FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15...

64
THE VIRGINIA TRANSPORTATION Commonwealth Transportation Board Virginia Department of Transportation Virginia Department of Rail and Public Transportation 2015 – 2020 REVISED FINAL FREDERICKSBURG DISTRICT

Transcript of FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15...

Page 1: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

THE VIRGINIA TRANSPORTATION

Commonwealth Transportation BoardVirginia Department of Transportation

Virginia Department of Rail and Public Transportation

2015 – 2020

REVISED FINAL

FREDERICKSBURG DISTRICT

Page 2: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

This Page Is Intentionally Left Blank

182 11/12/2014

Page 3: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FY15 REVISED FINAL

FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT

FY2019 FY2020FY2018FY2017FY2016FY2015Fund Source Name

Funding Allocation Summary (000's)

FREDERICKSBURG DISTRICT

System Totals

Interstate

Bond Proceeds

$0$24,401$25,132$49,920$18,352$0GARVEE Bonds $117,805

CTB Formula

0 0 0 0 1,205 0Bridge - State 1,205

0 0 0 2,291 0 0Paving - Federal 2,291

0 0 0 573 0 0Paving - Soft Match 573

0 0 0 4,117 1,380 0Paving - State 5,498

NHPP

0 0 0 0 1,988 2,261Statewide - Federal 4,249

0 0 0 0 497 565Statewide - Soft Match 1,062

Residue Parcel Revenue

0 0 0 0 0 241State 241

$0$24,401$25,132$56,901$23,422$3,067Total $132,923

Primary

CMAQ

$1,240$80$0$0$507$0MPO - Federal $1,827

310 20 0 0 127 0MPO - State Match 457

0 0 0 35 397 294TERMS - Federal 726

0 0 0 9 99 74TERMS - State Match 181

CTB Formula

8,065 2,474 253 0 500 500Bridge - State 11,791

0 0 0 0 1,303 0High Priority - State 1,303

0 0 0 0 0 24ITS - State 24

0 0 0 1,172 400 1,065Paving - Federal 2,637

0 0 0 293 100 266Paving - Soft Match 659

0 0 0 0 3,852 68Paving - State 3,920

Highway Safety Improvements

0 0 0 0 5,355 2,377Federal 7,732

0 0 0 0 595 264Soft Match 859

NHPP

1,064 318 0 0 0 94Bridge - Federal 1,476

266 79 0 0 0 24Bridge - Soft Match 369

0 0 3,486 522 4,769 753Statewide - Federal 9,531

0 0 872 131 1,192 188Statewide - Soft Match 2,383

Revenue Sharing Funds

0 0 0 0 0 3,508Local Match 3,508

0 0 0 0 0 3,508State Match 3,508

RSTP (STP Regional)

789 239 0 0 322 530MPO - Federal 1,879

197 60 0 0 80 132MPO - State Match 470

STP

1,500 600 0 0 33 1,027Bridge - Federal 3,161

375 150 0 0 8 257Bridge - Soft Match 790

0 0 200 760 2,116 1,751Statewide - Federal 4,827

0 0 50 190 529 438Statewide - Soft Match 1,207

$13,806$4,020$4,860$3,111$22,285$17,143Total $65,225

11/12/2014 183

Page 4: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FY15 REVISED FINAL

FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT

FY2019 FY2020FY2018FY2017FY2016FY2015Fund Source Name

Funding Allocation Summary (000's)

FREDERICKSBURG DISTRICT - cont.

System Totals

SecondaryCMAQ

$0$1,753$945$833$1,326$1,752MPO - Federal $6,610

0 438 236 208 332 438MPO - State Match 1,652

0 0 0 0 1,006 846TERMS - Federal 1,852

0 0 0 0 251 212TERMS - State Match 463

CTB Formula

0 736 662 285 1,193 0Bridge - State 2,877

437 454 422 417 256 47Unpaved - State 2,032

Highway Safety Improvements

0 0 0 0 0 2,025Federal 2,025

0 0 0 0 0 225Soft Match 225

Local Project Contributions

0 0 0 0 0 18,835Local 18,835

NHPP

0 0 1,483 1,229 617 786Bridge - Federal 4,115

0 0 371 307 154 196Bridge - Soft Match 1,029

Revenue Sharing Funds

0 0 0 0 0 12,987Local Match 12,987

0 0 0 0 0 12,987State Match 12,987

RSTP (STP Regional)

0 158 200 322 427 160MPO - Federal 1,268

0 39 50 81 107 40MPO - State Match 317

STP

827 1,050 529 54 1,189 185Bridge - Federal 3,833

207 262 132 13 297 46Bridge - Soft Match 958

507 523 514 315 384 459BROS - Federal 2,701

127 131 128 79 96 115BROS - Soft Match 675

0 0 0 0 472 500Statewide - Federal 972

0 0 0 0 118 125Statewide - Soft Match 243

Telecommunications

1,318 1,318 1,318 1,318 1,318 1,318State 7,908

$3,421$6,864$6,991$5,462$9,545$54,283Total $86,564

Urban

Bond Proceeds

$0$0$12,217$19,000$1,621$0GARVEE Bonds $32,838

CMAQ

300 0 617 560 0 0MPO - Federal 1,477

75 0 154 140 0 0MPO - State Match 369

CTB Formula

3,571 1,500 0 0 0 0Bridge - State 5,071

Local Project Contributions

0 0 0 0 0 993Local 993

Revenue Sharing Funds

0 0 0 0 0 170Local Match 170

0 0 0 0 0 170State Match 170

RSTP (STP Regional)

0 552 742 706 0 222MPO - Federal 2,222

0 138 186 177 0 55MPO - State Match 556

$3,946$2,189$13,917$20,583$1,621$1,611Total $43,867

184 11/12/2014

Page 5: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FY15 REVISED FINAL

FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT

FY2019 FY2020FY2018FY2017FY2016FY2015Fund Source Name

Funding Allocation Summary (000's)

FREDERICKSBURG DISTRICT - cont.

System Totals

TAP

$81$81$81$81$81$81MPO - Federal $487

0 0 0 0 0 1,000Statewide - Federal 1,000

$81$81$81$81$81$1,081Total $1,487

Other

CMAQ

$393$100$371$540$100$122MPO - Federal $1,627

98 25 93 135 25 31MPO - State Match 407

Highway Safety Improvements

2,405 1,683 1,344 1,338 508 270Federal 7,548

267 187 149 149 56 30Soft Match 839

Prescoping Funds

621 608 595 582 569 463State 3,437

Revenue Sharing Funds

0 0 0 0 0 265Local Match 265

0 0 0 0 0 265State Match 265

RSTP (STP Regional)

240 80 86 0 280 92MPO - Federal 778

60 20 22 0 70 23MPO - State Match 195

$4,085$2,703$2,659$2,743$1,607$1,562Total $15,360

Grand Total $25,339$40,258$53,641$88,881$58,561$78,747 $345,427

Enhancement

11/12/2014 185

Page 6: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

This Page Is Intentionally Left Blank

186 11/12/2014

Page 7: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program

FY15 REVISED FINAL Interstate

MPO Area

FredericksburgInterstate

PROGRAM/SYSTEM

RTE 95 - RELOCATION OF INTERCHANGE

PROJECT

UPC NO.:

ROUTE:

13558

FO0095

HB2 ADJUSTMENT

Fed Req for Access Appvl on Rte 627 Intchg.REPORT NOTE:

Underway

SCHEDULE

16,898

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEStafford County

FY2016 84,666CN

UnderwayFROM: 0.983 Miles South of ROUTE 630 TO: 0.809 Miles

North of Route 630 (1.7920 MI)

DESCRIPTION: 47,899RW

29983,29984,29985 -1PROJECT LENGTH: 1.7920 MI STRUCTURE NO.: SUFFICIENCY RATING:

SCOPE OF WORK: Relocation TO 149,462

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

18,352 0 24,401 25,132 49,920 0 0Bond Proceeds: GARVEE Bonds

0 0 0 0 0 0 1,900Bonus OA: Federal

0 0 0 0 0 0 211Bonus OA: State Match

0 0 0 0 0 0 15,185Interstate: Federal

0 0 0 0 0 0 1,345Interstate: State Match

0 0 0 0 0 0 8,613NHPP: Statewide - Federal

0 0 0 0 0 0 2,153NHPP: Statewide - Soft Match

0 0 0 0 0 241 54Residue Parcel Revenue: State

0 0 0 0 0 0 1,956Soft Match: Federal

0 0 24,401 25,132 49,920 18,352 241 31,416Total

MPO Area

FredericksburgInterstate

PROGRAM/SYSTEM

INTERCHANGE MODIFICATION REPORT (EXIT

126 JACKSON GATEWAY)

PROJECT

UPC NO.:

ROUTE:

90830

NFO0095

PE only. MPO projectREPORT NOTE:

Underway

SCHEDULE

862

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PESpotsylvania County

CNFROM: 0.90 mi North of Exit 126 TO: 1.85 mi South of

Exit 118 (10.5500 MI)

DESCRIPTION: RW

PROJECT LENGTH: 10.5500 MISCOPE OF WORK: Preliminary Engineering TO 862

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 200Local Project Contributions: Local

0 0 0 0 0 0 57Non-Formula: State Match

0 0 0 0 0 0 0Regular: Federal

0 0 0 0 0 0 150Residue Parcel Revenue: State

0 0 0 0 0 0 410RSTP (STP Regional): Federal

0 0 0 0 0 0 45RSTP (STP Regional): State Match

0 0 0 0 0 0 0 862Total

11/12/2014 187

Page 8: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program

FY15 REVISED FINAL Interstate

MPO Area

FredericksburgInterstate

PROGRAM/SYSTEM

I-95 RAPPAHANNOCK RIVER CROSSING

(SOUTHBOUND)

PROJECT

UPC NO.:

ROUTE:

101595

FO0095

HB2 ADJUSTMENT

This UPC will be used for the Southbound portion of project. UPC 105510 is for Northbound with

same limits. PE only.

REPORT NOTE:

Underway

SCHEDULE

9,500

ESTIMATED COST (000's)

JURISDICTION:

Interstate 95STREET NAME:

PEFredericksburg

FY2018 70,500CN

FY2017FROM: Exit 130 TO: 0.66 Miles N. of Exit 133 (3.8000 MI)DESCRIPTION: 20,000RW

PROJECT LENGTH: 3.8000 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 100,000

REQ'D AFTER

2020*FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

1,205 0 0 0 0 0 0CTB Formula: Bridge - State

0 0 0 0 0 0 1,841Interstate: Federal

0 0 0 0 0 0 238Interstate: State Match

1,988 0 0 0 0 2,261 0NHPP: Statewide - Federal

497 0 0 0 0 565 0NHPP: Statewide - Soft Match

0 0 0 0 0 0 137Non-Formula: State Match

0 0 0 0 0 0 596RSTP (STP Regional): Federal

0 0 0 0 0 0 12RSTP (STP Regional): State Match

0 0 0 0 0 0 160Soft Match: Federal

90,500 0 0 0 0 3,690 2,826 2,984Total

MPO Area

FredericksburgInterstate

PROGRAM/SYSTEM

I95 4-LANE & SHOULDER WIDENING FROM

EXIT 143 TO MM136

PROJECT

UPC NO.:

ROUTE:

104924

NFO0095

HB2 ADJUSTMENT

FY2017

SCHEDULE

2,231

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEStafford County

FY2022 127,769CN

FROM: MM143 TO: MM136DESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Reconstruction w/ Added Capacity TO 130,000

REQ'D AFTER

2020*FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 0Accounts Receivable: Local 130,000

MPO Area

FredericksburgInterstate

PROGRAM/SYSTEM

I-95 REST AREA ACCESS AND RTE. 3

CONNECTOR ROAD

PROJECT

UPC NO.:

ROUTE:

104928

FO0095

HB2 ADJUSTMENT

FY2016

SCHEDULE

10,800

ESTIMATED COST (000's)

JURISDICTION:

I-95STREET NAME:

PEFredericksburg District-wide

FY2021 104,200CN

FY2019FROM: I-95 TO: Int. of Rte. 3 and Rte. 627 (4.0000 MI)DESCRIPTION: 35,000RW

PROJECT LENGTH: 4.0000 MISCOPE OF WORK: New Construction Roadway TO 150,000

REQ'D AFTER

2020*FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 0Accounts Receivable: Local 150,000

188 11/12/2014

Page 9: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program

FY15 REVISED FINAL Interstate

MPO Area

FredericksburgInterstate

PROGRAM/SYSTEM

I-95 RAPPAHANNOCK RIVER CROSSING -

NORTHBOUND

PROJECT

UPC NO.:

ROUTE:

105510

FO0095

HB2 ADJUSTMENT

FY2015

SCHEDULE

8,500

ESTIMATED COST (000's)

JURISDICTION:

Interstate 95STREET NAME:

PEFredericksburg

FY2020 71,500CN

FY2018FROM: Exit 130 TO: Exit 133DESCRIPTION: 20,000RW

PROJECT LENGTH: _SCOPE OF WORK: Reconstruction w/ Added Capacity TO 100,000

REQ'D AFTER

2020*FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 0Accounts Receivable: Local 100,000

MPO Area

FredericksburgInterstate

PROGRAM/SYSTEM

PM-6A-14 ASPHALT RESURFACING, DISTRICT

WIDE- INTERSTATE

PROJECT

UPC NO.:

ROUTE:

104579

FO9999

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

VariousSTREET NAME:

PEFredericksburg District-wide

Underway 8,361CN

FROM: Various TO: VariousDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Resurfacing TO 8,361

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 2,291 0 0CTB Formula: Paving - Federal

0 0 0 0 573 0 0CTB Formula: Paving - Soft Match

1,380 0 0 0 4,117 0 0CTB Formula: Paving - State

0 0 0 0 0 0 2,864(X) Maintenance Funds: Statewide

-2,864 0 0 0 6,981 1,380 0 2,864Total

11/12/2014 189

Page 10: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program

FY15 REVISED FINAL Primary

MPO Area

NonMPOPrimary

PROGRAM/SYSTEM

ADA COMPLIANCE

PROJECT

UPC NO.:

ROUTE:

106348

NFO

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEFredericksburg District-wide

FY2015 500CN

FROM: various TO: variousDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 500

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 541Bond Proceeds: CPR Bonds -41

MPO Area

FredericksburgPrimary

PROGRAM/SYSTEM

GENERAL R/W EXPENSES, VARIOUS

LOCATIONS DISTRICT WIDE

PROJECT

UPC NO.: 63844

NFOProject Report Req'd

DISTRICT WIDEDESCRIPTION:

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 272Primary Formula: State

MPO Area

FredericksburgPrimary

PROGRAM/SYSTEM

FREDERICKSBURG PRIMARY DISTRICTWIDE

SIGNALS

PROJECT

UPC NO.: 70646

NFODistrict-wide

VARIOUS ROUTESDESCRIPTION:

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 38(X) Maintenance Funds: Statewide

0 0 0 0 0 0 406National Highway System Allocations:

Federal

0 0 0 0 0 0 43Preventive Maintenance & Systems

Operations: NHPP - Federal

0 0 0 0 0 0 487Total

MPO Area

NonMPOPrimary

PROGRAM/SYSTEM

TRENCH WIDENING - VARIOUS ROUTES

PROJECT

UPC NO.:

ROUTE:

106535

NFO0000

FY2015

SCHEDULE

200

ESTIMATED COST (000's)

JURISDICTION:

VariousSTREET NAME:

PEFredericksburg District-wide

FY2018 2,900CNFROM: Various locations TO: Various locations (13.7800

MI)

DESCRIPTION: RW

PROJECT LENGTH: 13.7800 MISCOPE OF WORK: Safety TO 3,100

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

2,700 0 0 0 0 0 90Highway Safety Improvements: Federal

300 0 0 0 0 0 0Highway Safety Improvements: Soft Match

0 0 0 0 0 0 10Highway Safety Improvements: State Match

0 0 0 0 0 3,000 0 100Total

190 11/12/2014

Page 11: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program

FY15 REVISED FINAL Primary

MPO Area

FredericksburgPrimary

PROGRAM/SYSTEM

RTE 1 - BRIDGE REPLACEMENT &

APPROACHES OVER AQUIA CREEK

PROJECT

UPC NO.:

ROUTE:

76515

NFO0001

Complete

SCHEDULE

810

ESTIMATED COST (000's)

JURISDICTION:

Jefferson Davis HighwaySTREET NAME:

PEStafford County

Underway 4,377CN

UnderwayFROM: 0.015 Mile South of Aquia Creek TO: 0.024 Mile

North of Aquia Creek (0.0390 MI)

DESCRIPTION: 514RW

28807 93PROJECT LENGTH: 0.0390 MI STRUCTURE NO.: SUFFICIENCY RATING:

SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 5,701

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 642Bond Match: State Bond Match

0 0 0 0 0 0 1,916Bridge Replacement: Federal

0 0 0 0 0 0 902Minimum Guarantee: Federal

0 0 0 0 0 94 738NHPP: Bridge - Federal

0 0 0 0 0 24 184NHPP: Bridge - Soft Match

0 0 0 0 0 0 870NHPP: Statewide - Federal

0 0 0 0 0 0 218NHPP: Statewide - Soft Match

0 0 0 0 0 0 40Primary Formula: Federal

0 0 0 0 0 0 10Primary Formula: State Match

0 0 0 0 0 0 62Soft Match: Federal

0 0 0 0 0 0 118 5,583Total

11/12/2014 191

Page 12: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program

FY15 REVISED FINAL Primary

MPO Area

FredericksburgPrimary

PROGRAM/SYSTEM

RTE 1 - INTERSECTION IMPROVEMENT AT RTE

1 & 606

PROJECT

UPC NO.:

ROUTE:

93136

NFO0001

MPO project.REPORT NOTE:

Complete

SCHEDULE

850

ESTIMATED COST (000's)

JURISDICTION:

