2014_Baja SAE India CostReportTemplate
-
Upload
monique-deleon -
Category
Documents
-
view
217 -
download
0
Transcript of 2014_Baja SAE India CostReportTemplate
-
8/12/2019 2014_Baja SAE India CostReportTemplate
1/71
Objective-The objective of the cost report is to report the cost value (suggested retail price) of the items selected
to build the car. The objective is notto report the cheapest price that an item can be purchased. For
example, if two schools are using the same Gear Box they both should be reporting the same price,
even though they might have purchased them for different prices, since both schools get the same
value from the Gear Box.
-The cost report should serve as two functions, (1) a bill of materials for the car, and (2) it should help
equalize teams that choose to use items of high value with teams that use items of low value.
-In industry it is very important to look at design and performance, as well as cost. Cost is the key
driving force to many design decisions. If shocks are selected that cost Rs 1,00,000 the team should
understand it will loose points in cost, but it might improve the score in the dynamic events. During
design presentations these cost decisions should be discussed.
Common Mistakes- Teams did not use the correct template; the only template that is allowed is the template which posted
for that year. If you submit an older template you will receive a score of 0.
- Teams found prices at discount companies that were not suggested retail prices. Remember to use
the current retail price of all parts.
- Teams did not get signatures on the summary cost page. It is required that you print out the summary
cost with captain and advisor approval signatures. This must be scanned and placed in the PDF aspage #1.
- Reports were not labeled correctly.
- Make sure everything is filled out. Don't leave anything blank (quantities, descriptions, sub-assembly
times, etc.).
- Bring a printed copy of the cost report with you to competition.
It also would be helpful to bring drawings of any components that are hidden or enclosed. For
example, a exploded view of a transmission or the component drawings. This would help speed
u an verification rocess.
Submission of reportsAll reports MUST be done using that year's template. Only one electronic copy will need to be
submitted by each team and this will be for all competitions in which the team is competing. The
template must be submitted as an Excel file (.xls or .xlsx). Do not add pictures, drawings or other
things that make this file larger.
All supporting documents (i.e.: scanned copy of the summary cost sheet with signature, cost overview,
cost sheets, pictures, ,receipts, drawings) should be included in the .PDF file. Only .PDF file will be
scored.
These files must be titled as specified in the rules. File size of PDF and EXCEL put together should not
exceed 6 MB
If the cost of your vehicle changes after you have submitted your cost report, then at registration you
mustsubmit a "Cost Adjustment Form". When submitting this form you must have receipts or form
"B" attached for each changed item. See the rules for more details on the Cost Adjustment form.
DO NOT SUBMIT REPORTS EMBEDDED WITH
MACROS IN THE FILE OR REPORTS WITH A .XLSMEXTENSION. REPORTS SUBMITTED IN THIS
FORMAT WILL NOT BE GRADED.
Foreign Teams
-
8/12/2019 2014_Baja SAE India CostReportTemplate
2/71
-
8/12/2019 2014_Baja SAE India CostReportTemplate
3/71
Receipts, catalog pages, or other documentation of cost must be included in the .PDF. To help make
the documentation clear and readable, each receipt must have the appropriate final cost circled. Each
receipt should also have the section title, Form A line number, and Form B (if needed) line number
clearly marked. All of these receipts must be included in the .PDF file. Documentation should be in
the same order as presented in the report. For example, all the engine documentation first, followed by
the transmission documentation, etc.
Editing the worksheetsThe worksheets have been designed to be used by most teams with little modification. The majority ofthe teams will find that one or more of the worksheets is too short to cover all the components used in
one functional area (Form A), fabricated items must be linked from Form B to Form A, or there are
more fabrication items than shown (Form B). Therefore, it is expected that the spreadsheets will need
to be modified. Use the following guidelines:
-You MAY NOT change the column headings, the categories, or the summation methods.
-You MAY add additional lines to accommodate your particular design. You may also need to add
additional sections to a Form B (and the resulting line in the corresponding Form A) as required. Minor
changes to the formatting of cells (i.e. visible decimal places) is permitted when necessary to
communicate within Forms A and B. If you add lines, it is your responsibility to ensure that formulas
pick up all additional lines and carry through the forms properly.
Form A Issues and EditingYou may insert additional lines as required. As long as you insert the lines above the summation
Formulas, the spreadsheet will pick up the costs in the new lines. You may need to renumber the lines;
this has no effect on the cost rollup. Be careful that the line numbers match the appropriate Form B
items. It is good practice to put all the Form B items at the top of the sheet, purchased items below.
Be careful not to 'CUT' items or drag and drop. Use 'COPY' functions. Failure to do so may lead to
dropped links to the final worksheet.
Form B Issues and EditingTo add an additional section for a fabricated item, highlight lines 2 through 25, 'COPY', highlight the
upper left corner below the last used section, and 'PASTE'. Be sure to add a page break above it and
change the item number appropriately. Next, you will need to add the three links to the appropriateForm B. Go to the appropriate line on the appropriate Form B, highlight the 'Part Name' cell, enter an
'=' to start a Formula, then (without completing the Formula) switch to Form B, find and highlight the
new Part Name cell, and hit 'enter'. This will transfer the location and send you back to Form A. Repeat
with materials and labor cost cells.
