INSTALLATIONOF PURGE GAS RECOVERY UNIT
NFL VIJAIPUR
CONTENTS OF TECHNICAL DOCUMENTS
PC65/E-1/P-II P
DOCUMENT NO. REV
Page 1 of 2
NFL VIJ AIPUR PGR-J ULY 2013
PART II
CONTENTS OF TECHNICAL DOCUMENTS
FOR
INSTALLATION OF PURGE GAS RECOVERY UNIT
NFL, VIJAIPUR
-
8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT
2/72
INSTALLATIONOF PURGE GAS RECOVERY UNIT
NFL VIJAIPUR
CONTENTS OF TECHNICAL DOCUMENTS
PC65/E-1/P-II P
DOCUMENT NO. REV
Page 2 of 2
NFL VIJ AIPUR PGR-J ULY 2013
LIST OF CONTENTS
PART-II TECHNICAL DOCUMENTS FOR INSTALLATION OF PURGE GAS RECOVERY
UNITSECTION DESCRIPTION
1.0 INTRODUCTION
2.0 GENERAL DESCRIPTION
3.0 DESIGN BASIS
4.0 SCOPE OF WORK
5.0 GUARANTEES
6.0 TIME SCHEDULE
7.0 QUALITY ASSURANCE & CONTROL
8.0 PROGRESS REPORTING
9.0 CLARIFICATION OF CONFLICTS
10.0 DRAWINGS & DOCUMENTS
11.0 VENDORS LIST
12.0 SPARES (COMMISSIONING & 2 YEARS OPERATION)
13.0 ANNEXURE
ANNEXURE 1 PROCESS BLOCK DIAGRAMANNEXURE 2 P&I DIAGRAMS
ANNEXURE 3 TIE-IN LIST
ANNEXURE 4 STATIC EQUIPMENT
ANNEXURE 4.2 ROTATING EQUIPMENT
ANNEXURE 5 PIPING
ANNEXURE 6 ELECTRICAL
ANNEXURE 7 INSTRUMENTATION
ANNEXURE 8 CIVIL
-
8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT
3/72
INSTALLATION OF PURGE GAS RECOVERY UNITAT NFL VIJAIPUR
PLANT: AMMONIA-II
PC 65/E-01/P-II 0
DOCUMENT NO REV
SHEET 1 of 13
0 12.07.13 12.07.13 COMMENT INCORPORATED DSC AV RKV
P 28.06.13 28.06.13 ISSUED FOR REVIEW DSC AV RKV
REV REV DATE EFF DATE PURPOSE PREPD REVWD APPD
INSTALLATION
OF
PURGE GAS RECOVERY UNIT
AMMONIA-II PLANT
NATIONAL FERTILIZERS LTD (NFL), VIJAIPUR
-
8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT
4/72
INSTALLATION OF PURGE GAS RECOVERY
UNIT AT NFL VIJAIPURPLANT: AMMONIA-II
PC65/E-01/P-II 0
DOCUMENT NO REV
SHEET 2 of 13
FORM NO: 02-0000-0021F2 REV1 All rights reserved
CONTENTS
Section. DESCRIPTION PAGE NO.
1.0 Introduction 3
2.0 General 3
3.0 Design Basis 4-9
4.0 Scope of work 10
5.0 Guarantees 10
6.0 Time Schedule 11
7.0 Quality Assurance & Control 12
8.0 Progress Reporting 12
9.0 Clarification of Conflicts 13
10.0 Drawings & Documents
11.0 Vendors List
12.0 Spares(Commissioning & 2 years Operation)
13.0 Annexure
Annexure 1 Process Block Diagram
Annexure 2 P&I Diagrams
Annexure 3 Tie-In List
Annexure 4 Static & Rotating Equipment
Annexure 5 Piping
Annexure 6 Electrical
Annexure 7 Instrumentation
Annexure 8 Civil
-
8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT
5/72
INSTALLATION OF PURGE GAS RECOVERY
UNIT AT NFL VIJAIPURPLANT: AMMONIA-II
PC65/E-01/P-II 0
DOCUMENT NO REV
SHEET 3 of 13
FORM NO: 02-0000-0021F2 REV1 All rights reserved
1.0 INTRODUCTION:
M/s National Fertilizers Ltd (NFL), Vijaipur is operating two Ammonia Plants each of
capacity of 1520 MTPD. AMMONIA-I & II Plants were commissioned in 1987 and 1997
respectively. Both the Plants are based on steam reforming process of M/S HTAS
Technology. Ammonia-I and Ammonia-II Plants have been revamped in 2012-13 to
1750MTPD and 1864 MTPD ammonia production capacity respectively.
In order to maintain loop pressure in synthesis section, a part of gas circulating in the
synthesis loop has to be pur ged out to the plant fuel system to maintain inerts at anacceptable level. However, this results in loss of Ammonia Production and increases
specific energy consumption. In order to recover H2 from Purge Gas and increase
ammonia production, One Purge gas Recovery Unit is installed In Ammonia-I plant. The
capacity of this PGRU is 15000 NM3/hr and is in operation since 1993.
NFL intends to install a Purge Gas Recovery (PGR) Unit at Ammonia-II Plant for recovery
of Hydrogen gas from Synthesis loop purge gas. Installation of PGR unit of 18,000 Nm/h
capacities will help in saving in energy consumption with associated increase in
Ammonia production.
2.0 GENERALDESCRIPTION:
This specification covers design engineering and supply of complete Purge gas recovery
unit consisting of
Gas Pre-treatment.
Hydrogen Recovery Unit.
Recovered ammonia purification.
The complete Hydrogen recovery unit shall be pr eferred as skid mounted for ease of
installation.
The purge gas from Ammonia-II plant synthesis loop shall be available at a pressure of
about 190 kg/cm2g. The purge gas shall be tapped by bidder from the synthesis loop and
shall be treated to remove ammonia and other impurities to make it suitable for feeding to
purge gas recovery unit for recovery of hydrogen gas. Bidder can offer PGR unit based
on any proven technology, which is in satisfactory operation as per Bid Evaluation
-
8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT
6/72
INSTALLATION OF PURGE GAS RECOVERY
UNIT AT NFL VIJAIPURPLANT: AMMONIA-II
PC65/E-01/P-II 0
DOCUMENT NO REV
SHEET 4 of 13
FORM NO: 02-0000-0021F2 REV1 All rights reserved
Criteria. The recovered hydrogen shall be fed to ammonia synthesis compressor inlet
stage depending upon the pressure of the recovered Hydrogen. The operating pressure
of different stages of Synthesis compressor is 25, 52 and 97 Kg/cm2. The recovered
ammonia shall be concentrated to 99.5% purity in distillation column and sent to
Ammonia plant. All process and ut ilities connections with the existing Ammonia-II plant
shall be installed by bidder by providing required isolation valves and piping.
Bidders can submit their bid based on any proven technology, which is in satisfactory
operation as per Bid Evaluation Criteria. The evaluation of the offer shall be based on
capital cost, operating cost of the unit and other loading criteria defined in the ITB.
3.0 DESIGN BASIS :
3.1 The design shall incorporate conventional, reliable & proven features with an ai m to
minimize the capital cost.
Consideration shall also be g iven for stability of operation even at reduced loads. The
vendor should base his design on the OWNERs requirement to operate the entire Unit
continuously for 24 months without shut down.
3.2 Process Specif ication
The Process Specification for PGR is given below in Table 1.
TABLE-1
COMPONENT UNIT PURGE GAS RECOVERED H2 TAIL GAS RECOVERED NH3
H2 Mole % 60 - 68
N2 Mole % 18 - 25
Ar Mole % 3 - 6
CH4 Mole % 6 - 12
NH3 Mole % 0.4 - 2.5
H2O Mole % 0
Flow Normal Nm3/hr 15000
Flow Rated Nm3/hr 18000
Pressure Kg/cm2
(g) 190 30 (Min.) 5 (Min.) 21
Temperature 0C 15 40 45 40
-
8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT
7/72
INSTALLATION OF PURGE GAS RECOVERY
UNIT AT NFL VIJAIPURPLANT: AMMONIA-II
PC65/E-01/P-II 0
DOCUMENT NO REV
SHEET 5 of 13
FORM NO: 02-0000-0021F2 REV1 All rights reserved
H2Recovery
(Minimum)% 90
Purity of
Recovered
streams
(Min.)