Jefferson Davis HwySTREET NAME:

PESpotsylvania County

Underway 5,120CN

UnderwayFROM: 0.287 Mile South of Rt 606 (Morris/MuddTavern

Rd) TO: 0.185 Mile North of Rt 606 (Morris/Mudd Tavern

Rd) (0.4720 MI)

DESCRIPTION: 2,172RW

PROJECT LENGTH: 0.4720 MISCOPE OF WORK: Safety TO 8,142

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 1,444CMAQ: Federal

507 0 0 0 0 0 729CMAQ: MPO - Federal

127 0 0 0 0 0 182CMAQ: MPO - State Match

0 0 0 0 0 0 279CMAQ: State Match

585 0 0 0 0 82 911Highway Safety Improvements: Federal

65 0 0 0 0 9 9Highway Safety Improvements: Soft Match

0 0 0 0 0 0 92Highway Safety Improvements: State Match

0 0 0 0 0 0 583Local Project Contributions: Local

0 0 0 0 0 0 323Minimum Guarantee: Federal

0 0 0 0 0 0 54Non-Formula: State Match

0 0 0 0 0 0 226Primary Formula: Federal

0 0 0 0 0 0 197Primary Formula: State

0 0 0 0 0 0 56Primary Formula: State Match

0 0 0 0 0 0 402RSTP (STP Regional): Federal

322 0 0 0 0 414 0RSTP (STP Regional): MPO - Federal

80 0 0 0 0 103 0RSTP (STP Regional): MPO - State Match

0 0 0 0 0 0 46RSTP (STP Regional): State Match

0 0 0 0 0 0 312Safety Funds: Hazard Elimination

0 0 0 0 0 1,686 608 5,847Total

MPO Area

FredericksburgPrimary

PROGRAM/SYSTEM

TURN LANE IMPROVEMENTS AT U.S. 1 AT

POTOMAC CREEK DRIVE

PROJECT

UPC NO.:

ROUTE:

100449

NFO0001

MPO Project. Revised schedule required.REPORT NOTE:

FY2017

SCHEDULE

275

ESTIMATED COST (000's)

JURISDICTION:

Jefferspm Davis HighwaySTREET NAME:

PEStafford County

FY2021 601CN

FY2020FROM: 0.25 miles North of Potomac Creek Drive (SR761)

TO: 0.25 miles south of Potomac Creek Drive (0.5000 MI)

DESCRIPTION: 585RW

PROJECT LENGTH: 0.5000 MISCOPE OF WORK: Safety TO 1,461

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 220 0 0 0 0 0CMAQ: MPO - Federal

0 55 0 0 0 0 0CMAQ: MPO - State Match

1,186 275 0 0 0 0 0 0Total

192 11/12/2014

Page 13: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program

FY15 REVISED FINAL Primary

MPO Area

FredericksburgPrimary

PROGRAM/SYSTEM

STUDY ONLY - WIDENING OF U.S. ROUTE 1

(BRAC RELATED)

PROJECT

UPC NO.:

ROUTE:

100456

NFO0001

MPO Project.REPORT NOTE:

Underway

SCHEDULE

838

ESTIMATED COST (000's)

JURISDICTION:

Jefferson Davis HighwaySTREET NAME:

PEStafford County

CNFROM: U.S. Route 1 intersection with Telegraph Road TO:

Prince William County Line (3.3000 MI)

DESCRIPTION: RW

PROJECT LENGTH: 3.3000 MISCOPE OF WORK: Preliminary Engineering TO 838

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 118Local Project Contributions: Local

0 0 239 0 0 116 221RSTP (STP Regional): MPO - Federal

0 0 60 0 0 29 55RSTP (STP Regional): MPO - State Match

0 0 299 0 0 0 145 394Total

MPO Area

FredericksburgPrimary

PROGRAM/SYSTEM

RTE. 1 OVER POTOMAC CREEK BRIDGE

REPLACEMENT

PROJECT

UPC NO.:

ROUTE:

102936

NFO0001

Revised schedule required.REPORT NOTE:

Underway

SCHEDULE

750

ESTIMATED COST (000's)

JURISDICTION:

Jefferson Davis HighwaySTREET NAME:

PEStafford County

FY2019 4,486CN

FY2016FROM: 0.1 mile North of Potomac Creek TO: 0.1 mile

South of Potomac Creek (0.2000 MI)

DESCRIPTION: 514RW

30214 -1PROJECT LENGTH: 0.2000 MI STRUCTURE NO.: SUFFICIENCY RATING:

SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 5,751

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 30Bond Match: State Bond Match

0 0 0 0 0 0 120Bridge Replacement: Federal

0 0 0 0 0 0 149CTB Formula: Bridge - Federal

0 0 0 0 0 0 37CTB Formula: Bridge - Soft Match

0 961 2,474 253 0 0 0CTB Formula: Bridge - State

0 1,064 318 0 0 0 0NHPP: Bridge - Federal

0 266 79 0 0 0 0NHPP: Bridge - Soft Match

0 2,291 2,871 253 0 0 0 336Total

11/12/2014 193

Page 14: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program

FY15 REVISED FINAL Primary

MPO Area

NonMPOPrimary

PROGRAM/SYSTEM

RTE. 1 OVER SOUTH RIVER

PROJECT

UPC NO.:

ROUTE:

102937

NFO0001

Revised schedule required.REPORT NOTE:

FY2018

SCHEDULE

400

ESTIMATED COST (000's)

JURISDICTION:

Jefferson Davis HighwaySTREET NAME:

PECaroline County

FY2022 1,800CN

FY2021FROM: South River TO: South River (0.2000 MI)DESCRIPTION: 400RW

PROJECT LENGTH: 0.2000 MISCOPE OF WORK: Bridge Rehab w/o Added Capacity TO 2,600

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 604 0 0 0 0 0CTB Formula: Bridge - State

0 540 600 0 0 0 0STP: Bridge - Federal

0 135 150 0 0 0 0STP: Bridge - Soft Match

570 1,280 750 0 0 0 0 0Total

MPO Area

FredericksburgPrimary

PROGRAM/SYSTEM

INTERSECTION IMPROVEMENT RTE1AND RTE

630

PROJECT

UPC NO.:

ROUTE:

103085

NFO0001

Revised estimate required.REPORT NOTE:

FY2013

SCHEDULE

630

ESTIMATED COST (000's)

JURISDICTION:

Jefferson Davis HighwaySTREET NAME:

PEStafford County

FY2017 2,500CN

FY2016FROM: 0.076 Mi South of Route 630 (Courthouse Road)

TO: 0.076 Mi North of Route 630 (Courthouse Road)

(0.1520 MI)

DESCRIPTION: 3,200RW

PROJECT LENGTH: 0.1520 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 6,330

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 1,563 1,602Revenue Sharing Funds: Local Match

0 0 0 0 0 1,563 1,602Revenue Sharing Funds: State Match

0 0 0 0 0 0 3,126 3,204Total

MPO Area

FredericksburgPrimary

PROGRAM/SYSTEM

I95 CORR TECH 1, 17 SIGNAL COMM CAM -

PRNC WILL TO HNOVER

PROJECT

UPC NO.:

ROUTE:

105443

NFO0001

Underway

SCHEDULE

540

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEFredericksburg District-wide

CN

FROM: Prince William CL TO: Hanover CL (46.7200 MI)DESCRIPTION: RW

PROJECT LENGTH: 46.7200 MISCOPE OF WORK: Safety TO 540

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 413CTB Formula: ITS - Federal

0 0 0 0 0 0 103CTB Formula: ITS - Soft Match

0 0 0 0 0 24 0CTB Formula: ITS - State

0 0 0 0 0 0 24 516Total

194 11/12/2014

Page 15: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program

FY15 REVISED FINAL Primary

MPO Area

FredericksburgPrimary

PROGRAM/SYSTEM

BRIDGE REPLACEMENT - ROUTE 1 OVER THE

RAPPAHANNOCK RIVER

PROJECT

UPC NO.:

ROUTE:

105533

FO0001

FY2020

SCHEDULE

4,500

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEStafford County

FY2025 43,500CN

FY2023FROM: 0.25 Miles south of exist. Bridge TO: 0.25 Miles

north of exist. Bridge (0.7000 MI)

DESCRIPTION: 2,000RW

PROJECT LENGTH: 0.7000 MISCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 50,000

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 4,500 0 0 0 0 0CTB Formula: Bridge - State 45,500

MPO Area

FredericksburgPrimary

PROGRAM/SYSTEM

INTERSECTION IMPROVEMENT AT RTE 1 &

HICKORY RIDGE RD

PROJECT

UPC NO.:

ROUTE:

105724

NFO0001

Underway

SCHEDULE

400

ESTIMATED COST (000's)

JURISDICTION:

Hickory Ridge RoadSTREET NAME:

PESpotsylvania County

FY2017 2,290CN

FY2016FROM: 0.19 MI South of Int. Rte 632 TO: 0.19 MI North of

Int. Rte 632 (0.3800 MI)

DESCRIPTION: 1,200RW

PROJECT LENGTH: 0.2200 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 3,890

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 1,945 0Revenue Sharing Funds: Local Match

0 0 0 0 0 1,945 0Revenue Sharing Funds: State Match

0 0 0 0 0 0 3,890 0Total

MPO Area

FredericksburgPrimary

PROGRAM/SYSTEM

INTERSECTION IMPROVEMENTS - RTE 1 JEFF

DAVIS HWY & RTE 628

PROJECT

UPC NO.:

ROUTE:

105899

NFO0001

Revised schedule required.REPORT NOTE:

FY2020

SCHEDULE

500

ESTIMATED COST (000's)

JURISDICTION:

Jefferson Davis HighwaySTREET NAME:

PEStafford County

FY2023 1,500CN

FY2022FROM: 0.25 Miles South of Int. Rte 1 & Rte 628 Eskimo

Hill Rd TO: 0.25 Miles North of Int. Rte 1 & Rte 628

Eskimo Hill Rd (0.5000 MI)

DESCRIPTION: 600RW

PROJECT LENGTH: 0.5000 MISCOPE OF WORK: Safety TO 2,600

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 400 0 0 0 0 0CMAQ: MPO - Federal

0 100 0 0 0 0 0CMAQ: MPO - State Match

2,100 500 0 0 0 0 0 0Total

11/12/2014 195

Page 16: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program

FY15 REVISED FINAL Primary

MPO Area

NonMPOPrimary

PROGRAM/SYSTEM

RTE 3 - WIDENING

PROJECT

UPC NO.:

ROUTE:

56939

NFO0003

HB2 ADJUSTMENT

PE OnlyREPORT NOTE:

Underway

SCHEDULE

2,254

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PERichmond County

FY2017 6,963CN

FY2016FROM: 0.16 miles west of Int. Rte. 3 Bypass and Rte. 3

Business TO: Int. of Rte 3 and Rte 203 (2.2500 MI)

DESCRIPTION: 1,089RW

PROJECT LENGTH: 2.2500 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 10,306

REQ'D AFTER

2020*FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 1,038Primary Formula: Federal

0 0 0 0 0 0 307Primary Formula: State

0 0 0 0 0 0 260Primary Formula: State Match

0 0 0 0 0 519 0STP: Statewide - Federal

0 0 0 0 0 130 0STP: Statewide - Soft Match

8,052 0 0 0 0 0 649 1,605Total

MPO Area

FredericksburgPrimary

PROGRAM/SYSTEM

ARRA RTE 3 ADD THROUGH & RIGHT TURN

LANES EBL & WBL

PROJECT

UPC NO.: 92990

FOARRA09

Project being constructed as Design Build ARRA project original PE on UPC 13564REPORT NOTE:

FROM: ROUTE 1112 (RUTHERFORD DRIVE) TO: 0.086

Mi West of Rte 627 (GORDON ROAD) (1.2960 MI)

DESCRIPTION:

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 25,215American Recovery and Reinvestment Act:

Flexible

MPO Area

FredericksburgPrimary

PROGRAM/SYSTEM

RTE 3 - COMMUTER PARKING LOT STUDY

PROJECT

UPC NO.:

ROUTE:

104923

NFO0003

MPO project.REPORT NOTE:

FY2019

SCHEDULE

500

ESTIMATED COST (000's)

JURISDICTION:

King's HighwaySTREET NAME:

PEStafford County

CNFROM: Rte 3 & Rte 3-Business Interchange TO: 2 Mi

East of Rte 3 & Rte 3-Business Interchange (2.0000 MI)

DESCRIPTION: RW

PROJECT LENGTH: 2.0000 MISCOPE OF WORK: Other TO 500

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 80 0 0 0 0CMAQ: MPO - Federal

0 0 20 0 0 0 0CMAQ: MPO - State Match

400 0 100 0 0 0 0 0Total

196 11/12/2014

Page 17: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program

FY15 REVISED FINAL Primary

MPO Area

NonMPOPrimary

PROGRAM/SYSTEM

BRIDGE REPL-WBL RTE 3 OVER N END

BRANCH (FED ID 11835)

PROJECT

UPC NO.:

ROUTE:

104925

NFO0003

Revised schedule required.REPORT NOTE:

FY2019

SCHEDULE

600

ESTIMATED COST (000's)

JURISDICTION:

John Clayton MemorialSTREET NAME:

PEMathews County

FY2021 1,686CN

FY2020FROM: North End Branch TO: North End Branch (0.1000

MI)

DESCRIPTION: 250RW

PROJECT LENGTH: 0.1000 MISCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 2,536

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 480 0 0 0 0 0STP: Bridge - Federal

0 120 0 0 0 0 0STP: Bridge - Soft Match

1,936 600 0 0 0 0 0 0Total

MPO Area

NonMPOPrimary

PROGRAM/SYSTEM

BRIDGE REPL- WBL RTE 3 OVER BURKE MILL

STREAM (FED ID 11834)

PROJECT

UPC NO.:

ROUTE:

105240

NFO0003

Revised schedule required.REPORT NOTE:

FY2019

SCHEDULE

600

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEMathews County

FY2021 1,686CN

FY2020FROM: Burke Mill Stream TO: Burke Mill Stream (0.1000

MI)

DESCRIPTION: 250RW

PROJECT LENGTH: 0.1000 MISCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 2,536

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 480 0 0 0 0 0STP: Bridge - Federal

0 120 0 0 0 0 0STP: Bridge - Soft Match

1,936 600 0 0 0 0 0 0Total

MPO Area

FredericksburgPrimary

PROGRAM/SYSTEM

FREDERICKSBURG AREA BYPASS STUDY

PROJECT

UPC NO.:

ROUTE:

105310

NFO0003

Underway

SCHEDULE

200

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEFredericksburg District-wide

CN

FROM: VARIOUS TO: VARIOUSDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Preliminary Engineering TO 200

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 200Primary Formula: State 0

11/12/2014 197

Page 18: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program

FY15 REVISED FINAL Primary

MPO Area

FredericksburgPrimary

PROGRAM/SYSTEM

BRIDGE REPLACE. - ROUTE 3 (BUS.) OVER

THE RAPPAHANNOCK RIVER

PROJECT

UPC NO.:

ROUTE:

105535

NFO0003

Revised schedule required.REPORT NOTE:

FY2020

SCHEDULE

3,000

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEStafford County

FY2025 15,000CN

FY2023FROM: 0.10 Mi. west of Exist Str. TO: 0.10 Mi. west of

Exist Str. (0.3500 MI)

DESCRIPTION: 2,000RW

PROJECT LENGTH: 0.3500 MISCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 20,000

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

500 2,000 0 0 0 500 0CTB Formula: Bridge - State 17,000

MPO Area

NonMPOPrimary

PROGRAM/SYSTEM

ROUTE 14 - IMPROVE DRAINAGE SYSTEM AT

MATHEWS COURTHOUSE

PROJECT

UPC NO.:

ROUTE:

87865

NFO0014

Underway

SCHEDULE

719

ESTIMATED COST (000's)

JURISDICTION:

Buckley Hall RoadSTREET NAME:

PEMathews County

FY2015 2,702CN

UnderwayFROM: Drainage Improvements TO: at Put-In CreekDESCRIPTION: 773RW

30116,30117 -1PROJECT LENGTH: 0.0000 MI STRUCTURE NO.: SUFFICIENCY RATING:

SCOPE OF WORK: Safety TO 4,194

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 153Bond Proceeds: CPR Bonds

0 0 0 0 0 0 306Federal STP: Federal

0 0 0 0 0 0 1Primary Formula: Federal

0 0 0 0 0 0 10Primary Formula: Federal/State

0 0 0 0 0 0 1,809Primary Formula: State

0 0 0 0 0 0 0Primary Formula: State Match

0 0 0 0 0 0 76Soft Match: Federal

1,377 0 0 0 0 94 0STP: Statewide - Federal

344 0 0 0 0 24 0STP: Statewide - Soft Match

0 0 0 0 0 1,722 118 2,355Total

198 11/12/2014

Page 19: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program

FY15 REVISED FINAL Primary

MPO Area

FredericksburgPrimary

PROGRAM/SYSTEM

RTE 17 - RECONSTRUCTION

PROJECT

UPC NO.:

ROUTE:

71774

FO0017

Contingent upon participation by County and Developer - State funds - AC for future federal

conversion.

REPORT NOTE:

Complete

SCHEDULE

3,290

ESTIMATED COST (000's)

JURISDICTION:

Warrenton RoadSTREET NAME:

PEStafford County

Underway 30,003CN

UnderwayFROM: 0.009 Mi. South of McLANE Drive TO: 0.196 Mi.

