2015 DDC Planted Fountain Drawings

9

description

2015 DDC Planted Fountain Drawings

Transcript of 2015 DDC Planted Fountain Drawings

  • FK

    February 12, 2015

    DESCRIPTION DATE

    DRAWN BY:

    CHECKED BY:

    DATE:

    DRAWING NUMBER:

    CADO FILE No:

    OF

    PROJECT NO:

    CAPITAL PROJECT NUMBER:

    PLANTED FOUNTAINAND SITEWORK

    L-000

    2 9

    LG

    SURVEY-REFERENCE DRAWING

    QUEENS BOROUGH HALLFOR THE:

    PW77417F

    PROJECT

    REVISIONS:

    SEAL & SIGNATURE

    NO.

    DRAWING TITLE:

    QUEENS BLVD. & UNION TPKE.

    PW77417F

  • SCALE: 1"=10'1REMOVE BENCH AND FOOTINGS COMPLETE.

    QUEENS BOULEVARD

    N

    UNIO

    N TU

    RNPI

    KELEGEND

    EXIST. STEEL BAR FENCE

    EXISTING TREE

    REMOVE CLF COMPLETE

    REMOVALS

    REMOVE PAVEMENT

    BUSSHELTER

    TREE PROTECTION

    REMOVALS PLAN

    1. Removal to be confined to areas shown on plan and corresponding notes.

    2. Temporary partitioning, such as plywood enclosures or other assemblies shall be used to controlthe spread of dust and construction debris.

    3. All park egress ways to remain open and unobstructed at all times during demolition andconstruction.

    4. Protect all existing equipment, utilities, lines, fixtures and finishes to remain, both above andbelow ground.

    5. Notify structural engineer prior to the removal or alteration of any structural elements. If there isany question about the structural role of any component to be removed, notify DDCt prior toproceeding with work.

    6. Report discrepancies from contract documents to architect and request all scope clarificationsfrom architect. Field discrepancies to be resolved with architect prior to start of work.

    7. Existing masonry and concrete shall carefully be removed. No jackhammer shall be used unlessotherwise deemed necessary by the construction manager and approved by QBH and DDC.

    8. Contractor shall provide temporary supports for existing structures as required by demolitionwork or new construction. Contractor shall be responsible for the structural integrity of the site.Temporary bracing and shoring shall be as per c26-190 of the New York City building code.

    9. General contractor shall be responsible for removal and/or salvage of all existing abandonedfixtures, plants, brick and any other equipment and construction debris. All materials removedshall be disposed legally off the site.

    10. Where existing concrete pavement is removed, the Contractor shall sawcut and neatly trim edgeof remaining pavement before installing new construction.

    11. Unless otherwise specified or indicated, all concrete shall have a minimum compressive strength@ 28 days of 4,000 PSI.

    12. All existing trees and vegetation to remain shall be protected by the Contractor. Any damagedtrees and/or vegetation shall be replaced in kind at the expense of the Contractor.

    13. The Contractor shall be responsible for all work zone pedestrian traffic control. The street andwalks shall be kept clear and clean at all times. All required wall protection and barricades shallbe included. All demolition and removal work shall be executed in accordance with therequirements of all applicable rules, regulations, codes and ordinances in effect.

    14. The Contractor shall be responsible for arranging with the Queens Borough Hall, New York CityDepartment of Design and Construction and the construction manager for site access, storageand waste handling. Contractor shall comply with all New York City Department of Design andConstruction rules and regulations and applicable provisions of the New York City building coderegarding demolition and renovation/construction work in the building.

    15. All adjoining property affected by the demolition work shall be protected by the provisions of thetenant safety notes and subchapter 19 of the New York City building code.

    16. All demolition shall be performed by methods which will prevent damage to areas that areexisting to remain. Contractor shall provide temporary site protection as required to these areas.Existing drainage structures shall be protected throughout construction and thoroughly cleanedout and left in good working order. Any damage that does occur, shall be corrected to thearchitects satisfaction and at the contractors expense.

    17. No building materials, equipment or trash shall be stored in public spaces.

    18. The construction site shall be kept in a safe, clean condition during all phases of the project,including demolition. All accesses and exits shall remain clear at all times.

    19. Contractor shall exercise all due care to ensure that there will be no disruption in electrical, gasor communication service to all surrounding areas during demolition. Contractor shall notify theQueens Borough Hall, New York City Department of Design and Construction and theconstruction manager at least (3) days prior to a required service shut down.

