2016-17 ACCOMMODATION REVIEW SCHOOL INFORMATION … · SCHOOL INFORMATION PROFILE Port...
Transcript of 2016-17 ACCOMMODATION REVIEW SCHOOL INFORMATION … · SCHOOL INFORMATION PROFILE Port...
AR 2016.17-01 – PTE
SCHOOL INFORMATION PROFILE
September 20, 2016
PORT ELGIN-SAUGEEN
CENTRAL SCHOOL
2016-17
ACCOMMODATION REVIEW
Port Elgin-Saugeen Central School
TABLE OF CONTENTS
Port Elgin-Saugeen Central School
Purpose: Value of School to the Students ..................................................................... 1 Value of School to the School Board .............................................................. 1 Facility Profile .................................................................................................................. 2 Instructional Profile ......................................................................................................... 5 Other School Use Profile ................................................................................................ 8 Appendices: A Site Plan .................................................................................................. 9 B Floor Plan .............................................................................................. 10 C School Attendance Area Map ................................................................ 11 D Aerial Photo/Context Map ..................................................................... 13 E Planning Map ........................................................................................ 14 F Five Year Renewal Needs ..................................................................... 15
SCHOOL INFORMATION PROFILE
Port Elgin-Saugeen Central School
Purpose:
The School Information Profile (SIP) is prepared by board staff as an orientation document to help the Accommodation Review Committee and the community understand the context surrounding the decisions to include the specific school in an accommodation review. The SIP provides an understanding of and familiarity with the facilities under review.
The SIP includes data for each of the following two considerations about the school under review:
a. Value to the student b. Value to the school board
The following SIP provides the information required as per section 8.1 of Accommodation Review Policy BP 3101-D of Bluewater District School Board.
The information provided in this report comes from various ministry reports, inspections and data required for submission by Bluewater District School Board to the Ministry of Education.
To maintain the accuracy of the data and consistency between direct locations, the information follows Ministry of Education definitions and formats for the gathering and presentation of the information. Information is prepared as of June 30, 2016, except where otherwise noted.
1
SCHOOL INFORMATION PROFILE
Port Elgin–Saugeen Central School
-Facility Profile-
1. Address 504 Catherine St., Port Elgin, ON N0H 2C1 2. Site Plan and Floor Plan(s)
Date of school construction and any subsequent additions noted
See Appendix A See Appendix B
Year of Construction and Additions 1967 – Constructed 1971 – Addition 1992 – Addition 1995 – Addition 2006 – Addition 2012 – Addition
3. School Attendance Area (boundary) Map
See Appendix C
4. Context Map (or air photo) Existing land uses surrounding the school
See Appendix D
5. Planning Map Zoning, Official Plan or secondary plan use designations noted
See Appendix E
6. Size of School Site Acres 9.5 Hectares 3.857. Building Area Sq. ft. 57,543 Sq. m 5,346
Closed Room Area (2015-16)
Sq. ft. 785.76 Sq. m. 73
8. Portable Classrooms 0 9. Number of Instructional Rooms & Specialty Teaching Spaces
23 Standard Classrooms 5 Kindergarten Classrooms 1 Music Classroom
Double Gymnasium with Stage Library 1 Resource Room
10. Area of Hard Surfaced Outdoor Play Area and/or Green Space
6.0 acres
Number of Play Fields / Outdoor Facilities 1 Sr. Soccer Fields Jr Soccer area(s) and Multiple Nets Ball Diamond Stone Dust Track Outdoor Shelter Area 2 Play Structure Areas Funnel Hoop FDK Play Area and Structure
Community Garden Area Buddy Benches 2 Swing Sets, with 4 Seats Each Sand Play Area 4 Basketball Nets Climbing Semi-Sphere 2 Bowl Swings
11. Major Facility Improvements, 10-Year History
ITEM COST 2006 - Uni-Ventilators/Boilers/HVAC $1,750,0002008 - Roof Replacement $335,0002011 - Energy Efficiencies, Lighting Upgrade $160,0002012 - FDK Addition $1,025,000
TOTAL $3,270,000
2
SCHOOL INFORMATION PROFILE
Port Elgin–Saugeen Central School
-Facility Profile-
Projected Five-Year Facility Renewal Needs of School
See Appendix F for an audited Ministry projection of the five-year facility renewal needs (2014 – 2018 time period)
PROJECTED TOTAL $5,748,49312. Current Facility Condition
Index (FCI) 5 Yr. 41.22%
Definition of what FCI represents
The number arrived at by dividing the estimated cost of repairs (over 5 years) required in a building by the benchmark cost of a replacement facility, expressed as a percentage.
