FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15...
Transcript of FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15...
THE VIRGINIA TRANSPORTATION
Commonwealth Transportation BoardVirginia Department of Transportation
Virginia Department of Rail and Public Transportation
2015 – 2020
REVISED FINAL
FREDERICKSBURG DISTRICT
This Page Is Intentionally Left Blank
182 11/12/2014
FY15 REVISED FINAL
FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT
FY2019 FY2020FY2018FY2017FY2016FY2015Fund Source Name
Funding Allocation Summary (000's)
FREDERICKSBURG DISTRICT
System Totals
Interstate
Bond Proceeds
$0$24,401$25,132$49,920$18,352$0GARVEE Bonds $117,805
CTB Formula
0 0 0 0 1,205 0Bridge - State 1,205
0 0 0 2,291 0 0Paving - Federal 2,291
0 0 0 573 0 0Paving - Soft Match 573
0 0 0 4,117 1,380 0Paving - State 5,498
NHPP
0 0 0 0 1,988 2,261Statewide - Federal 4,249
0 0 0 0 497 565Statewide - Soft Match 1,062
Residue Parcel Revenue
0 0 0 0 0 241State 241
$0$24,401$25,132$56,901$23,422$3,067Total $132,923
Primary
CMAQ
$1,240$80$0$0$507$0MPO - Federal $1,827
310 20 0 0 127 0MPO - State Match 457
0 0 0 35 397 294TERMS - Federal 726
0 0 0 9 99 74TERMS - State Match 181
CTB Formula
8,065 2,474 253 0 500 500Bridge - State 11,791
0 0 0 0 1,303 0High Priority - State 1,303
0 0 0 0 0 24ITS - State 24
0 0 0 1,172 400 1,065Paving - Federal 2,637
0 0 0 293 100 266Paving - Soft Match 659
0 0 0 0 3,852 68Paving - State 3,920
Highway Safety Improvements
0 0 0 0 5,355 2,377Federal 7,732
0 0 0 0 595 264Soft Match 859
NHPP
1,064 318 0 0 0 94Bridge - Federal 1,476
266 79 0 0 0 24Bridge - Soft Match 369
0 0 3,486 522 4,769 753Statewide - Federal 9,531
0 0 872 131 1,192 188Statewide - Soft Match 2,383
Revenue Sharing Funds
0 0 0 0 0 3,508Local Match 3,508
0 0 0 0 0 3,508State Match 3,508
RSTP (STP Regional)
789 239 0 0 322 530MPO - Federal 1,879
197 60 0 0 80 132MPO - State Match 470
STP
1,500 600 0 0 33 1,027Bridge - Federal 3,161
375 150 0 0 8 257Bridge - Soft Match 790
0 0 200 760 2,116 1,751Statewide - Federal 4,827
0 0 50 190 529 438Statewide - Soft Match 1,207
$13,806$4,020$4,860$3,111$22,285$17,143Total $65,225
11/12/2014 183
FY15 REVISED FINAL
FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT
FY2019 FY2020FY2018FY2017FY2016FY2015Fund Source Name
Funding Allocation Summary (000's)
FREDERICKSBURG DISTRICT - cont.
System Totals
SecondaryCMAQ
$0$1,753$945$833$1,326$1,752MPO - Federal $6,610
0 438 236 208 332 438MPO - State Match 1,652
0 0 0 0 1,006 846TERMS - Federal 1,852
0 0 0 0 251 212TERMS - State Match 463
CTB Formula
0 736 662 285 1,193 0Bridge - State 2,877
437 454 422 417 256 47Unpaved - State 2,032
Highway Safety Improvements
0 0 0 0 0 2,025Federal 2,025
0 0 0 0 0 225Soft Match 225
Local Project Contributions
0 0 0 0 0 18,835Local 18,835
NHPP
0 0 1,483 1,229 617 786Bridge - Federal 4,115
0 0 371 307 154 196Bridge - Soft Match 1,029
Revenue Sharing Funds
0 0 0 0 0 12,987Local Match 12,987
0 0 0 0 0 12,987State Match 12,987
RSTP (STP Regional)
0 158 200 322 427 160MPO - Federal 1,268
0 39 50 81 107 40MPO - State Match 317
STP
827 1,050 529 54 1,189 185Bridge - Federal 3,833
207 262 132 13 297 46Bridge - Soft Match 958
507 523 514 315 384 459BROS - Federal 2,701
127 131 128 79 96 115BROS - Soft Match 675
0 0 0 0 472 500Statewide - Federal 972
0 0 0 0 118 125Statewide - Soft Match 243
Telecommunications
1,318 1,318 1,318 1,318 1,318 1,318State 7,908
$3,421$6,864$6,991$5,462$9,545$54,283Total $86,564
Urban
Bond Proceeds
$0$0$12,217$19,000$1,621$0GARVEE Bonds $32,838
CMAQ
300 0 617 560 0 0MPO - Federal 1,477
75 0 154 140 0 0MPO - State Match 369
CTB Formula
3,571 1,500 0 0 0 0Bridge - State 5,071
Local Project Contributions
0 0 0 0 0 993Local 993
Revenue Sharing Funds
0 0 0 0 0 170Local Match 170
0 0 0 0 0 170State Match 170
RSTP (STP Regional)
0 552 742 706 0 222MPO - Federal 2,222
0 138 186 177 0 55MPO - State Match 556
$3,946$2,189$13,917$20,583$1,621$1,611Total $43,867
184 11/12/2014
FY15 REVISED FINAL
FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT
FY2019 FY2020FY2018FY2017FY2016FY2015Fund Source Name
Funding Allocation Summary (000's)
FREDERICKSBURG DISTRICT - cont.
System Totals
TAP
$81$81$81$81$81$81MPO - Federal $487
0 0 0 0 0 1,000Statewide - Federal 1,000
$81$81$81$81$81$1,081Total $1,487
Other
CMAQ
$393$100$371$540$100$122MPO - Federal $1,627
98 25 93 135 25 31MPO - State Match 407
Highway Safety Improvements
2,405 1,683 1,344 1,338 508 270Federal 7,548
267 187 149 149 56 30Soft Match 839
Prescoping Funds
621 608 595 582 569 463State 3,437
Revenue Sharing Funds
0 0 0 0 0 265Local Match 265
0 0 0 0 0 265State Match 265
RSTP (STP Regional)
240 80 86 0 280 92MPO - Federal 778
60 20 22 0 70 23MPO - State Match 195
$4,085$2,703$2,659$2,743$1,607$1,562Total $15,360
Grand Total $25,339$40,258$53,641$88,881$58,561$78,747 $345,427
Enhancement
11/12/2014 185
This Page Is Intentionally Left Blank
186 11/12/2014
FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Interstate
MPO Area
FredericksburgInterstate
PROGRAM/SYSTEM
RTE 95 - RELOCATION OF INTERCHANGE
PROJECT
UPC NO.:
ROUTE:
13558
FO0095
HB2 ADJUSTMENT
Fed Req for Access Appvl on Rte 627 Intchg.REPORT NOTE:
Underway
SCHEDULE
16,898
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEStafford County
FY2016 84,666CN
UnderwayFROM: 0.983 Miles South of ROUTE 630 TO: 0.809 Miles
North of Route 630 (1.7920 MI)
DESCRIPTION: 47,899RW
29983,29984,29985 -1PROJECT LENGTH: 1.7920 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Relocation TO 149,462
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
18,352 0 24,401 25,132 49,920 0 0Bond Proceeds: GARVEE Bonds
0 0 0 0 0 0 1,900Bonus OA: Federal
0 0 0 0 0 0 211Bonus OA: State Match
0 0 0 0 0 0 15,185Interstate: Federal
0 0 0 0 0 0 1,345Interstate: State Match
0 0 0 0 0 0 8,613NHPP: Statewide - Federal
0 0 0 0 0 0 2,153NHPP: Statewide - Soft Match
0 0 0 0 0 241 54Residue Parcel Revenue: State
0 0 0 0 0 0 1,956Soft Match: Federal
0 0 24,401 25,132 49,920 18,352 241 31,416Total
MPO Area
FredericksburgInterstate
PROGRAM/SYSTEM
INTERCHANGE MODIFICATION REPORT (EXIT
126 JACKSON GATEWAY)
PROJECT
UPC NO.:
ROUTE:
90830
NFO0095
PE only. MPO projectREPORT NOTE:
Underway
SCHEDULE
862
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PESpotsylvania County
CNFROM: 0.90 mi North of Exit 126 TO: 1.85 mi South of
Exit 118 (10.5500 MI)
DESCRIPTION: RW
PROJECT LENGTH: 10.5500 MISCOPE OF WORK: Preliminary Engineering TO 862
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 200Local Project Contributions: Local
0 0 0 0 0 0 57Non-Formula: State Match
0 0 0 0 0 0 0Regular: Federal
0 0 0 0 0 0 150Residue Parcel Revenue: State
0 0 0 0 0 0 410RSTP (STP Regional): Federal
0 0 0 0 0 0 45RSTP (STP Regional): State Match
0 0 0 0 0 0 0 862Total
11/12/2014 187
FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Interstate
MPO Area
FredericksburgInterstate
PROGRAM/SYSTEM
I-95 RAPPAHANNOCK RIVER CROSSING
(SOUTHBOUND)
PROJECT
UPC NO.:
ROUTE:
101595
FO0095
HB2 ADJUSTMENT
This UPC will be used for the Southbound portion of project. UPC 105510 is for Northbound with
same limits. PE only.
REPORT NOTE:
Underway
SCHEDULE
9,500
ESTIMATED COST (000's)
JURISDICTION:
Interstate 95STREET NAME:
PEFredericksburg
FY2018 70,500CN
FY2017FROM: Exit 130 TO: 0.66 Miles N. of Exit 133 (3.8000 MI)DESCRIPTION: 20,000RW
PROJECT LENGTH: 3.8000 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 100,000
REQ'D AFTER
2020*FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
1,205 0 0 0 0 0 0CTB Formula: Bridge - State
0 0 0 0 0 0 1,841Interstate: Federal
0 0 0 0 0 0 238Interstate: State Match
1,988 0 0 0 0 2,261 0NHPP: Statewide - Federal
497 0 0 0 0 565 0NHPP: Statewide - Soft Match
0 0 0 0 0 0 137Non-Formula: State Match
0 0 0 0 0 0 596RSTP (STP Regional): Federal
0 0 0 0 0 0 12RSTP (STP Regional): State Match
0 0 0 0 0 0 160Soft Match: Federal
90,500 0 0 0 0 3,690 2,826 2,984Total
MPO Area
FredericksburgInterstate
PROGRAM/SYSTEM
I95 4-LANE & SHOULDER WIDENING FROM
EXIT 143 TO MM136
PROJECT
UPC NO.:
ROUTE:
104924
NFO0095
HB2 ADJUSTMENT
FY2017
SCHEDULE
2,231
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEStafford County
FY2022 127,769CN
FROM: MM143 TO: MM136DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Reconstruction w/ Added Capacity TO 130,000
REQ'D AFTER
2020*FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 0Accounts Receivable: Local 130,000
MPO Area
FredericksburgInterstate
PROGRAM/SYSTEM
I-95 REST AREA ACCESS AND RTE. 3
CONNECTOR ROAD
PROJECT
UPC NO.:
ROUTE:
104928
FO0095
HB2 ADJUSTMENT
FY2016
SCHEDULE
10,800
ESTIMATED COST (000's)
JURISDICTION:
I-95STREET NAME:
PEFredericksburg District-wide
FY2021 104,200CN
FY2019FROM: I-95 TO: Int. of Rte. 3 and Rte. 627 (4.0000 MI)DESCRIPTION: 35,000RW
PROJECT LENGTH: 4.0000 MISCOPE OF WORK: New Construction Roadway TO 150,000
REQ'D AFTER
2020*FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 0Accounts Receivable: Local 150,000
188 11/12/2014
FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Interstate
MPO Area
FredericksburgInterstate
PROGRAM/SYSTEM
I-95 RAPPAHANNOCK RIVER CROSSING -
NORTHBOUND
PROJECT
UPC NO.:
ROUTE:
105510
FO0095
HB2 ADJUSTMENT
FY2015
SCHEDULE
8,500
ESTIMATED COST (000's)
JURISDICTION:
Interstate 95STREET NAME:
PEFredericksburg
FY2020 71,500CN
FY2018FROM: Exit 130 TO: Exit 133DESCRIPTION: 20,000RW
PROJECT LENGTH: _SCOPE OF WORK: Reconstruction w/ Added Capacity TO 100,000
REQ'D AFTER
2020*FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 0Accounts Receivable: Local 100,000
MPO Area
FredericksburgInterstate
PROGRAM/SYSTEM
PM-6A-14 ASPHALT RESURFACING, DISTRICT
WIDE- INTERSTATE
PROJECT
UPC NO.:
ROUTE:
104579
FO9999
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
VariousSTREET NAME:
PEFredericksburg District-wide
Underway 8,361CN
FROM: Various TO: VariousDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Resurfacing TO 8,361
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 2,291 0 0CTB Formula: Paving - Federal
0 0 0 0 573 0 0CTB Formula: Paving - Soft Match
1,380 0 0 0 4,117 0 0CTB Formula: Paving - State
0 0 0 0 0 0 2,864(X) Maintenance Funds: Statewide
-2,864 0 0 0 6,981 1,380 0 2,864Total
11/12/2014 189
FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Primary
MPO Area
NonMPOPrimary
PROGRAM/SYSTEM
ADA COMPLIANCE
PROJECT
UPC NO.:
ROUTE:
106348
NFO
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEFredericksburg District-wide
FY2015 500CN
FROM: various TO: variousDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 500
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 541Bond Proceeds: CPR Bonds -41
MPO Area
FredericksburgPrimary
PROGRAM/SYSTEM
GENERAL R/W EXPENSES, VARIOUS
LOCATIONS DISTRICT WIDE
PROJECT
UPC NO.: 63844
NFOProject Report Req'd
DISTRICT WIDEDESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 272Primary Formula: State
MPO Area
FredericksburgPrimary
PROGRAM/SYSTEM
FREDERICKSBURG PRIMARY DISTRICTWIDE
SIGNALS
PROJECT
UPC NO.: 70646
NFODistrict-wide
VARIOUS ROUTESDESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 38(X) Maintenance Funds: Statewide
0 0 0 0 0 0 406National Highway System Allocations:
Federal
0 0 0 0 0 0 43Preventive Maintenance & Systems
Operations: NHPP - Federal
0 0 0 0 0 0 487Total
MPO Area
NonMPOPrimary
PROGRAM/SYSTEM
TRENCH WIDENING - VARIOUS ROUTES
PROJECT
UPC NO.:
ROUTE:
106535
NFO0000
FY2015
SCHEDULE
200
ESTIMATED COST (000's)
JURISDICTION:
VariousSTREET NAME:
PEFredericksburg District-wide
FY2018 2,900CNFROM: Various locations TO: Various locations (13.7800
MI)
DESCRIPTION: RW
PROJECT LENGTH: 13.7800 MISCOPE OF WORK: Safety TO 3,100
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
2,700 0 0 0 0 0 90Highway Safety Improvements: Federal
300 0 0 0 0 0 0Highway Safety Improvements: Soft Match
0 0 0 0 0 0 10Highway Safety Improvements: State Match
0 0 0 0 0 3,000 0 100Total
190 11/12/2014
FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Primary
MPO Area
FredericksburgPrimary
PROGRAM/SYSTEM
RTE 1 - BRIDGE REPLACEMENT &
APPROACHES OVER AQUIA CREEK
PROJECT
UPC NO.:
ROUTE:
76515
NFO0001
Complete
SCHEDULE
810
ESTIMATED COST (000's)
JURISDICTION:
Jefferson Davis HighwaySTREET NAME:
PEStafford County
Underway 4,377CN
UnderwayFROM: 0.015 Mile South of Aquia Creek TO: 0.024 Mile
North of Aquia Creek (0.0390 MI)
DESCRIPTION: 514RW
28807 93PROJECT LENGTH: 0.0390 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 5,701
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 642Bond Match: State Bond Match
0 0 0 0 0 0 1,916Bridge Replacement: Federal
0 0 0 0 0 0 902Minimum Guarantee: Federal
0 0 0 0 0 94 738NHPP: Bridge - Federal
0 0 0 0 0 24 184NHPP: Bridge - Soft Match
0 0 0 0 0 0 870NHPP: Statewide - Federal
0 0 0 0 0 0 218NHPP: Statewide - Soft Match
0 0 0 0 0 0 40Primary Formula: Federal
0 0 0 0 0 0 10Primary Formula: State Match
0 0 0 0 0 0 62Soft Match: Federal
0 0 0 0 0 0 118 5,583Total
11/12/2014 191
FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Primary
MPO Area