    20. Demolition contractor shall be responsible for all items shown on the drawings to be removedincluding, but not limited to, abandoned fixtures; fixed and movable equipment. All materialremoved shall be disposed of legally off site.

    21. The Contractor shall arrange for container deliveries and pick-ups at regular intervals.

    REMOVAL NOTES

    PROVIDE TREEPROTECTION, TYP.

    PROVIDE TREE PROTECTION.TYP.

    ENLARGE TREE PIT AS SHOWN.SAWCUT ALONGEXPANSION JOINT ANDREMOVE CONCRETE -TYP.

    CAREFULLY REMOVE ENTIRESECTION OF EMBEDDEDSTONES COMPLETE.

    REMOVE EXISTING CHAINLINKFENCE AROUND FOUNTAIN,COMPLETE.

    CAREFULLY REMOVE ALLCONCRETE PAVEMENT WITHINTHE CIRCLE COMPLETE.SAWCUT ALONG EXPANSION JOINTS.

    5' 20'0 10'

    FK

    February 12, 2015

    NO. DESCRIPTION DATE

    DRAWN BY:

    SEAL & SIGNATURE

    CHECKED BY:

    DATE:

    REVISIONS:

    DRAWING TITLE:

    DRAWING NUMBER:

    CADO FILE No:OF

    PROJECT NO:

    FOR THE:

    PROJECT

    CAPITAL PROJECT NUMBER:

    PLANTED FOUNTAINAND SITEWORK

    PW77417F

    QUEENS BOROUGH HALL

    L-100

    3 9

    LG

    EXIST. DRAINAGE SYSTEMSHALL BE FLUSHED AND CLEANED OUT.INLETS SHALLBE PROTECTED.

    SAWCUT CAREFULLYTO PRODUCE A CLEAN,SMOOTH RADIUS.

    PW77417F

    QUEENS BLVD. & UNION TPKE.

    REMOVE SHRUB MASS ALONGFENCE, TYP.

  • SCALE: 1"=10'1INSTALL 6' BENCHES AND TRASHRECEPTACLES-TYP.SURFACE MOUNT AS PER DETAILS ANDMANUFACTURER'S RECOMMENDATIONS. PATCHCONCRETE AS REQUIRED.

    QUEENS BOULEVARD

    N

    UNIO

    N TU

    RNPI

    KELEGEND

    EXIST. STEEL BAR FENCE

    EXISTING TREE

    NEW 12' HIGH LIGHTPOST

    BUSSHELTER

    MATERIALS AND LAYOUT PLAN

    EXISTING SHRUB MASS

    DRAIN INLETS SHALL BE COVEREDWITH GEOTEXTILE.

    NEW 4" CONCRETE

    EXIST. 12' HIGH LIGHTPOST

    NEW TRASH RECEPTACLE

    MIN.

    3'-0"

    MIN.3'-0"TYP

    . TYP.

    INSTALL BAND OF EMBEDDED STONESIN CONCRETE, COMPLETE.

    3'

    3'

    EQ.(+/-15') EQ. (+/-15')CL

    PW77417F

    QUEENS BOROUGH HALL

    PROVIDE TWO (2) LEDRIVERSIDE LUMINAIRES ONDOT TYPE B POLES. CONNECTTO EXISTING LIGHTS, TYP.

    CONNECT NEW LIGHTS TOEXIST SITE PEDESTRIAN LIGHTS, TYP.

    QUEENSBOROUGH

    HALL

    MIN.

    2'-0"

    TYP.

    MIN.

    2'-0"

    TYP.

    PATCH CONCRETE AT BENCHREMOVAL.

    1'-6"

    5' 20'0 10' FK

    February 12, 2015

    NO. DESCRIPTION DATE

    DRAWN BY:

    SEAL & SIGNATURE

    CHECKED BY:

    DATE:

    REVISIONS:

    DRAWING NUMBER:

    CADO FILE No:OF

    PROJECT NO:

    FOR THE:

    PROJECT

    CAPITAL PROJECT NUMBER:

    PLANTED FOUNTAINAND SITEWORK

    L-101

    4 9

    LG

    NEW PEBBLED PAVEMENT

    EQ.(+/-18') EQ. (+/-18')

    CL

    14'-0

    "

    ALIGN

    MARBLE FOUNTAIN AND STEPS SHALL BERECONSTRUCTED OR PATCHED WITH STONE.COLOR, STRENGTH AND TEXTURE OF THE NEWMATERIALS SHALL MATCH THE EXISTING STONE.SEE FOUNTAIN RECONSTRUCTION DRAWING L-103AND L-104 AND SPECS FOR COMPLETESCOPE OF WORK .