There are two ways to calculate part costs on Form B: you can enter Density, Amount, Weight, and
Rs/Unit, and the final cost will be calculated for you. Alternatively, you can leave the Density column
blank and the cost will be calculated on the basis of Amount, and Rs/Unit.
There may be some cases where the cost calculation does not fit your situation. Use your preferred
calculation method, highlight the calculation in light yellow, and provide an explanation at the bottom of
that page (Insert blank lines as required).
The Amount should be the gross amount of material you started with, not the finished amount of
material in the finished part. i.e. If you machine a full transmission case, use the weight of the starting
billet, not the final case.
Be careful not to 'CUT' items or drag and drop. Use 'COPY' functions. Failure to do so may lead to
dropped links to the matching Form A.
Check Page size, orientation and page break to ensure proper print/pdf
SampleThere is a sample pair of Form A and Form B at the start of the worksheets. They are identical to the
others with the exception that they do not roll up to the final worksheet.
-
8/12/2019 2014_Baja SAE India CostReportTemplate
4/71
*Preferably, use SI standard for dimensions.
-
8/12/2019 2014_Baja SAE India CostReportTemplate
5/71
-
8/12/2019 2014_Baja SAE India CostReportTemplate
6/71
Cost GuideThe cost should reflect the prototype vehicle brought to competition. Included in this amount is the cost for the
Brigss and Straton engine, (use fixed price Rs. 25000, for the engine- to rationalise the price for all teams) but
excluded are the costs of the required life preserver, helmet, and face shield. Anything that is in the vehicle at the
time of technical inspection must be represented in the cost report. The prototype cost of the vehicle will be1. All purchased parts at full retail cost (INR), even if it was actually acquired with a discount or in a foreign country
where the exchange rate would make it cheaper.2. Receipts for all components over Rs. 200 (Indian Rupees) must be included.
(A) The receipts must be numbered and labeled, and included in the .PDF file. (B) The full retail cost of parts must be used in the Cost Report. Discounted or wholesale prices are not to be
used. If a part is used,
donated or discounted, the full retail cost for the part must still be used (or a part of similar specification).
(C) The supplier/retailers phone number must be included with each receipt.
(D) If the actual receipt for a part is not available, a photocopy of a page from a catalog of the part in question will
be acceptable.
(E) Receipts that are dated less than three (3) years prior to the Competition, i.e. no older than 3 years, are valid.
Part prices must be current for that year (year of competition). (Provide current year quotations for the previous
years purchased parts used in the car. And, support it with previous years original receipt. Use current years
3. All modified purchased parts should use full retail cost, plus the cost of the modifications taken from the
Operations Cost Table specified in the rule book appendix.
4. Fabricated/Manufactured parts use the cost for the basic material from the Materials Cost Table (refer rule book,
appendix); bearing in mind the weight must include any scrapfrom cutting or machining. If the material is notlisted in the table then a receipt for the material must be provided. The cost for making the part will then be added
using the rates from the Operations Cost Table (refer rule book, appendix).
5. Fabricated/Manufactured parts do not include design or setup time for your manufacturing, actual run time
6. Assembly labor is to be cost at Rs. 50 per hour.
(A) Assembly of a component is to be included in the cost of that component.
(B) Assembly of components into a sub-assembly is to be listed as Sub-System Assembly Time(D13 on Form
A) in the section
that sub-assembly appears.
(C) Assembly of a sub-assembly or assembly onto the vehicle is Vehicle Assembly Laborand should be
-
8/12/2019 2014_Baja SAE India CostReportTemplate
7/71
-
8/12/2019 2014_Baja SAE India CostReportTemplate
8/71
0
Material Labor Material1 Engine 0.00 25,000.00
2 Transmission 0.00 0.00
3 Drive Train 0.00 0.00
4 Steering 0.00 0.00
5 Suspension 0.00 0.00
6 Frame 0.00 0.00
7 Body 0.00 0.00
8 Brakes 0.00 0.00
9 Safety Equipment 0.00 0.00
10 Electrical Equipment 0.00 0.00
11 Fasteners 0.00 0.00
12 Miscellaneous 0.00 0.00
Rs0.00 Rs0.00 Rs0.00 Rs25,000.00
2014 Baja SAE Cost Adjustment Form
Car Number
Total Cost (Rs)
Sect#
Item Description of change
Subassembly Costs Sum of
Adj.Sub
1234
-
8/12/2019 2014_Baja SAE India CostReportTemplate
9/71
Labor0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Rs0.00
otal
-
8/12/2019 2014_Baja SAE India CostReportTemplate
10/71
Car Number
Team Name
Total Cost (Rs)
1 Engine
2 Transmission
3 Drive Train
4 Steering
5 Suspension
6 Frame
7 Body8 Brakes
9 Safety Equipment
10 Electrical Equipment
11 Fasteners
12 Miscellaneous
;
Team Captain:
Financial Head:
Level 1 Summary
Sr.No.
Item
-
8/12/2019 2014_Baja SAE India CostReportTemplate
11/71
1234
XYZ
25000.00
Engine, Engine Mountings, Engine Subframe, Fuel Tank, Exhaust System, Catalytic Convertor, Engine Oil,
Gearbox, Clutches, Accelerator Pedal, CVT, Shift Mechanisms, Transmission Oil etc.
