2018-2021 DNREC Capital Plan

95
2018-2021 DNREC Capital Plan Investing in Delaware’s Conservation Economy

Transcript of 2018-2021 DNREC Capital Plan

Page 1: 2018-2021 DNREC Capital Plan

2018-2021

DNREC Capital Plan

Investing in Delaware’s Conservation Economy

Page 2: 2018-2021 DNREC Capital Plan

2

April 10, 2018

Investing in Delaware’s Conservation Economy

STATE OF DELAWAREDEPARTMENT OF NATURAL RESOURCES

AND ENVIRONMENTAL CONTROL89 KINGS HIGHWAY

DOVER, DELAWARE 19901Phone: (302) 739-9000

Fax: (302) 739-6242 Offi ce of the

Secretary

Members of the Bond Bill Committee,

I am pleased to present you with a copy of DNREC’s 2018-2021 Capital Plan, which lays out our vision, composed of a series of key projects, each of which demonstrates that strategic environmental investments help drive economic prosperity and growth. By providing sustained funding for these critical infrastructure needs, we will help strengthen Delaware’s economy, while we improve the health of our environment.

Through the leadership of Governor John Carney and the support of the Delaware General Assembly, we have focused on continuing investment in the environmental infrastructure that supports tourism, recreation, and public health and safety.

By purifying air and water, mitigating fl ooding, and supporting diverse species, as well as providing recreational amenities, we generate millions of dollars in economic value. Outdoor recreation options, such as biking and walking trails, can help reduce health care costs as Delawareans adopt healthier lifestyles – and more than 60 percent of our residents now participate in outdoor recreation. Visitors come to Delaware to experience our pristine beaches, navigable waterways, rustic landscapes, world-class birding, hunting, fi shing, biking, and hiking. Clean air and water and memorable recreational experiences are vital to attracting visitors and new companies, as well as retaining businesses and their top talent. Thousands of Delaware jobs in businesses such as hotels, restaurants, retail outlets, bait and tackle shops, recreational equipment stores, marinas, and boat dealerships, as well as commercial watermen and farmers, depend upon maintaining a healthy environment.

Tourism spending in Delaware totals about $4.8 billion annually, with $1.2 billion in salaries and wages, and more than $500 million generated in state and local taxes. A new study shows $400 million was generated just by out-of-state visitors traveling 50 or more miles to visit Delaware’s state parks – and every dollar of operating general fund support our parks receive brings a return of $40 in economic activity.

So today, as many demands compete for limited resources, we encourage investment in Delaware’s extraordinary natural environment and the thousands of jobs and billions of dollars of activity that depend upon their stewardship. I look forward to your support of our natural resources as a vital sector of our economy and an important part of our quality of life here in Delaware.

Sincerely,

Shawn M. Garvin, Secretary

Page 3: 2018-2021 DNREC Capital Plan

3

Page 4: 2018-2021 DNREC Capital Plan

Table of Contents

4

Message from the Secretary ..........................................................................................2Critical Infrastructure Investments Shoreline and Waterway Management ................................................................................................... 6 High Hazard Dams and Dikes Repair/Replacement ............................................................................ 10

Tax Ditches and Public Ditches ........................................................................................................... 13 Resource, Conservation and Development 21st Century Fund Account ............................................. 15

Coastal Impoundments and Water Control Structure Rehabilitation/Replacement ............................. 16 Critical Equipment for Operations ....................................................................................................... 18

Environmental Laboratory Relocation ................................................................................................. 19 Debris Pit Remediation ........................................................................................................................ 20 Consolidation of the Dover Campus Offi ces ........................................................................................ 21 Groundwater Monitoring Network ....................................................................................................... 22 Poplar Thicket Erosion Control ............................................................................................................ 23

Clean Water Infrastructure Conservation Cost Share ...................................................................................................................... 24

Conservation Reserve and Enhancement Program (CREP) ................................................................. 26 Clean Water State Revolving Fund ...................................................................................................... 28

Support Healthy Families State Parks and Fish & Wildlife Areas: Rehabilitation of Critical Facilities ....................................... 32 Statewide Trails and Pathways ............................................................................................................. 37 Killens Pond Waterpark Improvements ............................................................................................... 41 Information Technology: Permitting, Registration, and Licensing ...................................................... 42 Minor Capital Improvements for Operations ....................................................................................... 44 Cape Henlopen Pier Replacement ........................................................................................................ 45 Historic Sites: Fort Miles Museum ...................................................................................................... 46 Baynard Stadium Renovations ............................................................................................................. 47

Holts Landing State Park Improvements ............................................................................................. 48 Brandywine Zoo ................................................................................................................................... 49 Biden Center Renovations .................................................................................................................... 50

Preserve Natural Heritage and Expand Ecotourism Redevelopment of Strategic Sites: NVF Yorklyn ................................................................................. 52

Delaware Bayshore Initiative ............................................................................................................... 55

Appendix Shoreline and Waterway Management ................................................................................................. 60

High Hazard Dams and Dikes Repair/Replacement ............................................................................ 63 DNREC Critical Equipment for Operations ......................................................................................... 65 DNREC Minor Capital Improvements for Operations ........................................................................ 67

Fish & Wildlife Capital Plan Project Priorities .................................................................................... 70 Parks & Recreation Capital Plan Project Priorities .............................................................................. 76

Statewide Trails and Pathways ............................................................................................................. 95

Page 5: 2018-2021 DNREC Capital Plan

5

Page 6: 2018-2021 DNREC Capital Plan

Critical Infrastructure InvestmentsShoreline and Waterway Management

6

Kev

in F

lem

ing

Broadkill Beach has been strengthened by beach nourishment. Final dune work is underway.

FY2019 Funding Request for Shoreline and Waterway Management: $5 Million

ShorelineFunding is requested to carry out the state’s Beach Preservation program along the Atlantic Ocean coast and Delaware Bay shoreline, including operation of the Indian River Inlet Sand Bypass Facility, the Delaware Inland Bays waterway management plan, and the University of Delaware Citizen Monitoring program efforts.

In FY2019, funding is requested to provide a match for federal funds to nourish Rehoboth, Dewey and Lewes beaches. The funds requested will also support the implementation of phase one of the 10-year Delaware Bay Beach Management Plan.

WaterwayUtilizing state resources and private contractors, the Delaware Inland Bays waterway management multi-year plan includes emphasis on waterway management projects and operations and environmental restoration initiatives in and near the state’s Inland Bays. Funding is requested to construct a benefi cial reuse dredging project in the federally-authorized channel in Massey’s Ditch.

Funding is also requested to perform ongoing waterway management operations in the state’s Inland Bays by: placing aids to navigation to properly mark channels for the boating public; removing nuisance accumulations of macro algae from near shore and shoreline areas; and removing abandoned vessels and derelict structures from waterways to ensure safe navigation. The University of Delaware provides training for volunteers to monitor macro algae accumulations and water quality improvements resulting from restoration activities.

Capital Request Funding State Federal OtherFY2017 $3,161,921 $1,400,000 $3,225,000FY2018 $2,198,191 $1,400,000 $3,800,000FY2019 $5,000,000 $20,990,000 $3,800,000FY2020 $5,000,000 $7,740,000 $3,800,000FY2021 $5,000,000 $11,740,000 $3,800,000Total $20,360,112 $43,270,000 $18,425,000

Project Description

The sources of other funds are the Public Accommodation Tax and Waterway Management Fund.

Delaware’s ocean and bay beaches are among the most prized in the nation. Bay beaches are a vital component of the Delaware Bayshore Initiative as a world-class conservation and low-impact recreation area.

Beach nourishment protects our infrastructure and property from fl ooding and storms and ensures that Delaware is prepared for the impacts of future storms. Nourished beaches are vital to tourism, job growth, and the state’s economy.

Additional Information: See Appendix, Shoreline and Waterway Management, pages 60-62

Page 7: 2018-2021 DNREC Capital Plan

7

Shoreline ManagementUnder the state’s Beach Preservation program, work typically includes beach nourishment, structural erosion control measures, public dune maintenance, and emergency storm repair and cleanup. Work is done only on publicly-accessible beaches and may involve cost sharing with federal and local governments. Under plans prepared by the U.S. Army Corps of Engineers (USACE), federal and state cost-shared beach nourishment projects are undertaken on three- to fi ve-year cycles for 50 years (generally, federal 65 percent and state 35 percent).

Economics:Delaware’s coastal economy has a signifi cant impact on our overall economy, generating almost $7 billion annually. Our coastal economy also generates $711 million in tax revenue and supports almost 60,000 jobs.

Since 2005, the federal government has invested $119.22 million in Delaware beach nourishment/restoration projects extending from Broadkill Beach to Fenwick Island. The state contributed $28.5 million in cost share funds, approximately one half of which came from bond bill appropriations.

Accomplishments/Current Projects: FY2017-2018The USACE completed the Broadkill Beach project in FY2017. DNREC supported this project, with $1.2 million in a contract for dune grass planting, dune fencing, and crossings in FY2017-18.

The USACE conducted maintenance beach nourishment work in Rehoboth and Dewey Beaches in FY2017, which required a $4.05 million state match paid to the USACE against their $7.5 million. This is a scheduled maintenance for the 50-year duration project that was initially constructed in 2005. Maintenance nourishment work is scheduled for Rehoboth and Dewey Beaches every three years until 2055.

The USACE will be conducting maintenance beach nourishment work in Bethany Beach and South Bethany. The state-required match was disbursed for

$3.5 million in the summer of 2017, with the project commencing in the spring of 2018 in accordance with the USACE work plan.

The USACE will be conducting maintenance beach nourishment work in Fenwick Island. The state required match of $4.0 million was disbursed in the summer of 2017, with the project commencing in winter/spring of 2018 in accordance with the USACE work plan.

An addition to the sand bypass facility at Indian River Inlet was constructed in April 2017. The addition includes a new offi ce, service bay, secure storage area, and bathroom. The work was funded primarily by the USACE ($1.2 million), with the state providing $350,000 in cost share funding. The bypass operates annually to pump sand from the south side of the Inlet to the north side to protect Route 1 and the Indian River Inlet Bridge.

The Beach Preservation program includes: Beach nourishment

Structural erosion control measures

Public dune maintenance

Emergency storm repair and cleanup

Regulations in support of the Beach Preservation Act to protect dunes and beaches

Delaware Bay Beaches Replenishment:The “Delaware Bayshore Communities Economic Analysis of Options for Shoreline Management” report provides state and local governments with an economic-based study associated with making public investments in Delaware Bay beach communities.

The report highlights the need for local communities to share in the funding of beach management. With storms and erosion threatening several bay communities, an equitable and sustainable investment policy for beach replenishment repair is vitally important.

Page 8: 2018-2021 DNREC Capital Plan

8

Dredged materials can be reused to nourish eroding shorelines and restore wetlands.

Installing channel markers in the Inland Bays makes it safer for boaters to navigate.

Waterway ManagementDNREC has been responsible for performing waterway management operations statewide since 1970. To ensure safe navigation for the boating public, the agency maintains adequate depths in waterways through dredging and sediment management. A major emphasis is being placed on using dredged material for benefi cial purposes, including nourishing eroded shorelines and restoring wetlands and island habitat.

DNREC also performs additional waterway management activities, including placing aids to navigation to properly mark channels, mechanically harvesting nuisance build-ups of macro-algae in the Inland Bays to improve water quality, aesthetics and boating access, and removing obstructions such as abandoned vessels, debris, and derelict structures that hinder navigation in the waters of the state.

Waterway Management Fund: The 148th General Assembly of Delaware passed Senate Bill (SB) 261, which was enacted in July 2016. The legislation implemented recommendations made by the Delaware Waterways Management and Financing Advisory Committee, which was formed by the passage of Senate Concurrent Resolution 64 in 2014.

Effective Jan. 1, 2017, SB 261 established a sustainable and dedicated source of funding, known as the Waterway Management Fund, for the exclusive support of state waterway management operations to keep channels open and safe for boaters. The fund is supported by an increase in boat registration fees with all the increased fee revenues dedicated to the fund.

Waterway Management Operations:Throughout the spring and summer of 2017, DNREC harvested 300 tons of algae from the state’s Inland Bays. Utilizing state resources and private contractors, the Delaware Inland Bays sediment management multi-year plan includes emphasis on waterway management projects and operations and environmental restoration initiatives in and near the state’s Inland Bays.

Economics: With about 62,000 boats registered in

Delaware, boaters rely on safe and navigable channels and waterways.

Improving navigation of our waterways supports our economy, tourism, and commercial and recreational fi shing.

The benefi cial use of clean, dredged material from navigation projects is the most cost-effective way to nourish eroded beaches.

In recent years, insuffi cient funding of federally authorized waterway management projects has resulted in many of these projects shifting to the state.

Page 9: 2018-2021 DNREC Capital Plan

9

Accomplishments:In FY2017, Bond Bill funds were used to complete maintenance dredging of the Assawoman Canal. Also in FY2017, navigational access improvement projects were completed at the University of Delaware College of Marine Studies Harbor in Lewes, the Indian River Marina and the Augustine Beach Boat Ramp.

FY2018-2019 Projects: Projects planned for FY2018-19 include navigational channel improvement work in Indian River and continued maintenance work in Assawoman Canal, the Indian River Marina and the Augustine Beach Boat Ramp.

A waterway crew is shown removing downed trees and debris from a waterway.

Page 10: 2018-2021 DNREC Capital Plan

Critical Infrastructure Investments

FY2019 Funding Request for Dams and Dikes: $1 Million

Craigs Pond spillway improvements completed.

Project Description

10

Capital Request Funding State Federal OtherFY2017 $1,500,000 $0 $0FY2018 $1,500,000 $0 $0FY2019 $1,000,000 $0 $0FY2020 $1,000,000 $0 $0FY2021 $1,000,000 $0 $0Total $6,000,000 $0 $0

DamsFunding is requested to perform emergency planning and monitoring, dam engineering, maintenance repairs, and general construction for state-owned dams. Major capital improvements initiated by DNREC include Garrisons Lake, and Concord, Chipmans, Craigs, Trap, and Mud Mill ponds. Funding will be used for the construction of these improvements and priority will continue to be dependent on fi nal construction estimates, environmental permitting, and fi nal designs.

DikesA complete inventory of dikes and associated structures is currently underway.

High Hazard Dams and Dikes Repair/ReplacementDams are an important but aging part of Delaware’s infrastructure. They were originally constructed for milling grain in the southern part of the state and for industrial purposes, including making gunpowder in the north. Today, dams provide recreational and fi shing opportunities. However, if dams fail, downstream communities and infrastructure could be threatened.

Dikes consist of low-wall earthen embankments with tide gauge structures designed to prevent fl ooding of adjacent properties and infrastructure. The fi ve dikes, in and near the city of New Castle, were originally built by Dutch and Swedish settlers between 200 and 350 years ago. The dikes were repaired and restored in 2013-2014 to provide the city and surrounding areas with fl ood protection from the Delaware River and reduced impacts from coastal storms. While

the improvements represent a milestone in coastal resiliency, the dikes continue to experience erosion and other issues from intense storms and waves that may require future repair and maintenance work.

Additional Information: See Appendix, High Hazard Dams and Dikes Repairs/Replacement, pages 63-64

Page 11: 2018-2021 DNREC Capital Plan

11

DamsDelaware’s Dam Safety Law was passed by the state legislature in 2004. Regulations adopted in 2009 require upgrades to ensure dam safety. All state-owned and regulated dams have been inspected regularly since 2009, and emergency action plans have been prepared for all of them. DNREC receives a Dam Safety Grant of about $50,000 annually from the U.S. Federal Emergency Management Agency.

Delaware has 47 regulated dams, 41 of which are state-owned dams, while the others are owned by New Castle County and the cities of Wilmington, Newark and Dover.

State-owned dams are classifi ed based upon the risk posed to downstream communities and infrastructure in the event of a dam failure and are not based upon the condition of a dam. DelDOT and DNREC developed a dam defi ciency ranking system which prioritizes state-owned dams for necessary upgrades and rehabilitation. A dam’s ranking is based on factors such as condition, spillway capacity, and population that could be at risk should a dam fail.

DNREC and DelDOT partner on dam inspections, and on coordinating maintenance, operations, and emergency management activities. They also work cooperatively, leveraging state funding to perform dam break inundation mapping, engineering studies, and the design and construction of improvements and rehabilitation projects.

Hearns Pond Dam RehabilitationCompleted in July 2017, the total dam rehabilitation project at Hearns Pond Dam near Seaford by DNREC and DelDOT represents the culmination of more than 10 years of work to develop a comprehensive dam safety program for the state. The dam’s history of failing during storms made its reconstruction the state’s highest priority. The project has importance beyond rehabilitating an historic dam, mill site, and boat ramp. The new Hearns Pond Dam is the fi rst dam in Delaware to meet the state’s new dam safety regulations.

Current Projects FY2017-2018DamsEngineering:

Final design on the Mud Mill Pond Dam has been completed. Permitting is currently underway, with the project expected to go to bid in summer 2018.

Garrison Spillway improvement design is 90 percent complete. This project will be fi nalized and is expected to go to bid in calendar year 2019.

Records Pond dam design is nearing completion. The project is currently delayed due to ongoing communications with the Town of Laurel. Future funding for this project will be budgeted by DelDOT.

Construction: Chipmans, Concord, and Craigs pond

dams are currently under construction for replacement of existing water control structures and are scheduled to be completed by the end of 2018.

Dam repairs and replacement: $150,000 remains for Red Clay Creek dam

removals.

The new Hearns Pond Dam in Seaford is the fi rst to comply with Delaware’s new dam safety regulations.

Page 12: 2018-2021 DNREC Capital Plan

DNREC is responsible for maintenance and repairs at Red Lion Dike, one of fi ve historic dikes in New Castle County.

12

DikesRepairs:

Annual funding of $50,000 is requested for maintenance and repairs to Red Lion Dike, which is maintained by the state.

Engineering: The statewide dike inventory is underway,

with completion expected in 2018.

In 2016, $100,000 was allocated and emergency repairs were completed to the Port Penn dike to alleviate fl ooding due to a dike breach. With $55,800 allocated for a follow-up assessment of the mile-long dike’s structure, DNREC staff completed survey work, vegetative clearing, and soil borings in early 2017.

Page 13: 2018-2021 DNREC Capital Plan

Critical Infrastructure Investments

Tax ditches, such as Cart Branch in Greenwood, need regular maintenance for adequate drainage.

FY2019 Funding Request for Tax Ditches and Public Ditches: $1.4 MillionProject DescriptionFunding is requested for planning, surveying, engineering, permitting, inspecting, and constructing drainage infrastructure, channels, and related water management projects. Constructing environmentally-sensitive projects requires minimizing temporary and permanent disturbances to all natural resources in the project area. A portion of these funds will be used to investigate watershed and drainage resources to provide information for the completion of water management improvement projects and related construction. This funding also allows the drainage program to provide technical assistance to more than 215 tax ditch organizations, private landowners, and public agencies statewide.

13

Capital Request Funding State Federal OtherFY2017 $1,148,700 $0 $0FY2018 $1,148,700 $0 $0FY2019 $1,400,000 $0 $0FY2020 $1,400,000 $0 $0FY2021 $1,400,000 $0 $0Total $6,497,400 $0 $0

Tax Ditches and Public DitchesTax DitchesIn 1951, the Delaware General Assembly passed the Tax Ditch Law, which authorized the creation of tax ditch organizations by Superior Court Order. Currently, 234 organizations statewide maintain more than 2,000 miles of tax ditches. These ditches are the backbone of Delaware’s drainage infrastructure and provide drainage to more than 50 percent of our state roads, three counties, 23 municipalities, 38,000 properties, and 829 square miles, or about one-third of the state.

The Tax Ditch Law requires DNREC to provide technical and administrative assistance to the tax ditch organizations. As a result of severe fl ooding in 2010 and several large storms over the past few years, fi ve new tax ditch petitions were received. Hudson Road Tax Ditch was formed in 2013, and construction was completed in 2015. Planning orders from Superior Court are active for the proposed Guinea Creek and Hollyville tax ditches. Lastly, the Kitts Hummock petition will be investigated to determine the feasibility of a tax ditch in this area.

Public DitchesIn 1996, the Joint Committee for Capital Improvement authorized 21st Century Funds for resource, conservation, and development projects for watershed and drainage improvements. These projects became known as “public ditches” because public funding was used for construction.

Page 14: 2018-2021 DNREC Capital Plan

14

Sussex 57%New

Castle 11%

Kent 32%

Tax Ditches by County(Total: 234 ditches)

A repaired tax ditch.

Highlights: Tax ditch administration is a partnership

among DNREC’s Division of Watershed Stewardship, the Sussex, Kent, and New Castle conservation districts, and the tax ditch organizations.

Constructing environmentally-sensitive projects requires minimizing temporary and permanent disturbances to all natural resources in the project area. Aging infrastructure is increasing the number of requests for technical and fi nancial assistance.

Severe fl ooding in 2010 and 2013 resulted in fi ve new tax ditch petitions and millions of dollars of new public ditch/21st Century Fund project requests.

Active Tax Ditch Petitions: Kitts Hummock Tax Ditch, Kent County

Guinea Creek Tax Ditch, near Long Neck, Sussex County

Hollyville Tax Ditch, near Harbeson, Sussex County

Tax Ditch Accomplishments: 2017 Drafted 106 court order changes (90 percent

were to reduce rights-of-way resulting from right of way inquiries)

Attended 60 annual meetings

Audited the fi nancial reports of 120 tax ditches

Provided environmental permitting for 28 tax ditch projects

Provided updated tax ditch assessment information to county tax offi ces

Provided updated certifi ed lists of tax ditch watershed parcels and rights-of-way to the Recorder of Deeds in each county

Public Ditch Accomplishments: 2017 Drainage program and partners responded

to 461 new drainage concerns. The concerns resulted in 90 new 21st Century Fund projects.

Completed landowner contacts, surveying, engineering and environmental permitting.

Page 15: 2018-2021 DNREC Capital Plan

Critical Infrastructure Investments

15

FY2019 Funding Request for Resource, Conservation and Development: $3 MillionProject Description

Capital Request Funding State Federal OtherFY2017 $3,812,800 $0 $0FY2018 $0 $0 $0FY2019 $3,000,000 $0 $0FY2020 $3,000,000 $0 $0FY2021 $3,000,000 $0 $0Total $12,812,800 $0 $0

Funding is requested to continue the design and construction of resource, conservation, and development projects statewide. Currently, 871 active drainage and water management projects have been approved by the Joint Committee on Capital Improvement. The estimated cost to complete all of the approved projects is more than $84 million.

Epilogue language in the annual bond bill requires tracking appropriated funds by county. All funds are currently obligated in New Castle County. All funds in Kent and Sussex County are expected to be obligated during FY2018. Construction of projects in Sussex County is being delayed until FY2019 due to lack of available funds.

Additional details can be found in the FY2017 Annual Report presented to the Joint Committee for Capital Improvement on June 27, 2017.

Resource, Conservation and Development 21st Century Fund Account

The Resource Conservation and Development (RC&D) 21st Century Fund Account was created in 1995 to make long-term investments that will enhance the state’s infrastructure, economic development, and quality of life. A special fund appropriation account dedicated to improving the health of communities by addressing statewide watershed and drainage issues was created within DNREC. Since 1996, more than 1,600 projects totaling $60 million have been completed out of this fund, which primarily funds small to mid-size drainage improvement projects.

The RC&D account currently holds $4.4 million in funds which have been appropriated for active projects statewide. DNREC expects all remaining funds in the account to be encumbered by the end of FY2018.

Examples of projects ready for engineering and design:

Oak Orchard and Bay Beach communities – fi nal engineering and construction documentation for high priority drainage projects

Persimmon Park Place, Dover, Kent County

Port Penn dike project, New Castle County

Page 16: 2018-2021 DNREC Capital Plan

16

Critical Infrastructure Investments

Impoundment work at Ted Harvey Conservation Area.

16

FY2019 Funding Request for Coastal Impoundments and Water Control Structure Rehabilitation/Replacement: $1 MillionProject Description

Capital Request Funding State Federal * OtherFY2018 $0 $1,762,500 $0FY2019 $1,000,000 $1,500,000 $0FY2020 $1,000,000 $1,500,000 $0Total $2,000,000 $4,762,500 $0

Funding is requested to restore and protect coastal impoundment habitats at the Augustine, Woodland Beach, Little Creek, and Ted Harvey wildlife areas along the Delaware Bay, and at Assawoman Wildlife Area along the Inland Bays from storm surge and extreme high tides. Repairs are needed to prevent loss of coastal impoundment wetlands to open water and, for the Delaware Bay impoundments, to reduce fl ooding and damage to Route 9. Projects will help protect adjacent communities from extreme storms; support management of gradual adaptation as sea levels rise, and restore quantity, quality, and stability of habitat for more than 25 species of waterfowl and more than 40 species of shorebirds, marsh birds, and wading birds. This funding will help leverage federal grant funds and Natural Resource Damage Assessment funds.

* The source of federal funds is Wildlife Restoration program, and National Fish & Wildlife Foundation.

Coastal Impoundments and Water Control Structure Rehabilitation/ Replacement

Coastal impoundments are tidal marsh areas where tidal fl ow is restricted by levees to manage water levels for waterfowl, shorebirds, and other wetland wildlife. Water levels are manipulated using water control structures to encourage growth of vegetation and provide water habitats benefi cial to wildlife, and to support other wetland functions.

The ability to control water levels in coastal impoundments also provides mosquito control and fl ood control benefi ts to surrounding communities. DNREC’s Division of Fish & Wildlife manages fi ve major impoundment systems statewide: Augustine, Woodland Beach, Little Creek, Ted Harvey, and Assawoman.

Benefits of Coastal Impoundments: Increase coastal ecosystem resiliency by

absorbing storm surges; Provide fl ood mitigation and control for

Bayshore communities and the Delaware Bayshore Byway (Route 9), a major coastal evacuation route;

Increase opportunities for outdoor recreational pursuits and support local economies; and

Increase habitat for shorebirds, waterfowl, muskrat, and juvenile fi sh populations, and reduce mosquito breeding areas.

Additional Information: See Appendix, Fish & Wildlife Capital Project Priorities, pages 70, 75

Page 17: 2018-2021 DNREC Capital Plan

17

Urgency of Rehabilitation Repair and rehabilitation are urgently needed to stabilize and increase the resiliency of impoundments to coastal storms and sea level rise. Impoundments are highly vulnerable to erosion under current degraded conditions; repairs will proactively extend key ecological and economic benefi ts. Delays will risk catastrophic loss of coastal wetlands.

FY2019 ProjectsLittle Creek Wildlife Area Main Impoundment: Restore levee system within the main impoundment unit and create an adjacent salt marsh and beach buffer to protect 450 acres of fresh/brackish marsh and provide protection for adjacent farmlands and the Town of Little Creek.

Augustine Wildlife Area Lang Marsh: Complete levee restoration and install a water control structure to protect 100 acres of marsh habitat and Route 9 from fl ooding.

Accomplishments: FY2017-2018Little Creek Wildlife Area Main Impoundment: Installed one water control structure and completed restoration design for more than 100 acres of salt marsh habitat and beach along the bayfront levee to protect 450 acres of coastal impoundment marsh habitat and provide protection for adjacent farmlands and the Town of Little Creek.

Little Creek Wildlife Area Mahon Impoundment: Designed dikes and circulation channels for the Mahon impoundment unit to protect 510 acres of coastal impoundment marsh habitat.

Woodland Beach Wildlife Area Taylors Gut Impoundment: Replaced an aging water control valve severely damaged by repeated storm events to increase resiliency of 250 acres of fresh/brackish impoundment marsh habitat that supports waterfowl hunting, provides a popular wildlife-viewing area, and protects Route 9 from erosion.

Ted Harvey Conservation Area South Impoundment: Restored 4,100 feet of levee, retrofi tted the emergency spillway, and replaced one water control structure designed to improve the resiliency of 880 acres in three impoundments and to provide a protective buffer along the St. Jones River and provide protection for the community of Kitts Hummock.

New water control structure installation in progress at Ted Harvey Conservation Area.

Page 18: 2018-2021 DNREC Capital Plan

Critical Infrastructure Investments

Critical Equipment for OperationsDNREC’s critical equipment assets have an average useful life of 10 years and provide public service and infrastructure support to nearly 100,000 acres of public land, 700 buildings, 16 state parks, 19 wildlife management areas, 10 natural preserves, two national estuarine research reserves, 65 freshwater ponds and marine access areas, all Delaware waterways, and environmental laboratory services.

18

Critical equipment has an average useful life of 10 years.

FY2019 Funding Critical Equipment for Operations: $2 MillionProject Description

Capital Request Funding State Federal OtherFY2018 $0 $0 $0FY2019 $2,000,000 $0 $0FY2020 $2,000,000 $0 $0FY2021 $2,000,000 $0 $0Total $6,000,000 $0 $0

Funding is requested for the acquisition/replacement of critical equipment essential to performing environmental and natural resource operations, conservation, protection, and research activities. Equipment requested includes mowers, utility vehicles, dump trucks, and picnic tables.

Additional Information: See Appendix, DNREC Critical Equipment for Operations, pages 65-66

Page 19: 2018-2021 DNREC Capital Plan

Critical Infrastructure InvestmentsEnvironmental Laboratory Relocation

19

DNREC’s full-service Environmental Laboratory processes approximately 80,000 to 100,000 samples and conducts up to 2.5 million tests each year, including testing of contaminated water and soils and performing biological evaluation of streams, lakes, and rivers. Many of the tests involve examining water quality for excess nutrients and other pollutants that can impact public health, animal welfare, and the environment.

To continue serving the public by performing chemical and biologic environmental testing, monitoring, assessments, and timely informational services, the present facility needs updating to accommodate current technologies and testing procedures. Originally developed using 1970s laboratory design criteria and last renovated in 1983, DNREC’s existing lab occupies 36,000 square feet in the Richardson & Robbins Building in Dover. Concept drawing of expansion option

Capital Request Funding State Federal OtherFY2018 $0 $0 $0FY2019 $1,000,000 $0 $0FY2020 $7,000,000 $0 $0FY2021 $0 $0 $0Total $8,000,000 $0 $0

FY2019 Funding Request for Environmental Laboratory Relocation: $1 MillionProject Description

Funding is requested to co-locate DNREC’s Environmental Laboratory next to the Department of Health and Social Services’ Public Health Laboratory, in Smyrna. A complete architectural review and conceptual design study has been completed, including details of costs, construction, and benefi ts of the proposed relocation. Co-locating DNREC’s lab next to the Public Health lab will provide savings of approximately $234,000 per year and reduce the space occupied by the lab to 18,000 square feet.

After constructing a new building to house DNREC’s lab, the existing spaces at the R&R Building can be renovated to create additional much-needed offi ce space. This will lead to more effective use of both offi ce and lab spaces. The project also includes integrating legally allowable laboratory functions, removal of offi ces from testing spaces, and safer, more effective and productive laboratory operations.

Co-locating the two labs while consolidating laboratory and offi ce spaces will signifi cantly increase effi ciencies and decrease operational costs. Other benefi ts include expanded opportunities for cross-collaboration among DNREC and DHSS expert staff to enhance research, knowledge, and expanded testing to benefi t public health, animal welfare, and the environment.

Page 20: 2018-2021 DNREC Capital Plan

20

Critical Infrastructure Investments

FY2019 Funding Request Debris Pits: $500,000

DNREC’s Debris Pit Program has identifi ed more than 150 debris pits that can pose threats to human health. Created when trees and stumps were buried underground when land was being developed in the 1960s, 70s and 80s, debris pits can form sinkholes in the landscape that can literally open up and create holes in the ground. These voids are sometimes narrow and devoid of oxygen, making them diffi cult to escape and potentially lethal.

Decaying wood in debris pits can also host concentrated pockets of methane, a health hazard. In addition, if structures have been built over debris pits, the settling of debris can lead to signifi cant structural damage.

Debris Pit Remediation

Work is underway to backfi ll dirt and restore property.

The average cost of remediating a property is $40,000.

New Castle County allocated $50,000 in funding to remediate debris pits in FY2018. This was down from FY2017 because of the lack of state matching funds. Bond Bill funds were not allocated in FY2016, FY2017, or FY2018.

Capital Request Funding State Federal Other*FY2018 $0 $0 $100,000FY2019 $500,000 $0 $100,000FY2020 $500,000 $0 $100,000FY2021 $500,000 $0 $100,000Total $1,500,000 $0 $400,000* The source of other funds is voluntary match.