FredericksburgPrimary
PROGRAM/SYSTEM
RTE 1 - INTERSECTION IMPROVEMENT AT RTE
1 & 606
PROJECT
UPC NO.:
ROUTE:
93136
NFO0001
MPO project.REPORT NOTE:
Complete
SCHEDULE
850
ESTIMATED COST (000's)
JURISDICTION:
Jefferson Davis HwySTREET NAME:
PESpotsylvania County
Underway 5,120CN
UnderwayFROM: 0.287 Mile South of Rt 606 (Morris/MuddTavern
Rd) TO: 0.185 Mile North of Rt 606 (Morris/Mudd Tavern
Rd) (0.4720 MI)
DESCRIPTION: 2,172RW
PROJECT LENGTH: 0.4720 MISCOPE OF WORK: Safety TO 8,142
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,444CMAQ: Federal
507 0 0 0 0 0 729CMAQ: MPO - Federal
127 0 0 0 0 0 182CMAQ: MPO - State Match
0 0 0 0 0 0 279CMAQ: State Match
585 0 0 0 0 82 911Highway Safety Improvements: Federal
65 0 0 0 0 9 9Highway Safety Improvements: Soft Match
0 0 0 0 0 0 92Highway Safety Improvements: State Match
0 0 0 0 0 0 583Local Project Contributions: Local
0 0 0 0 0 0 323Minimum Guarantee: Federal
0 0 0 0 0 0 54Non-Formula: State Match
0 0 0 0 0 0 226Primary Formula: Federal
0 0 0 0 0 0 197Primary Formula: State
0 0 0 0 0 0 56Primary Formula: State Match
0 0 0 0 0 0 402RSTP (STP Regional): Federal
322 0 0 0 0 414 0RSTP (STP Regional): MPO - Federal
80 0 0 0 0 103 0RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 46RSTP (STP Regional): State Match
0 0 0 0 0 0 312Safety Funds: Hazard Elimination
0 0 0 0 0 1,686 608 5,847Total
MPO Area
FredericksburgPrimary
PROGRAM/SYSTEM
TURN LANE IMPROVEMENTS AT U.S. 1 AT
POTOMAC CREEK DRIVE
PROJECT
UPC NO.:
ROUTE:
100449
NFO0001
MPO Project. Revised schedule required.REPORT NOTE:
FY2017
SCHEDULE
275
ESTIMATED COST (000's)
JURISDICTION:
Jefferspm Davis HighwaySTREET NAME:
PEStafford County
FY2021 601CN
FY2020FROM: 0.25 miles North of Potomac Creek Drive (SR761)
TO: 0.25 miles south of Potomac Creek Drive (0.5000 MI)
DESCRIPTION: 585RW
PROJECT LENGTH: 0.5000 MISCOPE OF WORK: Safety TO 1,461
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 220 0 0 0 0 0CMAQ: MPO - Federal
0 55 0 0 0 0 0CMAQ: MPO - State Match
1,186 275 0 0 0 0 0 0Total
192 11/12/2014
FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Primary
MPO Area
FredericksburgPrimary
PROGRAM/SYSTEM
STUDY ONLY - WIDENING OF U.S. ROUTE 1
(BRAC RELATED)
PROJECT
UPC NO.:
ROUTE:
100456
NFO0001
MPO Project.REPORT NOTE:
Underway
SCHEDULE
838
ESTIMATED COST (000's)
JURISDICTION:
Jefferson Davis HighwaySTREET NAME:
PEStafford County
CNFROM: U.S. Route 1 intersection with Telegraph Road TO:
Prince William County Line (3.3000 MI)
DESCRIPTION: RW
PROJECT LENGTH: 3.3000 MISCOPE OF WORK: Preliminary Engineering TO 838
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 118Local Project Contributions: Local
0 0 239 0 0 116 221RSTP (STP Regional): MPO - Federal
0 0 60 0 0 29 55RSTP (STP Regional): MPO - State Match
0 0 299 0 0 0 145 394Total
MPO Area
FredericksburgPrimary
PROGRAM/SYSTEM
RTE. 1 OVER POTOMAC CREEK BRIDGE
REPLACEMENT
PROJECT
UPC NO.:
ROUTE:
102936
NFO0001
Revised schedule required.REPORT NOTE:
Underway
SCHEDULE
750
ESTIMATED COST (000's)
JURISDICTION:
Jefferson Davis HighwaySTREET NAME:
PEStafford County
FY2019 4,486CN
FY2016FROM: 0.1 mile North of Potomac Creek TO: 0.1 mile
South of Potomac Creek (0.2000 MI)
DESCRIPTION: 514RW
30214 -1PROJECT LENGTH: 0.2000 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 5,751
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 30Bond Match: State Bond Match
0 0 0 0 0 0 120Bridge Replacement: Federal
0 0 0 0 0 0 149CTB Formula: Bridge - Federal
0 0 0 0 0 0 37CTB Formula: Bridge - Soft Match
0 961 2,474 253 0 0 0CTB Formula: Bridge - State
0 1,064 318 0 0 0 0NHPP: Bridge - Federal
0 266 79 0 0 0 0NHPP: Bridge - Soft Match
0 2,291 2,871 253 0 0 0 336Total
11/12/2014 193
FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Primary
MPO Area
NonMPOPrimary
PROGRAM/SYSTEM
RTE. 1 OVER SOUTH RIVER
PROJECT
UPC NO.:
ROUTE:
102937
NFO0001
Revised schedule required.REPORT NOTE:
FY2018
SCHEDULE
400
ESTIMATED COST (000's)
JURISDICTION:
Jefferson Davis HighwaySTREET NAME:
PECaroline County
FY2022 1,800CN
FY2021FROM: South River TO: South River (0.2000 MI)DESCRIPTION: 400RW
PROJECT LENGTH: 0.2000 MISCOPE OF WORK: Bridge Rehab w/o Added Capacity TO 2,600
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 604 0 0 0 0 0CTB Formula: Bridge - State
0 540 600 0 0 0 0STP: Bridge - Federal
0 135 150 0 0 0 0STP: Bridge - Soft Match
570 1,280 750 0 0 0 0 0Total
MPO Area
FredericksburgPrimary
PROGRAM/SYSTEM
INTERSECTION IMPROVEMENT RTE1AND RTE
630
PROJECT
UPC NO.:
ROUTE:
103085
NFO0001
Revised estimate required.REPORT NOTE:
FY2013
SCHEDULE
630
ESTIMATED COST (000's)
JURISDICTION:
Jefferson Davis HighwaySTREET NAME:
PEStafford County
FY2017 2,500CN
FY2016FROM: 0.076 Mi South of Route 630 (Courthouse Road)
TO: 0.076 Mi North of Route 630 (Courthouse Road)
(0.1520 MI)
DESCRIPTION: 3,200RW
PROJECT LENGTH: 0.1520 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 6,330
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 1,563 1,602Revenue Sharing Funds: Local Match
0 0 0 0 0 1,563 1,602Revenue Sharing Funds: State Match
0 0 0 0 0 0 3,126 3,204Total
MPO Area
FredericksburgPrimary
PROGRAM/SYSTEM
I95 CORR TECH 1, 17 SIGNAL COMM CAM -
PRNC WILL TO HNOVER
PROJECT
UPC NO.:
ROUTE:
105443
NFO0001
Underway
SCHEDULE
540
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEFredericksburg District-wide
CN
FROM: Prince William CL TO: Hanover CL (46.7200 MI)DESCRIPTION: RW
PROJECT LENGTH: 46.7200 MISCOPE OF WORK: Safety TO 540
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 413CTB Formula: ITS - Federal
0 0 0 0 0 0 103CTB Formula: ITS - Soft Match
0 0 0 0 0 24 0CTB Formula: ITS - State
0 0 0 0 0 0 24 516Total
194 11/12/2014
FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Primary
MPO Area
FredericksburgPrimary
PROGRAM/SYSTEM
BRIDGE REPLACEMENT - ROUTE 1 OVER THE
RAPPAHANNOCK RIVER
PROJECT
UPC NO.:
ROUTE:
105533
FO0001
FY2020
SCHEDULE
4,500
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEStafford County
FY2025 43,500CN
FY2023FROM: 0.25 Miles south of exist. Bridge TO: 0.25 Miles
north of exist. Bridge (0.7000 MI)
DESCRIPTION: 2,000RW
PROJECT LENGTH: 0.7000 MISCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 50,000
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 4,500 0 0 0 0 0CTB Formula: Bridge - State 45,500
MPO Area
FredericksburgPrimary
PROGRAM/SYSTEM
INTERSECTION IMPROVEMENT AT RTE 1 &
HICKORY RIDGE RD
PROJECT
UPC NO.:
ROUTE:
105724
NFO0001
Underway
SCHEDULE
400
ESTIMATED COST (000's)
JURISDICTION:
Hickory Ridge RoadSTREET NAME:
PESpotsylvania County
FY2017 2,290CN
FY2016FROM: 0.19 MI South of Int. Rte 632 TO: 0.19 MI North of
Int. Rte 632 (0.3800 MI)
DESCRIPTION: 1,200RW
PROJECT LENGTH: 0.2200 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 3,890
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 1,945 0Revenue Sharing Funds: Local Match
0 0 0 0 0 1,945 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 3,890 0Total
MPO Area
FredericksburgPrimary
PROGRAM/SYSTEM
INTERSECTION IMPROVEMENTS - RTE 1 JEFF
DAVIS HWY & RTE 628
PROJECT
UPC NO.:
ROUTE:
105899
NFO0001
Revised schedule required.REPORT NOTE:
FY2020
SCHEDULE
500
ESTIMATED COST (000's)
JURISDICTION:
Jefferson Davis HighwaySTREET NAME:
PEStafford County
FY2023 1,500CN
FY2022FROM: 0.25 Miles South of Int. Rte 1 & Rte 628 Eskimo
Hill Rd TO: 0.25 Miles North of Int. Rte 1 & Rte 628
Eskimo Hill Rd (0.5000 MI)
DESCRIPTION: 600RW
PROJECT LENGTH: 0.5000 MISCOPE OF WORK: Safety TO 2,600
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 400 0 0 0 0 0CMAQ: MPO - Federal
0 100 0 0 0 0 0CMAQ: MPO - State Match
2,100 500 0 0 0 0 0 0Total
11/12/2014 195
FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Primary
MPO Area
NonMPOPrimary
PROGRAM/SYSTEM
RTE 3 - WIDENING
PROJECT
UPC NO.:
ROUTE:
56939
NFO0003
HB2 ADJUSTMENT
PE OnlyREPORT NOTE:
Underway
SCHEDULE
2,254
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PERichmond County
FY2017 6,963CN
FY2016FROM: 0.16 miles west of Int. Rte. 3 Bypass and Rte. 3
Business TO: Int. of Rte 3 and Rte 203 (2.2500 MI)
DESCRIPTION: 1,089RW
PROJECT LENGTH: 2.2500 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 10,306
REQ'D AFTER
2020*FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,038Primary Formula: Federal
0 0 0 0 0 0 307Primary Formula: State
0 0 0 0 0 0 260Primary Formula: State Match
0 0 0 0 0 519 0STP: Statewide - Federal
0 0 0 0 0 130 0STP: Statewide - Soft Match
8,052 0 0 0 0 0 649 1,605Total
MPO Area
FredericksburgPrimary
PROGRAM/SYSTEM
ARRA RTE 3 ADD THROUGH & RIGHT TURN
LANES EBL & WBL
PROJECT
UPC NO.: 92990
FOARRA09
Project being constructed as Design Build ARRA project original PE on UPC 13564REPORT NOTE:
FROM: ROUTE 1112 (RUTHERFORD DRIVE) TO: 0.086
Mi West of Rte 627 (GORDON ROAD) (1.2960 MI)
DESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 25,215American Recovery and Reinvestment Act:
Flexible
MPO Area
FredericksburgPrimary
PROGRAM/SYSTEM
RTE 3 - COMMUTER PARKING LOT STUDY
PROJECT
UPC NO.:
ROUTE:
104923
NFO0003
MPO project.REPORT NOTE:
FY2019
SCHEDULE
500
ESTIMATED COST (000's)
JURISDICTION:
King's HighwaySTREET NAME:
PEStafford County
CNFROM: Rte 3 & Rte 3-Business Interchange TO: 2 Mi
East of Rte 3 & Rte 3-Business Interchange (2.0000 MI)
DESCRIPTION: RW
PROJECT LENGTH: 2.0000 MISCOPE OF WORK: Other TO 500
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 80 0 0 0 0CMAQ: MPO - Federal
0 0 20 0 0 0 0CMAQ: MPO - State Match
400 0 100 0 0 0 0 0Total
196 11/12/2014
FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Primary
MPO Area
NonMPOPrimary
PROGRAM/SYSTEM
BRIDGE REPL-WBL RTE 3 OVER N END
BRANCH (FED ID 11835)
PROJECT
UPC NO.:
ROUTE:
104925
NFO0003
Revised schedule required.REPORT NOTE:
FY2019
SCHEDULE
600
ESTIMATED COST (000's)
JURISDICTION:
John Clayton MemorialSTREET NAME:
PEMathews County
FY2021 1,686CN
FY2020FROM: North End Branch TO: North End Branch (0.1000
MI)
DESCRIPTION: 250RW
PROJECT LENGTH: 0.1000 MISCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 2,536
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 480 0 0 0 0 0STP: Bridge - Federal
0 120 0 0 0 0 0STP: Bridge - Soft Match
1,936 600 0 0 0 0 0 0Total
MPO Area
NonMPOPrimary
PROGRAM/SYSTEM
BRIDGE REPL- WBL RTE 3 OVER BURKE MILL
STREAM (FED ID 11834)
PROJECT
UPC NO.:
ROUTE:
105240
NFO0003
Revised schedule required.REPORT NOTE:
FY2019
SCHEDULE
600
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEMathews County
FY2021 1,686CN
FY2020FROM: Burke Mill Stream TO: Burke Mill Stream (0.1000
MI)
DESCRIPTION: 250RW
PROJECT LENGTH: 0.1000 MISCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 2,536
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 480 0 0 0 0 0STP: Bridge - Federal
0 120 0 0 0 0 0STP: Bridge - Soft Match
1,936 600 0 0 0 0 0 0Total
MPO Area
FredericksburgPrimary
PROGRAM/SYSTEM
FREDERICKSBURG AREA BYPASS STUDY
PROJECT
UPC NO.:
ROUTE:
105310
NFO0003
Underway
SCHEDULE
200
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEFredericksburg District-wide
CN
FROM: VARIOUS TO: VARIOUSDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Preliminary Engineering TO 200
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 200Primary Formula: State 0
11/12/2014 197
FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Primary
MPO Area
FredericksburgPrimary
PROGRAM/SYSTEM
BRIDGE REPLACE. - ROUTE 3 (BUS.) OVER
THE RAPPAHANNOCK RIVER
PROJECT
UPC NO.:
ROUTE:
105535
NFO0003
Revised schedule required.REPORT NOTE:
FY2020
SCHEDULE
3,000
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEStafford County
FY2025 15,000CN
FY2023FROM: 0.10 Mi. west of Exist Str. TO: 0.10 Mi. west of
Exist Str. (0.3500 MI)
DESCRIPTION: 2,000RW
PROJECT LENGTH: 0.3500 MISCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 20,000
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
500 2,000 0 0 0 500 0CTB Formula: Bridge - State 17,000
MPO Area
NonMPOPrimary
PROGRAM/SYSTEM
ROUTE 14 - IMPROVE DRAINAGE SYSTEM AT
MATHEWS COURTHOUSE
PROJECT
UPC NO.:
ROUTE:
87865
NFO0014
Underway
SCHEDULE
719
ESTIMATED COST (000's)
JURISDICTION:
Buckley Hall RoadSTREET NAME:
PEMathews County
FY2015 2,702CN
UnderwayFROM: Drainage Improvements TO: at Put-In CreekDESCRIPTION: 773RW
30116,30117 -1PROJECT LENGTH: 0.0000 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Safety TO 4,194
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 153Bond Proceeds: CPR Bonds
0 0 0 0 0 0 306Federal STP: Federal
0 0 0 0 0 0 1Primary Formula: Federal
0 0 0 0 0 0 10Primary Formula: Federal/State
0 0 0 0 0 0 1,809Primary Formula: State
0 0 0 0 0 0 0Primary Formula: State Match
0 0 0 0 0 0 76Soft Match: Federal
1,377 0 0 0 0 94 0STP: Statewide - Federal
344 0 0 0 0 24 0STP: Statewide - Soft Match
0 0 0 0 0 1,722 118 2,355Total
198 11/12/2014
FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Primary
MPO Area
FredericksburgPrimary
PROGRAM/SYSTEM
RTE 17 - RECONSTRUCTION
PROJECT
UPC NO.:
ROUTE:
71774
FO0017
Contingent upon participation by County and Developer - State funds - AC for future federal
conversion.
