWAS under the authority of their Project Manager. Hence this document before being effective shall be approved by the QA team of NAVIN FLUORINE INTERNATIONAL LIMITED, DEWAS, and authorized by the appropriate Project Authority.

    SPCPL

    Name Designation Signature Date

    Prepared By Rajesh Yerawar Sr. Executive - Mechanical

    Checked By Akhilesh Verma Manager - Mechanical

    Approved By Sanjay Katkade GM-Engineering

    CLIENT

    Name Designation Signature Date

    Approved By

    Authorized By

  • TECHNICAL SPECIFICATION

    HOT WATER GENEARTOR ( 10 M3/HR) PROJECT NO 21113 REVISION NO 00

    DOCUMENT NO M-00-D07 PAGE NO . PAGE4 OF 12

    File Location

    Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Hot Utilities system\21113 M-00-D07 URS HOT WATER GENERATOR ( 10 m3)-R0.docx

    Format No: SOP/ENG/005/02 Rev. 00 01/01/2013

    2.0 OVERVIEW

    2.1 PROJECT INTRODUCTION

    Navin Flourine International Limited has envisioned setting up an Manufacturing plant No.2 facility at Dewas along with the necessary utilities Nearest railway station : DEWAS Nearest airport : INDORE Ambient conditions:

    Summer ( DB / WB / % RH) 40 C / 24.4 C / 28 % Monsoon ( DB / WB / % RH) 28 C / 26 C / 82 % Winter ( DB / WB / % RH) 10 C / 5.6 C / 50 %

    2.2 PROJECT STANDARD

    The design, manufacturing, testing at factory of Hot Water Generator shall comply with the latest applicable standards.

    3.0 INSPECTION, TESTING AND DISPATCH

    The Hot water Generator will be subjected to inspection at manufacturers works in the presence of purchaser/consultant. During inspection following routine tests shall be carried out:

    Visual inspection for workmanship and verification with respect to specifications. Mechanical operation of valves etc. Functional test for control circuits. Tightness of screwed/bolted connections

    The vendor shall supply to purchaser 3 sets of the certificates of Internal routine tests.

  • TECHNICAL SPECIFICATION

    HOT WATER GENEARTOR ( 10 M3/HR) PROJECT NO 21113 REVISION NO 00

    DOCUMENT NO M-00-D07 PAGE NO . PAGE5 OF 12

    File Location

    Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Hot Utilities system\21113 M-00-D07 URS HOT WATER GENERATOR ( 10 m3)-R0.docx

    Format No: SOP/ENG/005/02 Rev. 00 01/01/2013

    4.0 DRAWINGS & DOCUMENTS Vendor to submit following Drawing & Documents at various stages.

    4.1 Drawings (3 Sets) - GA Drawings, Engineering Drawings (For approval, Approved, As built, As installed) - Electrical Circuit Diagrams - System schematics

    4.2 Manuals and Procedures (3 Sets) - Operation and Maintenance manuals - Specialized procedures, if applicable (such as Calibration, Cleaning, etc.) - Specifications and sources of some important materials, if applicable (such as lubricants,

    cleaning agents, etc.) 4.3 Lists (3 Sets)

    - Equipment and Instrument list with component descriptions - Electrical component parts list with descriptions - Spare parts list with appropriate identification nos., if any - Change parts list with appropriate identification nos., if any

    4.4 Factory Acceptance Test Certificates (3 Sets) - Detailed list of modifications after contract &/or in final approved design - Material specifications and test certificates - Instrument Calibration certificates - Functional/ Factory acceptance certificates (such as weld inspection, passivation, pressure/

    vacuum holds, etc.) - Warranty certificates - Surface finish test reports - Food grade material certificate

    4.5 Site Acceptance Test (3 Sets) - Operational Qualification Protocol

    5.0 PACKING

    Equipment shall be dispatched to site packed in full wooden case (Sea Worthy). It shall be wrapped in polythene sheets before putting in cases and it shall be ensured that damage to the equipment does not occur during handling/transportation. Lifting hooks shall be provided for unloading at site.

  • TECHNICAL SPECIFICATION

    HOT WATER GENEARTOR ( 10 M3/HR) PROJECT NO 21113 REVISION NO 00

    DOCUMENT NO M-00-D07 PAGE NO . PAGE6 OF 12

    File Location

    Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Hot Utilities system\21113 M-00-D07 URS HOT WATER GENERATOR ( 10 m3)-R0.docx

    Format No: SOP/ENG/005/02 Rev. 00 01/01/2013

    6.0 SPARES

    Commissioning Spares - The vendors shall include in the quoted price sufficient quantities of commissioning spares required for erection and commissioning of the equipment. These shall include such items as Bolts and other miscellaneous parts. Essential Spares - The vendor shall supply spares required for two years trouble free operation & furnish list of spare considered with offer.