13. Proximity of Students to their Existing School
0.25 km– 65.63 km (0.25 km to 19.54 km, 95% of the time)
Average Distance to the School for Students
4.90 km
14. Busing Ride Times (October 2015)
Longest 76 minutes Students Eligible for Transportation (%)
41.3%
Shortest 3 minutes Students Not Eligible for Transportation (%)
58.7%
Avg. Ride 28.90 minutes
15. School Utility Costs (2014-15)
Utilities Total Total Per sq.m. Total Per sq.ft. Total Per Student
$71,866 $13.44 $1.25 $121.50 16. Number of Parking Spaces
on site at school Staff and Visitors – 66 Barrier Free – 3 Bus Loading Zone: Yes Drop Off Zone: Yes Bikes: 5 Racks
Assessment of Adequacy of Site, Parking, Access and Egress
Location near arterial roads with site access from collector roads Adequate parking, student drop off area, and bus loading on school
property Safe access in/out of site; well-lit building perimeter and parking
area Walkable site from neighbourhood w/pedestrian access via
municipal sidewalks and onsite pedestrian pathways Bicycle racks on concrete pad, in visible location
17. Accessibility: Barrier-free accessibility from parking lots and public sidewalks; 2 entrance barrier free with openers No elevator access to stage 1 barrier-free washroom
18. Ministry Rated On-the-Ground Capacity (OTG)
694 - Pupil Spaces Surplus/(Shortage) of Pupil Spaces
102.5
3
SCHOOL INFORMATION PROFILE
Port Elgin-Saugeen Central School
-Instructional Profile-
1. Number of Teaching Staff
Description Classroom 25.00Library Contact .10Learning Resource Teacher 2.18Developmental Learning -Behaviour .70Native Second Language -Prep Time 4.92Total 32.90
Number of Non-Teaching Staff / Number of Support Staff
Description Educational Assistant 5.80Early Childhood Educators 4.00Library Clerk .10Head Custodian 1.00Assistant Head Custodian 1.00Custodian 1.25Total 13.15
Number of Itinerant Staff Description N/A Number of Administrative Staff
Description Principal 1.00Vice-Principal .80Office Manager 1.00Office Professional .80Total 3.60
2. Describe Program and Course Offerings
JK – 8 Program as determined by the Ontario Curriculum JK – 8 French Immersion Program Behaviour Unit
3. Describe Specialized Service Offerings
Breakfast Program Cooperative placements through Saugeen District Secondary School
4. Current Grade Configuration
JK- Grade 8
5.
Current Grade Organization
Regular Track Grade # of Classes JK/SK 3 SK/1 1 1 1 2 2 2/3 1 3 1 3/4 1 4 1 4/5 1 5/6 1 6 1 7 1 7/8 1 8 1 Total 17French Immersion
Grade # of Classes JK/SK 1
4
SCHOOL INFORMATION PROFILE
Port Elgin-Saugeen Central School
-Instructional Profile-
SK 1 1 1 1/2 1 2/3 1 4/5 1 5/6 1 7/8 1 Total 8
6. Number of Out-of-Area Students
49 Students
7. Utilization Factor/ Classroom Usage
85.2 %
8. Summary of Five Previous Years’ Enrolment
Regular Track - *ADE School Year # of Students 2011-12 509.75 2012-13 498.25 2013-14 493.75 2014-15 591.50 2015-16 591.50*ADE (Average Daily Enrolment) is calculated by taking the sum of the full-time equivalent enrolments on the Ministry of Education’s two count dates for funding (i.e. October 31 and March 31), divided by two.
