21 Century School Buildings Plan€¦ · Review Meeting #1 Meeting #2 Meeting #3 Meeting #4 1....

38
Community Meeting: “Design Development” | Frederick | October 28, 2015 | www.baltimore21stcenturyschools.org 1 21 st Century School Buildings Plan SCHOOL Calvin Rodwell School COMMUNITY MEETING 95% Feasibility Study | February 17, 2016

Transcript of 21 Century School Buildings Plan€¦ · Review Meeting #1 Meeting #2 Meeting #3 Meeting #4 1....

Page 1: 21 Century School Buildings Plan€¦ · Review Meeting #1 Meeting #2 Meeting #3 Meeting #4 1. Review process 2. Learn key terms 3.Interactive activity 1. Explore essential elements

Community Meeting: “Design Development” | Frederick | October 28, 2015 |

www.baltimore21stcenturyschools.org1

21st Century School Buildings PlanSCHOOL Calvin Rodwell SchoolCOMMUNITY MEETING 95% Feasibility Study | February 17, 2016

Page 2: 21 Century School Buildings Plan€¦ · Review Meeting #1 Meeting #2 Meeting #3 Meeting #4 1. Review process 2. Learn key terms 3.Interactive activity 1. Explore essential elements

Introductions and Agenda

Timeline

Previous Meeting Summary

Review Feasibility Discussion • Changes from 50% submission• Pros/Cons

Next Steps

Karen Summerville Communication Coordinator21st Century School Buildings Program

Alice Burley Project Manager, Feasibility Study21st Century School Buildings Program

Meredith Sullivan Architect Design Collective

Introductions Agenda

2Community Meeting: 95% Feasibility Study Review | Calvin Rodwell | February 17, 2016 | www.baltimore21stcenturyschools.org

Page 3: 21 Century School Buildings Plan€¦ · Review Meeting #1 Meeting #2 Meeting #3 Meeting #4 1. Review process 2. Learn key terms 3.Interactive activity 1. Explore essential elements

Design

3

Summary of Activities: Timeframe

July 2015 - May 2016

Planning Construction Occupancy

18-24 Months 18-24 Months

Timeline/Process

Community Meeting: 95% Feasibility Study Review | Calvin Rodwell | February 17, 2016 | www.baltimore21stcenturyschools.org

Page 4: 21 Century School Buildings Plan€¦ · Review Meeting #1 Meeting #2 Meeting #3 Meeting #4 1. Review process 2. Learn key terms 3.Interactive activity 1. Explore essential elements

4

Planning: 6-8 Months

Essential Elements

50% Feasibility

Feasibility Review

Meeting #1 Meeting #3 Meeting #4Meeting #2

1. Review process

2. Learn key terms

3.Interactive activity

1. Explore essential

elements of design

1. Review site & building

options

2. Provide feedback

1. Make recommendation

on building option

Educational Specification & Feasibility StudyPlanning

Jan 14, 2014 June 15 & Oct. 1, 2015 November 10, 2015

Community Meeting: 95% Feasibility Study Review | Calvin Rodwell | February 17, 2016 | www.baltimore21stcenturyschools.org

Page 5: 21 Century School Buildings Plan€¦ · Review Meeting #1 Meeting #2 Meeting #3 Meeting #4 1. Review process 2. Learn key terms 3.Interactive activity 1. Explore essential elements

Overview

6 Pre K and kindergarten classes 2 music rooms

6 classes for grades 1 and 2 1 art room

9 classes for grades 3, 4, and 5 1 culinary arts classroom

9 classes for grades 6, 7, and 8 Media center/video studio

5 collaborative learning areas Cafeteria

3 special education classrooms Gymnasium/Fitness Room

1 elementary science room Administrative, Health Suites

1 middle school science room Student services

1 technical education room Community Space

5

Calvin Rodwell Classrooms and Spaces

Community Meeting: 95% Feasibility Study Review | Calvin Rodwell | February 17, 2016 | www.baltimore21stcenturyschools.org

Page 6: 21 Century School Buildings Plan€¦ · Review Meeting #1 Meeting #2 Meeting #3 Meeting #4 1. Review process 2. Learn key terms 3.Interactive activity 1. Explore essential elements

6

Feasibility Study

1. Review existing conditions:

• Is the building structurally sound?

• What is the condition of the mechanical, electrical and plumbing

systems? Does the building meeting current building and ADA codes?

• Do the educational spaces serve the programmatic needs of the

students?