    T

    T

    T

    T

    RE-ATTACH ACCESS PANELS OFEXISTING PEDESTRIAN LIGHTS (2) .

    11

    9L-105

    4" CONCRETE PAVEMENT, TYP. 7L-105

    7L-105

    10L-105

    EJ

    EJ

    EJ

    EJ

    NEW 6' BENCH

    EXPANSION JOINT

    EJ

    EJEJ EJ

    PW77417F

    EJ

    EJ

    EJ

    EJ

    EJ

    EJ

    EJEJ

    EJ

    EJ

    QUEENS BLVD. & UNION TPKE.

    +/- 22'-2"

    L-105

    FOR PLANTED FOUNTAINSEE PLANTING PLAN L-102

    13L-105

    PROVIDE AND INSTALL BRONZE PLAQUEWITH BLIND STUD MOUNTINGON EXISTING FENCE.

  • DRAWING TITLE:

    PW77417F

    FK

    February 12, 2015

    NO. DESCRIPTION DATE

    DRAWN BY:

    SEAL & SIGNATURE

    CHECKED BY:

    DATE:

    REVISIONS:

    DRAWING NUMBER:

    CADO FILE No:OF

    PROJECT NO:

    PROJECT

    CAPITAL PROJECT NUMBER:

    PLANTED FOUNTAINAND SITEWORK

    L-102

    5 9

    LG

    PLANTING PLAN

    FOR THE:

    QUEENS BOROUGH HALL

    1 SCALE: 1"=5'

    LEGEND

    NEW TREE

    GROUNDCOVER

    DECIDUOUS SHRUBS

    PERENNIALS

    QUEENS BOROUGH HALL PARK PLANTING PLAN

    PLANT SCHEDULE

    FOTHERGILLA

    BOXWOOD

    LILY TURF

    COMMENTQUAN. KEY BOTANICAL NAME SIZE ROOT SPACING

    16

    8'-10' B&B AS SHOWN

    5 GAL. AS SHOWN FULL SPECIMEN24"-30"

    FULL SPECIMEN

    Dwarf Fothergilla

    3 PS Prunus sargentii Sargent's Cherry 3" CAL. B&B AS SHOWN FULL SPECIMEN

    AS SHOWN FULL SPECIMEN

    FG Fothergilla gardeniiBU 72

    1 CK Cornus kousa Korean Dogwood

    300 DA Mixed Daffodil Spring Bulbs Daffodils bulbs scattered through lilyturf groundcover

    18" o.c. 6"- 12" 450 VM Liriope muscari 'Monroe White' 'Monroe White' Lilyturf

    SARGENT'S CHERRY (3)

    Buxus microphylla 'Franklin's Gem' Boxwood 'Franklin's Gem' 18"-24"1 GAL..

    3 GAL.

    5' 20'0 10'

    KOUSA DOGWOOD

    N INSTALL TOPSOIL AND MULCH FORENLARGED TREE PIT.

    EXISTING TREE

    REPAIR AND PROVIDE LAWN IN AREASDISTURBED BY CONSTRUCTION ACTIVITY .

    PROVIDE LAWN INALL AREAS DISTURBEDBY CONSTRUCTION ACTIVITY-TYP.

    T

    T

    T

    PW77417F

    PROVIDE GEOTEXTILE FABRIC TO COVER THETWO DRAIN INLETS AND FLASHING FOR THEWATER PIPES TO PREVENT SOIL FROMENTERING THE DRAINAGE SYSTEM. SEE13,15/L-105-AND PLANTING SPEC..

    QUEENS BLVD. & UNION TPKE.

