2015 IIS Remote Technology BenchmarkDresden Station
Partnering with IIS World Class Support
• 6 weeks initial set up (2002)
• Return flight during power issues
• Movement of Old Steam Dryers
• Training at Benchmark
• Modification of HDDRD’s
• ALARACast
2015 IIS Remote Technology BenchmarkDresden Station
Not so much
Me: I bought an F3, and I believe the antennae colors are wrong. Can you verify what they are supposed to be?
2015 IIS Remote Technology BenchmarkDresden Station
Not so much
Vendor: I don’t know what you’re talking about, they are all black!
2015 IIS Remote Technology BenchmarkDresden Station
Record Low RFO ExposuresD3R23 72.700 Person-Rem
D2R23 88.670 Person-Rem
D3R22 93.995 Person-Rem
D3R20 116.657 Person-Rem
2015 IIS Remote Technology BenchmarkDresden Station
0.0
50.0
100.0
150.0
200.0
250.0
D3R19 D3R20 D3R21 D3R22 D2R23 D3R23 D2R24 (Est)
205.968
116.657
144.137
94
88.3
72.7
108Rem
Outage
Outage Dose Compairison
2015 IIS Remote Technology BenchmarkDresden Station
0
50
100
150
200
250
300
350
400
mre
m
Dresden U2 BRAC Survey Points
2015 IIS Remote Technology Benchmark
Dresden Historical Source Term Improvements
Refuel Floor Dose Rates
0
20
40
60
80
100
120
140
160
mre
m/h
r.
D2R20 DW 576' Dose Rate Hourly Trending
DW 576 0 Degrees DW 576 90 Degrees DW 576 180 Dgrees DW 576 270 Degrees
11/1/07 0800 Start First Fuel Shuffle11/8/07 0700 Start Second Fuel
10/31/2007 0410 Secured RWCU
11/4/07 0217 Secure SDC, Start ADHR
2015 IIS Remote Technology Benchmark
Dresden Historical Source Term Improvements
0
10
20
30
40
50
60
70
80
90
D2R23 DW 576 0 deg D2R23 DW 576 90 deg D2R23 DW 576 180 deg D2R23 DW 576 270 deg
D2R23 576' ARM Dose Rates
2015 IIS Remote Technology BenchmarkDresden Station
•Outage Use
• Drywell
• RWCU
• Refuel Floor
• Torus
•On Line
• Refuel Floor (Dry Cask, Fuel Pool Clean up)
• Steam Sensitive Areas
• RBEDT Rooms
• Rad Waste Concentrators
•Inventory• 80 cameras
• 15 BTR 800/80N
• 300 WRM2 Transmitter
• 600 DMC 3000s
• 100 DMC 2000s
2015 IIS Remote Technology BenchmarkDresden Station
•Slave Switch Opposite DW unit
• Eliminated having to move equipment to outage unit side
•POE Fixed Cameras
•DWL-P50 for WRM2 Base Units
•POE Lights
•Universal Camera Mounts
•Cable Management Hardware
•Protective Box on Refuel Floor
2015 IIS Remote Technology BenchmarkDresden Station
Continuous Improvement of Remote Technology
–Scaffold Camera Mounts
2015 IIS Remote Technology BenchmarkDresden Station
What’s Next?
•Improve HRA Briefing Process
• Not in RMT Room, but still need RPT awareness
• Move to Briefing Room, communicate with RMT techs with VKP
•Increase WAM usage
• Dose reduction on Refuel Floor
•Install Wifi ($10.5 mil over 3 years, starting 2016)
•VOCERA
•Mid Spans / POE Lighting
•DKP 16
•Additional POE Switches
2015 IIS Remote Technology BenchmarkDresden Station
Issues / Lessons Learned
•PWR’s
• Dose is so small that coverage is limited
• B2R18 - <20 Rem
•BWR’s
• Quad• Control Point is sometime so noisy that you cannot hear the VKP
on the smaller USB speakers• DKP 16
• Klipsch wireless?
• Hesitant to use headsets at control points
• Need to purchase additional Telex equipment
• Ownership with RP• May be resolved
•All
• Huge emphasis on Steam Leaks