Drive Shafts, Bearings, Axles, Tyres, Rims, Hub, etc.
Steering Wheel, Intermediate Shafts, Gear Box, Tie Rods, etc.
A Arms, Spindles, Shock Absorbers, Springs, etc.
Structural Members, Roll Cage, Mounts, Firewall, Seat, etc.
Outer Covering, Fenders, Skid Plates, etc.Mech/Hyd. Components, Pedals, Lines, Fittings, Fluid, etc.
Kill Switch, Fire Extinguisher, Safety Harness, etc.
Battery, Starter, Cables, Wiring, Safety Device, etc.
Nuts, Bolts, Spring Washer, etc. (don't include fasteners in each subassembly, put the QTY of each variou
Paint, Trim, etc. and other items.
Date:
2014 Baja SAE Off icial Cos ting
Description
-
8/12/2019 2014_Baja SAE India CostReportTemplate
12/71
Material Labor Time(min) Cost Material Labor
25,000.00 0.00 0.00 0.00 25,000.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
25,000.00 0.00 0.00 0.00 25,000.00 0.00
Approval Date:
Revision: A
heet
SubtotalSubassembly Costs
Vehicle Assembly Labor
Cost
-
8/12/2019 2014_Baja SAE India CostReportTemplate
13/71
Sample Subsystem Form A
Item Part Name Purc
hased
Fabr
icated
Vendor QtyMaterial
Cost
1 Roll Cage and rear frame X 1 134.53
2 Seat Mounting X 1 2.75
3 Bushings X MISC 1 100.00
4
5
6
7
8
9
Subsystem Assembly Time (minutes) 5 Subsystem Assy CostTotals
-
8/12/2019 2014_Baja SAE India CostReportTemplate
14/71
Labor Cost Exte
nded
Mate
rialCost
Labo
rCost
Exte
ndedTotal
5,625.00 134.53 5,625.00 5,759.53
512.00 2.75 512.00 514.75
0.00 100.00 0.00 100.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
4.17 4.17237.28 6,141.17 6,374.28
Total: 6,378.45
-
8/12/2019 2014_Baja SAE India CostReportTemplate
15/71
Line 1 on Sample Subsystem Form A
Description: Roll Cage and rear frame
Material:
Part Name Material Density Unit Amount Weight Rs/Unit
1 Pipes Astm A106 Gr B 0.01 cm^3 209.36 1.65 79.75
2 Pipes Astm A106 Gr B 0.01 cm^3 17.66 0.14 23.62
Subtotal:
Labor:
Rs/Unit
1 5.00
2 40.00
3 10.00
4
5
6
Subtotal:
Material Total
Labor Total
To Form A Line 1 Subassembly Total
Line 2 on Sample Subsystem Form A
Description: Seat Mounting
Material:
Part Name Material Density Unit Amount Weight Rs/Unit
1 Pipes ASTM A106 Gr B 0.01 cm^3 3.60 0.03 24.00
2 Plates Mild Steel 0.01 cm^3 10.53 0.08 25.00
Subtotal:
Labor:
Rs/Unit
1 5.00
2 5.00
3 10.00
4 3.00
5 5.00
6
Subtotal:
Material Total
Labor TotalTo Form A Line 2 Subassembly Total
Line 3 on Sample Subsystem Form A
Description: Bushings
Material:
Engine Subsystem Form B
Item
Manufacturing Process Amount Unit
Cut Pipes 957.00 cm
Bending 6.00 bend
Radiusing at ends 60.00 end
Item
Manufacturing Process Amount Unit
Cut pipes 32.00 cm
Cut plates 16.00 cm
Radiusing at ends 2.00 end
Drill Holes 4.00 hole (light)
Weld plates 48.00 cm
m
-
8/12/2019 2014_Baja SAE India CostReportTemplate
16/71
Part Name Material Density Unit Amount Weight Rs/Unit
1 Bushings piece 2.00 0.00 50.00
2 0.00
Subtotal:
Labor:
Rs/Unit
1
2
3
4
5
6
Subtotal:
Material Total
Labor Total
To Form A Line 3 Subassembly Total
Ite
Manufacturing Process Amount Unit
-
8/12/2019 2014_Baja SAE India CostReportTemplate
17/71
Cost (Rs)
131.25
3.28
134.53
Cost (Rs)
4785.00
240.00
600.00
0.00
0.00
0.00
5625.00
134.53
5625.00
5759.53
Cost (Rs)
0.68
2.07
2.75
Cost (Rs)
160.00
80.00
20.00
12.00
240.00
0.00
512.00
2.75
512.00514.75
-
8/12/2019 2014_Baja SAE India CostReportTemplate
18/71
Cost (Rs)
100.00
0.00
100.00
Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00
0.00
100.00
-
8/12/2019 2014_Baja SAE India CostReportTemplate
19/71
-
8/12/2019 2014_Baja SAE India CostReportTemplate
20/71
Engine Subsystem Form A
Item Part Name Purchased
Fabricated
Vendor Qty
Material
Cost Labor CostExtended
MaterialCost
LaborCost
ExtendedTotal
1 Engine X 1 25,000.00 25,000.00 0.00 25,000.0
2 Engine Mountings X 0.00 0.00 0.0
3 Drive Shaft X 0.00 0.00 0.0
4 0.00 0.00 0.0
5 0.00 0.00 0.0
