2020 ENTRY POINT SCHEDULE Effective Date: 01/01/2020 ...€¦ · OH2900612 FAIRBORN PUBLIC WATER...
Transcript of 2020 ENTRY POINT SCHEDULE Effective Date: 01/01/2020 ...€¦ · OH2900612 FAIRBORN PUBLIC WATER...
-
MOUNT ST. JOHNOH2900112
2020 DISTRIBUTION SCHEDULE
Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: MOUNT ST. JOHN DISTRIBUTIONDS000
Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and
Sample(s) Required between 3/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
-
BOWERSVILLE VILLAGE PWSOH2900212
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
2954582EP001
Facility Name: BOWERSVILLE VILLAGE
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
EP001EP001
Sample(s) Required betweenINORGANICS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 1/1/2020 and 5/31/2020
Sample(s) Required betweenNITRATE - 1040 1 1/1/2020 and 5/31/2020
Sample(s) Required betweenRADIOLOGICALS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:GROSS ALPHA - 4002 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 6/1/2020 and 10/31/2020
-
BOWERSVILLE VILLAGE PWSOH2900212
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: BOWERSVILLE, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS000
Sample(s) Required between 10/31/20201ASBESTOS - 1094 6/1/2020 and
Collect one sample at a tap served by asbestos-cement pipe. Due to limited Laboratory capacity and a 48 hour filtering requirement, contactyour lab early in the monitoring period to schedule a sampling date.
Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: BOWERSVILLE, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS201 3365 MAYSVILLE STREET
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
-
BOWERSVILLE VILLAGE PWSOH2900212
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: BOWERSVILLE, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Not RequiredLEAD - 1030 AND COPPER - 1022
-
FAIRBORN PUBLIC WATER SYSTEMOH2900612
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
2954585EP001
Facility Name: FAIRBORN - SANDHILL
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 3Facility Source: Ground Water
EP001EP001
Sample(s) Required betweenINORGANICS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 1/1/2020 and 5/31/2020
Sample(s) Required betweenNITRATE - 1040 1 1/1/2020 and 5/31/2020
Sample(s) Required betweenRADIOLOGICALS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:GROSS ALPHA - 4002 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 6/1/2020 and 10/31/2020
-
FAIRBORN PUBLIC WATER SYSTEMOH2900612
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
2960642EP002
Facility Name: FAIRBORN - NORTH PARK
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
EP002EP002
Sample(s) Required betweenINORGANICS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 1/1/2020 and 5/31/2020
Sample(s) Required betweenNITRATE - 1040 1 1/1/2020 and 5/31/2020
Sample(s) Required betweenRADIOLOGICALS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:GROSS ALPHA - 4002 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 6/1/2020 and 10/31/2020
-
FAIRBORN PUBLIC WATER SYSTEMOH2900612
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: FAIRBORN, CITY OF DISTRIBUTION Facility Class: CLASS 2DS000
Sample(s) Required between 10/31/20201ASBESTOS - 1094 6/1/2020 and
Collect one sample at a tap served by asbestos-cement pipe. Due to limited Laboratory capacity and a 48 hour filtering requirement, contactyour lab early in the monitoring period to schedule a sampling date.
