2015 HUD Continuum of Care NOFA Bidder’s Conference 1.Review of Community Input Session 2.Local...
-
Upload
edmund-booth -
Category
Documents
-
view
215 -
download
0
Transcript of 2015 HUD Continuum of Care NOFA Bidder’s Conference 1.Review of Community Input Session 2.Local...
2015 HUD Continuum of Care NOFA
Bidder’s Conference
1. Review of Community Input Session2. Local Process and Strategic Changes3. Application Highlights4. Q and A Session5. Next Steps and Submission
Meeting Agenda October 7, 2015
1. Review of Community Input Session
2. Local Process and Strategic Changes3. Application Highlights4. Q and A Session5. Next Steps and Submission
2
1. Review of Community Input Session
3
Funding Notice Highlights
4
Projects Created through Reallocation can now be:• RRH for families, singles and youth• PSH 100% for Chronically Homeless• HMIS• SSO for Coordinated Assessment only
Bonus Projects can be:• PSH for 100% Chronically Homeless• RRH for families, singles and youth
Funding Notice Highlights
5
• Scoring emphasis focused much more on system performance, Opening Doors, increases in PH and RRH, having Low Barriers and Housing First programs.
• Communities can apply for up to 15% of their ARD for
permanent housing bonus projects (FY 2015 Funding Notice, p.12)
• Tier 2 is much larger and more competitive it includes:• 15% - or approx. $4 million of the annual renewal
demand• Up to 15% more for bonus applications
Funding Notice Highlights
All reallocated, renewal and bonus projects will be ranked nationally using a 100 point scale (p. 16):
A. Continuum of Care Score up to 60 pointsB. Continuum of Care Rating of Project up to 20 pointsC. Project Type
1) 10 points for renewal and new PH (PSH & RRH), HMIS, SSO for Coordinated Assessment, TH exclusively for youth
2) 3 points for renewing TH not for youth3) 1 point for renewal SSO not Coordinated Entry
D. Commitment to Housing 1st or Low Barrier Priority up to 10 points
6
FY 2013-14 Continuum of Care Score
•Our 2013 CoC Application scored 118.75 out of 156 possible points in the national competition the equivalent of 76%
•That placed us in the second quintile of CoC in the 2014 competition for bonus projects
•We can deduce that at least 20% of Continuums scored better than we did, and not more than 40%
•Our continuum score well for HMIS, Point-In-Time Counts and our rating and ranking process.
7
Results of Community Input Session
8
• No changes recommended for Tier 1. All projects who scored fully in Tier 1 can remain there. Reallocated and Bonus projects will be ranked in Tier 2 and will not displace Tier 1 projects.
• The NOFA Committee will not be asking for a proposal to administer coordinated assessment, since we are too early in that process.
• The CoC and Collaborative Applicant will move forward with applying for the CoC Planning Grant, asking for the full 3% of ARD amount.
Results of Community Input Session
9
• Reallocated and Bonus projects will be ranked in Tier 2, below all renewal projects, based on their score. The exception will be the renewal project that did not make threshold, which will be placed at the bottom of the package below all new project types.
• Bonus and Reallocated PSH and RRH projects will both earn the same amount of points for project type.
• EveryOne Home will bring polices around key topic areas to the Membership Meeting later this month for adoption by the full CoC membership.
2. Local Process: Strategic Changes
10
Local Process: Changes
•As discussed at the October 1 Community Meeting, EveryOne Home has reviewed the e-snaps applications, and determined the applications for Reallocated/Bonus projects are sufficient to submit in lieu of a full local application. ▫An addendum document, distributed at this meeting,
along with project APRs will also be required for submission. This will have narrative sections critical to tie-breaking, keeping focus on our local priorities, and creating a diverse Tier 2
11
Local Process: Submission Deadlines•All grantees (Renewal, Reallocated, and Bonus) are
required to submit an application in e-snaps. •All Reallocated and Bonus applications must be in e-
snaps by 11/13/2015•All Reallocated and Bonus applicants must submit all
of the following documents to EveryOne Home via email by: 10/22/2015▫PDF of full e-snaps application (with attachments)▫PDF of the completed Local Addendum form (and
relevant attachments)
12
3. Application Highlights: Bonus and Reallocated Projects
13
Changes to the 2015 Applications
•Bonus and Reallocated project applicants will submit a local addendum, up to 3 2014 APRs from project partners, and a PDF of the e-snaps application to EveryOne Home.
