2014-119.1 Campbell Bridge Open House - Mississippi · PDF fileVoided Slab Girders, Concrete...

12
TOWN OF MISSISSIPPI MILLS CAMPBELL BRIDGE REHABILITATION O O S OPEN HOUSE JUNE 25, 2014 JUNE 25, 2014 STEWART COMMUNITY CENTRE 112 MACFARLANE ST. PAKENHAM, ON K0A 2X0

Transcript of 2014-119.1 Campbell Bridge Open House - Mississippi · PDF fileVoided Slab Girders, Concrete...

Page 1: 2014-119.1 Campbell Bridge Open House - Mississippi · PDF fileVoided Slab Girders, Concrete ... Replace superstructure Rehabilitate su ‐structure Maintain roa way width an ... Steel

TOWN OF MISSISSIPPI MILLSCAMPBELL BRIDGE REHABILITATION

O O SOPEN HOUSEJUNE 25, 2014JUNE 25, 2014

STEWART COMMUNITY CENTRE112 MACFARLANE ST.PAKENHAM, ON K0A 2X0

Page 2: 2014-119.1 Campbell Bridge Open House - Mississippi · PDF fileVoided Slab Girders, Concrete ... Replace superstructure Rehabilitate su ‐structure Maintain roa way width an ... Steel

TOWN OF MISSISSIPPI MILLSCAMPBELL BRIDGE REHABILITATION

Rehabilitation/Replacement Options:

Option 1: Steel Girders, Concrete Deck, Single LaneOption 1:

Option 2:

Steel Girders, Concrete Deck, Single LaneReplace superstructure / Rehabilitate sub‐structure / Maintain roadway width and minor improvement to vertical profile.

Voided Slab Girders, Concrete Overlay, Single Lane

Option 3:

Replace superstructure / Rehabilitate sub‐structure / Maintain roadway width and minor improvement to vertical profile.

Steel Girders, Timber Deck, Single LaneR l / R h bili b / M i i d id h d i

Option 4:

Replace superstructure / Rehabilitate sub‐structure / Maintain roadway width and minor improvement to vertical profile.

Lessard Modular Bridge, Single LaneReplace superstructure / Rehabilitate sub‐structure / Maintain roadway width and minor

Option 5:

Replace superstructure / Rehabilitate sub‐structure / Maintain roadway width and minor improvement to vertical profile.

Steel Girders, Concrete Deck, Two LanesFull bridge replacement / Increase roadway width to two lanes / Minor improvement to g p / y / pvertical profile. 

Page 3: 2014-119.1 Campbell Bridge Open House - Mississippi · PDF fileVoided Slab Girders, Concrete ... Replace superstructure Rehabilitate su ‐structure Maintain roa way width an ... Steel

TOWN OF MISSISSIPPI MILLSCAMPBELL BRIDGE REHABILITATION

Existing Conditions:•The existing steel girders are severely corroded and require replacement•The existing steel girders are severely corroded and require replacement.•The existing concrete deck is in poor condition.•The structure is load restricted and is one lane.•The guiderail requires replacement.•Abutments are in good condition and can be re‐used.

Work Required:•Existing girders, concrete deck and guiderail require replacement.•Road closure is required for all options.

Page 4: 2014-119.1 Campbell Bridge Open House - Mississippi · PDF fileVoided Slab Girders, Concrete ... Replace superstructure Rehabilitate su ‐structure Maintain roa way width an ... Steel

TOWN OF MISSISSIPPI MILLSCAMPBELL BRIDGE REHABILITATION

Option 1:  Replace superstructure, rehabilitate abutments, maintain road width and minor improvement to vertical profile.

Steel Girders, Concrete Deck, Single Lane

and minor improvement to vertical profile.

Cost Estimate: $239,000.00 

Approximate Road Closure: 8 weeks

Key Considerations:•Re‐use existing abutments.

i i i i i l fil

Approximate Road Closure: 8 weeks.

•Minor improvement to existing vertical profile.•Single lane bridge.

Page 5: 2014-119.1 Campbell Bridge Open House - Mississippi · PDF fileVoided Slab Girders, Concrete ... Replace superstructure Rehabilitate su ‐structure Maintain roa way width an ... Steel

TOWN OF MISSISSIPPI MILLSCAMPBELL BRIDGE REHABILITATION

Option 2: Replace superstructure, rehabilitate abutments, maintain road width and minor improvement to vertical profile.

Voided Slab Girders, Concrete Overlay, Single Lane

and minor improvement to vertical profile.