10-Year Enrolment Projection by Grade & Program
9. Current Extracurricular
Activities Skipping club, intramurals, Sandcastle theatre (Arts program) Basketball, volleyball, soccer, flag football, cross country running, floor hockey, glee club, music nights, bands, Me-to-We, tech club, GSA.
2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27
JK 56 59 60 61 62 63 64 65 65 65 65
SK 70 57 61 62 63 64 65 66 67 67 67
1 63 71 58 61 62 64 65 66 67 67 67
2 57 63 71 58 62 63 64 65 66 67 68
3 73 57 64 72 59 62 64 65 66 67 68
4 49 73 58 64 72 59 63 64 65 66 67
5 67 50 74 59 65 73 61 64 65 66 67
6 57 67 50 75 59 66 74 61 65 66 67
7 51 57 67 51 75 60 67 75 62 65 66
8 48 51 58 68 51 76 61 67 75 62 66
SE 0 0 0 0 0 0 0 0 0 0 0
ALT/OTH
Total 591 607 621 631 632 651 647 657 662 658 668
Port Elgin‐Saugeen Central School
5
SCHOOL INFORMATION PROFILE
Port Elgin-Saugeen Central School
-Other School Use Profile-
1. Non-School Program(s)/ Service(s) Resident at or Co-located with school
N/A Revenue Full Cost Recovery? (Yes or No)
2. Facility Partnership(s) N/A Revenue Full Cost Recovery? (Yes or No)
3. Community Use of School
Activities/Rentals Revenue $4,000.00 Full Cost Recovery?
Y
4. Before & After School Programs/Services
Owen Sound Family Y Revenue Board does not charge
Full Cost Recovery?
5. Lease Terms N/A Revenue Full Cost Recovery? (Yes or No)
6. Suitability for Facility Partnerships?
Yes
6
7
8
Port Elgin‐Saugeen Central School
English K‐8
Appendix C
9
French Immersion K‐8
10
© County of Bruce
0.4
THIS MAP IS NOT TO BE USED FOR NAVIGATION
NAD_1983_UTM_Zone_17N
Kilometers0.4
Notes
Legend
This map is a user generated static output from an Internet mapping site and is for
reference only. Data layers that appear on this map may or may not be accurate,
current, or otherwise reliable.
0.200
1: 8,000
Bruce County
2016 11
© County of Bruce
0.4
THIS MAP IS NOT TO BE USED FOR NAVIGATION
NAD_1983_UTM_Zone_17N
Kilometers0.4
Notes
Legend
This map is a user generated static output from an Internet mapping site and is for
reference only. Data layers that appear on this map may or may not be accurate,
current, or otherwise reliable.
0.200
1: 8,000
Bruce County
2016
FerryProvincial HighwayCounty RoadMunicipal or Other RoadAdjacent County BoundariesBody of WaterEvaluated WetlandWatercourse
Permanent Stream
Intermittent Stream
ZonesEnvironmental Protection/Hazard
Environmental Protection/Hazard Holding
Wetland
General Agriculture/Rural
General Agriculture/Rural Holding
Restricted Agriculture/Rural
Restricted Agriculture/Rural Holding
Hamlet Residential
Mobile Home Park Residential
Inland Lake Residential
Lakeshore Residential
Lakeshore Residential Holding
Lifestyle Community Residential
Lifestyle Community Residential Holding
Resort/Cottage Residential
Resort Residential Holding
Office Residential
Detached Residential
Detached Residential Holding
Low Density Residential12
Event Listing By Descending Event Priority
Bluewater District School Board
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement - D501003 Main Switchboards -1967 to 1971
Validation Survey2011-2015
79.01Urgent 2014 $218,400.00 $218,400.00D501003 Main Switchboards - 1967 to1971
Port Elgin-Saugeen CentralS, Building ID 6481-1
Major Repair - D3070 Systems Testing &Balancing
Validation Survey2011-2015
67.01High 2014 $38,220.00 $256,620.00D3070 Systems Testing & Balancing
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement - D305004 Fin Tube Radiation Validation Survey2011-2015
65.01High 2014 $173,300.40 $429,920.40D305004 Fin Tube Radiation
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement - D2020 Domestic WaterDistribution - Piping System - 1967 to 1971
Validation Survey2011-2015
63.01High 2014 $323,013.60 $752,934.00D2020 Domestic Water Distribution -Piping System - 1967 to 1971
Port Elgin-Saugeen CentralS, Building ID 6481-1
Study - Replacement - D2020 Domestic WaterDistribution - Piping System - 1967 to 1971