% 90 99.5
3.3 Utilities
3.3.1 Steam
Low Pressure Steam:Header Conditions: Normal DesignPressure, Kg/cm2g 3.5 6Temperature, 0C 250 350
Medium Pressure Steam:Header Conditions: Normal DesignPressure, Kg/cm2g 38 46Temperature, 0C 380 425
High Pressure Steam:Header Conditions: Normal DesignPressure, Kg/cm2g 107 130Temperature, 0C 525 540
3.3.2 Demineralised water
Battery Limit Conditions: Normal DesignPressure, Kg/cm2g 2 5Temperature, 0C 40 60
Quality in accordance with VGB norms for high Pressure Boilers
3.3.3 Cooling Water
Cooling Water SystemBattery Limit Conditions: Supply Return DesignPressure, Kg/cm2g 3.5 2 6Temperature, 0C 33 43 70
Temperature rise for Design of new coolers, 0C 10
Pressure drop for design of new coolers, Kg/cm2
g 0.7
-
8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT
8/72
INSTALLATION OF PURGE GAS RECOVERY
UNIT AT NFL VIJAIPURPLANT: AMMONIA-II
PC65/E-01/P-II 0
DOCUMENT NO REV
SHEET 6 of 13
FORM NO: 02-0000-0021F2 REV1 All rights reserved
3.3.4 Instrument air
Header Conditions: Normal Design
Pressure, Kg/cm2g 6.5 10Temperature, 0C Ambient 70
Dew Point at atm pressure, 0C -40Quality Free from dust water drops, oil
New Instrument lines to be made in SS 304
3.3.5 Plant Air
Header Conditions: Normal DesignPressure, Kg/cm2g 4 10Temperature, 0C 40 70
Quality Free from dust water drops, oil
3.3.6 Nitrogen
Header Conditions: Normal DesignPressure, Kg/cm2g 6 10Temperature, 0C 40 70
Quality Free from dust water drops, oil
Nitrogen, mole%, min 99.9Oxygen, mole%, max 0.01
3.3.7 Electric Power
Power is distributed at the followings levels:
1. 11 kV 3phase with resistance earthed neutral
2. 3.3 kV 3 phase with resistance earthed neutral3. 0.415 kV 3 phase with solidly earthed neutral4. 0.24 kV single phase with solidly earthed neutral
The above voltages have a tolerance of 10% and a 50 Hz frequency with a tolerance of3%.Instrument power will be distributed at 115 V AC with solidly earthed neutral (3 wiresystem)
Consumer Voltages:
Power lighting:
1. Motors above 1000 k 3 x 11 kV2. Motors from 150kV to 1000 k 3 x 3.3 kV
-
8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT
9/72
INSTALLATION OF PURGE GAS RECOVERY
UNIT AT NFL VIJAIPURPLANT: AMMONIA-II
PC65/E-01/P-II 0
DOCUMENT NO REV
SHEET 7 of 13
FORM NO: 02-0000-0021F2 REV1 All rights reserved
3. Motors up to 150 k 3 x 0.415 kV4. Electric Heaters acc. To manufactures requirement5. Lighting normal, emergency 240 V AC
6. Level gauge lighting 240 V AC7. Panic Lighting 10 V AC8. Hand Tools 110 V AC9. Lighting for vessels and furnace 24 V AC
Controls and instruments for switch gear:
1. 11 kV switch gear (trip circuit) 110 V DC2. 11 kV switch gear (other circuit) 240 V DC3. 3.3 kV switch gear (trip circuit) 110 V DC4. 3.3 kV switch gear (other circuit) 110 V DC5. 0.415 kV switch gear 240 V AC & 110 V DC
Instrumentation:
1. Motorised control valves (4 wire system) 3 x 415 V AC2. Solenid Valves 110 V DC3. \instruments and data logger (through UPS) 115 V AC4. Alarm circuits with lamps and relays 24 V DC5. Illumination of level gauges 240 V AC
3.4 Climatic Conditions
3.4.1 Atmospheric Pressure
Maximum recorded, mbar 967.9Minimum recorded, mbar 936.9Design, mbar 939.0
3.4.2 Air Temperature
Jan JulyHighest Temperature recorded, 0C 31.7 41.7Monthly mean daily max. temp., 0C 24.0 31.1Monthly mean temp.at 17:30 , 0C 22.7 26.1Monthly mean temp.at 10:30 , 0C 11.9 25.7Monthly mean daily min. temp., 0C 8.2 24.0Lowest Temperature recorded, 0C -2.2 20.6
Maximum Temperature recorded, 0C 46.1 (May)Lowest Temperature recorded, 0C -2.2 (January)
Annual mean temperature recorded, 0C 22.3
-
8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT
10/72
INSTALLATION OF PURGE GAS RECOVERY
UNIT AT NFL VIJAIPURPLANT: AMMONIA-II
PC65/E-01/P-II 0
DOCUMENT NO REV
SHEET 8 of 13
FORM NO: 02-0000-0021F2 REV1 All rights reserved
3.4.3 Design Air / humidity
Temperature 35 0C
Relative Humidity 100
3.4.4 Rainfall
Mean annual Rainfall, mm 1219.8Heaviest in a day, mm 290.5Design (1 hour), mm 120.0
3.4.5 HumidityJan July
Monthly mean relative humidity at 10:30, % 61 84Monthly mean relative humidity at 17:30, % 37 71
3.4.6 Wind
The recorded mean wind speeds are as follows:
January 1.4 Km/hrFebruary 5.1 Km/hrMarch 5.9 Km/hr
April 7.4 Km/hrMay 10.4 Km/hrJune 13.0 Km/hrJuly 12.0 Km/hrAugust 10.0 Km/hrSeptember 7.4 Km/hrOctober 5.9 Km/hrNovember 2.9 Km/hrDecember 3.3 Km/hr
Prevailing direction is W to E from February to June, SW to NE from June to October and
NE to SW from October to Fabruary.
Design Wind Speed. Km/hr 160
Design Wind load for design against wind forces and wind load shall be increased by 30% to cater for the effect on piping systems, platform, ladders etc.
3.4.7 Ambience
Due to the location within an industrial complex, the air may contain particles of send &Urea. The air may accidentally contain Ammonia vapour, and for this reason no part in
direct contact with the atmosphere may be constructed from copper or copper alloys.
-
8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT
11/72
INSTALLATION OF PURGE GAS RECOVERY
UNIT AT NFL VIJAIPURPLANT: AMMONIA-II
PC65/E-01/P-II 0
DOCUMENT NO REV
SHEET 9 of 13
FORM NO: 02-0000-0021F2 REV1 All rights reserved
3.4.8 Load bearing capacity
Nature of terrain Flat and Graded
Land characteristics Clay, Sand & Fractured rock
All major foundations may be placed at a depth of 1.5 - 2.0 meters below ground levelwith net sage bearing capacity of 300 450 KN/m2. Ordinary foundations may be placedat depth of 1.0 1.5 meters below ground level with a net safe bearing capacity of 150 200 KN/m2.
3.4.9 Seismic conditions
The design must be executed as per code IS 1893 (1975). The actual site at Vijaipur isdefined as being situated in zone one (I).
3.5 General Requirements
3.5.1 Required minimum hydrogen purity is 90.00%. High methane and argon rejection rates
are required. Vendor to confirm/ furnish improved rejection rates.
3.5.2 Required minimum recovered Liquid NH3purity is 99.50 %.
3.5.3 Hydrogen recovery to be guaranteed as 90%.
3.5.4 Vendor to provide/ confirm steam and other utilities requirement.3.5.5 Max. Ammonia concentration is 200 ppmv for reject gas.