REPORT NOTE:
Complete
SCHEDULE
3,290
ESTIMATED COST (000's)
JURISDICTION:
Warrenton RoadSTREET NAME:
PEStafford County
Underway 30,003CN
UnderwayFROM: 0.009 Mi. South of McLANE Drive TO: 0.196 Mi.
North of Stafford Lakes Parkway (2.0880 MI)
DESCRIPTION: 13,879RW
PROJECT LENGTH: 2.0880 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 47,172
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 595Bond Match: State Bond Match
0 0 0 0 0 0 12,413Bond Proceeds: CPR Bonds
0 0 0 0 0 0 1,095Bonus OA: Federal
0 0 0 0 0 0 1,618Minimum Guarantee: Federal
0 0 0 0 0 0 3,778National Highway System Allocations:
Federal
4,769 0 0 3,486 522 753 6,595NHPP: Statewide - Federal
1,192 0 0 872 131 188 1,649NHPP: Statewide - Soft Match
0 0 0 0 0 0 222Primary Formula: State
0 0 0 0 0 0 179Residue Parcel Revenue: State
0 0 0 0 0 0 245Revenue Sharing Funds: Local Match
0 0 0 0 0 0 245Revenue Sharing Funds: State Match
0 0 0 0 0 0 4,478SAFETEA-LU Earmarks: Federal
0 0 0 0 0 0 116SAFETEA-LU Earmarks: State Bond Match
0 0 0 0 0 0 1,003SAFETEA-LU Earmarks: State Match
0 0 0 0 0 0 1,028Soft Match: Federal
0 0 0 4,358 653 5,962 942 35,258Total
MPO Area
NonMPOPrimary
PROGRAM/SYSTEM
ROUTE 17 - RECONSTRUCTION
PROJECT
UPC NO.:
ROUTE:
86463
NFO0017
Complete
SCHEDULE
1,450
ESTIMATED COST (000's)
JURISDICTION:
Church LaneSTREET NAME:
PEEssex County
Underway 7,900CN
UnderwayFROM: 0.19 Miles North of Marsh Street TO: 0.11 Miles
South of Airport Road (0.1800 MI)
DESCRIPTION: 669RW
29891 -1PROJECT LENGTH: 0.1800 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Reconstruction w/o Added Capacity TO 10,019
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 445Bond Match: State Bond Match
0 0 0 0 0 0 771Federal STP: Federal
0 0 0 0 0 0 1,901Minimum Guarantee: Federal
0 0 0 0 0 0 479National Highway System Allocations:
Federal
0 0 0 0 0 0 120Non-Formula: State Match
0 0 0 0 0 0 890Primary Formula: Federal
0 0 0 0 0 0 3,125Primary Formula: State
0 0 0 0 0 0 122Primary Formula: State Match
0 0 0 0 0 0 223Soft Match: Federal
133 0 0 0 0 468 953STP: Statewide - Federal
33 0 0 0 0 117 238STP: Statewide - Soft Match
0 0 0 0 0 167 585 9,267Total
11/12/2014 199
FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Primary
MPO Area
Hampton RoadsPrimary
PROGRAM/SYSTEM
SIGNAL COORDINATION ALONG ROUTE 17
PROJECT
UPC NO.:
ROUTE:
98806
NFO0017
MPO Project.REPORT NOTE:
Underway
SCHEDULE
364
ESTIMATED COST (000's)
JURISDICTION:
Route 17STREET NAME:
PEGloucester County
FY2017 1,704CN
FY2015FROM: Coleman Bridge TO: Route 17/17B Intersection
(11.3000 MI)
DESCRIPTION: 132RW
PROJECT LENGTH: 11.3000 MISCOPE OF WORK: Safety TO 2,200
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 879($) CMAQ: Federal
0 0 0 0 0 771 285($) CMAQ: MPO - Federal
0 0 0 0 0 193 71($) CMAQ: MPO - State Match
0 0 0 0 0 0 964 1,236Total
MPO Area
Hampton RoadsPrimary
PROGRAM/SYSTEM
ROUTE 17 PEDESTRIAN IMPROVEMENT
PROJECT
UPC NO.:
ROUTE:
100626
NFO0017
MPO project. Revised estimate and schedule required.REPORT NOTE:
Complete
SCHEDULE
236
ESTIMATED COST (000's)
JURISDICTION:
George Washington Memorial HighwaySTREET NAME:
PEGloucester County
Underway 506CN
UnderwayFROM: From Route 17 at Northern Portion of Coleman Br
TO: Farmwood Road/Route 1237 (0.6640 MI)
DESCRIPTION: 10RW
PROJECT LENGTH: 0.6640 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 752
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 43($) CMAQ: Federal
0 0 0 0 437 0 214($) CMAQ: MPO - Federal
0 0 0 0 109 0 53($) CMAQ: MPO - State Match
0 0 0 0 0 0 11($) CMAQ: State Match
0 0 0 0 0 0 306($) RSTP (STP Regional): Federal
0 0 0 0 0 0 76($) RSTP (STP Regional): State Match
-497 0 0 0 547 0 0 703Total
MPO Area
NonMPOPrimary
PROGRAM/SYSTEM
INTERSECTION WITH RTE 17 AND RTE 17
NORTH BUSINESS
PROJECT
UPC NO.:
ROUTE:
103461
NFO0017
Underway
SCHEDULE
150
ESTIMATED COST (000's)
JURISDICTION:
TIDEWATER TRAILSTREET NAME:
PEMiddlesex County
FY2018 900CNFROM: INTERSECTION WITH RTE 17 TO: AND RTE 17
NB (0.1000 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.1000 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 1,050
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 855 90Highway Safety Improvements: Federal
0 0 0 0 0 95 0Highway Safety Improvements: Soft Match
0 0 0 0 0 0 10Highway Safety Improvements: State Match
0 0 0 0 0 0 950 100Total
200 11/12/2014
FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Primary
MPO Area
NonMPOPrimary
PROGRAM/SYSTEM
RIGHT TURN LANE RTE 17 AND RTE 616
PROJECT
UPC NO.:
ROUTE:
103462
NFO0017
REPORT NOTE:
FY2017
SCHEDULE
50
ESTIMATED COST (000's)
JURISDICTION:
TIDEWATER TRAILSTREET NAME:
PEMiddlesex County
FY2018 250CNFROM: INTERSECTION WITH RTE 17 TO: AND RTE 616
TOWN BRIDGE ROAD (0.1000 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.1000 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 300
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 200 40 0 0STP: Statewide - Federal
0 0 0 50 10 0 0STP: Statewide - Soft Match
0 0 0 250 50 0 0 0Total
MPO Area
NonMPOPrimary
PROGRAM/SYSTEM
INT. IMPROVEMENT – GEORGE WASHINGTON
HWY. / TC WALKER ROAD
PROJECT
UPC NO.:
ROUTE:
104163
NFO0017
Complete
SCHEDULE
205
ESTIMATED COST (000's)
JURISDICTION:
George Washington HighwaySTREET NAME:
PEGloucester County
Underway 2,082CN
FY2014FROM: Int. US Rte. 17 and TC Walker Rd. TO: 0.20 Miles
east of Int. US Rte. 17 and TC Walker Rd. (0.2000 MI)
DESCRIPTION: 10RW
PROJECT LENGTH: 0.2000 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 2,297
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 297Local Project Contributions: Local
0 0 0 0 0 0 1,000Revenue Sharing Funds: Local Match
0 0 0 0 0 0 1,000Revenue Sharing Funds: State Match
0 0 0 0 0 0 0 2,297Total
MPO Area
Hampton RoadsPrimary
PROGRAM/SYSTEM
RTE. 17 - INSTALL TRAFFIC SIGNAL
PROJECT
UPC NO.:
ROUTE:
104686
NFO0017
Complete
SCHEDULE
75
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEGloucester County
Underway 300CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 375
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 338Highway Safety Improvements: Federal
0 0 0 0 0 0 38Highway Safety Improvements: Soft Match
0 0 0 0 0 0 0 375Total
11/12/2014 201
FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Primary
MPO Area
FredericksburgPrimary
PROGRAM/SYSTEM
INTERSECTION IMPROVEMENTS - RTE 17
MILLS DR & RTE 609
PROJECT
UPC NO.:
ROUTE:
105893
NFO0017
Revised schedule required.REPORT NOTE:
FY2020
SCHEDULE
675
ESTIMATED COST (000's)
JURISDICTION:
Mills DriveSTREET NAME:
PESpotsylvania County
FY2022 2,350CN
FY2022FROM: 0.25 Miles North of Int. Rte 17 & Rte 609 TO: 0.25
Miles South of Int. Rte 17 & Rte 609 (0.5000 MI)
DESCRIPTION: 100RW
PROJECT LENGTH: 0.5000 MISCOPE OF WORK: Safety TO 3,125
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 620 0 0 0 0 0CMAQ: MPO - Federal
0 155 0 0 0 0 0CMAQ: MPO - State Match
2,350 775 0 0 0 0 0 0Total
MPO Area
NonMPOPrimary
PROGRAM/SYSTEM
RTE. 200 - CONSTRUCT SIDEWALK
PROJECT
UPC NO.:
ROUTE:
104688
NFO0200
Underway
SCHEDULE
50
ESTIMATED COST (000's)
JURISDICTION:
Hayes RoadSTREET NAME:
PELancaster County
FY2016 300CN
FY2015FROM: Begin at MP 1.85 TO: End at MP 1.96 (0.1300 MI)DESCRIPTION: 50RW
PROJECT LENGTH: 0.1300 MISCOPE OF WORK: Safety TO 400
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
270 0 0 0 0 45 45Highway Safety Improvements: Federal
30 0 0 0 0 5 5Highway Safety Improvements: Soft Match
0 0 0 0 0 300 50 50Total
202 11/12/2014
FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Primary
MPO Area
NonMPOPrimary
PROGRAM/SYSTEM
RTE 205 - BRIDGE REPLACEMENT AT MATTOX
CREEK
PROJECT
UPC NO.:
ROUTE:
76266
NFO0205
Complete
SCHEDULE
1,250
ESTIMATED COST (000's)
JURISDICTION:
Ridge RoadSTREET NAME:
PEWestmoreland County
Underway 7,055CN
UnderwayFROM: 0.112 Miles South of Route 638 TO: 0.134 Miles
North of Route 638 (0.2460 MI)
DESCRIPTION: 1,393RW
27819 -2PROJECT LENGTH: 0.2460 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 9,698
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 32Bond Match: State Bond Match
0 0 0 0 0 0 128Bridge Replacement: Federal
0 0 0 0 0 0 281Districtwide: Federal
0 0 0 0 0 0 1,448Federal STP: Federal
0 0 0 0 0 0 2,731Primary Formula: Federal
0 0 0 0 0 0 269Primary Formula: State
0 0 0 0 0 0 683Primary Formula: State Match
0 0 0 0 0 0 362Soft Match: Federal
33 0 0 0 0 1,027 232STP: Bridge - Federal
8 0 0 0 0 257 58STP: Bridge - Soft Match
605 0 0 0 605 0 509STP: Statewide - Federal
151 0 0 0 151 0 127STP: Statewide - Soft Match
0 0 0 0 756 798 1,284 6,860Total
MPO Area
NonMPOPrimary
PROGRAM/SYSTEM
RTE 206 - CONSTRUCT TURN LANES
PROJECT
UPC NO.:
ROUTE:
56951
NFO0206
Complete
SCHEDULE
675
ESTIMATED COST (000's)
JURISDICTION:
Dahlgren RoadSTREET NAME:
PEKing George County
Underway 1,855CN
UnderwayFROM: 0.127 Mi. West Int. Routes 218 & 624 TO: 0.271
Mi. East Int. Routes 218 & 624 (0.3980 MI)
DESCRIPTION: 1,092RW
PROJECT LENGTH: 0.3980 MISCOPE OF WORK: Restoration and Rehabilitation TO 3,622
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 269Bond Match: State Bond Match
0 0 0 0 0 0 1,074Federal STP: Federal
0 0 0 0 0 0 520Primary Formula: Federal
0 0 0 0 0 0 13Primary Formula: State
0 0 0 0 0 0 130Primary Formula: State Match
0 0 0 0 0 669 624STP: Statewide - Federal
0 0 0 0 0 167 156STP: Statewide - Soft Match
0 0 0 0 0 0 837 2,785Total
11/12/2014 203
FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Primary
MPO Area
Hampton RoadsPrimary
PROGRAM/SYSTEM
BICYCLE-PEDESTRIAN IMPROVEMENT TO
ROUTE 216, GUINEA ROAD
PROJECT
UPC NO.:
ROUTE:
100625
NFO0216
Revised schedule required. MPO project.REPORT NOTE:
Underway
SCHEDULE
299
ESTIMATED COST (000's)
JURISDICTION:
Guinea RoadSTREET NAME:
PEGloucester County
FY2017 1,098CN
FY2016FROM: Intersection of Guinea Road (R216) and 17 TO:
Intersection of Guinea Road (R216) Tidemill Road SR641
(1.3900 MI)
DESCRIPTION: 200RW
PROJECT LENGTH: 1.3900 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 1,597
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 146 0 0 239($) CMAQ: MPO - Federal
0 0 0 37 0 0 60($) CMAQ: MPO - State Match
1,115 0 0 183 0 0 0 299Total
MPO Area
FredericksburgPrimary
PROGRAM/SYSTEM
INTERSECTION IMPROVEMENTS (ROUTES 1,
17 AND 218)
PROJECT
UPC NO.:
ROUTE:
57044
NFO0218
Complete
SCHEDULE
2,255
ESTIMATED COST (000's)
JURISDICTION:
Butler RoadSTREET NAME:
PEStafford County
Underway 6,434CN
UnderwayFROM: 0.004 Miles East Int. Rte. 1 & Rte 218 TO: 0.104
Miles East Int. Rte. 1 & Rte 218 (0.1000 MI)
DESCRIPTION: 13,505RW
18075 72PROJECT LENGTH: 0.1000 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Safety TO 22,194
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,575Bond Match: State Bond Match
397 0 0 0 35 294 1,663CMAQ: TERMS - Federal
99 0 0 0 9 74 416CMAQ: TERMS - State Match
0 0 0 0 0 0 3,934CMAQ TERMS: Federal
0 0 0 0 0 0 983CMAQ TERMS: State Match
1,303 0 0 0 0 0 0CTB Formula: High Priority - State
0 0 0 0 0 0 5,926Federal STP: Federal
0 0 0 0 0 0 374Minimum Guarantee: Federal
0 0 0 0 0 0 1,369Primary Formula: Federal
0 0 0 0 0 0 200Primary Formula: State
0 0 0 0 0 0 342Primary Formula: State Match
0 0 0 0 0 0 39Priority Transportation Funds: State
0 0 0 0 115 0 2,415STP: Statewide - Federal
0 0 0 0 29 0 604STP: Statewide - Soft Match
0 0 0 0 187 1,799 368 19,840Total
204 11/12/2014
FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Primary
MPO Area
FredericksburgPrimary
PROGRAM/SYSTEM
RTE 218 - BUTLER ROAD WIDENING (2 TO 4
LANES)
PROJECT
UPC NO.:
ROUTE:
105911
NFO0218
Revised schedule required.REPORT NOTE:
FY2020
SCHEDULE
2,750
ESTIMATED COST (000's)
JURISDICTION:
Butler RoadSTREET NAME:
PEStafford County
FY2024 14,250CN
FY2022FROM: 0.104 East Int. Rte 1 & Rte 218 TO: Int. Rte 218 &
Chatham heights Road (1.0000 MI)
DESCRIPTION: 9,220RW
PROJECT LENGTH: 1.0000 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 26,220
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 789 0 0 0 0 0RSTP (STP Regional): MPO - Federal
0 197 0 0 0 0 0RSTP (STP Regional): MPO - State Match
25,234 986 0 0 0 0 0 0Total
MPO Area
NonMPOPrimary
PROGRAM/SYSTEM
RTE 360 INTERSECTION IMPROVEMENT WITH
RTE 698 ACADEMIC LANE
PROJECT
UPC NO.:
ROUTE:
103460
NFO0360
PE only. Revised schedule required.REPORT NOTE:
Underway
SCHEDULE
285
ESTIMATED COST (000's)
JURISDICTION:
RTE 360 Northumberland HwySTREET NAME:
PENorthumberland County
FY2016 672CN
FY2015FROM: 0.046 mi East of Intersection of Rte 360 & Rte 698
TO: 0.316 mi East of Intersection of Rte 360 & Rte 698
(0.2700 MI)
DESCRIPTION: 243RW
PROJECT LENGTH: 0.2700 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 1,200
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 129Minimum Guarantee: Federal
0 0 0 0 0 0 32Primary Formula: State
0 0 0 0 0 0 56(S) Secondary Formula: Federal
0 0 0 0 0 0 292(S) Secondary Formula: Federal/State
0 0 0 0 0 0 14(S) Secondary Formula: State Match
0 0 0 0 0 0 5(S) Telecommunications: State
672 0 0 0 0 0 0 528Total
MPO Area
NonMPOPrimary
PROGRAM/SYSTEM
RTE. 360 - PEDESTRIAN IMPROVEMENTS
PROJECT
UPC NO.:
ROUTE:
104689
NFO0360
Underway
SCHEDULE
183
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PERichmond County
FY2016 372CN
FY2015FROM: Rte. 3B TO: Rte. 3BDESCRIPTION: 95RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 650
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
450 0 0 0 0 45 90Highway Safety Improvements: Federal
50 0 0 0 0 5 10Highway Safety Improvements: Soft Match
0 0 0 0 0 500 50 100Total
11/12/2014 205
FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Primary
MPO Area
NonMPOPrimary
PROGRAM/SYSTEM
SS-6A-14 SLURRY SEAL TREATMENT,
DISTRICT WIDE - PRIMARY
PROJECT
UPC NO.:
ROUTE:
104575
NFO9999
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
VariousSTREET NAME:
PEFredericksburg District-wide
Underway 999CN
FROM: Various TO: VariousDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Resurfacing TO 999
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 665 0CTB Formula: Paving - Federal
0 0 0 0 0 166 0CTB Formula: Paving - Soft Match
100 0 0 0 0 68 0CTB Formula: Paving - State
0 0 0 0 0 0 0(X) Maintenance Funds: Statewide
0 0 0 0 0 100 899 0Total
MPO Area
NonMPOPrimary
PROGRAM/SYSTEM
PM-6C-14 ASPHALT RESURFACING, SALUDA
RES. -- PRIMARY
PROJECT
UPC NO.:
ROUTE:
104581
NFO9999
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEMiddlesex County
Underway 6,539CN
FROM: Various Routes TO: Various RoutesDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Resurfacing TO 6,539
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
400 0 0 0 1,172 400 290CTB Formula: Paving - Federal
100 0 0 0 293 100 32CTB Formula: Paving - Soft Match
3,752 0 0 0 0 0 0CTB Formula: Paving - State
0 0 0 0 0 0 0(X) Maintenance Funds: Statewide
0 0 0 0 1,465 4,252 500 323Total
MPO Area
FredericksburgPrimary
PROGRAM/SYSTEM
DISTRICT WIDE - SIGNAL UPGRADES
PROJECT
UPC NO.:
ROUTE:
104690
NFO9999
Underway
SCHEDULE
500
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEFredericksburg District-wide
FY2016 2,500CN
FY2015FROM: Various TO: VariousDESCRIPTION: 500RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 3,500
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
1,350 0 0 0 0 1,350 450Highway Safety Improvements: Federal
150 0 0 0 0 150 50Highway Safety Improvements: Soft Match
0 0 0 0 0 1,500 1,500 500Total
206 11/12/2014
FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Primary
MPO Area
NonMPOPrimary
PROGRAM/SYSTEM
PM-6H-15 ASPHALT RESURFACING, PRIMARY
PROJECT
UPC NO.:
ROUTE:
105486
NFO9999
Underway
SCHEDULE
150
ESTIMATED COST (000's)
JURISDICTION:
VariousSTREET NAME:
PEKing George County
FY2015 3,010CN
FROM: Various TO: VariousDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Resurfacing TO 3,160
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 2,844Highway Safety Improvements: Federal
0 0 0 0 0 0 267Highway Safety Improvements: Soft Match
0 0 0 0 0 0 49Highway Safety Improvements: State Match
0 0 0 0 0 0 0 3,160Total
MPO Area
FredericksburgPrimary
PROGRAM/SYSTEM
DISTRICT WIDE - SIGNAL INSTALLATIONS
PROJECT
UPC NO.:
ROUTE:
105832
NFO9999
NEW PROJECT
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEFredericksburg District-wide
FY2015 500CN
FROM: VARIOUS TO: VARIOUSDESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 500
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 450Highway Safety Improvements: Federal
0 0 0 0 0 0 50Highway Safety Improvements: State Match
0 0 0 0 0 0 0 500Total
11/12/2014 207
FY15 REVISED FINAL
FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICTSecondary
PROJECT PROGRAM/SYSTEM
SecondaryFREDERICKSBURG DISTRICT SSYP
DESCRIPTION:
REQUIRED ALLOCATIONS (000's)
Total available secondary allocations by locality and fund source.