North of Stafford Lakes Parkway (2.0880 MI)

DESCRIPTION: 13,879RW

PROJECT LENGTH: 2.0880 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 47,172

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 595Bond Match: State Bond Match

0 0 0 0 0 0 12,413Bond Proceeds: CPR Bonds

0 0 0 0 0 0 1,095Bonus OA: Federal

0 0 0 0 0 0 1,618Minimum Guarantee: Federal

0 0 0 0 0 0 3,778National Highway System Allocations:

Federal

4,769 0 0 3,486 522 753 6,595NHPP: Statewide - Federal

1,192 0 0 872 131 188 1,649NHPP: Statewide - Soft Match

0 0 0 0 0 0 222Primary Formula: State

0 0 0 0 0 0 179Residue Parcel Revenue: State

0 0 0 0 0 0 245Revenue Sharing Funds: Local Match

0 0 0 0 0 0 245Revenue Sharing Funds: State Match

0 0 0 0 0 0 4,478SAFETEA-LU Earmarks: Federal

0 0 0 0 0 0 116SAFETEA-LU Earmarks: State Bond Match

0 0 0 0 0 0 1,003SAFETEA-LU Earmarks: State Match

0 0 0 0 0 0 1,028Soft Match: Federal

0 0 0 4,358 653 5,962 942 35,258Total

MPO Area

NonMPOPrimary

PROGRAM/SYSTEM

ROUTE 17 - RECONSTRUCTION

PROJECT

UPC NO.:

ROUTE:

86463

NFO0017

Complete

SCHEDULE

1,450

ESTIMATED COST (000's)

JURISDICTION:

Church LaneSTREET NAME:

PEEssex County

Underway 7,900CN

UnderwayFROM: 0.19 Miles North of Marsh Street TO: 0.11 Miles

South of Airport Road (0.1800 MI)

DESCRIPTION: 669RW

29891 -1PROJECT LENGTH: 0.1800 MI STRUCTURE NO.: SUFFICIENCY RATING:

SCOPE OF WORK: Reconstruction w/o Added Capacity TO 10,019

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 445Bond Match: State Bond Match

0 0 0 0 0 0 771Federal STP: Federal

0 0 0 0 0 0 1,901Minimum Guarantee: Federal

0 0 0 0 0 0 479National Highway System Allocations:

Federal

0 0 0 0 0 0 120Non-Formula: State Match

0 0 0 0 0 0 890Primary Formula: Federal

0 0 0 0 0 0 3,125Primary Formula: State

0 0 0 0 0 0 122Primary Formula: State Match

0 0 0 0 0 0 223Soft Match: Federal

133 0 0 0 0 468 953STP: Statewide - Federal

33 0 0 0 0 117 238STP: Statewide - Soft Match

0 0 0 0 0 167 585 9,267Total

11/12/2014 199

Page 20: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program

FY15 REVISED FINAL Primary

MPO Area

Hampton RoadsPrimary

PROGRAM/SYSTEM

SIGNAL COORDINATION ALONG ROUTE 17

PROJECT

UPC NO.:

ROUTE:

98806

NFO0017

MPO Project.REPORT NOTE:

Underway

SCHEDULE

364

ESTIMATED COST (000's)

JURISDICTION:

Route 17STREET NAME:

PEGloucester County

FY2017 1,704CN

FY2015FROM: Coleman Bridge TO: Route 17/17B Intersection

(11.3000 MI)

DESCRIPTION: 132RW

PROJECT LENGTH: 11.3000 MISCOPE OF WORK: Safety TO 2,200

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 879($) CMAQ: Federal

0 0 0 0 0 771 285($) CMAQ: MPO - Federal

0 0 0 0 0 193 71($) CMAQ: MPO - State Match

0 0 0 0 0 0 964 1,236Total

MPO Area

Hampton RoadsPrimary

PROGRAM/SYSTEM

ROUTE 17 PEDESTRIAN IMPROVEMENT

PROJECT

UPC NO.:

ROUTE:

100626

NFO0017

MPO project. Revised estimate and schedule required.REPORT NOTE:

Complete

SCHEDULE

236

ESTIMATED COST (000's)

JURISDICTION:

George Washington Memorial HighwaySTREET NAME:

PEGloucester County

Underway 506CN

UnderwayFROM: From Route 17 at Northern Portion of Coleman Br

TO: Farmwood Road/Route 1237 (0.6640 MI)

DESCRIPTION: 10RW

PROJECT LENGTH: 0.6640 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 752

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 43($) CMAQ: Federal

0 0 0 0 437 0 214($) CMAQ: MPO - Federal

0 0 0 0 109 0 53($) CMAQ: MPO - State Match

0 0 0 0 0 0 11($) CMAQ: State Match

0 0 0 0 0 0 306($) RSTP (STP Regional): Federal

0 0 0 0 0 0 76($) RSTP (STP Regional): State Match

-497 0 0 0 547 0 0 703Total

MPO Area

NonMPOPrimary

PROGRAM/SYSTEM

INTERSECTION WITH RTE 17 AND RTE 17

NORTH BUSINESS

PROJECT

UPC NO.:

ROUTE:

103461

NFO0017

Underway

SCHEDULE

150

ESTIMATED COST (000's)

JURISDICTION:

TIDEWATER TRAILSTREET NAME:

PEMiddlesex County

FY2018 900CNFROM: INTERSECTION WITH RTE 17 TO: AND RTE 17

NB (0.1000 MI)

DESCRIPTION: RW

PROJECT LENGTH: 0.1000 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 1,050

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 855 90Highway Safety Improvements: Federal

0 0 0 0 0 95 0Highway Safety Improvements: Soft Match

0 0 0 0 0 0 10Highway Safety Improvements: State Match

0 0 0 0 0 0 950 100Total

200 11/12/2014

Page 21: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program

FY15 REVISED FINAL Primary

MPO Area

NonMPOPrimary

PROGRAM/SYSTEM

RIGHT TURN LANE RTE 17 AND RTE 616

PROJECT

UPC NO.:

ROUTE:

103462

NFO0017

REPORT NOTE:

FY2017

SCHEDULE

50

ESTIMATED COST (000's)

JURISDICTION:

TIDEWATER TRAILSTREET NAME:

PEMiddlesex County

FY2018 250CNFROM: INTERSECTION WITH RTE 17 TO: AND RTE 616

TOWN BRIDGE ROAD (0.1000 MI)

DESCRIPTION: RW

PROJECT LENGTH: 0.1000 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 300

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 200 40 0 0STP: Statewide - Federal

0 0 0 50 10 0 0STP: Statewide - Soft Match

0 0 0 250 50 0 0 0Total

MPO Area

NonMPOPrimary

PROGRAM/SYSTEM

INT. IMPROVEMENT – GEORGE WASHINGTON

HWY. / TC WALKER ROAD

PROJECT

UPC NO.:

ROUTE:

104163

NFO0017

Complete

SCHEDULE

205

ESTIMATED COST (000's)

JURISDICTION:

George Washington HighwaySTREET NAME:

PEGloucester County

Underway 2,082CN

FY2014FROM: Int. US Rte. 17 and TC Walker Rd. TO: 0.20 Miles

east of Int. US Rte. 17 and TC Walker Rd. (0.2000 MI)

DESCRIPTION: 10RW

PROJECT LENGTH: 0.2000 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 2,297

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 297Local Project Contributions: Local

0 0 0 0 0 0 1,000Revenue Sharing Funds: Local Match

0 0 0 0 0 0 1,000Revenue Sharing Funds: State Match

0 0 0 0 0 0 0 2,297Total

MPO Area

Hampton RoadsPrimary

PROGRAM/SYSTEM

RTE. 17 - INSTALL TRAFFIC SIGNAL

PROJECT

UPC NO.:

ROUTE:

104686

NFO0017

Complete

SCHEDULE

75

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEGloucester County

Underway 300CNDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 375

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 338Highway Safety Improvements: Federal

0 0 0 0 0 0 38Highway Safety Improvements: Soft Match

0 0 0 0 0 0 0 375Total

11/12/2014 201

Page 22: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program

FY15 REVISED FINAL Primary

MPO Area

FredericksburgPrimary

PROGRAM/SYSTEM

INTERSECTION IMPROVEMENTS - RTE 17

MILLS DR & RTE 609

PROJECT

UPC NO.:

ROUTE:

105893

NFO0017

Revised schedule required.REPORT NOTE:

FY2020

SCHEDULE

675

ESTIMATED COST (000's)

JURISDICTION:

Mills DriveSTREET NAME:

PESpotsylvania County

FY2022 2,350CN

FY2022FROM: 0.25 Miles North of Int. Rte 17 & Rte 609 TO: 0.25

Miles South of Int. Rte 17 & Rte 609 (0.5000 MI)

DESCRIPTION: 100RW

PROJECT LENGTH: 0.5000 MISCOPE OF WORK: Safety TO 3,125

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 620 0 0 0 0 0CMAQ: MPO - Federal

0 155 0 0 0 0 0CMAQ: MPO - State Match

2,350 775 0 0 0 0 0 0Total

MPO Area

NonMPOPrimary

PROGRAM/SYSTEM

RTE. 200 - CONSTRUCT SIDEWALK

PROJECT

UPC NO.:

ROUTE:

104688

NFO0200

Underway

SCHEDULE

50

ESTIMATED COST (000's)

JURISDICTION:

Hayes RoadSTREET NAME:

PELancaster County

FY2016 300CN

FY2015FROM: Begin at MP 1.85 TO: End at MP 1.96 (0.1300 MI)DESCRIPTION: 50RW

PROJECT LENGTH: 0.1300 MISCOPE OF WORK: Safety TO 400

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

270 0 0 0 0 45 45Highway Safety Improvements: Federal

30 0 0 0 0 5 5Highway Safety Improvements: Soft Match

0 0 0 0 0 300 50 50Total

202 11/12/2014

Page 23: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program

FY15 REVISED FINAL Primary

MPO Area

NonMPOPrimary

PROGRAM/SYSTEM

RTE 205 - BRIDGE REPLACEMENT AT MATTOX

CREEK

PROJECT

UPC NO.:

ROUTE:

76266

NFO0205

Complete

SCHEDULE

1,250

ESTIMATED COST (000's)

JURISDICTION:

Ridge RoadSTREET NAME:

PEWestmoreland County

Underway 7,055CN

UnderwayFROM: 0.112 Miles South of Route 638 TO: 0.134 Miles

North of Route 638 (0.2460 MI)

DESCRIPTION: 1,393RW

27819 -2PROJECT LENGTH: 0.2460 MI STRUCTURE NO.: SUFFICIENCY RATING:

SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 9,698

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 32Bond Match: State Bond Match

0 0 0 0 0 0 128Bridge Replacement: Federal

0 0 0 0 0 0 281Districtwide: Federal

0 0 0 0 0 0 1,448Federal STP: Federal

0 0 0 0 0 0 2,731Primary Formula: Federal

0 0 0 0 0 0 269Primary Formula: State

0 0 0 0 0 0 683Primary Formula: State Match

0 0 0 0 0 0 362Soft Match: Federal

33 0 0 0 0 1,027 232STP: Bridge - Federal

8 0 0 0 0 257 58STP: Bridge - Soft Match

605 0 0 0 605 0 509STP: Statewide - Federal

151 0 0 0 151 0 127STP: Statewide - Soft Match

0 0 0 0 756 798 1,284 6,860Total

MPO Area

NonMPOPrimary

PROGRAM/SYSTEM

RTE 206 - CONSTRUCT TURN LANES

PROJECT

UPC NO.:

ROUTE:

56951

NFO0206

Complete

SCHEDULE

675

ESTIMATED COST (000's)

JURISDICTION:

Dahlgren RoadSTREET NAME:

PEKing George County

Underway 1,855CN

UnderwayFROM: 0.127 Mi. West Int. Routes 218 & 624 TO: 0.271

Mi. East Int. Routes 218 & 624 (0.3980 MI)

DESCRIPTION: 1,092RW

PROJECT LENGTH: 0.3980 MISCOPE OF WORK: Restoration and Rehabilitation TO 3,622

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 269Bond Match: State Bond Match

0 0 0 0 0 0 1,074Federal STP: Federal

0 0 0 0 0 0 520Primary Formula: Federal

0 0 0 0 0 0 13Primary Formula: State

0 0 0 0 0 0 130Primary Formula: State Match

0 0 0 0 0 669 624STP: Statewide - Federal

0 0 0 0 0 167 156STP: Statewide - Soft Match

0 0 0 0 0 0 837 2,785Total

11/12/2014 203

Page 24: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program

FY15 REVISED FINAL Primary

MPO Area

Hampton RoadsPrimary

PROGRAM/SYSTEM

BICYCLE-PEDESTRIAN IMPROVEMENT TO

ROUTE 216, GUINEA ROAD

PROJECT

UPC NO.:

ROUTE:

100625

NFO0216

Revised schedule required. MPO project.REPORT NOTE:

Underway

SCHEDULE

299

ESTIMATED COST (000's)

JURISDICTION:

Guinea RoadSTREET NAME:

PEGloucester County

FY2017 1,098CN

FY2016FROM: Intersection of Guinea Road (R216) and 17 TO:

Intersection of Guinea Road (R216) Tidemill Road SR641

(1.3900 MI)

DESCRIPTION: 200RW

PROJECT LENGTH: 1.3900 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 1,597

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 146 0 0 239($) CMAQ: MPO - Federal

0 0 0 37 0 0 60($) CMAQ: MPO - State Match

1,115 0 0 183 0 0 0 299Total

MPO Area

FredericksburgPrimary

PROGRAM/SYSTEM

INTERSECTION IMPROVEMENTS (ROUTES 1,

17 AND 218)

PROJECT

UPC NO.:

ROUTE:

57044

NFO0218

Complete

SCHEDULE

2,255

ESTIMATED COST (000's)

JURISDICTION:

Butler RoadSTREET NAME:

PEStafford County

Underway 6,434CN

UnderwayFROM: 0.004 Miles East Int. Rte. 1 & Rte 218 TO: 0.104

Miles East Int. Rte. 1 & Rte 218 (0.1000 MI)

DESCRIPTION: 13,505RW

18075 72PROJECT LENGTH: 0.1000 MI STRUCTURE NO.: SUFFICIENCY RATING:

SCOPE OF WORK: Safety TO 22,194

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 1,575Bond Match: State Bond Match

397 0 0 0 35 294 1,663CMAQ: TERMS - Federal

99 0 0 0 9 74 416CMAQ: TERMS - State Match

0 0 0 0 0 0 3,934CMAQ TERMS: Federal

0 0 0 0 0 0 983CMAQ TERMS: State Match

1,303 0 0 0 0 0 0CTB Formula: High Priority - State

0 0 0 0 0 0 5,926Federal STP: Federal

0 0 0 0 0 0 374Minimum Guarantee: Federal

0 0 0 0 0 0 1,369Primary Formula: Federal

0 0 0 0 0 0 200Primary Formula: State

0 0 0 0 0 0 342Primary Formula: State Match

0 0 0 0 0 0 39Priority Transportation Funds: State

0 0 0 0 115 0 2,415STP: Statewide - Federal

0 0 0 0 29 0 604STP: Statewide - Soft Match

0 0 0 0 187 1,799 368 19,840Total

204 11/12/2014

Page 25: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program

FY15 REVISED FINAL Primary

MPO Area

FredericksburgPrimary

PROGRAM/SYSTEM

RTE 218 - BUTLER ROAD WIDENING (2 TO 4

LANES)

PROJECT

UPC NO.:

ROUTE:

105911

NFO0218

Revised schedule required.REPORT NOTE:

FY2020

SCHEDULE

2,750

ESTIMATED COST (000's)

JURISDICTION:

Butler RoadSTREET NAME:

PEStafford County

FY2024 14,250CN

FY2022FROM: 0.104 East Int. Rte 1 & Rte 218 TO: Int. Rte 218 &

Chatham heights Road (1.0000 MI)

DESCRIPTION: 9,220RW

PROJECT LENGTH: 1.0000 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 26,220

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 789 0 0 0 0 0RSTP (STP Regional): MPO - Federal

0 197 0 0 0 0 0RSTP (STP Regional): MPO - State Match

25,234 986 0 0 0 0 0 0Total

MPO Area

NonMPOPrimary

PROGRAM/SYSTEM

RTE 360 INTERSECTION IMPROVEMENT WITH

RTE 698 ACADEMIC LANE

PROJECT

UPC NO.:

ROUTE:

103460

NFO0360

PE only. Revised schedule required.REPORT NOTE:

Underway

SCHEDULE

285

ESTIMATED COST (000's)

JURISDICTION:

RTE 360 Northumberland HwySTREET NAME:

PENorthumberland County

FY2016 672CN

FY2015FROM: 0.046 mi East of Intersection of Rte 360 & Rte 698

TO: 0.316 mi East of Intersection of Rte 360 & Rte 698

(0.2700 MI)

DESCRIPTION: 243RW

PROJECT LENGTH: 0.2700 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 1,200

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 129Minimum Guarantee: Federal

0 0 0 0 0 0 32Primary Formula: State

0 0 0 0 0 0 56(S) Secondary Formula: Federal

0 0 0 0 0 0 292(S) Secondary Formula: Federal/State

0 0 0 0 0 0 14(S) Secondary Formula: State Match

0 0 0 0 0 0 5(S) Telecommunications: State

672 0 0 0 0 0 0 528Total

MPO Area

NonMPOPrimary

PROGRAM/SYSTEM

RTE. 360 - PEDESTRIAN IMPROVEMENTS

PROJECT

UPC NO.:

ROUTE:

104689

NFO0360

Underway

SCHEDULE

183

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PERichmond County

FY2016 372CN

FY2015FROM: Rte. 3B TO: Rte. 3BDESCRIPTION: 95RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 650

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

450 0 0 0 0 45 90Highway Safety Improvements: Federal

50 0 0 0 0 5 10Highway Safety Improvements: Soft Match

0 0 0 0 0 500 50 100Total

11/12/2014 205

Page 26: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program

FY15 REVISED FINAL Primary

MPO Area

NonMPOPrimary

PROGRAM/SYSTEM

SS-6A-14 SLURRY SEAL TREATMENT,

DISTRICT WIDE - PRIMARY

PROJECT

UPC NO.:

ROUTE:

104575

NFO9999

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

VariousSTREET NAME:

PEFredericksburg District-wide

Underway 999CN

FROM: Various TO: VariousDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Resurfacing TO 999

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 665 0CTB Formula: Paving - Federal

0 0 0 0 0 166 0CTB Formula: Paving - Soft Match

100 0 0 0 0 68 0CTB Formula: Paving - State

0 0 0 0 0 0 0(X) Maintenance Funds: Statewide

0 0 0 0 0 100 899 0Total

MPO Area

NonMPOPrimary

PROGRAM/SYSTEM

PM-6C-14 ASPHALT RESURFACING, SALUDA

RES. -- PRIMARY

PROJECT

UPC NO.:

ROUTE:

104581

NFO9999

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEMiddlesex County

Underway 6,539CN

FROM: Various Routes TO: Various RoutesDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Resurfacing TO 6,539

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

400 0 0 0 1,172 400 290CTB Formula: Paving - Federal

100 0 0 0 293 100 32CTB Formula: Paving - Soft Match

3,752 0 0 0 0 0 0CTB Formula: Paving - State

0 0 0 0 0 0 0(X) Maintenance Funds: Statewide

0 0 0 0 1,465 4,252 500 323Total

MPO Area

FredericksburgPrimary

PROGRAM/SYSTEM

DISTRICT WIDE - SIGNAL UPGRADES

PROJECT

UPC NO.:

ROUTE:

104690

NFO9999

Underway

SCHEDULE

500

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEFredericksburg District-wide

FY2016 2,500CN

FY2015FROM: Various TO: VariousDESCRIPTION: 500RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 3,500

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

1,350 0 0 0 0 1,350 450Highway Safety Improvements: Federal

150 0 0 0 0 150 50Highway Safety Improvements: Soft Match

0 0 0 0 0 1,500 1,500 500Total

206 11/12/2014

Page 27: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program

FY15 REVISED FINAL Primary

MPO Area

NonMPOPrimary

PROGRAM/SYSTEM

PM-6H-15 ASPHALT RESURFACING, PRIMARY

PROJECT

UPC NO.:

ROUTE:

105486

NFO9999

Underway

SCHEDULE

150

ESTIMATED COST (000's)

JURISDICTION:

VariousSTREET NAME:

PEKing George County

FY2015 3,010CN

FROM: Various TO: VariousDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Resurfacing TO 3,160

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 2,844Highway Safety Improvements: Federal

0 0 0 0 0 0 267Highway Safety Improvements: Soft Match

0 0 0 0 0 0 49Highway Safety Improvements: State Match

0 0 0 0 0 0 0 3,160Total

MPO Area

FredericksburgPrimary

PROGRAM/SYSTEM

DISTRICT WIDE - SIGNAL INSTALLATIONS

PROJECT

UPC NO.:

ROUTE:

105832

NFO9999

NEW PROJECT

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEFredericksburg District-wide

FY2015 500CN

FROM: VARIOUS TO: VARIOUSDESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 500

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 450Highway Safety Improvements: Federal

0 0 0 0 0 0 50Highway Safety Improvements: State Match

0 0 0 0 0 0 0 500Total

11/12/2014 207

Page 28: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FY15 REVISED FINAL

FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICTSecondary

PROJECT PROGRAM/SYSTEM

SecondaryFREDERICKSBURG DISTRICT SSYP

DESCRIPTION:

REQUIRED ALLOCATIONS (000's)

Total available secondary allocations by locality and fund source.

Fund Source NameCounty FY2016 FY2018 FY2019 FY2020FY2017 TotalFY2015

Caroline County

CTB Formula

13 14 13 12 8 1Unpaved - State 61

Telecommunications

85 85 85 85 85 85State 512

87 93 98 98 99 98Caroline County Total 572

Essex County

CTB Formula

32 34 31 31 19 3Unpaved - State 151

Telecommunications

33 33 33 33 33 33State 200

37 52 64 65 67 66Essex County Total 351

Gloucester County

CTB Formula

36 38 35 35 21 4Unpaved - State 169

Telecommunications

109 109 109 109 109 109State 656

113 131 144 145 147 146Gloucester County Total 826

King & Queen County

CTB Formula

69 72 67 66 41 7Unpaved - State 323

Telecommunications

21 21 21 21 21 21State 125

28 62 87 88 93 90King & Queen County Total 448

King George County

CTB Formula

44 46 43 42 26 5Unpaved - State 205

Telecommunications

69 69 69 69 69 69State 414

74 95 111 112 115 113King George County Total 619

King William County

CTB Formula

52 54 51 50 31 6Unpaved - State 244

Telecommunications

48 48 48 48 48 48State 287

53 78 98 98 102 100King William County Total 530

Lancaster County

CTB Formula

2 2 2 2 1 0Unpaved - State 10

Telecommunications

34 34 34 34 34 34State 203

34 35 36 36 36 36Lancaster County Total 213

208 11/12/2014

Page 29: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FY15 REVISED FINAL

FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICTSecondary

PROJECT PROGRAM/SYSTEM

SecondaryFREDERICKSBURG DISTRICT SSYP

DESCRIPTION:

REQUIRED ALLOCATIONS (000's)

Total available secondary allocations by locality and fund source.

Fund Source NameCounty FY2016 FY2018 FY2019 FY2020FY2017 TotalFY2015

Mathews County

CTB Formula

3 3 3 3 2 0Unpaved - State 15

Telecommunications

26 26 26 26 26 26State 159

27 28 30 30 30 30Mathews County Total 174

Middlesex County

CTB Formula

10 11 10 10 6 1Unpaved - State 47

Telecommunications

33 33 33 33 33 33State 196

34 39 42 43 43 43Middlesex County Total 244

Northumberland County

Telecommunications

37 37 37 37 37 37State 221

37 37 37 37 37 37Northumberland County Tota 221

Richmond County

CTB Formula

7 8 7 7 4 1Unpaved - State 35

Telecommunications

27 27 27 27 27 27State 164

28 32 34 34 35 35Richmond County Total 198

Spotsylvania County

CTB Formula

85 88 82 81 50 9Unpaved - State 395

Telecommunications

367 367 367 367 367 367State 2,200

376 416 448 449 455 452Spotsylvania County Total 2,595

Stafford County

CTB Formula

40 42 39 38 23 4Unpaved - State 186

Telecommunications

388 388 388 388 388 388State 2,326

392 411 426 426 429 428Stafford County Total 2,512

Westmoreland County

CTB Formula

41 43 40 39 24 4Unpaved - State 192

Telecommunications

41 41 41 41 41 41State 245

45 65 80 81 84 82Westmoreland County Total 437

Grand Total 1,755 1,772 1,740 1,735 1,574 1,365 9,940

11/12/2014 209

Page 30: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program

FY15 REVISED FINAL Secondary

MPO Area

NonMPOSecondary

PROGRAM/SYSTEM

RTE 633 - BRIDGE REPLACEMENT & APPR.

OVER SOUTH RIVER

PROJECT

UPC NO.:

ROUTE:

77327

NFO0633

Complete

SCHEDULE

465

ESTIMATED COST (000's)

JURISDICTION:

Bull Church RoadSTREET NAME:

PECaroline County

Underway 1,409CN

UnderwayFROM: 0.071 Miles South of South River TO: 0.059 Miles

North of South River (0.1300 MI)

DESCRIPTION: 38RW

28822 93PROJECT LENGTH: 0.1300 MI STRUCTURE NO.: SUFFICIENCY RATING:

SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 1,912

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 9Bond Match: State Bond Match

0 0 0 0 0 0 37Bridge Replacement: Federal

615 0 0 0 0 0 0CTB Formula: Bridge - State

0 0 0 0 0 0 201Federal STP: Federal

0 0 0 0 0 0 32Priority Transportation Funds: State

0 0 0 0 0 0 143(S) Secondary Formula: Federal

0 0 0 0 0 0 187(S) Secondary Formula: Federal/State

0 0 0 0 0 0 36(S) Secondary Formula: State Match

0 0 0 0 0 0 50Soft Match: Federal

174 0 0 0 0 111 197STP: BROS - Federal

43 0 0 0 0 28 49STP: BROS - Soft Match

0 0 0 0 0 832 139 942Total

MPO Area

NonMPOSecondary

PROGRAM/SYSTEM

RTE 644 - BRIDGE REPLACEMENT & APPR

OVER MARACOSSIC CREEK

PROJECT

UPC NO.:

ROUTE:

77329

NFO0644

Complete

SCHEDULE

330

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PECaroline County

Underway 696CN

UnderwayFROM: 0.016 mi. West of Maracossic Creek TO: 0.048

mi. East of Maracossic Creek (0.0640 MI)

DESCRIPTION: 32RW

28823 93PROJECT LENGTH: 0.0640 MI STRUCTURE NO.: SUFFICIENCY RATING:

SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 1,058

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 132Bond Match: State Bond Match

0 0 0 0 0 0 693Bridge Replacement: Federal

0 0 0 0 0 0 14Priority Transportation Funds: State

0 0 0 0 0 0 41Soft Match: Federal

0 0 0 0 0 0 141STP: BROS - Federal

0 0 0 0 0 0 35STP: BROS - Soft Match

0 0 0 0 0 0 1STP: Statewide - Federal

0 0 0 0 0 0 0STP: Statewide - Soft Match

0 0 0 0 0 0 0 1,058Total

210 11/12/2014

Page 31: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program

FY15 REVISED FINAL Secondary

MPO Area

NonMPOSecondary

PROGRAM/SYSTEM

RTE 654 OVER REEDY CREEK (STR. NO. 6039)

PROJECT

UPC NO.:

ROUTE:

84392

NFO0654

Complete

SCHEDULE

456

ESTIMATED COST (000's)

JURISDICTION:

Sign Board RoadSTREET NAME:

PECaroline County

Underway 738CN

UnderwayFROM: 0.50 Miles North of Rte 744 TO: 1.039 Miles South

of Rte 656 (0.1600 MI)

DESCRIPTION: 34RW

29448 -1PROJECT LENGTH: 0.1600 MI STRUCTURE NO.: SUFFICIENCY RATING:

SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 1,227

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 5Bond Match: State Bond Match

0 0 0 0 0 0 304Bonus OA: Federal

0 0 0 0 0 0 76Bonus OA: State Match

0 0 0 0 0 0 65Bridge Replacement: Federal

507 0 0 0 0 0 0CTB Formula: Bridge - State

0 0 0 0 0 0 11Soft Match: Federal

0 0 0 0 0 150 0STP: Bridge - Federal

0 0 0 0 0 38 0STP: Bridge - Soft Match

0 0 0 0 0 145 51STP: BROS - Federal

0 0 0 0 0 36 13STP: BROS - Soft Match

-174 0 0 0 0 507 369 526Total

MPO Area

NonMPOSecondary

PROGRAM/SYSTEM

RTE. 743 OVER SOUTH RIVER

PROJECT

UPC NO.:

ROUTE:

106213

NFO0743

FY2020

SCHEDULE

600

ESTIMATED COST (000's)

JURISDICTION:

Clifton RoadSTREET NAME:

PECaroline County

FY2022 1,010CN

FY2021FROM: South River TO: South River (0.0020 MI)DESCRIPTION: 150RW

PROJECT LENGTH: 0.0020 MISCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 1,760

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 137 0 0 0 0 0STP: BROS - Federal

0 34 0 0 0 0 0STP: BROS - Soft Match

1,589 171 0 0 0 0 0 0Total

11/12/2014 211

Page 32: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program

FY15 REVISED FINAL Secondary

MPO Area

NonMPOSecondary

PROGRAM/SYSTEM

RTE 659 - RECONSTRUCTION

PROJECT

UPC NO.:

ROUTE:

15257

NFO0659

State Funds - AC for future federal conversion.REPORT NOTE:

Underway

SCHEDULE

335

ESTIMATED COST (000's)

JURISDICTION:

DESHA ROADSTREET NAME:

PEEssex County

FY2015 999CN

UnderwayFROM: 0.108 Miles west of Intersection Route 671 TO:

0.610 Miles east of Intersection Route 671 (0.6350 MI)

DESCRIPTION: 554RW

PROJECT LENGTH: 0.7180 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 1,888

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 29Bond Match: State Bond Match

0 0 0 0 0 0 272(S) Federal Formula STP: Federal

0 0 0 0 0 0 33(S) Federal Formula STP: State Bond Match

0 0 0 0 0 0 115Minimum Guarantee: Federal

0 0 0 0 0 0 201(S) Secondary Formula: Federal/State

0 0 0 0 0 0 178(S) Secondary Formula: State

0 0 0 0 0 0 35(S) Secondary Formula: State Match

152 0 0 0 0 500 0STP: Statewide - Federal

38 0 0 0 0 125 0STP: Statewide - Soft Match

33 0 0 0 33 33 110(S) Telecommunications: State

0 0 0 0 33 224 658 973Total

MPO Area

NonMPOSecondary

PROGRAM/SYSTEM

RTE. 691 OVER PISCATAWAY CREEK

PROJECT

UPC NO.:

ROUTE:

102911

NFO0691

Underway

SCHEDULE

400

ESTIMATED COST (000's)

JURISDICTION:

Gordon's Mill RoadSTREET NAME:

PEEssex County

FY2018 700CN

FY2017FROM: Piscataway Creek TO: Piscataway Creek (0.2000

MI)

DESCRIPTION: 200RW

30215 -1PROJECT LENGTH: 0.2000 MI STRUCTURE NO.: SUFFICIENCY RATING:

SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 1,300

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

320 0 0 0 0 0 0STP: Statewide - Federal

80 0 0 0 0 0 0STP: Statewide - Soft Match

900 0 0 0 0 400 0 0Total

MPO Area

FredericksburgSecondary

PROGRAM/SYSTEM

RESURFACING - LITTLEPAGE STREET

PROJECT

UPC NO.:

ROUTE:

104166

NFO0000

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

Littlepage StreetSTREET NAME:

PEFredericksburg

Underway 218CN

FROM: Brompton Street TO: Monroe Street (0.3100 MI)DESCRIPTION: RW

PROJECT LENGTH: 0.3100 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 218

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 109Revenue Sharing Funds: Local Match

0 0 0 0 0 0 109Revenue Sharing Funds: State Match

0 0 0 0 0 0 0 218Total

212 11/12/2014

Page 33: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program

FY15 REVISED FINAL Secondary

MPO Area

NonMPOSecondary

PROGRAM/SYSTEM

RESURFACING - PRINCE EDWARD STREET

PROJECT

UPC NO.:

ROUTE:

104167

NFO0000

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

Rince Edward StreetSTREET NAME:

PEFredericksburg

Underway 590CN

FROM: George Street TO: Canal Street (0.5200 MI)DESCRIPTION: RW

PROJECT LENGTH: 0.5200 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 590

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 295Revenue Sharing Funds: Local Match

0 0 0 0 0 0 295Revenue Sharing Funds: State Match

0 0 0 0 0 0 0 590Total

MPO Area

FredericksburgSecondary

PROGRAM/SYSTEM

MILL / OVERLAY - VARIOUS LOCATIONS

PROJECT

UPC NO.:

ROUTE:

104431

NFO0000

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

Various RoutesSTREET NAME:

PEFredericksburg

Underway 430CNFROM: Various Locations TO: City of Fredericksburg

(2.1900 MI)

DESCRIPTION: RW

PROJECT LENGTH: 2.1900 MISCOPE OF WORK: Resurfacing TO 430

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 215Revenue Sharing Funds: Local Match

0 0 0 0 0 0 215Revenue Sharing Funds: State Match

0 0 0 0 0 0 0 430Total

MPO Area

FredericksburgSecondary

PROGRAM/SYSTEM

RECONSTRUCTION - CENTRAL PARK BLVD.