Funding is requested for the remediation of debris pits on private property where ground subsidence has caused signifi cant property and/or structural damage to primary residences and related structures. The average cost of remediating a property is between $30,000 and $50,000. More than 150 properties are presently on the waiting list for remediation, with an estimated seven- to eight-year wait time for remediation.

Project Description

Since 2001, DNREC has responded to more than 1,400 calls from constituents statewide regarding debris pits. Most debris pit inquiries come from property owners in New Castle County.

Debris pits are located on private properties in all three counties.

Currently, more than 150 properties with debris pits are on the waiting list to be remediated.

Wait time for remediation is estimated at seven to eight years.

Facts and Figures:

Page 21: 2018-2021 DNREC Capital Plan

21

Critical Infrastructure Investments

FY2019 Funding Request: $1,300,000

Originally built in 1881 as the Richardson and Robbins cannery, the R&R building at 89 Kings Highway in Dover has served as DNREC’s main campus since 1983.

Funding is requested to renovate the Richardson & Robbins Building over three years. With movement of certain DNREC offi ces (Human Resources, Fiscal Management, and Environmental Laboratory) to newly leased and/or constructed locations, renovations are necessary to allow the building to function adequately within the newly vacated areas. Renovations will include rearrangement of offi ce areas to allow more effi cient layouts, improvements to indoor air quality and circulation, increased use of alternate work locations and improved accessibility for the public.

Project Description

Capital Request Funding State Federal OtherFY2018 $0 $0 $0FY2019 $1,300,000 $0 $0FY2020 $1,300,000 $0 $0FY2021 $1,300,000 $0 $0Total $3,900,000 $0 $0

Renovation of Dover Campus Offi ces

Richardson & Robbins Building Now serving as DNREC’s main offi ce complex, the 85,420-square-foot Richardson & Robbins (R&R) Building was built in 1881 by food-canning pioneers Alden B. Richardson and James Washington Robbins to house their Dover canning operation. In 1959, the company and its cannery complex were sold to the William Underwood Company, which continued to make some of R&R’s products. The landmark Dover cannery was closed by Underwood in 1976.

In 1979, the same year the State of Delaware purchased the empty cannery complex, R&R was placed on the National Register of Historic Places. The abandoned complex was extensively renovated, while retaining its tall arched windows, ornate exterior brickwork and massive, rough-hewn exposed ceiling beams. It was dedicated as DNREC’s new main offi ce in April 1983.

The R&R Building TodayToday, R&R provides workspace for approximately 350 employees. Since relocating to the building in 1983, the department’s staff has increased by 100 percent. Due to the growth in the department, the

R&R building is not functionally adequate for the agency’s needs.

Renovations will expand the building’s capacity to house additional staff and provide better services to the public. The increased capacity will allow DNREC to eliminate other leased space and create a more cohesive environment to improve productivity and establish a walkable campus within downtown Dover. The plan is to renovate the R&R building over a three-year period.

Page 22: 2018-2021 DNREC Capital Plan

Critical Infrastructure Investments

Groundwater Monitoring NetworkThe Delaware Geological Survey’s long-term operations of a groundwater monitoring network found large areas within the state where crucial information on the condition of aquifers is largely unknown and existing monitoring infrastructure has reached the end of its useful life.

Following discussions with the Governor’s Water Supply Coordinating Council, DNREC and the Delaware Geological Survey have developed work plans and budgets for priority areas, including eastern Sussex County. This area is undergoing signifi cant population growth resulting in increased water demands. This combination, coupled with threats of saline water intrusion due to rising sea levels and close proximity to tidal water bodies, will require better monitoring of coastal aquifers, the sole source of freshwater in the area. Information gained from this project will enable the agencies to defi ne areas of acceptable and unacceptable water quality and quantity, ensuring a sustainable supply for future generations.

The Delaware Geological Survey will be the lead agency in the design and installation of the network, in cooperation with DNREC and public and investor-owned water purveyors.

FY2019 Funding Request for Water Supply Monitoring Network: $810,000

22

New monitoring wells are needed in eastern Sussex County where signifi cant population growth has occurred and where groundwater use is increasing for all water supply - public, agricultural irrigation, industry, and private domestic users. Th ese wells will monitor both water supply and quality, helping state agencies assure safe yields are being maintained, particularly important because of saltwater intrusion. Drilling will be needed into the major aquifers supplying all fresh water throughout eastern Sussex County.

Capital Request Funding State Federal OtherFY2018 $0 $0 $0FY2019 $810,000 $0 $0FY2020 $0 $0 $0Total $810,000 $0 $0

Project Description

The Coastal Sussex Water Supply Monitoring Network is needed to better monitor and protect our vital coastal aquifers, which are our only sources of drinking water in the region. The increasing water demands from the expanding population in the area continue to magnify the threat of saltwater intrusion from nearby tidal water bodies and rising sea levels.

Page 23: 2018-2021 DNREC Capital Plan

23

Poplar Thicket Erosion ControlPoplar Thicket is a 118-acre property consisting of forest, marshes, and wetlands spread across a quarter-mile of undisturbed Indian River Bay shoreline. The property was donated to The Nature Conservancy in October 2007 by landowner Austin Okie to serve as a bird refuge. In 2008, the property was transferred to the State of Delaware, establishing the Marian R. Okie Memorial Wildlife Preserve at Poplar Thicket. The preserve, managed by DNREC’s Division of Fish &Wildlife, has been restored as a refuge for birds and opened to the public for hunting in designated areas, conservation education, and low-impact activities such as hiking and bird watching.

As part of the agreement between The Nature Conservancy and Mr. Okie to transfer the property to the state, the state agreed to investigate a shoreline stabilization project at the property along the Indian River Bay. Preliminary engineering for erosion control design has been completed.

Critical Infrastructure Investments

Poplar Thicket, a quarter-mile property along the Indian River Bay shoreline, serves as a refuge for a variety of birds.

FY2019 Funding Request for Poplar Thicket Erosion Project: $750,000

Capital Request Funding State Federal OtherFY2019 $750,000 $0 $0FY2020 $2,000,000 $0 $0Total $2,750,000 $0 $0

Funding is requested to update design engineering and begin shoreline stabilization construction in FY2019 and to complete construction in FY2020 at the Poplar Thicket property along the Indian River Bay.

Project Description

Additional Information: See Appendix, Fish & Wildlife Capital Project Priorities, page 75

Page 24: 2018-2021 DNREC Capital Plan

Clean Water Infrastructure

Conservation Cost ShareDelaware’s Conservation Cost Share Program promotes conservation practices that improve soil and water quality by preventing agricultural and urban pollutants from reaching surface and ground waters. The program provides funding to landowners and producers by paying a portion of the cost to design, install, and maintain conservation practices or systems. Conservation cost share programs include planting cover crops and other conservation practices – important components of a successful nutrient reduction plan.

Cover crops are one key to reducing agricultural runoff that contributes nitrogen and phosphorus to our streams, rivers and bays. Producers plant cover crops, including grains like wheat, rye, and barley in the fall after the autumn harvest. Growing cover crops absorb under-utilized nutrients in the soil and reduce erosion from rain, snow, and wind. Cover crops also help producers by inhibiting noxious weeds and increasing organic matter in the soil.

FY2019 Funding Request for Conservation Cost Share: $3 Million

Sussex Conservation District’s air seeder planting cover crops into a fi eld of standing corn.

24

The Conservation Cost Share Program is the state’s principal fi nancial support mechanism for the design and installation costs of practices that provide critical water quality improvements and wildlife habitat and protect human health, natural resources, water supplies, and Delaware’s farmland soils. The program provides funds as incentives for landowners or users for public benefi t. Landowners who receive benefi ts must pay a portion of the cost to locate, design, install, and maintain conservation practices and systems.

Funding is requested to expand Delaware’s Conservation Cost Share Program. Of the amount needed for this program, 70 percent will be divided equally among the three counties to expand their programs. The remaining balance will be directed toward statewide nutrient management efforts.

Capital Request Funding State Federal OtherFY2017 $1,500,000 $2,000,000 $0FY2018 $1,500,000 $2,000,000 $0FY2019 $3,000,000 $2,000,000 $0FY2020 $3,000,000 $2,000,000 $0FY2021 $3,000,000 $2,000,000 $0Total $12,000,000 $10,000,000 $0

Project Description

Edw

in R

emsb

erg/

SAR

E

Page 25: 2018-2021 DNREC Capital Plan

Early cover growth emerges in a standing fi eld of corn.

25

Accomplishments and Current Projects: 2018

Cover crops planted: more than 50,000 acres; approximate cost $2.5 million

Cover crops requested: 150,000 acres; approximate cost $7.5 million

Requests for cover crop funding were more than three times the amount of funding that was available in 2018.

Cost/Benefit of Cover Crops:Through the Conservation Cost Share Program, producers receive an average of $50 per acre for cover crops planted, depending on the species of crop, timing, and application method.

Meeting Pollution Reduction Goals with Cover Crops: The Chesapeake Bay Watershed Implementation Plan (WIP) and the Pollution Control Strategy for the Inland Bays Watershed call for signifi cant increases in cover crop acreage.

149,500 acres of cover crops is the minimum acreage recommended annually to meet water quality goals in watersheds across the state; 92,765 of those acres are needed in the Chesapeake Bay Watershed.

In 2018, Delaware producers planted cover crops that reduced nitrogen by about 690,000 pounds per year and phosphorus by about 1,900 pounds per year, signifi cantly reducing nutrients from entering our waterways.

Without the support of the Conservation Cost Share Program, Delaware will not be able to fully implement the WIP or Pollution Control Strategy goals for most of its impaired watersheds.

Conservation Cost Share Practices:In addition to cover crops, conservation cost share funding is used for a number of other practices that prevent nutrient runoff. Some of these practices are:

Manure storage sheds

Animal waste systems

Heavy-use area protection

Poultry windbreaks

Composters

Water control structures

Manure handling equipment

Large animal mortality rendering

Urban conservation practices

Conservation Cost Share Program is a partnership among:

DNREC’s Division of Watershed Stewardship USDA Natural Resources Conservation

Service Sussex, Kent and New Castle Conservation

Districts Delaware Department of Agriculture U.S. Environmental Protection Agency (EPA) Landowners

Page 26: 2018-2021 DNREC Capital Plan

Clean Water InfrastructureConservation Reserve and Enhancement Program (CREP)CREP, a state and federal partnership, provides land owners with payments to remove environmentally sensitive areas from agricultural production, with the goal of reducing pollution of surface and subsurface waters associated with cropland tillage.

Stream buffers and restored wetlands, established through CREP, reduce nutrient and sediment loadings and improve water temperature and levels of dissolved oxygen, which are necessary to support biology and wildlife, increase upland wildlife habitat, and create wildlife corridors.

CREP is a partnership among DNREC’s Division of Watershed Stewardship, the USDA Natural Resources Conservation Service and the USDA Farm Service Agency.

Drone footage of wetland restoration site in Smyrna.

26

FY2019 Funding Request for CREP: $500,000

Funding is requested for the renewal of approximately 1,000 acres of marginal agricultural land currently protected by expiring CREP contracts. The state share of these contract renewals varies from 27 percent to 37.5 percent, depending on the conservation practice. The requested funding will leverage between $2.0 and $2.4 million in federal funds.

Capital Request Funding State Federal OtherFY2017 $1,000,000 $2,000,000 $0FY2018 $160,000 $1,000,000 $0FY2019 $500,000 $1,000,000 $0FY2020 $100,000 $1,000,000 $0FY2021 $100,000 $1,000,000 $0Total $1,960,000 $6,000,000 $0

Project Description

Page 27: 2018-2021 DNREC Capital Plan

Established wetlands reduce water pollution by fi ltering nutrients and sediment.

27

Current Program: 5,810 acres are in CREP practices, with the

goal of 10,000 acres statewide.

The state pays up to 37.5 percent of project installation costs.

Landowners receive incentive payments that range from $165 to $225 per acre per year. Landowners in the Chesapeake Bay watershed that implement riparian forest buffers are eligible for additional one-time incentive payments, up to $200 per acre.

Delaware’s current CREP acreage reduces more than 212,265 lbs. of nitrogen and 4,290.98 lbs. of phosphorus annually from entering the state’s waterways.

CREP provides environmental protection to Delaware’s waterways and is key to helping meet the water quality goals of the Chesapeake Bay Watershed Implementation Plan and the Pollution Control Strategy for the Inland Bays.

CREP Practices: Reduce nutrient and sediment loads to

impaired water bodies

Improve aquatic temperature and dissolved oxygen necessary to support biology and wildlife

Increase upland wildlife habitat and create wildlife corridors

List of eligible practices: Grassed fi lter strips

Riparian buffers

Wetland restoration

Hardwood tree planting

Wildlife habitat

Shallow water areas

Page 28: 2018-2021 DNREC Capital Plan

Clean Water Infrastructure

DNREC’s Terry Deputy and Dr. Andrew Sawyers, EPA Offi ce of Water, display the PISCES Award recognizing DNREC and CWSRF for excellence in a new water quality project as part of the revitalization of the former NVF site in Yorklyn.

28

FY2019 Funding Request for CWSRF: $1.4 Million

Funding is requested to provide state matching funds for the Federal Clean Water State Revolving Fund Capitalization grant. Delaware’s 2019 federal grant is anticipated to be approximately $7 million, which requires a 20 percent state match. This funding request will support the Water Infrastructure Advisory Council and its 2018 Intended-Use Plan for facility projects.

Capital Request Funding State Federal OtherFY2017 $1,400,000 $6,525,000 $0FY2018 $1,400,000 $6,474,000 $0FY2019 $1,400,000 $7,000,000 $0FY2020 $1,400,000 $7,000,000 $0FY2021 $1,400,000 $7,000,000 $0Total $7,000,000 $33,999,000 $0

Project Description

Clean Water State Revolving FundThe Clean Water State Revolving Fund (CWSRF) was authorized by Congress through the Clean Water Act Amendments of 1987. The program is a federal/state partnership that helps communities fi nance the cost of infrastructure needed to achieve compliance with the Clean Water Act.

Delaware’s Clean Water State Revolving Fund program was created by the General Assembly in 1990 and is administered by DNREC’s offi ce of Environmental Finance. The program provides low-cost fi nancing for a wide range of projects that repair and expand wastewater facilities, help homeowners replace failing septic systems, and farmers implement nonpoint source best management practices. Funds also support construction projects that control fl ooding and reduce stormwater runoff and erosion in communities; protect drinking water wells from pollution; protect the water quality of our bays, rivers and streams; and improve energy effi ciency at wastewater facilities saving taxpayers money.

The CWSRF program is funded by annual EPA capitalization grants and the required 20 percent state matching funds. Funds are loaned out at below-market interest rates, providing a more affordable way for communities and other eligible entities to fi nance high-cost infrastructure. Loan repayments are recycled

back into the program to be loaned out for other eligible projects. The CWSRF program serves as a revolving funding source that will last into the future.

Projects are reviewed and recommended for funding by the Delaware Water Infrastructure Advisory Council. The council has advisory oversight for the CWSRF and the Drinking Water State Revolving Fund (DWSRF) programs. The 13-member council, appointed by the Governor, advises the Governor and Secretaries of DNREC and the Delaware Department of Health and Social Services regarding project funding requests and fi nancing options through the CWSRF and DWSRF programs.

Page 29: 2018-2021 DNREC Capital Plan

The Wilmington Wastewater Treatment Plant Renewable Energy Biosolids Facility will utilize gases from the Cherry Island landfi ll to generate electricity.

29

Delaware’s CWSRF by the Numbers: Since the program’s inception, Delaware has

received $283.2 million in seed capital, $239.2 million in EPA funds, and $44 million in state funds.

95 municipal loans, totaling approximately $397.5 million have been closed.

The program has created and sustained thousands of jobs, supporting local economies.

Communities statewide that depend on wastewater systems have benefi tted from the CWSRF.

Benefits of the CWSRF Projects: Reduce the cost of fi nancing infrastructure

projects Provide long-term water quality benefi ts Create and support jobs and the economy Repair and improve aging water infrastructure Protect public health and the environment

Delaware Statewide Assessment of Wastewater Facilities Report:The Delaware Statewide Assessment of Wastewater Facilities Report examined the adequacy of existing facilities, the need for improvements and upgrades, and estimated costs of capital improvements, system revenues and user rates from 2011 through 2016.

The report, which was updated for 2018-2023, estimates the total capital cost needed for wastewater facilities to be in excess of $581 million. Municipalities are expected to request approximately $177 million from the CWSRF program. In addition, Delaware’s future capital project needs include $150 million for toxics removal and $2 million for Delaware’s Wastewater Management Account to provide revolving loans and grants that supplement public and private wastewater facility fi nancing, particularly for low-income communities.

Clean Water and Flood Abatement Task Force:In June 2015, the Delaware General Assembly passed Senate Concurrent Resolution 30, creating the Clean Water and Flood Abatement Task Force. The task force was charged with identifying and

recommending potential funding mechanisms to improve water quality and alleviate fl ooding in Delaware. Chaired by Senator Bryan Townsend and Representative Michael Mulrooney, the task force met multiple times from July 2015 through May 2016. All meetings were open to the public and included a public comment period. The Final Report of the Clean Water and Flood Abatement Task Force was issued April 24, 2017, detailing recommendations related to funding options for improving water quality and alleviating fl ooding issues (http://cleanwaterdelaware.org/clean-water-task-force).

FY2018 Loans (to-date): $57.8 Million Projects: Wastewater and Green Project ReserveLoans closed are active projects being implemented. Loans approved are pending loan closure.

Loans Closed: City of WilmingtonSouth Wilmington Wetlands Restoration & Conservation Project: $3.5 millionThe project includes land acquisition, permanent conservation easement, and construction to restore the South Wilmington Wetlands.

City of RehobothOcean Outfall Project: $40.5 millionThis Rehoboth Beach Wastewater Treatment Plant project eliminates the discharge of treated effl uent into the Lewes-Rehoboth Canal and constructs a new 24-inch ocean outfall pipe aligned along the plant access road and extending 6,000 feet offshore.

Page 30: 2018-2021 DNREC Capital Plan

30

City of RehobothWastewater Treatment Plant Upgrade Project: $12 millionThe project funding provides for the upgrade of the city’s wastewater treatment plant, and biosolids facilities.

Loans Approved: Kent County Air Blower Optimization Project: $1.02 million The project funding provides for the purchase of two turbo blowers to replace two existing multi-stage blowers at the Kent County Regional Recovery Facility.Loans Approved:City of Delaware CityWashington Street Flood Mitigation Project: $790,000 The project provides supplemental funding to the FEMA Grant for the Washington Street Flood Mitigation Phase 2 costs covering the installation of a new storm sewer main and submersible pumping station for managing stormwater.

FY2016-2017 Loans: $39.5 Million Projects: Wastewater and Green Project ReserveLoans closed were active projects being implemented. Loans approved were pending loan closure.

New Castle County

Loan Closed: DNREC, Division of Parks & RecreationLums Pond State Park Utility Improvements, Phase II: $6 million The project includes the installation of a sanitary sewer system, water main, driveways, bathhouse and dump station, as well as the replacement of fi re hydrants and the rehabilitation of existing pump stations and manholes.

DNREC Division Parks & Recreation NVF Yorklyn Wetlands Project: $1 millionDNREC Division of Waste & Hazardous SubstancesNVF Yorklyn Wetlands Project: $3.3 million DNREC Divisions of Parks & Recreation and Waste & Hazardous Substances will collaborate to remediate a zinc-contaminated site at the former National Vulcanized Fiber (NVF) facility. After remediation, a wetland will be constructed at the site, in addition to four other wetlands in the vicinity. The wetlands will help improve water quality, mitigate fl ooding and support the economic redevelopment of the area.

Kent County

Loans Closed: City of HarringtonWastewater Treatment Plant Upgrade Refi nancing: $1.5 million Farmington Sewer Extension Refi nancing: $600,000Sanitary Sewer Capacity Improvement Project: $1.5 million These projects were refi nanced through the program at a lower interest rate. Loan debt service savings allowed the city to borrow additional funds for a sanitary sewer capacity improvement project at $1.5 million.

Loans Approved: City of DoverTar Ditch Interceptor Project: $200,000 The project will replace 300 linear feet of a 15-inch sewer pipe along the Tar Ditch interceptor, which will eliminate fl ooding in the area east of South State Street and south of Elm Terrace in Dover.

Town of SmyrnaNorth Duck Creek Utility Extension Project: $1.2 million supplemental loan The supplemental loan will allow the town to complete necessary sewer replacements, sewer extensions and pump station upgrades/replacements projects. A loan in the amount of $5.9 million was provided to the town in August 2009.

Page 31: 2018-2021 DNREC Capital Plan

31

Sussex County

Loans Closed: Allen Harim Foods, LLCHarbeson Facility Wastewater Expansion and Upgrades: $8.4 millionThe project includes expansion and upgrade of the facility’s existing wastewater treatment plant, construction of a new sanitary wastewater treatment plant, and the purchase of a high capacity water heater to heat process water.Harbeson Facility Water Reuse Project: $3.2 million The project was originally intended as a new wastewater reuse system to treat effl uent from the expanded and upgraded wastewater treatment plant for reuse within the poultry processing facility. However, a project change of scope will allow treated wastewater to be spray-irrigated and wastewater to be treated by another facility.

Town of MillsboroGenerator Pump #1 and #5 Project: $157,000This project provided funding for the construction and installation of a new generator at pump stations #1 and #5. Generator Pump #2 Replacement Project: $610,000This project provided funding for the construction and installation of the replacement pump station #2. Wastewater Treatment Plant Refi nancing Project: $5.5 millionProject loan provided to refi nance the remaining balance of an earlier USDA loan for improvements, modifi cation, and upgrades to expand the town’s wastewater facilities, lines, and systems.

City of SeafordRenewable Energy System at the Seaford Wastewater Treatment Plant: $1.7 millionThis project includes the installation of a ground-mounted solar array. The system will offset a portion of the energy consumption of Seaford’s wastewater treatment plant.

Town of LaurelLaurel 6th Street Combined Sewer Over-Flow Project: $1.3 millionThe project includes the installation of stormwater pipes and manholes, bio-retention units and catch basins that are designed to eliminate untreated sewage overfl ows to the Broad Creek, Nanticoke River and Chesapeake Bay.

City of Lewes, Lewes Board of Public WorksHighland Acres Wastewater Collection System: $1.4 million The project includes the installation of sewer mains and manholes to serve the Highland Acres development and the upgrade of the existing lift station.

Town of BridgevilleWastewater Treatment Plant Upgrade Refi nancing: $800,000Tatman Farm Irrigation Project Refi nancing: $1.2 million These projects will be refi nanced to create annual loan debt service savings that will be used to help fund another wastewater project needed for the town.

Page 32: 2018-2021 DNREC Capital Plan

Support Healthy FamiliesState Parks and Fish & Wildlife Areas Rehabilitation of Critical Facilities

Many Fish & Wildlife properties include structures that need new roofs -- or replacement structures.

32

FY2019 Funding Request Parks/Fish and Wildlife: $6.5 Million

Capital Request Funding State Federal OtherFY2017 $3,500,000 $0 $0FY2018 $3,500,000 $2,862,500 $0FY2019 $6,500,000 $2,765,000 $0FY2020 $8,500,000 $750,000 $0FY2021 $8,500,000 $500,000 $0Total $30,500,000 $6,877,500 $0

DNREC’s Divisions of Parks & Recreation and Fish & Wildlife depend on the collection of fees and charges from licenses and services to maintain and improve infrastructure and protect the state’s ecological, cultural, and recreational resources. State parks and wildlife areas include nearly 100,000 acres statewide and contain more than 700 buildings in 32 public-access areas.

Funding is requested for a wide range of much-needed statewide projects to rehabilitate parks and wildlife area facilities, roofi ng, roads, utilities, and historic structures, including improvements benefi ting public safety and updates for continued compliance with the Americans with Disabilities Act. Projects also are needed to enhance public recreational access, maintain public buildings and support structures, and modernize utilities and telecommunications for visitors and support staff.

Funding is needed for the growing maintenance and restoration needs of recreational facilities, historic structures, and utility systems. The Divisions of Fish & Wildlife and Parks & Recreation have a combined maintenance and projects backlog of nearly $200 million.

Failing pavement collects water at the main beach bathhouse parking lot, Cape Henlopen State Park.

Additional Information: See Appendix, Fish & Wildlife Capital Project Priorities, pages 70 - 75Additional Information: See Appendix, Parks & Recreation Capital Project Priorities, pages 76 - 92

Page 33: 2018-2021 DNREC Capital Plan

33

Project Details:Facility MaintenanceFunding is requested for rehabilitation projects statewide in parks and wildlife areas, including: Parks & Recreation Projects

Renovations of residential buildings in state parks; Improvements to bathhouses, concession buildings, nature centers, and visitor centers; Installation of automated fee machines and similar public service solutions in state parks; Improvements to campgrounds, cottages, and cabins in state parks; Painting of numerous barns, fi eld offi ces, nature centers, and residences statewide; Plan replacement of the Garrisons Lake Clubhouse; and Replacement of siding on buildings statewide.Fish & Wildlife Projects Demolition of unsafe structures at the former Aquatic Resources Education Center complex; Construction of an offi ce for Fish & Wildlife Natural Resources Police in Little Creek; Repairs and upgrades at Ommelanden Hunter Education Training Center and Public Shooting

Range in New Castle; Construction of Woodland Wharf kayak and fi shing access area for the Captain John Smith Trail on

the Nanticoke River; Construction and repair of facilities in wildlife areas including pole buildings and storage sheds,

and emergency repairs; Replacement and repair of hunting and wildlife-viewing structures; and Maintenance dredging of Augustine Beach Boating and Fishing Access Area.Delaware National Estuarine Research Reserve Project Repairs and renovations to the lobby and entry at the St. Jones Reserve Center near Dover.

Critical Roofi ng Funding is requested for repair/replacement of building roofs in state parks and wildlife areas, including:

Historic barns and buildings within state parks, including: Bellevue offi ce, White Clay Creek sheep barn, Lums Pond mill house, Trap Pond’s Warrington House, Judge Morris Estate, Fort Delaware metal roof, and nine cantonment buildings at Fort Miles;

Youth camps and recreational facilities at Cape Henlopen, including eight dormitory buildings; Residential, recreational, and support structures in state parks, including: Holts Landing bathhouse,

Killens Pond maintenance building, Killens and Trap pond cabin roofs, Fenwick Island beach bathhouse, and Grassdale offi ce; and

Fish & Wildlife historic buildings and facilities, including Mulberry Landing pavilion at Assawoman Wildlife Area.

Road RehabilitationFunding is requested to begin repair of the 40-plus miles of roads in state parks and wildlife areas that are not eligible for Department of Transportation (DelDOT) or Federal Highway Administration funds. Inventory and assessment reports have been completed for Cape Henlopen and Killens Pond. Other road systems will be evaluated in the coming years.

Projects include: Paving state parks roads, including Cape Henlopen, Delaware Seashore, Killens Pond, and

Lums Pond; State parks parking lot projects, including renovations at Baynard Stadium; and Repairs to wildlife area roads, parking lots, and boat ramps statewide.

Page 34: 2018-2021 DNREC Capital Plan

34

Utility InfrastructureFunding is requested to upgrade aging utility and telecommunication infrastructure throughout DNREC’s properties through wholesale replacement, major maintenance, effi ciency measures, or installation of renewable energy systems not previously found on the properties.

Projects include: Updating sewer, water, and stormwater facilities in state parks; Upgrading telecommunication infrastructure statewide to increase connectivity for staff and

visitors; Upgrading state parks electrical utilities; Upgrading the wastewater treatment plant at Cape Henlopen State Park, with potential to connect to

city sewer; and Energy and utility upgrades to wildlife area facilities statewide.

Historic Building and Structure Stabilization Funding is requested for repair and stabilization of historic structures within the department’s inventory. This funding could be used to match federal and private grants and programs for historic preservation.

store; improving contact station and vehicular circulation; addition of playground and community gathering area;

Renovation of existing park offi ce; and Renovation of existing nature center.

Division of Parks & RecreationThe Division of Parks & Recreation manages 26,071 acres, 151 miles of trails, 43 miles of roadways, 619 buildings in 16 state parks, the Brandywine Zoo and Baynard Stadium, 10 preserves, and 92 conservation and other easements. More than 5.8 million people visited Delaware’s state parks in 2017. Nearly two-thirds of Delaware residents think parks and recreation facilities are a necessity.

The Division of Parks & Recreation has completed more than $35 million in projects over the last three years, thanks to bond bill funds, grants, loans, donations, and public-private partnerships.

Parks has maintenance and capital project backlogs of critical infrastructure projects of approximately $160 million. Additional potential enhancement projects could double that amount.

Current Projects: FY2018Cape Henlopen State Park

Repairing or replacing roofs and windows and installing air conditioning at youth camps and recreational facilities;

Renovating campground water and electric hookups; renovating bathhouse into camp

The sewage treatment plant at Cape Henlopen State Park is out of code compliance.

Page 35: 2018-2021 DNREC Capital Plan

35

Delaware Seashore State Park Repairing dry stack roof at Indian River

Marina; Designing and installing additional queuing

docks at marina; Investigating structural integrity of historic

tower, including sidewalk approach and lighting; and

Replacing playground at South Inlet campground.

Wilmington State Parks Renovating Josephine fountain. Removal of the tiger exhibit, and design and

renovation of the area; and Develop Brandywine Zoo master plan.

Brandywine Creek State Park Installing stairs at boat launch on Brandywine

Creek on public side of Thompson parking lot.

Lums Pond State Park Renovating sewer treatment plant; and Installing overfl ow parking lot at campground.

Bellevue State Park Repairing interior and exterior of parsonage

building for use as an offi ce and meeting location for parks programs and Friends groups.

Holts Landing State Park Designing and installing a parking lot for boat

launch area.

State Parks – statewide Completing building, roofi ng, and utility

repairs on projects; Painting numerous barns and residences; Making parking lot improvements; Making public safety improvements to

facilities; and Making improvements necessary for continued

ADA compliance.

National Gold Medal AwardDelaware State Parks received the 2015/2016 National Gold Medal Award for Excellence in Park and Recreation Management from the National

Recreation and Parks Association. Delaware is the only small state park system to win this prestigious biennial award since its inception in 1997.

Recent Accomplishments: Cape Henlopen State Park

Reinforced fi shing pier pilings and replaced all pier decking and railing;

Installed Phase II sewer lining of 70-year-old sewer system;

Installed six new cabins at campground; and Completed Artillery Park installation at Fort

Miles, Battery 519.

Wilmington State Park Removed and replaced unsafe bleachers with

temporary bleachers at Baynard Stadium; and

Completed the Eagle Ridge exhibit at Brandywine Zoo.

Brandywine Creek State Park Overlaid trail and parking lot at Thompson

Bridge area.

Killens Pond State Park Waterpark Completed Phase I renovations, including new

waterslides.

Lums Pond State Park Completed campground improvement of

water, sewer, and electrical hookup.

Bellevue State Park Repaired coffer dam on the pond.

Holts Landing State Park Completed installation of the double-sided

boat launch.

State Parks – statewide Made building, roofi ng and utility repairs on

projects; Painted numerous barns and residences; Made public safety improvements to facilities;

and Made improvements necessary for ADA

compliance.

Page 36: 2018-2021 DNREC Capital Plan

36

Division of Fish & WildlifeFish & Wildlife manages nearly 65,000 acres of land in 19 wildlife areas and 57 fi shing and boating access areas that provide opportunities for hunting, fi shing, boating, and wildlife-viewing to benefi t:

More than 110,000 resident/non-resident anglers fi shing in Delaware waters;

More than 20,000 resident/non-resident hunters who use public lands or harvest managed species;

Almost 62,000 boats registered in Delaware; and

900,000 resident Delawareans and more than 2 million visitors.

The Division of Fish & Wildlife has maintenance and project backlogs of more than $30 million in critical infrastructure projects.