2. Provide design options to comply with the site specific educational

specification

3. Analyze options for compliance with educational specification and

construction phasing and logistics

Feasibility Study

Community Meeting: 95% Feasibility Study Review | Calvin Rodwell | February 17, 2016 | www.baltimore21stcenturyschools.org

Page 7: 21 Century School Buildings Plan€¦ · Review Meeting #1 Meeting #2 Meeting #3 Meeting #4 1. Review process 2. Learn key terms 3.Interactive activity 1. Explore essential elements

7

Existing Conditions

• Original Building Constructed in 1978

• Existing square footage is 41,932 SF (ed spec square footage deficient)

• 2-story masonry building with a partial lower level

• Not ADA compliant

• ‘Open space plan’ classroom configuration on upper level

Community Meeting: 95% Feasibility Study Review | Calvin Rodwell | February 17, 2016 | www.baltimore21stcenturyschools.org

Page 8: 21 Century School Buildings Plan€¦ · Review Meeting #1 Meeting #2 Meeting #3 Meeting #4 1. Review process 2. Learn key terms 3.Interactive activity 1. Explore essential elements

8

Existing PlanN

Community Meeting: 95% Feasibility Study Review | Calvin Rodwell | February 17, 2016 | www.baltimore21stcenturyschools.org

Page 9: 21 Century School Buildings Plan€¦ · Review Meeting #1 Meeting #2 Meeting #3 Meeting #4 1. Review process 2. Learn key terms 3.Interactive activity 1. Explore essential elements

9

Pedestrian CirculationN

Community Meeting: 95% Feasibility Study Review | Calvin Rodwell | February 17, 2016 | www.baltimore21stcenturyschools.org

Page 10: 21 Century School Buildings Plan€¦ · Review Meeting #1 Meeting #2 Meeting #3 Meeting #4 1. Review process 2. Learn key terms 3.Interactive activity 1. Explore essential elements

10

Vehicular CirculationN

Community Meeting: 95% Feasibility Study Review | Calvin Rodwell | February 17, 2016 | www.baltimore21stcenturyschools.org

Page 11: 21 Century School Buildings Plan€¦ · Review Meeting #1 Meeting #2 Meeting #3 Meeting #4 1. Review process 2. Learn key terms 3.Interactive activity 1. Explore essential elements

11

Option 1: Ground Floor Plan

Community Meeting: 95% Feasibility Study Review | Calvin Rodwell | February 17, 2016 | www.baltimore21stcenturyschools.org

Page 12: 21 Century School Buildings Plan€¦ · Review Meeting #1 Meeting #2 Meeting #3 Meeting #4 1. Review process 2. Learn key terms 3.Interactive activity 1. Explore essential elements

12

Option 1: First Floor Plan

Community Meeting: 95% Feasibility Study Review | Calvin Rodwell | February 17, 2016 | www.baltimore21stcenturyschools.org

Page 13: 21 Century School Buildings Plan€¦ · Review Meeting #1 Meeting #2 Meeting #3 Meeting #4 1. Review process 2. Learn key terms 3.Interactive activity 1. Explore essential elements

13

Option 1: Second Floor Plan

Community Meeting: 95% Feasibility Study Review | Calvin Rodwell | February 17, 2016 | www.baltimore21stcenturyschools.org

Page 14: 21 Century School Buildings Plan€¦ · Review Meeting #1 Meeting #2 Meeting #3 Meeting #4 1. Review process 2. Learn key terms 3.Interactive activity 1. Explore essential elements

14

Option 1: Ground Floor Plan

N

Community Meeting: 95% Feasibility Study Review | Calvin Rodwell | February 17, 2016 | www.baltimore21stcenturyschools.org

Page 15: 21 Century School Buildings Plan€¦ · Review Meeting #1 Meeting #2 Meeting #3 Meeting #4 1. Review process 2. Learn key terms 3.Interactive activity 1. Explore essential elements

15

Option 1: First Floor Plan

N

Community Meeting: 95% Feasibility Study Review | Calvin Rodwell | February 17, 2016 | www.baltimore21stcenturyschools.org

Page 16: 21 Century School Buildings Plan€¦ · Review Meeting #1 Meeting #2 Meeting #3 Meeting #4 1. Review process 2. Learn key terms 3.Interactive activity 1. Explore essential elements

16

Option 1: Second Floor Plan

N

Community Meeting: 95% Feasibility Study Review | Calvin Rodwell | February 17, 2016 | www.baltimore21stcenturyschools.org

Page 17: 21 Century School Buildings Plan€¦ · Review Meeting #1 Meeting #2 Meeting #3 Meeting #4 1. Review process 2. Learn key terms 3.Interactive activity 1. Explore essential elements

17

Option 1: ChangesPros & Cons

PROS CONS

• Preserves the existing building

• Creates many new classrooms clustered

around individual Collaborative Learning and

flexible areas

• Provides dedicated art, music, science and

technology classrooms

• Works well with existing grades

• Leaves room on the flatter portions of the

site for SWM.