Sample(s) Required between 1/31/202030TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/202030 2/1/2020 andSample(s) Required between 3/31/202030 3/1/2020 andSample(s) Required between 4/30/202030 4/1/2020 andSample(s) Required between 5/31/202030 5/1/2020 andSample(s) Required between 6/30/202030 6/1/2020 andSample(s) Required between 7/31/202030 7/1/2020 andSample(s) Required between 8/31/202030 8/1/2020 andSample(s) Required between 9/30/202030 9/1/2020 andSample(s) Required between 10/31/202030 10/1/2020 andSample(s) Required between 11/30/202030 11/1/2020 andSample(s) Required between 12/31/202030 12/1/2020 and
Sample(s) Required between 1/31/202030TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/202030 2/1/2020 andSample(s) Required between 3/31/202030 3/1/2020 andSample(s) Required between 4/30/202030 4/1/2020 andSample(s) Required between 5/31/202030 5/1/2020 andSample(s) Required between 6/30/202030 6/1/2020 andSample(s) Required between 7/31/202030 7/1/2020 andSample(s) Required between 8/31/202030 8/1/2020 andSample(s) Required between 9/30/202030 9/1/2020 andSample(s) Required between 10/31/202030 10/1/2020 andSample(s) Required between 11/30/202030 11/1/2020 andSample(s) Required between 12/31/202030 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: FAIRBORN, CITY OF DISTRIBUTION Facility Class: CLASS 2DS201 3744 GERMANY LANE
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
-
FAIRBORN PUBLIC WATER SYSTEMOH2900612
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: FAIRBORN, CITY OF DISTRIBUTION Facility Class: CLASS 2DS202 2430 KAUFFMAN AVE
Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: FAIRBORN, CITY OF DISTRIBUTION Facility Class: CLASS 2LC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/202030LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
-
GREENE COUNTY - DAYOH2900803
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: GREENE COUNTY - DAY DISTRIBUTION Facility Class: CLASS 1DS000
Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: GREENE COUNTY - DAY DISTRIBUTION Facility Class: CLASS 1DS201 4380 MOHAVE
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
-
GREENE COUNTY - DAYOH2900803
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: GREENE COUNTY - DAY DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Not RequiredLEAD - 1030 AND COPPER - 1022
-
BELLBROOK WATER WORKSOH2901112
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
2954587EP001
Facility Name: BELLBROOK WTP 1
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
EP001EP001
Sample(s) Required betweenINORGANICS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 1/1/2020 and 5/31/2020
Sample(s) Required betweenNITRATE - 1040 1 1/1/2020 and 5/31/2020
Sample(s) Required betweenRADIOLOGICALS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:GROSS ALPHA - 4002 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
-
BELLBROOK WATER WORKSOH2901112
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: BELLBROOK WATER WORKS DISTRIBUTION Facility Class: CLASS 1DS000
Sample(s) Required between 10/31/20201ASBESTOS - 1094 6/1/2020 and
Collect one sample at a tap served by asbestos-cement pipe. Due to limited Laboratory capacity and a 48 hour filtering requirement, contactyour lab early in the monitoring period to schedule a sampling date.
Sample(s) Required between 1/31/202010TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/202010 2/1/2020 andSample(s) Required between 3/31/202010 3/1/2020 andSample(s) Required between 4/30/202010 4/1/2020 andSample(s) Required between 5/31/202010 5/1/2020 andSample(s) Required between 6/30/202010 6/1/2020 andSample(s) Required between 7/31/202010 7/1/2020 andSample(s) Required between 8/31/202010 8/1/2020 andSample(s) Required between 9/30/202010 9/1/2020 andSample(s) Required between 10/31/202010 10/1/2020 andSample(s) Required between 11/30/202010 11/1/2020 andSample(s) Required between 12/31/202010 12/1/2020 and
Sample(s) Required between 1/31/202010TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/202010 2/1/2020 andSample(s) Required between 3/31/202010 3/1/2020 andSample(s) Required between 4/30/202010 4/1/2020 andSample(s) Required between 5/31/202010 5/1/2020 andSample(s) Required between 6/30/202010 6/1/2020 andSample(s) Required between 7/31/202010 7/1/2020 andSample(s) Required between 8/31/202010 8/1/2020 andSample(s) Required between 9/30/202010 9/1/2020 andSample(s) Required between 10/31/202010 10/1/2020 andSample(s) Required between 11/30/202010 11/1/2020 andSample(s) Required between 12/31/202010 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: BELLBROOK WATER WORKS DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
-
BELLBROOK WATER WORKSOH2901112
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: BELLBROOK WATER WORKS DISTRIBUTION Facility Class: CLASS 1DS202 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: BELLBROOK WATER WORKS DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/202020LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
-
JAMESTOWN VILLAGE PWSOH2901712
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
2954589EP001
Facility Name: JAMESTOWN NEW PWS
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
EP001EP001
Sample(s) Required betweenINORGANICS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 1/1/2020 and 5/31/2020
Sample(s) Required betweenNITRATE - 1040 1 1/1/2020 and 5/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 6/1/2020 and 10/31/2020
-
JAMESTOWN VILLAGE PWSOH2901712
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: JAMESTOWN, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS000
Sample(s) Required between 10/31/20201ASBESTOS - 1094 6/1/2020 and
Collect one sample at a tap served by asbestos-cement pipe. Due to limited Laboratory capacity and a 48 hour filtering requirement, contactyour lab early in the monitoring period to schedule a sampling date.