Fund Source NameCounty FY2016 FY2018 FY2019 FY2020FY2017 TotalFY2015
Caroline County
CTB Formula
13 14 13 12 8 1Unpaved - State 61
Telecommunications
85 85 85 85 85 85State 512
87 93 98 98 99 98Caroline County Total 572
Essex County
CTB Formula
32 34 31 31 19 3Unpaved - State 151
Telecommunications
33 33 33 33 33 33State 200
37 52 64 65 67 66Essex County Total 351
Gloucester County
CTB Formula
36 38 35 35 21 4Unpaved - State 169
Telecommunications
109 109 109 109 109 109State 656
113 131 144 145 147 146Gloucester County Total 826
King & Queen County
CTB Formula
69 72 67 66 41 7Unpaved - State 323
Telecommunications
21 21 21 21 21 21State 125
28 62 87 88 93 90King & Queen County Total 448
King George County
CTB Formula
44 46 43 42 26 5Unpaved - State 205
Telecommunications
69 69 69 69 69 69State 414
74 95 111 112 115 113King George County Total 619
King William County
CTB Formula
52 54 51 50 31 6Unpaved - State 244
Telecommunications
48 48 48 48 48 48State 287
53 78 98 98 102 100King William County Total 530
Lancaster County
CTB Formula
2 2 2 2 1 0Unpaved - State 10
Telecommunications
34 34 34 34 34 34State 203
34 35 36 36 36 36Lancaster County Total 213
208 11/12/2014
FY15 REVISED FINAL
FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICTSecondary
PROJECT PROGRAM/SYSTEM
SecondaryFREDERICKSBURG DISTRICT SSYP
DESCRIPTION:
REQUIRED ALLOCATIONS (000's)
Total available secondary allocations by locality and fund source.
Fund Source NameCounty FY2016 FY2018 FY2019 FY2020FY2017 TotalFY2015
Mathews County
CTB Formula
3 3 3 3 2 0Unpaved - State 15
Telecommunications
26 26 26 26 26 26State 159
27 28 30 30 30 30Mathews County Total 174
Middlesex County
CTB Formula
10 11 10 10 6 1Unpaved - State 47
Telecommunications
33 33 33 33 33 33State 196
34 39 42 43 43 43Middlesex County Total 244
Northumberland County
Telecommunications
37 37 37 37 37 37State 221
37 37 37 37 37 37Northumberland County Tota 221
Richmond County
CTB Formula
7 8 7 7 4 1Unpaved - State 35
Telecommunications
27 27 27 27 27 27State 164
28 32 34 34 35 35Richmond County Total 198
Spotsylvania County
CTB Formula
85 88 82 81 50 9Unpaved - State 395
Telecommunications
367 367 367 367 367 367State 2,200
376 416 448 449 455 452Spotsylvania County Total 2,595
Stafford County
CTB Formula
40 42 39 38 23 4Unpaved - State 186
Telecommunications
388 388 388 388 388 388State 2,326
392 411 426 426 429 428Stafford County Total 2,512
Westmoreland County
CTB Formula
41 43 40 39 24 4Unpaved - State 192
Telecommunications
41 41 41 41 41 41State 245
45 65 80 81 84 82Westmoreland County Total 437
Grand Total 1,755 1,772 1,740 1,735 1,574 1,365 9,940
11/12/2014 209
FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE 633 - BRIDGE REPLACEMENT & APPR.
OVER SOUTH RIVER
PROJECT
UPC NO.:
ROUTE:
77327
NFO0633
Complete
SCHEDULE
465
ESTIMATED COST (000's)
JURISDICTION:
Bull Church RoadSTREET NAME:
PECaroline County
Underway 1,409CN
UnderwayFROM: 0.071 Miles South of South River TO: 0.059 Miles
North of South River (0.1300 MI)
DESCRIPTION: 38RW
28822 93PROJECT LENGTH: 0.1300 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 1,912
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 9Bond Match: State Bond Match
0 0 0 0 0 0 37Bridge Replacement: Federal
615 0 0 0 0 0 0CTB Formula: Bridge - State
0 0 0 0 0 0 201Federal STP: Federal
0 0 0 0 0 0 32Priority Transportation Funds: State
0 0 0 0 0 0 143(S) Secondary Formula: Federal
0 0 0 0 0 0 187(S) Secondary Formula: Federal/State
0 0 0 0 0 0 36(S) Secondary Formula: State Match
0 0 0 0 0 0 50Soft Match: Federal
174 0 0 0 0 111 197STP: BROS - Federal
43 0 0 0 0 28 49STP: BROS - Soft Match
0 0 0 0 0 832 139 942Total
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE 644 - BRIDGE REPLACEMENT & APPR
OVER MARACOSSIC CREEK
PROJECT
UPC NO.:
ROUTE:
77329
NFO0644
Complete
SCHEDULE
330
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PECaroline County
Underway 696CN
UnderwayFROM: 0.016 mi. West of Maracossic Creek TO: 0.048
mi. East of Maracossic Creek (0.0640 MI)
DESCRIPTION: 32RW
28823 93PROJECT LENGTH: 0.0640 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 1,058
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 132Bond Match: State Bond Match
0 0 0 0 0 0 693Bridge Replacement: Federal
0 0 0 0 0 0 14Priority Transportation Funds: State
0 0 0 0 0 0 41Soft Match: Federal
0 0 0 0 0 0 141STP: BROS - Federal
0 0 0 0 0 0 35STP: BROS - Soft Match
0 0 0 0 0 0 1STP: Statewide - Federal
0 0 0 0 0 0 0STP: Statewide - Soft Match
0 0 0 0 0 0 0 1,058Total
210 11/12/2014
FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE 654 OVER REEDY CREEK (STR. NO. 6039)
PROJECT
UPC NO.:
ROUTE:
84392
NFO0654
Complete
SCHEDULE
456
ESTIMATED COST (000's)
JURISDICTION:
Sign Board RoadSTREET NAME:
PECaroline County
Underway 738CN
UnderwayFROM: 0.50 Miles North of Rte 744 TO: 1.039 Miles South
of Rte 656 (0.1600 MI)
DESCRIPTION: 34RW
29448 -1PROJECT LENGTH: 0.1600 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 1,227
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 5Bond Match: State Bond Match
0 0 0 0 0 0 304Bonus OA: Federal
0 0 0 0 0 0 76Bonus OA: State Match
0 0 0 0 0 0 65Bridge Replacement: Federal
507 0 0 0 0 0 0CTB Formula: Bridge - State
0 0 0 0 0 0 11Soft Match: Federal
0 0 0 0 0 150 0STP: Bridge - Federal
0 0 0 0 0 38 0STP: Bridge - Soft Match
0 0 0 0 0 145 51STP: BROS - Federal
0 0 0 0 0 36 13STP: BROS - Soft Match
-174 0 0 0 0 507 369 526Total
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE. 743 OVER SOUTH RIVER
PROJECT
UPC NO.:
ROUTE:
106213
NFO0743
FY2020
SCHEDULE
600
ESTIMATED COST (000's)
JURISDICTION:
Clifton RoadSTREET NAME:
PECaroline County
FY2022 1,010CN
FY2021FROM: South River TO: South River (0.0020 MI)DESCRIPTION: 150RW
PROJECT LENGTH: 0.0020 MISCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 1,760
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 137 0 0 0 0 0STP: BROS - Federal
0 34 0 0 0 0 0STP: BROS - Soft Match
1,589 171 0 0 0 0 0 0Total
11/12/2014 211
FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE 659 - RECONSTRUCTION
PROJECT
UPC NO.:
ROUTE:
15257
NFO0659
State Funds - AC for future federal conversion.REPORT NOTE:
Underway
SCHEDULE
335
ESTIMATED COST (000's)
JURISDICTION:
DESHA ROADSTREET NAME:
PEEssex County
FY2015 999CN
UnderwayFROM: 0.108 Miles west of Intersection Route 671 TO:
0.610 Miles east of Intersection Route 671 (0.6350 MI)
DESCRIPTION: 554RW
PROJECT LENGTH: 0.7180 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 1,888
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 29Bond Match: State Bond Match
0 0 0 0 0 0 272(S) Federal Formula STP: Federal
0 0 0 0 0 0 33(S) Federal Formula STP: State Bond Match
0 0 0 0 0 0 115Minimum Guarantee: Federal
0 0 0 0 0 0 201(S) Secondary Formula: Federal/State
0 0 0 0 0 0 178(S) Secondary Formula: State
0 0 0 0 0 0 35(S) Secondary Formula: State Match
152 0 0 0 0 500 0STP: Statewide - Federal
38 0 0 0 0 125 0STP: Statewide - Soft Match
33 0 0 0 33 33 110(S) Telecommunications: State
0 0 0 0 33 224 658 973Total
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE. 691 OVER PISCATAWAY CREEK
PROJECT
UPC NO.:
ROUTE:
102911
NFO0691
Underway
SCHEDULE
400
ESTIMATED COST (000's)
JURISDICTION:
Gordon's Mill RoadSTREET NAME:
PEEssex County
FY2018 700CN
FY2017FROM: Piscataway Creek TO: Piscataway Creek (0.2000
MI)
DESCRIPTION: 200RW
30215 -1PROJECT LENGTH: 0.2000 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 1,300
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
320 0 0 0 0 0 0STP: Statewide - Federal
80 0 0 0 0 0 0STP: Statewide - Soft Match
900 0 0 0 0 400 0 0Total
MPO Area
FredericksburgSecondary
PROGRAM/SYSTEM
RESURFACING - LITTLEPAGE STREET
PROJECT
UPC NO.:
ROUTE:
104166
NFO0000
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
Littlepage StreetSTREET NAME:
PEFredericksburg
Underway 218CN
FROM: Brompton Street TO: Monroe Street (0.3100 MI)DESCRIPTION: RW
PROJECT LENGTH: 0.3100 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 218
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 109Revenue Sharing Funds: Local Match
0 0 0 0 0 0 109Revenue Sharing Funds: State Match
0 0 0 0 0 0 0 218Total
212 11/12/2014
FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RESURFACING - PRINCE EDWARD STREET
PROJECT
UPC NO.:
ROUTE:
104167
NFO0000
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
Rince Edward StreetSTREET NAME:
PEFredericksburg
Underway 590CN
FROM: George Street TO: Canal Street (0.5200 MI)DESCRIPTION: RW
PROJECT LENGTH: 0.5200 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 590
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 295Revenue Sharing Funds: Local Match
0 0 0 0 0 0 295Revenue Sharing Funds: State Match
0 0 0 0 0 0 0 590Total
MPO Area
FredericksburgSecondary
PROGRAM/SYSTEM
MILL / OVERLAY - VARIOUS LOCATIONS
PROJECT
UPC NO.:
ROUTE:
104431
NFO0000
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
Various RoutesSTREET NAME:
PEFredericksburg
Underway 430CNFROM: Various Locations TO: City of Fredericksburg
(2.1900 MI)
DESCRIPTION: RW
PROJECT LENGTH: 2.1900 MISCOPE OF WORK: Resurfacing TO 430
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 215Revenue Sharing Funds: Local Match
0 0 0 0 0 0 215Revenue Sharing Funds: State Match
0 0 0 0 0 0 0 430Total
MPO Area
FredericksburgSecondary
PROGRAM/SYSTEM
RECONSTRUCTION - CENTRAL PARK BLVD.
