2015-0009 Docksey - PZC Binder

13

Transcript of 2015-0009 Docksey - PZC Binder

Page 1: 2015-0009 Docksey - PZC Binder
Page 2: 2015-0009 Docksey - PZC Binder

30

C 2014 Chippewa County, WI

T29N R08WANSON (W), EAGLE POINT (S), LAFAYETTE (NW), TILDEN (E)

Parcel Mapping OnlineView each and every parcel in Chippewa County on the internet!

Chippewa County provides County-Wide Cadastral Mapping for free!Come and check out our new mapping site!

Simply go to:http://mapping.co.chippewa.wi.us

SEE

PAG

E 32

SEE PAGE 18

SEE

PA

GE

28

SEE PAGE 42

7000

8000

1100

010

000

9000

1300

012

000

13000 14000 170001600015000 1900018000

River

Chippewa

Jim

Creek

O’neil

Creek

Duncan

Creek

GlenLoch

City ofChippewa Falls

Old

Abe

Trai

l

Union

Pacific

Railroad

Eagle Point + Lafayette

Lake Wissota

Tilde

n +

Eagl

e Po

int

Eagle Point + Anson

Anson + Lafayette

Yellow

RiverPine

Harbor

2

6

3 2

1

1

1

1

1

1

1

1

1

1

2

8

7

3

45

6

3

22

2

34

12

2

3

8

7

4

51

6

2

5

4

3 3

212

11

10

98

7 5

2

124

S

124

178

S

Q

Q

SSOUTH

SSOUTH

B

I

O

178

123456

7 8 9 10 11 12

131415161718

19

363534333231

30 29 28 27 26 25

2423222120

CUP Location

Page 3: 2015-0009 Docksey - PZC Binder
Page 4: 2015-0009 Docksey - PZC Binder
Page 5: 2015-0009 Docksey - PZC Binder
Page 6: 2015-0009 Docksey - PZC Binder
Page 7: 2015-0009 Docksey - PZC Binder
Page 8: 2015-0009 Docksey - PZC Binder
Page 9: 2015-0009 Docksey - PZC Binder

DEPARTMENT OF PLANNING & ZONING 711 North Bridge Street, Chippewa Falls, WI 54729 Phone:715.726.7940 Fax:715.726.4596 www.co.chippewa.wi.us

Land Management 715.726.7940, Rm 009

Land Planning 715.726.7941, Rm 009

Land Records & G.I.S. 715.738.2595, Rm 005

POWTS & Wells 715.726.7943, Rm 009

CHIPPEWA COUNTY

Date: May 7th, 2015 To: Property Owner(s) From: Douglas Clary, Director Re: Conditional Use #2015-0009 Dear Property Owner(s): The Chippewa County Department of Planning & Zoning has received a request for a Conditional Use as shown below. Your property has been determined to be within the legal public hearing notification distance per county and state requirements. Please find below the PUBLIC HEARING notice for the May 21st, 2015 meeting of the Chippewa County Planning & Zoning Committee. If you have any questions regarding this request, please feel free to contact me at the above telephone number and/or attend the meetings as described.

(Publish – Chippewa Herald – May 10th, 2015 & May 14th, 2015)

CHIPPEWA COUNTY PLANNING & ZONING COMMITTEE NOTICE OF PUBLIC HEARING

STATE OF WISCONSIN PUBLIC NOTICE is hereby given to all persons in the County of Chippewa, Wisconsin, that a public hearing will be held on May 21st, 2015 beginning at 7:00 P.M. in Room 302, third floor of the Courthouse, Chippewa Falls, Wisconsin, relative to the following request: APPELLANTS: James & Janice Docksey

Location: Lot 1, CSM 4241, located in the NE/NW, Section 12, Township 29 North, Range 08 West, Town of Anson.

Conditional Use: To allow grading, filling and excavation on slopes of more than 35 percent and allow grading, filling and excavation in excess of 4,000 square feet on slopes less than 12% in accordance with sections 54-129(b)(1)a & 54-129(b)(1)c of the Chippewa County Shoreland Ordinance.

Specific information regarding this hearing can be obtained at the Chippewa County Department of Planning & Zoning. All persons interested are invited to attend said hearing and be heard.