Sample(s) Required between 1/31/20202TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20202 2/1/2020 andSample(s) Required between 3/31/20202 3/1/2020 andSample(s) Required between 4/30/20202 4/1/2020 andSample(s) Required between 5/31/20202 5/1/2020 andSample(s) Required between 6/30/20202 6/1/2020 andSample(s) Required between 7/31/20202 7/1/2020 andSample(s) Required between 8/31/20202 8/1/2020 andSample(s) Required between 9/30/20202 9/1/2020 andSample(s) Required between 10/31/20202 10/1/2020 andSample(s) Required between 11/30/20202 11/1/2020 andSample(s) Required between 12/31/20202 12/1/2020 and
Sample(s) Required between 1/31/20202TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20202 2/1/2020 andSample(s) Required between 3/31/20202 3/1/2020 andSample(s) Required between 4/30/20202 4/1/2020 andSample(s) Required between 5/31/20202 5/1/2020 andSample(s) Required between 6/30/20202 6/1/2020 andSample(s) Required between 7/31/20202 7/1/2020 andSample(s) Required between 8/31/20202 8/1/2020 andSample(s) Required between 9/30/20202 9/1/2020 andSample(s) Required between 10/31/20202 10/1/2020 andSample(s) Required between 11/30/20202 11/1/2020 andSample(s) Required between 12/31/20202 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: JAMESTOWN, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS201 202 HUNTERS POINTE
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
-
JAMESTOWN VILLAGE PWSOH2901712
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: JAMESTOWN, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS202 35 SOUTH LIMESTONE ST.
Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: JAMESTOWN, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/202010LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
-
WRIGHT STATE UNIVERSITYOH2902012
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
2954592EP001
Facility Name: WRIGHT STATE UNIVERSITY WTP
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
EP001EP001
Sample(s) Required betweenINORGANICS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 1/1/2020 and 5/31/2020
Sample(s) Required betweenNITRATE - 1040 1 1/1/2020 and 5/31/2020
Sample(s) Required betweenRADIOLOGICALS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:GROSS ALPHA - 4002 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 6/1/2020 and 10/31/2020
-
WRIGHT STATE UNIVERSITYOH2902012
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: WRIGHT STATE UNIVERSITY DISTRIBUTION Facility Class: CLASS 1DS000
Sample(s) Required between 1/31/202020TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/202020 2/1/2020 andSample(s) Required between 3/31/202020 3/1/2020 andSample(s) Required between 4/30/202020 4/1/2020 andSample(s) Required between 5/31/202020 5/1/2020 andSample(s) Required between 6/30/202020 6/1/2020 andSample(s) Required between 7/31/202020 7/1/2020 andSample(s) Required between 8/31/202020 8/1/2020 andSample(s) Required between 9/30/202020 9/1/2020 andSample(s) Required between 10/31/202020 10/1/2020 andSample(s) Required between 11/30/202020 11/1/2020 andSample(s) Required between 12/31/202020 12/1/2020 and
Sample(s) Required between 1/31/202020TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/202020 2/1/2020 andSample(s) Required between 3/31/202020 3/1/2020 andSample(s) Required between 4/30/202020 4/1/2020 andSample(s) Required between 5/31/202020 5/1/2020 andSample(s) Required between 6/30/202020 6/1/2020 andSample(s) Required between 7/31/202020 7/1/2020 andSample(s) Required between 8/31/202020 8/1/2020 andSample(s) Required between 9/30/202020 9/1/2020 andSample(s) Required between 10/31/202020 10/1/2020 andSample(s) Required between 11/30/202020 11/1/2020 andSample(s) Required between 12/31/202020 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: WRIGHT STATE UNIVERSITY DISTRIBUTION Facility Class: CLASS 1DS201 UNIVERSITY HALL
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
-
WRIGHT STATE UNIVERSITYOH2902012
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: WRIGHT STATE UNIVERSITY DISTRIBUTION Facility Class: CLASS 1DS202 DIGGS LAB
Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: WRIGHT STATE UNIVERSITY DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/202030LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
-
SPRING VALLEY VILLAGEOH2902422
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
2954594EP002
Facility Name: SPRING VALLEY STU 2
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
EP002EP002
Sample(s) Required betweenINORGANICS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 1/1/2020 and 5/31/2020
Sample(s) Required betweenNITRATE - 1040 1 1/1/2020 and 5/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 4/1/2020 and 6/30/2020
-
SPRING VALLEY VILLAGEOH2902422
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: SPRING VALLEY,VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS000
Sample(s) Required between 10/31/20201ASBESTOS - 1094 6/1/2020 and
Collect one sample at a tap served by asbestos-cement pipe. Due to limited Laboratory capacity and a 48 hour filtering requirement, contactyour lab early in the monitoring period to schedule a sampling date.
Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: SPRING VALLEY,VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS201 1480 PAINTERSVILLE ROAD
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
-
SPRING VALLEY VILLAGEOH2902422
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: SPRING VALLEY,VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS202 2547 US ROUTE 42 SOUTH
Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: SPRING VALLEY,VILLAGE OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/202010LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
-
SPRING VALLEY ESTATES MHPOH2902512
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
2954595EP001
Facility Name: SPRING VALLEY ESTATES MHP
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
EP001EP001
Sample(s) Required betweenINORGANICS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 1/1/2020 and 5/31/2020
Sample(s) Required betweenNITRATE - 1040 1 1/1/2020 and 5/31/2020
Sample(s) Required betweenRADIOLOGICALS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:GROSS ALPHA - 4002 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 6/1/2020 and 10/31/2020
-
SPRING VALLEY ESTATES MHPOH2902512
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/17/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: SPRING VALLEY ESTATES MH DISTRIBUTION Facility Class: CLASS 1DS000
Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: SPRING VALLEY ESTATES MH DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
-
SPRING VALLEY ESTATES MHPOH2902512
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/17/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: SPRING VALLEY ESTATES MH DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
-
XENIA CITY PWSOH2902812
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
2954597EP001
Facility Name: XENIA CITY
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 3Facility Source: Ground Water
EP001EP001
Sample(s) Required betweenINORGANICS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 1/1/2020 and 5/31/2020
Sample(s) Required betweenNITRATE - 1040 1 1/1/2020 and 5/31/2020
Sample(s) Required betweenRADIOLOGICALS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:GROSS ALPHA - 4002 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 6/1/2020 and 10/31/2020
-
XENIA CITY PWSOH2902812
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: XENIA, CITY OF DISTRIBUTION Facility Class: CLASS 2DS000
Sample(s) Required between 10/31/20201ASBESTOS - 1094 6/1/2020 and
Collect one sample at a tap served by asbestos-cement pipe. Due to limited Laboratory capacity and a 48 hour filtering requirement, contactyour lab early in the monitoring period to schedule a sampling date.
Sample(s) Required between 1/31/202030TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/202030 2/1/2020 andSample(s) Required between 3/31/202030 3/1/2020 andSample(s) Required between 4/30/202030 4/1/2020 andSample(s) Required between 5/31/202030 5/1/2020 andSample(s) Required between 6/30/202030 6/1/2020 andSample(s) Required between 7/31/202030 7/1/2020 andSample(s) Required between 8/31/202030 8/1/2020 andSample(s) Required between 9/30/202030 9/1/2020 andSample(s) Required between 10/31/202030 10/1/2020 andSample(s) Required between 11/30/202030 11/1/2020 andSample(s) Required between 12/31/202030 12/1/2020 and
Sample(s) Required between 1/31/202030TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/202030 2/1/2020 andSample(s) Required between 3/31/202030 3/1/2020 andSample(s) Required between 4/30/202030 4/1/2020 andSample(s) Required between 5/31/202030 5/1/2020 andSample(s) Required between 6/30/202030 6/1/2020 andSample(s) Required between 7/31/202030 7/1/2020 andSample(s) Required between 8/31/202030 8/1/2020 andSample(s) Required between 9/30/202030 9/1/2020 andSample(s) Required between 10/31/202030 10/1/2020 andSample(s) Required between 11/30/202030 11/1/2020 andSample(s) Required between 12/31/202030 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: XENIA, CITY OF DISTRIBUTION Facility Class: CLASS 2DS201 819 COLORADO DR.