3.5.6 Adequate provisions shall be m ade for isolation of equipment without causing a
shutdown, so that maintenance or repair work can be carried out on such items (e.g.
block valves on rotating equipment standby units, block valves and bypass on control
valves, etc.). All control valves on hazardous fluid shall be provided with double block
& bleed system. All isolation valves for various sections of the plants, process/steam
vents, drains, etc. as may be required during start-up/shut-down and during PLANT
upsets shall be provided
3.5.7 No deviations from the project specification and this specification are permitted unless
approved in writing by Owner/consultant.
3.5.8 Approval of owner for P&I diagrams, process flow sheets, specifications of equipments
and rotating machineries is required. P&I and all other drawings are to be computer
based.
3.5.9 Vendor other than given in vendor list for all equipments, machineries, package plants,
packing etc. are to be approved by owner.
-
8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT
12/72
INSTALLATION OF PURGE GAS RECOVERY
UNIT AT NFL VIJAIPURPLANT: AMMONIA-II
PC65/E-01/P-II 0
DOCUMENT NO REV
SHEET 10 of 13
FORM NO: 02-0000-0021F2 REV1 All rights reserved
3.5.10 Sizes of various Piping indicated in the Tie-in list & P&IDs of PGR(PC65-1000-0021)
is tentative and final sizes shall be as per designing & recommendation of vendor.
However, Sizes of existing lines where Tie-in is to be taken are actual.
4.0 SCOPE OF WORK:
Bidders scope of work shall include design, HAZOP study, engineering of equipment &
accessories, procurement and s upply of complete material & bought-out items for
mechanical, electrical and I nstruments of Hydrogen purge gas recovery unit including
fabrication at shop, Testing and Inspection, Packing, Loading &Transportation, Unloading
at site, Erection, Construction, Testing & Commissioning &Guaranteed test run for
complete PGR unit as per specification given in NIT.
4.1 Scope of Supply:
Scope of supply shall include but not limited to following items:
4.1.1 Purge gas pre-treatment unit.
4.1.2 Purge Gas Recovery unit.
4.1.3 Ammonia concentration unit
4.1.4 Interconnecting Piping valves as per Annexure 3.
4.1.5 Instrumentation and controls
4.1.6 Complete electrical system
4.1.7 Any other item required as per vendor
4.1.8 Demolition / obstruction, if any, of the equipments/structures related to
changes in the sections to be retained, shall be in the scope of the vendor.
5.0 GUARANTEES:
Vendor shall furnish following guarantees for the PGR system.
5.1 Performance Guarantees:
5.1.1 Vendor to guarantee plant operation at Rated, Normal and 50% of normal purge gas flow
rate.
5.1.2 Vendor to guarantee minimum Hydrogen recovery of 90.0 mol% at all above condition as
per 5.1.1.
5.1.2 Vendor to guarantee minimum Ammonia purity of 99.5 mol%.
-
8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT
13/72
INSTALLATION OF PURGE GAS RECOVERY
UNIT AT NFL VIJAIPURPLANT: AMMONIA-II
PC65/E-01/P-II 0
DOCUMENT NO REV
SHEET 11 of 13
FORM NO: 02-0000-0021F2 REV1 All rights reserved
5.1.3 Vendor shall guarantee purity of Hydrogen as minimum 90.00 %.
5.1.4 Vendor to guarantee max ammonia concentration 200 ppmv for the reject gas.
5.2 Guarantee for utili ty consumpt ion:
Vendor to guarantee specific consumption of following utilities per NM3of Hydrogen
recovered at normal operating capacity.
a) MP Steam (MT)
b) LP Steam (MT)
c) Cooling water (M3)
d) DM water (M3
)f) Power (KWH)
5.3 Guaranteed life of Membrane/packings/any other adsorbent media
5.4 Guaranteed start-up time for PGR unit
6.0 TIME SCHEDULE
The preferred completion period of PGR Unit shall be 8 months. In case of higher
completion period, necessary loading as per loading criteria shall be done.
6.1 Bidder shall furnish activity schedule in form of master network in PrimaVera identifying
major activities in various areas like design, engineering, procurement of materials and
bought out items, manufacture of equipment, delivery activities.
The schedule should confirm to the time period mentioned.
6.2 Master network shall be discussed and agreed upon. Engineering drawings and data
submission schedule shall also be discussed and finalized before issue of letter of intent.6.3 After award of contract, the bidder shall plan sequence of work of manufacture and
erection to meet the commissioning dates given above and shall ensure that all
work/manufacture, shop testing and shipment of equipment is in accordance with
construction/execution sequence.
6.4 Within fifteen days after award of letter of intent bidder shall submit for review and
approval of detailed network schedules based on master network as mutually agreed
upon, showing logic and duration of activities in following major areas: Detailed
engineering, procurement, manufacture, shop, inspection, testing despatch/shipment
and receipt at site.
-
8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT
14/72
INSTALLATION OF PURGE GAS RECOVERY
UNIT AT NFL VIJAIPURPLANT: AMMONIA-II
PC65/E-01/P-II 0
DOCUMENT NO REV
SHEET 12 of 13
FORM NO: 02-0000-0021F2 REV1 All rights reserved
6.5 Bidder shall, within fifteen days of award of letter of intent, submit the scheme for
calculation of percentage progress for schedule and actual, for review and approval of
the client.
7.0 QUALITY ASSURANCE AND CONTROL:
7.1 Quality Assurance (QA) shall mean the organisational set up, procedures as well as test
methods and facilities developed by bidder in order to assure that all equipments leaving
bidders shop are of the highest possible quality that is either equal to or better than the
requirement specified.
7.2 Quality control(QC), shall mean all the tests, measurement , checks and calibration whichare to be carried out in bidders shop in order to compare the actual characteristics of the
equipment/ unit /system with the specified ones, along with furnishing of the relevant
documentation (certificates/records) containing the data or result of these activities.
7.3 Bidder shall submit a c omprehensive description (manual) of QA/QC measures
contemplated by him for implementation with regard to this specification. It is contractual
obligation of the bidder to develop and implement adequate QA/QC systems.
7.4 QA/QC system shall cover all products and services of the contract i.e. documentationmaterial, shop and site fabrication, transportation and site works, including job sub
contracted by the bidder.
8.0 PROGRESS REPORTING:
Bidder shall prepare monthly progress report under the following broad heads, indicating
schedule and actual status of individual items.
i. Basic Engineering
ii. Detailed Engineering
iii. Procurement (Ordering)
iv. Manufacture
v. Delivery
vi. Erection & Commissioning
It should contain
i. Executive summary
ii. SCurve indicating schedule & actual percentage progress.
-
8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT
15/72
INSTALLATION OF PURGE GAS RECOVERY
UNIT AT NFL VIJAIPURPLANT: AMMONIA-II
PC65/E-01/P-II 0
DOCUMENT NO REV
SHEET 13 of 13
FORM NO: 02-0000-0021F2 REV1 All rights reserved
9.0 CLARIFICATION OF CONFLICTS:
If there is any conflict between the related specifications, codes and s tandards, the
Contractor shall immediately consult with the Purchaser in writing for clarification. Failure
of Contractor to seek, in writing, clarification of conflicting requirements prior to
acceptance of the Purchase Order shall constitute obligation of Contractor to comply with
all of the conflicting requirements at no additional cost, even to the extent that rework
and/or retesting may be required.