Current Projects: FY2018 Repairing roads and parking lots at boat ramps and

Fish & Wildlife areas;

Demolishing unsafe structures to improve public and/or staff access on Fish & Wildlife properties;

Making emergency repairs at Fish &Wildlife facilities;

Beginning safety repairs to crumbling and uneven concrete, walls, and doors, and replacing target retrieval system at Ommelanden Hunter Education Training Center’s indoor shooting range;

Making repairs to Mallard Lodge, including drywall, window/sliding door replacement, fi re escape repairs, and replacement of mattresses to improve safety conditions for overnight groups participating in aquatic education programs;

Constructing a transient boat dock, improving an existing small boat launch, repairing bulkhead, and adding parking for Woodland Wharf on Nanticoke River;

Constructing overhang and adding fencing to the Cedar Swamp Wildlife Area pole barn;

Completing design and beginning construction of Little Creek Wildlife-Fisheries Field Offi ce and Bayshore Visitors Center;

Completing general facility and roof repairs at various Fish & Wildlife locations; and

Completing improvements to the DuPont Nature Center exterior decking.

Recent Accomplishments: FY2016-2017 Completed construction of the new Aquatic

Resources Education Center, including the exterior patio with interpretive signs, and holding grand opening event;

Completed construction of the Owens Station Natural Resources Police outpost building;

Completed upgrades to Augustine Wildlife Area shop, including utilities, offi ce repairs, and mold remediation;

Repaired and rehabilitated historic buildings, including Robert Ashton and John Ashton historic homes; and

Completed repairs at New Castle County and Kent County Fish & Wildlife Natural Resources Police offi ce locations.

Failing boat ramp lot at Phillips Landing, Nanticoke Wildlife Area.

Page 37: 2018-2021 DNREC Capital Plan

Visitors enjoying the trail at Gordons Pond, Cape Henlopen State Park.

Statewide Trails and PathwaysThe First State Trails and Pathways Initiative expands a statewide network of new and enhanced trails and pathways for walking, biking, hiking, and active living. The Initiative has far-reaching advantages – boosting Delaware’s economy, benefi ting local businesses, and promoting the continued growth of the state’s recreation and tourism industries. By providing places to walk, run, or ride, trails and pathways enable people to connect with the outdoors and live healthier, more active lifestyles.

In collaboration with the Governor’s Offi ce, DelDOT, Bicycle Council, Pedestrian Advisory Committee, Council on Greenways and Trails, communities, and other stakeholders, DNREC is continuing to implement the First State Trails and Pathways Initiative.

Many trails and pathways projects are multi-phase and will be implemented in segments over a period of years. This request for funding will be dedicated

37

Support Healthy Families

FY2019 Funding Request for Statewide Trails and Pathways: $2.5 Million

Funding is requested for trail and pathway development to expand recreational and transportation opportunities for Delawareans and visitors. Project funding will leverage existing and new resources from state, federal, and private investments to continue Delaware’s national leadership in providing a world-class, interconnected network of shared-use pathways and trails that will support non-motorized travel and recreational trail opportunities.

Capital Request Funding State Federal OtherFY2017 $2,500,000 $896,623 $0FY2018 $3,000,000 $896,623 $0FY2019 $2,500,000 $896,623 $0FY2020 $3,000,000 $896,623 $0FY2021 $3,000,000 $896,623 $0Total $14,000,000 $4,483,115 $0

to support implementation of those projects identifi ed and prioritized in the plan, including essential equipment and/or systems necessary to commission these sites and structures for public use.

Additional Information: See Appendix, Statewide Trails and Pathways, pages 93 - 94

Page 38: 2018-2021 DNREC Capital Plan

38

A scenic trail with leaves just beginning to turn.

Current Projects:

White Clay Creek State Park, Tri-Valley Trail – Phase II planning and design of 1 trail mile under-way, with construction to commence in 2018.

Killens Pond State Park – Design of a 900-foot trail bridge to complete the pond loop trail and linking the Nature Center/boat rental area with the campground and to redesign the boat ramp area.

Holt’s Landing State Park – Construct a loop trail with elevated boardwalk and improve access for non-motorized boats.

Brandywine Creek State Park – Improve accessibility, safety, and stormwater drainage on the south side of the Brandywine Trail.

Cape Henlopen State Park – Design trail segment between park entrance and Lewes-Rehoboth Canal along the railroad corridor. This trail segment is a key link in the Georgetown-Lewes-Cape Regional Trail.

Lums Pond State Park

o Design phase I of the 1.2 mile trail from the park entrance to the central day-use area.

o Construct phase I of Buck Jersey trail from park entrance to Area 1.

Auburn Heights – Design phase I of the Hockessin/Kennett trail.

Garrisons Golf Course – Cart path repairs.

Delaware Bayshore

o Ted Harvey Wildlife Area Morris Tract – Design and engineer a 1-mile accessible trail and wildlife viewing enhancements.

o Little Creek Bayshore Visitor Center – Design and engineer a 1-mile accessible trail and a 0.5-mile viewing loop at the planned Bayshore Visitor Center.

o Ted Harvey Wildlife Area-St. Jones Reserve Connector Trail – Design and engineer a 0.75-mile accessible trail connecting the St. Jones Reserve to the Ted Harvey Wildlife Area.

o Augustine Wildlife Area – Cooper-Cross wildlife-viewing platform and trail construction to begin in spring 2018.

o Woodland Beach Wildlife Area – Design of wildlife-viewing trail and observation facility for the new Aquatic Resources Education Center; and design boardwalk rehabilitation, trail, and trailhead.

o Little Creek Wildlife Area – Construction of the boardwalk trail and observation tower replacement.

Future Projects: Assawoman Canal Trail – Construct underpass

at Route 26 and design 1.5-mile trail segment from Route 26 to south of Kent Avenue. This trail segment will connect South Bethany with Bethany Beach and Ocean View.

White Clay Creek State Park – Design and construct the Pomeroy Trail from Hopkins Road to the park offi ce, including a bridge.

Augustine Wildlife Area (Bayshore) – Cooper-Cross wildlife-viewing platform and trail construction to begin in spring 2018.

Woodland Beach Wildlife Area (Bayshore) – Construction of wildlife-viewing trail and ob-servation facility for the new Aquatic Resources Education Center; and design and construction for boardwalk rehabilitation, trail, and trailhead.

Little Creek Wildlife Area (Bayshore) – Construction of the boardwalk trail and observation tower replacement.

Page 39: 2018-2021 DNREC Capital Plan

39

Bicyclists enjoying the view from the C&D Canal Trail.

Accomplishments: 2016 to Present

Auburn Heights Preserve – 1.8 miles of trails under construction in 2017-2018.

White Clay Creek State Park, Tri-Valley Trail – Phase I construction of 1.8 trail miles completed and trailhead improvements underway.

Cape Henlopen State Park – 1.6-mile extension of the Junction & Breakwater Trail completed; total of 5.6 miles of trail links Lewes and Rehoboth.

Assawoman Canal Trail – 1.1 miles of trail and new trailhead; connects Ocean View and Bethany area communities.

Brandywine Creek State Park – Replacement bridge at Rocky Run and resurfacing of 0.5 mile segment of Brandywine Trail to improve accessibility and safety; key link in Brandywine Trail system.

Alapocas Run State Park – 0.6 miles of Northern Delaware Greenway Trail resurfaced to improve accessibility and safety.

Branch Canal Trail – 0.4-mile trail connecting Delaware City to the Michael N. Castle Trail; completed in June 2016.

Michael N. Castle Trail – The fi nal segment (1.9 miles) of the Michael N. Castle Trail along the C&D Canal was completed in late 2016. The offi cial opening of the trails along the C&D Canal, including the 12.1-mile Michael N. Castle and 0.4-mile Branch Canal Trails in Delaware, was held on Jan. 13, 2017.

Augustine Wildlife Area (Bayshore) – Cooper-Cross wildlife-viewing platform and trail design completed.

Ashton Tract (Bayshore) – New wildlife-viewing platform and trail construction completed.

Little Creek Wildlife Area (Bayshore) - Design and engineering for the boardwalk trail and observation tower replacement completed.

Blackbird Creek Reserve (Bayshore) – Trail and trailhead construction completed and trailhead information kiosk installed; pavilion access trail construction, and kayak/canoe access trail improvements completed.

Trail Markers & Information – New trail markers and trailhead information boards with maps were installed in Cape Henlopen, Trap Pond, White Clay Creek, Brandywine Creek, and Holts Landing state parks, and Assawoman Canal and the Ashton Tract (Bayshore).

The long-term vision for the Trails and Pathways Initiative includes:

Building a world-class, interconnected, accessible pathway network statewide;

Linking communities to support local sustainable economies and grow connections between neighborhoods, towns, and cities;

Supporting creation of local jobs;

Developing sustainable practices in creating the network through native landscaping and natural habitats;

Supporting healthy communities by providing affordable, active transportation choices;

Supporting healthy families and the Children in Nature Initiative;

Page 40: 2018-2021 DNREC Capital Plan

Walking dogs along the trail at Fort Miles, Cape Henlopen State Park.

Maintaining Delaware’s ranking in the top 10 bicycle-friendly states in the U.S. (currently ranked third in the nation by the League of American Bicyclists); and

Developing strategies for the ongoing maintenance and upgrades of existing facilities.

Trail Facts

Trail-related activities are the number one outdoor recreation activity in Delaware; more than half of our residents want more trail-related opportunities. (Source: State Comprehensive Outdoor Recreation Plan)

Delaware’s 571 miles of trails serve recreational trail users and provide alternative transportation routes. Trail networks serve hikers, walkers, runners, mountain bikers, bicyclists, equestrians, and nature enthusiasts.

The 14.3-mile continuous trail along the C&D Canal – which includes the Michael N. Castle and Branch Canal Trails in Delaware and the Ben Cardin Trail in Maryland – connects travelers to the historic towns of Delaware City and Chesapeake City.

Nearly 200,000 people use the Michael N. Castle Trail along the C&D Canal annually.

In greater Newark, more than 52,500 people live within a 10-minute bike ride of the area’s more than 70 miles of shared-use trails.

Delaware state park trail projects focus on completing trail network gaps, upgrading and enhancing trail systems, and making connections to communities and local parks. State wildlife area projects expand Bayshore nature-based recreation.

Trail Benefi ts

Economic – A trail can bring at least $1 million annually to a community, depending on how the area embraces a trail.

Health – In Delaware, one-third of adults and 40 percent of children ages 2 to 17 are overweight or obese. Trails and parks provide a means for children and families to be physically active and live healthy lifestyles.

Jobs and Tourism – Trails generate revenue for small businesses, restaurants, gear/bike shops and lodging, supporting local economies.

Environment – Bicycling and walking for recreation, work and everyday activities save on fuel costs and improve air quality. By biking or walking one mile instead of driving a car, nearly one pound of carbon dioxide emissions is eliminated.

40

Page 41: 2018-2021 DNREC Capital Plan

Support Healthy Families

Visitors enjoying the new pool amenities.

41

FY2019 Funding Request for Killens Pond Waterpark Improvements: $3.5 Million

Killens Pond Waterpark Improvements

Funding is requested for phase II of the four-phase renovations plan for Killens Pond Waterpark. Phase II includes a new sprayground, bathhouse, pavilion, play features, and several shade structures that will help expand the capacity of the water park.

Funding will support continued improvements to the pools, walkways, and pool decking; bathhouses, showers and lockers; ticket and concession buildings; and the pool’s mechanical building and infrastructure. Capital Request Funding State Federal OtherFY2018 $0 $0 $0FY2019 $3,500,000 $0 $0FY2020 $3,000,000 $0 $0FY2021 $3,000,000 $0 $0Total $9,500,000 $0 $0

Natural and recreational opportunities abound at Killens Pond State Park, centrally located in the heart of Kent County. The park’s centerpiece is the 66-acre millpond, which features boating and fi shing. The park also offers hiking and biking trails, a cross-country running course, game courts, ball fi elds, an 18-hole disc golf course, camping and cabins, playground equipment, and picnic areas. At the Nature Center, visitors can view a large collection of native reptiles and amphibians.

A master plan for improvements to the 19-year-old waterpark’s pool area was mapped out in 2014 and divided into four phases. Phase I construction was completed in 2016 and included the addition of state-of-the-art water slides – two spiral and two speed slides, each mounted on a 54-foot-high platform, almost twice as high as the slides they replaced.

Other improvements include an enhanced entry with colorful canopies, an enlarged queuing area to provide shade for customers waiting to enter the waterpark, and additional ticket booths to expedite the ticketing process. Accessibility improvements have been completed at the bathhouse, which also received a fresh coat of paint, and a new building to house the water fi ltration system to support the slide complex and future improvements.

Not counting regular maintenance, this is the fi rst renovation since the waterpark opened 20 years ago and is incredibly popular with park users.

Highlights: Killens Pond State Park is a major recreational

attraction in Kent County, drawing more than 180,000 visitors annually.

The park’s attractions, such as year-round camping, Killens Pond Waterpark, disc golf course and ball fi elds, make this park a popular travel destination.

The waterpark is open from Memorial Day weekend through Labor Day.

Project Description

Additional Information: See Appendix, Parks & Recreation Capital Project Priorities, pages 76, 82, 85, 91

Page 42: 2018-2021 DNREC Capital Plan

Support Healthy Families

DNREC’s licensing offi ce at the Richardson & Robbins building in Dover issues recreational licenses during normal business hours.

42

Capital Request Funding State Federal OtherFY2019 $1,500,000 $0 $0FY2020 $1,500,000 $0 $0FY2021 $1,500,000 $0 $0Total $4,500,000 $0 $0

Information Technology: Permitting, Registration, and LicensingTo be more effi cient and effective in performing key functions, and to improve the customer service experience, DNREC needs to consolidate and modernize its aged technology.

DNREC’s current Licensing and Registration System, eGov, is used to issue more than 170,000 recreational hunting, fi shing, and trapping licenses, charter and head boat licenses, tags, stamps, and conservation access passes annually. The Division of Fish & Wildlife’s Sales Force software handles the registrations of more than 60,000 boats each year. In addition to eGov and Sales Force, DNREC also maintains another 40+ solutions, either internally or through other vendors, for issuing various permits to residents, visitors, businesses, and municipalities. These disparate systems are diffi cult to support and impose a disjointed customer experience, causing frequent errors in form submissions, as well as resulting in frustration and permitting delays.

The current Fish & Wildlife licensing system is unstable, ineffi cient, and costly to maintain. This

An automated customer-centric system is needed that will encompass all DNREC service channels, including regulatory work, such as septic and well permits, in addition to authorizations such as fi shing and hunting licenses, and access passes. This new web-based solution will provide greater accessibility, allowing customers to conveniently use their mobile devices (IOS and Android compatible) 24 hours a day, seven days a week, with support for English and Spanish-speaking customers. Advanced reporting and analytical capabilities will reduce time previously used to compile and review data, allowing staff to provide more individualized customer support and permit reviews.

results in interruptions in service and often requires the public to enter duplicate information into multiple systems before a license or permit is granted. In addition, the current technology is incompatible with new technologies, including some internet browsers and mobile devices.

FY2019 Funding Request for Permitting, Registration and Licensing: $1.5 MillionProject Description

Page 43: 2018-2021 DNREC Capital Plan

An automatic interface that ensures the suspension or denial of renewals of any license to ineligible citizens. For example, according to Delaware law, the Division of Fish & Wildlife must deny issuance or suspend renewal of any license for individuals who owe child support.

A new permitting, regulation, and licensing system will improve Delaware’s ability to comply with interstate and federal guidelines, such as the Division of Fish & Wildlife’s compliance with the Interstate Wildlife Violator Compact (IWVC)*, and the Division of Waste & Hazardous Substances’ compliance with the Environmental Protection Agency’s e-Manifest program, just as examples.

*The IWVC is an interstate agreement, required by Delaware law, between member states to enhance compliance with hunting, fi shing, and other wildlife laws of member states, and to provide for the fair and impartial treatment of wildlife and fi sheries violators.

Automatic reporting of migratory bird hunting harvest data, license certifi cations, and the number of both exempt and nonexempt hunters and anglers in the state. Staff will be able to easily generate reports necessary to satisfy federal funding requirements, as well as provide useful internal data.

A common look-and-feel across all permits, licenses, and registrations, so that customers can more easily recognize and become familiar with DNREC transactions. This reduces any learning curve with each new electronic engagement and allows the Department to autofi ll previously known customer information such as home address and areas of interest.

Increasing the ability to share correlative scientifi c information across programs. For example, if a property has a permit from the Division of Water and a separate permit from the Division of Waste & Hazardous Substances, the central permitting solution will have the ability to bundle inspection and monitoring information for a more complete environmental picture.

Increasing customer service options. For example, if a customer is registering a boat, a consolidated permitting solution can provide relevant information such as boat ramp locations, water quality for swimming, fi shing seasons, and boat fueling stations. Each customer transaction should include additional DNREC information to inform and enhance their experience.

43

Other benefi ts of a new system:

Page 44: 2018-2021 DNREC Capital Plan

44

Minor Capital Improvements for OperationsDNREC infrastructure needs include minor capital improvements to the Department’s public facilities. These building and facility repairs/rehabilitations for all state-owned public properties include: Delaware Seashore State Park; Fort Delaware State Park; Cape Henlopen State Park; Brandywine Creek State Park and Brandywine Zoo; New Castle, Kent, and Sussex County Wildlife Regions 1, 2, and 3; DuPont Nature Center; Mallard Lodge; Aquatic Resources Education Center; Ted Harvey Wildlife Area; North Bowers Beach; Little Creek Fisheries Building; and the Delaware National Research Reserve’s Blackbird Creek and St. Jones reserves.

FY2019 Funding Request for Minor Capital Improvements: $2.5 Million

Support Healthy Families

The recently-renovated park offi ce at Cape Henlopen State Park.

Capital Request Funding State Federal OtherFY2018 $0 $0 $0FY2019 $2,500,000 $0 $0FY2020 $2,500,000 $0 $0FY2021 $2,500,000 $0 $0Total $7,500,000 $0 $0

Project Description

Funding is requested for minor capital improvement and equipment projects for the Department’s public facilities. Projects include roof and window replacements and repairs, bathroom renovations, parking lot and sidewalk repairs, and accessibility projects.

Additional Information: See Appendix, DNREC Minor Capital Improvements for Operations, pages 67-69

Page 45: 2018-2021 DNREC Capital Plan

45

Support Healthy FamiliesCape Henlopen Pier ReplacementAt the onset of World War II, the U.S. Army established a military base at Cape Henlopen and built a wooden fi shing pier to serve as a mining wharf. The pier became state property in 1964 when the State of Delaware accepted ownership of Cape lands and established Cape Henlopen State Park.

The aging pier has undergone several rehabilitative ef-forts since 2007, including extensive repairs to its pilings. The T-head portion of the pier was demolished in 2012 after its deteriorated condition was deemed a threat to safety and navigation.

DNREC’s Division of Parks & Recreation has moni-tored the condition of the pier and found an increasing rate of deterioration in the structure. In October 2014 the pier was closed as a safety measure after an engineer’s analysis recommended that pedestrian and vehicular traffi c be prohibited on the pier until repairs were made to a minimum of 24 wooden pilings holding up the structure.

The 1,300-foot pier reopened on May 25, 2016 after 149 pilings were repaired or replaced and extensive decking repairs completed. These repairs were will only temporarily extend the life of the pier. The more than 70-year-old structure needs to be replaced, and an investigation into the design, location, and other possible alternatives needs to begin as soon as possible. Preparing for a future pier will take years of consideration and design before construction can begin.

Pier Facts:

Ice damage in the winter of 2017 continued the deterioration of the Cape Henlopen pier. At this point, its remaining longevity is uncertain.

FY2019 Funding Request for Cape Pier Replacement: $650,000

Funding is requested for the design and permitting of a new Cape Henlopen State Park pier to replace the existing structure. The design and permitting process is expected to take two years.

Capital Request Funding State Federal OtherFY2018 $0 $0 $0FY2019 $650,000 $350,000 $0FY2020 $8,000,000 $0 $0FY2021 $7,000,000 $0 $0Total $15,650,000 $350,000 $0

Project Description

• More than 1.2 million people visit Cape Henlopen State Park each year.

• The Cape Henlopen Fishing Pier is the busiest fi shing structure in all of Delmarva and the most popular recreational fi shing structure in Delaware.

• The pier generates more than $700,000 in revenue annually for the state’s economy.

• The pier creates habitat for fi sh and other sea life and is used extensively by anglers, birdwatchers, and nature lovers.

• The pier’s bait and tackle concessionaire is a convenience for visitors and generates income for the park.

Additional Information: See Appendix, Parks & Recreation Capital Project Priorities, pages 76, 78

Page 46: 2018-2021 DNREC Capital Plan

Support Healthy FamiliesHistoric Sites:Fort Miles MuseumDNREC’s Division of Parks & Recreation manages more properties on or eligible for listing on the National Register of Historic Places than any other entity in the state. Examples include Civil War-era Fort Delaware, Bellevue Hall, Blue Ball Barn, and Sussex County’s iconic World War II fi re control towers and Fort Miles.

The capital backlog of historic properties and monuments throughout the state exceeds $15 million. Much-needed work includes replacing barn roofs, masonry work on Fort Delaware, and restoration of the Josephine Fountain in Wilmington. This request seeks a dedicated funding source to maintain and preserve these and other critical sites in our state’s history.

Fort Miles played a vital role in our nation’s coastal defense during WWII, with its heavy guns, mine fi elds, searchlights, and the towers. The Delaware River was a chief priority for defense planners because of the access it afforded to the large trade centers of Wilmington, Philadelphia, and beyond. After the war, the growing use of long-range missiles made US harbor defenses obsolete, and in 1964, more than 500 acres of the former military lands were returned to Delaware to form the core of

DNREC Secretary Shawn M. Garvin and Governor John Carney touring the new Artillery Park at Fort Miles.

46

today’s Cape Henlopen State Park. In 2005, the park’s Fort Miles Historical Area was placed on the National Register.

Recent projects at the popular seaside historic site include the 2016 opening of the Artillery Park, featuring a 16-inch gun salvaged from “Mighty Mo” – the USS Missouri – and other period armaments at Battery 519. Other improvements include new restrooms, a renovated mess hall, signage, and a grant-funded geothermal HVAC system.The primary project for requested FY2019 funding is to advance museum planning at Fort Miles, matching recent private donations and grants to restore the fort’s historic structures. In 2017, Friends groups raised more than $1 million via grants from organizations such the Longwood Foundation and the National Trust for Historic Preservation.

Capital Request Funding State Federal OtherFY2015 $150,000 $0 $0FY2018 $0 $0 $0FY2019 $500,000 $0 $0FY2020 $500,000 $0 $0FY2021 $500,000 $0 $0Total $1,650,000 $0 $0

Project Description

Funding is requested for improvements to the Fort Miles Museum inside Battery 519.

FY2019 Funding Request for Historic Sites/Fort Miles Museum: $500,000

Additional Information: See Appendix, Parks & Recreation Capital Project Priorities, pages 79, 84

Page 47: 2018-2021 DNREC Capital Plan

Baynard Stadium RenovationsLocated in Wilmington State Park, Baynard Stadium is owned by the City of Wilmington and managed by DNREC’s Division of Parks & Recreation. Built in 1922, the stadium has been the site of some of Delaware’s greatest high school football games and has hosted numerous track and fi eld meets, soccer and lacrosse games, and other sporting events. The last upgrade to the stadium was completed in 1972.

Baynard Stadium is in great need of repair. In 2016, the bleachers on the south side of the stadium were condemned and closed after an engineering assessment found them to be structurally unsafe. The bleachers were removed and replaced with temporary bleachers for the upcoming sports season. Bleachers on the north side are currently on a “watch list” by engineers, and likely are subject to closure at some time in the future due to ADA challenges and structural issues.

Installed in 2000, the existing running track is at the end of its expected 15-year lifespan. In 2014, the track received an overcoat treatment, but an assessment at the time determined that the underlying asphalt has deteriorated, requiring complete rehabilitation of the track.

The mayor of Wilmington formed a task force to evaluate the project and recommended a public-private partnership. The City of Wilmington solicited letters of interest for a public-private partnership; Salesianum High School was the only party to respond. The city and the school are in discussions about an agreement.

Temporary bleachers were installed at Baynard Stadium to ensure public safety.

47

Support Healthy Families

Future Funding Request for Baynard Stadium Renovations

Within the next two years, Baynard Stadium needs $1.5 million to begin greatly needed repairs. If no public-private partnership can be reached, funding will need to be authorized via the City of Wilmington, which owns the stadium, or via the state, which operates the facility, or the stadium could face a closure due to the defi ciencies with the track and north bleachers.

Capital Request Funding State Federal OtherFY2019 $0 $0 $0FY2020 $600,000 $0 $0FY2021 $1,000,000 $0 $0FY2022 $6,000,000 $0 $0Total $7,600,000 $0 $0

Project Description

Additional Information: See Appendix, Parks & Recreation Capital Project Priorities, pages 81, 85 -87, 89

Page 48: 2018-2021 DNREC Capital Plan

Support Healthy Families

48

Holts Landing State Park ImprovementsHolts Landing State Park is a hidden gem on Indian River Bay. The 203-acre park contains a variety of beautiful landscapes, from the Indian River Bay beach to grassy fi elds and hardwood forests.

The park is in need of upgrades and repairs. Phase I of the restoration was completed in April 2016 and included the installation of a new state-of-the-art dual boat ramp with an ADA-accessible fl oating dock. The boat ramp represents the largest capital investment ever made at the park.

The innovative ramp provides 24-hour access for watercraft enthusiasts. Unlike its predecessor, the ramp allows two users to simultaneously launch their vessels into the bay. To improve navigational boating access, DNREC’s Waterway Management Section dredged material from the boat ramp into Indian River Bay, creating a channel 60 feet wide that accommodates boats up to 25 feet in length. The beautiful boat ramp is expected to double its capacity, thereby boosting recreational opportunities and tourism at the park.

Location and concept of new parking lot at Holts Landing.

In early 2018 construction will be underway for the 30+ boat trailer parking lot adjacent to the boat launch.

Capital Request Funding State Federal OtherFY2018 $0 $0 $150,000FY2019 $0 $0 $0FY2020 $500,000 $0 $0FY2021 $1,000,000 $0 $0Total $1,500,000 $0 $150,000

Future Funding Request for Holts Landing

Funding is requested for the design and development of the park’s main parking lot and renovations for the restroom.

Project Description

Additional Information: See Appendix, Parks & Recreation Capital Project Priorities, pages 79, 82, 85, 87, 89, 91

Page 49: 2018-2021 DNREC Capital Plan

Brandywine Zoo

Support Healthy Families

Future Funding Request for Brandywine Zoo

Capital Request Funding State Federal OtherFY2019 $0 $0 $0FY2020 $1,500,000 $1,000,000 $1,500,000FY2021 $1,500,000 $0 $2,000,000FY2022 $1,000,000 $0 $4,000,000Total $4,000,000 $1,000,000 $7,500.000

Project Description

49

Artist’s rendering of the proposed new zoo entrance; and, at right, a red panda at the Brandywine Zoo.

Located in Wilmington on the banks of the Brandywine River, the Brandywine Zoo opened in 1905. Managed by DNREC’s Division of Parks & Recreation and supported by the Delaware Zoological Society, Delaware’s only zoo is accredited through the American Zoo and Aquarium Association, which sets standards for all aspects of operations.

During the most recent reaccreditation process, the zoo was placed under additional scrutiny due to aging infrastructure, including the need to modernize exhib-its and to improve animal care by expanding quaran-tine holding areas and other hospital facilities. Losing AZA accreditation would mean losing key animals on loan to the zoo, such as the popular red pandas and Andean condors.

Some recent physical improvements have been made, including converting the former tiger exhibit into an amphitheater, a pop-up hands-on exhibit, and a tent area for events and rentals, as well as sidewalk and railing replacement and new traveling zoo quarters.

In late 2017 and 2018, the Delaware Zoological Society and DNREC staff have been working on an updated zoo master plan. When the plan is complete, funding is needed to begin work on signifi cant capital improvements to the zoo, with the goal of earning reaccreditation in 2021.

Additional Information: See Appendix, Parks & Recreation Capital Project Priorities, pages 77, 91-92

Page 50: 2018-2021 DNREC Capital Plan

Biden Center Renovations

Support Healthy Families

FY2019 Funding Request for Biden Center Renovations: $1.3 Million

Capital Request Funding State Federal OtherFY2019 $1,300,000 $0 $0FY2020 $5,500,000 $0 $0FY2021 $0 $0 $0Total $6,800,000 $0 $0

Project Description

The Biden Environmental Education Center needs extensive renovations to better serve visitors and groups, including overnight accommodations for multi-day conferences and workshops.

Additional Information: See Appendix, Parks & Recreation Capital Project Priorities, pages 77.

50

Built in 1962 by the U.S. Army as part of Fort Miles and acquired by the state of Delaware in 1996, Cape Henlopen State Park’s Biden Center is currently used for meetings, classes, and other events, as well as housing parks staff offi ces and offi ces for the Friends of Cape Henlopen State Park and the Fort Miles Historical Society.

Until June 2013, when the facility was closed to overnight guests due to code compliance issues, including accessibility and lack of modern safety standards such as fi re suppression in the kitchen area, the Biden Center had also provided much-needed overnight accommodations for up to 53 guests in dorm-style rooms. Without overnight accommodations, the center cannot host regional environmental workshops, small conferences, educational retreats, and in-state and out-of-state volunteer service groups without renting other off-site facilities.

With renovations to bring the building up to code and modernize the facility, the Biden Center could again provide these services, as well as enhancing environmental education opportunities, offering rentals for fundraisers, reunions, and parties, and bringing additional visitors to the popular park

instead of sending them out of state. Proposed renovations include installing an elevator and a commercial kitchen with a fi re suppression system, modernizing restrooms, renovating the conference room and adding a breakout room to hold up to 200 people for special events.

Funding is requested to begin the programming, conceptual design, and draft construction documents for renovations to the Biden Environmental Training Center at Cape Henlopen State Park. Renovations will include updates to bring the building into compliance with modern safety standards and accessibility requirements and modernizing the facility to allow additional conference and training opportunities.

Page 51: 2018-2021 DNREC Capital Plan

51

Page 52: 2018-2021 DNREC Capital Plan

Preserve Natural Heritage and Expand Ecotourism

This conceptual illustration shows new facilities including a train station and amphitheater.

52

FY2019 Funding Request for NVF Redevelopment: $3 Million

Funding is requested for the continued remediation and redevelopment of the former NVF facility in Yorklyn, along the Red Clay Creek. DNREC completed a series of acquisitions that allow for remediation of the site, while providing open space, fl ood mitigation, and wetland creation, and supporting economic development. Asbestos abatement, demolition, and a new access road were completed.

FY2018 funding supports renovation of an Auburn Heights offi ce and parking lot, trail connections with historic bridges, construction of a new amphitheater, and other visitor-oriented projects.

FY2019 funding will continue to focus on the redevelopment of the site into park amenities, open space, fl ood mitigation, and wetland areas. The site will have several acres of fl ood retention capacity and will serve as the center of an expanding trail system, connecting several existing parcels of state property to local communities. Phase I of the trail system opened to the public in August 2012 and phase II of the trail system was completed in June 2017.

Capital Request Funding State Federal OtherFY2017 $2,500,000 $0 $0FY2018 $2,500,000 $0 $0FY2019 $3,000,000 $0 $0FY2020 $3,000,000 $0 $0FY2021 $1,000,000 $0 $0Total $12,000,000 $0 $0

Redevelopment of Strategic Sites:NVF YorklynYorklyn has been an active mill area since the early 18th century. A variety of mills have come and gone, with the largest products being snuff, paper, and fi ber. Yorklyn today resembles a ghost town of abandoned mill buildings. The last mill, National Vulcanized Fibre Corporation, later NVF, closed in 2009. A public-private partnership has mapped out the future of Yorklyn, which will transform the area into a vibrant, lively, and scenic town, while still retaining its mill industry roots.

NVF declared bankruptcy in 2009, and the contaminated and fl oodplain sections of the site were abandoned by the company. The State of Delaware assumed responsibility for the cleanup and demolition costs of the site. During the bankruptcy proceedings, a plan to purchase the NVF property was developed using federal fl ood mitigation grant funds, state Open

Space funds, and private funds. The neighboring Auburn Heights Preserve was created through a generous donation of 192 acres of conservation lands from Tom and Ruth Marshall. As a result of state and community efforts, more than 500 acres of contiguous open space have been preserved.

Project Description

Additional Information: See Appendix, Parks & Recreation Capital Project Priorities, page 76

Page 53: 2018-2021 DNREC Capital Plan

53

This aerial view shows a newly-created wetland at the NVF site in Yorklyn.