Validation Survey2011-2015
63.01High 2014 $8,190.00 $761,124.00D2020 Domestic Water Distribution -Piping System - 1967 to 1971
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement - D304003 Heating/Chilling waterdistribution systems - Piping Systems - 1967 to1971
Validation Survey2011-2015
62.01High 2016 $939,556.80 $1,700,680.80D304003 Heating/Chilling waterdistribution systems - Piping Systems -1967 to 1971
Port Elgin-Saugeen CentralS, Building ID 6481-1
Study - Replacement - D304003 Heating/Chillingwater distribution systems - Piping Systems -1967 to 1971
Validation Survey2011-2015
62.01High 2016 $8,190.00 $1,708,870.80D304003 Heating/Chilling waterdistribution systems - Piping Systems -1967 to 1971
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement - D304007 Exhaust Systems Validation Survey2011-2015
59.01High 2014 $65,520.00 $1,774,390.80D304007 Exhaust Systems
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement [B2020 Exterior Windows -Addition 1]
Validation Survey2011-2015
56.01High 2014 $195,366.08 $1,969,756.88B2020 Exterior Windows - Addition 1
Port Elgin-Saugeen CentralS, Building ID 6481-1
Major Repair [B2010 Exterior Walls - OriginalBuilding]
Validation Survey2011-2015
56.01High 2014 $31,258.55 $2,001,015.43B2010 Exterior Walls - OriginalBuilding
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement - D3060 Controls &Instrumentation
Validation Survey2011-2015
52.01High 2014 $262,080.00 $2,263,095.43D3060 Controls & Instrumentation
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement - D502002 Lighting Equipment -Interior Lighting Fixtures
Validation Survey2011-2015
52.01High 2014 $321,375.60 $2,584,471.03D502002 Lighting Equipment - InteriorLighting Fixtures
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement - D502002 Lighting Equipment -Exterior Lighting
Validation Survey2011-2015
52.01High 2014 $53,508.00 $2,637,979.03D502002 Lighting Equipment -Exterior Lighting
Asset Brief Description Data Origin PriorityValuePriority Year Cost Cumulative Cost
Printed On: 2016/07/21
Element
Event Listing By Descending Event Priority (2014 - 2018)Bluewater District School Board Page 1 of 513
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement - D2010 Plumbing Fixtures -Washroom Fixtures
Validation Survey2011-2015
48.01Medium 2018 $9,264.32 $2,647,243.35D2010 Plumbing Fixtures - WashroomFixtures
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement [C3020 Floor Finishes - OriginalBuilding]
Validation Survey2011-2015
46.01Medium 2015 $78,897.00 $2,726,140.35C3020 Floor Finishes - OriginalBuilding
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement [C1030 Fittings - Addition 1] Validation Survey2011-2015
44.01Medium 2016 $93,775.55 $2,819,915.90C1030 Fittings - Addition 1
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement [C1030 Fittings - Original Building] Validation Survey2011-2015
44.01Medium 2016 $62,517.00 $2,882,432.90C1030 Fittings - Original Building
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement [C3030 Ceiling Finishes - Addition1]
Validation Survey2011-2015
42.01Medium 2016 $46,888.30 $2,929,321.20C3030 Ceiling Finishes - Addition 1
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement [D503001 Fire Alarm Systems -Addition 1]
Validation Survey2011-2015
40.61Medium 2018 $18,392.40 $2,947,713.60D503001 Fire Alarm Systems -Addition 1
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement [D503001 Fire Alarm Systems -Addition 1]
Validation Survey2011-2015
40.61Medium 2018 $18,392.40 $2,966,106.00D503001 Fire Alarm Systems -Addition 1
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement [D503001 Fire Alarm Systems -Original Building]
Validation Survey2011-2015
40.61Medium 2018 $29,192.80 $2,995,298.80D503001 Fire Alarm Systems -Original Building
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement [D501003 Main Switchboards -Original Building]
Validation Survey2011-2015