-
8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT
16/72
INSTALLATION OF PURGE GAS RECOVERY UNIT
PACKAGE IN AMMONIA-II
AT NFL, VIJAIPURPC65/E-1/ P-II/10.0 0
DOCUMENT REV
Page 1 of 17
_________________________________________________________________________________________________________________FORM NO: 02-0000-0021 F2REV2 All rights reserved
TECHNICAL
SECTION 10.0 DRAWINGS & DOCUMENT
-
8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT
17/72
INSTALLATION OF PURGE GAS RECOVERY UNIT
PACKAGE IN AMMONIA-II
AT NFL, VIJAIPURPC65/E-1/ P-II/10.0 0
DOCUMENT REV
Page 2 of 17
_________________________________________________________________________________________________________________FORM NO: 02-0000-0021 F2REV2 All rights reserved
TABLE OF CONTENTS
SL. NO. DESCRIPTION SHEET NUMBER
1.0 DRAWINGS & DOCUMENTS 3
2.0 CATEGORY OF DOCUMENTS 5
3.0 PROCEDURE 7
4.0 LIST OF DRAWINGS & DOCUMENTS 8
-
8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT
18/72
INSTALLATION OF PURGE GAS RECOVERY UNIT
PACKAGE IN AMMONIA-II
AT NFL, VIJAIPURPC65/E-1/ P-II/10.0 0
DOCUMENT REV
Page 3 of 17
_________________________________________________________________________________________________________________FORM NO: 02-0000-0021 F2REV2 All rights reserved
1.0 DRAWINGS & DOCUMENTS
This chapter details out various drawings and documents to be generated at various stages
during the course of execution of the Project by the LSTK Bidder for different project activities.
Categorization of the documents/ drawings for review/ information/ records of PMC and the
review/ approval requirements of the Owner/ PMC along with routing of the documents/
drawings will be conveyed separately as a philosophy.
The efficient handling of drawings and documents to be prepared by the LSTK Bidder under the
contract is the key to the timely completion of the plants. The LSTK Bidder undertakes to
ensure that all drawings and documents to be submitted by him to the Owner/ PMC shall be ofprofessional quality and conforming to the contractual requirements. The LSTK Bidder also
undertakes to institute a formal drawing control system which will be documented and
submitted to the Owner/PMC for review or approval.
Compliance of this chapter on drawings and documents is mandatory and is non-negotiable.
The drawings / documents are to be generated by the LSTK Bidder at various stages of the
project covering different activities. The drawings / documents generated will be in the category
of Approval/ Review/ Information. The list of drawings and documents required is enclosed;
however, the categorisation for the drawings/ documents will be informed separately. However,
this will in no way relieve the LSTK Bidder of responsibility to conform to drawings, standards,
specification, codes and contractual requirements / obligations.
The LSTK Bidder shall prepare the drawing numbering procedure and submit to Owner/ PMC
for approval. Each Drawing submitted by the LSTK Bidder shall be clearly marked with the
name of the Owner, PMC with revision number & date. It should contain the minimum following
details:
a.Size of Drawing.
b.Discipline of Engineering for which the drawing is issued.
c.Discipline wise segregation of numbering sequence for example:
LSTK Bidder to note that the number corresponds to Ammonia- I & II plants and shall be
prefixed to all related documents/deliverables which shall be indicated to successful bidder.
-
8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT
19/72
-
8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT
20/72
INSTALLATION OF PURGE GAS RECOVERY UNIT
PACKAGE IN AMMONIA-II
AT NFL, VIJAIPURPC65/E-1/ P-II/10.0 0
DOCUMENT REV
Page 5 of 17
_________________________________________________________________________________________________________________FORM NO: 02-0000-0021 F2REV2 All rights reserved
Sequence of submission of drawing is essential for proper review of documents and timely
completion of the project is to be adhered. In case sequence is not maintained, the documents
submitted will not be reviewed by Owner/ PMC and responsibility of timely execution of plant
shall be to the LSTK Bidder's account.
2.0 CATEGORY OF DOCUMENTS
Category Description Action by Owner/ PMC
1 Records/ Information
LSTK Bidder can continue to progress with the work. This
drawings or documents will be retained with Owner/PMC
for information only. Owner/ PMC reserves the right to
advise the LSTK Bidder of any comments (deviations
from the contract) at any time and the LSTK Bidder is
liable to respond to satisfy that the work being done is in
accordance with the contract; deviations, if any will be
bidder's risk and cost.
2 Review
Owner/PMC will review and advise the LSTK Bidder of
any Comments on Bidders Drawings / documents within
specified schedule (ie 2 weeks), from date of receipt in
PMC office of LSTK Bidder's drawings/documents. The
review period is defined as date of receipt of documents
by PMC, to date of issue of comments by PMC. This
review period shall be valid only if submission of drawings
is done by LSTK Bidder in accordance with approved
drawings / documents schedule as indicated in ITB. In
case of any non-conformity to the above by LSTK Bidder
due to which the period of review extends beyond 2weeks by the PMC, schedule delay, if any will have to be
absorbed by the Bidder.
The documents falling under Review category will be returned with comments within specified
time schedules subject to fulfilling other conditions enumerated. The information category
document will be retained for information only but however Owner/PMC reserves the right to
comment at any stage of the Project, but not later than two weeks of receipt.
-
8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT
21/72
INSTALLATION OF PURGE GAS RECOVERY UNIT
PACKAGE IN AMMONIA-II
AT NFL, VIJAIPURPC65/E-1/ P-II/10.0 0
DOCUMENT REV
Page 6 of 17
_________________________________________________________________________________________________________________FORM NO: 02-0000-0021 F2REV2 All rights reserved
Where clearance of Owner/ PMC is required for ordering of equipment materials, enquiry
documents and one technically selected offer is to be submitted for review. The unpriced
copies of purchase orders detailing both technical and commercial aspects for all items shall be
submitted to PMC/ Owner within 15 days of issue of the same.
Each purchase order forwarded should contain complete technical documents. It is obligatory
for the LSTK Bidder to obtain acceptance on all the technical documents and accepted copy
only to be forwarded to Owner / PMC. Any inaccuracies /omissions/inconsistencies noticed and
brought to the notice of the LSTK Bidder at any stage of the project will be rectified/ replaced by
LSTK Bidder without any cost & time implication to the Owner/ PMC.
Detailed manufacturing schedules of fabricated/ manufactured items shall be submitted withinone month of ordering, Status report for all the items in detail, will be submitted once in a
month.
Documents to Boiler Regulation authorities shall be submitted and getting the documents
reviewed by PMC/Owner. To any other agencies, documents shall be submitted under
intimation to PMC/Owner.
As built drawings and documents will be generated within one month of completion of activities
on respective items of work.
As Built Drawings:
LSTK Bidder will furnish reproducible and electronic files of all the drawings under their scope
to Owner / PMC, certified as As-Built Issue by Third Party Inspection Agency (TPIA) for
Vendor Items coming under Third Party Inspection / LSTK Bidder for all other drawings.
Upon completion of identifiable units or components of the fabrication, construction and
installation phase of the project the Bidder will complete all the related plans to the "as built'
stage including all Vendor drawings and furnish Owner/PMC with the following:
a. One complete set of all original tracings copies.
b. One complete set of reduced size (A3-297x420 mm) copies of all drawings.
c. One set of CD for all documents/drawings/data
d. All the as built drawings duly certified should be scanned and converted into electronic
files made on magnetic/discs/optical long storage.
-
8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT
22/72
INSTALLATION OF PURGE GAS RECOVERY UNIT
PACKAGE IN AMMONIA-II
AT NFL, VIJAIPURPC65/E-1/ P-II/10.0 0
DOCUMENT REV
Page 7 of 17
_________________________________________________________________________________________________________________FORM NO: 02-0000-0021 F2REV2 All rights reserved
e. All other project documents such as operating and maintenance manuals,
manufacturers' Catalogues etc. shall also be scanned on magnetic/optical discs for safe
storage and retrievals by the Owner when needed.
f. 8 complete sets of full size prints of the drawings and 4 sets of reduced size prints.
g. 8 complete bound sets of Manufacturer's specifications including design calculations.
h. 8 complete sets in hard binders of the Manufacturers data book including certified prints
and data for all items including test reports. Data Books shall be complete with index as
tag numbers associated with Manufacturer's data shown. Equipment data shall include
as a minimum requirement the principal and description of operation, drawings and
dimensions, spare parts lists and unpriced purchase orders and bill of material.
i. 8 bound copies each of the Spare Parts data books and the Lubricants inventory
Schedule.
j. 8 complete sets of field records shall be signed by both the Bidder's and Owner's
Representative at the site.
k. Original approvals and related drawings and documents from the statutory authority.
l. Copies of correspondence with the statutory authorities.