    44 SE Sedum Sun Sparkler 'Dazzleberry Stonecrop Sun Sparkler 1 GAL.. INSTALLED IN POTS

    SEDUM (44) SEE 14/L-105

    ENLARGEMENT OF FOURUPPER BASINS

  • DRAWING TITLE:

    PW77417F

    FK

    February 12, 2015

    NO. DESCRIPTION DATE

    DRAWN BY:

    SEAL & SIGNATURE

    CHECKED BY:

    DATE:

    REVISIONS:

    DRAWING NUMBER:

    CADO FILE No:OF

    PROJECT NO:

    PROJECT

    CAPITAL PROJECT NUMBER:

    PLANTED FOUNTAINAND SITEWORK

    L-103

    6 9

    LG

    RECONSTRUCTION PLAN 1

    FOR THE:

    QUEENS BOROUGH HALL

    LEGEND

    REPLACE FULL UNIT

    REPLACE PARTIAL UNIT(DUTCHMAN REPAIR)

    CEMENTITIOUS PATCH

    CRACK REPAIR

    SCALE:QUEENS BOROUGH HALL PARK FOUNTAIN RECONSTRUCTION1

    5' 20'0 10'N

    FOUNTAIN STEPS FOUNTAIN BASIN AND STONEWORK

    REMOVE STUCCO AT JOINT BETWEENFLOOR AND WALL OF BASIN. FILLJOINT AND RE-STUCCO,TYP.

    REMOVE STUCCO FROM THISSECTION OF BASIN WALLAND RE-STUCCO,TYP.

    REMOVE STUCCO ANDRE-STUCCO

    1. Number each stone at the three tiers of steps, using marker that can be completely removedwithout damaging the stone. Provide a photographic survey of the numbered stones prior toremoval.

    2. Carefully remove the stones without damage. Protect and store stones to be reused. Copynumbers onto an unseen location )e.g., bottom, rear) that will be evident following cleaning of thestones so that stones can be returned to their original locations. Salvage stones not to be reusedas needed as a source for Dutchman repairs.

    3. Provide one or more of the stones to be reused to the provider of the proposed cleaning andconsolidation materials for testing (see testing program).

    4. Remove old mortar from base and from stones; prepare bed for resetting.

    5. Stones may be cleaned before or after they are reset on the base (see cleaning spec).

    6. Fabricate and install new stones where indicated on drawings to match the original size andprofiles, using matching marble (believed to be originally sourced from Vermont).

    7. Undertake Dutchman repairs where indicated on drawings, using salvaged stone or matchingnew stone. Match the contours of the blocks to which the Dutchman inserts are attached.Dutchman inserts are to be attached with stainless steel pins and epoxy.

    8. Set the old and new stone steps on the prepared concrete base using a full mortar bed (seemortar spec). Do not point at this stage.

    9. Ease the edges of the new full and partial stone replacements to reduce their contrast with theold, weathered blocks. Do not remove material from the old stones.

    NOTES AND SCOPE OF WORKFOR FOUNTAIN STABILIZATIONBASE STEPS

    1. Remove all pointing mortar using hand tools. Small, hand-held power grinders may be usedfollowing testing and approval of a sample of work, but only for horizontal joints and vertical jointswhere there are no adjacent stone blocks. Grind only the center of the joints, and remove theremaining mortar with hand tools. Do not damage the stone or widen the joints.

    2. Undertake stone replacement and Dutchman repairs where indicated on drawings, usingsalvaged stone or matching new stone. Dutchman inserts to be attached with stainless steel pinsand epoxy.

    3. Ease the edges of the new full and partial stone replacements to reduce their contrast with theold, weathered blocks. Do not remove material from the old stones.

    4. Clean all stonework (see cleaning spec).

    5. Undertake cementitious repairs as noted on drawings and specifications.

    6. Apply consolidant based on test results (see spec).

    7. Point all stonework (see pointing spec).

    REMAINDER OF STONEWORK

    1. Chip out loose and damaged stucco and underlying concrete from the main basin. Undercutlarge cracks and holes to provide a key. Apply patching mortar, providing a smooth, levelrepair. Follow all manufacturer's recommendations for preparation and curing of substrateand for application of primer.

    2. Install Kemper system or approved equal for fountain linings in main basin and in four upperbasins. Terminate the material at the joint line between the stone coping and stucco basinlining. Use typical manufacturer's termination details at the two functioning drains in the mainbasin and at the pipe penetrations. Seal the four open water supply pipes within the mainbasin but do not remove the pipes.

    3. Apply geotextile to cover both drain inlets.

    4. At the upper platform, clean remains of embedded iron clamps and apply full coats ofrust-inhibitive primer and paint to the visible iron. Fill all holes and cracks with

    patching mortar, then apply a full coat of cement stucco, feathering the stucco at the edges of the platform so it is not visible from below.