6 0.00 0.00 0.0
7 0.00 0.00 0.0
8 0.00 0.00 0.0
9 0.00 0.00 0.0
Subsystem Assembly Time (minutes) 0 Subsystem Assy Cost 0.00 0.0
Totals 25,000.00 0.00 25,000.0
Total: 25,000.0
-
8/12/2019 2014_Baja SAE India CostReportTemplate
21/71
Line 1 on Engine Subsystem Form A
Description: (From Sheet "A")
Material:
Part Name Material Density Unit Amount Weight Rs/Unit
1 0.00
2 0.00
Subtotal:
Labor:
Rs/Unit
1
2
3
4
5
6
Subtotal:
Material TotalLabor Total
To Form A Line 1 Subassembly Total
Line 2 on Engine Subsystem Form A
Description: (From Sheet "A")
Material:
Part Name Material Density Unit Amount Weight Rs/Unit
1 0.00
2 0.00
Subtotal:
Labor:
Rs/Unit
1
2
3
4
5
6
Subtotal:
Material Total
Labor Total
To Form A Line 2 Subassembly Total
Line 3 on Engine Subsystem Form A
Description: (From Sheet "A")
Material:
Part Name Material Density Unit Amount Weight Rs/Unit
1 0.00
Item
Item
Manufacturing Process Amount Unit
Engine Subsystem Form B
Item
Manufacturing Process Amount Unit
-
8/12/2019 2014_Baja SAE India CostReportTemplate
22/71
2 0.00
Subtotal:
Labor:
Rs/Unit
1
2
3
45
6
Subtotal:
Material Total
Labor Total
To Form A Line 3 Subassembly Total
Manufacturing Process Amount Unit
-
8/12/2019 2014_Baja SAE India CostReportTemplate
23/71
Cost (Rs)
0.00
0.00
0.00
Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.00
0.00
Cost (Rs)
0.00
0.00
0.00
Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Cost (Rs)
0.00
-
8/12/2019 2014_Baja SAE India CostReportTemplate
24/71
0.00
0.00
Cost (Rs)
0.00
0.00
0.00
0.000.00
0.00
0.00
0.00
0.00
0.00
-
8/12/2019 2014_Baja SAE India CostReportTemplate
25/71
Transmission Subsystem Form A
Item Part Name Purchased
Fabricated
Vendor Qty
Material
Cost Labor Cost Extended
MaterialCost
LaborCost
ExtendedTotal
1 0.00 0.00 0.00
2 0.00 0.00 0.00
3 0.00 0.00 0.00
4 0.00 0.00 0.00
5 0.00 0.00 0.00
6 0.00 0.00 0.00
7 0.00 0.00 0.00
8 0.00 0.00 0.00
9 0.00 0.00 0.00
Subsystem Assembly Time (minutes) 0 Subsystem Assy Cost 0.00 0.00
Totals 0.00 0.00 0.00
Total: 0.00
-
8/12/2019 2014_Baja SAE India CostReportTemplate
26/71
Line 1 on Transmission Subsystem Form A
Description: (From Sheet "A")
Material:
Part Name Material Density Unit Amount Weight
1 0.00
2 0.00
Labor:
1
2
3
4
5
6
To Form A Line 1
Line 2 on Transmission Subsystem Form A
Description: (From Sheet "A")
Material:
Part Name Material Density Unit Amount Weight
1 0.00
2 0.00
Labor:
1
2
3
4
5
6
To Form A Line 2
Item
Manufacturing Process Amount Unit
Item
Transmission Subsystem Form B
Manufacturing Process Amount Unit
-
8/12/2019 2014_Baja SAE India CostReportTemplate
27/71
Line 3 on Transmission Subsystem Form A
Description: (From Sheet "A")
Material:
Part Name Material Density Unit Amount Weight
1 0.002 0.00
Labor:
1
2
3
4
5
6
To Form A Line 3
Item
Manufacturing Process Amount Unit
-
8/12/2019 2014_Baja SAE India CostReportTemplate
28/71
Rs/Unit Cost (Rs)
0.00
0.00
Subtotal: 0.00
Rs/Unit Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal: 0.00
Material Total 0.00
Labor Total 0.00
Subassembly Total 0.00
Rs/Unit Cost (Rs)
0.00
0.00
Subtotal: 0.00
Rs/Unit Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal: 0.00
Material Total 0.00
Labor Total 0.00
Subassembly Total 0.00
-
8/12/2019 2014_Baja SAE India CostReportTemplate
29/71
Rs/Unit Cost (Rs)
0.000.00
Subtotal: 0.00
Rs/Unit Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal: 0.00
Material Total 0.00
Labor Total 0.00
Subassembly Total 0.00
-
8/12/2019 2014_Baja SAE India CostReportTemplate
30/71
Drive Subsystem Form A
Item Part Name Purchased
Fabricated
Vendor Qty
Material
Cost Labor Cost Extended
MaterialCost
LaborCost
ExtendedTotal
1 0.00 0.00 0.0
2 0.00 0.00 0.0
3 0.00 0.00 0.0
4 0.00 0.00 0.0
5 0.00 0.00 0.0
6 0.00 0.00 0.0
7 0.00 0.00 0.0
8 0.00 0.00 0.0
9 0.00 0.00 0.0
Subsystem Assembly Time (minutes) 0 Subsystem Assy Cost 0.00 0.0