PROJECT

UPC NO.:

ROUTE:

105727

NFO9999

FY2015

SCHEDULE

100

ESTIMATED COST (000's)

JURISDICTION:

VariousSTREET NAME:

PEFredericksburg

FY2017 1,560CN

FROM: Various TO: Various (0.8500 MI)DESCRIPTION: RW

PROJECT LENGTH: 0.8500 MISCOPE OF WORK: Resurfacing TO 1,660

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 830 0Revenue Sharing Funds: Local Match

0 0 0 0 0 830 0Revenue Sharing Funds: State Match

0 0 0 0 0 0 1,660 0Total

11/12/2014 213

Page 34: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program

FY15 REVISED FINAL Secondary

MPO Area

NonMPOSecondary

PROGRAM/SYSTEM

ADA COMPLIANCE

PROJECT

UPC NO.:

ROUTE:

106349

NFO

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEFredericksburg District-wide

FY2015 482CN

FROM: various TO: variousDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 482

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 573Bond Proceeds: CPR Bonds -91

MPO Area

Hampton RoadsSecondary

PROGRAM/SYSTEM

BRIDGE REPLACEMENT RTE. 602 OVER

BURKES MILL STREAM

PROJECT

UPC NO.:

ROUTE:

96681

NFO0602

Underway

SCHEDULE

454

ESTIMATED COST (000's)

JURISDICTION:

Burkes Pond RoadSTREET NAME:

PEGloucester County

FY2015 834CN

UnderwayFROM: 0.079 mile north of Burkes Mill Stream TO: 0.030

mile south of Burkes Mill Stream (0.1090 MI)

DESCRIPTION: 58RW

29427 -1PROJECT LENGTH: 0.1090 MI STRUCTURE NO.: SUFFICIENCY RATING:

SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 1,347

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 60Bond Match: State Bond Match

0 0 0 0 0 0 546Bridge Replacement: Federal

0 0 0 0 0 0 23Soft Match: Federal

207 0 0 0 0 0 367STP: BROS - Federal

52 0 0 0 0 0 92STP: BROS - Soft Match

0 0 0 0 0 259 0 1,088Total

MPO Area

Hampton RoadsSecondary

PROGRAM/SYSTEM

RTE 615 - RECONSTRUCTION AND MINOR

WIDENING

PROJECT

UPC NO.:

ROUTE:

7909

NFO0615

Underway

SCHEDULE

419

ESTIMATED COST (000's)

JURISDICTION:

BURLEIGH ROADSTREET NAME:

PEGloucester County

FY2015 1,547CN

UnderwayFROM: 0.42 MI EAST OF ROUTE 616 TO: 0.59 MI EAST

OF ROUTE 616 (0.1700 MI)

DESCRIPTION: 50RW

29666 -1PROJECT LENGTH: 0.1700 MI STRUCTURE NO.: SUFFICIENCY RATING:

SCOPE OF WORK: Reconstruction w/o Added Capacity TO 2,016

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 27Bond Match: State Bond Match

0 0 0 0 0 0 462(S) Federal Formula STP: Federal

0 0 0 0 0 0 116(S) Federal Formula STP: State Bond Match

0 0 0 0 0 0 108Minimum Guarantee: Federal

0 0 0 0 0 0 1,021(S) Secondary Formula: Federal/State

0 0 0 0 0 0 283(S) Telecommunications: State

0 0 0 0 0 0 0 2,016Total

214 11/12/2014

Page 35: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program

FY15 REVISED FINAL Secondary

MPO Area

Hampton RoadsSecondary

PROGRAM/SYSTEM

BRIDGE REPLACEMENT RTE. 662 OVER FOX

CREEK (FED ID 8552)

PROJECT

UPC NO.:

ROUTE:

98807

NFO0662

.REPORT NOTE:

Underway

SCHEDULE

474

ESTIMATED COST (000's)

JURISDICTION:

Almondsville Rd.STREET NAME:

PEGloucester County

FY2018 1,025CN

FY2014FROM: Fox Creek TO: Fox CreekDESCRIPTION: 139RW

29888 -1PROJECT LENGTH: _ STRUCTURE NO.: SUFFICIENCY RATING:

SCOPE OF WORK: Bridge Replacement w/ Added Capacity TO 1,639

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 19Bond Match: State Bond Match

0 0 736 0 0 0 0CTB Formula: Bridge - State

0 0 0 0 0 0 440Minimum Guarantee: Federal

0 0 0 0 0 0 91Soft Match: Federal

3 0 0 0 279 0 0STP: BROS - Federal

1 0 0 0 70 0 0STP: BROS - Soft Match

0 0 736 0 349 4 0 550Total

MPO Area

Hampton RoadsSecondary

PROGRAM/SYSTEM

RT 1216 BICYCLE-PEDESTRIAN

IMPROVEMENT

PROJECT

UPC NO.:

ROUTE:

100624

NFO1216

Revised schedule required. MPO project.REPORT NOTE:

Underway

SCHEDULE

501

ESTIMATED COST (000's)

JURISDICTION:

Hayes RoadSTREET NAME:

PEGloucester County

FY2016 1,058CNFROM: Northern intersection of Hayes Road and 17; also

intersecti TO: Southern intersection of Hayes Road and

17; also intersectio (1.7600 MI)

DESCRIPTION: RW

PROJECT LENGTH: 1.7600 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 1,559

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 847 0 0 400($) CMAQ: MPO - Federal

0 0 0 212 0 0 100($) CMAQ: MPO - State Match

0 0 0 1,059 0 0 0 500Total

11/12/2014 215

Page 36: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program

FY15 REVISED FINAL Secondary

MPO Area

NonMPOSecondary

PROGRAM/SYSTEM

NEWTOWN ROAD OVER BEVERLY CREEK (

VA STR 6909)

PROJECT

UPC NO.:

ROUTE:

100828

NFO0721

Underway

SCHEDULE

750

ESTIMATED COST (000's)

JURISDICTION:

Newtown Rd.STREET NAME:

PEKing & Queen County

FY2016 1,787CN

UnderwayFROM: Beverly Creek TO: Beverly Creek (0.1000 MI)DESCRIPTION: 230RW

29886 -1PROJECT LENGTH: 0.1000 MI STRUCTURE NO.: SUFFICIENCY RATING:

SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 2,767

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 320Bridge Replacement: Federal

0 0 0 0 0 0 29(S) Secondary Formula: Federal

0 0 0 0 0 0 7(S) Secondary Formula: State Match

0 0 0 0 0 0 80Soft Match: Federal

1,189 0 0 337 54 35 250STP: Bridge - Federal

297 0 0 84 13 9 63STP: Bridge - Soft Match

0 0 0 421 67 1,486 44 749Total

MPO Area

NonMPOSecondary

PROGRAM/SYSTEM

RTE 1003 - BRIDGE REPLACEMENT

PROJECT

UPC NO.:

ROUTE:

81502

NFO1003

Revised schedule required.REPORT NOTE:

Underway

SCHEDULE

616

ESTIMATED COST (000's)

JURISDICTION:

Chelsea Rd.STREET NAME:

PEKing William County

FY2017 2,123CN

FY2015FROM: 0.41 MILES NORTH OF ROUTE 1002 TO: 0.54

MILES NORTH OF ROUTE 1002 (0.1260 MI)

DESCRIPTION: 110RW

28824 93PROJECT LENGTH: 0.1260 MI STRUCTURE NO.: SUFFICIENCY RATING:

SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 2,848

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 320Bonus OA: Federal

0 0 0 0 0 0 80Bonus OA: State Match

72 0 0 35 285 0 0CTB Formula: Bridge - State

0 370 523 514 36 203 0STP: BROS - Federal

0 92 131 128 9 51 0STP: BROS - Soft Match

0 462 654 677 330 72 253 400Total

MPO Area

NonMPOSecondary

PROGRAM/SYSTEM

MERRY POINT FERRY DOCK AND TRAV. INFO.

IMPROVEMENTS

PROJECT

UPC NO.:

ROUTE:

103785

NFO0604

Underway

SCHEDULE

35

ESTIMATED COST (000's)

JURISDICTION:

Merry Point RoadSTREET NAME:

PELancaster County

FY2016 140CNFROM: North end of Merry Point Ferry landing TO: South

end of Merry Point Ferry landing

DESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Ferry boats TO 175

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 35Discretionary Grants: State Match

0 0 0 0 0 0 140Ferry Boat Discretionary Funds: Federal

0 0 0 0 0 0 0 175Total

216 11/12/2014

Page 37: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program

FY15 REVISED FINAL Secondary

MPO Area

NonMPOSecondary

PROGRAM/SYSTEM

SUNNYBANK FERRY DOCK AND TRAVELER

INFORMATION IMPROVEMENTS

PROJECT

UPC NO.:

ROUTE:

103786

NFO0604

Underway

SCHEDULE

35

ESTIMATED COST (000's)

JURISDICTION:

Merry Point RoadSTREET NAME:

PELancaster County

FY2016 140CNFROM: North end of Merry Point Ferry landing TO: South

end of Merry Point Ferry landing

DESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Ferry boats TO 175

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 35Discretionary Grants: State Match

0 0 0 0 0 0 140Ferry Boat Discretionary Funds: Federal

0 0 0 0 0 0 0 175Total

MPO Area

NonMPOSecondary

PROGRAM/SYSTEM

RESTORE DRAINAGE FACILITIES (OUTFALLS)

PROJECT

UPC NO.:

ROUTE:

105731

NFO9999

FY2014

SCHEDULE

15

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEMathews County

FY2020 50CNFROM: VARIOUS ROUTES (COUNTYWIDE) TO:

VARIOUS ROUTES (COUNTYWIDE)

DESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Other TO 65

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 25 0Revenue Sharing Funds: Local Match

0 0 0 0 0 25 0Revenue Sharing Funds: State Match

0 0 0 0 0 0 15(S) Telecommunications: State

0 0 0 0 0 0 50 15Total

MPO Area

NonMPOSecondary

PROGRAM/SYSTEM

RTE 638 RECONSTRUCT AND IMPROVE

DRAINAGE

PROJECT

UPC NO.:

ROUTE:

103482

NFO0638

Underway

SCHEDULE

265

ESTIMATED COST (000's)

JURISDICTION:

OAK ROW ROADSTREET NAME:

PERichmond County

FY2018 504CN

UnderwayFROM: RTE 638 TO: RTE 638 (0.0160 MI)DESCRIPTION: 76RW

29665 -1PROJECT LENGTH: 0.4000 MI STRUCTURE NO.: SUFFICIENCY RATING:

SCOPE OF WORK: Reconstruction w/o Added Capacity TO 846

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 258(S) Federal Formula STP: Federal

0 0 0 0 0 0 65(S) Federal Formula STP: State Bond Match

0 0 0 0 0 0 66Minimum Guarantee: Federal

0 0 0 0 0 0 32(S) Secondary Formula: Federal

0 0 0 0 0 0 285(S) Secondary Formula: Federal/State

0 0 0 0 0 0 23(S) Secondary Formula: State

0 0 0 0 0 0 8(S) Secondary Formula: State Match

0 0 0 0 0 0 108(S) Telecommunications: State

0 0 0 0 0 0 0 846Total

11/12/2014 217

Page 38: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program

FY15 REVISED FINAL Secondary

MPO Area

FredericksburgSecondary

PROGRAM/SYSTEM

BRIDGE REPLACEMENT OVER I-95 &

ROADWAY IMPROVEMENTS

PROJECT

UPC NO.:

ROUTE:

100829

NFO0606

Revised Schedule Required.REPORT NOTE:

Underway

SCHEDULE

1,460

ESTIMATED COST (000's)

JURISDICTION:

Mudd Tavern Rd.STREET NAME:

PESpotsylvania County

FY2019 6,413CN

FROM: over Rte. 95 TO: over Rte. 95 (0.3000 MI)DESCRIPTION: RW

29885 -1PROJECT LENGTH: 0.3000 MI STRUCTURE NO.: SUFFICIENCY RATING:

SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 7,874

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 483Bridge Replacement: Federal

0 0 0 627 0 0 0CTB Formula: Bridge - State

617 0 0 1,483 1,229 786 200NHPP: Bridge - Federal

154 0 0 371 307 196 50NHPP: Bridge - Soft Match

0 0 0 0 0 0 459(S) Secondary Formula: Federal

0 0 0 0 0 0 675(S) Secondary Formula: Federal/State

0 0 0 0 0 0 115(S) Secondary Formula: State Match

0 0 0 0 0 0 121Soft Match: Federal

0 0 0 2,481 1,537 772 982 2,102Total

MPO Area

FredericksburgSecondary

PROGRAM/SYSTEM

RTE 606 - RECONSTRUCTION OF MUDD

TAVERN ROAD

PROJECT

UPC NO.:

ROUTE:

105463

NFO0606

Revised estimate required.REPORT NOTE:

Underway

SCHEDULE

1,250

ESTIMATED COST (000's)

JURISDICTION:

Mudd Tavern RoadSTREET NAME:

PESpotsylvania County

FY2017 6,000CN

FY2015FROM: Bridge over I-95 TO: 0.55 Mi East of Bridge over

I-95 (0.5500 MI)

DESCRIPTION: 2,000RW

PROJECT LENGTH: 0.5500 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 9,250

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 4,450 0Local Project Contributions: Local

0 0 0 0 0 2,000 0Revenue Sharing Funds: Local Match

0 0 0 0 0 2,000 0Revenue Sharing Funds: State Match

0 0 0 0 0 0 800(S) Secondary Formula: Federal/State

0 0 0 0 0 0 8,450 800Total

218 11/12/2014

Page 39: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program

FY15 REVISED FINAL Secondary

MPO Area

FredericksburgSecondary

PROGRAM/SYSTEM

RTE. 606 - RECONSTRUCTION OF MUDD

TAVERN ROAD

PROJECT

UPC NO.:

ROUTE:

105464

NFO0606

Revised estimate required.REPORT NOTE:

FY2014

SCHEDULE

1,500

ESTIMATED COST (000's)

JURISDICTION:

Mudd Tavern RoadSTREET NAME:

PESpotsylvania County

FY2018 5,000CN

FY2017FROM: Various TO: Various (0.5100 MI)DESCRIPTION: 6,000RW

PROJECT LENGTH: 0.5100 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 12,500

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 11,900 0Local Project Contributions: Local

0 0 0 0 0 250 0Revenue Sharing Funds: Local Match

0 0 0 0 0 250 0Revenue Sharing Funds: State Match

0 0 0 0 0 0 100(S) Secondary Formula: Federal/State

0 0 0 0 0 0 12,400 100Total

MPO Area

FredericksburgSecondary

PROGRAM/SYSTEM

INTERSECTION IMPROVEMENTS - RTE 620 &

RTE 1

PROJECT

UPC NO.:

ROUTE:

51845

NFO0620

Revised schedule required. Accruing for CN.REPORT NOTE:

Underway

SCHEDULE

2,519

ESTIMATED COST (000's)

JURISDICTION:

HARRISON ROAD EASTSTREET NAME:

PESpotsylvania County

FY2016 9,248CN

UnderwayFROM: 0.010 Mi. W. of Int. Rte. 1 and Rte. 620 TO: 0.232

Mi. W. of Int. Rte 1. and Rte. 620 (0.2220 MI)

DESCRIPTION: 10,244RW

PROJECT LENGTH: 0.2220 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 22,011

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 0CMAQ: Federal

453 0 1,593 945 676 431 0CMAQ: MPO - Federal

113 0 398 236 169 108 0CMAQ: MPO - State Match

0 0 0 0 0 0 0CMAQ: State Match

0 0 0 0 0 0 1,001(S) Federal Formula STP: Federal

0 0 0 0 0 0 250(S) Federal Formula STP: State Bond Match

0 0 0 0 0 1,800 0Highway Safety Improvements: Federal

0 0 0 0 0 200 0Highway Safety Improvements: Soft Match

0 0 0 0 0 0 3,073Revenue Sharing Funds: Local Match

0 0 0 0 0 0 3,073Revenue Sharing Funds: State Match

427 0 158 200 322 0 0RSTP (STP Regional): MPO - Federal

107 0 39 50 81 0 0RSTP (STP Regional): MPO - State Match

0 0 0 0 0 0 826(S) Secondary Formula: Federal/State

367 0 89 326 326 254 1,077(S) Telecommunications: State

2,842 0 2,278 1,758 1,574 1,468 2,792 9,299Total

11/12/2014 219

Page 40: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program

FY15 REVISED FINAL Secondary

MPO Area

FredericksburgSecondary

PROGRAM/SYSTEM

INSTALL TRAFFIC SIGNAL RTE. 620 & 1284 -

SPOTSYLVANIA

PROJECT

UPC NO.:

ROUTE:

100600

NFO0620

Complete

SCHEDULE

51

ESTIMATED COST (000's)

JURISDICTION:

Harrison Road (Route 620)STREET NAME:

PESpotsylvania County

Underway 377CNDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 428

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 110Accounts Receivable: Local

0 0 0 0 0 0 297Highway Safety Improvements: Federal

0 0 0 0 0 0 33Highway Safety Improvements: State Match

-12 0 0 0 0 0 0 440Total

MPO Area

FredericksburgSecondary

PROGRAM/SYSTEM

RTE. 620 - SIGNAL AND MEDIAN

MODIFICATION

PROJECT

UPC NO.:

ROUTE:

104687

NFO0620

Underway

SCHEDULE

80

ESTIMATED COST (000's)

JURISDICTION:

Harrison RoadSTREET NAME:

PESpotsylvania County

FY2015 289CNFROM: 0.12 MI South of Int of Rte 639 & Rte 620 TO: Int

of Rte 639 & Rte 620 (0.1200 MI)

DESCRIPTION: RW

PROJECT LENGTH: 0.1200 MISCOPE OF WORK: Safety TO 369

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 225 107Highway Safety Improvements: Federal

0 0 0 0 0 25 8Highway Safety Improvements: Soft Match

0 0 0 0 0 0 4Highway Safety Improvements: State Match

0 0 0 0 0 0 250 119Total

MPO Area

FredericksburgSecondary

PROGRAM/SYSTEM

EXPANSION OF COMMUTER PARKING LOT AT

GORDON ROAD

PROJECT

UPC NO.:

ROUTE:

100448

NFO0627

Complete

SCHEDULE

1,205

ESTIMATED COST (000's)

JURISDICTION:

Gordon RoadSTREET NAME:

PESpotsylvania County

Underway 4,354CN

UnderwayFROM: Parking Lot at Rte. 627 TO: and Route 3 (0.1940

MI)

DESCRIPTION: 2,348RW

PROJECT LENGTH: 0.1940 MISCOPE OF WORK: Safety TO 7,908

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

52 0 0 0 0 137 0CMAQ: MPO - Federal

13 0 0 0 0 34 0CMAQ: MPO - State Match

1,006 0 0 0 0 846 1,523CMAQ: TERMS - Federal

251 0 0 0 0 212 381CMAQ: TERMS - State Match

0 0 0 0 0 0 320CMAQ TERMS: Federal

0 0 0 0 0 0 80CMAQ TERMS: State Match

0 0 0 0 0 0 2,443STP: Statewide - Federal

0 0 0 0 0 0 611STP: Statewide - Soft Match

0 0 0 0 0 1,322 1,229 5,357Total

220 11/12/2014

Page 41: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program

FY15 REVISED FINAL Secondary

MPO Area

FredericksburgSecondary

PROGRAM/SYSTEM

RECONSTRUCTION - JONES POWELL ROAD

PROJECT

UPC NO.:

ROUTE:

105718

NFO0653

FY2015

SCHEDULE

260

ESTIMATED COST (000's)

JURISDICTION:

Jones Powell RoadSTREET NAME:

PESpotsylvania County

FY2017 781CN

FY2016DESCRIPTION: 109RW

PROJECT LENGTH: _SCOPE OF WORK: Reconstruction w/o Added Capacity TO 1,150

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 575 0Revenue Sharing Funds: Local Match

0 0 0 0 0 575 0Revenue Sharing Funds: State Match

0 0 0 0 0 0 1,150 0Total

MPO Area

FredericksburgSecondary

PROGRAM/SYSTEM

RTE 658 - BRIDGE REPLACEMENT

PROJECT

UPC NO.:

ROUTE:

81501

NFO0658

Revised schedule required.REPORT NOTE:

Underway

SCHEDULE

520

ESTIMATED COST (000's)

JURISDICTION:

Mt. Olive Rd.STREET NAME:

PESpotsylvania County

FY2018 1,920CN

FY2018FROM: 0.57 Mi South of Rte 666 TO: 1.62 Mi North of Rte

681 (0.4200 MI)

DESCRIPTION: 146RW

28808 93PROJECT LENGTH: 0.4200 MI STRUCTURE NO.: SUFFICIENCY RATING:

SCOPE OF WORK: Bridge Replacement w/ Added Capacity TO 2,586

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 827 1,050 192 0 0 0STP: Bridge - Federal

0 207 262 48 0 0 0STP: Bridge - Soft Match

0 1,033 1,312 240 0 0 0 0Total

MPO Area

FredericksburgSecondary

PROGRAM/SYSTEM

COUNTYWIDE ENGINEERING & SURVEY

PROJECT

UPC NO.: 99962

NFOBudget Item

MINOR SURVEY & PRELIMINARY ENGINEERING FOR BUDGET ITEMS AND INCIDENTAL

TYPE WORK.

