Ricardo de Gusmao Dornelles: Brazil & the U.S.: Strategic Energy Dialogue
2014 Policy Dialogue on Energy For SD for Asia and the … Jona.pdf · 2014 Policy Dialogue on...
Transcript of 2014 Policy Dialogue on Energy For SD for Asia and the … Jona.pdf · 2014 Policy Dialogue on...
2014 Policy Dialogue on Energy For SD for Asia and the Pacific
Cambodia’s Energy Situation and Regional
Trend
General Overview Cambodia’s Power Sector
Aug. 2014
Total Power Supply: 1370.75 MW
Domestic Power Supply: 1077 MW, = 78.57%
Power Import: 293,75MW = 21.42%
Total Villages: 14,073
Village Access to Electricity: 7,754 = 55.10%
Total H.H : 2,041,208 H.H
H.H Access to Electricity: 1,336,246 = 59.10%
Hydro Power Account for APPROX. 50%
Current Structure of Electricity Sector
REE IPP PEC EDC
Cambodia’s Electricity Business
Electricity Authority of Cambodia (EAC)
Royal Government of Cambodia
Regulation Policy Maker Owner
-Ownership of EDC
-Policy, Strategy, Planning, Technical Standard
-Tariff, License, Financial Performance, Enforce the regulations, Rule and Standard.
Ministry of Mines Energy (MME)
Ministry of Economic and Finance (MEF)
To provide an adequate supply of energy throughoutCambodia at reasonable and affordable price,
To ensure a reliable and secured electricity supply atreasons price, which facilitates investment in Cambodiaand development of national economy,
To encourage exploration and environmentally andsocially acceptable development of energy resourcesneeded for supply to all sectors of Cambodia economy,
To encourage the efficient use of energy and to minimizethe detrimental environmental affects resulted fromenergy supply and consumption.
ENERGY POLICY
CAMBODIA POWER STRATEGY
A-Development of Generation
B-Development of Transmission lines
C-Development of Rural Electrification
Increasing diversify of power supply such as Hydro, Coal power, Importing electricity, biomass and others renewable energies to meet the electricity demand and reduce fuel oil for power generation.
Development the national transmission line, GMS & ASEAN power grid, maximize mini-grid to rural areas, upgrading the HV, MV & LV.
Supply from the National Grid, Mini-grid, Grid extension and stand-alone system (BCS, SHS, Micro Hydropower, biomass, etc.
Interconnection Plan betweenProvincial Town
N. Provincial Name 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018
1 Phnom Penh
2 Kandal
3 Kampong Speu
4 Takeo
5 Kampot
6 Kep
7 Sihanoukville
8 Kampong Cham
9 Banteay Meanchey
10 Battambang
11 Siemreap
12Kampong Chhnang
13 Pursat
14 Koh Kong
15 Oddar Meanchey
16 Pailin
17 Prey Veng
18 Svay Rieng
19 Kratie
20 Stung Treng
21 Ratanak Kiri
22 Mondul Kiri
23 Kampong Thom
24 Preah Vihear
8
Existing Grid
+ Committed Projects
+ Candidate Projects
POST-2015 BASE CASE AND CANDIDATE PROJECTS
CAMBODIA
INDONESIA
SARAWAK
BRUNEI
P. MALAYSIA
PEOPLE'S REPUBLIC OF CHINA
YUNNAN
BATAMSINGAPORE
8
11
14
10
6
12
43
1
7
2
5
9
13
15
LAO PDR
16
SABAH
Earliest COD
1) P.Malaysia - Singapore (New) Post 2020
2) Thailand - P.Malaysia
• Sadao - Bukit Keteri Existing
• Khlong Ngae - Gurun Existing
• Su Ngai Kolok - Rantau Panjang 2016
• Khlong Ngae – Gurun (2nd Phase, 300MW) 2016
3) Sarawak - P. Malaysia 2025
4) P.Malaysia - Sumatra 2019
5) Batam - Singapore 2020
6) Sarawak - West Kalimantan 2015
7) Philippines - Sabah 2020
8) Sarawak - Sabah – Brunei
• Sarawak –Sabah 2020
• Sabah – Brunei Not Selected
• Sarawak – Brunei 2016
9) Thailand - Lao PDR
• Roi Et 2 - Nam Theun 2 Existing
• Sakon Nakhon 2 – Thakhek – Then Hinboun (Exp.) Existing
• Mae Moh 3 - Nan - Hong Sa 2015
• Udon Thani 3- Nabong (converted to 500KV) 2019
• Ubon Ratchathani 3 – Pakse – Xe Pian Xe Namnoy 2018
• Khon Kaen 4 – Loei 2 – Xayaburi 2019
• Thailand – Lao PDR (New) 2015-2023
10) Lao PDR - Vietnam 2016-2020
11) Thailand - Myanmar 2018-2026
12) Vietnam - Cambodia (New) 2020
13) Lao PDR - Cambodia 2016
14) Thailand - Cambodia (New) Post 2020
15) East Sabah - East Kalimantan Post 2020
16) Singapore – Sumatra Post 2020
I. ASEAN Interconnection Projects(Updated in May 2014)
Priority Projects
Northern
Southern
Eastern
I.1 STATUS OF ASEAN INTERCONNECTION PROJECT UPDATED IN MAY 2014
(MW)
SYSTEM REGION EXISTING ON-GOING FUTURE TOTAL
NORTHERN REGION 2,659 6,062 16,374 - 19,524 25,095 - 28,215
9. Thailand - Lao PDR 2,111 3,352 2,465 7,928 10. Lao PDR-Vietnam 248 2,410 2,658 11.Thailand- Myanmar 11,709 - 14,859 11,709 - 14,86012.Vietnam-Cambodia 170 170 13.Lao PDR - Cambodia 300 300 14.Thailand - Cambodia 100 2,200 2,300
SOUTHERN SYSTEM 450 600 1,800 2,850
1. P. Malaysia - Singapore 450 600 1,050 4. P Malaysia - Sumatra 600 600 5. Batam - Singapore 600 600 16. Singapore - Sumatra 600 600
EASTERN SYSTEM 430 600 1,030
6. Sarawak - W. Kalimantan 230 20307. Philliines - Sabah 500 500 8. Sarawak - Sabah - Brunei 200 100 300 15. E.Sabah - E. Kalimantan
NORTHERN - SOUTHERN SYSTEM 380 100 300 780
2. Thailand - P.Malaysia 380 100 300 780
SOUTHERN - EASTERN SYSTEM 3,200 3,200
3. Sarawak - P. Malaysia 3,200 3,200
GRAND TOTAL 3,489 7,192 22,474 – 25,424 32,925 – 36,075