PROJECT
UPC NO.:
ROUTE:
105727
NFO9999
FY2015
SCHEDULE
100
ESTIMATED COST (000's)
JURISDICTION:
VariousSTREET NAME:
PEFredericksburg
FY2017 1,560CN
FROM: Various TO: Various (0.8500 MI)DESCRIPTION: RW
PROJECT LENGTH: 0.8500 MISCOPE OF WORK: Resurfacing TO 1,660
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 830 0Revenue Sharing Funds: Local Match
0 0 0 0 0 830 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 1,660 0Total
11/12/2014 213
FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
ADA COMPLIANCE
PROJECT
UPC NO.:
ROUTE:
106349
NFO
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEFredericksburg District-wide
FY2015 482CN
FROM: various TO: variousDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 482
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 573Bond Proceeds: CPR Bonds -91
MPO Area
Hampton RoadsSecondary
PROGRAM/SYSTEM
BRIDGE REPLACEMENT RTE. 602 OVER
BURKES MILL STREAM
PROJECT
UPC NO.:
ROUTE:
96681
NFO0602
Underway
SCHEDULE
454
ESTIMATED COST (000's)
JURISDICTION:
Burkes Pond RoadSTREET NAME:
PEGloucester County
FY2015 834CN
UnderwayFROM: 0.079 mile north of Burkes Mill Stream TO: 0.030
mile south of Burkes Mill Stream (0.1090 MI)
DESCRIPTION: 58RW
29427 -1PROJECT LENGTH: 0.1090 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 1,347
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 60Bond Match: State Bond Match
0 0 0 0 0 0 546Bridge Replacement: Federal
0 0 0 0 0 0 23Soft Match: Federal
207 0 0 0 0 0 367STP: BROS - Federal
52 0 0 0 0 0 92STP: BROS - Soft Match
0 0 0 0 0 259 0 1,088Total
MPO Area
Hampton RoadsSecondary
PROGRAM/SYSTEM
RTE 615 - RECONSTRUCTION AND MINOR
WIDENING
PROJECT
UPC NO.:
ROUTE:
7909
NFO0615
Underway
SCHEDULE
419
ESTIMATED COST (000's)
JURISDICTION:
BURLEIGH ROADSTREET NAME:
PEGloucester County
FY2015 1,547CN
UnderwayFROM: 0.42 MI EAST OF ROUTE 616 TO: 0.59 MI EAST
OF ROUTE 616 (0.1700 MI)
DESCRIPTION: 50RW
29666 -1PROJECT LENGTH: 0.1700 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Reconstruction w/o Added Capacity TO 2,016
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 27Bond Match: State Bond Match
0 0 0 0 0 0 462(S) Federal Formula STP: Federal
0 0 0 0 0 0 116(S) Federal Formula STP: State Bond Match
0 0 0 0 0 0 108Minimum Guarantee: Federal
0 0 0 0 0 0 1,021(S) Secondary Formula: Federal/State
0 0 0 0 0 0 283(S) Telecommunications: State
0 0 0 0 0 0 0 2,016Total
214 11/12/2014
FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
Hampton RoadsSecondary
PROGRAM/SYSTEM
BRIDGE REPLACEMENT RTE. 662 OVER FOX
CREEK (FED ID 8552)
PROJECT
UPC NO.:
ROUTE:
98807
NFO0662
.REPORT NOTE:
Underway
SCHEDULE
474
ESTIMATED COST (000's)
JURISDICTION:
Almondsville Rd.STREET NAME:
PEGloucester County
FY2018 1,025CN
FY2014FROM: Fox Creek TO: Fox CreekDESCRIPTION: 139RW
29888 -1PROJECT LENGTH: _ STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Bridge Replacement w/ Added Capacity TO 1,639
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 19Bond Match: State Bond Match
0 0 736 0 0 0 0CTB Formula: Bridge - State
0 0 0 0 0 0 440Minimum Guarantee: Federal
0 0 0 0 0 0 91Soft Match: Federal
3 0 0 0 279 0 0STP: BROS - Federal
1 0 0 0 70 0 0STP: BROS - Soft Match
0 0 736 0 349 4 0 550Total
MPO Area
Hampton RoadsSecondary
PROGRAM/SYSTEM
RT 1216 BICYCLE-PEDESTRIAN
IMPROVEMENT
PROJECT
UPC NO.:
ROUTE:
100624
NFO1216
Revised schedule required. MPO project.REPORT NOTE:
Underway
SCHEDULE
501
ESTIMATED COST (000's)
JURISDICTION:
Hayes RoadSTREET NAME:
PEGloucester County
FY2016 1,058CNFROM: Northern intersection of Hayes Road and 17; also
intersecti TO: Southern intersection of Hayes Road and
17; also intersectio (1.7600 MI)
DESCRIPTION: RW
PROJECT LENGTH: 1.7600 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 1,559
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 847 0 0 400($) CMAQ: MPO - Federal
0 0 0 212 0 0 100($) CMAQ: MPO - State Match
0 0 0 1,059 0 0 0 500Total
11/12/2014 215
FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
NEWTOWN ROAD OVER BEVERLY CREEK (
VA STR 6909)
PROJECT
UPC NO.:
ROUTE:
100828
NFO0721
Underway
SCHEDULE
750
ESTIMATED COST (000's)
JURISDICTION:
Newtown Rd.STREET NAME:
PEKing & Queen County
FY2016 1,787CN
UnderwayFROM: Beverly Creek TO: Beverly Creek (0.1000 MI)DESCRIPTION: 230RW
29886 -1PROJECT LENGTH: 0.1000 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 2,767
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 320Bridge Replacement: Federal
0 0 0 0 0 0 29(S) Secondary Formula: Federal
0 0 0 0 0 0 7(S) Secondary Formula: State Match
0 0 0 0 0 0 80Soft Match: Federal
1,189 0 0 337 54 35 250STP: Bridge - Federal
297 0 0 84 13 9 63STP: Bridge - Soft Match
0 0 0 421 67 1,486 44 749Total
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE 1003 - BRIDGE REPLACEMENT
PROJECT
UPC NO.:
ROUTE:
81502
NFO1003
Revised schedule required.REPORT NOTE:
Underway
SCHEDULE
616
ESTIMATED COST (000's)
JURISDICTION:
Chelsea Rd.STREET NAME:
PEKing William County
FY2017 2,123CN
FY2015FROM: 0.41 MILES NORTH OF ROUTE 1002 TO: 0.54
MILES NORTH OF ROUTE 1002 (0.1260 MI)
DESCRIPTION: 110RW
28824 93PROJECT LENGTH: 0.1260 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 2,848
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 320Bonus OA: Federal
0 0 0 0 0 0 80Bonus OA: State Match
72 0 0 35 285 0 0CTB Formula: Bridge - State
0 370 523 514 36 203 0STP: BROS - Federal
0 92 131 128 9 51 0STP: BROS - Soft Match
0 462 654 677 330 72 253 400Total
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
MERRY POINT FERRY DOCK AND TRAV. INFO.
IMPROVEMENTS
PROJECT
UPC NO.:
ROUTE:
103785
NFO0604
Underway
SCHEDULE
35
ESTIMATED COST (000's)
JURISDICTION:
Merry Point RoadSTREET NAME:
PELancaster County
FY2016 140CNFROM: North end of Merry Point Ferry landing TO: South
end of Merry Point Ferry landing
DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Ferry boats TO 175
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 35Discretionary Grants: State Match
0 0 0 0 0 0 140Ferry Boat Discretionary Funds: Federal
0 0 0 0 0 0 0 175Total
216 11/12/2014
FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
SUNNYBANK FERRY DOCK AND TRAVELER
INFORMATION IMPROVEMENTS
PROJECT
UPC NO.:
ROUTE:
103786
NFO0604
Underway
SCHEDULE
35
ESTIMATED COST (000's)
JURISDICTION:
Merry Point RoadSTREET NAME:
PELancaster County
FY2016 140CNFROM: North end of Merry Point Ferry landing TO: South
end of Merry Point Ferry landing
DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Ferry boats TO 175
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 35Discretionary Grants: State Match
0 0 0 0 0 0 140Ferry Boat Discretionary Funds: Federal
0 0 0 0 0 0 0 175Total
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RESTORE DRAINAGE FACILITIES (OUTFALLS)
PROJECT
UPC NO.:
ROUTE:
105731
NFO9999
FY2014
SCHEDULE
15
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEMathews County
FY2020 50CNFROM: VARIOUS ROUTES (COUNTYWIDE) TO:
VARIOUS ROUTES (COUNTYWIDE)
DESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Other TO 65
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 25 0Revenue Sharing Funds: Local Match
0 0 0 0 0 25 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 15(S) Telecommunications: State
0 0 0 0 0 0 50 15Total
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE 638 RECONSTRUCT AND IMPROVE
DRAINAGE
PROJECT
UPC NO.:
ROUTE:
103482
NFO0638
Underway
SCHEDULE
265
ESTIMATED COST (000's)
JURISDICTION:
OAK ROW ROADSTREET NAME:
PERichmond County
FY2018 504CN
UnderwayFROM: RTE 638 TO: RTE 638 (0.0160 MI)DESCRIPTION: 76RW
29665 -1PROJECT LENGTH: 0.4000 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Reconstruction w/o Added Capacity TO 846
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 258(S) Federal Formula STP: Federal
0 0 0 0 0 0 65(S) Federal Formula STP: State Bond Match
0 0 0 0 0 0 66Minimum Guarantee: Federal
0 0 0 0 0 0 32(S) Secondary Formula: Federal
0 0 0 0 0 0 285(S) Secondary Formula: Federal/State
0 0 0 0 0 0 23(S) Secondary Formula: State
0 0 0 0 0 0 8(S) Secondary Formula: State Match
0 0 0 0 0 0 108(S) Telecommunications: State
0 0 0 0 0 0 0 846Total
11/12/2014 217
FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
FredericksburgSecondary
PROGRAM/SYSTEM
BRIDGE REPLACEMENT OVER I-95 &
ROADWAY IMPROVEMENTS
PROJECT
UPC NO.:
ROUTE:
100829
NFO0606
Revised Schedule Required.REPORT NOTE:
Underway
SCHEDULE
1,460
ESTIMATED COST (000's)
JURISDICTION:
Mudd Tavern Rd.STREET NAME:
PESpotsylvania County
FY2019 6,413CN
FROM: over Rte. 95 TO: over Rte. 95 (0.3000 MI)DESCRIPTION: RW
29885 -1PROJECT LENGTH: 0.3000 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 7,874
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 483Bridge Replacement: Federal
0 0 0 627 0 0 0CTB Formula: Bridge - State
617 0 0 1,483 1,229 786 200NHPP: Bridge - Federal
154 0 0 371 307 196 50NHPP: Bridge - Soft Match
0 0 0 0 0 0 459(S) Secondary Formula: Federal
0 0 0 0 0 0 675(S) Secondary Formula: Federal/State
0 0 0 0 0 0 115(S) Secondary Formula: State Match
0 0 0 0 0 0 121Soft Match: Federal
0 0 0 2,481 1,537 772 982 2,102Total
MPO Area
FredericksburgSecondary
PROGRAM/SYSTEM
RTE 606 - RECONSTRUCTION OF MUDD
TAVERN ROAD
PROJECT
UPC NO.:
ROUTE:
105463
NFO0606
Revised estimate required.REPORT NOTE:
Underway
SCHEDULE
1,250
ESTIMATED COST (000's)
JURISDICTION:
Mudd Tavern RoadSTREET NAME:
PESpotsylvania County
FY2017 6,000CN
FY2015FROM: Bridge over I-95 TO: 0.55 Mi East of Bridge over
I-95 (0.5500 MI)
DESCRIPTION: 2,000RW
PROJECT LENGTH: 0.5500 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 9,250
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 4,450 0Local Project Contributions: Local
0 0 0 0 0 2,000 0Revenue Sharing Funds: Local Match
0 0 0 0 0 2,000 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 800(S) Secondary Formula: Federal/State
0 0 0 0 0 0 8,450 800Total
218 11/12/2014
FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
FredericksburgSecondary
PROGRAM/SYSTEM
RTE. 606 - RECONSTRUCTION OF MUDD
TAVERN ROAD
PROJECT
UPC NO.:
ROUTE:
105464
NFO0606
Revised estimate required.REPORT NOTE:
FY2014
SCHEDULE
1,500
ESTIMATED COST (000's)
JURISDICTION:
Mudd Tavern RoadSTREET NAME:
PESpotsylvania County
FY2018 5,000CN
FY2017FROM: Various TO: Various (0.5100 MI)DESCRIPTION: 6,000RW
PROJECT LENGTH: 0.5100 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 12,500
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 11,900 0Local Project Contributions: Local
0 0 0 0 0 250 0Revenue Sharing Funds: Local Match
0 0 0 0 0 250 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 100(S) Secondary Formula: Federal/State
0 0 0 0 0 0 12,400 100Total
MPO Area
FredericksburgSecondary
PROGRAM/SYSTEM
INTERSECTION IMPROVEMENTS - RTE 620 &
RTE 1
PROJECT
UPC NO.:
ROUTE:
51845
NFO0620
Revised schedule required. Accruing for CN.REPORT NOTE:
Underway
SCHEDULE
2,519
ESTIMATED COST (000's)
JURISDICTION:
HARRISON ROAD EASTSTREET NAME:
PESpotsylvania County
FY2016 9,248CN
UnderwayFROM: 0.010 Mi. W. of Int. Rte. 1 and Rte. 620 TO: 0.232
Mi. W. of Int. Rte 1. and Rte. 620 (0.2220 MI)
DESCRIPTION: 10,244RW
PROJECT LENGTH: 0.2220 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 22,011
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 0CMAQ: Federal
453 0 1,593 945 676 431 0CMAQ: MPO - Federal
113 0 398 236 169 108 0CMAQ: MPO - State Match
0 0 0 0 0 0 0CMAQ: State Match
0 0 0 0 0 0 1,001(S) Federal Formula STP: Federal
0 0 0 0 0 0 250(S) Federal Formula STP: State Bond Match
0 0 0 0 0 1,800 0Highway Safety Improvements: Federal
0 0 0 0 0 200 0Highway Safety Improvements: Soft Match
0 0 0 0 0 0 3,073Revenue Sharing Funds: Local Match
0 0 0 0 0 0 3,073Revenue Sharing Funds: State Match
427 0 158 200 322 0 0RSTP (STP Regional): MPO - Federal
107 0 39 50 81 0 0RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 826(S) Secondary Formula: Federal/State
367 0 89 326 326 254 1,077(S) Telecommunications: State
2,842 0 2,278 1,758 1,574 1,468 2,792 9,299Total
11/12/2014 219
FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
FredericksburgSecondary
PROGRAM/SYSTEM
INSTALL TRAFFIC SIGNAL RTE. 620 & 1284 -
SPOTSYLVANIA
PROJECT
UPC NO.:
ROUTE:
100600
NFO0620
Complete
SCHEDULE
51
ESTIMATED COST (000's)
JURISDICTION:
Harrison Road (Route 620)STREET NAME:
PESpotsylvania County
Underway 377CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 428
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 110Accounts Receivable: Local
0 0 0 0 0 0 297Highway Safety Improvements: Federal
0 0 0 0 0 0 33Highway Safety Improvements: State Match
-12 0 0 0 0 0 0 440Total
MPO Area
FredericksburgSecondary
PROGRAM/SYSTEM
RTE. 620 - SIGNAL AND MEDIAN
MODIFICATION
PROJECT
UPC NO.:
ROUTE:
104687
NFO0620
Underway
SCHEDULE
80
ESTIMATED COST (000's)
JURISDICTION:
Harrison RoadSTREET NAME:
PESpotsylvania County
FY2015 289CNFROM: 0.12 MI South of Int of Rte 639 & Rte 620 TO: Int
of Rte 639 & Rte 620 (0.1200 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.1200 MISCOPE OF WORK: Safety TO 369
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 225 107Highway Safety Improvements: Federal
0 0 0 0 0 25 8Highway Safety Improvements: Soft Match
0 0 0 0 0 0 4Highway Safety Improvements: State Match
0 0 0 0 0 0 250 119Total
MPO Area
FredericksburgSecondary
PROGRAM/SYSTEM
EXPANSION OF COMMUTER PARKING LOT AT
GORDON ROAD
PROJECT
UPC NO.:
ROUTE:
100448
NFO0627
Complete
SCHEDULE
1,205
ESTIMATED COST (000's)
JURISDICTION:
Gordon RoadSTREET NAME:
PESpotsylvania County
Underway 4,354CN
UnderwayFROM: Parking Lot at Rte. 627 TO: and Route 3 (0.1940
MI)
DESCRIPTION: 2,348RW
PROJECT LENGTH: 0.1940 MISCOPE OF WORK: Safety TO 7,908
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
52 0 0 0 0 137 0CMAQ: MPO - Federal
13 0 0 0 0 34 0CMAQ: MPO - State Match
1,006 0 0 0 0 846 1,523CMAQ: TERMS - Federal
251 0 0 0 0 212 381CMAQ: TERMS - State Match
0 0 0 0 0 0 320CMAQ TERMS: Federal
0 0 0 0 0 0 80CMAQ TERMS: State Match
0 0 0 0 0 0 2,443STP: Statewide - Federal
0 0 0 0 0 0 611STP: Statewide - Soft Match
0 0 0 0 0 1,322 1,229 5,357Total
220 11/12/2014
FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
FredericksburgSecondary
PROGRAM/SYSTEM
RECONSTRUCTION - JONES POWELL ROAD
PROJECT
UPC NO.:
ROUTE:
105718
NFO0653
FY2015
SCHEDULE
260
ESTIMATED COST (000's)
JURISDICTION:
Jones Powell RoadSTREET NAME:
PESpotsylvania County
FY2017 781CN
FY2016DESCRIPTION: 109RW
PROJECT LENGTH: _SCOPE OF WORK: Reconstruction w/o Added Capacity TO 1,150
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 575 0Revenue Sharing Funds: Local Match
0 0 0 0 0 575 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 1,150 0Total
MPO Area
FredericksburgSecondary
PROGRAM/SYSTEM
RTE 658 - BRIDGE REPLACEMENT
PROJECT
UPC NO.:
ROUTE:
81501
NFO0658
Revised schedule required.REPORT NOTE:
Underway
SCHEDULE
520
ESTIMATED COST (000's)
JURISDICTION:
Mt. Olive Rd.STREET NAME:
PESpotsylvania County
FY2018 1,920CN
FY2018FROM: 0.57 Mi South of Rte 666 TO: 1.62 Mi North of Rte
681 (0.4200 MI)
DESCRIPTION: 146RW
28808 93PROJECT LENGTH: 0.4200 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Bridge Replacement w/ Added Capacity TO 2,586
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 827 1,050 192 0 0 0STP: Bridge - Federal
0 207 262 48 0 0 0STP: Bridge - Soft Match
0 1,033 1,312 240 0 0 0 0Total
MPO Area
FredericksburgSecondary
PROGRAM/SYSTEM
COUNTYWIDE ENGINEERING & SURVEY
PROJECT
UPC NO.: 99962
NFOBudget Item
MINOR SURVEY & PRELIMINARY ENGINEERING FOR BUDGET ITEMS AND INCIDENTAL
TYPE WORK.