3.0 PROCEDURE
The procedure for compilation of final as-built documents / drawings shall be informed later.
However the Procedure for routing the final / as built documents/ drawings to PMC / Owner
shall be informed during the execution stage.
-
8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT
23/72
INSTALLATION OF PURGE GAS RECOVERY UNIT
PACKAGE IN AMMONIA-II
AT NFL, VIJAIPURPC65/E-1/ P-II/10.0 0
DOCUMENT REV
Page 8 of 17
_________________________________________________________________________________________________________________FORM NO: 02-0000-0021 F2REV2 All rights reserved
4.0 LIST OF DRAWINGS & DOCUMENTS
4.1 PROCESS
Sl.No DescriptionWithBid(Y/N)
ForReview/Approval
ForInformation
Final/Approved/ As-built
1.0 Design Basis Y Y Y
2.0 Process Description Y Y Y
3.0 Process Flow Diagrams Y Y Y
4.0 P&I Diagrams Y Y Y
5.0 Tie-in Point Diagram Y Y Y
6.0Data sheet of all equipment andmachinery
Y Y Y
7.0 Guaranteed Consumption of utilities Y Y Y
8.0 Life of Membrane/ other media
Y Y Y
9.0 Start up requirement of PGR unit Y Y Y
4.2 STATIC EQUIPMENTS
Sr.No
Name of Document
WithBid
Y/N
ForReview/
Approv
al
Forinformatio
n
Final /approved
/ As-built
1.0 Filled in Data Sheets of pressure equipment along withoutline sketches showing thickness of main parts, weight(erection & operating) and anchorage details
Y - - -
2.0 General arrangement for package items showing plan,elevation & end view
Y Y - Y
3.0 Recommended spares for commissioning & 2 yearsoperation
Y Y - -
4.0 Details of internals including demister, i.e. make andmodel No., free volume, wire dia, surface area, and
density of material and separation efficiency.
Y - - -
-
8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT
24/72
INSTALLATION OF PURGE GAS RECOVERY UNIT
PACKAGE IN AMMONIA-II
AT NFL, VIJAIPURPC65/E-1/ P-II/10.0 0
DOCUMENT REV
Page 9 of 17
_________________________________________________________________________________________________________________FORM NO: 02-0000-0021 F2REV2 All rights reserved
5.0 Civil load data including details of foundation/anchor bolts N - Y Y
6.0 Drawing list N Y - Y
7.0 Thermal, Mechanical & Structural Design calculations,Hydrodynamic calculation for Internals includingfabrication drgs. Of main equipment & Internalscomplying with the specifications and codes.
N Y - Y
8.0 Skin temperature vs. Metal tube length curve for superheaters, economizer & Air Preheater etc.
N - - Y
9.0 Specifications for Acid/Alkali cleaning N - - Y
10.0 Welding procedure and performance records approvedby inspecting authority ( ** )
N Y - Y
11.0 Operating/Maintenance manual for mechanical itemswherever required N - - Y
12.0 Transportation drawing showing overall dimension, C.G.weight and handling instructions duly approved byappropriate authority
N - Y Y
13.0 Procedure for hydraulic test and heat treatment (** ) N Y - Y
14.0 Procedure for tube to tubesheet joint (**) N Y - Y
15.0 Procedure for repair of damaged tubes (**) N Y - Y
16.0 Procedure for site jobs like assembly, heat treatment,
testing ,application of painting & insulation etc. ( ** )
N Y - Y
17.0 Records of NDT tests e.g. Radiography, UltrasonicTesting(UT), Magnetic Particle / Penetrant Testing(MP/PT), hardness etc. ( ** )
N - - Y
18.0 Records of vacuum box test plumbness, roundness,peaking, banding etc. (**)
N - - Y
19.0 Materials test certificates duly stamped by inspectingauthority ( ** )
N - - Y
20.0 PWHT Charts (**) N - - Y
21.0 Mock-up test for Tube To Tube sheet joint (**) N - - Y
22.0 Test on production test coupons ( ** ) N - - Y
23.0 Corrosion test reports including C, Cr, Ni, Mo and ferritecontents report of raw materials, weldments, HAZ etc. ( **)
N - - Y
24.0 Hydraulic/pneumatic/Hydro-Pneumatic test reports ( ** ) N - - Y
25.0 Strain gauge measurement ( ** ) N - - Y
26.0 Foundation settlement check record(**) N - - Y
27.0 Calibration report (**) N - - Y
-
8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT
25/72
INSTALLATION OF PURGE GAS RECOVERY UNIT
PACKAGE IN AMMONIA-II
AT NFL, VIJAIPURPC65/E-1/ P-II/10.0 0
DOCUMENT REV
Page 10 of 17
_________________________________________________________________________________________________________________FORM NO: 02-0000-0021 F2REV2 All rights reserved
4.3 Rotating Equipment
PUMPS WithBid
(Y/N)
For
Review/Approv
al
For
Informatio
n
Final/Approved/ As-builtSl.No Description
1.0
List of drawings / documents including drawing
number, revision number, description and
approval status
N Y - Y
2.0Detailed manufacturing programme (Time bar
chart )Y Y - Y
3.0 Certified dimensional outline drawing Y Y - Y
4.0 Cross sectional drawing and bill of material Y Y - Y
5.0 Shaft seal drawing and bill of material N Y - Y
6.0
Shaft coupling assembly drawing and bill of
materials including allowable misalignment
clearances, shaft bores & key ways dimensions
with tolerances and the style of coupling guard
N Y - Y
7.0
Primary & auxiliary sealing schematic and bill of
materials including seal fluid, fluid flows,
pressure pipe and valve sizes, instrumentation,orifice sizes, and piping arrangement drawings
N Y - Y
8.0
Cooling or heating schematic and bill of
materials including cooling & heating media,
fluid flows, pressure, pipe and valve sizes,
instrumentation, orifice sizes and piping
arrangement drawings
N Y - Y
9.0 Lube oil schematic and bill of materials Y Y - Y
10.0
Lube oil system arrangement drawing including
sizes, rating and location of all customerconnections N Y - Y
28.0 All final As- built shop drgs. & design calculations dulycertified by Third Party inspecting authority ( ** )
N - - Y
29.0 Records/ drawings, charts duly approved, signed andstamped by Statutory Authorities ( ** )
N - - Y
30.0 All Radiography films ( ** ) N - - Y
31.0 Mechanical Guarantee Certificate ( ** ) N - - Y
32.0 Inspectors final certificate ( ** ) N - - Y
-
8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT
26/72
INSTALLATION OF PURGE GAS RECOVERY UNIT
PACKAGE IN AMMONIA-II
AT NFL, VIJAIPURPC65/E-1/ P-II/10.0 0
DOCUMENT REV
Page 11 of 17
_________________________________________________________________________________________________________________FORM NO: 02-0000-0021 F2REV2 All rights reserved
11.0 Lube oil component drawings data N Y - Y
12.0Electrical and instrumentation schematics,
wiring diagrams and bill of materials N Y - Y
13.0Electrical and instrumentation arrangement
drawing and list of componentsN Y - Y
14.0 Performance curves Y Y - Y
15.0Pump specification sheet with complete details
in proforma enclosed with enquiry / orderY Y - Y
16.0
Certified foundation assembly drawing of pump
with driver & all accessories mounted on baseplate with load diagram for foundation design
(In case of motor being procured by purchaser,
motor frame details will be supplied to vendor
within 4 weeks.)