• Provides a centralized, secured entrance to

the school

• Provides minimal separation of the middle

school and elementary school populations

• Would require a lengthy phased and

occupied renovation and addition project, if a

swing space is not available

• Parking lot would not increase in size

• Cafeteria would remain undersized

• Second floor layout in existing building is

inefficient due to existing building dimensions

• Requires relocation of sanitary connection,

fuel tanks and electrical transformer

• Does not meet all of the goals of the Ed.

Spec.

Community Meeting: 95% Feasibility Study Review | Calvin Rodwell | February 17, 2016 | www.baltimore21stcenturyschools.org

Page 18: 21 Century School Buildings Plan€¦ · Review Meeting #1 Meeting #2 Meeting #3 Meeting #4 1. Review process 2. Learn key terms 3.Interactive activity 1. Explore essential elements

18

Option 2: Ground Floor Plan

Community Meeting: 95% Feasibility Study Review | Calvin Rodwell | February 17, 2016 | www.baltimore21stcenturyschools.org

Page 19: 21 Century School Buildings Plan€¦ · Review Meeting #1 Meeting #2 Meeting #3 Meeting #4 1. Review process 2. Learn key terms 3.Interactive activity 1. Explore essential elements

19

Option 2: First Floor Plan

Community Meeting: 95% Feasibility Study Review | Calvin Rodwell | February 17, 2016 | www.baltimore21stcenturyschools.org

Page 20: 21 Century School Buildings Plan€¦ · Review Meeting #1 Meeting #2 Meeting #3 Meeting #4 1. Review process 2. Learn key terms 3.Interactive activity 1. Explore essential elements

20

Option 2: Second Floor Plan

Community Meeting: 95% Feasibility Study Review | Calvin Rodwell | February 17, 2016 | www.baltimore21stcenturyschools.org

Page 21: 21 Century School Buildings Plan€¦ · Review Meeting #1 Meeting #2 Meeting #3 Meeting #4 1. Review process 2. Learn key terms 3.Interactive activity 1. Explore essential elements

21

Option 2: ChangesPros & Cons

PROS CONS

• Preserves the existing building

• Creates many new classrooms clustered

around individual Collaborative Learning and

flexible areas

• Dedicated art, music, science and technology

classrooms

• Expanded cafeteria/kitchen

• Provides a centralized, secured entrance to

the school

• New entrance is more ADA friendly

• Works well with existing grades

• Leaves room on the flatter portions of the

site for SWM.

• Would allow for better after-hours separation

of core areas from classroom areas

• Provides minimal separation of the middle

school and elementary school populations

• Would require a lengthy phased and

occupied renovation and addition project, if a

swing space is not available

• Parking lot would not increase in size

• Requires relocation of sanitary connection

and fuel tanks

• Loss of mature trees on site

• Building is close to east property line and

existing church building

• Second floor layout in existing building is

inefficient due to existing building dimensions

Community Meeting: 95% Feasibility Study Review | Calvin Rodwell | February 17, 2016 | www.baltimore21stcenturyschools.org

Page 22: 21 Century School Buildings Plan€¦ · Review Meeting #1 Meeting #2 Meeting #3 Meeting #4 1. Review process 2. Learn key terms 3.Interactive activity 1. Explore essential elements

22

Option 3: Ground Floor Plan

Community Meeting: 95% Feasibility Study Review | Calvin Rodwell | February 17, 2016 | www.baltimore21stcenturyschools.org

Page 23: 21 Century School Buildings Plan€¦ · Review Meeting #1 Meeting #2 Meeting #3 Meeting #4 1. Review process 2. Learn key terms 3.Interactive activity 1. Explore essential elements

23

Option 3: First Floor Plan

Community Meeting: 95% Feasibility Study Review | Calvin Rodwell | February 17, 2016 | www.baltimore21stcenturyschools.org

Page 24: 21 Century School Buildings Plan€¦ · Review Meeting #1 Meeting #2 Meeting #3 Meeting #4 1. Review process 2. Learn key terms 3.Interactive activity 1. Explore essential elements

24

Option 3: Second Floor Plan

Community Meeting: 95% Feasibility Study Review | Calvin Rodwell | February 17, 2016 | www.baltimore21stcenturyschools.org

Page 25: 21 Century School Buildings Plan€¦ · Review Meeting #1 Meeting #2 Meeting #3 Meeting #4 1. Review process 2. Learn key terms 3.Interactive activity 1. Explore essential elements