Current Projects FY2018:

Design and construction of a trail to the Creative Center for the Arts

Construction of water utilities to serve the site, allowing for redevelopment

Design of the NVF trail connector to Hockessin, with the assistance of DelDOT

Renovation and construction to transform the former Marshall Brothers Paper Mill offi ce into the new main park offi ce

Design and construction of the new amphitheater, including parking lot improvements and new plaza

Design of the trail and utility connection to the Snuff Mill property, including a bridge

Construction of a new entrance into Auburn Heights Preserve

Setting a refurbished historic bridge connecting the phase I and II trails

Demolition of a barn in preparation for a future maintenance facility; design of the maintenance building

Project Accomplishments FY2014-2017:

Demolished the NVF Corporate Offi ce, the zinc and water treatment facilities and several mill buildings

Removed hundreds of tons of asbestos and hazardous materials

Completed historic documentation of the Marshall Brothers Paper Mill and stabilized the offi ce for reuse as the new park offi ce

Stabilized the Marshall Brothers Paper Mill roof

Opened the fi rst and second phase of the Auburn Heights trails

Completed construction of the new Gun Club Road in spring 2015

Completed investigation and recommendations for improvement for the Paper Mill Water Race

Developed recommendations for the farm lane bridge

Completed a feasibility study for accessible restrooms at the Marshall Steam Museum

Held public meetings to review the updated master plan

Initiated a railbike test program

Auburn Heights Mansion is one of the nearby attractions adjoining the NVF redevelopment area.

Page 54: 2018-2021 DNREC Capital Plan

54

Redevelopment Plans:The Auburn Valley Master Plan was created by a partnership of business developers, neighboring organizations, and DNREC’s Divisions of Parks & Recreation, Waste & Hazardous Substances, Watershed Stewardship and Water. Other partners include DelDOT, the Federal Emergency Management Agency (FEMA), the EPA, local, state, and federal legislators, with strong support from neighboring property owners and conservation and recreational organizations in the Yorklyn area.

The redevelopment of the site creates an innovative model whereby the state and private sector are co-developing under a single master plan, resulting in a residential and destination community where the state retains ownership of a portion of the site dedicated to recreational use.

The public/private partners are cleaning up contaminated areas, restoring fl oodplains, and expanding recreational, educational, shopping, and dining opportunities. A unique trail system will connect these new commercial sites with historic and natural areas, including existing attractions – the Marshall Steam Museum, the Delaware Nature Society, the Center for Creative Arts, and the town of Hockessin. In addition, historic bridges rescued from other states’ projects will connect sections of trail. This historic “bridge park” will create a destination within the park itself.

Redevelopment Progress: The site is undergoing an environmental cleanup of nearly a century of historic contamination. Work includes installing a series of wetland and fl ood mitigation sites, and a comprehensive stream restoration that will not only improve water quality and protect fi sh in Red Clay Creek, but will also remove contaminant sources. These measures will reduce severe fl ooding that has resulted in signifi cant economic impacts to Yorklyn.

DNREC’s Division of Waste & Hazardous Substances’ Site Investigation and Restoration Section is leading the remediation of the brownfi eld site, including building demolition, asbestos removal, and cleaning up decades of zinc contamination in the soil and groundwater. More than 233 tons of contaminants have been removed from the property.

Flooding problems are being addressed by the Divisions of Parks & Recreation and Waste & Hazardous Substances through the creation of several wetlands that will fi lter contaminants and lessen the effects of fl ooding. DNREC’s Divisions of Watershed Stewardship and Water are assisting in these efforts, working with FEMA, monitoring fl ood-reduction efforts and the water quality of Red Clay Creek.

With the protection of 119 acres of the former NVF property, major steps have been taken toward transforming the area into a residential, commercial, conservation, and recreation area. NVF lands have been combined with adjacent state park preserve lands encompassing more than 400 acres. Approximately 90 percent of the land will be open space with a roughly six-mile, country-road style trail that will be used for walking, biking, jogging, and horseback riding. A new access road into the site has been completed.

Already, 1.5 miles of trails have been constructed for use by hikers, bicyclists, equestrians, and vintage car enthusiasts. A new trail will also be built connecting NVF with the Center for Creative Arts.

Abandoned mill buildings and industrial contamination are being cleaned up and transformed at the former NVF site in Yorklyn.

Page 55: 2018-2021 DNREC Capital Plan

Preserve Natural Heritage and Expand Ecotourism

FY2019 Funding Request for Bayshore Projects: $500,000

55

Concept drawings for the new accessible wildlife observation tower in the Little Creek Wildlife Area.

Funding is requested for the Delaware Bayshore Initiative to help leverage existing and new resources from department fees and incentive programs, land conservation funds, penalty funds/Coastal Zone Act offsets, other federal grant funds, and private investments.

This funding will support key habitat restoration, recreational, and educational enhancement projects for FY2019 to improve hunting, fi shing, and wildlife-viewing opportunities that will drive signifi cant tourism and support local communities. Key projects include accessible wildlife-viewing platforms at Woodland Beach, Little Creek, and Ted Harvey wildlife areas; interpretive signs and kiosks in multiple Bayshore beach communities; pedestrian path and amenity enhancements at the Aquatic Resource Education Center and Little Creek Wildlife Area, and interpretive and wayfi nding guides for the Bayshore and Bayshore Byway.

Delaware Bayshore InitiativeThe Delaware Bayshore is widely recognized as an area of outstanding national, hemispheric, and global ecological signifi cance. The Bayshore Initiative, led by DNREC’s Division of Fish & Wildlife, was honored by the U.S. Department of Interior as a keystone conservation and outdoor recreation project under the America’s Great Outdoors program. The goals of the Initiative are to protect and restore habitat, enhance recreation and education opportunities that foster support for conservation, and involve Bayshore residents in ways that will help strengthen their communities.

The Initiative builds upon the legacy of former Governor Russell W. Peterson, who recognized the ecological signifi cance of this region more than 45 years ago and proposed the landmark Delaware Coastal Zone Act to protect the Bayshore from industrial development.

Today, more than half of the Bayshore region extending from the City of New Castle to Cape Henlopen State Park is protected as national wildlife refuges, state wildlife areas, parks and reserves, farmland preserves, and private conservation lands.

Capital Request Funding State Federal* OtherFY2017 $500,000 $1,000,000 $0FY2018 $500,000 $500,000 $0FY2019 $500,000 $500,000 $0FY2020 $500,000 $500,000 $0FY2021 $500,000 $500,000 $0Total $2,500,000 $3,000,000 $0*The sources of federal funds are Wildlife and Sport Fish Restoration program and Federal Highway Scenic Byway program, as well as other federal funding opportunities.

Project Description

Additional Information: See Appendix, Fish & Wildlife Capital Project Priorities, pages 70-71

Page 56: 2018-2021 DNREC Capital Plan

56

Leveraging Funding:Since 2012, Delaware has been awarded nearly $15 million in federal, state, and private partner funds for Bayshore projects.

Existing and new resources are available from: Open Space Program; DelDOT; U.S. Fish and Wildlife Service’s Wildlife and Sport Fish Restoration Program; North American Wetland Conservation Act; National Coastal Wetland Conservation Program; Federal Highway Administration Byways Program; Disaster Relief Act of 2012 (Hurricane Sandy); National Fish and Wildlife Foundation; Strategic Opportunity Fund for Adaptation (DNREC’s Division of Energy & Climate); other federal grant programs; department fees and incentive programs; penalty funds; Coastal Zone Act offsets; and private investments.

Current Projects: FY2018-2019 Augustine Wildlife Area - Ashton Tract Public Access and Wildlife-Viewing Enhancements:

Design and construct accessible sidewalk and portable toilet screen at the public access parking area.

Augustine Wildlife Area - Cooper-Cross Public Access and Wildlife-Viewing Enhancements:

Construction of accessible wildlife-observation platform, trail, interpretive signs, and parking area; design and construct a connector trail from the public access parking to the Lang Impoundment levee.

Woodland Beach Wildlife Area - Aquatic Resources Education Center/Bayshore Visitor Center:

Design Taylors Gut wildlife-viewing area and trail; construct improved kayak/canoe access to Mallard Lodge pond; design and rehabilitate the existing boardwalk trail; design a pedestrian connector trail and boardwalk along Route 9 from the Mallard Lodge; and design and construct accessible restroom facilities and improved parking along Route 9 at outdoor education area.

Little Creek Bayshore Visitor Center: Complete master plan and land development

plan to include the Bayshore Visitor Center, parking, associated trails, and wildlife-viewing enhancements; design indoor interpretive exhibits, visitor information area, and public restrooms.

Little Creek Wildlife Area - Little Creek Boardwalk and Wildlife-Viewing Tower Enhancements:

Construct accessible, two-tier wildlife-viewing tower, boardwalk trail, interpretive signs, and parking area.

Little Creek Wildlife Area – Little River Boating Access Area:

Design and construct small vessel boat ramp and parking area on Little River.

Bayshore Communities: Engage local communities to develop and

place interpretive signs about local wildlife and habitat resources at key public-access sites at Delaware Bay beaches to foster support for conservation; support development of conservation and cultural educational facilities within communities; and support development of climate adaptation projects within communities.

Delaware Bayshore Information Resources: Continue promoting the Bayshore branding/

marketing campaign; develop promotional materials and signs using brand; install signs and information kiosks and develop public-access guides; and develop Delaware Bayshore Byway/Route 9 wayfi nding sign plan.

Rehabilitation work at Mispillion Harbor.

Page 57: 2018-2021 DNREC Capital Plan

57

Produced “From Duck Creek to Delaware Bay,” an educational video for the Aquatic Resources Education Center about the local resources, culture, and heritage surrounding the site; and

Produced “Bayshore Forever” land conservation and habitat restoration factsheets and promotional video.

Outdoor Recreation:Delaware’s conservation economy, including fi shing, hunting, and wildlife-viewing, is a $315 million industry.

Wildlife watching in Delaware generates nearly $170 million in retail sales and $27 million in state and local tax revenues.

The state’s wildlife-watching economy supports almost 3,300 Delaware jobs with $119 million in salaries, wages, and business-owner income.

More than half of Delaware’s residents participate in outdoor recreation annually.

New interpretive sign frames installed at Broadkill Beach.

Accomplishments: FY2017-2018 Completed restoration, sand replenishment,

and groin installation along the sea wall and beach at Mispillion Harbor to protect and maintain the harbor shoreline, increase habitat for horseshoe crabs and shorebirds, and improve resiliency of the harbor to protect multiple public assets, resulting in community and regional economic benefi ts;

Installed benches along the accessible trail at the Ashton Tract of Augustine Wildlife Area;

Completed engineering of Cooper-Cross wildlife-observation platform, trail, and parking area with accessible parking at Augustine Wildlife Area;

Completed design and installation of outdoor interpretive signs and exhibits at the Aquatic Resources Education Center;

Completed master plan for the Aquatic Resources Education Center and related outdoor amenities and recreation enhancements;

Completed design of improved kayak/canoe access to Mallard Lodge pond;

Completed design and engineering of an accessible, two-tier wildlife-observation tower, boardwalk trail, interpretive signs, and parking area at the Little Creek Wildlife Area;

Birdwatching on the Little Creek Wildlife Area.

Page 58: 2018-2021 DNREC Capital Plan

58

Bayshore Initiative Goals:The Delaware Bayshore Initiative is aligned with efforts that focus on conservation, recreation, education, and community engagement. Goals include supporting economic growth by making the Bayshore a world-class ecotourism destination, and improving quality of life for residents and visitors through healthy outdoor recreation opportunities.

Achieving the vision of the Delaware Bayshore becoming a premier global destination for birding, wildlife watching, hunting, and outdoor recreation will require:

Ecological restoration, including enhancement of stream and wetland corridors and the restoration of coastal beach wetland, meadow, and forest habitats;

Resource protection, including the installation of barriers and signage that prevent motorized vehicle access, vandalism, and damage to habitat areas;

Connections between local communities and waterways by providing trails, pathways, and access areas;

Enhanced access to waterways by providing safe kayak and canoe access points, and ensuring safe parking capacity at access points;

Enhanced visitor engagement through the development of wildlife-viewing platforms, towers and blinds, trail enhancements, interpretive signage and exhibits, development of web and mobile device applications and interpretative guides, maps and wayfi nding signs, and other promotional materials and guides to attract regional, national, and international visitors;

Volunteer promotion by supporting opportunities for local communities and families to participate in habitat restoration projects and stewardship activities; and

Assistance to local communities for planning and design of amenities that support and enhance public access to Bayshore resources and provide information about the Bayshore area’s culture and history.

Bayshore Community Partners: City of New Castle, Delaware City, Port Penn, Woodland Beach, Leipsic, Little Creek, Pickering Beach, Kitts Hummock, Bowers Beach, South Bowers Beach, Slaughter Beach, Prime Hook Beach, Broadkill Beach, and Lewes.

Page 59: 2018-2021 DNREC Capital Plan

59

Page 60: 2018-2021 DNREC Capital Plan

60

Last

Upd

ate:

1/2

6/18

1-Ju

l-201

6 Ba

lanc

eFY

201

7FY

201

8FY

201

9FY

202

0Fu

ndin

g So

urce

s (f

eder

al sh

are)

Annu

al D

CPP

Sand

Byp

ass G

rant

- 40

633

(5-Y

ear A

vera

ge o

f Fed

eral

Re

imbu

rsem

ent)

390.

00$

390.

00$

390.

00$

390.

00$

(sta

te sh

are)

Bond

App

ropr

iatio

n Sh

orel

ine

- 102

51/2

5338

/599

34 (1

)82

8.80

$

2,79

8.20

$

7,

450.

00$

7,

450.

00$

7,

450.

00$

Bo

nd A

ppro

pria

tion

Wat

erw

ay D

redg

ing

1025

1/25

338/

5993

4(1)

Bond

App

ropr

iatio

n W

ater

way

- Na

viga

tion

& W

ater

way

Ope

ratio

ns

350.

00$

Bond

App

ropr

iatio

n W

ater

way

- UD

Citi

zens

Mon

itorin

g50

.00

$

50

.00

$

50.0

0$

50

.00

$

An

nual

GF

Sand

Byp

ass -

003

7480

.00

$

80

.00

$

80.0

0$

80

.00

$

An

nual

GF

Shor

elin

e &

Wat

erw

ay -

0015

0/00

160

205.

50$

205.

50$

205.

50$

205.

50$

Hote

l Acc

omod

atio

n Ta

x - 7

6500

/300

65/6

6501

5,99

8.00

$

2,

500.

00$

2,50

0.00

$

2,50

0.00

$

2,50

0.00

$

Wat

erw

ay M

anag

emen

t Fee

- 76

202/

3006

3/66

302

650.

00$

1,30

0.00

$

1,30

0.00

$

1,30

0.00

$

Dred

ging

Pro

ject

s - 5

0125

(1)

450.

00$

-$

-

$

-

$

UD

Mar

ine

Harb

or (c

ost s

hare

eve

ry 4

yea

rs)

250.

00$

-$

-

$

-

$

Tota

l Est

imat

ed F

undi

ng6,

826.

80$

7,72

3.70

$

11

,975

.50

$

11,9

75.5

0$

11,9

75.5

0$

Proj

ect E

xpen

ditu

res/

Encu

mbr

ance

sFY

201

7FY

201

8FY

201

9FY

202

0(s

tate

shar

e)NO

URIS

HING

OCE

AN B

EACH

ES: (2

)

Reho

both

-Dew

ey81

.00

$

81

.00

$

4,11

9.00

$

81.0

0$

Lew

es45

.00

$

45

.00

$

1,34

4.80

$

45.0

0$

Beth

any-

Sout

h Be

than

y3,

850.

00$

81.0

0$

81

.00

$

3,58

1.00

$

Fenw

ick Is

land

5,15

0.00

$

15

0.00

$

15

0.00

$

15

0.00

$

Br

oadk

ill

81.0

0$

81.0

0$

81

.00

$

3,04

2.00

$

Indi

an R

iver

San

d By

pass

Ope

ratio

ns, C

rane

& F

acili

ty Im

prov

emen

ts (5

-Yea

r Av

erag

e of

Fed

eral

-40.

75 a

nd S

tate

-59.

25 S

hare

s)95

0.00

$

95

0.00

$

95

0.00

$

95

0.00

$

Annu

al S

hore

line

Oper

atio

ns C

ontr

actu

al M

aint

enan

ce, E

quip

men

t, Su

pply

, and

Pe

rson

nel

350.

00$

350.

00$

350.

00$

350.

00$

NOUR

ISHI

NG B

AY B

EACH

ES(3

)

Pick

erin

g Be

ach

(pla

n./e

ng.,

truc

kfill

/pro

p. a

cces

s, be

achf

ill, t

ruck

fill)

2,00

0.00

$

DNRE

C W

ater

shed

Ste

war

dshi

p - S

hore

line

and

Wat

erw

ay M

anag

emen

t

Capi

tal P

roje

ct P

riorit

ies F

Y201

7-20

20Pr

ojec

t Cos

t Est

imat

es ($

in th

ousa

nds)

Shor

elin

e an

d W

ater

way

Man

agem

ent

Page 61: 2018-2021 DNREC Capital Plan

61

Shor

elin

e an

d W

ater

way

Man

agem

ent

Last

Upd

ate:

1/2

6/18

1-Ju

l-201

6 Ba

lanc

eFY

201

7FY

201

8FY

201

9FY

202

0

DNRE

C W

ater

shed

Ste

war

dshi

p - S

hore

line

and

Wat

erw

ay M

anag

emen

t

Capi

tal P

roje

ct P

riorit

ies F

Y201

7-20

20Pr

ojec

t Cos

t Est

imat

es ($

in th

ousa

nds)

Kitts

Hum

moc

k (p

lan.

/eng

. & tr

uckf

ill, t

ruck

fill/p

rop.

acc

ess,

bea

chfil

l) 3,

000.

00$

Bo

wer

s (pl

an./e

ng.,

jetty

cons

truc

tion,

bea

chfil

l)2,

000.

00$

Sout

h Bo

wer

s (pl

an./e

ng.,

jetty

cons

truc

tion,

bea

chfil

l)1,

500.

00$

3,

250.

00$

Sl

augh

ter B

each

(pla

n./e

ng.,

beac

hfill

)4,

600.

00$

Prim

e Ho

ok (p

lan.

/eng

., be

achf

ill)

Broa

dkill

Bea

ch (t

ruck

fill,

fed

proj

ect m

aint

enan

ce- e

.g. c

ross

over

s)1,

000.

00$

Lew

es (t

ruck

fill)

500.

00$

Cape

Sho

res (

truc

kfill

)50

0.00

$

Annu

al W

ater

way

Ope

ratio

ns C

ontr

actu

al M

aint

enan

ce, E

quip

men

t, Su

pply

, and

Pe

rson

nel

350.

00$

350.

00$

350.

00$

Annu

al W

ater

way

- UD

Citi

zens

Mon

itorin

g50

.00

$

50

.00

$

50.0

0$

NAVI

GATI

ON

/ DRE

DGE

PRO

JECT

S(4)

Mas

sey'

s Ditc

h (p

lann

ing/

engi

neer

ing,

cons

truc

tion)

4,00

0.00

$

As

saw

oman

Can

al (p

lann

ing/

engi

neer

ing,

cons

truc

tion)

1,50

0.00

$

100.

00$

100.

00$

Little

Riv

er (p

lann

ing/

engi

neer

ing,

cons

truc

tion)

Lew

es-R

ehob

oth

Cana

l (pl

anni

ng/e

ngin

eerin

g, co

nstr

uctio

n)35

0.00

$

2,

000.

00$

He

rrin

g Cr

eek

(pla

nnin

g/en

gine

erin

g, co

nstr

uctio

n)35

0.00

$

2,

000.

00$

Lo

ve C

reek

(pla

nnin

g/en

gine

erin

g, co

nstr

uctio

n)35

0.00

$

2,

000.

00$

W

hite

Cre

ek (p

lann

ing/

engi

neer

ing,

cons

truc

tion)

350.

00$

2,00

0.00

$

Misp

illio

n Ri

ver (

plan

ning

/eng

inee

ring,

cons

truc

tion)

Indi

an R

iver

(in-

hous

e co

nstr

uctio

n)Ho

lt's L

andi

ng(p

lann

ing/

engi

neer

ing,

in-h

ouse

cons

truc

tion)

Dela

war

e Ci

ty M

oorin

g Ba

sin (i

n-ho

use

cons

truc

tion)

Indi

an R

iver

Inle

t Mar

ina

(in-h

ouse

cons

truc

tion)

75.0

0$

Tota

l Est

imat

ed E

xpen

ditu

res

23,0

82.0

0$

9,33

8.00

$

17,5

25.8

0$

12,2

99.0

0$

Bala

nce

of F

undi

ng fo

r Pla

nned

Pro

ject

s6,

826.

80$

(8,5

31.5

0)$

(5,8

94.0

0)$

(1

4,08

1.80

)$

(6,2

17.5

0)$

Page 62: 2018-2021 DNREC Capital Plan

62

Shor

elin

e an

d W

ater

way

Man

agem

ent

Last

Upd

ate:

1/2

6/18

1-Ju

l-201

6 Ba

lanc

eFY

201

7FY

201

8FY

201

9FY

202

0

DNRE

C W

ater

shed

Ste

war

dshi

p - S

hore

line

and

Wat

erw

ay M

anag

emen

t

Capi

tal P

roje

ct P

riorit

ies F

Y201

7-20

20Pr

ojec

t Cos

t Est

imat

es ($

in th

ousa

nds)

(4) C

ontr

actu

al N

avig

atio

n Pr

ojec

ts in

clude

cons

ultin

g se

rvice

s for

pla

nnin

g an

d en

gine

erin

g an

d es

timat

ed co

nstr

uctio

n co

sts.

Proj

ect C

ost B

asis :

(1)

DNR

EC A

nnua

l GF

Shor

elin

e &

Wat

erw

ay B

udge

t for

dun

es, d

redg

e, h

arve

st, c

hann

el m

arki

ng, a

nd fa

cility

ope

ratio

ns/m

aint

enan

ce; (

2) U

.S. A

rmy

Corp

of E

ngin

eers

20

16-2

020

Dela

war

e Oc

ean

Beac

h Pr

ojec

t Sch

edul

e; a

nd (3

) DNR

EC 1

0-Ye

ar B

ay B

each

Man

agem

ent P

lan

in a

ccor

danc

e w

ith P

BJ&

S co

nstr

uctio

n te

mpl

ate.

(1) A

ppro

pria

tion

is ba

sed

on a

ctua

l aw

ard

bala

nce,

reco

mm

ende

d, o

r req

uest

ed b

ond

fund

ing.

(2) D

NREC

's in

vest

men

t in

Ocea

n Be

ach

proj

ects

is e

xpec

ted

to le

vera

ge 2

016-

2020

US

Corp

of E

ngin

eers

(US

ACOE

) fun

ding

of $

47.8

mill

ion.

US

ACOE

mat

ch ra

tios c

an v

ary

depe

ndin

g on

(3

) Bay

Bea

ch P

roje

cts i

nclu

de co

nsul

ting

serv

ices f

or p

lann

ing

and

engi

neer

ing,

est

imat

ed tr

uckf

ill n

eeds

, pro

pert

y ac

quist

ion

for a

cces

s, an

d be

achf

ill in

acc

orda

nce

with

the

PBJ&

S te

mpl

ate.

Also

ann

ual B

ay B

each

Mai

nten

ance

for B

road

kill

Beac

h to

com

plet

e ap

purt

enan

ces f

or d

une,

cros

sove

rs, e

tc. a

s par

t of t

he U

SACO

E M

ain

Chan

nel D

eepi

ng.

Page 63: 2018-2021 DNREC Capital Plan

63

Hig

h H

azar

d D

ams a

nd D

ikes

Rep

air/

Rep

lace

men

t

PRO

JECT

Coun

tyFY

201

7FY

201

8FY

201

9FY

202

0To

tal b

y Pr

ojec

t

July

1 C

arry

forw

ard

(App

r 500

87 U

nenc

umbe

red

Bond

Fun

ds)

3,60

6.8

$

2,10

8.6

$

1,48

8.6

$

938.

6$

New

Yea

r Fisc

al B

ond

Bill

Appr

opria

tion

1,50

0.0

$

1,50

0.0

$

1,50

0.0

$

1,50

0.0

$

Tota

l Res

ourc

es:

5,10

6.8

$

3,60

8.6

$

2,98

8.6

$

2,43

8.6

$

Dike

Reh

abili

tatio

n:Re

d Lio

n Di

ke -

Com

plet

ed

New

Cas

tle-

$

Arm

y Cr

eek

& G

amba

cort

a Di

kes -

Com

plet

edNe

w C

astle

-$

Bu

tton

woo

d Di

ke -

Com

plet

edNe

w C

astle

-$

Br

oad

Mar

sh D

ike

- Com

plet

edNe

w C

astle

-$

Em

erge

ncy

Actio

n Pl

ans f

or a

ll 5

Dike

s - C

ompl

eted

New

Cas

tle-

$

RIP

Insp

ectio

ns o

f Flo

od G

ates

(req

uire

d by

Cor

p) -

Com

plet

edNe

w C

astle

-$

Perm

it M

itiga

tion

Proj

ect a

t Pet

erso

n Re

fuge

- co

nstr

ucte

d in

fisc

al 2

014

with

fina

l veg

etat

ion,

se

edin

g, a

nd a

s-bu

ilt su

rvey

com

plet

ed in

fall

2014

. Si

te m

onito

ring

cont

inue

s.Ne

w C

astle

-$

-$

Di

ke In

vent

ory

and

Asse

ssm

ent

Stat

ewid

e-

$

Phas

e 1

- des

ktop

revi

ew ($

100k

in F

iscal

201

6)-

$

Phas

e 2

- fie

ld re

view

200.

0$

200.

0$

-$

Di

ke R

epai

rs a

nd M

aint

enan

ce*

Stat

ewid

e60

.0$

50

.0$

50

.0$

50

.0$

21

0.0

$

-

$

Dam

Reh

abili

tatio

n an

d Re

pairs

:-

$

Hear

ns P

ond

Dam

($3

,429

,000

to D

elDO

T in

Janu

ary

2014

)Su

ssex

-$

Re

cord

s Pon

d Da

m ($

1,00

0,00

0 to

Del

DOT

in Ju

ne 2

014)

Suss

ex-

$

Trap

Pon

d Da

m -

Fund

s enc

umbe

red

in F

iscal

201

4 w

ith re

pairs

com

plet

ed in

Fisc

al 2

016

Suss

ex-

$

Red

Clay

Dam

150.

0$

150.

0$

Garr

isons

Lake

Dam

- Fu

nds e

ncum

bere

d in

Fisc

al 2

014

with

em

erge

ncy

repa

irs co

mpl

eted

in

Fisc

al 2

016

Kent

-$

Ch

ipm

ans P

ond

Dam

- Sp

illw

ay Im

prov

emen

ts*

Suss

ex84

3.1

$

84

3.1

$

Co

ncor

d Po

nd D

am -

Spill

way

Impr

ovem

ents

*Su

ssex

761.

9$

761.

9$

Crai

gs P

ond

Dam

- Sp

illw

ay Im

prov

emen

ts*

Suss

ex89

5.0

$

89

5.0

$

M

udm

ill P

ond

Dam

- Sp

illw

ay Im

prov

emen

ts**

Kent

810.

0$

810.

0$

Blai

rs P

ond

Dam

- Em

bank

men

t Im

prov

emen

tsSu

ssex

100.

0$

100.

0$

Huds

on P

ond

Dam

Reh

abili

tatio

n (re

class

ified

as l

ow h

azar

d, n

o lo

nger

regu

late

d)Su

ssex

-$

Ga

rriso

ns La

ke D

am S

pillw

ay R

epai

rs C

onst

ruct

ion*

*Ke

nt1,

100.

0$

1,

100.

0$

Silv

er La

ke D

am-M

ilfor

d (s

till d

eter

min

ing

owne

rshi

p)Ke

nt-

$

-

$

Dam

Insp

ectio

n, P

lann

ing,

Des

ign,

and

Eng

inee

ring

Stat

ewid

e40

0.0

$

40

0.0

$

40

0.0

$

1,

200.

0$

McC

orm

ick T

aylo

r - T

ask

1 In

spec

tion

of 1

0 da

ms,

desig

n em

bank

men

t sta

biliz

atio

n an

d an

alys

is of

wat

er co

ntro

l sys

tem

s; T

ask

2 En

gine

erin

g an

d pr

elim

inar

y de

sign

for F

leet

woo

od sp

illw

ay

impr

ovem

ents

($30

0k in

Fisc

al 2

016)

500.

0$

500.

0$

O'B

rien

and

Gere

Fin

al D

esig

ns ($

500k

in F

iscal

201

6 fo

r Chi

pman

s, Co

ncor

d, C

raig

s, M

udm

ill, H

udso

n, a

nd

Garr

ison

Spill

way

)-

$

DNRE

C W

ater

shed

Ste

war

dshi

p &

Coa

stal

Pro

gram

s - D

ams a

nd D

ikes

Capi

tal P

roje

ct F

undi

ng P

riorit

ies a

nd C

ash

Flow

Est

imat

e FY

2018

-202

0Pr

ojec

t Cos

t Est

imat

es ($

in th

ousa

nds)

Last

Upd

ated

01/

13/2

018

Page 64: 2018-2021 DNREC Capital Plan

1

64

PRO

JECT

Coun

tyFY

201

7FY

201

8FY

201

9FY

202

0To

tal b

y Pr

ojec

t

DNRE

C W

ater

shed

Ste

war

dshi

p &

Coa

stal

Pro

gram

s - D

ams a

nd D

ikes

Capi

tal P

roje

ct F

undi

ng P

riorit

ies a

nd C

ash

Flow

Est

imat

e FY

2018

-202

0Pr

ojec

t Cos

t Est

imat

es ($

in th

ousa

nds)

Last

Upd

ated

01/

13/2

018

O'B

rien

& G

ere

Cons

truc

tion

Revi

ew S

ervi

ces f

or C

hipm

ans,

Conc

ord

& C

raig

s48

1.8

$

48

1.8

$

O

'Brie

n &

Ger

e Co

nstr

uctio

n Re

view

Ser

vice

s for

Mud

mill

Pon

d Da

m23

0.0

$

23

0.0

$

O

'Brie

n &

Ger

e Co

nstr

uctio

n Se

rvice

s for

Gar

rison

s Lak

e Da

m29

0.0

$

29

0.0

$

-

$

Dam

Ann

ual M

aint

enan

ceSt

atew

ide

-$

-$

Po

nd-s

ide

Vege

tatio

n Cl

earin

g &

Mai

nten

ance

(Sta

te-o

wne

d up

stre

am sl

ope

for 1

8 da

ms)

Stat

ewid

e50

.0$

10

0.0

$

10

0.0

$

10

0.0

$

35

0.0

$

-

$

Wat

er-le

vel M

onito

ring

(Inst

alla

tion

of 1

4 st

atio

ns &

ong

oing

mai

nten

ance

)St

atew

ide

46.3

$

80.0

$

110.

0$

145.

0$

381.

3$

Tota

l Pro

ject

ed E

xpen

ditu

res:

46.3

$

2,12

0.0

$

2,05

0.0

$

695.

0$

8,50

3.1

$

June

30

Proj

ecte

d Ba

lanc

e:1,

468.

7$

1,

488.

6$

93

8.6

$

1,

743.

6$

Not

e : T

hese

pro

ject

est

imat

es a

re b

ased

on

engi

neer

ing,

des

ign,

site

visi

ts a

nd in

put f

rom

DNR

EC, D

elDO

T, a

nd co

ntra

cted

eng

inee

ring

firm

s for

Dam

Rep

airs

/Reh

abili

tatio

n. D

ike

repa

ir ne

eds w

ill b

e fu

rthe

r ref

ined

whe

n st

atew

ide

inve

ntor

y an

d as

sess

men

ts a

re co

mpl

eted

.

*Pro

ject

eng

inee

ring

and

final

cons

truc

tion

docu

men

ts a

re co

mpl

ete.

DN

REC

is in

the

perm

ittin

g ph

ase

for C

hipm

ans,

Con

cord

, Cra

igs s

pillw

ay im

prov

emen

ts; e

xpec

ting

to b

id in

Janu

ary

2017

with

a co

ntra

ct

awar

ded

sprin

g 20

17; a

nd co

nstr

uctio

n w

ill co

mm

ence

sum

mer

or f

all 2

017.