•E-snaps and local addendum are the same for for both Reallocated and Bonus project types. There will be only one application and one addendum for both Reallocated and Bonus project types.
14
Bonus and Reallocated Applications
•Total points available = 100
•Due to EveryOne Home Electronically on 10/22/15
•Due in e-snaps on 11/13/2015
•Projects must score a minimum of 60 points to be included in package
15
E-snaps: Setting up your Project
16
Applicants should refer to pages 12 – 13 of the e-snaps Application Instruction New Projects for direction on how to set up their New Project Application.
Pages 5-10 of the instructions contain information for both new and existing users to access the system.
CoC Leveraging (10 pts)
• Basic information about project, applicant and sub-recipients• Allowable Project Types are:
▫New HMIS
▫New or Bonus PSH for Chronically Homeless
▫New RRH for Singles, Families, and Youth
•Up to 10 points will be awarded to those projects which increase the amount of PH available to the Continuum, with maximum points going to projects who convert to PH funded through other sources and request CoC funds to expand PH in the HUD package as well.
•Questions concerning this criteria can be found in the Local Addendum question d and the score sheet.
17
Demonstrated Capacity of Applicant (25 pts)
• Describes applicant team, roles, experience, history of working together.
• Points for strong experience of partners, no outstanding federal debt, monitoring or audit issues; strong past performance on similar projects.
• Maximum Quality Assurance points will be awarded to those with a strong plan in place that is clearly articulated.
• Questions concerning this criteria can be found in e-snaps Section 2 and Local Addendum questions f-h
18
Project Details (25 pts)
• Section describes overall project, target population, housing assistance, and supportive services to be provided
• Points for well-designed project, appropriate services and outreach plan to population
•Questions concerning this criteria can be found in e-snaps Sections 3-5, and Local Addendum question i.
19
Performance Measures (20 pts)
•Applicant and partners meet or exceed local benchmarks, as demonstrated by APRs submitted with application as well as project outcomes as entered into e-snaps.
•APR run period is 1/1/2014 – 1/1/2015•Questions concerning this criteria can be
found in e-snaps Section 6, and Local Addendum question j.
20
Budget (15 pts)•Points for reasonable and clear budget for type of
project; Required match of 25% is included; Other project funds needed for project are committed or likely; Project is cost effective compared to other similar new permanent housing applications.
• Leveraging included here –points will be awarded for those projects leveraging 150% or greater.
•Questions concerning this criteria can be found in e-snaps Section 7 and Local Addendum question k.
21
Completeness and Clarity (5 pts)
•Maximum points will be given to those applications which are clear and complete. All questions relevant to the project must be answered.
• There are no corresponding questions to this criteria – it will be based on quality of all answers in both e-snaps and the Local Addendum.
22
4. Q and A Session
23
5. Next Steps and Submission
24
E-SNAPS and Local Submissions
•All renewal, reallocated and bonus projects must be submitted in e-snaps
•Reallocated and bonus applications will use the e-snaps application forms and submit them and the local addendum form to EveryOne Home by 10/22/15.
•Reallocated and bonus applications approved for the package must be ready for review by the Collaborative Applicant in e-snaps by 11/13/15
25
Local Submission of E-snaps
26
Applicants should reference page 72 of the e-snaps instructions for direction on exporting their applications. Submitting the application to e-snaps is not required in order to export the file and attachments.
Key Dates Moving Forward…• October 7 Applications for reallocated and bonus projects
released at Bidder’s Conference.
• October 9 - October 19 staff and NOFA Committee address applicant questions.
• October 22 All applications for reallocated and bonus funds are due to EveryOne Home by 4PM.
• November 6 Programs will be notified of their status in the package and their final rating and ranking.
• November 13 New Applications due in e-snaps.
• November 20 Application due to HUD.
27
28