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
-
XENIA CITY PWSOH2902812
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: XENIA, CITY OF DISTRIBUTION Facility Class: CLASS 2DS202 517 UNION RD
Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: XENIA, CITY OF DISTRIBUTION Facility Class: CLASS 2LC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/202030LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
-
YELLOW SPRINGS VILLAGE PWSOH2903012
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
2954598EP001
Facility Name: YELLOW SPRINGS VLG
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
EP001EP001
Sample(s) Required betweenINORGANICS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 1/1/2020 and 5/31/2020
Sample(s) Required betweenNITRATE - 1040 1 1/1/2020 and 5/31/2020
Sample(s) Required betweenRADIOLOGICALS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:GROSS ALPHA - 4002 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 6/1/2020 and 10/31/2020
-
YELLOW SPRINGS VILLAGE PWSOH2903012
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: YELLOW SPRINGS, VILLAGE DISTRIBUTION Facility Class: CLASS 1DS000
Sample(s) Required between 1/31/20204TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20204 2/1/2020 andSample(s) Required between 3/31/20204 3/1/2020 andSample(s) Required between 4/30/20204 4/1/2020 andSample(s) Required between 5/31/20204 5/1/2020 andSample(s) Required between 6/30/20204 6/1/2020 andSample(s) Required between 7/31/20204 7/1/2020 andSample(s) Required between 8/31/20204 8/1/2020 andSample(s) Required between 9/30/20204 9/1/2020 andSample(s) Required between 10/31/20204 10/1/2020 andSample(s) Required between 11/30/20204 11/1/2020 andSample(s) Required between 12/31/20204 12/1/2020 and
Sample(s) Required between 1/31/20204TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20204 2/1/2020 andSample(s) Required between 3/31/20204 3/1/2020 andSample(s) Required between 4/30/20204 4/1/2020 andSample(s) Required between 5/31/20204 5/1/2020 andSample(s) Required between 6/30/20204 6/1/2020 andSample(s) Required between 7/31/20204 7/1/2020 andSample(s) Required between 8/31/20204 8/1/2020 andSample(s) Required between 9/30/20204 9/1/2020 andSample(s) Required between 10/31/20204 10/1/2020 andSample(s) Required between 11/30/20204 11/1/2020 andSample(s) Required between 12/31/20204 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: YELLOW SPRINGS, VILLAGE DISTRIBUTION Facility Class: CLASS 1DS201 DOLLAR GENERAL 1485 XENIA AVE
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
-
YELLOW SPRINGS VILLAGE PWSOH2903012
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: YELLOW SPRINGS, VILLAGE DISTRIBUTION Facility Class: CLASS 1DS202 RAHN PARK DAYTON STREET
Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: YELLOW SPRINGS, VILLAGE DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/202020LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
-
WRIGHT-PATTERSON AFB AREA B PWSOH2903312
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
2954600EP001
Facility Name: WRIGHT-PATTERSON AFB AREA B STU 1
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 2Facility Source: Ground Water
EP001EP001
Sample(s) Required betweenINORGANICS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 1/1/2020 and 5/31/2020
Sample(s) Required betweenNITRATE - 1040 1 1/1/2020 and 5/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020
-
WRIGHT-PATTERSON AFB AREA B PWSOH2903312
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
2960515EP002
Facility Name: WRIGHT-PATTERSON AFB AREA B STU 2
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Source: Ground Water
EP002EP002
Sample(s) Required betweenINORGANICS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 1/1/2020 and 5/31/2020
Sample(s) Required betweenNITRATE - 1040 1 1/1/2020 and 5/31/2020
Sample(s) Required betweenRADIOLOGICALS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:GROSS ALPHA - 4002 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020
-
WRIGHT-PATTERSON AFB AREA B PWSOH2903312
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: WRIGHT-PATTERSON AFB, B DISTRIBUTION Facility Class: CLASS 2DS000
Sample(s) Required between 10/31/20201ASBESTOS - 1094 6/1/2020 and
Collect one sample at a tap served by asbestos-cement pipe. Due to limited Laboratory capacity and a 48 hour filtering requirement, contactyour lab early in the monitoring period to schedule a sampling date.