    BASINS AND UPPER PLATFORM

    TESTS, SAMPLES AND SUBMITTALS FOR STONE WORK

    1. New marble for full replacement stone blocks, for type, color, grain, etc.

    2. Replacement stone for workmanship, including form, texture and finish.

    3. Partial (Dutchman) replacement stone for workmanship, including form, texture, finish, fitting.

    4. Cementitious patching for mix recipe and workmanship.

    5. Removal of mortar.

    6. Pointing mortar for mix recipe, color and texture.

    7. Workmanship for pointing mortar.

    8. Marble cleaning test for appearance and effect on stone.

    9. Marble consolidation test, including appearance and lab test results for penetration.

    CRACK REPAIR, TYP.NOTE: MOST CRACKS EXTENDUP VERITICAL WALL OF BASIN.

    CEMENTITIOUS PATCH, TYP.

    DUTCHMAN REPAIR, TYP.

    FULL REPLACEMENT, TYP.

    PW77417F

    QUEENS BLVD. & UNION TPKE.

  • DRAWING TITLE:

    PW77417F

    FK

    February 12, 2015

    NO. DESCRIPTION DATE

    DRAWN BY:

    SEAL & SIGNATURE

    CHECKED BY:

    DATE:

    REVISIONS:

    DRAWING NUMBER:

    CADO FILE No:OF

    PROJECT NO:

    PROJECT

    CAPITAL PROJECT NUMBER:

    PLANTED FOUNTAINAND SITEWORK

    PW77417F

    L-104

    7 9

    LG

    FOUNTAIN RECONSTRUCTIONELEVATIONS

    FOR THE:

    QUEENS BOROUGH HALL

    LEGEND

    REPLACE FULL UNIT

    REPLACE PARTIAL UNIT(DUTCHMAN REPAIR)

    CEMENTITIOUS PATCH

    CRACK REPAIR

    REMOVE STUCCO ANDRE-STUCCO

    SCALE:QUEENS BOROUGH HALL PARK FOUNTAIN RECONSTRUCTION1

    5' 20'0 10'

    WEST ELEVATION

    EAST ELEVATION

    SOUTH ELEVATION

    NORTH ELEVATION

    QUEENS BLVD. & UNION TPKE.

  • 3. TAMP PLANTING MIX FIRMLY

    EACH PLANT BALL.

    4. SOAK EACH PLANT BALL AND PIT IMMEDIATELY AFTER

    AS PIT IS FILLED AROUND

    INSTALLATION.

    TAMP SOIL MIX UNDER

    MINIMIZE SETTLEMENTEACH PLANT BALL TO

    OF APPROVED

    ENTIRE PLANTING BED"V" TRENCH AROUND

    MULCH

    PLANTING BEDEDGE OF

    MIN. 2" HT.

    3" LAYER

    TYP. COLLAR

    PLANT MIX

    SEE LANDSCAPE PLANSPACING VARIES

    INSTALL PLANTS ATFINSHED GRADE

    2.

    1. SCARIFY ROOT MASS IFUSING CONTAINERIZEDPLANT MATERIAL.

    3. TAMP PLANTING MIX FIRMLY

    EACH PLANT BALL.

    4. SOAK EACH PLANT BALL AND PIT IMMEDIATELY AFTER

    AS PIT IS FILLED AROUND

    INSTALLATION.

    INSTALL PLANTS ATFINSHED GRADE

    2.

    1. SCARIFY ROOT MASS IFUSING CONTAINERIZEDPLANT MATERIAL.

    6" GRAVELSURROUNDED BYFILTER FABRIC

    PLANTING TOPSOIL

    MULCH

    SPREAD AND LIFTRUNNERS ABOVE MULCH

    CORED WEEP HOLES

    6"

    6"3'

    -0" M

    IN.

    3'-6

    "

    1-0"

    (3) CEDAR STAKES

    2'-0" SAUCER, TYP.

    3 PIECES OF NEW REINFORCED RUBBER HOSE

    4"6"

    EXIST. LAWN

    4 - 1 14" DIA. STEEL ANCHORBOLTS, 1 14" - 7 THREAD TO BE 4"LONG, H.D. GALVANIZEDTHREADED END FOR 6" DISTANCE

    CLASS 1 CONC (1:2:4) TOATTAIN 3500 PSI IN 7 DAYS

    COMPACTEDSUBGRADE

    4 #6 VERTICAL BARS6 #4 HORIZONTALBARS AT 13" ONEACH SIDE

    NOTE:1. HEIGHT OF POLE 12' = 5'-0"DEPTH

    HT.

    OF

    PO

    LE

    4 - 1 14" MALLEABLEIRON BOLT COUPLING4" LONG 18

    " MIN

    .