25

Option 3: Third Floor Plan

Community Meeting: 95% Feasibility Study Review | Calvin Rodwell | February 17, 2016 | www.baltimore21stcenturyschools.org

Page 26: 21 Century School Buildings Plan€¦ · Review Meeting #1 Meeting #2 Meeting #3 Meeting #4 1. Review process 2. Learn key terms 3.Interactive activity 1. Explore essential elements

26

Option 3: ChangesPros & Cons

PROS CONS

• PreK/K classrooms are on the ground level

with direct access to play area

• Dedicate art, music, science and technology

classrooms

• Provides separation of the middle school and

elementary school populations by floor

• Provides new core areas within easy access of

all grade levels.

• Works well with existing grades

• Leaves room on the flatter portions of the

site for SWM

• Keeps 3-story portion of building along

Liberty Heights Avenue

• Provides a centralized, secured entrance to

the school

• Would require the use of a swing space to

relocate the entire school during construction

• Loss of mature trees on site

• Relocation of electrical transformer and fuel

tanks

• Gymnasium is not located near parking

• Security concern due to configuration of the

building

Community Meeting: 95% Feasibility Study Review | Calvin Rodwell | February 17, 2016 | www.baltimore21stcenturyschools.org

Page 27: 21 Century School Buildings Plan€¦ · Review Meeting #1 Meeting #2 Meeting #3 Meeting #4 1. Review process 2. Learn key terms 3.Interactive activity 1. Explore essential elements

27

Option 3B: Ground Floor Plan

Community Meeting: 95% Feasibility Study Review | Calvin Rodwell | February 17, 2016 | www.baltimore21stcenturyschools.org

Page 28: 21 Century School Buildings Plan€¦ · Review Meeting #1 Meeting #2 Meeting #3 Meeting #4 1. Review process 2. Learn key terms 3.Interactive activity 1. Explore essential elements

28

Option 3B: First Floor Plan

Community Meeting: 95% Feasibility Study Review | Calvin Rodwell | February 17, 2016 | www.baltimore21stcenturyschools.org

Page 29: 21 Century School Buildings Plan€¦ · Review Meeting #1 Meeting #2 Meeting #3 Meeting #4 1. Review process 2. Learn key terms 3.Interactive activity 1. Explore essential elements

29

Option 3B: Second Floor Plan

Community Meeting: 95% Feasibility Study Review | Calvin Rodwell | February 17, 2016 | www.baltimore21stcenturyschools.org

Page 30: 21 Century School Buildings Plan€¦ · Review Meeting #1 Meeting #2 Meeting #3 Meeting #4 1. Review process 2. Learn key terms 3.Interactive activity 1. Explore essential elements

30

Option 3B: Third Floor Plan

Community Meeting: 95% Feasibility Study Review | Calvin Rodwell | February 17, 2016 | www.baltimore21stcenturyschools.org

Page 31: 21 Century School Buildings Plan€¦ · Review Meeting #1 Meeting #2 Meeting #3 Meeting #4 1. Review process 2. Learn key terms 3.Interactive activity 1. Explore essential elements

31

Option 3B: ChangesPros & Cons

Community Meeting: “Feasibility Study Review” | Calvin Rodwell | February 17, 2016 | www.baltimore21stcenturyschools.org

PROS CONS

•Dedicate art, music, science and technology

classrooms

• Provides separation of the middle school and

elementary school populations by floor

• Provides new core areas within easy access of

all grade levels.

• Works well with existing grades

• Leaves room on the flatter portions of the

site for SWM

• Keeps 3-story portion of building along

Liberty Heights Avenue

• Provides a centralized, secured entrance to

the school

• Would require the use of a swing space to

relocate the entire school during construction

• Loss of mature trees on site

• Interfere with existing parking lot and does

not provide addition area for parking

• Relocation of electrical transformer and fuel

tanks

• Gymnasium is segregated from the other

activity programs

• Circulation to gymnasium is too long

• Gymnasium is not at the grade with the

exterior play area

• Security concern due to configuration of

the building

•Building addition is very close to property

line

Page 32: 21 Century School Buildings Plan€¦ · Review Meeting #1 Meeting #2 Meeting #3 Meeting #4 1. Review process 2. Learn key terms 3.Interactive activity 1. Explore essential elements

32

Option 4: First Floor Plan

Community Meeting: 95% Feasibility Study Review | Calvin Rodwell | February 17, 2016 | www.baltimore21stcenturyschools.org