Sample(s) Required between 1/31/202010TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/202010 2/1/2020 andSample(s) Required between 3/31/202010 3/1/2020 andSample(s) Required between 4/30/202010 4/1/2020 andSample(s) Required between 5/31/202010 5/1/2020 andSample(s) Required between 6/30/202010 6/1/2020 andSample(s) Required between 7/31/202010 7/1/2020 andSample(s) Required between 8/31/202010 8/1/2020 andSample(s) Required between 9/30/202010 9/1/2020 andSample(s) Required between 10/31/202010 10/1/2020 andSample(s) Required between 11/30/202010 11/1/2020 andSample(s) Required between 12/31/202010 12/1/2020 and
Sample(s) Required between 1/31/202010TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/202010 2/1/2020 andSample(s) Required between 3/31/202010 3/1/2020 andSample(s) Required between 4/30/202010 4/1/2020 andSample(s) Required between 5/31/202010 5/1/2020 andSample(s) Required between 6/30/202010 6/1/2020 andSample(s) Required between 7/31/202010 7/1/2020 andSample(s) Required between 8/31/202010 8/1/2020 andSample(s) Required between 9/30/202010 9/1/2020 andSample(s) Required between 10/31/202010 10/1/2020 andSample(s) Required between 11/30/202010 11/1/2020 andSample(s) Required between 12/31/202010 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: WRIGHT-PATTERSON AFB, B DISTRIBUTION Facility Class: CLASS 2DS201 OFF OF SPAATZ CIRCLE (TAP 1)
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
-
WRIGHT-PATTERSON AFB AREA B PWSOH2903312
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: WRIGHT-PATTERSON AFB, B DISTRIBUTION Facility Class: CLASS 2DS202 C AND 10TH STREET
Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: WRIGHT-PATTERSON AFB, B DISTRIBUTION Facility Class: CLASS 2LC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/202030LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
-
WRIGHT-PATTERSON AFB AREA A PWSOH2903412
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
2954601EP001
Facility Name: WRIGHT PATTERSON AFB AREA AREA A STU 1
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 2Facility Source: Ground Water
EP001EP001
Sample(s) Required betweenINORGANICS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 6/1/2020 and 10/31/2020
Sample(s) Required betweenNITRATE - 1040 1 7/1/2020 and 9/30/2020
Sample(s) Required betweenRADIOLOGICALS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:GROSS ALPHA - 4002 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020
-
WRIGHT-PATTERSON AFB AREA A PWSOH2903412
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
2960516EP002
Facility Name: WRIGHT-PATTERSON AFB AREA AREA A STU 2
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 2Facility Source: Ground Water
EP002EP002
Sample(s) Required betweenINORGANICS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 6/1/2020 and 10/31/2020
Sample(s) Required betweenNITRATE - 1040 1 7/1/2020 and 9/30/2020
Sample(s) Required betweenRADIOLOGICALS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:GROSS ALPHA - 4002 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020
-
WRIGHT-PATTERSON AFB AREA A PWSOH2903412
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
2960517EP003
Facility Name: WRIGHT-PATTERSON AFB AREA AREA A STU 3
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Source: Ground Water
EP003EP003
Sample(s) Required betweenINORGANICS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 1/1/2020 and 5/31/2020
Sample(s) Required betweenNITRATE - 1040 1 1/1/2020 and 5/31/2020
Sample(s) Required betweenRADIOLOGICALS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:GROSS ALPHA - 4002 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020
-
WRIGHT-PATTERSON AFB AREA A PWSOH2903412
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
2960518EP004
Facility Name: WRIGHT-PATTERSON AFB AREA AREA A STU 4
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Source: Ground Water
EP004EP004
Sample(s) Required betweenINORGANICS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 1/1/2020 and 5/31/2020
Sample(s) Required betweenNITRATE - 1040 1 1/1/2020 and 5/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020
-
WRIGHT-PATTERSON AFB AREA A PWSOH2903412
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: WRIGHT-PATTERSON AFB, A/C DISTRIBUTION Facility Class: CLASS 1DS000
Sample(s) Required between 10/31/20201ASBESTOS - 1094 6/1/2020 and
Collect one sample at a tap served by asbestos-cement pipe. Due to limited Laboratory capacity and a 48 hour filtering requirement, contactyour lab early in the monitoring period to schedule a sampling date.