** P

roje

ct co

nstr

uctio

n do

cum

ents

for M

ud M

ill P

ond

spill

way

impr

ovem

ents

and

Gar

rison

Lake

Dam

spill

way

repa

irs a

re n

earin

g co

mpl

etio

n. P

erm

ittin

g an

d bi

ddin

g is

expe

cted

by

fall

2017

, and

cons

truc

tion

by sp

ring

2018

for M

udm

ill w

ith G

arris

ons p

erm

ittin

g ex

pect

ed in

sprin

g 20

18 a

nd co

nstr

uctio

n in

fall

2018

.

Hig

h H

azar

d D

ams a

nd D

ikes

Rep

air/

Rep

lace

men

t

Page 65: 2018-2021 DNREC Capital Plan

65

DN

RE

C C

ritic

al E

quip

men

t for

Ope

ratio

ns

IPU

Cate

gory

Req

uest

ed A

mou

nt

Proj

ect /

Des

crip

tion

of U

se /

Loca

tion

Offi

ce o

f Nat

ural

Res

ourc

e (O

NR)

40-0

3-02

Divi

sion

of P

arks

- Cr

itica

l Equ

ipm

ent

$

90,

000.

00

72-in

ch ri

ding

mow

ers (

repl

acem

ents

) (BC

SP &

FDS

P 4W

D) -

BVSP

, WCC

SP, B

CSP,

CHS

P, F

DSP

$

76,

000.

00

Brus

h ch

ippe

r for

stor

m d

amag

e cle

anup

and

gen

eral

tree

mai

nten

ance

2 e

ach

- sta

tew

ide

$

178,

000.

00

NJPA

cont

ract

util

ity tr

acto

r with

buc

ket 2

eac

h - B

CSP,

WCC

SP $

4

5,00

0.00

F3

50 D

ump

truc

k - B

CSP

$

60,

000.

00

LPSP

/ FDS

P M

ini B

us -

LPSP

$

45,

000.

00

Van

with

lift

for p

arki

ng lo

t lig

ht m

aint

enan

ce -

WSP

$

45,

000.

00

F350

Dum

p tr

uck

- AHP

$

8

,000

.00

Buck

et a

ttac

hmen

t for

John

Dee

re tr

acto

r - C

HSP

$

8

,000

.00

ATV

for r

ange

rs 2

eac

h - C

HSP,

DSS

P $

1

5,00

0.00

Be

ach

clean

er -

CHSP

$

8

,000

.00

Cam

pgro

und

host

gol

f car

ts 4

eac

h - C

HSP,

DSS

P $

9

9,00

0.00

Ni

ne re

plac

emen

t util

ity v

ehicl

es -

DSSP

, CHS

P, T

PSP,

KPS

P, W

CCSP

, BVS

P, IR

M, F

DSP

$

25,

000.

00

Recr

eatio

n bo

ats a

nd a

cces

sorie

s rep

lace

men

ts fo

r par

k re

venu

e - v

ario

us $

2

0,00

0.00

Pi

cnic

grill

s and

fire

ring

s - v

ario

us $

2

5,00

0.00

Pi

cnic

tabl

e m

ater

ials

for a

ppro

xim

atel

y 20

0 ta

bles

- st

atew

ide

$

70,

000.

00

NJRP

cont

ract

-JD 1

0' 1

600

turb

o se

ries r

idin

g m

ower

- LP

SP $

7

0,00

0.00

NJ

RP co

ntra

ct-JD

10'

160

0 tu

rbo

serie

s rid

ing

mow

er -

CHSP

$

28,

000.

00

60" c

omm

ercia

l Z-tu

rn m

ower

2 e

ach

- DSS

P, W

CCSP

$

18,

500.

00

Mob

i Mat

-bea

ch A

DA a

cces

sible

mat

s - C

HSP,

DSS

P $

3,0

00.0

0 Tr

aile

r spr

ay u

nit-3

00 g

allo

n fo

r env

ironm

enta

l ste

war

dshi

p pr

ojec

ts -

stat

ewid

e $

3

0,00

0.00

Ar

go a

mph

ibio

us u

tility

veh

icle-

repl

aces

200

6 un

it - s

tate

wid

e $

15

0,00

0.00

Vo

lvo

front

end

load

er re

plac

emen

t - D

SSP

$

6

,000

.00

Mai

nten

ance

trai

ler -

WCC

SP $

4

2,00

0.00

Bo

b Ca

t with

buc

ket -

WCC

SP $

5,0

00.0

0 Pl

ate

com

pact

or -

WCC

SP $

4

5,00

0.00

Tr

uck

for p

arki

ng lo

t lig

ht re

pairs

- st

atew

ide

$

20,

000.

00

Trac

tor d

riven

fini

sh m

ower

17'

- BC

SP $

8

0,00

0.00

F-

650

or e

qual

dum

p tr

uck,

alu

min

um d

ump

body

and

hea

vy g

ear t

ow p

kg. -

stat

ewid

e1,

314,

500.

00$

40-0

3-03

Divi

sion

of F

ish &

Wild

life

- Crit

ical

Equ

ipm

ent

70,0

00.0

0$

Fish

erie

s - A

quat

ic Ha

rves

ter

610,

000.

00$

M

osqu

ito C

ontr

ol -

Rota

ry e

xcav

ator

58,0

00.0

0$

Mos

quito

Con

trol

- Tw

o Ar

go 8

x8 T

undr

as a

nd tr

aile

r23

,000

.00

$

M

osqu

ito C

ontr

ol -

New

cab

for K

obel

co ro

tary

exc

avat

or20

,500

.00

$

W

ildlif

e - T

wo

bush

hog

mow

ers f

or R

egio

n 2

80,0

00.0

0$

Wild

life

- Tra

ctor

repl

acem

ent R

egio

n 3

20,0

00.0

0$

Wild

life

- Sec

urity

cam

eras

at o

ffice

loca

tions

30,0

00.0

0$

Wild

life

- Tra

iler f

or R

egio

n 1

20,0

00.0

0$

Wild

life

- Str

aw b

low

er

Fisc

al 2

019

Criti

cal E

quip

men

t Req

uest

(as o

f 09/

15/2

017)

Depa

rtm

ent o

f Nat

ural

Res

ourc

es a

nd E

nviro

nmen

tal C

ontr

ol

DNRE

C re

ques

ts ca

pita

l im

prov

emen

t fun

ds fo

r the

acq

uisit

ion/

repl

acem

ent o

f crit

ical

equ

ipm

ent e

ssen

tial i

n pe

rfor

min

g en

viro

nmen

tal a

nd n

atur

al re

sour

ce o

pera

tions

, con

serv

atio

n, p

rote

ctio

n an

d re

sear

ch a

ctiv

ities

. The

se

criti

cal e

quip

men

t ass

ets h

ave

a us

eful

life

of o

ver 1

0 ye

ars a

nd p

rovi

de p

ublic

serv

ices

and

infr

astr

uctu

re su

ppor

t to

near

ly 1

00,0

00 a

cres

of p

ublic

land

, 700

bui

ldin

gs, 1

6 st

ate

park

s, 16

wild

life

man

agem

ent a

reas

, 10

natu

ral

pres

erve

s, tw

o na

tiona

l est

uarin

e re

sear

ch re

serv

e sit

es, 6

5 fr

eshw

ater

pon

ds a

nd m

arin

e ac

cess

are

as, a

ll De

law

are

wat

erw

ays a

nd e

nviro

nmen

tal l

abor

ator

y se

rvic

es, w

hich

incl

ude

(but

are

not

lim

ited

to) t

he fo

llow

ing:

Page 66: 2018-2021 DNREC Capital Plan

66

IPU

Cate

gory

Req

uest

ed A

mou

nt

Proj

ect /

Des

crip

tion

of U

se /

Loca

tion

Fisc

al 2

019

Criti

cal E

quip

men

t Req

uest

(as o

f 09/

15/2

017)

Depa

rtm

ent o

f Nat

ural

Res

ourc

es a

nd E

nviro

nmen

tal C

ontr

ol

DNRE

C re

ques

ts ca

pita

l im

prov

emen

t fun

ds fo

r the

acq

uisit

ion/

repl

acem

ent o

f crit

ical

equ

ipm

ent e

ssen

tial i

n pe

rfor

min

g en

viro

nmen

tal a

nd n

atur

al re

sour

ce o

pera

tions

, con

serv

atio

n, p

rote

ctio

n an

d re

sear

ch a

ctiv

criti

cal e

quip

men

t ass

ets h

ave

a us

eful

life

of o

ver 1

0 ye

ars a

nd p

rovi

de p

ublic

serv

ices

and

infr

astr

uctu

re su

ppor

t to

near

ly 1

00,0

00 a

cres

of p

ublic

land

, 700

bui

ldin

gs, 1

6 st

ate

park

s, 16

wild

life

man

agem

ent a

reas

, pr

eser

ves,

two

natio

nal e

stua

rine

rese

arch

rese

rve

sites

, 65

fres

hwat

er p

onds

and

mar

ine

acce

ss a

reas

, all

Dela

war

e w

ater

way

s and

env

ironm

enta

l lab

orat

ory

serv

ices

, whi

ch in

clud

e (b

ut a

re n

ot li

mite

d to

) the

fol

185,

000.

00$

W

ildlif

e - F

loat

atio

n tr

uck

136,

000.

00$

W

ildlif

e - T

ract

ors f

or R

egio

n 2

(2 tr

acto

rs)

140,

000.

00$

W

ildlif

e - 6

Whe

el d

ump

truc

k fo

r con

stru

ctio

n cr

ew4,

300.

00$

W

ildlif

e - 4

" tra

sh p

ump

for c

onst

ruct

ion

crew

115,

000.

00$

W

ildlif

e - P

ositr

ac lo

ader

for R

egio

n 2

65,0

00.0

0$

Wild

life

- Dum

p Tr

uck

for R

egio

n 1

(to re

plac

e ex

istin

g)12

,000

.00

$

W

ildlif

e - A

gricu

ltura

l spr

ayer

for R

egio

n 1

12,0

00.0

0$

Wild

life

- Reg

ion

2- R

adia

rc S

pray

er12

,000

.00

$

W

ildlif

e - J

ohn

Deer

e ga

tor f

or R

egio

n 1

7,00

0.00

$

Wild

life

- Out

boar

d m

otor

for R

egio

n 2

5,00

0.00

$

Wild

life

- Gra

ding

bla

de fo

r Reg

ion

25,

000.

00$

W

ildlif

e - D

ebris

blo

wer

for R

egio

n 3

22,0

00.0

0$

Wild

life

- Tw

o ze

ro-tu

rn m

ower

s for

Reg

ion

310

0,00

0.00

$

Wild

life

- Ski

d lo

ader

20,0

00.0

0$

Wild

life

- Jon

boa

t for

Reg

ion

35,

000.

00$

W

ildlif

e - A

uger

for R

egio

n 3

15,0

00.0

0$

Wild

life

- Stu

mp

grin

der f

or R

egio

n 3

20,0

00.0

0$

Wild

life

- Woo

d ch

ippe

r for

Reg

ion

310

,500

.00

$

W

ildlif

e - R

epai

r and

repl

ace

Spor

tsm

an A

gain

st H

unge

r dee

r coo

lers

at p

rison

1,82

2,30

0.00

$

40

-03-

04Di

visio

n of

Wat

ersh

ed S

tew

ards

hip

- Crit

ical

Equ

ipm

ent

200,

000.

00$

Sh

orel

ine

and

Wat

erw

ay M

anag

emen

t - D

ump

truc

k40

,000

.00

$

Co

nser

vatio

n Pr

ogra

ms -

Min

i exc

avat

or12

,000

.00

$

Co

nser

vatio

n Pr

ogra

ms -

John

Dee

re g

ator

252,

000.

00$

ON

R Su

btot

al3,

148,

800.

00$

40-0

4O

ffice

of E

nviro

nmen

tal P

rote

ctio

n (O

EP)

40-0

4-04

Divi

sion

of W

aste

and

Haz

ardo

us S

ubst

ance

s - C

ritic

al E

quip

men

t

180,

000.

00$

Re

plac

e th

ree

port

able

han

dhel

d Fo

urie

r Tra

nsfo

rm In

frare

d Sp

ectr

osco

py m

eter

s for

det

ectio

nun

know

n liq

uids

and

solid

s

OEP

Sub

tota

l18

0,00

0.00

$

DNRE

C To

tal C

urre

nt C

ritic

al E

quip

men

t Nee

ds3,

328,

800.

00$

DN

RE

C C

ritic

al E

quip

men

t for

Ope

ratio

ns

Page 67: 2018-2021 DNREC Capital Plan

67

DN

RE

C M

inor

Cap

ital I

mpr

ovem

ents

for

Ope

ratio

ns

IPU

Cate

gory

Requ

este

d Am

ount

Proj

ect /

Des

crip

tion

of U

se /

Loca

tion

Offi

ce o

f Nat

ural

Res

ourc

es40

-03-

02Di

visio

n of

Par

ks a

nd R

ecre

atio

n - M

CI73

,000

.00

$

Fe

nton

Hou

se w

indo

ws -

Bra

ndyw

ine

Cree

k30

,000

.00

$

Po

le b

uild

ing

- Tra

p Po

nd25

,000

.00

$

M

aint

enan

ce sh

op fe

ncin

g - T

rap

Pond

30,0

00.0

0$

Fuel

tank

at m

aint

enan

ce y

ard

- For

t Del

awar

e60

,000

.00

$

W

ater

par

k re

plas

terin

g - K

illen

s Pon

d10

,000

.00

$

M

ushr

oom

spra

y re

plac

emen

t - K

illen

s Pon

d15

,000

.00

$

W

ater

par

k fr

og sl

ide

refu

rbish

men

t - K

illen

s Pon

d35

,000

.00

$

Fu

el ta

nk re

plac

emen

t - C

ape

Henl

open

7,00

0.00

$

Shed

for r

ange

rs' A

TVs -

Cap

e He

nlop

en10

,000

.00

$

Do

ors f

or y

outh

cam

p - C

ape

Henl

open

10,0

00.0

0$

Park

offi

ce H

VAC

- Cap

e He

nlop

en20

,000

.00

$

15

1 Sm

ithm

ill B

ank

barn

foun

datio

n - W

hite

Cla

y Cr

eek

34,0

00.0

0$

Shee

p ba

rn ro

of -

Whi

te C

lay

Cree

k10

0,00

0.00

$

Criti

cal r

oof r

epla

cem

ent 1

0-12

bui

ldin

gs re

quiri

ng n

ew ro

ofin

g w

ould

be

repl

aced

100,

000.

00$

Cr

itica

l ext

erio

r ski

n bu

ildin

g re

pairs

to si

ding

, sof

fit d

oors

and

trim

of a

ppro

xim

atel

y 10

bui

ldin

gs

oper

atio

nal a

nd h

istor

ical

75,0

00.0

0$

Bath

hou

se u

pgra

des i

nclu

ding

plu

mbi

ng fi

xtur

es, t

ile re

pair

and

repl

acem

ent,

and

misc

ella

neou

s har

dwar

e in

cludi

ng d

oors

, ven

tilat

ion

and

part

ition

s. 40

,000

.00

$

Cr

itica

l sew

age

repa

irs to

repl

ace/

repa

ir ag

ing

facil

ity a

nd e

quip

men

t65

,000

.00

$

Cr

itica

l zoo

exh

ibit

upgr

ades

for v

isito

r and

ani

mal

safe

ty -

Bran

dyw

ine

Zoo

100,

000.

00$

W

aysid

es a

nd e

xhib

it re

plac

emen

ts st

atew

ide-

educ

atio

n an

d vi

sitor

exp

erie

nce

50,0

00.0

0$

Build

ing

reno

vatio

ns fo

r offi

ce u

sed

at W

hite

Cla

y Cr

eek

50,0

00.0

0$

Build

ing

reno

vatio

ns fo

r offi

ce u

sed

at Lu

ms P

ond

100,

000.

00$

Br

andy

win

e Cr

eek

Natu

re C

ente

r-bu

ildin

g up

grad

es fo

r ADA

com

plia

nce

and

visit

or a

cces

s to

rest

room

s ye

ar-r

ound

, offi

ce to

acc

omm

odat

e st

aff n

eeds

75,0

00.0

0$

ADA

Kaya

k La

unch

- Lu

ms

40,0

00.0

0$

Deck

Boa

rd R

epla

cem

ent

- For

t Del

awar

e10

0,00

0.00

$

Road

way

and

par

king

lot m

aint

enan

ce a

nd re

pairs

-sta

tew

ide-

iden

tifie

d in

Div

ision

nee

ds m

atrix

15,0

00.0

0$

Fort

Del

awar

e do

ck ra

il sy

stem

repa

irs a

nd sa

fety

upg

rade

s75

,000

.00

$

Be

ll Ho

use

Bath

room

- Fi

rst S

tate

Her

itage

3,60

0.00

$

Bell

Hous

e br

ick p

aver

side

wal

k - F

irst S

tate

Her

itage

8,50

0.00

$

Bell

Hous

e fe

nce

inst

alla

tion

- Firs

t Sta

te H

erita

ge20

,000

.00

$

Be

llevu

e of

fice

cent

ral a

ir75

,000

.00

$

Eq

uipm

ent p

ole

build

ing

- Cap

e He

nlop

en20

,000

.00

$

Fo

rt D

elaw

are

dock

boa

rds

55,0

00.0

0$

Bran

dyw

ine

Cree

k po

le sh

ed a

nd fe

ncin

g20

,000

.00

$

Br

andy

win

e fe

e bo

oth

60,0

00.0

0$

Kille

ns P

ond

boat

doc

k15

,000

.00

$

M

etal

stor

age

build

ing

door

s - K

illen

s Pon

d80

,000

.00

$

Ju

dge

Mor

ris E

stat

e Re

pairs

- W

hite

Cla

y10

0,00

0.00

$

Nive

n Ho

use

repa

irs -

Whi

te C

lay

15,0

00.0

0$

Wel

l and

fros

t-fre

e sp

igot

at p

rimiti

ve ca

mp

- Bra

ndyw

ine

Cree

k65

,000

.00

$

El

ectr

ic se

rvice

at p

avill

ion

- Bra

ndyw

ine

Cree

k

Fisc

al 2

019

Min

or C

apita

l Im

prov

emen

ts (M

CI) R

eque

st a

s of S

epte

mbe

r 15,

201

7De

part

men

t of N

atur

al R

esou

rces

and

Env

ironm

enta

l Con

trol

DNRE

C re

ques

ts m

inor

capi

tal i

mpr

ovem

ents

to th

e de

part

men

t’s p

ublic

faci

litie

s. T

hese

ass

et im

prov

emen

ts in

clud

e bu

ildin

g an

d fa

cilit

y re

pairs

/reh

abili

tatio

n fo

r sta

te-o

wne

d pr

oper

ties,

incl

udin

g: D

elaw

are

Seas

hore

; For

t

Page 68: 2018-2021 DNREC Capital Plan

68

IPU

Cate

gory

Requ

este

d Am

ount

Proj

ect /

Des

crip

tion

of U

se /

Loca

tion

Fisc

al 2

019

Min

or C

apita

l Im

prov

emen

ts (M

CI) R

eque

st a

s of S

epte

mbe

r 15,

201

7De

part

men

t of N

atur

al R

esou

rces

and

Env

ironm

enta

l Con

trol

DNRE

C re

ques

ts m

inor

capi

tal i

mpr

ovem

ents

to th

e de

part

men

t’s p

ublic

faci

litie

s. T

hese

ass

et im

prov

emen

ts in

clud

e bu

ildin

g an

d fa

cilit

y re

pairs

/reh

abili

tatio

n fo

r sta

te-o

wne

d pr

oper

ties,

incl

udin

g: D

elaw

are

Seas

hore

; For

t 7,

500.

00$

Ro

ckla

nd b

iosu

n cle

an o

ut -

Bran

dyw

ine

Cree

k25

0,00

0.00

$

Rock

land

and

Tho

mps

on's

bios

on re

nova

tions

- Br

andy

win

e Cr

eek

20,0

00.0

0$

Barn

pai

ntin

g - D

wig

ht's,

Car

ney

- Bra

ndyw

ine

Cree

k75

,000

.00

$

Re

plac

emen

t fish

ing

dock

s at C

amp

Grou

nd -

Trap

Pon

d2,

233,

600.

00$

40-0

3-03

Divi

sion

of F

ish &

Wild

life

- MCI

100,

000.

00$

Ba

ysho

re In

itiat

ive-

offi

ce fu

rnitu

re a

nd e

xhib

its15

,000

.00

$

Ne

w o

utsid

e fe

nced

-in a

rea

for s

ecur

ing

larg

er e

vide

nce

item

s, di

visio

n ve

ssel

s & e

quip

men

t for

En

forc

emen

t Del

awar

e Ci

t y o

ffice

50,0

00.0

0$

Boat

Sto

rage

at S

usse

x - B

oat s

tora

ge a

t Sus

sex

Coun

ty E

nfor

cem

ent (

pole

bui

ldin

g)25

0,00

0.00

$

Park

ing

lot r

epai

rs fo

r boa

t ram

ps5,

000.

00$

In

crea

se si

ze o

f clim

ate

cont

rolle

d pe

stici

de st

orag

e ar

ea a

t Milf

ord

Mos

quito

Con

trol

offi

ce24

,000

.00

$

Re

plac

e oi

l/gre

ase

deliv

ery

syst

em fo

r Milf

ord

Mos

quito

Con

trol

offi

ce10

0,00

0.00

$

Boat

Sto

rage

at L

ittle

Cre

ek fa

cility

20,0

00.0

0$

Dryw

all r

epai

rs a

nd re

pain

ting

of a

ll M

alla

rd Lo

dge

inte

rior c

eilin

gs, w

alls

and

door

s, an

d re

seal

ing

of w

ood

trim

50

0,00

0.00

$

Inst

alla

tion

of b

oard

wal

k co

nnec

tor b

etw

een

AREC

and

Mal

lard

Lodg

e - C

onst

ruct

ion

of a

boa

rdw

alk

conn

ecto

r bet

wee

n M

alla

rd Lo

dge

& A

REC

pavi

lion

and

boar

dwal

k tr

ail i

s nee

ded

to p

rom

ote

safe

pas

sage

(a

void

ing

wal

king

alo

ng ro

ute

9) fo

r sch

ool a

nd y

outh

gro

ups u

sing

facil

ities

and

to cr

eate

an

inte

rpre

tive

ADA-

acce

ss w

alki

ng to

ur lo

op fo

r eco

-tour

ists a

nd o

ther

visi

tors

to th

e AR

E co

mpl

ex.

750,

000.

00$

Re

plac

e bo

ardw

alk

deck

ing

at A

REC

- Rep

lace

men

t of w

orn

wea

ther

dec

king

& ra

il bo

ards

on

AREC

tida

l m

arsh

boa

rdw

alk

with

new

low

-mai

nten

ance

, env

ironm

enta

l-frie

ndly

mat

eria

ls (c

ost b

ased

on

arch

itect

ural

cons

ulta

nt e

stim

ate

follo

win

g pr

elim

inar

y sit

e vi

sit)

50,0

00.0

0$

Repl

ace

5 se

ts o

f slid

ing

glas

s doo

rs a

nd w

indo

w tr

eatm

ents

; ins

tall

ADA-

frien

dly

thre

shol

ds o

n 1s

t flo

or o

f M

alla

rd Lo

dge.

- Ex

istin

g do

ors a

re o

ld w

ith ro

llers

dys

func

tiona

l, m

akin

g it

diffi

cult

and

unsa

fe to

ope

n an

d clo

se (e

spec

ially

for a

child

or i

ndiv

idua

l in

a w

heel

chai

r); d

oor t

hres

hold

s nee

d to

be

mor

e sm

ooth

and

safe

fo

r whe

elch

air e

gres

s as w

ell;

vert

ical b

linds

hav

e be

en b

eat u

p an

d br

oken

and

no

long

er d

o th

e jo

b.

7,00

0.00

$

Repa

ir/re

seal

ing

wor

n &

wea

ther

ed b

oard

s on

Lodg

e fir

e es

cape

& a

ssoc

iate

d de

ckin

g. -

Safe

ty co

ncer

ns fo

r th

e in

tegr

ity o

f fire

esc

ape

stai

rs a

nd ra

ils a

nd p

ro-a

ctiv

e w

ood

trea

tmen

t to

prot

ect a

nd p

rese

rve

func

tion

of in

tact

stru

ctur

es.

12,5

00.0

0$

Addi

tion

of 1

2' x

20'

shed

at n

ew A

REC

for s

tora

ge o

f Gat

or, t

ools

& o

ther

mac

hine

ry -

Dow

nsizi

ng o

f st

ruct

ure

from

old

to n

ew fa

cility

(and

loss

of t

he n

o lo

nger

safe

to u

se b

arn

area

) lea

ves a

voi

d in

spac

e av

aila

ble

for s

tora

ge o

f too

ls, m

achi

nery

, fie

ld e

quip

men

t, ac

tivity

kits

and

oth

er e

duca

tion

supp

lies.

100,

000.

00$

In

stal

latio

n of

an

ADA-

acce

ssib

le ca

noe/

kaya

k do

ckin

g sy

stem

beh

ind

Mal

lard

Lodg

e fo

r saf

e ex

plor

atio

n of

AR

EC p

ond.

- A

new

laun

ch a

t Lod

ge w

ould

pro

vide

eas

ier a

nd sa

fer a

cces

s to

pond

for u

sers

, exis

ting

cano

e la

unch

are

a is

too

shal

low

and

rock

y, ca

usin

g ca

noes

to d

evel

op le

aks f

rom

cont

inue

d dr

aggi

ng o

ver h

ard

bott

oms f

rom

alo

ng sh

orel

ine;

also

exis

ting

rip-ra

pped

and

tile

d la

unch

ram

p pr

esen

t saf

ety

haza

rds f

or

child

ren

slipp

ing

and

falli

ng w

hile

get

ting

in a

nd o

ut o

f can

oes.

DN

RE

C M

inor

Cap

ital I

mpr

ovem

ents

for

Ope

ratio

ns

Page 69: 2018-2021 DNREC Capital Plan

69

IPU

Cate

gory

Requ

este

d Am

ount

Proj

ect /

Des

crip

tion

of U

se /

Loca

tion

Fisc

al 2

019

Min

or C

apita

l Im

prov

emen

ts (M

CI) R

eque

st a

s of S

epte

mbe

r 15,

201

7De

part

men

t of N

atur

al R

esou

rces

and

Env

ironm

enta

l Con

trol

DNRE

C re

ques

ts m

inor

capi

tal i

mpr

ovem

ents

to th

e de

part

men

t’s p

ublic

faci

litie

s. T

hese

ass

et im

prov

emen

ts in

clud

e bu

ildin

g an

d fa

cilit

y re

pairs

/reh

abili

tatio

n fo

r sta

te-o

wne

d pr

oper

ties,

incl

udin

g: D

elaw

are

Seas

hore

; For

t 25

,000

.00

$

In

stal

l new

fron

t and

rear

doo

rs/r

epai

r and

inst

all n

ew th

resh

olds

at t

he D

NC. -

Con

stan

t use

of f

ront

doo

r ha

s cau

sed

need

for r

epla

cing

with

an

indu

stria

l-str

engt

h do

or u

nit.

Bac

k an

d sid

e do

ors a

re n

ot to

curr

ent

code

and

nee

d up

grad

ing.

Thr

esho

lds a

re ro

tted

and

nee

d to

be

repl

aced

with

alu

min

um/v

inyl

.

7,50

0.00

$

Stor

age

Shed

- Hun

ter E

duca

tion

- Ins

talla

tion

of a

stor

age

shed

at H

unte

r Edu

catio

n bu

ildin

g15

,000

.00

$

Pa

vilio

n in

stal

latio

n - A

dditi

on o

f a 2

0 x

20 ft

pav

ilion

to p

rovi

de co

vera

ge to

stud

ents

for t

he li

ve fi

re

port

ion

of th

e Hu

nter

Edu

catio

n Co

urse

. Cl

asse

s are

taug

ht y

ear-

roun

d at

the

Little

Cre

ek H

unte

r Ed

ucat

ion

Trai

ning

Cen

ter a

nd a

pav

ilion

wou

ld a

llow

for t

he li

ve fi

re co

mpo

nent

exe

rcise

to b

e co

mpl

eted

du

ring

all t

ypes

of w

eath

er (r

ain,

snow

, exc

essiv

e su

n, e

tc).

2,03

1,00

0.00

$

O

NR

Subt

otal

4,26

4,60

0.00

$

DN

REC

Tota

l Nee

d4,

264,

600.

00$

DN

RE

C M

inor

Cap

ital I

mpr

ovem

ents

for

Ope

ratio

ns

Page 70: 2018-2021 DNREC Capital Plan

70

Fish

& W

ildlif

e C

apita

l Pla

n Pr

ojec

t Pri

oriti

es

Proj

ect N

ame

($

in th

ousa

nds)

FY 2

018

FY20

19

FY20

20

FY20

21

How

will

pro

ject

be

fund

ed?

F&W

- Crit

ical

Equ

ipm

ent (

13 it

ems a

cros

s Div

ision

)1,

649.

301,

034.

25BO

ND/A

SF/N

SF

F&W

- Min

or C

apita

l Im

prov

emen

ts (8

item

s acr

oss D

ivisi

on)

1,37

9.00

391.

50BO

ND/A

SF/N

SF/O

THER

Bays

hore

Initi

ativ

e - w

ildlif

e vi

ewin

g st

ruct

ures

at T

aylo

rs G

ut a

t W

oodl

and

Beac

h, M

orris

Tra

ct a

nd Lo

gan

Lane

Tra

ct a

t Ted

Har

vey

Cons

erva

tion

Area

, Coo

per C

ross

site

dev

elop

men

t and

obs

erva

tion

tow

er a

nd L

ittle

Cre

ek b

oard

wal

k an

d ob

serv

atio

n to

wer

.

500.

0050

0.00

BOND

Bays

hore

Initi

ativ

e - S

t. Jo

nes R

eser

ve to

Ted

Har

vey

conn

ecto

r loo

p tr

ail,

Lang

Impo

undm

ent d

ike

trai

l, an

d vi

sitor

cent

er w

illdi

fe lo

op tr

ail,

Port

Pen

n tr

ail r

ehab

ilita

tion

and

real

ignm

ent

500.

00BO

ND

Bays

hore

Initi

ativ

e- B

aysh

ore

Visit

or C

ente

r and

Litt

le C

reek

Wild

life

and

Fish

ierie

s Fie

ld O

ffice

Fac

ility

- - D

esig

n an

d co

nstr

uct n

ew fi

eld

offic

e bu

ildin

g- co

nstr

uctio

n of

offi

ce sp

ace

for 4

0 st

aff,

smal

l con

fere

nce

room

, sta

ff br

eak

room

, bat

hroo

ms,

stor

age

close

ts, u

tiliti

es ro

om, a

nd

pole

bui

ldin

gs f

or fi

eld

equi

pmen

t.

2,60

0.00

2,60

0.00

BOND

/USF

WS

Gran

t (P

R)/B

aysh

ore

Byw

ays

Bays

hore

Initi

ativ

e - O

ffice

and

Visi

tor C

ente

r fur

nitu

re a

nd e

xhib

its.

100.

0010

0.00

BOND

/NSF

Bays

hore

Initi

ativ

e - L

eips

ic M

useu

m P

arki

ng a

nd A

DA e

ntra

nce

ram

p de

sign

20.0

0BO

ND

Bays

hore

Initi

ativ

e- M

ispill

ion

Harb

or R

eser

ve -

harb

or re

stor

atio

n50

0.00

BOND

/NSF

Bays

hore

Initi

ativ

e- Li

ttle

Cre

ek &

Ted

Har

vey

Impo

undm

ents

, Por

t M

ahon

- di

ke re

pairs

& w

ater

cont

rol s

truc

ture

500.

00BO

ND/N

SF

Bays

hore

Initi

ativ

e- Li

ttle

Cre

ek ro

ad re

pairs

50.0

0BO

ND

DNRE

C - D

iv. o

f Fish

and

Wild

life

Divi

sion

of F

ish &

Wild

life

Capi

tal P

lan

FY '1

8 - F

Y '2

1*

Page 71: 2018-2021 DNREC Capital Plan

71

Proj

ect N

ame

($

in th

ousa

nds)

FY 2

018

FY20

19

FY20

20

FY20

21

How

will

pro

ject

be

fund

ed?