Page 33: 21 Century School Buildings Plan€¦ · Review Meeting #1 Meeting #2 Meeting #3 Meeting #4 1. Review process 2. Learn key terms 3.Interactive activity 1. Explore essential elements

33

Option 4: Second Floor Plan

Community Meeting: 95% Feasibility Study Review | Calvin Rodwell | February 17, 2016 | www.baltimore21stcenturyschools.org

Page 34: 21 Century School Buildings Plan€¦ · Review Meeting #1 Meeting #2 Meeting #3 Meeting #4 1. Review process 2. Learn key terms 3.Interactive activity 1. Explore essential elements

34

Option 4: Third Floor Plan

Community Meeting: 95% Feasibility Study Review | Calvin Rodwell | February 17, 2016 | www.baltimore21stcenturyschools.org

Page 35: 21 Century School Buildings Plan€¦ · Review Meeting #1 Meeting #2 Meeting #3 Meeting #4 1. Review process 2. Learn key terms 3.Interactive activity 1. Explore essential elements

35

Option 4: ChangesPros & Cons

PROS CONS

• Creates a completely new building that could

meet most, if not all, of the goals of the Ed. Spec.

• Creates new classrooms clustered around

individual Collaborative Learning and flexible areas

• Provides new core areas within easy access of all

grade levels

• Provides a centralized, secured entrance to the

school

• Would allow for better after-hours separation of

core areas from classroom areas

• Allows for expanded parking area

• Works well with existing grades

• Leaves room on the flatter portions of the site for

SWM

• Would allow for the school, to remain in

operation during most of the construction period

• Creates a very “suburban” site plan, with the

school building far removed from the main street

in the community, and the play fields as a front

lawn

• Although the school could theoretically remain

on-site during construction, access, noise and

disruption would be unavoidable

• No clear separation of elementary and middle

school

• Parking is far from main entry

• Play areas are situation along higher traffic roads

• Relocation of utilities including sanitary

connection, fuel tanks and electric transformer

• Service along a residential street

Community Meeting: 95% Feasibility Study Review | Calvin Rodwell | February 17, 2016 | www.baltimore21stcenturyschools.org

Page 36: 21 Century School Buildings Plan€¦ · Review Meeting #1 Meeting #2 Meeting #3 Meeting #4 1. Review process 2. Learn key terms 3.Interactive activity 1. Explore essential elements

36

Feasibility Review

• School stakeholders provide feedback on building recommendation

• City Schools staff review stakeholder recommendation and other criteria

• 21st Century staff work with MOU partners to finalize recommendation

Selection

• Board of School Commissioners Approval

• Notification to Maryland Stadium Authority

• Interagency on School Construction Approval

• Design Architect/Engineer Request for Proposal

• Award A/E and construction managers

8-12 months Pre-Design: 2-4 monthsPlanning : 6-8 months

Feasibility Option

Feasibility Option

Feasibility Option

Next Steps:Pre-Design

Community Meeting: 95% Feasibility Study Review | Calvin Rodwell | February 17, 2016 | www.baltimore21stcenturyschools.org

Page 37: 21 Century School Buildings Plan€¦ · Review Meeting #1 Meeting #2 Meeting #3 Meeting #4 1. Review process 2. Learn key terms 3.Interactive activity 1. Explore essential elements

37

Timeline:Next Steps

February –March 2016

Post display of options

Core team promote and collect more surveys

Core team meeting in Feb

Board of School Commissioners vote

March –July 2016

MOU Partners vote

MSA release RFP for design phase

Design architect and engineer interviews

Architect & engineer selection

Summer 2016-Summer 2017

Design Process

*3 core team meetings

*4 school-wide meetings

Community Meeting: 95% Feasibility Study Review | Calvin Rodwell | February 17, 2016 | www.baltimore21stcenturyschools.org

Page 38: 21 Century School Buildings Plan€¦ · Review Meeting #1 Meeting #2 Meeting #3 Meeting #4 1. Review process 2. Learn key terms 3.Interactive activity 1. Explore essential elements

21st Century School Buildings ProgramBaltimore City Public Schools200 East North Avenue Room 407-BBaltimore MD 21202(443) 642-4600

Mignon R. AnthonyExecutive Director, 21st Century Buildings ProgramBaltimore City Public Schools

Gary McGuiganSenior Vice President, Capital Development DivisionMaryland Stadium Authority

Dawn KirstaetterDeputy Mayor, Health, Human Services, Education and YouthCity of Baltimore

David LeverExecutive Director, Public School Construction ProgramState of Maryland

www.baltimore21stcenturyschools.org

This presentation is brought to you by the

21st Century School Buildings Program

and Design Collective.

Thank You!

38