Cost Estimate: $253,000.00 

Approximate Road Closure: 5 weeksApproximate Road Closure: 5 weeks.

Key Considerations:•Re‐use existing abutments.

i i i i i l fil•Minor improvement to existing vertical profile.•Single lane bridge.

Page 6: 2014-119.1 Campbell Bridge Open House - Mississippi · PDF fileVoided Slab Girders, Concrete ... Replace superstructure Rehabilitate su ‐structure Maintain roa way width an ... Steel

TOWN OF MISSISSIPPI MILLSCAMPBELL BRIDGE REHABILITATION

Option 3: Replace superstructure, rehabilitate abutments, maintain road width and minor improvement to vertical profile.

Steel Girders, Timber Deck, Single Lane

and minor improvement to vertical profile.

Cost Estimate: $219,500.00 

Approximate Road Closure: 6 weeksApproximate Road Closure: 6 weeks.

Key Considerations:•Re‐use existing abutments.

i i i i i l fil•Minor improvement to existing vertical profile.•Single lane bridge.•Reduced deck service life.

Page 7: 2014-119.1 Campbell Bridge Open House - Mississippi · PDF fileVoided Slab Girders, Concrete ... Replace superstructure Rehabilitate su ‐structure Maintain roa way width an ... Steel

TOWN OF MISSISSIPPI MILLSCAMPBELL BRIDGE REHABILITATION

Option 4: Replace superstructure, rehabilitate abutments, reduce road width and minor improvement to vertical profile.

Lessard Modular Bridge, Single Lane

and minor improvement to vertical profile.

Cost Estimate: $237,000.00 

Approximate Road Closure: 4 weeksApproximate Road Closure: 4 weeks.

Key Considerations:•Re‐use existing abutments.

i i i i i l fil•Minor improvement to existing vertical profile.•Single lane bridge.•Prefabricated modular bridge.

Page 8: 2014-119.1 Campbell Bridge Open House - Mississippi · PDF fileVoided Slab Girders, Concrete ... Replace superstructure Rehabilitate su ‐structure Maintain roa way width an ... Steel

TOWN OF MISSISSIPPI MILLSCAMPBELL BRIDGE REHABILITATION

Option 5: Replace superstructure and substructure, increase road width and minor improvement to vertical profile.

Steel Girders, Concrete Deck, Two Lanes

minor improvement to vertical profile.

Cost Estimate: $644,000.00 

Approximate Road Closure: 16 weeksApproximate Road Closure: 16 weeks.

Key Considerations:•New substructure.

l b id id h•Two lane bridge width.•Minor improvement to existing vertical profile.•Increased environmental impact.

Page 9: 2014-119.1 Campbell Bridge Open House - Mississippi · PDF fileVoided Slab Girders, Concrete ... Replace superstructure Rehabilitate su ‐structure Maintain roa way width an ... Steel

TOWN OF MISSISSIPPI MILLSCAMPBELL BRIDGE REHABILITATION

Summary of Alternatives:

Existing Option 3

Option 1 Option 4

Option 2Option 5

Page 10: 2014-119.1 Campbell Bridge Open House - Mississippi · PDF fileVoided Slab Girders, Concrete ... Replace superstructure Rehabilitate su ‐structure Maintain roa way width an ... Steel

TOWN OF MISSISSIPPI MILLSCAMPBELL BRIDGE REHABILITATION

Concession 9 North – Vertical Profile:

•Minor improvement to vertical profile.

•Vertical profile improvement applies for all bridge options.

Horizontal scale 1:10 of vertical

Page 11: 2014-119.1 Campbell Bridge Open House - Mississippi · PDF fileVoided Slab Girders, Concrete ... Replace superstructure Rehabilitate su ‐structure Maintain roa way width an ... Steel

TOWN OF MISSISSIPPI MILLSCAMPBELL BRIDGE REHABILITATION

Detour Options:

•All options require road closure during construction.•Detour approximately 5.5km.

Page 12: 2014-119.1 Campbell Bridge Open House - Mississippi · PDF fileVoided Slab Girders, Concrete ... Replace superstructure Rehabilitate su ‐structure Maintain roa way width an ... Steel

TOWN OF MISSISSIPPI MILLSCAMPBELL BRIDGE REHABILITATION

Additional Comments/ Questions:

Requests for additional information, questions and comments can be directed to the Town’s Public Works Department; contact information as follows:follows:

Cory Smith, Roads and Public Works TechnologistTown of Mississippi Mills3131 Old Perth Road, P.O. Box 400Almonte, Ontario K0A 1A0