210 MW Boiler Construction 1

14
MAHAGENCO Presentation on 210 MW Boiler Construction Presented by Uddhao G. Manapure K-57, Batch Koradi Training Centre Koradi

Transcript of 210 MW Boiler Construction 1

Page 1: 210 MW Boiler Construction 1

MAHAGENCO

Presentation on

210 MW Boiler Construction

Presented by

Uddhao G. Manapure

K-57, Batch

Koradi Training Centre

Koradi

1. INTRODUCTION

Page 2: 210 MW Boiler Construction 1

Boiler is any closed vessel exceeding 22.75 liters in capacity used for

steam generation under pressure. First boiler was developed in 1725 and its

working pressure was 6 to 10 kg/cm2 and was called Wagon Boiler

There are mainly two types of Boilers

1. Fire Tube Boiler

2. Water tube Boiler

The boiler used for generation of power is somewhat different in construction than the

boilers used in other industrial applications. The boiler used for power generation is constructed

by the four walls called water walls. These walls are made up of long tubes called water wall

tubes through which water flows and the combustion of fuel takes place inside the boiler. The

flue gases so formed passes through two passes of the boiler.

1. First Pass

2. Second Pass

Boiler used in Thermal Power Plant are again subdivided into

1. Natural Circulation

2. Forced Circulation - operating pressure approaches

to critical pressure

According to working pressure

1. Sub critical Pressure Boiler: - working press. Range 130 to 180 kg/cm2

2. Critical Pressure Boiler: - pressure 221.2 kg/cm2

3. Supercritical pressure Boiler or Once Through Boiler: - working pressure

240 kg/cm2

Boiler design Considerations:-

Following factors are taken into consideration:-

Page 3: 210 MW Boiler Construction 1

Lowest capital cost, easy in construction, simplicity safety, good working condition, easy in maintenance.

Availability of auxiliaries Efficient operation, effective for heat transfer well insulate of casings, ability to deliver

pure steam with effective drum internals, to genrate steam of full capacity.

1.1 Boiler Construction :-

Main parts of Boiler used in Thermal power plant1) Boiler Drum2) Down corners3) Water wall4) Furnace

Superheater

5) Primary Superheater6) Platen superheater7) Final Superheater8) Reheater9) Economizer10) Burners11) Ignitors12) Windbox 13) Soot Blowers

The flue gas formed by combustion of a fuel in the furnace passes through two passes

I) First PassII) Second Pass

First pass consist of

1) Furnace water wall2) Platen super heater3) Reheater4) Water wall screen tubes

Second pass consist of

1) Final super heater2) LTSH3) Economizer

After second pass flue gases flows through air preheater where it gives heat to air then passes through ESP & blown out to atmosphere through chimney.

1.1.1. Boiler Drum :-

Page 4: 210 MW Boiler Construction 1

1) Drum is a pressure vessel2) It is made of special carbon steel plate

Material of SA-299 grade A1 Or SA- 515 Grade 70Plates thickness having 132 mm

3) The function of Boiler Drum is to separate water & steam from the mixture generated in the furnace wall.

4) It also provides a water storage for preventing the starvation of tubes.

Parts :-

1) Turbo separator 2) Screen dryer3) Feed pipe4) Baffle Plate5) Drum level gauge (lower)6) Riser tube (Water walls Tubes) i.e 6 x 23 rows on drum7) Chemical dosing pipe8) Main hole & main hole cover9) Safety Valve10) Sampling line11) Vents

Technical specification of 210 MW boiler drum is given below.Length 15700 mmWeight 123 TonnesInternal Diameter 1676 mmOutside Diameter 1942 mmThickness of Metal 132 mmMaterial Carbon Steel SA 515 Gr. 70 or S.A. 299 A1Pressure in Drum 149.7 Kg. /cm2 (LMW Unit)

168 Kg. /cm2 (KWU Unit)

Total Number of Turboseprater in each row 50

Location :-

Boiler drum is located at height of 53 Mtr. from a ground level. The main supporting structure of a boiler consist of 18 main column & 12 auxilary column. The main columns supported the main boiler components.

1.1.2 Down comers

Page 5: 210 MW Boiler Construction 1

1) There are 6 to 8 down comer from drum and are jointed to ring headers to provide water to water walls.

2) The Two down comers joined to Platen water wall header.

3) platter water wall header are not provided to every boiler.

Rear

Left Right

Front

1) Two down comer – to front side of Bottom Ringheader2) Two down comer - to rear side of Bottom Ringheader3) One down comer – to left side of Bottom Ringheader4) One down corner – To right side of Bottom Ringheader5) Two down comer – Tow water wall platen inletheader.

1.1.3 Water walls

1) Water wall tubes also called as riser tubes.

2) furance made up of 4 water walls

I) front water wall

II) LHS water wall

III) rear water wallIV) RHS water wall

I) Front water wall :- Connection’s made up of water tubes from the front portion of Bottom Ringheader to

front top header are shown.

1) Platen water walls :- There are four platen water walls located at the top of the combustion chamber to

increase the heating surface without increasing the volume of the boiler furnace.2) L.H.S. water walls :-

The left side water wall connections from Bottom Ringheader to left top headers as shown.