Y Y - Y
17.0
Engineering flow diagram showing:
- Lubrication & sealing lines
- Flushing / washing lines
- Cooling / steam lines
N Y - Y
18.0
Reference list for pumps supplied in past for
similar duty conditions. Reference list shallcontain complete address of user, users
purchase order number, brief specifications
and date of commissioning
Y - - Y
19.0 Lube oil schedule N - - Y
20.0Automatic recirculation valve assembly drawing,
sectional drawing with bill of materialY Y - Y
21.0 Quality Assurance Plan. Y Y - -
22.0
Material test certificates and Inspection &performance test report along with
dispatch clearance certificates from
inspector
N - - Y
23.0Instruction manuals describing installation,
operation and maintenance proceduresN - - Y
24.0 Spare parts recommendations and price list Y - - Y
25.0Parts catalogue complete with reference
drawing nos. and sketches etc.Y - - Y
-
8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT
27/72
-
8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT
28/72
INSTALLATION OF PURGE GAS RECOVERY UNIT
PACKAGE IN AMMONIA-II
AT NFL, VIJAIPURPC65/E-1/ P-II/10.0 0
DOCUMENT REV
Page 13 of 17
_________________________________________________________________________________________________________________FORM NO: 02-0000-0021 F2REV2 All rights reserved
4.5 CIVIL & STRUCTURALS
Sl. No. DescriptionWith Bid
(Y/N)
ForReview/
Approval
For
Information
Final/Approved/ As-built
1.0 Engineering specifications Y
2.0 Design basis Y
3.0 Overall foundation layout drawings Y Y Y
4.0 Drawings & design calculations Equipmentfoundations
Y Y
5.0 Drawings & design calculations forSteel/RCC structures foundations
Y Y
6.0 Drawings & design calculations forSteel/RCC structures
Y Y
7.0Drawings & design calculations for majorSteel/RCC structures/foundations viz.compressors & machine foundations etc.
Y Y
8.0Structural layout drawings:Showing key plan wise StructuralSectional drawings, platforms, Ladders,Walkways & Staircases
Y Y
9.0 Fabrication & construction drawings forstructures
Y Y
10.0 Standards for steel structures Y
11.0 Standards for concrete construction Y
12.0 Standards for general civil Y
-
8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT
29/72
INSTALLATION OF PURGE GAS RECOVERY UNIT
PACKAGE IN AMMONIA-II
AT NFL, VIJAIPURPC65/E-1/ P-II/10.0 0
DOCUMENT REV
Page 14 of 17
_________________________________________________________________________________________________________________FORM NO: 02-0000-0021 F2REV2 All rights reserved
4.6 ELECTRICAL
Sr.No. Name of Document
Documents Required (Y / N)
With
Bid
For
Approval
/ Review
For
Informatio
n
Final /
Approve
d/ As-
Built
1. Load List indicating rated and absorbed
power of loads and duty type (Continuous
/ Standby / Intermittent) at different
voltages including emergency loads
Y
To be
submitte
d as and
when
revised-
Y Y
2. Construction power requirement:-
1.0 Peak load in KVA
2.0 Estimated KWH in KWH
3.0 Duration:- in days
Y - Y Y
3. Single line distribution diagram (LV,
lighting,) including protection and
metering details
Y Y - Y
4. Specification of all Electrical Equipment - Y - Y
5. Filled in Specification Sheets and Technical
Particulars of all equipment- Y - Y
6. General arrangement and foundation
drawings of all equipment N - Y Y
7. Equipment layout in Sub Station, MCC
room, and plant area showing location of
all electrical equipment N
Y( Before
releasing
for civil
construct
ion)
- Y
8. Cable schedule N - Y Y
9. Cable rack / trench / pipe layout N - Y Y
10. Power Layout N - Y Y
11. Schematic diagram for all control panel &
switch boards
N Y
Y
(Before
order
placement
to sub
vendor)
Y
12. Feeder Details of all LV switch boards /
PanelsN Y
Same as
above-Y
13. Interconnection & Terminal connection
diagramN - Y Y
14. List of controls, interlocks, indication &
metering at various locations for all drives. N - Y Y
-
8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT
30/72
INSTALLATION OF PURGE GAS RECOVERY UNIT
PACKAGE IN AMMONIA-II
AT NFL, VIJAIPURPC65/E-1/ P-II/10.0 0
DOCUMENT REV
Page 15 of 17
_________________________________________________________________________________________________________________FORM NO: 02-0000-0021 F2REV2 All rights reserved
Sr.No. Name of Document
Documents Required (Y / N)
With
Bid
For
Approval
/ Review
For
Informatio
n
Final /
Approve
d/ As-
Built
15. Characteristic curves for motor N - Y Y
17. Earthing Layout
N -
Y
(1 month
before
commence
ment of
work)
Y
18. Lighting layout
N -
Y( 2months
before
commence
ment of
actual
work)
Y
19. Catalogues for all bought out items
Y -
Y( Before
erection of
equipment
)
-
20. Bill of Materials covering all electrical
equipment and installation materials
- -
As and
when PO is
released to
sub
vendors
Y
21. Installation operation and maintenance
(Manual)N - Y -
23. Spare Parts list Y - Y Y
24. Test Certificates N ** - Y
25. Guarantee Certificates N ** - Y
26. Quality Assurance Plan & Formats N ** Y - Y
28. Erection Drawings & Details N Y - Y
29. Construction & Commissioning
specification and procedure for all
equipment
- - Y Y
-
8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT
31/72
INSTALLATION OF PURGE GAS RECOVERY UNIT
PACKAGE IN AMMONIA-II
AT NFL, VIJAIPURPC65/E-1/ P-II/10.0 0
DOCUMENT REV
Page 16 of 17
_________________________________________________________________________________________________________________FORM NO: 02-0000-0021 F2REV2 All rights reserved
4.7 Instrumentation
Sl.No Description WithBid(Y/N)
For Review/Approval
ForInformation
Final/
Approved/ As-
built
1 Drawing & document schedule Y Y
2 Instrument Index Y
3Instrument sizing calculations (controlvalves, safety valves & flow elements)
Y
4 Utility requirements Y
5 Level sketches Y
6 Material Requisition Y Y
7 Purchase Requisition Y
8 Vendor Drawings Y
9 Functional Schematic Y
10 Logic Diagrams as per ISA 75.2 Y
11 Instrument loop drawings Y
12 Control room layout Y Y
13 Layout of equipment inside control room Y Y
14 Power supply distribution Y Y
15 Wiring diagram for panels Y
16 Configuration diagram Y Y
17 I/O assignment Y Y
18DCS graphics, report/log formats & otherDCS docs.
Y Y
19 Instrument duct / tray layout Y
20 Instrument cable schedule Y
-
8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT
32/72
INSTALLATION OF PURGE GAS RECOVERY UNIT
PACKAGE IN AMMONIA-II
AT NFL, VIJAIPURPC65/E-1/ P-II/10.0 0
DOCUMENT REV
Page 17 of 17
_________________________________________________________________________________________________________________FORM NO: 02-0000-0021 F2REV2 All rights reserved
Sl.No DescriptionWithBid
(Y/N)
For Review/Approval
ForInformation
Final/Approved/ As-
built
21 Instrument location plans Y
22 Instrument installation drawings Y
23 Bill of material for installation items Y
24 Spare part list for :
a. Mandatory Spares Y
b. Start up & commissioning Y
25 Inspection & test procedures Y
26Complete catalogues with part list for allvendor supplied instruments, control etc.
Y
27Installation, operation & maintenancemanuals
Y
28 As Built Drawings Y
Notes:
1.Final documentations including approved documentation from statutory design verifying
authority shall be supplied in hard copies (6 sets) as well as soft copies in CD formats.
Applicable software is MS Office 2000, Word, Access, Excel and PDF.
2.Document marked as (**) are to be approved by authorized Inspection Agency and
Statutory Authorities as applicable.
3.Bidder shall submit document in required number of sets as stated elsewhere in
commercial part.
4.This list indicates the minimum drawings and documents requirements. However vendor
shall submit complete list of document & drawing schedule listing all drawings and
documents to be submitted by them during the course of execution of the job. The
schedule shall list all drawings and documents along with their number and expected
date of submission.