REPORT NOTE:
FROM: VARIOUS LOCATIONS IN COUNTY TO:
VARIOUS LOCATIONS IN COUNTY
DESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 46Local Revenue: Local Revenue
0 0 0 0 0 0 4(S) Telecommunications: State
0 0 0 0 0 0 50Total
11/12/2014 221
FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
FredericksburgSecondary
PROGRAM/SYSTEM
INTERSECTION IMPROVEMENTS AT
SPOTSYLVANIA AVENUE & MINE ROAD
PROJECT
UPC NO.:
ROUTE:
105726
NFO9999
FY2015
SCHEDULE
450
ESTIMATED COST (000's)
JURISDICTION:
Spotsylvania AveSTREET NAME:
PESpotsylvania County
FY2017 900CN
FY2016FROM: Int of Soptsylvania Ave & Mine Rd TO: 0.25 MI
South of Int Soptsylvania Ave & Mine Rd (0.2500 MI)
DESCRIPTION: 250RW
PROJECT LENGTH: 0.2500 MISCOPE OF WORK: Other TO 1,600
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 800 0Revenue Sharing Funds: Local Match
0 0 0 0 0 800 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 1,600 0Total
MPO Area
FredericksburgSecondary
PROGRAM/SYSTEM
PM-6E-12 ASPHALT RESURFACING
(FREDERICKSBURG RESIDENCY)
PROJECT
UPC NO.:
ROUTE:
99437
NFO0000
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEStafford County
Underway 6,240CNFROM: Various Locations TO: Within Fredericksburg
Residency
DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Resurfacing TO 6,240
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 5,548Demonstration Funds: Federal
0 0 0 0 0 0 692(X) Maintenance Funds: Statewide
0 0 0 0 0 0 0 6,240Total
MPO Area
FredericksburgSecondary
PROGRAM/SYSTEM
FERRY ROAD- WIDENING AND RE-STRIPING
PROJECT
UPC NO.:
ROUTE:
103084
NFO0606
Revised estimate required.REPORT NOTE:
Underway
SCHEDULE
200
ESTIMATED COST (000's)
JURISDICTION:
Ferry RoadSTREET NAME:
PEStafford County
FY2016 700CN
FY2015FROM: kings Highway (Route 3) TO: Mount Vernon Ave.
(0.1000 MI)
DESCRIPTION: 150RW
PROJECT LENGTH: 0.1000 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 1,050
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 850Local Project Contributions: Local
0 0 0 0 0 462 100Revenue Sharing Funds: Local Match
0 0 0 0 0 462 100Revenue Sharing Funds: State Match
-924 0 0 0 0 0 924 1,050Total
222 11/12/2014
FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
FredericksburgSecondary
PROGRAM/SYSTEM
LEASE COMMUTER PARKING SPACES
PROJECT
UPC NO.:
ROUTE:
87764
NFO0610
Administered by MPOREPORT NOTE:
Underway
SCHEDULE
455
ESTIMATED COST (000's)
JURISDICTION:
Garrisonville RoadSTREET NAME:
PEStafford County
CN
FROM: Route 1 TO: Route 643DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Transit TO 455
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 120CMAQ: Federal
13 0 160 0 36 35 0CMAQ: MPO - Federal
3 0 40 0 9 9 0CMAQ: MPO - State Match
0 0 0 0 0 0 30CMAQ: State Match
0 0 200 0 45 16 44 150Total
MPO Area
FredericksburgSecondary
PROGRAM/SYSTEM
610 - LEFT TURN LANES TO AND FROM
ONVILLE ROAD
PROJECT
UPC NO.:
ROUTE:
93225
NFO0610
Complete
SCHEDULE
1,276
ESTIMATED COST (000's)
JURISDICTION:
Garrisonville RoadSTREET NAME:
PEStafford County
Underway 3,481CN
UnderwayFROM: 0.219 Miles West of Route 641 (Onville Road) TO:
0.091 Miles East of Route 641 (Onville Road) (0.3110 MI)
DESCRIPTION: 8,649RW
PROJECT LENGTH: 0.3110 MISCOPE OF WORK: Safety TO 13,406
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 2,179CMAQ: Federal
809 0 0 0 122 854 3,148CMAQ: MPO - Federal
202 0 0 0 30 214 787CMAQ: MPO - State Match
0 0 0 0 0 0 545CMAQ: State Match
0 0 0 0 0 0 989Public Lands Highway Discretionary Funds:
Federal
0 0 0 0 0 0 899RSTP (STP Regional): Federal
0 0 0 0 0 160 1,775RSTP (STP Regional): MPO - Federal
0 0 0 0 0 40 444RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 225RSTP (STP Regional): State Match
-16 0 0 0 152 1,011 1,268 10,991Total
11/12/2014 223
FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
FredericksburgSecondary
PROGRAM/SYSTEM
RTE 610 - GARRISONVILLE ROAD - WIDEN TO
6 LANES - PHASE 2
PROJECT
UPC NO.:
ROUTE:
98847
NFO0610
Revised estimate required.REPORT NOTE:
Underway
SCHEDULE
1,000
ESTIMATED COST (000's)
JURISDICTION:
GARRISONVILLE ROADSTREET NAME:
PEStafford County
FY2014 10,300CN
FY2013FROM: ONVILLE ROAD RTE641 TO: EUSTACE ROAD
RTE 751 (0.6500 MI)
DESCRIPTION: 2,500RW
PROJECT LENGTH: 0.6500 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 13,800
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 6,900Revenue Sharing Funds: Local Match
0 0 0 0 0 0 6,900Revenue Sharing Funds: State Match
0 0 0 0 0 0 0 13,800Total
MPO Area
FredericksburgSecondary
PROGRAM/SYSTEM
RTE 616 - POPLAR ROAD INTERSECTION
IMPROVEMENT
PROJECT
UPC NO.:
ROUTE:
100622
NFO0616
LOCALLY ADMINISTERED; $1,445,000 in state secondary funds; $100,000 in Local funds paid
to VDOT via separate project; $250,000 in Local (No Post) Contributions
REPORT NOTE:
Underway
SCHEDULE
200
ESTIMATED COST (000's)
JURISDICTION:
POPLAR ROADSTREET NAME:
PEStafford County
FY2015 1,471CN
FY2013FROM: RTE 616 Intersection with TO: RTE 627 Mountain
View Road (0.2500 MI)
DESCRIPTION: 124RW
PROJECT LENGTH: 0.2500 MISCOPE OF WORK: Safety TO 1,795
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 2Accounts Receivable: Local
0 0 0 0 0 0 250Local Project Contributions: Local
0 0 0 0 0 0 98Project Contributions: Various Sources
338 0 0 0 44 161 903(S) Telecommunications: State
0 0 0 0 44 338 161 1,253Total
224 11/12/2014
FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
FredericksburgSecondary
PROGRAM/SYSTEM
RTE 630 - WIDEN TO 4 LANES
PROJECT
UPC NO.:
ROUTE:
4632
NFO0630
State Funds - AC for Future Federal Conversion. Revised Estimate and Schedule Required.REPORT NOTE:
Underway
SCHEDULE
2,375
ESTIMATED COST (000's)
JURISDICTION:
COURTHOUSE ROADSTREET NAME:
PEStafford County
FY2016 20,578CN
UnderwayFROM: 0.10 MILES WEST OF ROUTE 628 TO: 0.22
MILE WEST OF ROUTE 732 (1.7300 MI)
DESCRIPTION: 7,018RW
PROJECT LENGTH: 1.7300 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 29,971
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 353(S) Federal Formula STP: Federal
0 0 0 0 0 0 88(S) Federal Formula STP: State Bond Match
0 0 0 0 0 6,475 6,090Revenue Sharing Funds: Local Match
0 0 0 0 0 6,475 6,090Revenue Sharing Funds: State Match
0 0 0 0 0 0 16(S) Secondary Formula: Federal
0 0 0 0 0 0 1,209(S) Secondary Formula: Federal/State
0 0 0 0 0 0 4(S) Secondary Formula: State Match
0 0 388 367 294 0 361(S) Telecommunications: State
1,761 0 388 367 294 0 12,950 14,211Total
MPO Area
FredericksburgSecondary
PROGRAM/SYSTEM
ROUTE 652- RECONSTRUCTION
PROJECT
UPC NO.:
ROUTE:
102916
NFO0652
Underway
SCHEDULE
500
ESTIMATED COST (000's)
JURISDICTION:
Truslow RoadSTREET NAME:
PEStafford County
FY2014 4,367CN
FY2013FROM: Berea Church Road TO: Plantation Drive (0.9000
MI)
DESCRIPTION: 1,400RW
PROJECT LENGTH: 0.9000 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 6,267
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 3,134Revenue Sharing Funds: Local Match
0 0 0 0 0 0 3,134Revenue Sharing Funds: State Match
0 0 0 0 0 0 0 6,267Total
11/12/2014 225
FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
FredericksburgSecondary
PROGRAM/SYSTEM
STAFFORDBORO BOULEVARD COMMUTER
PARKING LOT EXPANSION
PROJECT
UPC NO.:
ROUTE:
97552
NFO0684
Complete
SCHEDULE
1,729
ESTIMATED COST (000's)
JURISDICTION:
Staffordboro BoulevardSTREET NAME:
PEStafford County
Underway 9,235CN
UnderwayFROM: Staffordboro Boulevard TO: Commuter Parking Lot
(0.3260 MI)
DESCRIPTION: 1,965RW
PROJECT LENGTH: 0.3260 MISCOPE OF WORK: Transit TO 12,929
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 90Bond Match: State Bond Match
0 0 0 0 0 0 503Bond Proceeds: CPR Bonds
0 0 0 0 0 0 320CMAQ: Federal
0 0 0 0 0 295 0CMAQ: MPO - Federal
0 0 0 0 0 74 0CMAQ: MPO - State Match
0 0 0 0 0 0 80CMAQ: State Match
0 0 0 0 0 0 800CMAQ: TERMS - Federal
0 0 0 0 0 0 200CMAQ: TERMS - State Match
0 0 0 0 0 0 2,674CMAQ TERMS: Federal
0 0 0 0 0 0 673CMAQ TERMS: State Match
0 0 0 0 0 0 1,320Demonstration Funds: Federal
0 0 0 0 0 827 173(X) Maintenance Funds: Statewide
0 0 0 0 0 0 992Minimum Guarantee: Federal
0 0 0 0 0 0 1,875Revenue Sharing Funds: Local Match
0 0 0 0 0 0 1,875Revenue Sharing Funds: State Match
0 0 0 0 0 0 158(S) Secondary Formula: Federal/State
0 0 0 0 0 0 1,196 11,733Total
MPO Area
FredericksburgSecondary
PROGRAM/SYSTEM
RECONSTRUCTION - BRENT POINT RD.
PROJECT
UPC NO.:
ROUTE:
105721
NFO9999
Revised estimate required.REPORT NOTE:
FY2015
SCHEDULE
200
ESTIMATED COST (000's)
JURISDICTION:
VariousSTREET NAME:
PEStafford County
FY2017 2,000CN
FY2015FROM: Various TO: Various (4.6000 MI)DESCRIPTION: 250RW
PROJECT LENGTH: _SCOPE OF WORK: Resurfacing TO 2,450
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 2,250 0Local Project Contributions: Local
0 0 0 0 0 100 0Revenue Sharing Funds: Local Match
0 0 0 0 0 100 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 2,450 0Total
226 11/12/2014
FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
FredericksburgSecondary
PROGRAM/SYSTEM
RECONSTRUCTION - ENON ROAD
PROJECT
UPC NO.:
ROUTE:
105722
NFO9999
Revised estimate required.REPORT NOTE:
FY2015
SCHEDULE
535
ESTIMATED COST (000's)
JURISDICTION:
VariousSTREET NAME:
PEStafford County
FY2017 2,100CN
FY2016FROM: Various TO: Various (0.6000 MI)DESCRIPTION: 400RW
PROJECT LENGTH: 0.6000 MISCOPE OF WORK: Resurfacing TO 3,035
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 235 0Local Project Contributions: Local
0 0 0 0 0 1,400 0Revenue Sharing Funds: Local Match
0 0 0 0 0 1,400 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 3,035 0Total
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
PAVE UNPAVED ROAD - COPLE DRIVE
PROJECT
UPC NO.:
ROUTE:
104164
NFO0000
Complete
SCHEDULE
20
ESTIMATED COST (000's)
JURISDICTION:
Cople DriveSTREET NAME:
PEWestmoreland County
Underway 50CN
FROM: Int. Rte. 1501 TO: Int. Rte. 1505 (0.1000 MI)DESCRIPTION: RW
PROJECT LENGTH: 0.1000 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 70
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 35Revenue Sharing Funds: Local Match
0 0 0 0 0 0 35Revenue Sharing Funds: State Match
0 0 0 0 0 0 0 70Total
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE 621 - BRIDGE REPLACEMENT
PROJECT
UPC NO.:
ROUTE:
81500
NFO0621
Complete
SCHEDULE
799
ESTIMATED COST (000's)
JURISDICTION:
Prospect Hill RoadSTREET NAME:
PEWestmoreland County
Underway 3,238CN
UnderwayFROM: 0.770 Miles south of Intersection Route 202 TO:
0.959 Miles south of Intersection Route 202 (0.1890 MI)
DESCRIPTION: 581RW
28614 -2PROJECT LENGTH: 0.1890 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 4,619
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 335Bond Match: State Bond Match
0 0 0 0 0 0 2,165Bridge Replacement: Federal
0 0 0 0 0 0 971(S) Federal Formula STP: Federal
0 0 0 0 0 0 186(S) Federal Formula STP: State Bond Match
0 0 0 0 0 0 114Federal STP: Federal
0 0 0 0 0 0 242(S) Secondary Formula: Federal
0 0 0 0 0 0 254(S) Secondary Formula: Federal/State
0 0 0 0 0 0 117(S) Secondary Formula: State Match
0 0 0 0 0 0 235Soft Match: Federal
0 0 0 0 0 0 0 4,619Total
11/12/2014 227
FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
PAVE UNPAVED ROAD-WOODLAND DRIVE
(NORTH)
PROJECT
UPC NO.:
ROUTE:
104165
NFO9999
Complete
SCHEDULE
20
ESTIMATED COST (000's)
JURISDICTION:
Woodland Drive (North)STREET NAME:
PEWestmoreland County
Underway 58CN
FROM: Int. Rte. 1501 TO: Int. Rte. 1505 (0.1100 MI)DESCRIPTION: RW
PROJECT LENGTH: 0.1100 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 78
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 39Revenue Sharing Funds: Local Match
0 0 0 0 0 0 39Revenue Sharing Funds: State Match
0 0 0 0 0 0 0 78Total
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RURAL ADDITION - BAY VIEW DRIVE
PROJECT
UPC NO.:
ROUTE:
105719
NFO9999
Underway
SCHEDULE
20
ESTIMATED COST (000's)
JURISDICTION:
VariousSTREET NAME:
PEWestmoreland County
FY2016 102CN
FROM: Various TO: Various (0.1400 MI)DESCRIPTION: RW
PROJECT LENGTH: 0.1400 MISCOPE OF WORK: Resurfacing TO 122
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 51 10Revenue Sharing Funds: Local Match
0 0 0 0 0 51 10Revenue Sharing Funds: State Match
0 0 0 0 0 0 102 20Total
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RUARAL ADDITION - STRIPER DRIVE
PROJECT
UPC NO.:
ROUTE:
105720
NFO9999
Underway
SCHEDULE
10
ESTIMATED COST (000's)
JURISDICTION:
Striper DriveSTREET NAME:
PEWestmoreland County
FY2015 27CN
FROM: Route 1319 TO: Dead end (0.0500 MI)DESCRIPTION: RW
PROJECT LENGTH: 0.0500 MISCOPE OF WORK: Resurfacing TO 37
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 19 11Revenue Sharing Funds: Local Match
0 0 0 0 0 19 11Revenue Sharing Funds: State Match
-22 0 0 0 0 0 37 22Total
228 11/12/2014
FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Urban
MPO Area
FredericksburgUrban
PROGRAM/SYSTEM
FALL HILL AVE. BRIDGE & APPROACHES
RECONSTRUCTION & WIDENING
PROJECT
UPC NO.:
ROUTE:
88699
FO
Underway
SCHEDULE
5,159
ESTIMATED COST (000's)
JURISDICTION:
Fall Hill AvenueSTREET NAME:
PEFredericksburg
Underway 32,392CN
UnderwayFROM: 0.12 Miles West of Gordon W. Shelton Blvd. TO:
0.03 Miles West of Rappahannock Canal Bridge (2.1900
MI)
DESCRIPTION: 6,850RW
29890 -1PROJECT LENGTH: 2.1900 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Reconstruction w/ Added Capacity TO 44,400
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 40Bond Match: State Bond Match
0 0 0 0 0 0 2,253Bond Proceeds: CPR Bonds
1,621 0 0 12,217 19,000 0 0Bond Proceeds: GARVEE Bonds
0 0 0 0 0 0 160Bridge Replacement: Federal
0 0 0 0 0 0 566Federal Formula STP: Federal
0 0 0 0 0 0 141Federal Formula STP: State Bond Match
0 0 0 0 0 0 4Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 156Non-Formula: State
0 0 0 0 0 0 2,880Revenue Sharing Funds: Local Match
0 0 0 0 0 0 2,880Revenue Sharing Funds: State Match
0 0 0 0 0 0 1,539RSTP (STP Regional): Federal
0 0 0 0 0 0 230RSTP (STP Regional): State Match
0 0 0 0 0 0 10State Formula: Urban - Local Match
0 0 0 0 0 0 90Urban Formula: Federal
0 0 0 0 0 0 374Urban Formula: Federal/State
0 0 0 0 0 0 220Urban Formula: State
0 0 0 0 0 0 20Urban Formula: State Match
0 0 0 12,217 19,000 1,621 0 11,562Total
MPO Area
FredericksburgUrban
PROGRAM/SYSTEM
RTE 1 OVER OLD RAPPAHANNOCK CANAL, VA
STR. 1802
PROJECT
UPC NO.:
ROUTE:
90077
NFO0001
Underway
SCHEDULE
1,073
ESTIMATED COST (000's)
JURISDICTION:
Jefferson Davis BypassSTREET NAME:
PEFredericksburg
FY2018 5,206CN
FY2016FROM: Old Rappahannock Canal TO: Old Rappahannock
Canal
DESCRIPTION: 150RW
29889 -1PROJECT LENGTH: _ STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 6,429
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 120Bond Match: State Bond Match
0 0 0 0 0 0 480Bridge Replacement: Federal
0 3,571 1,500 0 0 0 0CTB Formula: Bridge - State
0 0 0 582 0 0 0RSTP (STP Regional): MPO - Federal
0 0 0 146 0 0 0RSTP (STP Regional): MPO - State Match
30 3,571 1,500 728 0 0 0 600Total
11/12/2014 229
FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Urban
MPO Area
FredericksburgUrban
PROGRAM/SYSTEM
LAFAYETTE BOULEVARD/KENMORE AVENUE
ROUNDABOUT
PROJECT
UPC NO.:
ROUTE:
100439
NFO0001
Revised schedule required.REPORT NOTE:
FY2015
SCHEDULE
375
ESTIMATED COST (000's)
JURISDICTION:
Lafayette BlvdSTREET NAME:
PEFredericksburg
FY2020 872CNFROM: Intersection of Lafayette Blvd and TO: Kenmore
Ave.
DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Reconstruction w/o Added Capacity TO 1,247
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 300 0 0 0 0 0CMAQ: MPO - Federal
0 75 0 0 0 0 0CMAQ: MPO - State Match
872 375 0 0 0 0 0 0Total
MPO Area
FredericksburgUrban
PROGRAM/SYSTEM
REPLACE BRIDGE ON ROUTE 1 OVER HAZEL
RUN
PROJECT
UPC NO.:
ROUTE:
100444
NFO0001
Revised schedule required.REPORT NOTE:
Underway
SCHEDULE
400
ESTIMATED COST (000's)
JURISDICTION:
Jefferson Davis HighwaySTREET NAME:
PEFredericksburg
FY2020 3,086CN
FY2014FROM: 0.03 Mile North of Hazel Run TO: 0.03 Mile South
of Hazel run (0.0600 MI)
DESCRIPTION: 200RW
30101 -1PROJECT LENGTH: 0.0600 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Bridge Rehab w/o Added Capacity TO 3,686
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 116Revenue Sharing Funds: Local Match
0 0 0 0 0 0 116Revenue Sharing Funds: State Match
0 0 0 0 0 0 75RSTP (STP Regional): Federal
0 0 0 0 161 0 0RSTP (STP Regional): MPO - Federal
0 0 0 0 40 0 0RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 19RSTP (STP Regional): State Match
3,159 0 0 0 201 0 0 325Total
MPO Area
FredericksburgUrban
PROGRAM/SYSTEM
ROUTE 1 - SIGNAL OPTIMIZATION
PROJECT
UPC NO.:
ROUTE:
100451
NFO0001
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
Jefferson Davis HighwaySTREET NAME:
PEFredericksburg
FY2017 425CNFROM: Stafford County Line TO: Spotsylvania County Line
(3.3900 MI)
DESCRIPTION: RW
PROJECT LENGTH: 3.3900 MISCOPE OF WORK: Safety TO 425
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 180 160 0 0CMAQ: MPO - Federal
0 0 0 45 40 0 0CMAQ: MPO - State Match
0 0 0 225 200 0 0 0Total
230 11/12/2014
FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Urban
MPO Area
FredericksburgUrban
PROGRAM/SYSTEM
PRINCESS ANNE STREET IMPROVEMENTS -
PHASE 2
PROJECT
UPC NO.:
ROUTE:
100459
NFO0001
MPO Project.REPORT NOTE:
Underway
SCHEDULE
100
ESTIMATED COST (000's)
JURISDICTION:
Princess Anne St.STREET NAME:
PEFredericksburg
FY2019 1,371CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Reconstruction w/o Added Capacity TO 1,471
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 552 0 545 80 0RSTP (STP Regional): MPO - Federal
0 0 138 0 136 20 0RSTP (STP Regional): MPO - State Match
0 0 689 0 681 0 100 0Total
MPO Area
FredericksburgUrban
PROGRAM/SYSTEM
ROUTE 3 SIGNAL OPTIMIZATION
PROJECT
UPC NO.:
ROUTE:
100450
NFO0003
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
William StreetSTREET NAME:
PEFredericksburg
FY2017 1,047CNFROM: Blue Gray Parkway/Plank Road TO: Route 3
business (William Street) (2.8300 MI)
DESCRIPTION: RW
PROJECT LENGTH: 2.8300 MISCOPE OF WORK: Safety TO 1,047
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 437 400 0 0CMAQ: MPO - Federal
0 0 0 109 100 0 0CMAQ: MPO - State Match
0 0 0 547 500 0 0 0Total
MPO Area
FredericksburgUrban
PROGRAM/SYSTEM
FALL HILL AVENUE BRIDGE REPLACEMENT
OVER RAPPAHANNOCK CANAL
PROJECT
UPC NO.:
ROUTE:
91452
NFO0639
Revised schedule requiredREPORT NOTE:
Complete
SCHEDULE
798
ESTIMATED COST (000's)
JURISDICTION:
Fall Hill AvenueSTREET NAME:
PEFredericksburg
Underway 3,254CN
UnderwayFROM: 0.09 Mi. W of the Rappahannock Canal TO: 0.10
Mi. E. of the Rappahannock Canal (0.2130 MI)
DESCRIPTION: 50RW
29299 -1PROJECT LENGTH: 0.2130 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 4,102
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 993 0Local Project Contributions: Local
0 0 0 0 0 0 1,554Revenue Sharing Funds: Local Match
0 0 0 0 0 0 1,554Revenue Sharing Funds: State Match
0 0 0 0 0 0 993 3,109Total
11/12/2014 231
FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Urban
MPO Area
FredericksburgUrban
PROGRAM/SYSTEM
RECONSTRUCTION - AMELIA STREET
PROJECT
UPC NO.:
ROUTE:
105735
NFO9999
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
VariousSTREET NAME:
PEFredericksburg
FY2015 340CN
FROM: Various TO: Various (0.4200 MI)DESCRIPTION: RW
PROJECT LENGTH: 0.4200 MISCOPE OF WORK: Resurfacing TO 340
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 170 0Revenue Sharing Funds: Local Match
0 0 0 0 0 170 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 340 0Total
MPO Area
FredericksburgUrban
PROGRAM/SYSTEM
REGIONAL LAND USE SCENARIO PLANNING
PROJECT
UPC NO.:
ROUTE:
93975
NFO0000
MPO project. Revised estimate and schedule required. Locally administered.REPORT NOTE:
Underway
SCHEDULE
780
ESTIMATED COST (000's)
JURISDICTION:
N/ASTREET NAME:
PEFredericksburg District-wide
CN
FROM: Regional Land Use TO: Scenario PlanningDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Preliminary Engineering TO 780
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 10Non-Formula: State
0 0 0 0 0 0 239RSTP (STP Regional): Federal
0 0 0 160 0 142 83RSTP (STP Regional): MPO - Federal
0 0 0 40 0 35 21RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 50RSTP (STP Regional): State Match
0 0 0 200 0 0 177 403Total
232 11/12/2014
FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Enhancement
MPO Area
FredericksburgEnhancement
PROGRAM/SYSTEM
VIRGINIA CENTRAL RAILWAY TRAIL - PHASE I
PROJECT
UPC NO.: 13785
NFOCTB Reporting Req'd
FROM: BICYCLE/PEDESTRIAN CORRIDOR OF 1.25
MILE SECTION CONNECTING TO: RESIDENTIAL
AREAS TO COMMERCIAL & RECREATIONAL
FACILITIES
DESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 246 0TAP: Statewide - Federal
0 0 0 0 0 0 1,089Transportation Enhancement Funds:
Federal
0 0 0 0 0 62 272(X) Transportation Enhancement Funds:
Local
0 0 0 0 0 308 1,361Total
MPO Area
FredericksburgEnhancement
PROGRAM/SYSTEM
BELMONT/FERRY FARM TRAIL
PROJECT
UPC NO.:
ROUTE:
17570
NFO
Complete
SCHEDULE
540
ESTIMATED COST (000's)
JURISDICTION:
Phase 4STREET NAME:
PEStafford County
Underway 765CN
UnderwayFROM: Pratt Park TO: Chatham BridgeDESCRIPTION: 95RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 1,400
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 542 165TAP: Statewide - Federal
0 0 0 0 0 0 1,266Transportation Enhancement Funds:
Federal
0 0 0 0 0 136 268(X) Transportation Enhancement Funds:
Local
-978 0 0 0 0 0 678 1,699Total
MPO Area
NonMPOEnhancement
PROGRAM/SYSTEM
KING AND QUEEN COUNTY ENHANCEMENTS
PROJECT
UPC NO.:
ROUTE:
52016
NFO
REPORT NOTE:
Complete
SCHEDULE
600
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEKing & Queen County
Underway 1,465CNFROM: NEW GATEWAY SIGNAGE, TOURISM FOCUS
AREAS, PUBLIC ACCESS TO: LANDSCAPINGS,
WATER AND LAND TRAILS
DESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Landscaping/Beautification TO 2,065
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 755Project Contributions: Various Sources
0 0 0 0 0 0 808Transportation Enhancement Funds:
Federal
0 0 0 0 0 0 202(X) Transportation Enhancement Funds:
Local
300 0 0 0 0 0 0 1,765Total
11/12/2014 233
FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Enhancement
MPO Area
NonMPOEnhancement
PROGRAM/SYSTEM
MATHEWS COUNTY - MATHEWS
COURTHOUSE
PROJECT
UPC NO.:
ROUTE:
63560
NFO
$164,843 allocation from #T4971 as per CTB 6/19/08. Revised schedule required.REPORT NOTE:
Underway
SCHEDULE
459
ESTIMATED COST (000's)
JURISDICTION:
Main StreetSTREET NAME:
PEMathews County
FY2012 2,343CN
FY2011PLANNING STUDY OF MATHEWS COURTHOUSE &
HISTORIC COURT GREEN
DESCRIPTION: 1,524RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Rehabilitation of Historic Bldgs/Facilities TO 4,327
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 376TAP: Statewide - Federal
0 0 0 0 0 0 1,427Transportation Enhancement Funds:
Federal
0 0 0 0 0 0 451(X) Transportation Enhancement Funds:
Local
2,073 0 0 0 0 0 0 2,254Total
MPO Area
FredericksburgEnhancement
PROGRAM/SYSTEM
CONST. OF SIDEWALKS, INSTALLATION OF
SIGNAGE & BUS STOPS
PROJECT
UPC NO.:
ROUTE:
91238
NFO
$71,211 transfer from cancelled project UPC 50106 6/2013REPORT NOTE:
Complete
SCHEDULE
572
ESTIMATED COST (000's)
JURISDICTION:
Jefferson Davis Hwy.STREET NAME:
PEStafford County
Underway 2,995CN
FY2012FROM: Rte 1 & Rte 630 Int TO: Rte 687 Hope Rd (0.2400
MI)
DESCRIPTION: 1,438RW
PROJECT LENGTH: 0.2400 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 5,005
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,496Project Contributions: Various Sources
0 0 0 0 0 0 168TAP: MPO - Federal
0 0 0 0 0 0 332TAP: Statewide - Federal
0 0 0 0 0 0 2,307Transportation Enhancement Funds:
Federal
0 0 0 0 0 0 702(X) Transportation Enhancement Funds:
Local
0 0 0 0 0 0 0 5,005Total
234 11/12/2014
FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Enhancement
MPO Area
NonMPOEnhancement
PROGRAM/SYSTEM
NEW POINT COMFORT LIGHTHOUSE
STABILIZATION AND RESTORATION
PROJECT
UPC NO.:
ROUTE:
94279
NFO
Complete
SCHEDULE
10
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEMathews County
Underway 707CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Environmental Only TO 717
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 726TAP: Statewide - Federal
0 0 0 0 0 0 574Transportation Enhancement Funds:
Federal
0 0 0 0 0 0 325(X) Transportation Enhancement Funds:
Local
-907 0 0 0 0 0 0 1,624Total
MPO Area
NonMPOEnhancement
PROGRAM/SYSTEM
RESTORING THE EDGE HILL STATION
PROPERTY
PROJECT
UPC NO.:
ROUTE:
103579
NFO
Underway
SCHEDULE
140
ESTIMATED COST (000's)
JURISDICTION:
Main StreetSTREET NAME:
PEGloucester County
FY2015 341CN
FROM: Main Street TO: Main StreetDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Restoration and Rehabilitation TO 481
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1Project Contributions: Various Sources
0 0 0 0 0 0 384TAP: Statewide - Federal
0 0 0 0 0 0 96(X) Transportation Enhancement Funds:
Local
0 0 0 0 0 0 0 481Total
MPO Area
NonMPOEnhancement
PROGRAM/SYSTEM
MONROE BIRTHPLACE TIMELINE WALK
PROJECT
UPC NO.:
ROUTE:
103582
NFO
Underway
SCHEDULE
40
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEWestmoreland County
FY2015 654CNFROM: James Monroe Birthplace Park TO: James Monroe
Birthplace Park (1.0000 MI)
DESCRIPTION: RW
PROJECT LENGTH: 1.0000 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 694
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 371TAP: Statewide - Federal
0 0 0 0 0 0 184Transportation Enhancement Funds:
Federal
0 0 0 0 0 0 139(X) Transportation Enhancement Funds:
Local
0 0 0 0 0 0 0 694Total
11/12/2014 235
FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Enhancement
MPO Area
NonMPOEnhancement
PROGRAM/SYSTEM
TOWN OF WARSAW SIDEWALKS
PROJECT
UPC NO.:
ROUTE:
105961
NFOEN14
FY2015
SCHEDULE
22
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEWarsaw
FY2018 191CN
FY2017FROM: Main Street 700 ft North of Intersection with Route
360 TO: Intersection of Route 360 and Morgan Lane
DESCRIPTION: 609RW
PROJECT LENGTH: _SCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 822
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 211 0TAP: Statewide - Federal
0 0 0 0 0 53 0(X) Transportation Enhancement Funds:
Local
558 0 0 0 0 0 264 0Total
236 11/12/2014
FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Public Transportation
MPO Area
FredericksburgPublic Transportation
PROGRAM/SYSTEM
FREDERICKSBURG REGIONAL TRANSIT - NEW
BUSES
PROJECT
UPC NO.:
ROUTE:
T6742
NFO0000
MPO project. Revised schedule required.REPORT NOTE:
FY2009
SCHEDULE
420
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEMulti-jurisdictional: Fredericksbug MPO
CN
FROM: New bus Fred service TO: ExpansionDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Transit TO 420
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 336CMAQ: Federal
0 0 0 0 0 0 84CMAQ: State Match
0 0 0 0 0 0 0 420Total
MPO Area
FredericksburgPublic Transportation
PROGRAM/SYSTEM
FREDERICKSBURG TRANSIT OPERATIONAL
ASSISTANCE
PROJECT
UPC NO.:
ROUTE:
T6725
NFO0000
MPO Project; Administered by DRPTREPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEFredericksburg
FY2009 901CN
FROM: Fredericksburg TO: VariousDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Transit TO 901
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 803CMAQ: Federal
0 0 0 0 0 0 98CMAQ: State Match
0 0 0 0 0 0 0 901Total
MPO Area
FredericksburgPublic Transportation
PROGRAM/SYSTEM
REPLACEMENT BUSES FOR FRED TRANSIT
PROJECT
UPC NO.:
ROUTE:
93065
NFO0000
Revised estimate & schedule required.REPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEMulti-jurisdictional: Fredericksbug MPO
FY2017 2,391CN
FROM: Various TO: VariousDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Transit TO 2,391
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 764CMAQ: Federal
0 0 0 0 0 0 191CMAQ: State Match
0 0 0 0 0 0 160RSTP (STP Regional): Federal
0 0 0 0 0 0 40RSTP (STP Regional): State Match
1,236 0 0 0 0 0 0 1,155Total