    38"

    3 1 2"

    4"

    TRANSFORMER BASE

    BRONZEGROUNDINGBUSHING

    APPLY APPROVED CORROSIONINHIBITING COMPOUND

    BETWEEN HOLD-DOWN HARDWAREAND CONTACT- AREA OF TRANSFORMERBASE 2" CHAMFER

    3"

    2. DETAIL IS SCHEMATIC ONLY.SEE NYC DOT DETAIL FORTYPICAL FOUNDATIONS FORLAMPPOSTS.

    KEMPER SYSTEMFOUNTAIN LINEROR EQUAL

    LINE BASIN WITH 2 PLY(8MIL.) POLYFILM TO CATCHWATER RUNOFF. PROVIDE2" PEBBLES TO STABILIZEPOTTED PLANTS.

    PERENNIALS IN POTS

    PLAN SECTION

    SEDUM "CHERRY TART"

    INSTALL GEOTEXTILE OVERDRAIN INLETS, TYP.

    EXISTING 4' S.B.F.

    9" X 18" CAST BRONZE PLAQUEBOLTED TO FENCE

    FINISHED GRADE

    THIS FOUNTAIN PLAZA

    IS DEDICATED TO

    THE WOMEN OF QUEENS

    MATERIAL: CAST BRONZEFONT: ARCHITECTURAL PRISMAFINISH: STAIN FINISH RAISED LETTERING AND BORDERBLIND STUD MOUNTING ON FENCE.

    BASIS OF DESIGN IS IMPACT SIGNSTEL. # 707-469-7178, IMPACTSIGNS.COMOR APPROVED EQUAL.

    SCALE: 12"=1'-0"1 2

    3 SCALE: 3/8"=1'-0"

    4 SCALE: 3/8"=1'-0"

    5 SCALE: 3/8"=1'-0"

    7 SCALE: 3/4"=1'-0"

    9 SCALE: 1/8"=1'-0" SCALE: 18"=1'-0"10

    DRAWING TITLE:

    PW77417F

    FK

    February 12, 2015

    DESCRIPTION DATE

    DRAWN BY:

    SEAL & SIGNATURE

    CHECKED BY:

    DATE:

    REVISIONS:

    DRAWING NUMBER:

    CADO FILE No:

    OF

    PROJECT NO:

    PROJECT

    CAPITAL PROJECT NUMBER:

    PLANTED FOUNTAINAND SITEWORK

    L-105

    LG

    FOR THE:

    QUEENS BOROUGH HALL

    SCALE: 3/16"=1'-0"

    CONSTRUCTION DETAILS

    8 9

    QUEENS BLVD. & UNION TPKE.SCALE: 12"=1'-0"11

    PW77417F

    14

    6 SCALE: 1/4"=1'-0"

    SCALE: 12"=1'-0"12SCALE: 14"=1'-0"15

    SCALE: 3/8"=1'-0"

    SCALE: 18"=1'-0"13

  • DRAWING TITLE:

    PW77417F

    FK

    February 12, 2015

    DESCRIPTION DATE

    DRAWN BY:

    SEAL & SIGNATURE

    CHECKED BY:

    DATE:

    REVISIONS:

    DRAWING NUMBER:

    CADO FILE No:OF

    PROJECT NO:

    PROJECT

    CAPITAL PROJECT NUMBER:

    PLANTED FOUNTAINAND SITEWORK

    L-106

    9

    LG

    HISTORIC FOUNTAIN DETAILSFOR REFERENCE ONLY

    FOR THE:

    QUEENS BOROUGH HALL

    SCALE: 14"=1'-0"1

    SCALE: 18"=1'-0"4

    1 FOR REFERENCE ONLY FOR REFERENCE ONLY

    FOR REFERENCE ONLY

    9

    SCALE : 316" = 1'-0"

    PW77417F

    QUEENS BLVD. & UNION TPKE.

    SCALE: 18"=1'-0"3 FOR REFERENCE ONLY

    UPDATED 1_ T-100DDC-DCAS TITLESHEETUPDATED 2_ L-000 SurveyUPDATED 3_ L-100 Removals PlanUPDATED 4_L-101 Material and Layout PlanUPDATED 5_L-102 Planting PlanUPDATED 6_L-103 ReconstructionUPDATED 7_L-104 Reconstruction ElevationsUPDATED 8_ L-105 CONST. DETAILSUPDATED 9_L-106 HIST. FOUNTAIN DETAILS