LEGEND: Y - Yes, N - No
-
8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT
33/72
INSTALLATION OF PURGE GAS RECOVERY
UNIT PACKAGE IN AMMONIA-II
AT NFL, VIJAIPUR
PC65/E-1/ P-II/11.00
DOCUMENT NO REV
Page 1 of 26
FORM NO: 02-0000-0021 F2REV2 All rights reserved
TECHNICAL
SECTION - 11.0
VENDOR LIST
-
8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT
34/72
INSTALLATION OF PURGE GAS RECOVERY
UNIT PACKAGE IN AMMONIA-II
AT NFL, VIJAIPUR
PC65/E-1/ P-II/11.00
DOCUMENT NO REV
Page 2 of 26
FORM NO: 02-0000-0021 F2REV2 All rights reserved
TABLE OF CONTENTS
SL. NO. DESCRIPTION SHEET NUMBER
1.02.0
2.1
2.2
3.0
4.0
5.0
Package Vendor - PGRMechanical
Static Equipments
Rotating Equipments
Piping
Electrical
Instrumentation
33
3
3
4
13
15
-
8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT
35/72
INSTALLATION OF PURGE GAS RECOVERY
UNIT PACKAGE IN AMMONIA-II
AT NFL, VIJAIPUR
PC65/E-1/ P-II/11.00
DOCUMENT NO REV
Page 3 of 26
FORM NO: 02-0000-0021 F2REV2 All rights reserved
Sl.No Vendor s Name Country
1.0 PURGE GAS RECOVERY UNIT
1 Liquid Air Engineering India2 BHPV India
3 Air Product Belgium
4 Air Liquide France
5 Linde Engineering Germany
6 Chart Energy USA
7 UOP USA
8 Membrane Technology & Research, Inc. Newark, CA USA
2.0 Mechanical - Static Equipments
2.1 COLUMNS
1 ARTSON ENGINEERING LIMITED India
2 BHPV India
3 Godrej & Boyce Mfg. Co. Ltd India
4 GR Engineering Private Ltd India
5 Grasim Industries India
6 India Tube Mills & Metal Industries LTD. India
7 Kaveri Engg. Industries Ltd. India
8 Larsen & Toubro Ltd India
9 Lloyds Steel Industries Limited India
10 Novatech Projects India (P) Ltd. (CS &SS only) India
11 Patel Air Temp india limited (CS & SS only) India
12 Precision Equipments (Chennai) PVt. Ltd. India
13 Tata Chemicals Ltd. India
14 The Anup Engineering Limited India
15 The Indian Sugar & General Engg. Corpn. , Dahej ( CS/SS/AS) India16 The Indian Sugar & General Engg. Corpn. (ISGEC). Yamuna Nagar India
17 Hyosung Corporation Korea
18 Apparatebau Schweisstechnik Gmbh Austria
19 Schoeller-Bleckmann Nitec GMBH Austria
20 ATB Acciaieria E Tubificio Di Brescia SP Italy
21 Belleli S.P.A. Italy
22 GE Power (Nuovo Pignone SPA) Italy
23 Rolle S.P.A Italy
24 Hitachi Zosen Japan
25 Kawasaki Heavy Industries Ltd. Japan
26 Mitsui & Company Ltd. Japan
27 Doosan Mecatec Co. Ltd. Korea28 Hanjan DCM Co. Ltd. Korea
29 Hundai Heavy Industries Ltd. Korea
30 Korea heavy industries & constn . Co. Ltd Korea
31 Sembawang Engg. (PTE) ltd Singapore
32 Mechanical DE LA Pena S.A Spain
2.2 Mechanical - Rotating Equipments
Pumps (Centrif ugal)
1 A.R Wilfley India Pvt. Ltd India
2 Beacon Weir Ltd India
3 Bharat pumps and Compressors Ltd India4 ITT Corporation India Ltd. (Formerly Gould Pumps Inc.) India
5 Kirloskar Brothers Ltd. India
6 Kirloskar Ebara pumps Ltd India
-
8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT
36/72
INSTALLATION OF PURGE GAS RECOVERY
UNIT PACKAGE IN AMMONIA-II
AT NFL, VIJAIPUR
PC65/E-1/ P-II/11.00
DOCUMENT NO REV
Page 4 of 26
FORM NO: 02-0000-0021 F2REV2 All rights reserved
7 Kishore pumps Pvt. Ltd India
8 KSB Pumps Ltd India
9 Sulzer pumps India Ltd. (single stage only) India
10 Pumpen Fabrik Ernst Vogel Austria
11 Ensival S.A Belgium
12 GE Power (Nuovo Pignone Spa) Italy
13 Weir Gabbioneta SRL Italy
14 Arai pump Mfg. Co. Ltd Japan
15 Sanwa Hydrotech Corporation Japan
16 Flowserve (IDP) U.K
17 Labour pump Co. Ltd U.K
Pumps (Reciprocating)
1 Bharat pumps and compressors Ltd India
2 V.K Pumps Industries Pvt. Ltd India3 UT Pumps & system Pvt. Ltd India
4 Swelore Engineering Pvt. Ltd India
5 Lewa Herbertott Gmbh & Co Germany
6 Uraca Pumpenfabrik Gmbh & Co Germany
7 Dosapro Millton Roy Italy
8 Peroni Pompe Spa Italy
9 Nigata Worthington pumps Japan
10 Nikkiso Co. Ltd. Japan
11 Bran & Luebbe Ltd. U.K
3.0 PIPING
CS Welded Pipes To API 5L Spiral Long. Welded (SAW/EFSW)