    7.0 DATASHEET

    SR. NO. DESIGN PARAMETERS REQUIRED SPECIFICATIONS

    1 GENERAL Tag No. HW-101

    a Type Plate type Heat Exchanger with inbuilt condensate recovery unit

    b Hot Water Application For process / in reactor jacket c Capacity 100,000 kcal/hr d Qty. 01 Nos. (1 Working ) e Hot Water flow required 10 m3/hr

    f Cold water inlet temp. 75 deg C (At the first startup of system, temp. would be 30 deg C)

    g Hot Water outlet temp. 85 deg C h Steam pressure available 3.5 Kg/cm2 i Input Water quality Soft water j Electrical supply 230 V / 1 phase + N / 50 Hz /AC k Steam Consumption Vendor to specify l Model No. Vendor to specify

    m Design Code Vendor to specify

  • TECHNICAL SPECIFICATION

    HOT WATER GENEARTOR ( 10 M3/HR) PROJECT NO 21113 REVISION NO 00

    DOCUMENT NO M-00-D07 PAGE NO . PAGE7 OF 12

    File Location

    Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Hot Utilities system\21113 M-00-D07 URS HOT WATER GENERATOR ( 10 m3)-R0.docx

    Format No: SOP/ENG/005/02 Rev. 00 01/01/2013

    SR. NO. DESIGN PARAMETERS REQUIRED SPECIFICATIONS

    2 Plate type Heat Exchanger

    a Make Alfa laval / Tranter / IDMC/Spirex b Model No. Vendor to specify

    c Type Semi welded type d Utility

    Type Steam @ 3.5 kg/cm2 (g)

    Flow Rate (kg/hr) Vendor to specify

    Pressure Drop (kg/cm2(g)) 0.1 e Process

    Type Water

    Inlet Temp(C) 75C (At the first startup of system, temp. would be 30 deg C)

    Outlet Temp(C) 85C

    Inlet Nozzle Size(NB) Vendor to specify

    Outlet Nozzle Size ( NB) Vendor to specify

    Pressure Drop (Kg/cm2)(g) Vendor to specify f End Connection ANSI B 16.5, 150# g Heat Transfer Area (m2) Vendor to specify h No. of Plates Vendor to specify

    i Plate Thickness Vendor to specify

    j MOC

    Plate SS 304

    Gasket EPDM Clip on type

    End Plates IS 2062

    Studs & Bolts IS1367

    Tie Rods & Bolts IS1367

  • TECHNICAL SPECIFICATION

    HOT WATER GENEARTOR ( 10 M3/HR) PROJECT NO 21113 REVISION NO 00

    DOCUMENT NO M-00-D07 PAGE NO . PAGE8 OF 12

    File Location

    Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Hot Utilities system\21113 M-00-D07 URS HOT WATER GENERATOR ( 10 m3)-R0.docx

    Format No: SOP/ENG/005/02 Rev. 00 01/01/2013

    SR. NO. DESIGN PARAMETERS REQUIRED SPECIFICATIONS

    Upper & Lower SS 304

    Carrying Bar SS 304

    3 Steam Control Valve

    a Type PID Based Pneumatic / Electrical actuated globe valve with Positioner b Make Vendor to specify

    c MOC

    Body CS (CARBON STEEL)

    Trim SS 410

    Packing PTFE

    Size (NB) Vendor to specify d End Connection ANSI B 16.5, 150#

    4 On Off Valve Pneumatic /Electrical actuated valve with on- off Controller a Type Globe type b Make Vendor to specify

    c MOC

    Body CS (CARBON STEEL)

    Piston SS 410

    Packing PTFE

    Size (NB) Vendor to specify d End Connection ANSI B 16.5, 150# 5 Safety Valve

    a Type Spring loaded type with Screwed End BSPT b Make Vendor to specify

    c Model Vendor to specify

    d MOC

  • TECHNICAL SPECIFICATION

    HOT WATER GENEARTOR ( 10 M3/HR) PROJECT NO 21113 REVISION NO 00

    DOCUMENT NO M-00-D07 PAGE NO . PAGE9 OF 12

    File Location

    Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Hot Utilities system\21113 M-00-D07 URS HOT WATER GENERATOR ( 10 m3)-R0.docx

    Format No: SOP/ENG/005/02 Rev. 00 01/01/2013

    SR. NO. DESIGN PARAMETERS REQUIRED SPECIFICATIONS

    Body Vendor to specify

    Seat Vendor to specify

    Spring Vendor to specify e Bonnet closed

    f Cap Screwed g Size (NB)