Dated this 7th day of May, 2015. Douglas Clary, Director Department of Planning & Zoning Chippewa County

Page 10: 2015-0009 Docksey - PZC Binder

2015-0009 Docksey CUP - Location Map

Map produced on May 8th, 2015 by the Chippewa County Department of Planning & Zoning and is forreference purposes only. Scale: 1" = 600'

Conditional Use Location

Page 11: 2015-0009 Docksey - PZC Binder

DEPARTMENT OF PLANNING & ZONING 711 North Bridge Street, Chippewa Falls, WI 54729 Phone:715.726.7940 Fax:715.726.4596 www.co.chippewa.wi.us

Land Management 715.726.7940, Rm 009

Land Planning 715.726.7942, Rm 009

Land Records & G.I.S. 715.738.2595, Rm 005

POWTS & Wells 715.726.7943, Rm 009

CHIPPEWA COUNTY

Date: June 17, 2015 To: Lee McIIquham, Planning & Zoning Committee Chair From: Tony Roder, Zoning Inspector Re: James & Janice Docksey Shoreland Grading/Filling/Excavation Request

Conditional Use Information – 2015-0010

1. Appellant Name: James & Janice Docksey, property owners. Mark Erickson, Kramer Land Design Studio project engineer. Lloyd Stunkel, Natural Touch Landscaping.

2. Conditional Use Permit: To allow filling/grading/excavation on slopes of more than 35% and in excess of 4,000 square feet on slopes less than 12% for stump removal and leveling. Submitted plans also identify a 4 foot wide at-grade stairway to the water, firepit area with retaining walls, and a sitting bench area outside the scope of the original CUP permit. This CUP is being applied for to cover the area and activities not previously addressed by CUP 2014-0006.

3. Town Recommendation: The Town of Anson was notified of this request.

4. Recommendation For CUP: If granted, the following conditions should be considered by the Planning and Zoning Committee:

a. Activities allowed under the permit would be the after-the-fact filling/grading/excavation necessary to level the identified areas and for the proposed construction of a 4 foot wide at-grade stairway to the water, firepit area with retaining walls, and a sitting bench area based on the submitted plans and within the requirements of the Chippewa County Shoreland, Zoning, and Floodplain Ordinances. Actual building plan review and permitting are required separate of this CUP process.

1. Two areas adjacent the “existing asphalt pathway” will also be modified with construction of diversion berms and small catchment basins. Those features shall also be included with this CUP.

b. Only the stairway construction is permitted within the 75 foot shoreland setback per Section 54-126(a).

c. Erosion control fencing must be installed along the downslope edge of any disturbed area and at the bank of the shaded/disturbed area. Depending on site disturbance or precipitation, additional fencing may be required. Planning & Zoning Department personnel shall be called once the fencing is installed and prior to removal of fencing to verify vegetation is reestablished.

d. Any breach or failure in the silt fencing may require a reapplication or modification to this CUP if the total disturbed area on-site substantially increases beyond the area that is identified in the plans.

e. Proposed site development (i.e. retaining walls, sitting bench, …) must be located above the Regional Floodplain Elevation of 903’ MSL. The submitted plan identifies the base of the hill at approxiamtely 912’ MSL.

f. Unless otherwise shown or specified, erosion control measures shall comply with the WDNR "Stormwater Management Technical Standards" (available on the WDNR web site at dnr.wi.gov/topic/stormwater/standards/const_standards.html). Depending on site disturbance or precipitation additional erosion control measures may be required.

1. Revise the plans as site conditions change during construction and improve the plans if current BMP’s are not effectively controlling erosion and sediment. The revised plans require Planning and Zoning department review.

g. Downspouts or drainage ways shall be temporarily directed away from any disturbed area until vegetation is permanently established.

Page 12: 2015-0009 Docksey - PZC Binder

Docksey, James & Janice CUP 2015-0009 Page 2

h. No vegetation removal outside the 30 foot corridor is permitted within 35 feet of the river and all site development within 35 feet is required to occur with the 30 foot corridor (i.e. stairways to water, docks/piers, boathouses).

i. When final slopes are established and properly seeded and/or erosion control mat placed, Planning & Zoning Department personnel shall be called for final inspection. Once vegetation is completely established and the site inspected, Planning and Zoning will issue written approval to remove silt fencing. Silt fence must remain in place and in good working order until such time as the approval for removal is issued.

1. Additional topsoil may be required by the department to improve soil growing conditions on the steep, rocky slope.

j. Failure to maintain erosion control measures (i.e. silt fence, drainage ways, straw bales, culverts) on-site shall be considered a violation and enforcement action(s) per section 54-31 of the Chippewa County Shoreland Ordinance will apply. A stop work order will be issued until the erosion is controlled and/or cleaned-up.

k. This permit, if granted, does not supersede any permitting required by any other jurisdiction (i.e. WI DNR, USACE.).

l. Any other conditions that the Committee feels necessary in order to protect the site.

Attached Information:

1. P & Z Dept. Aerial and Plat Map 2. Site Plan (KLDS, 5/19/15) 3. Landscape plans

Page 13: 2015-0009 Docksey - PZC Binder

2015-0009 Docksey CUP - Aerial 2014

Map produced on May 8th, 2015 by the Chippewa County Department of Planning & Zoning and is forreference purposes only. Scale: 1" = 300'

Conditional Use Location