34.61Medium 2018 $24,706.24 $3,020,005.04D501003 Main Switchboards -Original Building
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement [G30 Site Civil/Mechanical Utilities- Site]
Validation Survey2003
32.00Medium 2014 $123,875.00 $3,143,880.04G30 Site Civil/Mechanical Utilities -Site
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement [B3010 Roof Coverings - Addition1]
Validation Survey2003
30.61Medium 2015 $195,366.08 $3,339,246.12B3010 Roof Coverings - Addition 1
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement [B2020 Exterior Windows -Original Building]
Validation Survey2011-2015
26.61Medium 2017 $89,310.00 $3,428,556.12B2020 Exterior Windows - OriginalBuilding
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement [B2030 Exterior Doors - Addition1]
Validation Survey2011-2015
24.61Low 2017 $24,960.00 $3,453,516.12B2030 Exterior Doors - Addition 1
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement [B2030 Exterior Doors - Addition1]
Validation Survey2011-2015
24.61Low 2017 $9,984.00 $3,463,500.12B2030 Exterior Doors - Addition 1
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement [D3050 Terminal & Package Units- Addition 2]
Validation Survey2011-2015
24.61Low 2018 $29,338.40 $3,492,838.52D3050 Terminal & Package Units -Addition 2
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement [B2030 Exterior Doors - OriginalBuilding]
Validation Survey2011-2015
24.61Low 2017 $12,480.00 $3,505,318.52B2030 Exterior Doors - OriginalBuilding
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement [B2030 Exterior Doors - OriginalBuilding]
Validation Survey2011-2015
24.61Low 2017 $4,992.00 $3,510,310.52B2030 Exterior Doors - OriginalBuilding
Asset Brief Description Data Origin PriorityValuePriority Year Cost Cumulative Cost
Printed On: 2016/07/21
Element
Event Listing By Descending Event Priority (2014 - 2018)Bluewater District School Board Page 2 of 514
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement [G204001 Fencing & Gates - Site] Validation Survey2011-2015
24.61Low 2017 $37,212.24 $3,547,522.76G204001 Fencing & Gates - Site
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement [D502002 Lighting Equipment -Addition 1]
Validation Survey2011-2015
22.61Low 2018 $16,508.96 $3,564,031.72D502002 Lighting Equipment -Addition 1
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement - D3060 Controls &Instrumentation
Validation Survey2011-2015
22.61Low 2018 $25,968.80 $3,590,000.52D3060 Controls & Instrumentation
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement [D3060 Controls & Instrumentation- Addition 3]
Validation Survey2011-2015
22.61Low 2018 $7,720.96 $3,597,721.48D3060 Controls & Instrumentation -Addition 3
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement [D3060 Controls & Instrumentation- Original Building]
Validation Survey2011-2015
22.61Low 2018 $109,351.84 $3,707,073.32D3060 Controls & Instrumentation -Original Building
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement [D302099 Other Heat GeneratingSystems - Addition 1]
Validation Survey2011-2015
20.61Low 2018 $10,803.52 $3,717,876.84D302099 Other Heat GeneratingSystems - Addition 1
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement [D302099 Other Heat GeneratingSystems - Addition 1]
Validation Survey2011-2015
20.61Low 2018 $10,803.52 $3,728,680.36D302099 Other Heat GeneratingSystems - Addition 1
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement [D302099 Other Heat GeneratingSystems - Addition 1]
Model 20.61Low 2018 $45,850.48 $3,774,530.84D302099 Other Heat GeneratingSystems - Addition 1
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement [D302099 Other Heat GeneratingSystems - Addition 2]
Validation Survey2011-2015
20.61Low 2018 $8,349.12 $3,782,879.96D302099 Other Heat GeneratingSystems - Addition 2
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement [D302099 Other Heat GeneratingSystems - Addition 3]