    Inlet (mm) Vendor to specify

    Outlet (mm) Vendor to specify h Range (Psi) Vendor to specify i Back pressure Atmospheric 6 Steam Inlet Valve

    a Type Piston Valve ASTM A 105 with SS internal b Make Vendor to specify

    c MOC

    Body CS (CARBON STEEL)

    Piston BS 3605 304 S18 (SS 304)

    Packing SS reinforce Graphite d Inlet valve Size (NB) Vendor to specify e End connections ANSI B 16.5, 150# 7 Strainer

    a Type Y Type

    b Make Vendor to specify

    c MOC

    Body CS (CARBON STEEL)

    Element SS Perforated sheet & SS 304 Wire Mesh d Mesh 20 Mesh

  • TECHNICAL SPECIFICATION

    HOT WATER GENEARTOR ( 10 M3/HR) PROJECT NO 21113 REVISION NO 00

    DOCUMENT NO M-00-D07 PAGE NO . PAGE10 OF 12

    File Location

    Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Hot Utilities system\21113 M-00-D07 URS HOT WATER GENERATOR ( 10 m3)-R0.docx

    Format No: SOP/ENG/005/02 Rev. 00 01/01/2013

    SR. NO. DESIGN PARAMETERS REQUIRED SPECIFICATIONS

    e Size (NB) Vendor to specify f End connections Flange End type ANSI 16.5,150# 8 Moisture Separator With Steam Trap

    a Type Impingement plate type b Make Vendor to specify

    c Model Vendor to specify

    d MOC CS (CARBON STEEL)

    Size (NB) Vendor to specify e End connections Flanged to BS 10 Table H (ANSI B 16.5, 150#) 9 Pressure Gauges

    a Type Bourdon gauge b Make Vendor to specify

    c Dial size (mm) 150 d Range (Kg/cm2 (g)) 0 - 6 e End connections BSPT (M) f MOC

    Bourdon SS 304

    Connection & Movement SS 304

    Case SS 304

    Syphon SS 304

    g Accessories

    Syphon Pig tail, BSPT (M)

    Isolation valve Piston valve, Globe type BSPT 10 Pumping Trap

    a Type Float type pumping trap b Make Vendor to specify

  • TECHNICAL SPECIFICATION

    HOT WATER GENEARTOR ( 10 M3/HR) PROJECT NO 21113 REVISION NO 00

    DOCUMENT NO M-00-D07 PAGE NO . PAGE11 OF 12

    File Location

    Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Hot Utilities system\21113 M-00-D07 URS HOT WATER GENERATOR ( 10 m3)-R0.docx

    Format No: SOP/ENG/005/02 Rev. 00 01/01/2013

    SR. NO. DESIGN PARAMETERS REQUIRED SPECIFICATIONS

    c Model Vendor to specify

    d Back Pressure (kg/cm2(g) Vendor to specify e Trapping capacity (kg/hr) Vendor to specify f MOC

    Body IS 2062

    Float Assembly SS 304

    Studs & Nut IS 1367/A193/A194

    Gaskets Asbestos free

    Condensate valve Piston Valve - (ASTM A 105) with SS internal

    Strainers Y type (ASTM A 105) with SS Perforated sheet & wire mesh

    Motive steam inlet valve Piston Valve (ASTM A 105) with SS internal

    Steam trap Thermodynamic type - (ASTM A 105) with SS internal

    Check Valve Disc check Valve- (ASTM A 105) with SS internal g Nozzle Size (NB)

    Condensate Outlet Vendor to specify

    Drain Vendor to specify

    h End connections Flanged to ANSI B 16.5, 150# 11 Piping

    a Make Jindal / Tata b MOC SA 106 Gr.B

    12 Bolts & Nuts

    a Bolts A 193 Gr B7 b Nuts A 194 Gr 2H

  • TECHNICAL SPECIFICATION

    HOT WATER GENEARTOR ( 10 M3/HR) PROJECT NO 21113 REVISION NO 00

    DOCUMENT NO M-00-D07 PAGE NO . PAGE12 OF 12

    File Location

    Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Hot Utilities system\21113 M-00-D07 URS HOT WATER GENERATOR ( 10 m3)-R0.docx

    Format No: SOP/ENG/005/02 Rev. 00 01/01/2013

    SR. NO. DESIGN PARAMETERS REQUIRED SPECIFICATIONS

    13 Temp Controller

    a Make Radix

    b Range Vendor to specify c Model Vendor to specify

    14 Overall Dimensions (L x W x H) Vendor to specify

    15 Accessories

    a Piping with skid To include b Necessary Blind plugs To include

    c Cabling with skid To include

    d Electrical panel To include

    e Insulator with Claddingwithin skid To include

    f Ethernet port for communication with DCS To include