11/12/2014 237
FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Public Transportation
MPO Area
FredericksburgPublic Transportation
PROGRAM/SYSTEM
VRE COMMUTER RAIL STATION IN
SPOTSYLVANIA
PROJECT
UPC NO.:
ROUTE:
93066
NFO0000
Complete
SCHEDULE
1,859
ESTIMATED COST (000's)
JURISDICTION:
Benchmark RoadSTREET NAME:
PESpotsylvania County
Underway 11,484CN
UnderwayFROM: 0.023 Mi. South of VRE Drive TO: 0.109 Mi. North
of Route 17 (0.5630 MI)
DESCRIPTION: 1,522RW
PROJECT LENGTH: 0.5630 MISCOPE OF WORK: Other TO 14,865
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,622CMAQ: Federal
0 0 0 0 0 0 363CMAQ: MPO - Federal
0 0 0 0 0 0 91CMAQ: MPO - State Match
0 0 0 0 0 0 406CMAQ: State Match
0 0 0 0 0 0 310Local Project Contributions: Local
0 0 0 0 0 0 6,037Revenue Sharing Funds: Local Match
0 0 0 0 0 0 6,037Revenue Sharing Funds: State Match
0 0 0 0 0 0 0 14,865Total
MPO Area
FredericksburgPublic Transportation
PROGRAM/SYSTEM
NEW FRED TRANSIT ROUTES
PROJECT
UPC NO.:
ROUTE:
93067
NFO0000
$42,500 local investment in new transit services requiredREPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEMulti-jurisdictional: Fredericksbug MPO
CN
Five Transit RoutesDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Transit TO 0
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,046CMAQ: Federal
0 0 0 0 0 0 262CMAQ: State Match
-1,308 0 0 0 0 0 0 1,308Total
MPO Area
FredericksburgPublic Transportation
PROGRAM/SYSTEM
FIVE TRANSIT VEHICLES FOR ROUTES IN
FAMPO AREA
PROJECT
UPC NO.:
ROUTE:
93068
NFO0000
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEFredericksburg District-wide
FY2010 0CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Transit TO 0
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 400CMAQ: Federal
0 0 0 0 0 0 100CMAQ: State Match
-500 0 0 0 0 0 0 500Total
238 11/12/2014
FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Miscellaneous
MPO Area
FredericksburgMiscellaneous
PROGRAM/SYSTEM
CONGESTION MANAGEMENT SYSTEM &
PROJECT DEFINITIONS
PROJECT
UPC NO.:
ROUTE:
91856
NFO
Revised schedule and estimate required.REPORT NOTE:
Underway
SCHEDULE
383
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEMulti-jurisdictional: Fredericksbug MPO
CN
FROM: N/A TO: N/ADESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Preliminary Engineering TO 383
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 179Primary Formula: State
0 0 0 0 0 0 0RSTP (STP Regional): Federal
0 0 0 86 0 0 77RSTP (STP Regional): MPO - Federal
0 0 0 22 0 0 19RSTP (STP Regional): MPO - State Match
0 0 0 108 0 0 0 275Total
MPO Area
NonMPOMiscellaneous
PROGRAM/SYSTEM
PROJECT PRESCOPING - FREDERICKSBURG
PROJECT
UPC NO.: 99570
NFOBalance Entry
FROM: Various TO: VariousDESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
569 621 608 595 582 463 1,482Prescoping Funds: State
MPO Area
FredericksburgMiscellaneous
PROGRAM/SYSTEM
PUBLIC INVOLVEMENT ACTIVITIES
PROJECT
UPC NO.:
ROUTE:
102626
NFO
Revised estimate required.REPORT NOTE:
Underway
SCHEDULE
408
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEMulti-jurisdictional: Fredericksbug MPO
CNFROM: City of Fredericksburg TO: Stafford and
Spotsylvania Counties
DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Preliminary Engineering TO 408
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 114RSTP (STP Regional): Federal
40 0 80 0 0 92 0RSTP (STP Regional): MPO - Federal
10 0 20 0 0 23 0RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 29RSTP (STP Regional): State Match
0 0 100 0 0 50 116 143Total
MPO Area
Multiple MPOsMiscellaneous
PROGRAM/SYSTEM
DISTRICTWIDE GUARDRAIL
PROJECT
UPC NO.: 81375
NFODistrict-wide
DESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 20Highway Safety Improvements: Federal
0 0 0 0 0 0 2Highway Safety Improvements: State Match
0 0 0 0 0 0 23Total
11/12/2014 239
FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Miscellaneous
MPO Area
FredericksburgMiscellaneous
PROGRAM/SYSTEM
DISTRICTWIDE ROADWAY SAFETY
ASSESSMENT- F'BURG
PROJECT
UPC NO.: 81378
NFODistrict-wide
DESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
238 0 0 0 0 0 786Highway Safety Improvements: Federal
26 0 0 0 0 0 17Highway Safety Improvements: Soft Match
0 0 0 0 0 0 70Highway Safety Improvements: State Match
0 0 0 0 264 0 874Total
MPO Area
FredericksburgMiscellaneous
PROGRAM/SYSTEM
HSIP DISTRICT-WIDE HIGH RISK RURAL
ROADS FREDERICKSBURG
PROJECT
UPC NO.: 86620
NFODistrict-wide
Fredericksburg High Risk Rural Roads Safety ProjectsDESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,878High Risk Rural: Federal
0 0 0 0 0 0 209High Risk Rural: State Match
0 0 0 0 0 0 2,087Total
MPO Area
FredericksburgMiscellaneous
PROGRAM/SYSTEM
FAMPO CLRP PLANNING ASSISTANCE
PROJECT
UPC NO.:
ROUTE:
90268
NFO0000
MPO projectREPORT NOTE:
Underway
SCHEDULE
1,115
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEMulti-jurisdictional: Fredericksbug MPO
CN
FROM: Area-wide TO: VariousDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Preliminary Engineering TO 1,115
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 411RSTP (STP Regional): Federal
240 240 0 0 0 0 0RSTP (STP Regional): MPO - Federal
60 60 0 0 0 0 0RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 103RSTP (STP Regional): State Match
0 0 0 0 0 0 1RSTP (STP Regional): Statewide
0 300 0 0 0 300 0 515Total
240 11/12/2014
FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Miscellaneous
MPO Area
FredericksburgMiscellaneous
PROGRAM/SYSTEM
VIRGINIA CENTRAL RAILWAY TRAIL,
FREDERICKSBURG
PROJECT
UPC NO.:
ROUTE:
91174
NFO0000
MPO project.REPORT NOTE:
Complete
SCHEDULE
150
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEFredericksburg
Underway 2,069CNFROM: Int. of Lafayette Blvd & Princess Anne St. TO:
0.89 Mi. West of Rte. 1 = (200' W of exist. Idlewild path)
(2.6520 MI)
DESCRIPTION: RW
PROJECT LENGTH: 2.6520 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 2,219
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,437CMAQ: Federal
0 0 0 0 0 0 200CMAQ: MPO - Federal
0 0 0 0 0 0 50CMAQ: MPO - State Match
0 0 0 0 0 0 359CMAQ: State Match
0 0 0 0 0 0 34Local Project Contributions: Local
0 0 0 0 0 0 112RSTP (STP Regional): Federal
0 0 0 0 0 0 28RSTP (STP Regional): State Match
0 0 0 0 0 0 0 2,219Total
MPO Area
NonMPOMiscellaneous
PROGRAM/SYSTEM
WEST POINT - ELEMENTARY AND MIDDLE
SCHOOL - SRTS PROJECT
PROJECT
UPC NO.:
ROUTE:
93135
NFO0000
Complete
SCHEDULE
69
ESTIMATED COST (000's)
JURISDICTION:
Thompson Mattoponi ChelseaSTREET NAME:
PEWest Point
Underway 207CNFROM: In front of school near Thompson and Mattaponi
(Phase 1) TO: to Chelsea and Bagby from Thompson
DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 276
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 28Local Project Contributions: Local
0 0 0 0 0 0 276Safe Routes to School: Federal
-28 0 0 0 0 0 0 305Total
MPO Area
NonMPOMiscellaneous
PROGRAM/SYSTEM
COLONIAL BEACH - SRTS - COLONIAL BEACH
ES - SIDEWALKS ETC.
PROJECT
UPC NO.:
ROUTE:
102825
NFO0000
Revised schedule required.REPORT NOTE:
Underway
SCHEDULE
68
ESTIMATED COST (000's)
JURISDICTION:
Livingstone StreetSTREET NAME:
PEColonial Beach
FY2015 434CN
UnderwayFROM: Wilder Ave. TO: Washington Ave.DESCRIPTION: 63RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 565
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 498Safe Routes to School: Federal 67
11/12/2014 241
FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Miscellaneous
MPO Area
NonMPOMiscellaneous
PROGRAM/SYSTEM
TOWN OF WEST POINT - SRTS - WEST POINT
ES, MS - SIDEWALKS
PROJECT
UPC NO.:
ROUTE:
102826
NFO0000
Revised schedule required.REPORT NOTE:
Underway
SCHEDULE
17
ESTIMATED COST (000's)
JURISDICTION:
Bagby Street (Phase 2)STREET NAME:
PEWest Point
FY2014 126CN
FY2013FROM: Mattaponi Avenue TO: Chelsea RoadDESCRIPTION: 7RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 151
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 29Safe Routes to School: Federal 122
MPO Area
FredericksburgMiscellaneous
PROGRAM/SYSTEM
CITY OF FREDERICKSBURG PARKING
STRUCTURE
PROJECT
UPC NO.:
ROUTE:
102987
NFO0000
FY2018
SCHEDULE
100
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEFredericksburg
CNFROM: City Of Fredericksburg Parking Structure TO: Near
VRE
DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Preliminary Engineering TO 100
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 293 0 271 440 0 0CMAQ: MPO - Federal
0 73 0 68 110 0 0CMAQ: MPO - State Match
-1,155 367 0 338 550 0 0 0Total
MPO Area
FredericksburgMiscellaneous
PROGRAM/SYSTEM
GW RIDE CONNECT / TDM ASSISTANCE
PROJECT
UPC NO.:
ROUTE:
103685
NFO0000
Underway
SCHEDULE
1,165
ESTIMATED COST (000's)
JURISDICTION:
N/ASTREET NAME:
PEMulti-jurisdictional: Fredericksbug MPO
CN
FROM: N/A TO: N/ADESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Transit TO 1,165
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 78CMAQ: Federal
100 100 100 100 100 122 236CMAQ: MPO - Federal
25 25 25 25 25 31 59CMAQ: MPO - State Match
0 0 0 0 0 0 19CMAQ: State Match
-6 125 125 125 125 125 153 393Total
242 11/12/2014
FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Miscellaneous
MPO Area
NonMPOMiscellaneous
PROGRAM/SYSTEM
COMMITTED SAFETY
PROJECTS-FREDERICKSBURG
PROJECT
UPC NO.:
ROUTE:
106556
NFO0000
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEFredericksburg District-wide
N/A 0CNDESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: TO 0
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 2,405 1,683 1,344 1,338 0 0Highway Safety Improvements: Federal
0 267 187 149 149 0 0Highway Safety Improvements: Soft Match
-7,522 2,672 1,870 1,493 1,487 0 0 0Total
MPO Area
FredericksburgMiscellaneous
PROGRAM/SYSTEM
VANPOOL STATISTICS COLLECTION AND
REPORTING
PROJECT
UPC NO.:
ROUTE:
95531
FO0095
MPO projectREPORT NOTE:
FY2013
SCHEDULE
200
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEMulti-jurisdictional: Fredericksbug MPO
CN
FROM: NA TO: NADESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Transit TO 200
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 138CMAQ: Federal
0 0 0 0 0 0 22CMAQ: MPO - Federal
0 0 0 0 0 0 6CMAQ: MPO - State Match
0 0 0 0 0 0 35CMAQ: State Match
0 0 0 0 0 0 0 200Total
MPO Area
FredericksburgMiscellaneous
PROGRAM/SYSTEM
IMPROVEMENTS TO AIRPORT ROAD
(CENTREPORT PARKWAY) & RTE 628
PROJECT
UPC NO.:
ROUTE:
77409
NFO8900
Includes FY05 Federal Omnibus Bill Allocations.REPORT NOTE:
Underway
SCHEDULE
164
ESTIMATED COST (000's)
JURISDICTION:
Centreport ParkwaySTREET NAME:
PEStafford County
FY2015 791CN
UnderwayFROM: Intersection with Route 628 TO: 0.096 miles
south of Route 628 (0.0960 MI)
DESCRIPTION: 595RW
PROJECT LENGTH: 0.0960 MISCOPE OF WORK: New Construction Roadway TO 1,550
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 159Demonstration Funds: Federal
0 0 0 0 0 0 6(S) Residue Parcel Revenue: State
0 0 0 0 0 0 1,024(S) Secondary Formula: Federal/State
0 0 0 0 0 0 4(S) Secondary Formula: State
0 0 0 0 0 0 346(S) Telecommunications: State
10 0 0 0 0 0 0 1,539Total
11/12/2014 243
FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Miscellaneous
MPO Area
FredericksburgMiscellaneous
PROGRAM/SYSTEM
HSIP FREDERICKSBURG DISTRICTWIDE
PROJECT
UPC NO.: T6523
NFODistrict-wide
Various locationsDESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 238Highway Safety Improvements: Federal
0 0 0 0 0 0 26Highway Safety Improvements: State Match
0 0 0 0 0 0 265Total
MPO Area
FredericksburgMiscellaneous
PROGRAM/SYSTEM
DISTRICT WIDE - PE ONLY - SIGNAL
CLEARANCE INTERVAL STUDY
PROJECT
UPC NO.:
ROUTE:
104691
NFO9999
Underway
SCHEDULE
900
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEFredericksburg District-wide
CN
FROM: Various TO: VariousDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 900
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
270 0 0 0 0 270 270Highway Safety Improvements: Federal
30 0 0 0 0 30 30Highway Safety Improvements: Soft Match
0 0 0 0 0 300 300 300Total
MPO Area
FredericksburgMiscellaneous
PROGRAM/SYSTEM
SIGNAL INSTALLATION - INT OF BALLS
BLUFF DR & SPOTSY PARKWAY
PROJECT
UPC NO.:
ROUTE:
105725
NFO9999
FY2015
SCHEDULE
90
ESTIMATED COST (000's)
JURISDICTION:
Balls Bluff DrSTREET NAME:
PESpotsylvania County
FY2017 440CNFROM: Int of Balls Bluff Dr & Spotsylvania Parkway TO:
Int of Balls Bluff Dr & Spotsylvania Parkway
DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Reconstruction w/o Added Capacity TO 530
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 265 0Revenue Sharing Funds: Local Match
0 0 0 0 0 265 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 530 0Total
244 11/12/2014