DNRE

C - D

iv. o

f Fish

and

Wild

life

Divi

sion

of F

ish &

Wild

life

Capi

tal P

lan

FY '1

8 - F

Y '2

1*

Bays

hore

Initi

ativ

e - S

laug

hter

Mar

vel T

ract

Par

tner

ship

Boa

rdw

alk

and

View

ing

Plat

form

325.

00NS

F By

way

Bays

hore

Initi

ativ

e - D

elaw

are

City

inte

rpre

tive

exhi

bits

15

0.00

BOND

Enfo

rcem

ent-

Boat

Sto

rage

Sus

sex C

ount

y En

forc

emen

t (po

le b

uild

ing)

50.0

050

.00

BOND

Enfo

rcem

ent-

Little

Cre

ek d

ock,

fuel

stat

ion,

par

king

200.

00BO

ND

Enfo

rcem

ent-

Dela

war

e Ci

ty O

ffice

- fen

ce in

stal

latio

n15

.00

15.0

0BO

ND

Enfo

rcem

ent-

Little

Cre

ek O

ffice

- Des

ign/

Engi

neer

ing

and

cons

truc

tion

of o

ffice

spac

e- re

cept

ion

area

, sm

all c

onfe

renc

e ro

om, i

nter

view

room

, ev

iden

ce ro

om, s

taff

brea

k ro

om, 2

bat

hroo

ms a

nd st

orag

e clo

sets

400.

00BO

ND

Fish

erie

s- 7

th S

tree

t Boa

t Ram

p - W

ilmin

gton

1,20

0.00

1,20

0.00

NRDA

/ASF

Fish

erie

s- A

bbot

ts B

arrie

r-fre

e Fi

shin

g Pi

er In

stal

latio

n AS

F/NS

F

Fish

erie

s- A

rtifi

cial R

eef P

rogr

am

600.

0060

0.00

NSF

- ann

ual r

eef d

eplo

ymen

ts

ongo

ing

Fish

erie

s- A

ugus

tine

Beac

h Fi

shin

g Ac

cess

Are

a Re

cons

truc

tion/

M

aint

enan

ce D

redg

ing

250.

0025

0.00

ASF/

NSF/

BOND

Fish

erie

s- B

ecks

Pon

d Ba

rrie

r - F

ishin

g Pi

er In

stal

latio

ns

ASF/

NSF

Fish

erie

s- B

ecks

Pon

d La

unch

Are

a Dr

edgi

ng

BOND

Fish

erie

s- B

lair'

s Pon

d Ba

rrie

r-Fish

ing

Pier

Inst

alla

tion

AS

F/NS

F

Fish

erie

s- B

road

Cre

ek F

ishin

g Pi

er Im

prov

emen

ts

ASF/

NSF

Fish

erie

s- C

edar

Cre

ek P

rom

enad

e Re

pair

50.0

0AS

F/NS

F

Fish

erie

s- C

hurc

hman

's M

arsh

Boa

t Ram

p Re

habi

litat

ion

ASF/

NSF

Fish

& W

ildlif

e C

apita

l Pla

n Pr

ojec

t Pri

oriti

es

Page 72: 2018-2021 DNREC Capital Plan

72

Proj

ect N

ame

($

in th

ousa

nds)

FY 2

018

FY20

19

FY20

20

FY20

21

How

will

pro

ject

be

fund

ed?

DNRE

C - D

iv. o

f Fish

and

Wild

life

Divi

sion

of F

ish &

Wild

life

Capi

tal P

lan

FY '1

8 - F

Y '2

1*

Fish

erie

s- C

ollin

s Bea

ch D

redg

ing

AS

F/NS

F

Fish

erie

s- C

ollin

s Bea

ch H

ydro

grap

hic

ASF/

NSF

Fish

erie

s- C

ours

ey P

ond

Bulk

head

Rep

air

ASF/

NSF

Fish

erie

s- C

ourt

esy

Dock

s in

all F

&W

Pon

dsAS

F/NS

F/BO

ND

Fish

erie

s- D

obbi

nsvi

lle (N

ew C

astle

) Fish

ing

Pier

- con

stru

ctio

nAS

F/NS

F/BO

NDFi

sher

ies-

C&

D Ca

nal f

ishin

g pi

ers d

esig

n/en

gine

erin

g &

ADA

ac

cess

ibili

tyBO

ND/n

sf

Fish

erie

s- F

leet

woo

d Po

nd La

unch

ing

Area

ASF/

NSF

Fish

erie

s- Le

ipsic

Boa

t Doc

k

ASF

Fish

erie

s- Li

ttle

Cre

ek B

oat R

amp

1,50

0.00

2,20

0.00

ASF/

NSF/

BOND

Fish

erie

s- M

aint

enan

ce o

f F&

W st

ate-

owne

d po

nd d

ams*

BOND

- *H

igh

Haza

rd D

am a

nd

Dike

Rep

air o

r Rep

lace

men

t. Pr

ojec

t prio

ritie

s ass

igne

d th

roug

h th

e Di

visio

n of

W

ater

shed

Stew

ards

hip

Fish

erie

s- M

asse

y's M

ill P

ond

Ram

p Im

prov

emen

t AS

F/NS

F

Fish

erie

s- M

illsb

oro

Pond

Ram

p an

d Co

urte

sy D

ock

100.

0010

0.00

ASF/

NSF

Fish

erie

s- P

arki

ng lo

t rep

airs

for b

oat r

amps

500.

0025

0.00

ASF/

NSF/

BOND

Fish

erie

s- P

hilli

ps La

ndin

g Bo

at R

amp

Reha

bilit

atio

n 1,

100.

001,

100.

00AS

F/NS

F

Fish

erie

s- P

ort M

ahon

Boa

t Ram

pAS

F/NS

F

Fish

erie

s- P

ort M

ahon

Fish

ing

Pier

s AS

F/NS

F

Fish

& W

ildlif

e C

apita

l Pla

n Pr

ojec

t Pri

oriti

es

Page 73: 2018-2021 DNREC Capital Plan

73

Proj

ect N

ame

($

in th

ousa

nds)

FY 2

018

FY20

19

FY20

20

FY20

21

How

will

pro

ject

be

fund

ed?

DNRE

C - D

iv. o

f Fish

and

Wild

life

Divi

sion

of F

ish &

Wild

life

Capi

tal P

lan

FY '1

8 - F

Y '2

1*

Fish

erie

s- R

ecor

ds P

ond

Laun

ch A

rea

Dred

ging

AS

F/NS

F

Fish

erie

s- R

osed

ale

Beac

h Ra

mp

Area

Dre

dgin

g

ASF/

NSF

Fish

erie

s- R

osed

ale

Fish

ing

Area

Upg

rade

s AS

F/NS

F

Fish

erie

s- S

cott

on La

ndin

g Bo

at A

cces

s Reh

abili

tatio

n an

d Fi

sh P

ier

100.

0010

0.00

ASF/

NSF

Fish

erie

s- W

oodl

and

Beac

h Ba

yfro

nt R

amp

ASF/

NSF

Fish

erie

s- W

oodl

and

Beac

h In

land

Ram

p Re

habi

litat

ion

ASF/

NSF

Fish

erie

s- W

oodl

and

Wha

rf k

ayak

and

fish

ing

acce

ss a

rea

750.

0075

0.00

ASF/

NSF/

BOND

Fish

erie

s - B

ower

s Bea

ch B

oatin

g Ac

cess

Par

king

Lot R

ehab

ilita

tion

575.

00BO

ND/N

SF/S

OFA

Mos

quito

Con

trol

- ne

w M

ilfor

d of

fice

build

ing-

cons

truc

tion

of se

vera

l of

fice

spac

es p

lus r

ecep

tion

area

, sm

all c

onfe

renc

e ro

om, s

taff

brea

k ro

om, 2

bat

hroo

ms,

stor

age

close

ts, u

tiliti

es ro

om, p

ole

shed

for

pest

icide

stor

age.

400.

0056

4.00

BOND

Mos

quito

Con

trol

- In

crea

se S

ize o

f Clim

ate

Cont

rol o

f Pes

ticid

e St

orag

e Ar

ea -

Milf

ord

loca

tion

5.00

5.00

BOND

Mos

quito

Con

trol

- M

ilfor

d Co

nstr

uct V

ehicl

e W

ash

dow

n pa

d w

ith

Cont

ainm

ent S

yste

m fo

r Pes

ticid

e/oi

l/gre

ase

Rins

es50

.00

50.0

0BO

ND

Mos

quito

Con

trol

- M

ilfor

d- F

urth

er R

emed

iate

old

DDT

/DDE

Res

idue

s Fo

und

in G

arag

e Fl

oorin

g an

d As

socia

ted

Soils

and

on

Num

erou

s Ga

rage

/Sho

p Su

rface

s

40.0

040

.00

BOND

Mos

quito

Con

trol

- M

ilfor

d- R

enov

ate

old

offic

e bu

ildin

g, co

nver

t to

smal

l lab

+ in

sect

ory,

plu

s sto

rage

spac

e50

.00

75.0

0BO

ND

Mos

quito

Con

trol

- Gr

ease

and

Oil

Deliv

ery

Syst

em fo

r Milf

ord

MC

Shop

24.0

0BO

ND

Fish

& W

ildlif

e C

apita

l Pla

n Pr

ojec

t Pri

oriti

es

Page 74: 2018-2021 DNREC Capital Plan

74

Proj

ect N

ame

($

in th

ousa

nds)

FY 2

018

FY20

19

FY20

20

FY20

21

How

will

pro

ject

be

fund

ed?

DNRE

C - D

iv. o

f Fish

and

Wild

life

Divi

sion

of F

ish &

Wild

life

Capi

tal P

lan

FY '1

8 - F

Y '2

1*

OGL

- DuP

ont N

atur

e Ce

nter

- new

fron

t doo

r ins

talla

tion

and

rear

doo

r re

pair/

inst

alla

tion

of n

ew th

resh

olds

and

dec

k re

pairs

and

reha

bilit

atio

n.5.

5025

.00

BOND

OLG

- ARE

C ca

noe/

kaya

k La

unch

45.0

010

0.00

BOND

OLG

- ARE

C st

orag

e sh

ed -

new

inst

alla

tion

12.5

012

.50

NSF/

BOND

OLG

- ARE

C/M

alla

rd Lo

dge-

Inst

alla

tion

of b

oard

wal

k co

nnec

tor

300.

0050

0.00

Tran

spor

tatio

n Al

tern

ativ

es

Prog

ram

(TAP

)/BO

ND

OLG

- ARE

C- re

plac

emen

t of b

oard

wal

k de

ckin

g an

d st

one

dust

trai

l re

habi

litat

ion

167.

0075

0.00

PARK

S TR

AILS

&

PATH

WAY

S/BO

NDO

LG- D

emol

ition

of u

nsaf

e st

ruct

ures

on

F&W

are

as o

pen

for p

ublic

use

(A

REC)

100.

0010

0.00

BOND

OLG

-Con

stru

ctio

n of

smal

l ADA

acc

essib

le re

stro

om fa

cility

in p

lace

of

dem

olish

ed A

REC

to a

ccom

mod

ate

scho

ol g

roup

s usin

g Ec

oExp

lore

r tr

ail.

175.

50BO

ND

OLG

- Lice

nsin

g an

d Re

gist

ratio

n Te

chno

logy

App

licat

ion

Deve

lopm

ent

3,00

0.00

3,00

0.00

BOND

OLG

- Litt

le C

reek

Hun

ter E

duca

tion

- sto

rage

shed

7.50

7.50

BOND

OLG

- Litt

le C

reek

Hun

ter E

duca

tion-

pav

ilion

inst

alla

tion

15.0

015

.00

BOND

OLG

- Mal

lard

Lodg

e Re

pairs

Enh

ance

men

ts- A

DA im

prov

emen

ts

inclu

ding

dec

king

, doo

r rep

lace

men

t, do

or th

resh

olds

, cab

inet

har

dwar

e,

base

boar

d he

atin

g re

plac

emen

t

50.0

050

.00

BOND

OLG

- Mal

lard

Lodg

e - R

oof,

sidin

g an

d gu

tter

repl

acem

ent

75.0

0BO

NDO

LG- M

alla

rd Lo

dge

- fire

esc

ape

repa

irs7.

007.

00BO

ND

OLG

- Mal

lard

Lodg

e - d

ryw

all r

epai

rs a

nd re

pain

ting

20.0

020

.00

BOND

Fish

& W

ildlif

e C

apita

l Pla

n Pr

ojec

t Pri

oriti

es

Page 75: 2018-2021 DNREC Capital Plan

75

Proj

ect N

ame

($

in th

ousa

nds)

FY 2

018

FY20

19

FY20

20

FY20

21

How

will

pro

ject

be

fund

ed?

DNRE

C - D

iv. o

f Fish

and

Wild

life

Divi

sion

of F

ish &

Wild

life

Capi

tal P

lan

FY '1

8 - F

Y '2

1*

Wild

life-

C&

R Ho

rse

barn

roof

repl

acem

ent

10.0

0BO

ND

Wild

life-

Equ

ipm

ent s

hed

for A

ssaw

oman

Reg

ion

360

.00

60.0

0AS

F/NS

F/BO

ND

Wild

life-

Em

erge

ncy

repa

irs to

F&

W o

wne

d bu

ildin

gs20

0.00

200.

00NS

F/BO

ND

Wild

life-

Om

mel

ande

n Ra

nge

Upgr

ade

100.

0010

0.00

BOND

Wild

life-

Ow

ens S

tatio

n En

forc

emen

t bui

ldin

g an

d as

socia

ted

pist

ol/r

ifle

rang

eAS

F/NS

F/BO

ND

Wild

life-

Pop

lar T

hick

et E

rosio

n Pr

ojec

tBO

ND

Wild

life-

Pol

e bu

ildin

g to

be

cons

truc

ted

at A

ugus

tine

shop

75.0

0BO

NDW

ildlif

e- P

ort M

ahon

Wat

er C

ontr

ol S

truc

ture

25.0

025

.00

ASF/

NSF

Wild

life-

Rep

air a

nd R

ehab

ilita

te H

istor

ical H

ouse

s on

Wild

life

Man

agem

ent A

reas

250.

0025

0.00

BOND

Wild

life-

Roa

d re

pairs

F&

W a

reas

and

par

king

lots

(gra

vel)

60.0

060

.00

ASF/

NSF/

BOND

Wild

life-

Roo

f rep

lace

men

t on

Mul

berr

y La

ndin

g Pa

vilio

n12

.00

12.0

0BO

NDW

ildlif

e- S

tate

wid

e Im

poun

dmen

t Res

tora

tion

Cons

truc

tion

(Aug

ustin

e,

Woo

dlan

d Be

ach,

Litt

le C

reek

, Ted

Har

vey,

and

Ass

awom

an W

ildlif

e Ar

eas)

587.

504,

500.

00NS

F/BO

ND

Wild

life-

Ted

Har

vey

new

impo

undm

ent c

onst

ruct

ion

350.

0035

0.00

NSF/

BOND

Wild

life-

Rep

air a

nd re

plac

e hu

ntin

g an

d w

ildlif

e vi

ewin

g st

ruct

ures

on

wild

life

area

s30

.00

30.0

0NS

F/BO

ND

TOTA

L18

,827

.30

25,1

28.2

512

5.00

40.0

0*

Figu

res r

epre

sent

ed in

thou

sand

s

Fish

& W

ildlif

e C

apita

l Pla

n Pr

ojec

t Pri

oriti

es

Page 76: 2018-2021 DNREC Capital Plan

76

Park

s & R

ecre

atio

n C

apita

l Pro

ject

Pri

oriti

es

Park

Uni

tCo

unty

Proj

ect D

etai

lsFi

scal

201

8Fi

scal

201

9Fi

scal

202

0Fi

scal

202

1Ca

pe H

enlo

pen

Stat

e Pa

rkSu

ssex

Sew

er P

lant

repl

acem

ent

and

upgr

ades

1,50

0.0

$

1,

500.

0$

1,50

0.0

$

Ca

pe H

enlo

pen

Stat

e Pa

rkSu

ssex

Wol

fe N

eck

Cam

era

Syst

emW

hite

Cla

y Cr

eek

Stat

e Pa

rkNe

w C

astle

Deer

field

Roo

f Rep

lace

men

t Lu

ms P

ond

Stat

e Pa

rkNe

w C

astle

Phas

e II

utili

ty u

pgra

des c

ampg

roun

d

Cape

Hen

lope

n St

ate

Park

Suss

exEn

gine

erin

g/ C

onst

ruct

ion

for s

tair

repa

ir at

Tow

er 7

Cape

Hen

lope

n St

ate

Park

Suss

exNe

w te

mpo

rary

cam

pgro

und

stor

e an

d of

fice

upgr

ades

Cape

Hen

lope

n St

ate

Park

Suss

exCa

mpg

roun

d: 3

poi

nt h

ook-

ups,

site

upgr

ades

, pl

aygr

ound

, am

phith

eate

r, pa

vilio

n, a

dditi

onal

ove

rflow

pa

rkin

g, ci

rcul

atio

ns im

prov

emen

ts

Aubu

rn H

eigh

ts P

rese

rve

New

Cas

tleNV

F in

stal

latio

n of

road

s, pa

rkin

g lo

ts, i

nfra

stru

ctur

e,

park

offi

ce re

nova

tions

, am

phith

eate

r, dr

aina

ge, t

rails

an

d br

idge

s2,

500.

0$

3,00

0.0

$

3,

000.

0$

1,00

0.0

$

Kille

ns P

ond

Stat

e Pa

rkKe

ntW

ater

park

repa

irs, u

pgra

des a

nd re

plac

emen

ts (P

hase

2-

4)3,

500.

0$

3,00

0.0

$

3,

000.

0$

Fort

Del

awar

e St

ate

Park

New

Cas

tleIsl

and

tram

pat

h: re

pair

resu

rface

pat

h20

0.0

$

20

0.0

$

Fort

Del

awar

e St

ate

Park

New

Cas

tle

Pavi

lion

cons

truc

tion.

The

For

t cur

rent

ly d

oes n

ot h

ave

a sa

fe sh

ade

stru

ctur

e fo

r the

pat

rons

to h

ave

thei

r lu

nche

s, w

here

the

picn

ic ta

bles

curr

ently

are

loca

ted

ther

e ar

e fa

lling

bric

ks o

verh

ead

100.

0$

100.

0$

Fort

DuP

ont S

tate

Par

kNe

w C

astle

Shop

am

eniti

es -w

ater

, sew

er a

nd re

stro

oms,

fenc

ing

and

regr

ade

(pos

sible

relo

catio

n to

Gra

ssda

le)

Cape

Hen

lope

n St

ate

Park

Suss

exNe

w P

ier D

esig

n1,

000.

0$

1,00

0.0

$

1,

000.

0$

Bran

dyw

ine

Cree

k St

ate

Park

New

Cas

tlePa

ve, f

ix e

rosio

n on

exi

stin

g st

oned

trai

ls50

0.0

$

Kille

ns P

ond

Stat

e Pa

rkKe

ntSa

fe p

edes

tria

n co

nnec

tor b

etw

een

boat

rent

al a

nd b

oat

ram

p2,

000.

0$

Fort

Del

awar

e St

ate

Park

New

Cas

tleLa

ndin

g Si

te35

0.0

$

W

hite

Cla

y Cr

eek

Stat

e Pa

rkNe

w C

astle

Life

Cour

se B

ridge

s rep

lace

men

t

Whi

te C

lay

Cree

k St

ate

Park

New

Cas

tleBr

idge

eva

luat

ion

and

repl

acem

ent/

Natu

re C

ente

r80

.0$

30.0

$

Fort

Del

awar

e St

ate

Park

New

Cas

tleFu

el D

ock

Pilin

g re

plac

emen

t/re

pair

engi

neer

ing

and

cons

truc

tion

150.

0$

300.

0$

Proj

ect C

ost E

stim

ates

($ in

thou

sand

s)Ca

pita

l Pro

ject

Prio

ritie

s 201

8-20

21DN

REC-

Park

s and

Rec

reat

ion

Last

Upd

ate:

1/2

9/18

Page 77: 2018-2021 DNREC Capital Plan

77

Park

s & R

ecre

atio

n C

apita

l Pro

ject

Pri

oriti

es

Park

Uni

tCo

unty

Proj

ect D

etai

lsFi

scal

201

8Fi

scal

201

9Fi

scal

202

0Fi

scal

202

1Pr

ojec

t Cos

t Est

imat

es ($

in th

ousa

nds)

Capi

tal P

roje

ct P

riorit

ies 2

018-

2021

DNRE

C-Pa

rks a

nd R

ecre

atio

n

Last

Upd

ate:

1/2

9/18

Bran

dyw

ine

Zoo

Mas

ter P

lan

New

Cas

tleAZ

A Co

mpl

ianc

e30

0.0

$

1,

000.

0$

1,00

0.0

$

De

law

are

Seas

hore

Sta

te P

ark

Suss

exSa

fety

repl

acem

ent

200.

0$

Aubu

rn H

eigh

ts P

rese

rve

New

Cas

tleUp

grad

es to

ele

vato

rs, m

ansio

n an

d ca

rria

ge h

ouse

100.

0$

Dela

war

e Se

asho

re S

tate

Par

kSu

ssex

Mar

ina

- Mar

ina

boat

ram

p no

rth

side

does

not

hav

e an

y ra

iling

nex

t to

the

side

wal

k. T

he ra

mp

has a

8 fo

ot fa

ll th

at is

not

pro

tect

ed w

ith ra

iling

25.0

$

Fort

Del

awar

e St

ate

Park

New

Cas

tleRa

iling

repl

acem

ent o

n to

p of

the

Fort

. Th

e Fo

rt’s

roof

ra

iling

nee

ds to

be

repl

ace

to p

reve

nt v

isito

rs a

nd

empl

oyee

s fro

m fa

lling

50.0

$

Fort

Del

awar

e St

ate

Park

New

Cas

tleHe

ronr

y ov

erlo

ok re

plac

emen

t. T

he cu

rren

t her

onry

look

ou

t is i

mpr

oper

ly co

nstr

ucte

d an

d is

unst

able

50.0

$

Fort

Del

awar

e St

ate

Park

New

Cas

tle

Two

(2) p

iling

s to

be fi

lled,

bra

ced,

and

wra

pped

, ap

prox

imat

ely

20’ v

ertic

ally

, fro

m lo

w ti

de to

hig

h tid

e lin

es.

Repl

acem

ent o

f 3 d

iago

nal c

ross

mem

bers

bel

ow

high

tide

line

.

Aubu

rn H

eigh

ts P

rese

rve

New

Cas

tleCa

rria

ge H

ouse

offi

ces s

econ

dary

egr

ess.

The

carr

iage

ho

use

seco

nd fl

oor o

ffice

s do

not h

ave

seco

ndar

y eg

ress

in

case

of a

n em

erge

ncy

35.0

$

Fo

rt D

elaw

are

Stat

e Pa

rkNe

w C

astle

Ft D

E m

ason

ry re

pairs

100.

0$

Wilm

ingt

on S

tate

Par

ksNe

w C

astle

H. F

letc

her B

row

n Pa

rk -

Rota

ry p

ark

proj

ect,

com

plet

e ov

erha

ul1,

500.

0$

Wilm

ingt

on S

tate

Par

ksNe

w C

astle

Bran

dyw

ine

Park

: Nor

th P

ark

Driv

e; re

plac

e cu

rb,

wal

kway

and

fenc

e15

0.0

$

Whi

te C

lay

Cree

k St

ate

Park

New

Cas

tlepa

rkin

g lo

t and

fee

colle

ctio

n st

atio

n af

ter 8

40 C

reek

Ro

ad h

ouse

is d

emol

ished

100.

0$

Fenw

ick Is

land

Sta

te P

ark

Suss

exFe

nwick

isla

nd p

arki

ng e

xpan

sion,

am

enity

upg

rade

s, dr

opof

f,ren

ovat

ion,

entr

ance

que

uing

and

eva

cuat

ion

rout

e im

prov

emen

ts2,

000.

0$

Cape

Hen

lope

n St

ate

Park

Suss

exBi

den

cent

er re

nova

tions

5,00

0.0

$

$

Page 78: 2018-2021 DNREC Capital Plan

78

Park

s & R

ecre

atio

n C

apita

l Pro

ject

Pri

oriti

es

Park

Uni

tCo

unty

Proj

ect D

etai

lsFi

scal

201

8Fi

scal

201

9Fi

scal

202

0Fi

scal

202

1Pr

ojec

t Cos

t Est

imat

es ($

in th

ousa

nds)

Capi

tal P

roje

ct P

riorit

ies 2

018-

2021

DNRE

C-Pa

rks a

nd R

ecre

atio

n

Last

Upd

ate:

1/2

9/18

Lum

s Pon

d St

ate

Park

New

Cas

tleSu

mm

it No

rth

eros

ion

issue

s, ba

nk st

abili

zatio

n, ri

p ra

p1,

000.

0$

Belle

vue

Stat

e Pa

rkNe

w C

astle

Pond

Rep

lace

out

flow

pip

e an

d ca

tch

basin

in p

ond

750.

0$

Dela

war

e Se

asho

re S

tate

Par

kSu

ssex

New

fuel

line

s upg

rade

and

pum

ps n

eede

d at

fuel

doc

k.15

0.0

$

Ca

pe H

enlo

pen

Stat

e Pa

rkSu

ssex

Yout

h ca

mps

air

cond

ition

ing

250.

0$

Belle

vue

Stat

e Pa

rkNe

w C

astle

Pond

: rep

air r

etai

ning

wal

l at

brid

ge60

.0$

Cape

Hen

lope

n St

ate

Park

Suss

exNe

w F

ishin

g Pi

er C

onst

ruct

ion

1,00

0.0

$

8,

000.

0$

7,00

0.0

$

De

law

are

Seas

hore

Sta

te P

ark

Suss

exLif

egua

rd H

ousin

g75

0.0

$

Fo

rt D

elaw

are

Stat

e Pa

rkNe

w C

astle

Repa

ir le

aks o

n te

rre

plai

n

Fort

DuP

ont S

tate

Par

kNe

w C

astle

Dem

oliti

on o

f thr

ee (3

) bui

ldin

gs: W

hite

War

ehou

se, O

ld

Fort

Del

awar

e Hi

stor

ical S

ocie

ty b

uild

ing

($22

,000

), an

d M

otor

Poo

l Bui

ldin

g80

.0$

Port

Pen

n In

terp

retiv

e Ce

nter

New

Cas

tleCl

eave

r: re

pair/

repl

ace

roof

100.

0$

Belle

vue

Stat

e Pa

rkNe

w C

astle

Perc

hero

n Ba

rn R

oof-

Stru

ctur

al re

pairs

and

roof

sh

ingl

es.

400.

0$

Cape

Hen

lope

n St

ate

Park

Suss

exFo

rt M

iles E

ntra

nce

Road

and

Par

king

Lot

1,75

0.0

$

Trap

Pon

d St

ate

Park

Suss

exNe

w C

ampg

roun

d ba

thho

use

repl

ace

com

post

ing

facil

ity40

0.0

$

Lu

ms P

ond

Stat

e Pa

rkNe

w C

astle

Lum

s rep

lace

yur

ts w

ith ca

bins

400.

0$

Aubu

rn H

eigh

ts P

rese

rve

New

Cas

tleCo

nstr

uctio

n of

new

mai

nten

ance

bui

ldin

g.10

0.0

$

De

law

are

Seas

hore

Sta

te P

ark

Suss

exM

arin

a Dr

edgi

ng25

0.0

$

Aubu

rn H

eigh

ts P

rese

rve

New

Cas

tleSt

eam

Car

Mus

eum

Ren

ovat

ion

and

asph

alt r

esur

facin

g2,

000.

0$

Bran

dyw

ine

Cree

k St

ate

Park

New

Cas

tleRe

desig

n an

d Re

trof

it of

Com

post

ing

Toile

ts a

t Th

omps

ons-

we

curr

ently

hav

e th

ese

close

d w

ith p

ort-a

-jo

hns i

n fro

nt.

250.

0$

Fort

Del

awar

e St

ate

Park

New

Cas

tleEn

dico

tt R

oof w

ater

proo

fing

and

prep

arat

ion

for s

olar

pr

ojec

t1,

200.

0$

Fort

DuP

ont S

tate

Par

kNe

w C

astle

1905

Gua

rd H

ouse

rest

orat

ion

65.0

$

Fo

rt D

uPon

t Sta

te P

ark

New

Cas

tleRo

of R

epla

cem

ents

250.

0$

Trap

Pon

d St

ate

Park

Suss

exJa

mes

bra

nch

cano

e/ka

yak

laun

ch a

t Hitc

h Po

nd R

oad

200.

0$

Page 79: 2018-2021 DNREC Capital Plan

79

Park

s & R

ecre

atio

n C

apita

l Pro

ject

Pri

oriti

es

Park

Uni

tCo

unty

Proj

ect D

etai

lsFi

scal

201

8Fi

scal

201

9Fi

scal

202

0Fi

scal

202

1Pr

ojec

t Cos

t Est

imat

es ($

in th

ousa

nds)

Capi

tal P

roje

ct P

riorit

ies 2

018-

2021

DNRE

C-Pa

rks a

nd R

ecre

atio

n

Last

Upd

ate:

1/2

9/18

Whi

te C

lay

Cree

k St

ate

Park

New

Cas

tleBu

ildin

g En

velo

pe re

nova

tions

Clu

b Ho

use

and

Cart

Bar

n1,

500.

0$

Cape

Hen

lope

n St

ate

Park

Suss

exCa

mpg

roun

d Ca

bins

900.

0$

Whi

te C

lay

Cree

k St

ate

Park

New

Cas

tle

Judg

e M

orris

Est

ate-

Exte

rior r

epai

rs a

nd p

aint

ing:

Woo

d sh

ingl

e ro

of re

pairs

, sof

fit re

pairs

and

pai

ntin

g, re

pair

and

pain

ting

of w

indo

w fr

ames

, sill

s, sh

utte

rs, d

oors

, do

or fr

ames

.60

.0$

Aubu

rn H

eigh

ts P

rese

rve

New

Cas

tleO

vers

ee F

arm

new

sept

ic sy

stem

and

bui

ldin

g re

nova

tions

750.

0$

Stat

ewid

e an

d Sp

ecia

lSt

atew

ide

Stru

ctur

al st

udy

of a

ll fir

e co

ntro

l tow

ers

90.0

$

Alap

ocas

Run

Sta

te P

ark

New

Cas

tleAl

apoc

as W

oods

: Ala

poca

s Run

wat

erfa

ll br

idge

- sto

ne

wal

ls st

abili

zatio

n(en

gine

erin

g re

view

)25

0.0

$

Cape

Hen

lope

n St

ate

Park

Suss

exFM

HA: M

useu

m p

lan

deve

lopm

ent a

nd im

plem

enta

tion

500.

0$

Bran

dyw

ine

Cree

k St

ate

Park

New

Cas

tle

Nort

hern

Del

awar

e Gr

eenw

ay tr

ail:

repa

ir dr

aina

ge a

nd

eros

ion

issue

s. Re

pairs

to 4

pip

e cu

lver

ts/ s

wal

es/ t

rail

surfa

ce a

long

gre

enw

ay; r

epai

r dra

inag

e iss

ues a

t ov

erlo

ok50

.0$

Trap

Pon

d St

ate

Park

Suss

exBe

thes

da C

hurc

h: co

mpo

stin

g to

ilet,

benc

hes,

park

ing

150.

0$

Lum

s Pon

d St

ate

Park

New

Cas

tleBo

at re

ntal

Are

a: b

oat d

ock

repa

irs ($

10k/

yr. f

or 3

yrs

.)30

.0$

Belle

vue

Stat

e Pa

rkNe

w C

astle

Figu

re 8

/ hun

ter b

arn

rest

room

s1,

000.

0$

Lum

s Pon

d St

ate

Park

New

Cas

tleAm

phith

eate

r aro

und

cam

pgro

und

75.0

$

Lu

ms P

ond

Stat

e Pa

rkNe

w C

astle

Play

grou

nd a

t cam

pgro

und

250.

0$

Holts

Land

ing

Stat

e Pa

rkSu

ssex

Holts

Par

king

Lot B

oat D

ock

addi

tion

and

light

ing

150.