Totals 0.00 0.00 0.0
Total: 0.0
-
8/12/2019 2014_Baja SAE India CostReportTemplate
31/71
Line 1 on Drive Subsystem Form A
Description: (From Sheet "A")
Material:
Part Name Material Density Unit Amount Weight
1 0.00
2 0.00
Labor:
1
2
3
4
5
6
To Form A Line 1
Line 2 on Drive Subsystem Form A
Description: (From Sheet "A")
Material:
Part Name Material Density Unit Amount Weight
1 0.00
2 0.00
Labor:
1
2
3
4
5
6
To Form A Line 2
Item
Manufacturing Process Amount Unit
Drive Subsystem Form B
Item
Manufacturing Process Amount Unit
-
8/12/2019 2014_Baja SAE India CostReportTemplate
32/71
Line 3 on Drive Subsystem Form A
Description: (From Sheet "A")
Material:
Part Name Material Density Unit Amount Weight
1 0.002 0.00
Labor:
1
2
3
4
5
6
To Form A Line 3
Item
Manufacturing Process Amount Unit
-
8/12/2019 2014_Baja SAE India CostReportTemplate
33/71
Rs/Unit Cost (Rs)
0.00
0.00
Subtotal: 0.00
Rs/Unit Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal: 0.00
Material Total 0.00
Labor Total 0.00
Subassembly Total 0.00
Rs/Unit Cost (Rs)
0.00
0.00
Subtotal: 0.00
Rs/Unit Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal: 0.00
Material Total 0.00
Labor Total 0.00
Subassembly Total 0.00
-
8/12/2019 2014_Baja SAE India CostReportTemplate
34/71
Rs/Unit Cost (Rs)
0.000.00
Subtotal: 0.00
Rs/Unit Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal: 0.00
Material Total 0.00
Labor Total 0.00
Subassembly Total 0.00
-
8/12/2019 2014_Baja SAE India CostReportTemplate
35/71
Steering Subsystem Form A
Item Part Name Purchased
Fabricated
Vendor Qty
Material
Cost Labor Cost Extended
MaterialCost
LaborCost
ExtendedTotal
1 0.00 0.00 0.002 0.00 0.00 0.00
3 0.00 0.00 0.00
4 0.00 0.00 0.00
5 0.00 0.00 0.00
6 0.00 0.00 0.00
7 0.00 0.00 0.00
8 0.00 0.00 0.00
9 0.00 0.00 0.00
Subsystem Assembly Time (minutes) 0 Subsystem Assy Cost 0.00 0.00
Totals 0.00 0.00 0.00
Total: 0.00
-
8/12/2019 2014_Baja SAE India CostReportTemplate
36/71
Line 1 on Steering Subsystem Form A
Description: (From Sheet "A")
Material:
Part Name Material Density Unit Amount Weight Rs/Unit
1 0.00
2 0.00
Subtotal:
Labor:
Rs/Unit
1
2
3
4
5
6
Subtotal:
Material Total
Labor Total
To Form A Line 1 Subassembly
Line 2 on Steering Subsystem Form A
Description: (From Sheet "A")
Material:
Part Name Material Density Unit Amount Weight Rs/Unit
1 0.00
2 0.00
Subtotal:
Labor:
Rs/Unit
1
2
3
4
5
6
Subtotal:
Material Total
Labor Total
To Form A Line 2 Subassembly
Item
Manufacturing Process Amount Unit
Item
Steering Subsystem Form B
Manufacturing Process Amount Unit
-
8/12/2019 2014_Baja SAE India CostReportTemplate
37/71
Line 3 on Steering Subsystem Form A
Description: (From Sheet "A")
Material:
Part Name Material Density Unit Amount Weight Rs/Unit
1 0.002 0.00
Subtotal:
Labor:
Rs/Unit
1
2
3
4
5
6
Subtotal:
Material Total
Labor Total
To Form A Line 3 Subassembly
Item
Manufacturing Process Amount Unit
-
8/12/2019 2014_Baja SAE India CostReportTemplate
38/71
Cost (Rs)
0.00
0.00
0.00
Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Cost (Rs)
0.00
0.00
0.00
Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
8/12/2019 2014_Baja SAE India CostReportTemplate
39/71
Cost (Rs)
0.000.00
0.00
Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
8/12/2019 2014_Baja SAE India CostReportTemplate
40/71
Suspension Subsystem Form A
Item Part Name Purchased
Fabricated
Vendor Qty
Material
Cost Labor Cost Extended
MaterialCost
LaborCost
ExtendedTotal
1 0.00 0.00 0.002 0.00 0.00 0.00
3 0.00 0.00 0.00
4 0.00 0.00 0.00
5 0.00 0.00 0.00
6 0.00 0.00 0.00
7 0.00 0.00 0.00
8 0.00 0.00 0.00
9 0.00 0.00 0.00
Subsystem Assembly Time (minutes) 0 Subsystem Assy Cost 0.00 0.00
Totals 0.00 0.00 0.00
Total: 0.00
-
8/12/2019 2014_Baja SAE India CostReportTemplate
41/71
Line 1 onSuspension Subsystem Form A
