Santos Energy Solutions – Moomba CCS Project2020 Roundtable for Oil & Gas - 30 November 2020Christian Winterfield, Team Leader CCS Subsurface & FDP
2040 target
+ Fuel efficiency
+ Electrification and renewables integration
+ Utilisation of CCS technology to reduce emissions and to accelerate the economic feasibility of hydrogen and natural gas tohydrogen switching as the market transitions
+ Reduce Scope 1 and 2absolute emissions by 26-30% by 2030 from 2020baseline1
+ New target
+ Net zero Scope 1 and 2absolute emissions by2040
Emissions reduction targets designed to support Australia’s Paris Agreement commitments. 26-30% reduction by 2030
2
2030 target
Technology enablers
2030 Scope 3 emissions target
+ Santos will actively workwith customers to reducetheir Scope 1 and 2emissions by >1 mtCO2eper year by 2030
1 Reductions are relative to a baseline defined as Santos’ net share of Scope 1 and 2 emissions from financial year 19/20 production volumes, adjusted to include Bayu-Undan and DLNG at 68.4% from 1 January 2020.
+ Reduce emissions >5%across the Cooper Basinand Queenslandoperations
+ Ahead of plan
2025 target
Net zero by 2040
Multiple potential carbon storage sites – low risk due to established hydrocarbon operations.
3
Moomba Carbon Storage SEO
SOUT
H AU
STRA
LIA
QUEE
NSLA
ND
5
7
1
6
2 3
4
4. DELLA
2. STRZELECKI-MARABOOKA
5. TIRRAWARRA
3. KIDMAN-AROONA-BAGUNDI
1. MOOMBA GAS PLANT
6. FLY-LAKE
7. GIDGEALPA
CO2 Source
~60 km
~60 km
~25 km
~40 km
~50 km
~50 km
Existing separated industrial CO2 source – Moomba gas plant
Long-term experience with gas injection
Depleted reservoirs with proven rock seal
Multiple injection targets close to CO2 source
4
Santos has a proven track record and decades of experience injecting hydrocarbons and water for enhanced recovery and storage
CCS – Global Milestones & Santos Operations
1980s1970s 1990s 2000s 2010s
Santos Tirrawarra EOR (C2)
CO2-EOR Permian Basin (USA)
Slepiner CCS (Norway)
Santos Mereenie CH4 Injection
Chevron Gorgon CCS
Santos Fly Lake EOR
Santos Cooper Basin Waterflood
Moomba CCS Project Sanction
Santos Dullingari H2O
Since 2008 Santos has injected >50kt of CO2 into Cooper Basin reservoirs at Fly Lake as part of a raw gas injection scheme for enhanced oil recovery (EOR)
Santos Moomba LDB Storage
Since the 1980s Santos has operated the Moomba LDB underground storage reservoir, undertaking successive periods of gas injection and withdrawal.
1
2
5
Current project: Store 1.7 Mtpa Moomba vented CO2
Industry leading cost: <A$30/tCO2
Primary objective: Large-scale carbon capture and storage opportunity to reduce emissions
Moomba CCS Project: Objectives & Key Milestones
2019 Facilities Pre-FEED complete
2019 Storage reservoir screening complete
2019 Q4 Facilities FEED commenced
2020 Reservoir modelling commenced
2020 Regulatory approvals commenced
YE2020 Target sanction-ready project
MOOMBA CARBON STORAGE EIR & SEO
COVERED BY ESTABLISHED EIRs & SEOs
6
The project targets the capture of Moomba vented CO2 and establishment of suitable storage reservoirs.
Moomba CCS Project: Facilities
Vent (H2O)
CO2 Source CO2 Processing CO2 DisposalCO2 Transport
CO2 Train Upgrade Moomba CO2 Facility CO2 Pipeline Field Facilities
CO2 Distribution
Injection Wells
Candidate Field #1
Candidate Field #2
Future Field Development
Brownfields Integration
+ Capture from Benfield Trains
+ Utilities integration
Greenfields Development
+ Compression
+ TEG Dehydration
+ CO2 export Pipeline
Moomba CCS Project: Moomba Plant Facility
8
+ Injectivity well understood through decades ofhydrocarbon production data
Moomba CCS Project: Injection TargetsDepleted hydrocarbon reservoirs are well characterised and understood through decades of exploration, appraisal and production data, making them the ideal storage targets.
CONTAINMENT
INJECTIVITY
CAPACITY + Storage capacity well understood through historichydrocarbon production volumes
+ Reservoir seals proven through containment ofhydrocarbons for tens of millions of years
13
Moomba CCS Project: Monitoring Plan
MEASURE+ Accurately measure the volume of CO2 injected into the reservoir + Establish baseline conditions+ Assess the integrity of the storage complex and wells
MONITOR+ Determine the movement and ultimate fate of the injected CO2
+ Ongoing assessment of reservoir parameters and subsurface data
MANAGE+ Detect and facilitate timely response to any deviations from planned
migration and containment + Assess the effectiveness of any implemented risk control measures
CCS MONITORING PLAN OBJECTIVES
14
1) Low risk storage complex – proven hydrocarbon containment
2) Baseline supported by historic production data and reservoir models
3) Monitoring plan focus is direct measurement from observation wells
Detailed monitoring plan under development
Moomba CCS Project: Monitoring Method
CONCEPTUAL PLAN
15
Moomba CCS Project: Opportunity Summary
15
Established operations and CO2 processing facilities
Proven track record of natural gas storage
Geological seals proven by hydrocarbon containment
High level of geological knowledge through production history
Globally competitive large-scale storage cost