0$

Whi

te C

lay

Cree

k St

ate

Park

New

Cas

tleNi

ven

Hous

e re

pairs

for m

arke

t ren

tal;

Stru

cutr

al re

pair;

15

0.0

$

Wilm

ingt

on S

tate

Par

ksNe

w C

astle

Rock

ford

Par

k: d

evel

op o

ne-w

ay tr

affic

flow

and

pro

vide

pa

rkin

g10

0.0

$

St

atew

ide

and

Spec

ial

Stat

ewid

eSt

atew

ide

secu

rity

cam

era

syst

em10

0.0

$

Page 80: 2018-2021 DNREC Capital Plan

80

Park

s & R

ecre

atio

n C

apita

l Pro

ject

Pri

oriti

es

Park

Uni

tCo

unty

Proj

ect D

etai

lsFi

scal

201

8Fi

scal

201

9Fi

scal

202

0Fi

scal

202

1Pr

ojec

t Cos

t Est

imat

es ($

in th

ousa

nds)

Capi

tal P

roje

ct P

riorit

ies 2

018-

2021

DNRE

C-Pa

rks a

nd R

ecre

atio

n

Last

Upd

ate:

1/2

9/18

Dela

war

e Se

asho

re S

tate

Par

kSu

ssex

Life

savi

ng st

atio

n AD

A up

date

s50

.0$

Whi

te C

lay

Cree

k St

ate

Park

New

Cas

tleBu

ildin

g Gr

eenh

ouse

50.0

$

Lu

ms P

ond

Stat

e Pa

rkNe

w C

astle

Cam

pgro

und

visit

or’s

park

ing

lot

(sto

ne)

50.0

$

Lu

ms P

ond

Stat

e Pa

rkNe

w C

astle

Lum

s Boa

t Ram

p Co

urte

sy D

ock

100.

0$

Fort

Del

awar

e St

ate

Park

New

Cas

tlePa

thw

ay le

velin

g on

the

Fort

wal

kway

s. T

he F

ort’s

gr

anite

wal

kway

s are

ext

rem

ely

une

ven

with

lots

of

trip

ping

haz

ards

and

nee

d to

be

rese

t.75

.0$

Cape

Hen

lope

n St

ate

Park

Suss

exPa

rk fu

el ta

nk re

plac

emen

ts.

The

se ta

nks a

re si

ngle

wal

l ta

nks a

nd d

o no

t hav

e se

cond

ary

cont

ainm

ent i

n th

e ev

ent o

f a sp

ill60

.0$

Bran

dyw

ine

Cree

k St

ate

Park

New

Cas

tlePa

rk e

ntra

nce

road

sink

hol

e re

pairs

. T

he e

ntra

nce

road

ha

s sin

k ho

les d

ue a

n im

prop

erly

inst

alle

d or

faile

d cu

lver

t75

.0$

Belle

vue

Stat

e Pa

rkNe

w C

astle

Fox

Poin

t par

king

lot l

ight

s are

not

ope

ratio

nal.

The

in

oper

able

par

king

lot l

ight

s are

a se

curit

y co

ncer

n25

.0$

Whi

te C

lay

Cree

k St

ate

Park

New

Cas

tleDe

erfie

ld se

wer

repa

irs/u

pgra

des

25.0

$

Whi

te C

lay

Cree

k St

ate

Park

New

Cas

tleNi

ven

Prop

erty

: str

uctu

ral r

epai

rs to

Niv

en B

arn

or

docu

men

tatio

n of

hist

oric

signi

fican

ce fo

r dem

o40

0.0

$

Fort

Del

awar

e St

ate

Park

New

Cas

tleM

ainl

and

land

ing

craf

t wor

k do

ck: r

epla

ce e

xist

ing

dock

th

at is

too

shor

t and

not

ade

quat

ely

anch

ored

100.

0$

Alap

ocas

Run

Sta

te P

ark

New

Cas

tleW

eldi

n Ro

ad: P

rovi

de sa

fe p

edes

tria

n cr

ossin

g be

twee

n lo

t D a

nd C

anDo

pla

ygro

und/

ath

letic

fiel

ds10

0.0

$

Wilm

ingt

on S

tate

Par

ksNe

w C

astle

Nort

h pa

rk d

rive:

Pro

vide

safe

ped

estr

ian

cros

sing

near

co

ndos

; clo

se o

ff cu

t thr

ough

200.

0$

Aubu

rn H

eigh

ts P

rese

rve

New

Cas

tleM

ansio

n, p

arki

ng lo

t pla

n, d

esig

n, co

nstr

uctio

n, se

ptic

Tank

repl

acem

ent a

nd/o

r con

nect

ion

to se

wer

on

Beng

e Ro

ad1,

000.

0$

Dela

war

e Se

asho

re S

tate

Par

kSu

ssex

Mitc

hell

Hous

e Re

nova

tions

and

Roa

d Fl

oodi

ng re

pairs

250.

0$

Dela

war

e Se

asho

re S

tate

Par

kSu

ssex

Tow

er #

3 re

nova

tions

250.

0$

2,00

0.0

$

1,

000.

0$

Page 81: 2018-2021 DNREC Capital Plan

81

Park

s & R

ecre

atio

n C

apita

l Pro

ject

Pri

oriti

es

Park

Uni

tCo

unty

Proj

ect D

etai

lsFi

scal

201

8Fi

scal

201

9Fi

scal

202

0Fi

scal

202

1Pr

ojec

t Cos

t Est

imat

es ($

in th

ousa

nds)

Capi

tal P

roje

ct P

riorit

ies 2

018-

2021

DNRE

C-Pa

rks a

nd R

ecre

atio

n

Last

Upd

ate:

1/2

9/18

Lum

s Pon

d St

ate

Park

New

Cas

tlePa

rk O

ffice

acc

essib

ility

upg

rade

s. T

he e

ntra

nce

ram

p an

d re

stro

oms d

o no

t mee

t cur

rent

ADA

acc

essib

ility

re

quire

men

ts.

65.0

$

Aubu

rn H

eigh

ts P

rese

rve

New

Cas

tleM

useu

m b

oile

r roo

m b

ump

out r

oof r

epla

cem

ent.

The

roof

will

star

t to

leak

on

top

of th

e bo

iler r

oom

eq

uipm

ent

10.0

$

Fo

rt D

elaw

are

Stat

e Pa

rkNe

w C

astle

Ft. D

E re

pair

and

repa

int w

indo

ws

40.0

$

Fo

rt D

elaw

are

Stat

e Pa

rkNe

w C

astle

Ft D

E do

ck re

pairs

65.0

$

Be

llevu

e St

ate

Park

New

Cas

tlePl

ace

ston

e ne

ar h

orse

bar

n ac

cess

way

15.0

$

Wilm

ingt

on S

tate

Par

ksNe

w C

astle

Rock

ford

" ten

nis c

ourt

are

a; re

pave

exi

stin

g pa

rkin

g ar

ea/ a

cces

sibili

ty im

prov

emen

ts10

0.0

$

Belle

vue

Stat

e Pa

rkNe

w C

astle

Repa

ir da

mag

e to

bik

e pa

th (P

hila

delp

hia

Pike

)10

0.0

$

Be

llevu

e St

ate

Park

New

Cas

tleRe

pair

Perc

hero

n Ba

rn a

nd O

ffice

road

s40

.0$

Belle

vue

Stat

e Pa

rkNe

w C

astle

Park

Offi

ce: A

DA im

prov

emen

ts to

offi

ce d

oor a

nd ra

mp

18.0

$

Ca

pe H

enlo

pen

Stat

e Pa

rkSu

ssex

Pick

le B

all C

ourt

s20

0.0

$

Ca

pe H

enlo

pen

Stat

e Pa

rkSu

ssex

New

par

k of

fice

750.

0$

Lum

s Pon

d St

ate

Park

New

Cas

tleW

aste

wat

er tr

eatm

ent p

lant

repl

acem

ent

3,00

0.0

$

De

law

are

Seas

hore

Sta

te P

ark

Suss

exDr

y St

ack

Roof

Rep

lace

men

t50

0.0

$

W

ilmin

gton

Sta

te P

arks

New

Cas

tleRe

stor

atio

n of

the

Todd

Mem

oria

l.80

.0$

Wilm

ingt

on S

tate

Par

ksNe

w C

astle

Repl

ace

Runn

ing

Trac

k at

Bay

nard

Sta

dium

.80

0.0

$

Trap

Pon

d St

ate

Park

Suss

exPa

rk O

ffice

roof

repa

ir.

The

Offi

ce ro

of h

as a

sag

in th

e ro

of30

.0$

Trap

Pon

d St

ate

Park

Suss

exTh

ree

(3) e

ach

fishi

ng d

ock

repl

acem

ents

. The

curr

ent

fishi

ng d

ocks

are

wor

n ou

t and

uns

tabl

e.45

.0$

Trap

Pon

d St

ate

Park

Suss

exA

Loop

Bat

h ho

use

roof

repl

acem

ent.

The

curr

ent

shin

gles

hav

e ex

ceed

ed th

eir e

xpec

ted

life

and

the

roof

is

curr

ently

leak

ing.

30.0

$

Lum

s Pon

d St

ate

Park

New

Cas

tle

The

Bath

Hou

se ro

ofs r

epla

cem

ent.

The

curr

ent r

oofs

ar

e le

akin

g an

d ha

ve e

xcee

ded

thei

r exp

ecte

d lif

e an

d ne

ed to

be

repl

aced

bef

ore

we

star

t to

get s

truc

tura

l da

mag

e65

.0$

Page 82: 2018-2021 DNREC Capital Plan

82

Park

s & R

ecre

atio

n C

apita

l Pro

ject

Pri

oriti

es

Park

Uni

tCo

unty

Proj

ect D

etai

lsFi

scal

201

8Fi

scal

201

9Fi

scal

202

0Fi

scal

202

1Pr

ojec

t Cos

t Est

imat

es ($

in th

ousa

nds)

Capi

tal P

roje

ct P

riorit

ies 2

018-

2021

DNRE

C-Pa

rks a

nd R

ecre

atio

n

Last

Upd

ate:

1/2

9/18

Lum

s Pon

d St

ate

Park

New

Cas

tlePo

nd B

erm

repa

ir

- Th

e Po

nd b

erm

has

seve

re e

rosio

ns

and

requ

ires r

epai

r bef

ore

com

plet

e fa

ilure

60.0

$

Kille

ns P

ond

Stat

e Pa

rkKe

ntTh

e M

aint

enan

ce sh

op ro

of re

plac

emen

t. T

he cu

rren

t ro

of h

as e

xcee

ded

it ex

pect

ed li

fe a

nd n

eed

to b

e re

plac

ed b

efor

e w

e st

art t

o ge

t str

uctu

ral

dam

age

20.0

$

Kille

ns P

ond

Stat

e Pa

rkKe

ntTh

e Bo

at re

ntal

doc

k ne

eds r

epla

cem

ent.

The

curr

ent

boat

doc

k is

wor

n an

d do

es n

ot m

eet A

cces

sibili

ty

requ

irem

ents

60.0

$

Dela

war

e Se

asho

re S

tate

Par

kSu

ssex

Bulk

head

wal

ls se

alan

t is s

epar

atin

g fro

m m

etal

caus

ing

corr

osio

n.

If th

e co

rros

ion

cont

inue

s unt

reat

ed w

e co

uld

suffe

r pre

mat

ure

bulk

head

failu

re35

0.0

$

Holts

Land

ing

Stat

e Pa

rkSu

ssex

Wat

er b

uild

ing

sidin

g an

d w

indo

w re

plac

emen

t.

The

w

indo

ws a

re b

roke

n an

d th

e sid

ing

requ

ires r

epla

cem

ent

15.0

$

Holts

Land

ing

Stat

e Pa

rkSu

ssex

Bath

hou

se ro

of re

plac

emen

t. T

he sh

ingl

es h

ave

exce

eded

thei

r life

exp

ecta

ncy

and

requ

ire re

plac

emen

t20

.0$

Fenw

ick Is

land

Sta

te P

ark

Suss

exFe

nwick

Isla

nd B

ath

Hous

e ro

of re

plac

emen

t. T

he b

ath

hous

e ro

of is

leak

ing

and

requ

ires r

epla

cem

ent

75.0

$

Fort

Del

awar

e St

ate

Park

New

Cas

tlePo

rt P

enn

inte

rpre

tive

cent

er ro

of re

plac

emen

t. T

he

curr

ent r

oof w

ood

shin

gles

are

star

ting

to cu

rl60

.0$

Fort

Del

awar

e St

ate

Park

New

Cas

tle

East

Sid

e Te

rrep

lein

of f

ort.

now

ther

e ar

e m

ajor

sink

ho

les i

n th

at se

ctio

n of

the

Terr

eple

in.

soil

is g

radu

ally

fil

terin

g its

way

bet

wee

n th

e (e

ngin

eere

d) g

ap b

etw

een

the

oute

r & in

ner w

all o

f the

fort

.60

.0$

Page 83: 2018-2021 DNREC Capital Plan

83

Park

s & R

ecre

atio

n C

apita

l Pro

ject

Pri

oriti

es

Park

Uni

tCo

unty

Proj

ect D

etai

lsFi

scal

201

8Fi

scal

201

9Fi

scal

202

0Fi

scal

202

1Pr

ojec

t Cos

t Est

imat

es ($

in th

ousa

nds)

Capi

tal P

roje

ct P

riorit

ies 2

018-

2021

DNRE

C-Pa

rks a

nd R

ecre

atio

n

Last

Upd

ate:

1/2

9/18

Dela

war

e Se

asho

re S

tate

Par

kSu

ssex

surfa

ces:

rem

ove

any

loos

e pa

int,

spot

prim

e an

y ba

re

woo

d or

blo

ck, c

aulk

whe

re n

eede

d.

Tow

er R

oad

8.0

$

Cape

Hen

lope

n St

ate

Park

Suss

exPr

imiti

ve y

outh

cam

p pa

vilio

n ro

of re

plac

emen

t. T

he

shin

gles

hav

e ex

ceed

ed th

eir e

xpec

ted

life

and

are

in

need

of r

epla

cem

ent

18.0

$

Cape

Hen

lope

n St

ate

Park

Suss

exPo

int C

omfo

rt st

atio

n ro

of re

plac

emen

t.

The

shin

gles

ha

ve e

xcee

ded

thei

r exp

ecte

d lif

e an

d ne

ed to

be

repl

ace

befo

re d

amag

e to

the

supe

r str

uctu

re15

.0$

Cape

Hen

lope

n St

ate

Park

Suss

exM

ain

Beac

h Ba

th H

ouse

par

king

lot r

esur

face

.

The

pa

rkin

g lo

t has

num

erou

s pot

hol

es a

nd is

seve

rely

cr

acke

d25

0.0

$

Belle

vue

Stat

e Pa

rkNe

w C

astle

Mou

nt P

leas

ant M

eetin

g Ho

use

roof

repl

acem

ent.

Th

e cu

rren

t woo

d sh

ingl

es h

ave

exce

ed th

eir l

ife e

xpec

tanc

y an

d ar

e clo

se to

leak

ing

70.0

$

Belle

vue

Stat

e Pa

rkNe

w C

astle

Mou

nt P

leas

ant P

arso

nage

repa

irs.

The

exte

rior o

f the

pa

rson

age

has e

xtre

me

rot a

nd so

ffit d

amag

e12

5.0

$

Belle

vue

Stat

e Pa

rkNe

w C

astle

Belle

vue

Hall

2nd

and

3rd

floor

com

plet

ion.

Thi

s pro

ject

w

ill m

axim

ize th

e us

e of

the

facil

ity.

150.

0$

Aubu

rn H

eigh

ts P

rese

rve

New

Cas

tleM

useu

m b

oile

r roo

m b

ump

out r

oof r

epla

cem

ent.

The

roof

will

star

t to

leak

on

top

of th

e bo

iler r

oom

eq

uipm

ent.

10.0

$

Dela

war

e Se

asho

re S

tate

Par

kSu

ssex

IRM

pili

ngs s

andb

last

ed, s

eale

d, a

nd p

ile ja

cket

s45

0.0

$

Fort

Del

awar

e St

ate

Park

New

Cas

tleFt

. DE

repl

acem

ent o

f flo

atin

g do

ck fo

r Del

afor

t12

5.0

$

Page 84: 2018-2021 DNREC Capital Plan

84

Park

s & R

ecre

atio

n C

apita

l Pro

ject

Pri

oriti

es

Park

Uni

tCo

unty

Proj

ect D

etai

lsFi

scal

201

8Fi

scal

201

9Fi

scal

202

0Fi

scal

202

1Pr

ojec

t Cos

t Est

imat

es ($

in th

ousa

nds)

Capi

tal P

roje

ct P

riorit

ies 2

018-

2021

DNRE

C-Pa

rks a

nd R

ecre

atio

n

Last

Upd

ate:

1/2

9/18

Cape

Hen

lope

n St

ate

Park

Suss

exCa

pe y

outh

cam

ps I

and

II el

ectr

ic up

grad

es20

0.0

$

Ca

pe H

enlo

pen

Stat

e Pa

rkSu

ssex

Cape

dor

m a

dditi

on o

f HVA

C50

.0$

Cape

Hen

lope

n St

ate

Park

Suss

exCa

pe D

orm

rest

room

upg

rade

s35

.0$

Belle

vue

Stat

e Pa

rkNe

w C

astle

Cauf

fiel H

ouse

HVA

C sy

stem

repa

ir an

d/or

repl

ace

40.0

$

Aubu

rn H

eigh

ts P

rese

rve

New

Cas

tleRe

pair/

repl

ace

win

dow

sills

, fra

mes

and

trim

at A

H M

ansio

n su

npor

ch30

.0$

Trap

Pon

d St

ate

Park

Suss

exW

arrin

gton

hou

se d

ocum

enta

tion

20.0

$

Alap

ocas

Run

Sta

te P

ark

New

Cas

tleBl

ue b

all b

arn:

corr

ect m

oist

ure

issue

s in

vent

ilatio

n sy

stem

200.

0$

Belle

vue

Stat

e Pa

rkNe

w C

astle

Pavi

lion

#1 n

eeds

colu

mns

repa

irs to

be

com

plet

ed in

ho

use

4.0

$

Dela

war

e Se

asho

re S

tate

Par

kSu

ssex

Tow

ers r

oad

ocea

n: b

athh

ouse

(life

guar

d, m

en's,

w

omen

's ro

oms)

; rep

lace

doo

r & fr

ame

with

fibe

rgla

ss8.

0$

Be

llevu

e St

ate

Park

New

Cas

tleSt

able

s: re

plac

e sh

ingl

es o

n w

oode

n ba

rn40

.0$

Cape

Hen

lope

n St

ate

Park

Suss

exFo

rt M

iles:

Wat

erpr

oof B

unke

r 519

roof

75.0

$

W

hite

Cla

y Cr

eek

Stat

e Pa

rkNe

w C

astle

WSC

: Rep

lace

roof

on

Wel

ls ba

rn45

.0$

Wilm

ingt

on S

tate

Par

ksNe

w C

astle

18th

Str

eet B

aske

t bal

l cou

rts;

asp

halt

over

lay,

surfa

cing,

re

plac

e go

als,

repa

irs to

conc

rete

seat

ing

area

20.0

$

Wilm

ingt

on S

tate

Par

ksNe

w C

astle

Bran

dyw

ine

Park

: Lov

erin

g Av

enue

Ten

nis C

ourt

s;

Reno

vate

or R

emov

e35

.0$

Whi

te C

lay

Cree

k St

ate

Park

New

Cas

tleO

ld C

oach

road

: dem

olish

hou

se25

.0$

Whi

te C

lay

Cree

k St

ate

Park

New

Cas

tleNa

ture

cent

er: r

epai

r pla

ster

and

repa

int i

nter

ior

15.0

$

Fo

rk B

ranc

h Na

ture

Pre

serv

eKe

ntFo

rk B

ranc

h sit

e Pl

an; p

arki

ng p

lan

500.

0$

Fort

Del

awar

e St

ate

Park

New

Cas

tleRe

pair

win

dow

sills

at F

ort

40.0

$

Ca

pe H

enlo

pen

Stat

e Pa

rkSu

ssex

Fort

mile

s res

troo

m20

0.0

$

Cape

Hen

lope

n St

ate

Park

Suss

exM

aint

enan

ce sh

op fi

ber o

ptic

inst

alla

tion,

pha

se II

170.

0$

Cape

Hen

lope

n St

ate

Park

Suss

exM

aint

enan

ce P

ole

Shed

60.0

$

Br

andy

win

e Cr

eek

Stat

e Pa

rkNe

w C

astle

Fent

on B

arn

docu

men

tatio

n - p

ossib

le d

emo

340.

0$

Lum

s Pon

d St

ate

Park

New

Cas

tleO

verlo

ok, f

ishin

g st

ruct

ure

and

pont

oon

land

ing

at

cam

pgro

und

200.

0$

Page 85: 2018-2021 DNREC Capital Plan

85

Park

s & R

ecre

atio

n C

apita

l Pro

ject

Pri

oriti

es

Park

Uni

tCo

unty

Proj

ect D

etai

lsFi

scal

201

8Fi

scal

201

9Fi

scal

202

0Fi

scal

202

1Pr

ojec

t Cos

t Est

imat

es ($

in th

ousa

nds)

Capi

tal P

roje

ct P

riorit

ies 2

018-

2021

DNRE

C-Pa

rks a

nd R

ecre

atio

n

Last

Upd

ate:

1/2

9/18

Trap

Pon

d St

ate

Park

Suss

exCo

ttag

es w

ith d

ock

at T

russ

um P

ond

Prop

erty

500.

0$

Garr

ison'

s Lak

e Go

lf Co

urse

Kent

Even

t Pav

ilion

500.

0$

Holts

Land

ing

Stat

e Pa

rkSu

ssex

Staf

f Hou

sing

Holts

Land

ing

300.

0$

Garr

ison'

s Lak

e Go

lf Co

urse

Kent

Cart

Par

th re

nova

tions

and

repl

acem

ents

100.

0$

Garr

ison'

s Lak

e Go

lf Co

urse

Kent

Sand

Tra

p re

plac

emen

ts50

.0$

Dela

war

e Se

asho

re S

tate

Par

kSu

ssex

WIF

I for

cam

pgro

unds

and

Mar

ina

150.

0$

Garr

ison'

s Lak

e Go

lf Co

urse

Kent

Offi

ce re

plac

emen

t25

0.0

$

W

ilmin

gton

Sta

te P

arks

New

Cas

tleBa

ynar

d St

adiu

m R

enov

atio

nsCa

pe H

enlo

pen

Stat

e Pa

rkSu

ssex

New

Nat

ure

Cent

er25

0.0

$

3,

200.

0$

3,00

0.0

$

Lum

s Pon

d St

ate

Park

New

Cas

tleCa

mpg

roun

d ad

ditio

n of

impr

oved

prim

itive

ca

mpg

roun

ds a

nd te

nt ca

mpi

ng a

reas

75.0

$

Dela

war

e Se

asho

re S

tate

Par

kSu

ssex

Sout

h In

let C

ampg

roun

d te

nt si

tes c

ampi

ng

upgr

ades

/cot

tage

s50

0.0

$

W

hite

Cla

y Cr

eek

Stat

e Pa

rkNe

w C

astle

Inst

all 1

0 X

20’ P

avili

on a

t Nat

ure

Cent

er30

.0$

Whi

te C

lay

Cree

k St

ate

Park

New

Cas

tleDe

term

ine

futu

re u

se o

f Kra

pf H

ouse

. Per

form

wor

k in

pr

epar

atio

n fo

r int

ende

d us

e:15

0.0

$

Dela

war

e Se

asho

re S

tate

Par

kSu

ssex

Addi

tiona

l Que

uein

g Do

cks f

or D

ryst

ack

(Urg

ent).

Thes

e do

cks a

re n

eede

d as

ap fo

r the

safe

ty a

nd p

rope

r dai

ly

oper

atio

n of

our

Dry

Sta

ck F

acili

ty.

150.

0$

Alap

ocas

Run

Sta

te P

ark

New

Cas

tle

Acqu

ire N

ew C

astle

Cou

nty

mai

nten

ance

facil

ity o

ff of

Al

apoc

as D

rive.

Mak

e im

prov

emen

ts a

s nee

ded.

With

the

loss

of t

he B

ancr

oft M

ill b

uild

ings

, the

WSP

& A

RSP

mai

nten

ance

ope

ratio

ns a

re in

dire

nee

d of

an

area

to

stor

e/se

cure

equ

ipm

ent

500.

0$

Cape

Hen

lope

n St

ate

Park

Suss

exDa

y Ca

mp

Acce

ssib

ility

to C

hape

l15

0.0

$

Kille

ns P

ond

Stat

e Pa

rkKe

ntIn

tern

Hou

sing(

$50K

ava

ilabl

e vi

a Am

eriC

orps

)50

.0$

Lum

s Pon

d St

ate

Park

New

Cas

tleDe

mol

ish o

ld w

ater

stor

age

and

trea

tmen

t bui

ldin

g36

.9$

Cam

pgro

und:

thre

e-po

int h

ooku

ps fo

r hos

t site

s; fu

nded

Page 86: 2018-2021 DNREC Capital Plan

86

Park

Uni

tCo

unty

Proj

ect D

etai

lsFi

scal

201

8Fi

scal

201

9Fi

scal

202

0Fi

scal

202

1Pr

ojec

t Cos

t Est

imat

es ($

in th

ousa

nds)

Capi

tal P

roje

ct P

riorit

ies 2

018-

2021

DNRE

C-Pa

rks a

nd R

ecre

atio

n

Last

Upd

ate:

1/2

9/18

Whi

te C

lay

Cree

k St

ate

Park

New

Cas

tleve

hicu

lar a

cces

s (in

cludi

ng b

us a

cces

s) a

nd p

arki

ng; R

oof

repa

ir/re

plac

emen

t50

.0$

Whi

te C

lay

Cree

k St

ate

Park

New

Cas

tleJu

dge

Mor

ris R

FI fo

r par

tner

20.0

$

Tr

ap P

ond

Stat

e Pa

rkSu

ssex

Two

(2) n

ew ca

bins

150.

0$

Dela

war

e Se

asho

re S

tate

Par

kSu

ssex

Kaya

k re

ntal

facil

ity10

.0$

Dela

war

e Se

asho

re S

tate

Par

kSu

ssex

IR M

arin

a - P

avili

on15

0.0

$

St

atew

ide

and

Spec

ial

Stat

ewid

eIn

tern

Dor

m H

ousin

g15

0.0

$

St

atew

ide

and

Spec

ial

Stat

ewid

eFe

e Co

llect

ion

auto

mat

ed25

0.0

$

Au

burn

Hei

ghts

Pre

serv

eNe

w C

astle

Ove

rsee

Dam

repa

ir50

0.0

$

Wilm

ingt

on S

tate

Par

ksNe

w C

astle

Bran

dyw

ine

Park

: Bay

nard

stad

ium

; Rep

air/

repa

ve

road

way

s & im

prov

e tr

affic

flow

/par

king

in g

ener

al20

0.0

$

Whi

te C

lay

Cree

k St

ate

Park

New

Cas

tleJu

dge

Mor

ris: i

nsta

ll ne

w h

eate

rs in

gar

age/

offic

e15

.0$

Fort

Del

awar

e St

ate

Park

New

Cas

tleBa

ke o

ven

room

rest

orat

ion

for i

ncre

ased

pro

gram

min

g us

e60

.0$

Bran

dyw

ine

Cree

k St

ate

Park

New

Cas

tleYC

C bu

ildin

g/ sp

ring

hous

e up

grad

es35

.0$

Belle

vue

Stat

e Pa

rkNe

w C

astle

Offi

ce -

cent

ral a

/c, h

eat

25.0

$

Be

llevu

e St

ate

Park

New

Cas

tleSc

hool

Hou

se R

ehab

750.

0$

Lum

s Pon

d St

ate

Park

New

Cas

tlePa

rk O

ffice

add

ition

and

acc

essib

ility

upg

rade

s65

.0$

Lum

s Pon

d St

ate

Park

New

Cas

tleAs

phal

t Rep

airs

at t

he ca

mpg

roun

d en

tran

ce ro

ad.

40.0

$

Lum

s Pon

d St

ate

Park

New

Cas

tleAs

phal

t Rep

airs

at t

he d

og p

ark

and

mai

n en

tran

ce ro

ad-

trai

lhea

d25

.3$

Alap

ocas

Run

Sta

te P

ark

New

Cas

tleDe

sign

and

inst

all d

evice

(s) t

o di

vert

stor

m w

ater

run-

off

from

a cu

lver

t und

er G

reen

way

trai

l to

a st

orm

dra

in a

t th

e Br

andy

win

e Co

ndom

iniu

ms.

25.0

$

Park

s & R

ecre

atio

n C

apita

l Pro

ject

Pri

oriti

es

Page 87: 2018-2021 DNREC Capital Plan

87

Park

Uni

tCo

unty

Proj

ect D

etai

lsFi

scal

201

8Fi

scal

201

9Fi

scal

202

0Fi

scal

202

1Pr

ojec

t Cos

t Est

imat

es ($

in th

ousa

nds)

Capi

tal P

roje

ct P

riorit

ies 2

018-

2021

DNRE

C-Pa

rks a

nd R

ecre

atio

n

Last

Upd

ate:

1/2

9/18

Lum

s Pon

d St

ate

Park

New

Cas

tle

Sew

er P

lant

Pit

Door

s rep

lace

men

t.

The

sew

er p

lant

pi

t doo

rs a

re o

ld st

eel d

oors

that

are

seve

rely

de

terio

rate

d an

d ne

ed to

be

repl

aced

with

fibe

rgla

ss

door

s10

.0$

Lum

s Pon

d St

ate

Park

New

Cas

tleGo

Ape

Par

king

Lot r

esur

face

.

The

par

king

lot h

as

extr

eme

dete

riora

tion

and

need

s to

be re

surfa

ced

250.

0$

Holts

Land

ing

Stat

e Pa

rkSu

ssex

Park

ing

lot p

avin

g re

quire

s res

urfa

cing.

T

he lo

t has

pot

ho

les a

nd cr

acki

ng80

.0$

Holts

Land

ing

Stat

e Pa

rkSu

ssex

Bath

hou

se re

mod

el o

f int

erio

r. T

he in

terio

r of t

he b

ath

hous

e is

in n

eed

of a

n co

mpl

ete

reno

vatio

n30

.0$

Dela

war

e Se

asho

re S

tate

Par

kSu

ssex

Sea

Shor

e m

aint

enan

ce y

ard

pavi

ng re

surfa

ce.

The

pavi

ng h

as p

ot h

oles

and

crac

king

requ

ires r

esur

facin

g60

.0$

Bran

dyw

ine

Cree

k St

ate

Park

New

Cas

tleM

aint

enan

ce ro

ad p

avin

g re

surfa

ce.

The

mai

nten

ance

ro

ad p

avem

ent h

as cr

acks

and

pot

hol

es45

.0$

Belle

vue

Stat

e Pa

rkNe

w C

astle

Tenn

is Ce

nter

par

king

lot r

esur

face

. Th

e pa

rkin

g lo

t has

ex

cess

ive

crac

king

and

det

erio

ratio

n15

0.0

$

Fo

rt D

elaw

are

Stat

e Pa

rkNe

w C

astle

Ft. D

E co

atin

g/se

alin

g m

etal

roof

s10

0.0

$

Fo

rt D

elaw

are

Stat

e Pa

rkNe

w C

astle

Ft. D

E PO

W b

arra

cks r

oof r

epai

r6.

0$

Fo

rt D

elaw

are

Stat

e Pa

rkNe

w C

astle

Ft. D

E pa

thw

ays (

barg

e an

d st

one)

35.0

$

Fo

rt D

elaw

are

Stat

e Pa

rkNe

w C

astle

Ft. D

E w

ater

tank

repl

acem

ent

5.0

$

Belle

vue

Stat

e Pa

rkNe

w C

astle

Cauf

fiel:

wat

er to

wer

ext

erio

r rep

airs

25.0

$

Cape

Hen

lope

n St

ate

Park

Suss

exM

echa

nics

shop

: ext

erio

r env

elop

e m

aint

enan

ce65

.0$

Alap

ocas

Run

Sta

te P

ark

New

Cas

tleBl

ue b

all b

arn:

cour

tyar

d- st

one

wal

l mas

onry

repa

irs60

.0$

Wilm

ingt

on S

tate

Par

ksNe

w C

astle

Bayn

ard

stad

ium

: pai

nt n

orth

ble

ache

rs(le

ad p

aint

issu

es)

150.