Description: (From Sheet "A")
Material:
Part Name Material Density Unit Amount Weight
1 0.002 0.00
Labor:
1
2
3
4
5
6
To Form A Line 1
Line 2 on Suspension Subsystem Form A
Description: (From Sheet "A")
Material:
Part Name Material Density Unit Amount Weight
1 0.00
2 0.00
Labor:
1
2
3
4
5
6
To Form A Line 2
Line 3 on Suspension Subsystem Form A
Description: (From Sheet "A")
Amount UnitManufacturing Process
Item
Suspension Subsystem Form B
Item
Manufacturing Process Amount Unit
-
8/12/2019 2014_Baja SAE India CostReportTemplate
42/71
Material:
Part Name Material Density Unit Amount Weight
1 0.00
2 0.00
Labor:
1
2
3
4
5
6
To Form A Line 3
Item
Manufacturing Process Amount Unit
-
8/12/2019 2014_Baja SAE India CostReportTemplate
43/71
Rs/Unit Cost (Rs)
0.000.00
Subtotal: 0.00
Rs/Unit Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal: 0.00
Material Total 0.00
Labor Total 0.00
Subassembly Total 0.00
Rs/Unit Cost (Rs)
0.00
0.00
Subtotal: 0.00
Rs/Unit Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal: 0.00
Material Total 0.00
Labor Total 0.00
Subassembly Total 0.00
-
8/12/2019 2014_Baja SAE India CostReportTemplate
44/71
Rs/Unit Cost (Rs)
0.00
0.00
Subtotal: 0.00
Rs/Unit Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal: 0.00
Material Total 0.00
Labor Total 0.00
Subassembly Total 0.00
-
8/12/2019 2014_Baja SAE India CostReportTemplate
45/71
Frame Subsystem Form A
Item Part Name Purchased
Fabricated
Vendor Qty
Material
Cost Labor Cost Extended
MaterialCost
LaborCost
ExtendedTotal
1 0.00 0.00 0.002 0.00 0.00 0.00
3 0.00 0.00 0.00
4 0.00 0.00 0.00
5 0.00 0.00 0.00
6 0.00 0.00 0.00
7 0.00 0.00 0.00
8 0.00 0.00 0.00
9 0.00 0.00 0.00
Subsystem Assembly Time (minutes) 0 Subsystem Assy Cost 0.00 0.00
Totals 0.00 0.00 0.00
Total: 0.00
-
8/12/2019 2014_Baja SAE India CostReportTemplate
46/71
Line 1 on Frame Subsystem Form A
Description: (From Sheet "A")
Material:
Part Name Material Density Unit Amount
1
2
Labor:
1
2
3
4
5
6
To Form A Line
Line 2 on Frame Subsystem Form A
Description: (From Sheet "A")
Material:
Part Name Material Density Unit Amount
1
2
Labor:
1
2
3
4
5
6
To Form A Line
Item
Manufacturing Process Amount U
Frame Subsystem Form B
Item
Manufacturing Process Amount U
-
8/12/2019 2014_Baja SAE India CostReportTemplate
47/71
Line 3 on Frame Subsystem Form A
Description: (From Sheet "A")
Material:
Part Name Material Density Unit Amount
12
Labor:
1
2
3
4
5
6
To Form A Line
Item
Manufacturing Process Amount U
-
8/12/2019 2014_Baja SAE India CostReportTemplate
48/71
Weight Rs/Unit Cost (Rs)
0.00 0.00
0.00 0.00
Subtotal: 0.00
Rs/Unit Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal: 0.00
Material Total 0.00
Labor Total 0.00
1 Subassembly Total 0.00
Weight Rs/Unit Cost (Rs)
0.00 0.00
0.00 0.00
Subtotal: 0.00
Rs/Unit Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal: 0.00
Material Total 0.00
Labor Total 0.00
2 Subassembly Total 0.00
it
it
-
8/12/2019 2014_Baja SAE India CostReportTemplate
49/71
Weight Rs/Unit Cost (Rs)
0.00 0.000.00 0.00
Subtotal: 0.00
Rs/Unit Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal: 0.00
Material Total 0.00
Labor Total 0.00
3 Subassembly Total 0.00
it
-
8/12/2019 2014_Baja SAE India CostReportTemplate
50/71
Body Subsystem Form A
Item Part Name Purchased
Fabricated
Vendor Qty
Material
Cost Labor Cost Extended
MaterialCost
LaborCost
ExtendedTotal
1 0.00 0.00 0.0
2 0.00 0.00 0.0
3 0.00 0.00 0.0
4 0.00 0.00 0.0
5 0.00 0.00 0.0
6 0.00 0.00 0.0
7 0.00 0.00 0.0
8 0.00 0.00 0.0
9 0.00 0.00 0.0
Subsystem Assembly Time (minutes) 0 Subsystem Assy Cost 0.00 0.0
Totals 0.00 0.00 0.0
Total: 0.0
-
8/12/2019 2014_Baja SAE India CostReportTemplate
51/71
Body Subsystem Form B
Line 1 on Body Subsystem Form A
Description: (From Sheet "A")
Material:
Part Name Material Density Unit Amount Weight Rs/Unit
1 0.00