Validation Survey2011-2015
20.61Low 2018 $7,720.96 $3,790,600.92D302099 Other Heat GeneratingSystems - Addition 3
Port Elgin-Saugeen CentralS, Building ID 6481-1
Functional Events [F106003 Library ResourceCentre - Addition 1]
Validation Survey2003
20.61Low 2014 $0.00 $3,790,600.92F106003 Library Resource Centre -Addition 1
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement [D2020 Domestic WaterDistribution - Addition 1]
Validation Survey2011-2015
18.61Low 2018 $7,996.56 $3,798,597.48D2020 Domestic Water Distribution -Addition 1
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement - D2010 Plumbing Fixtures -Washroom Fixtures
Validation Survey2011-2015
18.61Low 2018 $27,544.40 $3,826,141.88D2010 Plumbing Fixtures - Addition 2
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement [C3020 Floor Finishes - Addition1]
Validation Survey2011-2015
16.61Low 2017 $14,885.52 $3,841,027.40C3020 Floor Finishes - Addition 1
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement [C3020 Floor Finishes - Addition1]
Validation Survey2011-2015
16.61Low 2017 $17,862.00 $3,858,889.40C3020 Floor Finishes - Addition 1
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement [C3020 Floor Finishes - Addition1]
Validation Survey2011-2015
16.61Low 2017 $37,212.24 $3,896,101.64C3020 Floor Finishes - Addition 1
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement [C3020 Floor Finishes - Addition2]
Validation Survey2011-2015
16.61Low 2017 $14,885.52 $3,910,987.16C3020 Floor Finishes - Addition 2
Asset Brief Description Data Origin PriorityValuePriority Year Cost Cumulative Cost
Printed On: 2016/07/21
Element
Event Listing By Descending Event Priority (2014 - 2018)Bluewater District School Board Page 3 of 515
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement [C3020 Floor Finishes - OriginalBuilding]
Validation Survey2011-2015
16.61Low 2017 $17,862.00 $3,928,849.16C3020 Floor Finishes - OriginalBuilding
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement - D2030 Sanitary Waste - 1967 to1971
Validation Survey2011-2015
16.61Low 2014 $323,013.60 $4,251,862.76D2030 Sanitary Waste - 1967 to 1971
Port Elgin-Saugeen CentralS, Building ID 6481-1
Functional Events [F106007 General PurposeRoom - Addition 1]
Validation Survey2003
16.61Low 2014 $0.00 $4,251,862.76F106007 General Purpose Room -Addition 1
Port Elgin-Saugeen CentralS, Building ID 6481-1
Study - Replacement - D2030 Sanitary Waste -1967 to 1971
Validation Survey2011-2015
16.61Low 2014 $8,190.00 $4,260,052.76D2030 Sanitary Waste - 1967 to 1971
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement [C1030 Fittings - Addition 1] Validation Survey2011-2015
14.61Low 2017 $22,327.76 $4,282,380.52C1030 Fittings - Addition 1
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement [D502001 Branch Wiring -Addition 1]
Validation Survey2011-2015
14.61Low 2014 $761,560.80 $5,043,941.32D502001 Branch Wiring - 1967 to1971
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement [D503004 Public Address Systems- Addition 1]
Validation Survey2011-2015
14.61Low 2018 $30,999.28 $5,074,940.60D503004 Public Address Systems -Addition 1
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement [C1030 Fittings - Addition 2] Validation Survey2011-2015
14.61Low 2017 $29,770.00 $5,104,710.60C1030 Fittings - Addition 2
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement [C1030 Fittings - Addition 3] Validation Survey2003
14.61Low 2017 $8,931.52 $5,113,642.12C1030 Fittings - Addition 3
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement [C1030 Fittings - Original Building] Validation Survey2011-2015
14.61Low 2017 $14,885.52 $5,128,527.64C1030 Fittings - Original Building
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement [C1030 Fittings - Original Building] Validation Survey2011-2015
14.61Low 2017 $74,425.52 $5,202,953.16C1030 Fittings - Original Building
Port Elgin-Saugeen CentralS, Building ID 6481-1