3) R.H.S. Water walls :-The right side water wall connections from the right portion of bottom ring headers to the right top header as shown.

Bottom Ringheader

Page 6: 210 MW Boiler Construction 1

4) The rear water wall :- Connection’s from bottom ring headers to rear top headers as shown.

About 60% rear water wall tubes form goose neck and are connected to the rear top most header. A goose neck helps in maintaining a better distribution of the flue gas steam in the transition zone i.e. In between first & second pass.

And about 30% of rear water wall tubes go straight to the top rear header which is exactly above the rear portion of the Ringheader.

About 10% of the water wall tube from rear side rear side bottom Ringheader are connected to the extended water wall inlet headers located below the goose neck.

From the extended water wall inlet headers water gooses to righ & Left top headers

Riser tube connection from boiler top header to drum are shown there are 6 x 23 rows of riser tube connection’s on the drum as shown, in fig

The fig. shows the complete assembly ofa) Water walls from bottom ring headers to top headers.b) Riser tube connections from top header’s to drum as shown in fig.

1.1.4 Furnace :- The tall rectangular raident type furnace or used in modern design of pulverized fuel

boiler.

Height of modern boiler is increased to lower gas temp & reduced sagging.

Furnace is of two passes

In front pass combustion of fuel takes place & hence this is the most hot zone of the

boiler called is firing zones.

The temp of firing zone is about 12000c to 14000c this type of furnace is called water

cooled furnace

After second pass flue gases passess through Air Preheater where it gives heat to air then

passes through ESP and blown out to atmosphere through chimney.

Page 7: 210 MW Boiler Construction 1
Page 8: 210 MW Boiler Construction 1

Superheaters:-

1.1.5 1) primary super Heater (LTSH)

Steam from drum comes to LTSH, It has two stages i) Upper bank & Lower bank Each bank has 134 assemblies of pitch 102 mm Material of the tubes are SA 209 T, SA 210 Gr. A, SA 213 T11 Size of the tubes is 44.5 x 4.5 mm Temprerature with standing range 4500c to 4800c

1.1.6 2) Platen superheater :- (Radient superheather)

Steam from LTSH comes to platen superheater It is situated in furnace vertically. It has 29 assemblies having pitch of 457 mm Material of the tube is alloy steel SA 213 T11

SA 213 T22 Size of the tubes are 51 x 7.1 mm

& 51 x 8.6 mm

1.1.7 3) Final superheaters:-

It is situated vertically behind reheater having 119 assemblies at a pitch of 114 mm Size of tubes 51 x 7.6 mm Final superheater tubes are made up of SA 213 T22 alloy steel This material can with stand temperature upto 5800c

1.1.8 REHEATER :-

Reheater is located behind the platen superheater. It is Two parts front & rear Front reheater has 59 assemblies at a pitch of 229 mm & Rear Reheater has 89 assemblies

at a pitch of 152mm Material of Tubes SA 213 T1 alloy steel. Tube size 54 x 3.6 mm Tube material can withstand temp. upto 5500c.

1.1.9 :- Economizer :-

It is located between LTSH & Air Preheaters in second pass of furnace. Feed water after HP Heater passes through economizer. After this it is goes to drum. Economizer is in two banks, lower banks & upear Bank It has 270 assemblies at a pitch of 102mm Material of tubes SA 210 Gr A1 Size of tubes 44.5 x 4.5 mm Tubes material can withstand tamp. Upto 450 0c

1.1.10 Burners & Igniters:-

Page 9: 210 MW Boiler Construction 1

Coal is used as primary fuel & oil is used as a secondary fuel during start up of boilers & for flame stability at loads & other transient operating conditions.

Burner is to automise fuel, penetrate & mixed with proper proportions for complete combustion.

Burner are stituated at 3 elevation’s called AB,CD & EF At every there are four burners. Fo/LSHS can be fired at all elevations but LDO can be taken at AB elevation’s only

startup of boiler. For every burner weather LDO/FO there is one igniter to ignite the burner. Now igniter’s are being changed from HSD/LDO to HEA (High energy arc igniters,

purly electrical)

1.1.11 wind box :- The wind box is situated at 11mtr level of boiler it is in two parts. One is in LHS &

other is in RHS of Boiler. There are thirteen compartments in it on each corners out of which

1) 3 for oil burners2) 6 for coal mills.3) 4 for auxiliary air.

These compartment are connected to burner tilt mechanism which is operated +/-30 as per require according to final temp of steam.

The secondary air after Airpreheater come to windbox and is given to furnace along with fuel for complete combustion.

1.1.12 Soot blowers :- About 78 soot blowers are provide at different zones to remove the accumulated

soot on boiler tubes for effective heat transfer.

Types of soot blower :-Water wall soot Blowers :-

There are situated on the furnace & are 56 in no’s These are driven by electric motors. Super heated steam is blown through them to clean the disignated area of the water

wall. Two soot blower’s are located on air heater’s to clean the basket’s of A.H. Steam from PRDS is taken for this purpose.

LRSB :-

Long retractable soot blower’s are 20 in nos. These are used to clean S.H. & R.H. & are located in 2nd pass of the furnace.

Page 10: 210 MW Boiler Construction 1
Page 11: 210 MW Boiler Construction 1