0$

Trap

Pon

d St

ate

Park

Suss

exBo

at re

ntal

Bui

ldin

g; n

ew si

ding

, roo

f, do

ors,

inte

rior &

ex

terio

r lig

hts a

nd p

lum

bing

fixt

ures

28.0

$

Park

s and

Rec

reat

ion

Cap

ital P

roje

ct P

rior

ities

Page 88: 2018-2021 DNREC Capital Plan

88

Park

Uni

tCo

unty

Proj

ect D

etai

lsFi

scal

201

8Fi

scal

201

9Fi

scal

202

0Fi

scal

202

1Pr

ojec

t Cos

t Est

imat

es ($

in th

ousa

nds)

Capi

tal P

roje

ct P

riorit

ies 2

018-

2021

DNRE

C-Pa

rks a

nd R

ecre

atio

n

Last

Upd

ate:

1/2

9/18

Fort

DuP

ont S

tate

Par

kNe

w C

astle

Mill

ings

to p

atch

pot

hole

s in

road

way

s4.

0$

Fort

Del

awar

e St

ate

Park

New

Cas

tleTi

cket

sale

s/gi

ft sh

op: p

urch

ase

hard

y bo

ard

to re

-sid

e ba

ck si

de o

f bui

ldin

g (p

ark

staf

f to

inst

all)

5.0

$

Fort

Del

awar

e St

ate

Park

New

Cas

tleIsl

and

conc

essio

n st

and:

repl

ace

rott

en fl

oor a

nd w

all

boar

ds3.

0$

Fort

Del

awar

e St

ate

Park

New

Cas

tleIsl

and

pier

: rep

lace

dec

k bo

ards

(inc

ludi

ng fu

el d

ock)

5.0

$

Fort

Del

awar

e St

ate

Park

New

Cas

tleIsl

and

pier

han

drai

l: co

ntin

ue re

plac

ing

hand

rail

com

pone

nts

2.5

$

Cape

Hen

lope

n St

ate

Park

Suss

exRo

ad a

nd p

arki

ng im

prov

emen

ts1.

5$

Whi

te C

lay

Cree

k St

ate

Park

New

Cas

tleCr

eek

Road

: nor

th o

f Hop

kins

road

; gra

ding

/ dra

inag

e of

th

is ro

adw

ay e

ntra

nce

to th

e na

ture

cent

er10

.0$

Fox

Poin

t Sta

te P

ark

New

Cas

tlePa

ve p

hase

II ro

ad a

nd p

arki

ng a

reas

250.

0$

Belle

vue

Stat

e Pa

rkNe

w C

astle

Rese

al fl

oors

in m

ain

rest

room

s (Sc

rap

Hous

e)20

.0$

Belle

vue

Stat

e Pa

rkNe

w C

astle

Rese

al M

aint

enan

ce P

arki

ng Lo

t8.

0$

Fort

DuP

ont S

tate

Par

kNe

w C

astle

Tenn

is co

urts

: Res

urfa

ce, p

atch

crac

ks, r

esto

re a

spha

lt on

tw

o (2

) at

For

t DuP

ont S

tate

Par

k30

.0$

Lum

s Pon

d St

ate

Park

New

Cas

tleRe

pair

crac

ks in

par

king

lots

35.0

$

W

ilmin

gton

Sta

te P

arks

New

Cas

tleBa

ncro

ft M

ills:

Rep

ave

park

ing

area

60.0

$

Wilm

ingt

on S

tate

Par

ksNe

w C

astle

Rock

ford

Par

k: F

irst P

resb

yter

ian

Chur

ch re

grad

e slo

pe

betw

een

chur

ch a

nd ra

cew

ay to

allo

w e

asie

r mow

er

acce

ss75

.0$

Wilm

ingt

on S

tate

Par

ksNe

w C

astle

Bran

dyw

ine

Park

: Ren

ovat

e/ re

pair

Jose

phin

e fo

unta

in25

0.0

$

Whi

te C

lay

Cree

k St

ate

Park

New

Cas

tleJu

dge

Mor

ris: r

efin

ish w

ood

floor

s20

.0$

Whi

te C

lay

Cree

k St

ate

Park

New

Cas

tleW

SC: s

tain

ban

d st

age

10.0

$

W

hite

Cla

y Cr

eek

Stat

e Pa

rkNe

w C

astle

Judg

e M

orris

: fin

ish e

xter

ior p

aint

ing

60.0

$

W

hite

Cla

y Cr

eek

Stat

e Pa

rkNe

w C

astle

Judg

e M

orris

: int

erio

r pai

ntin

g35

.0$

Whi

te C

lay

Cree

k St

ate

Park

New

Cas

tleex

terio

r pai

nt a

ll ba

rns

50.0

$

W

hite

Cla

y Cr

eek

Stat

e Pa

rkNe

w C

astle

Park

offi

ce :e

xter

ior p

aint

ing/

stuc

co re

pair

25.0

$

Park

s & R

ecre

atio

n C

apita

l Pro

ject

Pri

oriti

es

Page 89: 2018-2021 DNREC Capital Plan

89

Park

Uni

tCo

unty

Proj

ect D

etai

lsFi

scal

201

8Fi

scal

201

9Fi

scal

202

0Fi

scal

202

1Pr

ojec

t Cos

t Est

imat

es ($

in th

ousa

nds)

Capi

tal P

roje

ct P

riorit

ies 2

018-

2021

DNRE

C-Pa

rks a

nd R

ecre

atio

n

Last

Upd

ate:

1/2

9/18

Whi

te C

lay

Cree

k St

ate

Park

New

Cas

tleRe

plac

e po

st/ r

ail f

ence

@ 8

96 a

nd w

edge

woo

d8.

0$

Lu

ms P

ond

Stat

e Pa

rkNe

w C

astle

resu

rface

tenn

is co

urts

30.0

$

Lu

ms P

ond

Stat

e Pa

rkNe

w C

astle

boat

ram

p: re

plac

e ra

mp,

par

king

500.

0$

Fo

rt D

uPon

t Sta

te P

ark

New

Cas

tleDu

plex

92A

repa

irs11

.0$

Cape

Hen

lope

n St

ate

Park

Suss

exYo

uth

cam

p 1,

Mes

s Hal

l: re

plac

e flo

or10

.0$

Bran

dyw

ine

Cree

k St

ate

Park

New

Cas

tleBa

rn p

aint

ing

25.0

$

Au

burn

Hei

ghts

Pre

serv

eNe

w C

astle

Exte

rior P

aint

ing

30.0

$

Belle

vue

Stat

e Pa

rkNe

w C

astle

Hunt

er B

arn

and

Figu

re 8

- Asp

halt

over

lay

fix fl

oor

75.0

$

Ho

lts La

ndin

g St

ate

Park

Suss

exCa

mpg

roun

d ho

st si

tes a

nd h

ook

ups

250.

0$

Be

llevu

e St

ate

Park

New

Cas

tleCa

uffie

l Bar

n re

nova

tions

500.

0$

Be

llevu

e St

ate

Park

New

Cas

tleM

usic

Gard

en p

atio

and

land

scap

ing

80.0

$

Whi

te C

lay

Cree

k St

ate

Park

New

Cas

tleEn

tran

ce ro

ad to

Nat

ure

Cent

er e

valu

atio

n, d

esig

n an

d re

loca

tion

and

cons

truc

tion

1,50

0.0

$

W

hite

Cla

y Cr

eek

Stat

e Pa

rkNe

w C

astle

New

Par

k O

ffice

500.

0$

Lu

ms P

ond

Stat

e Pa

rkNe

w C

astle

Cam

pgro

und

over

flow

par

king

lot

200.

0$

Lu

ms P

ond

Stat

e Pa

rkNe

w C

astle

Go A

pe B

athh

ouse

repl

acem

ent

500.

0$

De

law

are

Seas

hore

Sta

te P

ark

Suss

exCo

ttag

es p

avili

on, g

rill a

nd g

athe

ring

area

75.0

$

Ho

lts La

ndin

g St

ate

Park

Suss

exHo

lts M

ain

Park

ing

Lot r

edes

ign

and

upgr

ades

550.

0$

Ho

lts La

ndin

g St

ate

Park

Suss

exHo

lts B

athh

ouse

- re

plac

e50

0.0

$

Cape

Hen

lope

n St

ate

Park

Suss

exNe

w B

each

Bat

hhou

se w

ith la

rger

Cap

acity

1,00

0.0

$

Wilm

ingt

on S

tate

Par

ksNe

w C

astle

Deve

lop

a sig

n pl

an. D

esig

n, m

anuf

actu

re a

nd in

stal

l.

The

Wilm

ingt

on P

arks

are

in d

ire n

eed

of u

nifo

rm a

nd

prof

essio

nal s

igna

ge.

75.0

$

W

ilmin

gton

Sta

te P

arks

New

Cas

tleNe

w P

ark

Offi

ce1,

500.

0$

Wilm

ingt

on S

tate

Par

ksNe

w C

astle

Plan

, des

ign

& d

evel

op a

dditi

onal

on-

site

park

ing

unde

r th

e

I-95

brid

ge fr

om S

tadi

um D

rive

to S

outh

Par

k Dr

ive.

Cr

eate

add

ition

al o

n-sit

e pa

rkin

g to

be

used

by

visit

ors t

o th

e Br

andy

win

e Zo

o, Jo

seph

ine

Gard

ens a

nd B

ayna

rd

Stad

ium

.50

0.0

$

Whi

te C

lay

Cree

k St

ate

Park

New

Cas

tleRe

plac

e Ce

dar S

hake

Roo

f (Ba

rn is

an

East

burn

Bar

n) .

100.

0$

Park

s & R

ecre

atio

n C

apita

l Pro

ject

Pri

oriti

es

Page 90: 2018-2021 DNREC Capital Plan

90

Park

Uni

tCo

unty

Proj

ect D

etai

lsFi

scal

201

8Fi

scal

201

9Fi

scal

202

0Fi

scal

202

1Pr

ojec

t Cos

t Est

imat

es ($

in th

ousa

nds)

Capi

tal P

roje

ct P

riorit

ies 2

018-

2021

DNRE

C-Pa

rks a

nd R

ecre

atio

n

Last

Upd

ate:

1/2

9/18

Whi

te C

lay

Cree

k St

ate

Park

New

Cas

tleIn

stal

l Life

Fitn

ess u

nits

on

fitne

ss tr

ail.

Inst

all l

ife fi

tnes

s un

its a

long

an

exist

ing

fitne

ss tr

ail i

n Ca

rpen

ter

Recr

eatio

n Ar

ea15

0.0

$

Whi

te C

lay

Cree

k St

ate

Park

New

Cas

tleEx

pans

ion

of C

ham

bers

Roc

k Ro

ad P

arki

ng Lo

t75

.0$

Bran

dyw

ine

Cree

k St

ate

Park

New

Cas

tle

Haw

k W

atch

Com

fort

Sta

tion.

Thi

s is a

larg

e re

stro

om

facil

ity in

the

park

for s

pecia

l eve

nts a

nd p

avili

on/p

icnic

area

rent

als.

Curr

ently

ther

e is

no w

ay fo

r whe

elch

air

acce

ss to

this

rest

room

.75

.0$

Bran

dyw

ine

Cree

k St

ate

Park

New

Cas

tle

Desig

n an

d co

nstr

uctio

n of

a p

rope

r kay

ak/c

anoe

take

ou

t sta

tion

at T

hom

pson

s Brid

ge o

n bo

th N

orth

and

So

uth

side.

Thi

s wou

ld in

clude

a re

desig

n of

bot

h an

in

clusio

n of

ADA

acc

essib

le ta

ke o

ut o

n on

e sid

e.25

.0$

Bran

dyw

ine

Cree

k St

ate

Park

New

Cas

tle

Thom

pson

s Brid

ge p

arki

ng lo

t is t

oo sm

all f

or it

s cur

rent

us

e. T

he p

arki

ng lo

t fill

s and

is cl

osed

just

abo

ut e

very

w

eeke

nd in

the

sum

mer

and

som

e w

eeke

nds i

n sp

ring/

fall

300.

0$

Lu

ms P

ond

Stat

e Pa

rkNe

w C

astle

Park

offi

ce a

dditi

on60

.0$

Lum

s Pon

d St

ate

Park

New

Cas

tleLu

ms R

ange

r offi

ce a

dditi

on65

.0$

Lum

s Pon

d St

ate

Park

New

Cas

tleLu

ms p

ole

build

ing

for b

oat r

enta

ls30

.0$

Lum

s Pon

d St

ate

Park

New

Cas

tleLu

ms c

oncr

ete

pavi

ng fo

r cric

ket f

ield

pitc

h13

.0$

Lum

s Pon

d St

ate

Park

New

Cas

tlesh

ade

stru

ctur

e at

mai

nten

ance

com

plex

for b

oat r

enta

l op

erat

ion,

to le

ssen

UV

dete

riora

tion

25.0

$

Belle

vue

Stat

e Pa

rkNe

w C

astle

Side

wal

k/cir

cula

tion

plan

bet

wee

n ar

ts b

uild

ing

and

man

sion

75.0

$

W

ilmin

gton

Sta

te P

arks

New

Cas

tleBr

andy

win

e Pa

rk: r

epla

ce li

fe co

urse

trai

l60

.0$

Whi

te C

lay

Cree

k St

ate

Park

New

Cas

tleNa

ture

cent

er P

arki

ng: c

onve

rt tu

rf pa

rkin

g ar

ea to

gr

avel

(10-

12 sp

aces

)70

.0$

Lum

s Pon

d St

ate

Park

New

Cas

tleco

ncre

te p

itchi

ng a

rea

for c

ricke

t with

in A

rea

One

8.0

$

Park

s & R

ecre

atio

n C

apita

l Pro

ject

Pri

oriti

es

Page 91: 2018-2021 DNREC Capital Plan

91

Park

Uni

tCo

unty

Proj

ect D

etai

lsFi

scal

201

8Fi

scal

201

9Fi

scal

202

0Fi

scal

202

1Pr

ojec

t Cos

t Est

imat

es ($

in th

ousa

nds)

Capi

tal P

roje

ct P

riorit

ies 2

018-

2021

DNRE

C-Pa

rks a

nd R

ecre

atio

n

Last

Upd

ate:

1/2

9/18

Fort

Del

awar

e St

ate

Park

New

Cas

tleTi

cket

sale

s/gi

ft sh

op: u

pgra

de e

xter

ior(i

nclu

ding

m

arqu

ee ro

of a

nd o

verh

ang)

40.0

$

Br

andy

win

e Cr

eek

Stat

e Pa

rkNe

w C

astle

Mai

nten

ance

are

a: co

nstr

uct 4

bay

pol

e sh

ed45

.0$

Alap

ocas

Run

Sta

te P

ark

New

Cas

tleEx

tend

wat

er a

nd e

lect

ric to

shop

nea

r 202

150.

0$

Al

apoc

as R

un S

tate

Par

kNe

w C

astle

pavi

lion

acro

ss fr

om B

ancr

oft M

ills b

ridge

300.

0$

Wilm

ingt

on S

tate

Par

ksNe

w C

astle

Rock

ford

: rem

ove

or re

nova

te b

all f

ield

in lo

wer

fiel

d30

.0$

Fox

Poin

t Sta

te P

ark

New

Cas

tlePa

ve b

ike

path

from

railr

oad

trac

ks to

ent

ranc

e10

.5$

Alap

ocas

Run

Sta

te P

ark

New

Cas

tleBl

ue B

all B

arn:

crea

te st

abili

zed

turf

over

flow

par

king

ar

ea a

djac

ent t

o Ba

rn25

0.0

$

Wilm

ingt

on S

tate

Par

ksNe

w C

astle

Stor

age

facil

ity fo

r int

erpr

etat

ion

100.

0$

W

ilmin

gton

Sta

te P

arks

New

Cas

tleZo

o: im

plem

ent p

hase

I m

aste

r pla

n10

,000

.0$

Whi

te C

lay

Cree

k St

ate

Park

New

Cas

tleJu

dge

Mor

ris: f

abric

ate

and

inst

all d

ecor

ativ

e ga

tes a

t m

ain

driv

e50

.0$

Whi

te C

lay

Cree

k St

ate

Park

New

Cas

tleW

SC; i

nsta

ll ch

ain

link

fenc

e @

mai

nten

ance

. Are

a sh

op/

pole

shed

25.0

$

W

hite

Cla

y Cr

eek

Stat

e Pa

rkNe

w C

astle

Poss

um H

ill; r

epla

ce cl

ivus

with

Bio

-Sun

40.0

$

W

hite

Cla

y Cr

eek

Stat

e Pa

rkNe

w C

astle

Add

play

grou

nd e

quip

men

t (2

- 5 y

ears

)75

.0$

Kille

ns P

ond

Stat

e Pa

rkKe

ntTw

o (2

) sha

de st

ruct

ures

20.0

$

Ki

llens

Pon

d St

ate

Park

Kent

Rest

room

s for

prim

itive

and

fam

ily ca

mpi

ng80

.0$

Fort

DuP

ont S

tate

Par

kNe

w C

astle

Pole

bui

ldin

g25

.0$

Fort

Del

awar

e St

ate

Park

New

Cas

tleNe

w b

ench

es fo

r gra

nd ca

sem

ate

8.0

$

Fort

Del

awar

e St

ate

Park

New

Cas

tleCo

mpo

stin

g to

ilet -

isla

nd12

0.0

$

Fort

Del

awar

e St

ate

Park

New

Cas

tleSo

ldie

r sle

epin

g ro

om re

nova

tion

30.0

$

Fo

rt D

elaw

are

Stat

e Pa

rkNe

w C

astle

Blac

ksm

ith sh

op re

cons

truc

tion

75.0

$

De

law

are

Seas

hore

Sta

te P

ark

Suss

exNe

w a

ir st

atio

n (fr

esh

pond

trus

t)25

.0$

Holts

Land

ing

Stat

e Pa

rkSu

ssex

Holts

ent

ranc

e sig

n(21

st C

entu

ry)

5.0

$

Dela

war

e Se

asho

re S

tate

Par

kSu

ssex

IR M

arin

a - s

huffl

eboa

rd co

urts

50.0

$

Ho

lts La

ndin

g St

ate

Park

Suss

exHo

lts La

ndin

g Pl

aygr

ound

repl

acem

ent

150.

0$

Ca

pe H

enlo

pen

Stat

e Pa

rkSu

ssex

Para

de F

ield

irrig

atio

n50

.0$

Cape

Hen

lope

n St

ate

Park

Suss

exPa

rk o

ffice

exp

ansio

n15

0.0

$

Cape

Hen

lope

n St

ate

Park

Suss

exPr

imiti

ve a

rea

rest

room

100.

0$

Park

s & R

ecre

atio

n C

apita

l Pro

ject

Pri

oriti

es

Page 92: 2018-2021 DNREC Capital Plan

92

Park

Uni

tCo

unty

Proj

ect D

etai

lsFi

scal

201

8Fi

scal

201

9Fi

scal

202

0Fi

scal

202

1Pr

ojec

t Cos

t Est

imat

es ($

in th

ousa

nds)

Capi

tal P

roje

ct P

riorit

ies 2

018-

2021

DNRE

C-Pa

rks a

nd R

ecre

atio

n

Last

Upd

ate:

1/2

9/18

Cape

Hen

lope

n St

ate

Park

Suss

exHe

rrin

g po

int r

estr

oom

s, se

wer

400.

0$

Ca

pe H

enlo

pen

Stat

e Pa

rkSu

ssex

Herr

ing

Poin

t Par

king

Lot

45.0

$

Ca

pe H

enlo

pen

Stat

e Pa

rkSu

ssex

Gord

ons P

ond;

rest

room

s/sh

ower

s25

0.0

$

Bran

dyw

ine

Cree

k St

ate

Park

New

Cas

tleFl

int W

oods

: bus

/ dro

p-of

f loc

atio

n30

.0$

Bran

dyw

ine

Cree

k St

ate

Park

New

Cas

tleTh

omps

ons B

ridge

: ins

tall

step

s and

land

scap

ing

50.0

$

Bran

dyw

ine

Cree

k St

ate

Park

New

Cas

tlena

ture

cent

er: a

dd la

b/cla

ssro

om w

ing,

rang

er o

ffice

60.0

$

Bran

dyw

ine

Cree

k St

ate

Park

New

Cas

tleNa

ture

Cen

ter:

upgr

ade

rest

room

s to

inclu

de o

utsid

e ac

cess

100.

0$

Br

andy

win

e Cr

eek

Stat

e Pa

rkNe

w C

astle

Mai

nten

ance

shop

: Sec

urity

fenc

e15

.0$

Bran

dyw

ine

Cree

k St

ate

Park

New

Cas

tleM

aint

enan

ce sh

op -

Repl

ace,

inclu

de re

stro

oms

200.

0$

Be

llevu

e St

ate

Park

New

Cas

tleCa

rria

ge H

ouse

Res

troo

ms

25.0

$

Be

llevu

e St

ate

Park

New

Cas

tleCa

bana

Res

troo

m re

nova

tion

35.0

$

Be

llevu

e St

ate

Park

New

Cas

tleAr

ts B

uild

ing:

Inst

all r

estr

oom

s in

40.5

$

Wilm

ingt

on S

tate

Par

ksNe

w C

astle

Bran

dyw

ine

Zoo

mon

key

hous

e dr

op o

ff ar

ea, g

athe

ring

spac

e re

usin

g bu

ildin

g br

icks

350.

0$

Lu

ms P

ond

Stat

e Pa

rkNe

w C

astle

Cam

pgro

und

Play

grou

nd25

0.0

$

2,50

0.0

$

43

,110

.0$

40,9

10.7

$

42

,993

.5$

Park

s & R

ecre

atio

n C

apita

l Pro

ject

Pri

oriti

es

Page 93: 2018-2021 DNREC Capital Plan

93

Stat

ewid

e Tr

ails

and

Pat

hway

s

Area

Trai

l Pro

ject

Det

ail

Proj

ect S

tage

Fisc

al 2

016

Fisc

al 2

017

Fi

scal

201

8

Fisc

al 2

019

Fi

scal

202

0 O

ther

Fun

ds

Sou

rce

of

Oth

er

Mat

chin

g Fu

nds

Not

es

Tri-V

alle

y Tr

ail

Phas

e 2

(1.0

mi)

- WCC

SP -

Poss

um H

ill A

rea

to

Corn

er K

etch

com

mun

ity co

nnec

tor t

rail.

Brid

ge

desig

n/co

nstr

uctio

n

Desig

n/Co

nstr

uctio

n50

0.0

$

Unde

r des

ign,

out

to b

id m

id

2018

Gord

ons P

ond

Trai

l Re

pairs

from

Sto

rm Jo

nas

Reco

nstr

uctio

n83

.0$

Com

plet

eCa

pe H

enlo

pen

SP

Wal

king

Dun

e Tr

ail b

ridge

Cons

truc

tion

222.

7$

Co

mpl

ete

Cape

Hen

lope

n SP

J&

B Tr

ail r

ehab

Reha

b26

.9$

Com

plet

e; si

gnin

g ne

eded

Cape

Hen

lope

n Ea

ster

nmos

t seg

men

t of

Geor

geto

wn-

Lew

es-C

ape

Trai

l, Fr

eem

an H

wy

to p

ark

entr

ance

(1.2

5 m

i);

may

inclu

de tr

ail c

onne

ctio

n to

DRB

A L&

R Ca

nal

brid

ge

Envi

ronm

enta

l As

sess

men

t, De

sign,

and

Co

nstr

uctio

n es

timat

e

954.

0$

35

0.0

$

Envi

ronm

enta

l ass

essm

ent

unde

rway

with

Par

ks

cons

ulta

nt, w

orki

ng w

ith

DelD

OT

to h

ave

trac

ks

rem

oved

from

vac

ated

RR

Bran

dyw

ine

Cree

k SP

Cr

eek

Rd T

rail,

Tho

mps

on S

tatio

n ar

ea to

Ram

sey

Rd. P

roje

ct in

conj

unct

ion

with

NPS

, Firs

t Sta

te

Natio

nal M

onum

ent

(2.0

mi)

Desig

n/Co

nstr

uctio

n30

0.0

$

Bid

pack

age

bein

g pr

epar

ed

Augu

stin

e W

ildlif

e Ar

ea

Coop

er C

ross

Tra

il &

vie

win

g pl

atfo

rm

(0.2

mi)

Desig

n/co

nstr

uctio

n30

0.0

$

350.

0$

Fed

Byw

ay

Conc

ept c

ompl

ete;

des

ign

com

plet

e Fa

ll '1

6; c

onst

ruct

ion

'17.

Ted

Harv

ey W

ildlif

e Ar

ea

Mor

ris T

ract

vie

win

g tr

ail a

nd o

bser

vatio

n pl

atfo

rm (1

.0 m

i)De

sign

150.

0$

Bay

shor

e BB

O

n ho

ld

Little

Cre

ek W

ildlif

e Ar

ea

Bays

hore

Visi

tor C

ente

r and

vie

win

g tr

ail (

500'

) -

boar

dwal

k an

d ob

serv

atio

n. to

wer

De

sign

$

1

90.5

$

23.

9 F

ed B

yway

;

Bays

hore

BB

Fina

l con

cept

sum

mer

'16.

RTP

20%

Mat

ch

Pl

aceh

olde

r for

seve

ral t

rail

impr

ovem

ent p

roje

cts

Mat

ch $

200

.0

For s

tate

par

k, F

&W

, an

d lo

cal

park

pro

ject

s to

be in

clude

d in

fu

ture

RPT

Wor

k Pl

an

Assa

wom

an C

anal

Tra

il Ph

ase

2, R

oute

26

unde

rpas

s and

kay

ak la

unch

Desig

n $

200

.0

Plan

ning

und

erw

ay

Lum

s Pon

d Bu

ck Je

rsey

Pat

hway

Pha

se 1

(1.2

mi)

Desig

n19

8.0

$

In D

elDO

T qu

eue

to co

nstr

uct

Holts

Land

ing

SP

Seah

awk

Trai

l boa

rdw

alk

conn

ecto

r (0

.1 m

i) an

d tr

ail i

mpr

ovem

ents

Desig

n/Co

nstr

uctio

n13

2.0

$

330.

0$

RTP

FF

Y12

Wor

k Pl

an a

ppro

ved.

De

sign,

NEP

A un

derw

ayCa

stle

Tra

ilSt

. Geo

rges

trai

lhea

d ex

pans

ion

Desig

n15

0.0

$

Bran

dyw

ine

Cree

k SP

Ac

cess

trai

l loo

p fro

m N

atur

e Ce

nter

(1.0

mile

s)De

sign/

Cons

truc

tion

70.0

$

Fu

ture

RTP

Pro

ject

Woo

dlan

d Be

ach

WA

AREC

Bay

shor

e By

way

- P

hase

2 -

boa

rdw

alk

conn

ecto

r (0.

5 m

i) an

d bo

ardw

alk

reha

bilit

atio

nDe

sign/

Cons

truc

tion

$

9

99.5

$

423.

1 F

ed B

yway

;

Bays

hore

BB

$489

K de

sign

estim

ate;

bo

ardw

alk

reha

b es

timat

e:

$637

,140

; con

nect

or e

stim

ate

$399

,500

RTP

20%

Mat

ch

Plac

ehol

der f

or se

vera

l pro

ject

s

Mat

ch $

200

.0

For s

tate

par

k, F

&W

, an

d lo

cal

park

pro

ject

s to

be in

clude

d in

fu

ture

RPT

Wor

k Pl

an

Lum

s Pon

d SP

Buck

Jers

ey P

athw

ay P

hase

2 (

1.0

mi)

Cons

truc

tion

$

2

45.0

R

TP

Obl

igat

ed

Kille

ns P

ond

SP

Pond

side

Trai

l ped

estr

ian

brid

geDe

sign

$

4

00.0

Un

der d

esig

n

DNRE

C - P

arks

and

Rec

reat

ion

Trai

l Pro

ject

Prio

ritie

s FY

2016

- 20

20Pr

ojec

t Cos

ts/E

stim

ates

($ in

thou

sand

s)La

st U

pdat

e: 1

/29/

18

Page 94: 2018-2021 DNREC Capital Plan

94

Stat

ewid

e Tr

ails

and

Pat

hway

s

Area

Trai

l Pro

ject

Det

ail

Proj

ect S

tage

Fisc

al 2

016

Fisc

al 2

017

Fi

scal

201

8

Fisc

al 2

019

Fi

scal

202

0 O

ther

Fun

ds

Sou

rce

of

Oth

er

Mat

chin

g Fu

nds

Not

es

DNRE

C - P

arks

and

Rec

reat

ion

Trai

l Pro

ject

Prio

ritie

s FY

2016

- 20

20Pr

ojec

t Cos

ts/E

stim

ates

($ in

thou

sand

s)La

st U

pdat

e: 1

/29/

18

Holts

Land

ing

SP

Seah

awk

Trai

l boa

rdw

alk

conn

ecto

r (0

.1 m

i)Co

nstr

uctio

n $

300

.0

RTP

De

sign,

NEP

A

Assa

wom

an C

anal

Tra

il Ph

ase

2, T

own

Road

Kay

ak la

unch

Cons

truc

tion

$

30.

0

Assa

wom

an C

anal

Tra

il Ph

ase

3, tr

ail R

t 26

to S

outh

Bet

hany

(1.5

mi)

Cons

truc

tion

$

9

00.0

Aubu

rn H

eigh

tsNV

F to

Hoc

kess

in co

nnec

tor

Cons

truc

tion

$

2

00.0

$

1,

000.

0 T

E (D

elDo

t) Pl

anni

ng d

one,

des

ign

to b

egin

sp

ring

2018

Augu

stin

e W

ildlif

e Ar

eaLa

ng M

arsh

Loop

from

Por

t Pen

n O

ffice

(1.0

mi)

Cons

truc

tion

$

70.

0 U

SFW

S Tr

ail b

uilt

on le

vee.

En

g/de

sign/

perm

its co

mpl

ete

Nov

'16.

Leve

e co

nstr

uctio

n Lit

tle C

reek

Wild

life

Area

Ba

ysho

re V

isito

r Cen

ter a

nd v

iew

ing

trai

l (50

0') -

bo

ardw

alk

and

obse

rvat

ion.

tow

er

Cons

truc

tion

$

4

75.0

$

156.

2 F

ed B

yway

;

Bays

hore

BB

Oblig

ated

RTP

20%

Mat

chPl

aceh

olde

r for

seve

ral p

roje

cts

M

atch

$

4

00.0

Fo

r sta

te p

ark,

F&

W,

and

loca

l pa

rk p

roje

cts t

o be

inclu

ded

in

futu

re R

PT W

ork

Plan

Whi

te C

lay

Cree

k SP

Phas

e 2,

Tri-

Valle

y Tr

ail

Cons

truc

tion

$

1,5

00.0

Kille

ns P

ond

SP

Pond

side

Trai

l ped

estr

ian

brid

geCo

nstr

uctio

n $

1

,200

.0

Little

Cre

ek W

ildlif

e Ar

ea

Wild

life

view

ing

trai

l loo

p-co

ntin

gent

and

Tow

n of

Lit

tle C

reek

conn

ecto

r tra

il (0

.5 m

i)Co

nstr

uctio

n $

7

5.0

Little

Cre

ek W

ildlif

e Ar

ea

Bays

hore

Visi

tor C

ente

r and

vie

win

g lo

op tr

ail (

1.0

mi)

Cons

truc

tion

$

20.

0 $

100.

0 F

ed B

yway

Ted

Harv

ey W

ildlif

e Ar

ea

St Jo

nes R

eser

ve T

rail

Conn

ecto

r enh

ance

men

ts

and

exte

nsio

n (0

.5 m

i)De

sign

$

18.

0 $

72.

0 F

ed B

yway

RTP

20%

Mat

ch

Pl

aceh

olde

r for

seve

ral p

roje

cts

Mat

ch $

200

.0

For s

tate

par

k, F

&W

, an

d lo

cal

park

pro

ject

s to

be in

clude

d in

fu

ture

RPT

Wor

k Pl

anBo

nd B

ill -

Reco

mm

ende

d/Re

ques

ted

$

3,0

00.0

$

2

,500

.0

$

2,5

00.0

$

3

,000

.0

$

3,0

00.0

Tota

l Est

imat

ed N

eed

$

2,7

77.1

$

2

,299

.5

$

- $

3

,020

.0

$

3,0

13.0

2,

605.

2$

Byw

ay -

Fede

ral S

ceni

c Byw

ay

Prog

ram

CTF

– Co

mm

unity

Tra

nspo

rtat

ion

Fund

RTP

– Re

crea

tiona

l Tra

il Pr

ogra

m

Page 95: 2018-2021 DNREC Capital Plan