Sample(s) Required between 1/31/202015TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/202015 2/1/2020 andSample(s) Required between 3/31/202015 3/1/2020 andSample(s) Required between 4/30/202015 4/1/2020 andSample(s) Required between 5/31/202015 5/1/2020 andSample(s) Required between 6/30/202015 6/1/2020 andSample(s) Required between 7/31/202015 7/1/2020 andSample(s) Required between 8/31/202015 8/1/2020 andSample(s) Required between 9/30/202015 9/1/2020 andSample(s) Required between 10/31/202015 10/1/2020 andSample(s) Required between 11/30/202015 11/1/2020 andSample(s) Required between 12/31/202015 12/1/2020 and
Sample(s) Required between 1/31/202015TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/202015 2/1/2020 andSample(s) Required between 3/31/202015 3/1/2020 andSample(s) Required between 4/30/202015 4/1/2020 andSample(s) Required between 5/31/202015 5/1/2020 andSample(s) Required between 6/30/202015 6/1/2020 andSample(s) Required between 7/31/202015 7/1/2020 andSample(s) Required between 8/31/202015 8/1/2020 andSample(s) Required between 9/30/202015 9/1/2020 andSample(s) Required between 10/31/202015 10/1/2020 andSample(s) Required between 11/30/202015 11/1/2020 andSample(s) Required between 12/31/202015 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: WRIGHT-PATTERSON AFB, A/C DISTRIBUTION Facility Class: CLASS 1DS201 MUSTANG DRIVE (TAP 19)
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
-
WRIGHT-PATTERSON AFB AREA A PWSOH2903412
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: WRIGHT-PATTERSON AFB, A/C DISTRIBUTION Facility Class: CLASS 1DS202 SHERWOOD STREET (TAP 20)
Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: WRIGHT-PATTERSON AFB, A/C DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/202030LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
-
GREENE CO.-NORTHWEST REG WATEROH2903512
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
2954602EP001
Facility Name: GREENE CO NORTHWEST REGIONAL WTP 1
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 3Facility Source: Ground Water
EP001EP001
Sample(s) Required betweenINORGANICS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 1/1/2020 and 5/31/2020
Sample(s) Required betweenNITRATE - 1040 1 1/1/2020 and 5/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 6/1/2020 and 10/31/2020
-
GREENE CO.-NORTHWEST REG WATEROH2903512
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
2960519EP002
Facility Name: GREENE CO. NORTHWEST REGIONAL WTP 2
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
EP002EP002
Sample(s) Required betweenARSENIC - 1005 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020
Sample(s) Required betweenINORGANICS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:ANTIMONY, TOTAL - 1074 BARIUM - 1010 BERYLLIUM, TOTAL CADMIUM - 1015 CHROMIUM - 1020 CYANIDE - 1024FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL -
Sample(s) Required betweenNITRITE - 1041 1 1/1/2020 and 5/31/2020
Sample(s) Required betweenNITRATE - 1040 1 1/1/2020 and 5/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 6/1/2020 and 10/31/2020
-
GREENE CO.-NORTHWEST REG WATEROH2903512
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MON