Study - Replacement - D2040 Rain WaterDrainage - 1967 to 1971
Validation Survey2011-2015
14.00Low 2014 $8,190.00 $5,211,143.16D2040 Rain Water Drainage - 1967 to1971
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement [C1020 Interior Doors - Addition 1] Validation Survey2011-2015
12.61Low 2017 $17,862.00 $5,229,005.16C1020 Interior Doors - Addition 1
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement [C1020 Interior Doors - Addition 1] Validation Survey2011-2015
12.61Low 2017 $7,442.24 $5,236,447.40C1020 Interior Doors - Addition 1
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement [C1020 Interior Doors - Addition 2] Validation Survey2011-2015
12.61Low 2017 $10,419.76 $5,246,867.16C1020 Interior Doors - Addition 2
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement [C3030 Ceiling Finishes - Addition2]
Validation Survey2011-2015
12.61Low 2017 $14,885.52 $5,261,752.68C3030 Ceiling Finishes - Addition 2
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement [C1020 Interior Doors - OriginalBuilding]
Validation Survey2011-2015
12.61Low 2017 $44,655.52 $5,306,408.20C1020 Interior Doors - OriginalBuilding
Asset Brief Description Data Origin PriorityValuePriority Year Cost Cumulative Cost
Printed On: 2016/07/21
Element
Event Listing By Descending Event Priority (2014 - 2018)Bluewater District School Board Page 4 of 516
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement [C1020 Interior Doors - OriginalBuilding]
Validation Survey2011-2015
12.61Low 2017 $17,862.00 $5,324,270.20C1020 Interior Doors - OriginalBuilding
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement [C3030 Ceiling Finishes - OriginalBuilding]
Validation Survey2011-2015
12.61Low 2017 $44,655.52 $5,368,925.72C3030 Ceiling Finishes - OriginalBuilding
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement [C3010 Wall Finishes - Addition 1] Validation Survey2011-2015
10.61Low 2017 $22,327.76 $5,391,253.48C3010 Wall Finishes - Addition 1
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement [C3010 Wall Finishes - Addition 2] Validation Survey2011-2015
10.61Low 2017 $7,442.24 $5,398,695.72C3010 Wall Finishes - Addition 2
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement [C3010 Wall Finishes - OriginalBuilding]
Validation Survey2011-2015
10.61Low 2017 $29,770.00 $5,428,465.72C3010 Wall Finishes - OriginalBuilding
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement [G204007 Playing Fields - Site] Validation Survey2011-2015
10.61Low 2017 $111,637.76 $5,540,103.48G204007 Playing Fields - Site
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement [G204007 Playing Fields - Site] Validation Survey2011-2015
10.61Low 2017 $59,540.00 $5,599,643.48G204007 Playing Fields - Site
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement [G204007 Playing Fields - Site] Validation Survey2011-2015
10.61Low 2017 $74,425.52 $5,674,069.00G204007 Playing Fields - Site
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement [C1010 Partitions - OriginalBuilding]
Validation Survey2011-2015
10.61Low 2017 $37,212.24 $5,711,281.24C1010 Partitions - Original Building
Port Elgin-Saugeen CentralS, Building ID 6481-1
Replacement [G2050 Landscaping - Site] Validation Survey2011-2015
4.61Low 2017 $37,212.24 $5,748,493.48G2050 Landscaping - Site
Asset Brief Description Data Origin PriorityValuePriority Year Cost Cumulative Cost
Printed On: 2016/07/21
Element
Event Listing By Descending Event Priority (2014 - 2018)Bluewater District School Board Page 5 of 517
Bluewater District School Board
Report Summary
NoneSaved Report Name
Jason SpitzigUser Name
SpreadsheetReport Type
Event Listing By Descending Event PriorityReport Name
2014Start Year
5Number of Years
DefaultPriority
Port Elgin-Saugeen Central S, Building ID 6481-1Structure / Instance
2016/07/21Printed Date
Event Listing By Descending Event Priority (2014 - 2018)Bluewater District School Board 18