REPORT NOTE:

FROM: VARIOUS LOCATIONS IN COUNTY TO:

VARIOUS LOCATIONS IN COUNTY

DESCRIPTION:

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 46Local Revenue: Local Revenue

0 0 0 0 0 0 4(S) Telecommunications: State

0 0 0 0 0 0 50Total

11/12/2014 221

Page 42: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program

FY15 REVISED FINAL Secondary

MPO Area

FredericksburgSecondary

PROGRAM/SYSTEM

INTERSECTION IMPROVEMENTS AT

SPOTSYLVANIA AVENUE & MINE ROAD

PROJECT

UPC NO.:

ROUTE:

105726

NFO9999

FY2015

SCHEDULE

450

ESTIMATED COST (000's)

JURISDICTION:

Spotsylvania AveSTREET NAME:

PESpotsylvania County

FY2017 900CN

FY2016FROM: Int of Soptsylvania Ave & Mine Rd TO: 0.25 MI

South of Int Soptsylvania Ave & Mine Rd (0.2500 MI)

DESCRIPTION: 250RW

PROJECT LENGTH: 0.2500 MISCOPE OF WORK: Other TO 1,600

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 800 0Revenue Sharing Funds: Local Match

0 0 0 0 0 800 0Revenue Sharing Funds: State Match

0 0 0 0 0 0 1,600 0Total

MPO Area

FredericksburgSecondary

PROGRAM/SYSTEM

PM-6E-12 ASPHALT RESURFACING

(FREDERICKSBURG RESIDENCY)

PROJECT

UPC NO.:

ROUTE:

99437

NFO0000

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEStafford County

Underway 6,240CNFROM: Various Locations TO: Within Fredericksburg

Residency

DESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Resurfacing TO 6,240

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 5,548Demonstration Funds: Federal

0 0 0 0 0 0 692(X) Maintenance Funds: Statewide

0 0 0 0 0 0 0 6,240Total

MPO Area

FredericksburgSecondary

PROGRAM/SYSTEM

FERRY ROAD- WIDENING AND RE-STRIPING

PROJECT

UPC NO.:

ROUTE:

103084

NFO0606

Revised estimate required.REPORT NOTE:

Underway

SCHEDULE

200

ESTIMATED COST (000's)

JURISDICTION:

Ferry RoadSTREET NAME:

PEStafford County

FY2016 700CN

FY2015FROM: kings Highway (Route 3) TO: Mount Vernon Ave.

(0.1000 MI)

DESCRIPTION: 150RW

PROJECT LENGTH: 0.1000 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 1,050

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 850Local Project Contributions: Local

0 0 0 0 0 462 100Revenue Sharing Funds: Local Match

0 0 0 0 0 462 100Revenue Sharing Funds: State Match

-924 0 0 0 0 0 924 1,050Total

222 11/12/2014

Page 43: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program

FY15 REVISED FINAL Secondary

MPO Area

FredericksburgSecondary

PROGRAM/SYSTEM

LEASE COMMUTER PARKING SPACES

PROJECT

UPC NO.:

ROUTE:

87764

NFO0610

Administered by MPOREPORT NOTE:

Underway

SCHEDULE

455

ESTIMATED COST (000's)

JURISDICTION:

Garrisonville RoadSTREET NAME:

PEStafford County

CN

FROM: Route 1 TO: Route 643DESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Transit TO 455

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 120CMAQ: Federal

13 0 160 0 36 35 0CMAQ: MPO - Federal

3 0 40 0 9 9 0CMAQ: MPO - State Match

0 0 0 0 0 0 30CMAQ: State Match

0 0 200 0 45 16 44 150Total

MPO Area

FredericksburgSecondary

PROGRAM/SYSTEM

610 - LEFT TURN LANES TO AND FROM

ONVILLE ROAD

PROJECT

UPC NO.:

ROUTE:

93225

NFO0610

Complete

SCHEDULE

1,276

ESTIMATED COST (000's)

JURISDICTION:

Garrisonville RoadSTREET NAME:

PEStafford County

Underway 3,481CN

UnderwayFROM: 0.219 Miles West of Route 641 (Onville Road) TO:

0.091 Miles East of Route 641 (Onville Road) (0.3110 MI)

DESCRIPTION: 8,649RW

PROJECT LENGTH: 0.3110 MISCOPE OF WORK: Safety TO 13,406

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 2,179CMAQ: Federal

809 0 0 0 122 854 3,148CMAQ: MPO - Federal

202 0 0 0 30 214 787CMAQ: MPO - State Match

0 0 0 0 0 0 545CMAQ: State Match

0 0 0 0 0 0 989Public Lands Highway Discretionary Funds:

Federal

0 0 0 0 0 0 899RSTP (STP Regional): Federal

0 0 0 0 0 160 1,775RSTP (STP Regional): MPO - Federal

0 0 0 0 0 40 444RSTP (STP Regional): MPO - State Match

0 0 0 0 0 0 225RSTP (STP Regional): State Match

-16 0 0 0 152 1,011 1,268 10,991Total

11/12/2014 223

Page 44: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program

FY15 REVISED FINAL Secondary

MPO Area

FredericksburgSecondary

PROGRAM/SYSTEM

RTE 610 - GARRISONVILLE ROAD - WIDEN TO

6 LANES - PHASE 2

PROJECT

UPC NO.:

ROUTE:

98847

NFO0610

Revised estimate required.REPORT NOTE:

Underway

SCHEDULE

1,000

ESTIMATED COST (000's)

JURISDICTION:

GARRISONVILLE ROADSTREET NAME:

PEStafford County

FY2014 10,300CN

FY2013FROM: ONVILLE ROAD RTE641 TO: EUSTACE ROAD

RTE 751 (0.6500 MI)

DESCRIPTION: 2,500RW

PROJECT LENGTH: 0.6500 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 13,800

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 6,900Revenue Sharing Funds: Local Match

0 0 0 0 0 0 6,900Revenue Sharing Funds: State Match

0 0 0 0 0 0 0 13,800Total

MPO Area

FredericksburgSecondary

PROGRAM/SYSTEM

RTE 616 - POPLAR ROAD INTERSECTION

IMPROVEMENT

PROJECT

UPC NO.:

ROUTE:

100622

NFO0616

LOCALLY ADMINISTERED; $1,445,000 in state secondary funds; $100,000 in Local funds paid

to VDOT via separate project; $250,000 in Local (No Post) Contributions

REPORT NOTE:

Underway

SCHEDULE

200

ESTIMATED COST (000's)

JURISDICTION:

POPLAR ROADSTREET NAME:

PEStafford County

FY2015 1,471CN

FY2013FROM: RTE 616 Intersection with TO: RTE 627 Mountain

View Road (0.2500 MI)

DESCRIPTION: 124RW

PROJECT LENGTH: 0.2500 MISCOPE OF WORK: Safety TO 1,795

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 2Accounts Receivable: Local

0 0 0 0 0 0 250Local Project Contributions: Local

0 0 0 0 0 0 98Project Contributions: Various Sources

338 0 0 0 44 161 903(S) Telecommunications: State

0 0 0 0 44 338 161 1,253Total

224 11/12/2014

Page 45: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program

FY15 REVISED FINAL Secondary

MPO Area

FredericksburgSecondary

PROGRAM/SYSTEM

RTE 630 - WIDEN TO 4 LANES

PROJECT

UPC NO.:

ROUTE:

4632

NFO0630

State Funds - AC for Future Federal Conversion. Revised Estimate and Schedule Required.REPORT NOTE:

Underway

SCHEDULE

2,375

ESTIMATED COST (000's)

JURISDICTION:

COURTHOUSE ROADSTREET NAME:

PEStafford County

FY2016 20,578CN

UnderwayFROM: 0.10 MILES WEST OF ROUTE 628 TO: 0.22

MILE WEST OF ROUTE 732 (1.7300 MI)

DESCRIPTION: 7,018RW

PROJECT LENGTH: 1.7300 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 29,971

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 353(S) Federal Formula STP: Federal

0 0 0 0 0 0 88(S) Federal Formula STP: State Bond Match

0 0 0 0 0 6,475 6,090Revenue Sharing Funds: Local Match

0 0 0 0 0 6,475 6,090Revenue Sharing Funds: State Match

0 0 0 0 0 0 16(S) Secondary Formula: Federal

0 0 0 0 0 0 1,209(S) Secondary Formula: Federal/State

0 0 0 0 0 0 4(S) Secondary Formula: State Match

0 0 388 367 294 0 361(S) Telecommunications: State

1,761 0 388 367 294 0 12,950 14,211Total

MPO Area

FredericksburgSecondary

PROGRAM/SYSTEM

ROUTE 652- RECONSTRUCTION

PROJECT

UPC NO.:

ROUTE:

102916

NFO0652

Underway

SCHEDULE

500

ESTIMATED COST (000's)

JURISDICTION:

Truslow RoadSTREET NAME:

PEStafford County

FY2014 4,367CN

FY2013FROM: Berea Church Road TO: Plantation Drive (0.9000

MI)

DESCRIPTION: 1,400RW

PROJECT LENGTH: 0.9000 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 6,267

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 3,134Revenue Sharing Funds: Local Match

0 0 0 0 0 0 3,134Revenue Sharing Funds: State Match

0 0 0 0 0 0 0 6,267Total

11/12/2014 225

Page 46: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program

FY15 REVISED FINAL Secondary

MPO Area

FredericksburgSecondary

PROGRAM/SYSTEM

STAFFORDBORO BOULEVARD COMMUTER

PARKING LOT EXPANSION

PROJECT

UPC NO.:

ROUTE:

97552

NFO0684

Complete

SCHEDULE

1,729

ESTIMATED COST (000's)

JURISDICTION:

Staffordboro BoulevardSTREET NAME:

PEStafford County

Underway 9,235CN

UnderwayFROM: Staffordboro Boulevard TO: Commuter Parking Lot

(0.3260 MI)

DESCRIPTION: 1,965RW

PROJECT LENGTH: 0.3260 MISCOPE OF WORK: Transit TO 12,929

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 90Bond Match: State Bond Match

0 0 0 0 0 0 503Bond Proceeds: CPR Bonds

0 0 0 0 0 0 320CMAQ: Federal

0 0 0 0 0 295 0CMAQ: MPO - Federal

0 0 0 0 0 74 0CMAQ: MPO - State Match

0 0 0 0 0 0 80CMAQ: State Match

0 0 0 0 0 0 800CMAQ: TERMS - Federal

0 0 0 0 0 0 200CMAQ: TERMS - State Match

0 0 0 0 0 0 2,674CMAQ TERMS: Federal

0 0 0 0 0 0 673CMAQ TERMS: State Match

0 0 0 0 0 0 1,320Demonstration Funds: Federal

0 0 0 0 0 827 173(X) Maintenance Funds: Statewide

0 0 0 0 0 0 992Minimum Guarantee: Federal

0 0 0 0 0 0 1,875Revenue Sharing Funds: Local Match

0 0 0 0 0 0 1,875Revenue Sharing Funds: State Match

0 0 0 0 0 0 158(S) Secondary Formula: Federal/State

0 0 0 0 0 0 1,196 11,733Total

MPO Area

FredericksburgSecondary

PROGRAM/SYSTEM

RECONSTRUCTION - BRENT POINT RD.

PROJECT

UPC NO.:

ROUTE:

105721

NFO9999

Revised estimate required.REPORT NOTE:

FY2015

SCHEDULE

200

ESTIMATED COST (000's)

JURISDICTION:

VariousSTREET NAME:

PEStafford County

FY2017 2,000CN

FY2015FROM: Various TO: Various (4.6000 MI)DESCRIPTION: 250RW

PROJECT LENGTH: _SCOPE OF WORK: Resurfacing TO 2,450

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 2,250 0Local Project Contributions: Local

0 0 0 0 0 100 0Revenue Sharing Funds: Local Match

0 0 0 0 0 100 0Revenue Sharing Funds: State Match

0 0 0 0 0 0 2,450 0Total

226 11/12/2014

Page 47: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program

FY15 REVISED FINAL Secondary

MPO Area

FredericksburgSecondary

PROGRAM/SYSTEM

RECONSTRUCTION - ENON ROAD

PROJECT

UPC NO.:

ROUTE:

105722

NFO9999

Revised estimate required.REPORT NOTE:

FY2015

SCHEDULE

535

ESTIMATED COST (000's)

JURISDICTION:

VariousSTREET NAME:

PEStafford County

FY2017 2,100CN

FY2016FROM: Various TO: Various (0.6000 MI)DESCRIPTION: 400RW

PROJECT LENGTH: 0.6000 MISCOPE OF WORK: Resurfacing TO 3,035

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 235 0Local Project Contributions: Local

0 0 0 0 0 1,400 0Revenue Sharing Funds: Local Match

0 0 0 0 0 1,400 0Revenue Sharing Funds: State Match

0 0 0 0 0 0 3,035 0Total

MPO Area

NonMPOSecondary

PROGRAM/SYSTEM

PAVE UNPAVED ROAD - COPLE DRIVE

PROJECT

UPC NO.:

ROUTE:

104164

NFO0000

Complete

SCHEDULE

20

ESTIMATED COST (000's)

JURISDICTION:

Cople DriveSTREET NAME:

PEWestmoreland County

Underway 50CN

FROM: Int. Rte. 1501 TO: Int. Rte. 1505 (0.1000 MI)DESCRIPTION: RW

PROJECT LENGTH: 0.1000 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 70

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 35Revenue Sharing Funds: Local Match

0 0 0 0 0 0 35Revenue Sharing Funds: State Match

0 0 0 0 0 0 0 70Total

MPO Area

NonMPOSecondary

PROGRAM/SYSTEM

RTE 621 - BRIDGE REPLACEMENT

PROJECT

UPC NO.:

ROUTE:

81500

NFO0621

Complete

SCHEDULE

799

ESTIMATED COST (000's)

JURISDICTION:

Prospect Hill RoadSTREET NAME:

PEWestmoreland County

Underway 3,238CN

UnderwayFROM: 0.770 Miles south of Intersection Route 202 TO:

0.959 Miles south of Intersection Route 202 (0.1890 MI)

DESCRIPTION: 581RW

28614 -2PROJECT LENGTH: 0.1890 MI STRUCTURE NO.: SUFFICIENCY RATING:

SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 4,619

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 335Bond Match: State Bond Match

0 0 0 0 0 0 2,165Bridge Replacement: Federal

0 0 0 0 0 0 971(S) Federal Formula STP: Federal

0 0 0 0 0 0 186(S) Federal Formula STP: State Bond Match

0 0 0 0 0 0 114Federal STP: Federal

0 0 0 0 0 0 242(S) Secondary Formula: Federal

0 0 0 0 0 0 254(S) Secondary Formula: Federal/State

0 0 0 0 0 0 117(S) Secondary Formula: State Match

0 0 0 0 0 0 235Soft Match: Federal

0 0 0 0 0 0 0 4,619Total

11/12/2014 227

Page 48: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program

FY15 REVISED FINAL Secondary

MPO Area

NonMPOSecondary

PROGRAM/SYSTEM

PAVE UNPAVED ROAD-WOODLAND DRIVE

(NORTH)

PROJECT

UPC NO.:

ROUTE:

104165

NFO9999

Complete

SCHEDULE

20

ESTIMATED COST (000's)

JURISDICTION:

Woodland Drive (North)STREET NAME:

PEWestmoreland County

Underway 58CN

FROM: Int. Rte. 1501 TO: Int. Rte. 1505 (0.1100 MI)DESCRIPTION: RW

PROJECT LENGTH: 0.1100 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 78

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 39Revenue Sharing Funds: Local Match

0 0 0 0 0 0 39Revenue Sharing Funds: State Match

0 0 0 0 0 0 0 78Total

MPO Area

NonMPOSecondary

PROGRAM/SYSTEM

RURAL ADDITION - BAY VIEW DRIVE

PROJECT

UPC NO.:

ROUTE:

105719

NFO9999

Underway

SCHEDULE

20

ESTIMATED COST (000's)

JURISDICTION:

VariousSTREET NAME:

PEWestmoreland County

FY2016 102CN

FROM: Various TO: Various (0.1400 MI)DESCRIPTION: RW

PROJECT LENGTH: 0.1400 MISCOPE OF WORK: Resurfacing TO 122

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 51 10Revenue Sharing Funds: Local Match

0 0 0 0 0 51 10Revenue Sharing Funds: State Match

0 0 0 0 0 0 102 20Total

MPO Area

NonMPOSecondary

PROGRAM/SYSTEM

RUARAL ADDITION - STRIPER DRIVE

PROJECT

UPC NO.:

ROUTE:

105720

NFO9999

Underway

SCHEDULE

10

ESTIMATED COST (000's)

JURISDICTION:

Striper DriveSTREET NAME:

PEWestmoreland County

FY2015 27CN

FROM: Route 1319 TO: Dead end (0.0500 MI)DESCRIPTION: RW

PROJECT LENGTH: 0.0500 MISCOPE OF WORK: Resurfacing TO 37

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 19 11Revenue Sharing Funds: Local Match

0 0 0 0 0 19 11Revenue Sharing Funds: State Match

-22 0 0 0 0 0 37 22Total

228 11/12/2014

Page 49: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program

FY15 REVISED FINAL Urban

MPO Area

FredericksburgUrban

PROGRAM/SYSTEM

FALL HILL AVE. BRIDGE & APPROACHES

RECONSTRUCTION & WIDENING

PROJECT

UPC NO.:

ROUTE:

88699

FO

Underway

SCHEDULE

5,159

ESTIMATED COST (000's)

JURISDICTION:

Fall Hill AvenueSTREET NAME:

PEFredericksburg

Underway 32,392CN

UnderwayFROM: 0.12 Miles West of Gordon W. Shelton Blvd. TO:

0.03 Miles West of Rappahannock Canal Bridge (2.1900

MI)

DESCRIPTION: 6,850RW

29890 -1PROJECT LENGTH: 2.1900 MI STRUCTURE NO.: SUFFICIENCY RATING:

SCOPE OF WORK: Reconstruction w/ Added Capacity TO 44,400

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 40Bond Match: State Bond Match

0 0 0 0 0 0 2,253Bond Proceeds: CPR Bonds

1,621 0 0 12,217 19,000 0 0Bond Proceeds: GARVEE Bonds

0 0 0 0 0 0 160Bridge Replacement: Federal

0 0 0 0 0 0 566Federal Formula STP: Federal

0 0 0 0 0 0 141Federal Formula STP: State Bond Match

0 0 0 0 0 0 4Local Project Contributions: Urban - Local

Match

0 0 0 0 0 0 156Non-Formula: State

0 0 0 0 0 0 2,880Revenue Sharing Funds: Local Match

0 0 0 0 0 0 2,880Revenue Sharing Funds: State Match

0 0 0 0 0 0 1,539RSTP (STP Regional): Federal

0 0 0 0 0 0 230RSTP (STP Regional): State Match

0 0 0 0 0 0 10State Formula: Urban - Local Match

0 0 0 0 0 0 90Urban Formula: Federal

0 0 0 0 0 0 374Urban Formula: Federal/State

0 0 0 0 0 0 220Urban Formula: State

0 0 0 0 0 0 20Urban Formula: State Match

0 0 0 12,217 19,000 1,621 0 11,562Total

MPO Area

FredericksburgUrban

PROGRAM/SYSTEM

RTE 1 OVER OLD RAPPAHANNOCK CANAL, VA

STR. 1802

PROJECT

UPC NO.:

ROUTE:

90077

NFO0001

Underway

SCHEDULE

1,073

ESTIMATED COST (000's)

JURISDICTION:

Jefferson Davis BypassSTREET NAME:

PEFredericksburg

FY2018 5,206CN

FY2016FROM: Old Rappahannock Canal TO: Old Rappahannock

Canal

DESCRIPTION: 150RW

29889 -1PROJECT LENGTH: _ STRUCTURE NO.: SUFFICIENCY RATING:

SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 6,429

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 120Bond Match: State Bond Match

0 0 0 0 0 0 480Bridge Replacement: Federal

0 3,571 1,500 0 0 0 0CTB Formula: Bridge - State

0 0 0 582 0 0 0RSTP (STP Regional): MPO - Federal

0 0 0 146 0 0 0RSTP (STP Regional): MPO - State Match

30 3,571 1,500 728 0 0 0 600Total

11/12/2014 229

Page 50: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program

FY15 REVISED FINAL Urban

MPO Area

FredericksburgUrban

PROGRAM/SYSTEM

LAFAYETTE BOULEVARD/KENMORE AVENUE

ROUNDABOUT

PROJECT

UPC NO.:

ROUTE:

100439

NFO0001

Revised schedule required.REPORT NOTE:

FY2015

SCHEDULE

375

ESTIMATED COST (000's)

JURISDICTION:

Lafayette BlvdSTREET NAME:

PEFredericksburg

FY2020 872CNFROM: Intersection of Lafayette Blvd and TO: Kenmore

Ave.

DESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Reconstruction w/o Added Capacity TO 1,247

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 300 0 0 0 0 0CMAQ: MPO - Federal

0 75 0 0 0 0 0CMAQ: MPO - State Match

872 375 0 0 0 0 0 0Total

MPO Area

FredericksburgUrban

PROGRAM/SYSTEM

REPLACE BRIDGE ON ROUTE 1 OVER HAZEL

RUN

PROJECT

UPC NO.:

ROUTE:

100444

NFO0001

Revised schedule required.REPORT NOTE:

Underway

SCHEDULE

400

ESTIMATED COST (000's)

JURISDICTION:

Jefferson Davis HighwaySTREET NAME:

PEFredericksburg

FY2020 3,086CN

FY2014FROM: 0.03 Mile North of Hazel Run TO: 0.03 Mile South

of Hazel run (0.0600 MI)

DESCRIPTION: 200RW

30101 -1PROJECT LENGTH: 0.0600 MI STRUCTURE NO.: SUFFICIENCY RATING:

SCOPE OF WORK: Bridge Rehab w/o Added Capacity TO 3,686

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 116Revenue Sharing Funds: Local Match

0 0 0 0 0 0 116Revenue Sharing Funds: State Match

0 0 0 0 0 0 75RSTP (STP Regional): Federal

0 0 0 0 161 0 0RSTP (STP Regional): MPO - Federal

0 0 0 0 40 0 0RSTP (STP Regional): MPO - State Match

0 0 0 0 0 0 19RSTP (STP Regional): State Match

3,159 0 0 0 201 0 0 325Total

MPO Area

FredericksburgUrban

PROGRAM/SYSTEM

ROUTE 1 - SIGNAL OPTIMIZATION

PROJECT

UPC NO.:

ROUTE:

100451

NFO0001

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

Jefferson Davis HighwaySTREET NAME:

PEFredericksburg

FY2017 425CNFROM: Stafford County Line TO: Spotsylvania County Line

(3.3900 MI)

DESCRIPTION: RW

PROJECT LENGTH: 3.3900 MISCOPE OF WORK: Safety TO 425

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 180 160 0 0CMAQ: MPO - Federal

0 0 0 45 40 0 0CMAQ: MPO - State Match

0 0 0 225 200 0 0 0Total

230 11/12/2014

Page 51: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program

FY15 REVISED FINAL Urban

MPO Area

FredericksburgUrban

PROGRAM/SYSTEM

PRINCESS ANNE STREET IMPROVEMENTS -

PHASE 2

PROJECT

UPC NO.:

ROUTE:

100459

NFO0001

MPO Project.REPORT NOTE:

Underway

SCHEDULE

100

ESTIMATED COST (000's)

JURISDICTION:

Princess Anne St.STREET NAME:

PEFredericksburg

FY2019 1,371CNDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Reconstruction w/o Added Capacity TO 1,471

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 552 0 545 80 0RSTP (STP Regional): MPO - Federal

0 0 138 0 136 20 0RSTP (STP Regional): MPO - State Match

0 0 689 0 681 0 100 0Total

MPO Area

FredericksburgUrban

PROGRAM/SYSTEM

ROUTE 3 SIGNAL OPTIMIZATION

PROJECT

UPC NO.:

ROUTE:

100450

NFO0003

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

William StreetSTREET NAME:

PEFredericksburg

FY2017 1,047CNFROM: Blue Gray Parkway/Plank Road TO: Route 3

business (William Street) (2.8300 MI)

DESCRIPTION: RW

PROJECT LENGTH: 2.8300 MISCOPE OF WORK: Safety TO 1,047

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 437 400 0 0CMAQ: MPO - Federal

0 0 0 109 100 0 0CMAQ: MPO - State Match

0 0 0 547 500 0 0 0Total

MPO Area

FredericksburgUrban

PROGRAM/SYSTEM

FALL HILL AVENUE BRIDGE REPLACEMENT

OVER RAPPAHANNOCK CANAL

PROJECT

UPC NO.:

ROUTE:

91452

NFO0639

Revised schedule requiredREPORT NOTE:

Complete

SCHEDULE

798

ESTIMATED COST (000's)

JURISDICTION:

Fall Hill AvenueSTREET NAME:

PEFredericksburg

Underway 3,254CN

UnderwayFROM: 0.09 Mi. W of the Rappahannock Canal TO: 0.10

Mi. E. of the Rappahannock Canal (0.2130 MI)

DESCRIPTION: 50RW

29299 -1PROJECT LENGTH: 0.2130 MI STRUCTURE NO.: SUFFICIENCY RATING:

SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 4,102

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 993 0Local Project Contributions: Local

0 0 0 0 0 0 1,554Revenue Sharing Funds: Local Match

0 0 0 0 0 0 1,554Revenue Sharing Funds: State Match

0 0 0 0 0 0 993 3,109Total

11/12/2014 231

Page 52: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program

FY15 REVISED FINAL Urban

MPO Area

FredericksburgUrban

PROGRAM/SYSTEM

RECONSTRUCTION - AMELIA STREET

PROJECT

UPC NO.:

ROUTE:

105735

NFO9999

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

VariousSTREET NAME:

PEFredericksburg

FY2015 340CN

FROM: Various TO: Various (0.4200 MI)DESCRIPTION: RW

PROJECT LENGTH: 0.4200 MISCOPE OF WORK: Resurfacing TO 340

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 170 0Revenue Sharing Funds: Local Match

0 0 0 0 0 170 0Revenue Sharing Funds: State Match

0 0 0 0 0 0 340 0Total

MPO Area

FredericksburgUrban

PROGRAM/SYSTEM

REGIONAL LAND USE SCENARIO PLANNING

PROJECT

UPC NO.:

ROUTE:

93975

NFO0000

MPO project. Revised estimate and schedule required. Locally administered.REPORT NOTE:

Underway

SCHEDULE

780

ESTIMATED COST (000's)

JURISDICTION:

N/ASTREET NAME:

PEFredericksburg District-wide

CN

FROM: Regional Land Use TO: Scenario PlanningDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Preliminary Engineering TO 780

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 10Non-Formula: State

0 0 0 0 0 0 239RSTP (STP Regional): Federal

0 0 0 160 0 142 83RSTP (STP Regional): MPO - Federal

0 0 0 40 0 35 21RSTP (STP Regional): MPO - State Match

0 0 0 0 0 0 50RSTP (STP Regional): State Match

0 0 0 200 0 0 177 403Total

232 11/12/2014

Page 53: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program

FY15 REVISED FINAL Enhancement

MPO Area

FredericksburgEnhancement

PROGRAM/SYSTEM

VIRGINIA CENTRAL RAILWAY TRAIL - PHASE I

PROJECT

UPC NO.: 13785

NFOCTB Reporting Req'd

FROM: BICYCLE/PEDESTRIAN CORRIDOR OF 1.25

MILE SECTION CONNECTING TO: RESIDENTIAL

AREAS TO COMMERCIAL & RECREATIONAL

FACILITIES

DESCRIPTION:

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 246 0TAP: Statewide - Federal

0 0 0 0 0 0 1,089Transportation Enhancement Funds:

Federal

0 0 0 0 0 62 272(X) Transportation Enhancement Funds:

Local

0 0 0 0 0 308 1,361Total

MPO Area

FredericksburgEnhancement

PROGRAM/SYSTEM

BELMONT/FERRY FARM TRAIL

PROJECT

UPC NO.:

ROUTE:

17570

NFO

Complete

SCHEDULE

540

ESTIMATED COST (000's)

JURISDICTION:

Phase 4STREET NAME:

PEStafford County

Underway 765CN

UnderwayFROM: Pratt Park TO: Chatham BridgeDESCRIPTION: 95RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 1,400

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 542 165TAP: Statewide - Federal

0 0 0 0 0 0 1,266Transportation Enhancement Funds:

Federal

0 0 0 0 0 136 268(X) Transportation Enhancement Funds:

Local

-978 0 0 0 0 0 678 1,699Total

MPO Area

NonMPOEnhancement

PROGRAM/SYSTEM

KING AND QUEEN COUNTY ENHANCEMENTS

PROJECT

UPC NO.:

ROUTE:

52016

NFO

REPORT NOTE:

Complete

SCHEDULE

600

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEKing & Queen County

Underway 1,465CNFROM: NEW GATEWAY SIGNAGE, TOURISM FOCUS

AREAS, PUBLIC ACCESS TO: LANDSCAPINGS,

WATER AND LAND TRAILS

DESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Landscaping/Beautification TO 2,065

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 755Project Contributions: Various Sources

0 0 0 0 0 0 808Transportation Enhancement Funds:

Federal

0 0 0 0 0 0 202(X) Transportation Enhancement Funds:

Local

300 0 0 0 0 0 0 1,765Total

11/12/2014 233

Page 54: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program

FY15 REVISED FINAL Enhancement

MPO Area

NonMPOEnhancement

PROGRAM/SYSTEM

MATHEWS COUNTY - MATHEWS

COURTHOUSE

PROJECT

UPC NO.:

ROUTE:

63560

NFO

$164,843 allocation from #T4971 as per CTB 6/19/08. Revised schedule required.REPORT NOTE:

Underway

SCHEDULE

459

ESTIMATED COST (000's)

JURISDICTION:

Main StreetSTREET NAME:

PEMathews County

FY2012 2,343CN

FY2011PLANNING STUDY OF MATHEWS COURTHOUSE &

HISTORIC COURT GREEN

DESCRIPTION: 1,524RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Rehabilitation of Historic Bldgs/Facilities TO 4,327

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 376TAP: Statewide - Federal

0 0 0 0 0 0 1,427Transportation Enhancement Funds:

Federal

0 0 0 0 0 0 451(X) Transportation Enhancement Funds:

Local

2,073 0 0 0 0 0 0 2,254Total

MPO Area

FredericksburgEnhancement

PROGRAM/SYSTEM

CONST. OF SIDEWALKS, INSTALLATION OF

SIGNAGE & BUS STOPS

PROJECT

UPC NO.:

ROUTE:

91238

NFO

$71,211 transfer from cancelled project UPC 50106 6/2013REPORT NOTE:

Complete

SCHEDULE

572

ESTIMATED COST (000's)

JURISDICTION:

Jefferson Davis Hwy.STREET NAME:

PEStafford County

Underway 2,995CN

FY2012FROM: Rte 1 & Rte 630 Int TO: Rte 687 Hope Rd (0.2400

MI)

DESCRIPTION: 1,438RW

PROJECT LENGTH: 0.2400 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 5,005

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 1,496Project Contributions: Various Sources

0 0 0 0 0 0 168TAP: MPO - Federal

0 0 0 0 0 0 332TAP: Statewide - Federal

0 0 0 0 0 0 2,307Transportation Enhancement Funds:

Federal

0 0 0 0 0 0 702(X) Transportation Enhancement Funds:

Local

0 0 0 0 0 0 0 5,005Total

234 11/12/2014

Page 55: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program

FY15 REVISED FINAL Enhancement

MPO Area

NonMPOEnhancement

PROGRAM/SYSTEM

NEW POINT COMFORT LIGHTHOUSE

STABILIZATION AND RESTORATION

PROJECT

UPC NO.:

ROUTE:

94279

NFO

Complete

SCHEDULE

10

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEMathews County

Underway 707CNDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Environmental Only TO 717

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 726TAP: Statewide - Federal

0 0 0 0 0 0 574Transportation Enhancement Funds:

Federal

0 0 0 0 0 0 325(X) Transportation Enhancement Funds:

Local

-907 0 0 0 0 0 0 1,624Total

MPO Area

NonMPOEnhancement

PROGRAM/SYSTEM

RESTORING THE EDGE HILL STATION

PROPERTY

PROJECT

UPC NO.:

ROUTE:

103579

NFO

Underway

SCHEDULE

140

ESTIMATED COST (000's)

JURISDICTION:

Main StreetSTREET NAME:

PEGloucester County

FY2015 341CN

FROM: Main Street TO: Main StreetDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Restoration and Rehabilitation TO 481

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 1Project Contributions: Various Sources

0 0 0 0 0 0 384TAP: Statewide - Federal

0 0 0 0 0 0 96(X) Transportation Enhancement Funds:

Local

0 0 0 0 0 0 0 481Total

MPO Area

NonMPOEnhancement

PROGRAM/SYSTEM

MONROE BIRTHPLACE TIMELINE WALK

PROJECT

UPC NO.:

ROUTE:

103582

NFO

Underway

SCHEDULE

40

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEWestmoreland County

FY2015 654CNFROM: James Monroe Birthplace Park TO: James Monroe

Birthplace Park (1.0000 MI)

DESCRIPTION: RW

PROJECT LENGTH: 1.0000 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 694

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 371TAP: Statewide - Federal

0 0 0 0 0 0 184Transportation Enhancement Funds:

Federal

0 0 0 0 0 0 139(X) Transportation Enhancement Funds:

Local

0 0 0 0 0 0 0 694Total

11/12/2014 235

Page 56: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program

FY15 REVISED FINAL Enhancement

MPO Area

NonMPOEnhancement

PROGRAM/SYSTEM

TOWN OF WARSAW SIDEWALKS

PROJECT

UPC NO.:

ROUTE:

105961

NFOEN14

FY2015

SCHEDULE

22

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEWarsaw

FY2018 191CN

FY2017FROM: Main Street 700 ft North of Intersection with Route

360 TO: Intersection of Route 360 and Morgan Lane

DESCRIPTION: 609RW

PROJECT LENGTH: _SCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 822

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 211 0TAP: Statewide - Federal