2 0.00Subtotal:
Labor:
Rs/Unit
1
2
3
4
5
6
Subtotal:
Material Total
Labor Total
To Form A Line 1 Subassembly Total
Line 2 on Body Subsystem Form A
Description: (From Sheet "A")
Material:
Part Name Material Density Unit Amount Weight Rs/Unit
1 0.00
2 0.00Subtotal:
Labor:
Rs/Unit
1
2
3
4
5
6
Subtotal:
Material Total
Labor Total
To Form A Line 2 Subassembly Total
Line 3 on Body Subsystem Form A
Description: (From Sheet "A")
Item
Manufacturing Process Amount Unit
Item
Manufacturing Process Amount Unit
-
8/12/2019 2014_Baja SAE India CostReportTemplate
52/71
Material:
Part Name Material Density Unit Amount Weight Rs/Unit
1 0.00
2 0.00
Subtotal:
Labor:
Rs/Unit1
2
3
4
5
6
Subtotal:
Material Total
Labor Total
To Form A Line 3 Subassembly Total
Item
Manufacturing Process Amount Unit
-
8/12/2019 2014_Baja SAE India CostReportTemplate
53/71
Cost (Rs)
0.00
0.000.00
Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Cost (Rs)
0.00
0.000.00
Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
8/12/2019 2014_Baja SAE India CostReportTemplate
54/71
Cost (Rs)
0.00
0.00
0.00
Cost (Rs)0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
8/12/2019 2014_Baja SAE India CostReportTemplate
55/71
Brakes Subsystem Form A
Item Part Name Purchased
Fabricated
Vendor Qty
Material
Cost Labor Cost Extended
MaterialCost
LaborCost
ExtendedTotal
1 0.00 0.00 0.002 0.00 0.00 0.00
3 0.00 0.00 0.00
4 0.00 0.00 0.00
5 0.00 0.00 0.00
6 0.00 0.00 0.00
7 0.00 0.00 0.00
8 0.00 0.00 0.00
9 0.00 0.00 0.00
Subsystem Assembly Time (minutes) 0 Subsystem Assy Cost 0.00 0.00
Totals 0.00 0.00 0.00
Total: 0.00
-
8/12/2019 2014_Baja SAE India CostReportTemplate
56/71
Brakes Subsystem Form B
Line 1 on Brakes Subsystem Form A
Description: (From Sheet "A")
Material:
Part Name Material Density Unit Amount Weight
1 0.002 0.00
Labor:
1
2
3
4
5
6
To Form A Line 1
Line 2 on Brakes Subsystem Form A
Description: (From Sheet "A")
Material:
Part Name Material Density Unit Amount Weight
1 0.00
2 0.00
Labor:
1
2
3
4
5
6
To Form A Line 2
Item
Manufacturing Process Amount Unit
Item
Manufacturing Process Amount Unit
-
8/12/2019 2014_Baja SAE India CostReportTemplate
57/71
Line 3 on Brakes Subsystem Form A
Description: (From Sheet "A")
Material:
Part Name Material Density Unit Amount Weight
1 0.00
2 0.00
Labor:
1
2
3
4
5
6
To Form A Line 3
Item
Manufacturing Process Amount Unit
-
8/12/2019 2014_Baja SAE India CostReportTemplate
58/71
Rs/Unit Cost (Rs)
0.000.00
Subtotal: 0.00
Rs/Unit Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal: 0.00
Material Total 0.00
Labor Total 0.00
Subassembly Total 0.00
Rs/Unit Cost (Rs)
0.00
0.00
Subtotal: 0.00
Rs/Unit Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal: 0.00
Material Total 0.00
Labor Total 0.00
Subassembly Total 0.00
-
8/12/2019 2014_Baja SAE India CostReportTemplate
59/71
Rs/Unit Cost (Rs)
0.00
0.00Subtotal: 0.00
Rs/Unit Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal: 0.00
Material Total 0.00
Labor Total 0.00
Subassembly Total 0.00
-
8/12/2019 2014_Baja SAE India CostReportTemplate
60/71
Safety Equipment Subsystem Form A
Item Part Name Purchased
Fabricated
Vendor Qty
Material
Cost Labor Cost Extended
MaterialCost
LaborCost
ExtendedTotal
1 0.00 0.00 0.002 0.00 0.00 0.00
3 0.00 0.00 0.00
4 0.00 0.00 0.00
5 0.00 0.00 0.00
6 0.00 0.00 0.00
7 0.00 0.00 0.00
8 0.00 0.00 0.00
9 0.00 0.00 0.00
Subsystem Assembly Time (minutes) 0 Subsystem Assy Cost 0.00 0.00
Totals 0.00 0.00 0.00
Total: 0.00
-
8/12/2019 2014_Baja SAE India CostReportTemplate
61/71
Safety Equipment Subsystem Form B
Line 1 on Safety Equipment Subsystem Form A
Description: (From Sheet "A")
Material:
Part Name Material Density Unit Amount Weight
1 0.002 0.00
Labor:
1
2
3
4
5
6
To Form A Line 1
Line 2 on Safety Equipment Subsystem Form A
Description: (From Sheet "A")
Material:
Part Name Material Density Unit Amount Weight
1 0.00
2 0.00
Labor:
1
2
3
4
5
6
To Form A Line 2
Item
Manufacturing Process Amount Unit
Item
Manufacturing Process Amount Unit
-
8/12/2019 2014_Baja SAE India CostReportTemplate
62/71
Line 3 on Safety Equipment Subsystem Form A
Description: (From Sheet "A")
Material:
Part Name Material Density Unit Amount Weight
1 0.00
2 0.00
Labor:
1
2
3
4
5
6
To Form A Line 3
Item
Manufacturing Process Amount Unit
-
8/12/2019 2014_Baja SAE India CostReportTemplate
63/71
Rs/Unit Cost (Rs)
0.000.00
Subtotal: 0.00
Rs/Unit Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal: 0.00
Material Total 0.00
Labor Total 0.00
Subassembly Total 0.00
Rs/Unit Cost (Rs)
0.00
0.00
Subtotal: 0.00
Rs/Unit Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal: 0.00
Material Total 0.00
Labor Total 0.00
Subassembly Total 0.00
-
8/12/2019 2014_Baja SAE India CostReportTemplate
64/71
Rs/Unit Cost (Rs)
0.00
0.00Subtotal: 0.00
Rs/Unit Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal: 0.00
Material Total 0.00
Labor Total 0.00
Subassembly Total 0.00
-
8/12/2019 2014_Baja SAE India CostReportTemplate
65/71
Electrical Subsystem Form A
Item Part Name Purchased
Fabricated
Vendor Qty
Material
Cost Labor Cost Extended
MaterialCost
LaborCost
ExtendedTotal
1 0.00 0.00 0.00
2 0.00 0.00 0.00
3 0.00 0.00 0.00
4 0.00 0.00 0.00
5 0.00 0.00 0.00
6 0.00 0.00 0.00
7 0.00 0.00 0.00
8 0.00 0.00 0.00
9 0.00 0.00 0.00
Subsystem Assembly Time (minutes) 0 Subsystem Assy Cost 0.00 0.00
Totals 0.00 0.00 0.00
Total: 0.00
-
8/12/2019 2014_Baja SAE India CostReportTemplate
66/71
Fasteners Subsystem Form A
Item Part Name Purchased
Fabricated
Vendor Qty
Material
Cost Labor Cost Extended
MaterialCost
LaborCost
ExtendedTotal
1 0.00 0.002 0.00 0.00
3 0.00 0.00
4 0.00 0.00
5 0.00 0.00
6 0.00 0.00
7 0.00 0.00
8 0.00 0.00
9 0.00 0.00
Subsystem Assembly Time (minutes) 0 Subsystem Assy Cost 0.00 0.00
Totals 0.00 0.00 0.00
Total: 0.00
-
8/12/2019 2014_Baja SAE India CostReportTemplate
67/71
Miscellaneous Items Form A
Item Part Name Purchased
Fabricated
Vendor Qty
Material
Cost Labor Cost Extended
MaterialCost
LaborCost
ExtendedTotal
1 0.00 0.00 0.00
2 0.00 0.00 0.00
3 0.00 0.00 0.00
4 0.00 0.00 0.00
5 0.00 0.00 0.00
6 0.00 0.00 0.00
7 0.00 0.00 0.00
8 0.00 0.00 0.00
9 0.00 0.00 0.00
Subsystem Assembly Time (minutes) 0 Subsystem Assy Cost 0.00 0.00
Totals 0.00 0.00 0.00
Total: 0.00
-
8/12/2019 2014_Baja SAE India CostReportTemplate
68/71
Miscellaneous Items Form B
Line 1 on Miscellaneous Items Form A
Description: (From Sheet "A")
Material:
Part Name Material Density Unit Amount Weight
1 0.002 0.00
Labor:
1
2
3
4
5
6
To Form A Line 1
Line 2 on Miscellaneous Items Form A
Description: (From Sheet "A")
Material:
Part Name Material Density Unit Amount Weight
1 0.00
2 0.00
Labor:
1
2
3
4
5
6
To Form A Line 2
Item
Manufacturing Process Amount Unit
Item
Manufacturing Process Amount Unit
-
8/12/2019 2014_Baja SAE India CostReportTemplate
69/71
Line 3 on Miscellaneous Items Form A
Description: (From Sheet "A")
Material:
Part Name Material Density Unit Amount Weight
1
2
Labor:
1
2
3
4
5
6
To Form A Line 3
Item
Manufacturing Process Amount Unit
-
8/12/2019 2014_Baja SAE India CostReportTemplate
70/71
Rs/Unit Cost (Rs)
0.000.00
Subtotal: 0.00
Rs/Unit Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal: 0.00
Material Total 0.00
Labor Total 0.00
Subassembly Total 0.00
Rs/Unit Cost (Rs)
0.00
0.00
Subtotal: 0.00
Rs/Unit Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal: 0.00
Material Total 0.00
Labor Total 0.00
Subassembly Total 0.00
-
8/12/2019 2014_Baja SAE India CostReportTemplate
71/71
Rs/Unit Cost
Rs0.00
Rs0.00Subtotal: Rs0.00
Rs/Unit Cost
Rs0.00
Rs0.00
Rs0.00
Rs0.00
Rs0.00
Rs0.00
Subtotal: Rs0.00
Material Total Rs0.00
Labor Total Rs0.00
Subassembly Total Rs0.00