0 0 0 0 0 53 0(X) Transportation Enhancement Funds:

Local

558 0 0 0 0 0 264 0Total

236 11/12/2014

Page 57: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program

FY15 REVISED FINAL Public Transportation

MPO Area

FredericksburgPublic Transportation

PROGRAM/SYSTEM

FREDERICKSBURG REGIONAL TRANSIT - NEW

BUSES

PROJECT

UPC NO.:

ROUTE:

T6742

NFO0000

MPO project. Revised schedule required.REPORT NOTE:

FY2009

SCHEDULE

420

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEMulti-jurisdictional: Fredericksbug MPO

CN

FROM: New bus Fred service TO: ExpansionDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Transit TO 420

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 336CMAQ: Federal

0 0 0 0 0 0 84CMAQ: State Match

0 0 0 0 0 0 0 420Total

MPO Area

FredericksburgPublic Transportation

PROGRAM/SYSTEM

FREDERICKSBURG TRANSIT OPERATIONAL

ASSISTANCE

PROJECT

UPC NO.:

ROUTE:

T6725

NFO0000

MPO Project; Administered by DRPTREPORT NOTE:

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEFredericksburg

FY2009 901CN

FROM: Fredericksburg TO: VariousDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Transit TO 901

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 803CMAQ: Federal

0 0 0 0 0 0 98CMAQ: State Match

0 0 0 0 0 0 0 901Total

MPO Area

FredericksburgPublic Transportation

PROGRAM/SYSTEM

REPLACEMENT BUSES FOR FRED TRANSIT

PROJECT

UPC NO.:

ROUTE:

93065

NFO0000

Revised estimate & schedule required.REPORT NOTE:

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEMulti-jurisdictional: Fredericksbug MPO

FY2017 2,391CN

FROM: Various TO: VariousDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Transit TO 2,391

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 764CMAQ: Federal

0 0 0 0 0 0 191CMAQ: State Match

0 0 0 0 0 0 160RSTP (STP Regional): Federal

0 0 0 0 0 0 40RSTP (STP Regional): State Match

1,236 0 0 0 0 0 0 1,155Total

11/12/2014 237

Page 58: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program

FY15 REVISED FINAL Public Transportation

MPO Area

FredericksburgPublic Transportation

PROGRAM/SYSTEM

VRE COMMUTER RAIL STATION IN

SPOTSYLVANIA

PROJECT

UPC NO.:

ROUTE:

93066

NFO0000

Complete

SCHEDULE

1,859

ESTIMATED COST (000's)

JURISDICTION:

Benchmark RoadSTREET NAME:

PESpotsylvania County

Underway 11,484CN

UnderwayFROM: 0.023 Mi. South of VRE Drive TO: 0.109 Mi. North

of Route 17 (0.5630 MI)

DESCRIPTION: 1,522RW

PROJECT LENGTH: 0.5630 MISCOPE OF WORK: Other TO 14,865

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 1,622CMAQ: Federal

0 0 0 0 0 0 363CMAQ: MPO - Federal

0 0 0 0 0 0 91CMAQ: MPO - State Match

0 0 0 0 0 0 406CMAQ: State Match

0 0 0 0 0 0 310Local Project Contributions: Local

0 0 0 0 0 0 6,037Revenue Sharing Funds: Local Match

0 0 0 0 0 0 6,037Revenue Sharing Funds: State Match

0 0 0 0 0 0 0 14,865Total

MPO Area

FredericksburgPublic Transportation

PROGRAM/SYSTEM

NEW FRED TRANSIT ROUTES

PROJECT

UPC NO.:

ROUTE:

93067

NFO0000

$42,500 local investment in new transit services requiredREPORT NOTE:

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEMulti-jurisdictional: Fredericksbug MPO

CN

Five Transit RoutesDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Transit TO 0

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 1,046CMAQ: Federal

0 0 0 0 0 0 262CMAQ: State Match

-1,308 0 0 0 0 0 0 1,308Total

MPO Area

FredericksburgPublic Transportation

PROGRAM/SYSTEM

FIVE TRANSIT VEHICLES FOR ROUTES IN

FAMPO AREA

PROJECT

UPC NO.:

ROUTE:

93068

NFO0000

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEFredericksburg District-wide

FY2010 0CNDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Transit TO 0

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 400CMAQ: Federal

0 0 0 0 0 0 100CMAQ: State Match

-500 0 0 0 0 0 0 500Total

238 11/12/2014

Page 59: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program

FY15 REVISED FINAL Miscellaneous

MPO Area

FredericksburgMiscellaneous

PROGRAM/SYSTEM

CONGESTION MANAGEMENT SYSTEM &

PROJECT DEFINITIONS

PROJECT

UPC NO.:

ROUTE:

91856

NFO

Revised schedule and estimate required.REPORT NOTE:

Underway

SCHEDULE

383

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEMulti-jurisdictional: Fredericksbug MPO

CN

FROM: N/A TO: N/ADESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Preliminary Engineering TO 383

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 179Primary Formula: State

0 0 0 0 0 0 0RSTP (STP Regional): Federal

0 0 0 86 0 0 77RSTP (STP Regional): MPO - Federal

0 0 0 22 0 0 19RSTP (STP Regional): MPO - State Match

0 0 0 108 0 0 0 275Total

MPO Area

NonMPOMiscellaneous

PROGRAM/SYSTEM

PROJECT PRESCOPING - FREDERICKSBURG

PROJECT

UPC NO.: 99570

NFOBalance Entry

FROM: Various TO: VariousDESCRIPTION:

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

569 621 608 595 582 463 1,482Prescoping Funds: State

MPO Area

FredericksburgMiscellaneous

PROGRAM/SYSTEM

PUBLIC INVOLVEMENT ACTIVITIES

PROJECT

UPC NO.:

ROUTE:

102626

NFO

Revised estimate required.REPORT NOTE:

Underway

SCHEDULE

408

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEMulti-jurisdictional: Fredericksbug MPO

CNFROM: City of Fredericksburg TO: Stafford and

Spotsylvania Counties

DESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Preliminary Engineering TO 408

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 114RSTP (STP Regional): Federal

40 0 80 0 0 92 0RSTP (STP Regional): MPO - Federal

10 0 20 0 0 23 0RSTP (STP Regional): MPO - State Match

0 0 0 0 0 0 29RSTP (STP Regional): State Match

0 0 100 0 0 50 116 143Total

MPO Area

Multiple MPOsMiscellaneous

PROGRAM/SYSTEM

DISTRICTWIDE GUARDRAIL

PROJECT

UPC NO.: 81375

NFODistrict-wide

DESCRIPTION:

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 20Highway Safety Improvements: Federal

0 0 0 0 0 0 2Highway Safety Improvements: State Match

0 0 0 0 0 0 23Total

11/12/2014 239

Page 60: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program

FY15 REVISED FINAL Miscellaneous

MPO Area

FredericksburgMiscellaneous

PROGRAM/SYSTEM

DISTRICTWIDE ROADWAY SAFETY

ASSESSMENT- F'BURG

PROJECT

UPC NO.: 81378

NFODistrict-wide

DESCRIPTION:

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

238 0 0 0 0 0 786Highway Safety Improvements: Federal

26 0 0 0 0 0 17Highway Safety Improvements: Soft Match

0 0 0 0 0 0 70Highway Safety Improvements: State Match

0 0 0 0 264 0 874Total

MPO Area

FredericksburgMiscellaneous

PROGRAM/SYSTEM

HSIP DISTRICT-WIDE HIGH RISK RURAL

ROADS FREDERICKSBURG

PROJECT

UPC NO.: 86620

NFODistrict-wide

Fredericksburg High Risk Rural Roads Safety ProjectsDESCRIPTION:

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 1,878High Risk Rural: Federal

0 0 0 0 0 0 209High Risk Rural: State Match

0 0 0 0 0 0 2,087Total

MPO Area

FredericksburgMiscellaneous

PROGRAM/SYSTEM

FAMPO CLRP PLANNING ASSISTANCE

PROJECT

UPC NO.:

ROUTE:

90268

NFO0000

MPO projectREPORT NOTE:

Underway

SCHEDULE

1,115

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEMulti-jurisdictional: Fredericksbug MPO

CN

FROM: Area-wide TO: VariousDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Preliminary Engineering TO 1,115

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 411RSTP (STP Regional): Federal

240 240 0 0 0 0 0RSTP (STP Regional): MPO - Federal

60 60 0 0 0 0 0RSTP (STP Regional): MPO - State Match

0 0 0 0 0 0 103RSTP (STP Regional): State Match

0 0 0 0 0 0 1RSTP (STP Regional): Statewide

0 300 0 0 0 300 0 515Total

240 11/12/2014

Page 61: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program

FY15 REVISED FINAL Miscellaneous

MPO Area

FredericksburgMiscellaneous

PROGRAM/SYSTEM

VIRGINIA CENTRAL RAILWAY TRAIL,

FREDERICKSBURG

PROJECT

UPC NO.:

ROUTE:

91174

NFO0000

MPO project.REPORT NOTE:

Complete

SCHEDULE

150

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEFredericksburg

Underway 2,069CNFROM: Int. of Lafayette Blvd & Princess Anne St. TO:

0.89 Mi. West of Rte. 1 = (200' W of exist. Idlewild path)

(2.6520 MI)

DESCRIPTION: RW

PROJECT LENGTH: 2.6520 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 2,219

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 1,437CMAQ: Federal

0 0 0 0 0 0 200CMAQ: MPO - Federal

0 0 0 0 0 0 50CMAQ: MPO - State Match

0 0 0 0 0 0 359CMAQ: State Match

0 0 0 0 0 0 34Local Project Contributions: Local

0 0 0 0 0 0 112RSTP (STP Regional): Federal

0 0 0 0 0 0 28RSTP (STP Regional): State Match

0 0 0 0 0 0 0 2,219Total

MPO Area

NonMPOMiscellaneous

PROGRAM/SYSTEM

WEST POINT - ELEMENTARY AND MIDDLE

SCHOOL - SRTS PROJECT

PROJECT

UPC NO.:

ROUTE:

93135

NFO0000

Complete

SCHEDULE

69

ESTIMATED COST (000's)

JURISDICTION:

Thompson Mattoponi ChelseaSTREET NAME:

PEWest Point

Underway 207CNFROM: In front of school near Thompson and Mattaponi

(Phase 1) TO: to Chelsea and Bagby from Thompson

DESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 276

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 28Local Project Contributions: Local

0 0 0 0 0 0 276Safe Routes to School: Federal

-28 0 0 0 0 0 0 305Total

MPO Area

NonMPOMiscellaneous

PROGRAM/SYSTEM

COLONIAL BEACH - SRTS - COLONIAL BEACH

ES - SIDEWALKS ETC.

PROJECT

UPC NO.:

ROUTE:

102825

NFO0000

Revised schedule required.REPORT NOTE:

Underway

SCHEDULE

68

ESTIMATED COST (000's)

JURISDICTION:

Livingstone StreetSTREET NAME:

PEColonial Beach

FY2015 434CN

UnderwayFROM: Wilder Ave. TO: Washington Ave.DESCRIPTION: 63RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 565

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 498Safe Routes to School: Federal 67

11/12/2014 241

Page 62: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program

FY15 REVISED FINAL Miscellaneous

MPO Area

NonMPOMiscellaneous

PROGRAM/SYSTEM

TOWN OF WEST POINT - SRTS - WEST POINT

ES, MS - SIDEWALKS

PROJECT

UPC NO.:

ROUTE:

102826

NFO0000

Revised schedule required.REPORT NOTE:

Underway

SCHEDULE

17

ESTIMATED COST (000's)

JURISDICTION:

Bagby Street (Phase 2)STREET NAME:

PEWest Point

FY2014 126CN

FY2013FROM: Mattaponi Avenue TO: Chelsea RoadDESCRIPTION: 7RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 151

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 29Safe Routes to School: Federal 122

MPO Area

FredericksburgMiscellaneous

PROGRAM/SYSTEM

CITY OF FREDERICKSBURG PARKING

STRUCTURE

PROJECT

UPC NO.:

ROUTE:

102987

NFO0000

FY2018

SCHEDULE

100

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEFredericksburg

CNFROM: City Of Fredericksburg Parking Structure TO: Near

VRE

DESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Preliminary Engineering TO 100

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 293 0 271 440 0 0CMAQ: MPO - Federal

0 73 0 68 110 0 0CMAQ: MPO - State Match

-1,155 367 0 338 550 0 0 0Total

MPO Area

FredericksburgMiscellaneous

PROGRAM/SYSTEM

GW RIDE CONNECT / TDM ASSISTANCE

PROJECT

UPC NO.:

ROUTE:

103685

NFO0000

Underway

SCHEDULE

1,165

ESTIMATED COST (000's)

JURISDICTION:

N/ASTREET NAME:

PEMulti-jurisdictional: Fredericksbug MPO

CN

FROM: N/A TO: N/ADESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Transit TO 1,165

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 78CMAQ: Federal

100 100 100 100 100 122 236CMAQ: MPO - Federal

25 25 25 25 25 31 59CMAQ: MPO - State Match

0 0 0 0 0 0 19CMAQ: State Match

-6 125 125 125 125 125 153 393Total

242 11/12/2014

Page 63: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program

FY15 REVISED FINAL Miscellaneous

MPO Area

NonMPOMiscellaneous

PROGRAM/SYSTEM

COMMITTED SAFETY

PROJECTS-FREDERICKSBURG

PROJECT

UPC NO.:

ROUTE:

106556

NFO0000

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEFredericksburg District-wide

N/A 0CNDESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: TO 0

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 2,405 1,683 1,344 1,338 0 0Highway Safety Improvements: Federal

0 267 187 149 149 0 0Highway Safety Improvements: Soft Match

-7,522 2,672 1,870 1,493 1,487 0 0 0Total

MPO Area

FredericksburgMiscellaneous

PROGRAM/SYSTEM

VANPOOL STATISTICS COLLECTION AND

REPORTING

PROJECT

UPC NO.:

ROUTE:

95531

FO0095

MPO projectREPORT NOTE:

FY2013

SCHEDULE

200

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEMulti-jurisdictional: Fredericksbug MPO

CN

FROM: NA TO: NADESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Transit TO 200

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 138CMAQ: Federal

0 0 0 0 0 0 22CMAQ: MPO - Federal

0 0 0 0 0 0 6CMAQ: MPO - State Match

0 0 0 0 0 0 35CMAQ: State Match

0 0 0 0 0 0 0 200Total

MPO Area

FredericksburgMiscellaneous

PROGRAM/SYSTEM

IMPROVEMENTS TO AIRPORT ROAD

(CENTREPORT PARKWAY) & RTE 628

PROJECT

UPC NO.:

ROUTE:

77409

NFO8900

Includes FY05 Federal Omnibus Bill Allocations.REPORT NOTE:

Underway

SCHEDULE

164

ESTIMATED COST (000's)

JURISDICTION:

Centreport ParkwaySTREET NAME:

PEStafford County

FY2015 791CN

UnderwayFROM: Intersection with Route 628 TO: 0.096 miles

south of Route 628 (0.0960 MI)

DESCRIPTION: 595RW

PROJECT LENGTH: 0.0960 MISCOPE OF WORK: New Construction Roadway TO 1,550

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 159Demonstration Funds: Federal

0 0 0 0 0 0 6(S) Residue Parcel Revenue: State

0 0 0 0 0 0 1,024(S) Secondary Formula: Federal/State

0 0 0 0 0 0 4(S) Secondary Formula: State

0 0 0 0 0 0 346(S) Telecommunications: State

10 0 0 0 0 0 0 1,539Total

11/12/2014 243

Page 64: FREDERICKSBURGsyip.virginiadot.org/reports/213/03-FY15-REVISED-FINAL... · 2014. 11. 5. · FY15 REVISED FINAL FY2015-2020 Six-Year Improvement Program FREDERICKSBURG DISTRICT Fund

FREDERICKSBURG DISTRICTFY2015-2020 Six-Year Improvement Program

FY15 REVISED FINAL Miscellaneous

MPO Area

FredericksburgMiscellaneous

PROGRAM/SYSTEM

HSIP FREDERICKSBURG DISTRICTWIDE

PROJECT

UPC NO.: T6523

NFODistrict-wide

Various locationsDESCRIPTION:

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 238Highway Safety Improvements: Federal

0 0 0 0 0 0 26Highway Safety Improvements: State Match

0 0 0 0 0 0 265Total

MPO Area

FredericksburgMiscellaneous

PROGRAM/SYSTEM

DISTRICT WIDE - PE ONLY - SIGNAL

CLEARANCE INTERVAL STUDY

PROJECT

UPC NO.:

ROUTE:

104691

NFO9999

Underway

SCHEDULE

900

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEFredericksburg District-wide

CN

FROM: Various TO: VariousDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 900

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

270 0 0 0 0 270 270Highway Safety Improvements: Federal

30 0 0 0 0 30 30Highway Safety Improvements: Soft Match

0 0 0 0 0 300 300 300Total

MPO Area

FredericksburgMiscellaneous

PROGRAM/SYSTEM

SIGNAL INSTALLATION - INT OF BALLS

BLUFF DR & SPOTSY PARKWAY

PROJECT

UPC NO.:

ROUTE:

105725

NFO9999

FY2015

SCHEDULE

90

ESTIMATED COST (000's)

JURISDICTION:

Balls Bluff DrSTREET NAME:

PESpotsylvania County

FY2017 440CNFROM: Int of Balls Bluff Dr & Spotsylvania Parkway TO:

Int of Balls Bluff Dr & Spotsylvania Parkway

DESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Reconstruction w/o Added Capacity TO 530

REQ'D AFTER

2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 265 0Revenue Sharing Funds: Local Match

0 0 0 0 0 265 0Revenue Sharing Funds: State Match

0 0 0 0 0 0 530 0Total

244 11/12/2014