1. HEAVY METAL PIPE CENTRE (Upto 24" (Upto SCHXXS) India
2 Jindal Pipes Ltd. India
3 JOTINDRA STEEL & TUBES LTD. (" to 14") India
4 KALPESH TUBE(INDIA), (TRADER) India
5 Lalit Profiles & Steel Inds. Ltd. India
6. Mann Industries India
7. Mukat Pipes Tarapur India
8 PRATIBHA INDUSTRIES NB LTD.,(16" to 24" NB, Wall Thickness:6 mm to 20 mm) India
9. P.K.Forge & Fitting Industries India
10. Ratnamani Metals & Tubes Ltd. India11 SAIL India
12 SAGAR STEEL CORPORATION (TRADER India
13 Saw Pipes India
14 Surinder Engg. Co. Pvt. Ltd India
15. Surya Roshini Ltd India
16 THE BENGAL MILL STORES SUPPLY CO.(TRADER) India
17 Welspun Gujarat Stahl Rohren Limited (For Anjar and Dahej Plants) India
18 Phoceenne France
19 ETS Trouvay & Cauvin France
20 Mannesmann Handel AG Germany
21 Thyssen-Krupp Stahlunion GmbH Germany
22 Dalmine SPA Italy
23 Raccortubi SRL Italy
-
8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT
37/72
INSTALLATION OF PURGE GAS RECOVERY
UNIT PACKAGE IN AMMONIA-II
AT NFL, VIJAIPUR
PC65/E-1/ P-II/11.00
DOCUMENT NO REV
Page 5 of 26
FORM NO: 02-0000-0021 F2REV2 All rights reserved
24 Kosei Sangyo Ltd Japan
25 Marubeni Itochu Steel Japan
26 Mitsubishi Corporation Japan
27 Nippon Kokan Japan
28 Nippon Steel Corporation Japan
29 Nishitani & Co. Ltd. Japan
30 Nissho Iwai Corporation Japan
31 Okura & Co. Ltd. Japan
32 Sojitz Corporation Japan
33 Sumitomo Metal Industries Ltd. Japan
34 Hyundai Corporation Korea
35 British Steel Corporation U.K.
36 Corus Tubes Limited U.K.
37 SAW pipes USA, Inc U.S.ACS/AS LT Seamless Pipes
1 BHEL India
2 Indian Tube Co. India
3 ISMT Limited India
4 Jay Lakshmi steel & engineering co. India
5 Jindal Saw Ltd. India
6 Maharashtra Seamless Ltd. India
7 P.K.Forge & Fitting Industries India
8 Phoceenne France
9 ETS Trouvay & Cauvin France
10 Mannesmann Handel AG Germany
11 Horst Kurvers GmbH Germany
12 Dalmine SPA Italy
13 Gam Raccordi S.P.A Italy
14 IBF Seamless Pipes SPA Italy
15 Raccortubi SRL Italy
16 Marubeni Itochu Steel Japan
17 Mitsubishi Corporation Japan
18 Nippon Steel Corporation Japan
19 Nishitani & Co. LTD. Japan
20 Nissho Iwai Corporation Japan21 Okura & Co. Ltd. Japan
22 Sojitz Corporation Japan
23 Sumitomo Metal Industries Ltd. Japan
24 Hyundai Corporation Korea
25 AB Sandvik Steel Sweden
26 Vomal International Limited U.K.
27 Corus Tubes Limited U.K.
28 British Steel Corporation U.K.
SS Seamless / Welded Pipes
1. Anil Metal Corporation India
2 Apex Tubes India
3 BHANDARI FOILS & TUBES LIMITED(Seamless Upto 4"(Sch. 80)&Welded Upto 20"(Thk.
-
8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT
38/72
INSTALLATION OF PURGE GAS RECOVERY
UNIT PACKAGE IN AMMONIA-II
AT NFL, VIJAIPUR
PC65/E-1/ P-II/11.00
DOCUMENT NO REV
Page 6 of 26
FORM NO: 02-0000-0021 F2REV2 All rights reserved
4 Choksi Tube Company Ltd. India
5 HEAVY METAL & TUBES (Upto 8" (thickness upto 18.26 mm)) India
6 HEAVY METAL PIPE CENTRE (Upto 8" ( Upto SCH80S) (PDIL approved
Manufacturer's Make only))
India
7 Jaylakshmi Steel & Engg. Co India
8 Jindal Saw Ltd. India
9 KRYSTAL STEEL MANUFACTURING PVT. LTD. (Upto 2" (Material uptoGrade SS 321))
India
10 Mardale Pipes Plus Ltd India
11 MODERN TUBE INDUSTRIES LIMITED (Upto 2" (Upto SS Grade 321)) India
12 Nuclear Fuel Complex India
13 P.K.Forge & Fitting Industries India
14 Prakash Steelage Limited(0.5 to 20 welded & 0.25 to 8 smls (upto sch 40s)) India
15 QUALITY STAINLESS PVT. LTD. ( Seamless: Upto 6" (SCH40S ), Welded:
Upto 20" (SCH40S)
India
16 Rajendra Mechanical Industries Ltd. India
17 Ratnamani Metals & Tubes Ltd. India
18 SANDVIK ASIA PVT. LTD. (" to 2" (Thk: upto 8.74 mm)) India
19 SANGHVI METALS (TRADER) India
20 SCORODITE STAINLESS (INDIA) PVT. LTD. (Upto 2" (Upto SS Grade 321)) India
21 Shubhlaxmi Metals & Tubes Pvt. Ltd India
22 Suraj Stainless Limited India
23 THE BENGAL MILL STORES SUPPLY CO.(TRADER) India
24 ETS Trouvay & Cauvin France
25 Phoceenne France
26 H. BUTTING GmbH & CO. (Seamless : Upto 30" (upto 16mm thk) & Welded: Upto72" (upto 64mm )
Germany
27 Horst Kurvers GmbH Germany
28 Mannesmann Handel AG Germany
29 Thyssen-Krupp Stahlunion GmbH Germany
30 Dalmine SPA Italy
31 Gam Raccordi S.P.A Italy
32 IBF Seamless Pipes SPA Italy
33 Raccortubi SRL Italy
34 Marubeni Itochu Steel Japan
35 Mitsubishi Corporation Japan
36 Nippon Steel Corporation Japan
37 Nishitani & CO. LTD. Japan
38 Nissho Iwai Corporation Japan
39 Okura & Co. LTD. Japan
40 Sojitz Corporation Japan
41 Sumitomo Metal Industries LTD. Japan
42 Ab Sandvik Steel Sweden
43 T.T.I. Tubacex Tubos Inoxidables, S.A. Spain
44 SOSTA BV (Upto 72" ( thickness upto 25.4 mm)) Netherland
45 Vomal International Limited U.K.
46 Corus Tubes Limited U.K.47 British Steel Corporation U.K.
48 Hyundai Corporation Korea
-
8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT
39/72
INSTALLATION OF PURGE GAS RECOVERY
UNIT PACKAGE IN AMMONIA-II
AT NFL, VIJAIPUR
PC65/E-1/ P-II/11.00
DOCUMENT NO REV
Page 7 of 26
FORM NO: 02-0000-0021 F2REV2 All rights reserved
SS Seamless Tubes
1. Anil Metal Corporation India
2 APEX TUBES PVT. LIMITED (Upto 50.8 mm OD (Thickness Upto 4.00 mm)) India
3 BHANDARI FOILS & TUBES LIMITED (Upto 50 mm OD) India
4 HEAVY METAL & TUBES (Upto 8" (thickness upto 18.26 mm)) India
5 KRYSTAL STEEL MANUFACTURING PVT. LTD. (Upto 50.8 OD (Material uptoGrade SS 321))
India
6. MODERN TUBE INDUSTRIES LIMITED (Upto 50.80 OD (Upto SS Grade 321)) India
7. India
8 Prakash Steelage Limited (0.25" to 4" (upto 5mm thickness)) India
9. Ratnamani Metals & Tubes Ltd. India
10. SANDVIK ASIA PVT. LTD. (OD upto 60.33 (Thk: upto 8.74 mm)) India
11 SCORODITE STAINLESS (INDIA) PVT.LTD. (Upto 50.80 OD (Upto SS Grade321))
India
12 Suraj Stainless Limited India
13 T.T.I.-Tubacex Tubos Inoxidables, S.A.(OD 15.8 mm to 250.0 mm, wall thk.1.0mm)
Spain
Fittings: CS/AS/SS Seamless & Forged
1. Amforge Industries India
2 Anil Metal Corporation India
3 COMMERCIAL SUPPLYING AGENCY
4 CSA FITTINGS (Forged: " to 2" (Upto 9000#) & Seamless: 2" to 8" (Upto SCHXXS))
5 EBY Fasteners India
6. EBY Industries India
7. FIT-TECH INDUSTRIES (CS (Forged) Elbow and Tee " NB to 1 " NB, Rating3000#, 6000#, 9000#
India
8 Flash Forge(P) Ltd. India
9. Gujarat Infrapipes Pvt. Ltd. India
10. IISCO Ltd. India
11 Jay Lakshmi Steel & Engineering Co. India
12 KALPESH TUBE(INDIA),(TRADER) (upto a max order value Rs.25.0 lakh) India
13 M.S Fittings Manufacturing Co. Pvt Ltd. India
14 Mardale Pipes Plus Ltd India
15. National Org Chemical India Ltd India
16 Navkar Forgings & Fittings Pvt. Ltd India
17 NL HAZRA India
18 P.K Forge & Fitting industries India
19 Parmar Techno Forge India
20 Perfect Marketing (P) Ltd, India
21 PETROCHEM INDUSTRIES (Seamless: upto 16" (all Fittings) & upto 36" (OnlyCaps) Sch : XXS /
India
22 RAJENDRA FORGE INDUSTRIES (CS: Upto 12" Sch 40 & SS: 6" Sch 40S) India
23 SAGAR STEEL CORPORATION (TRADER) India
24 SANGHVI METALS (TRADER) India
25 Sawan Engineers India
26 Shivananda Pipe Fittings Ltd., India
27 Surya Roshni Ltd India
28 S & G Engineers (P) Ltd. India
29 STEWARTS AND LLOYDS OF INDIA LIMITED India
-
8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT
40/72
INSTALLATION OF PURGE GAS RECOVERY
UNIT PACKAGE IN AMMONIA-II
AT NFL, VIJAIPUR
PC65/E-1/ P-II/11.00
DOCUMENT NO REV
Page 8 of 26
FORM NO: 02-0000-0021 F2REV2 All rights reserved
30 Teekay Tubes Private Limited India
31 THE BENGAL MILL STORES SUPPLY CO.(TRADER) India
32 Topaz Piping Industries India
33 Tube Bend India
34 Tube Products Incorporate(CS fitting Only) India
35 Visvesaraya iron & steel Ltd. India
36 Zoloto Industries India
37 BHDT GMBH Austria
37 BHDT GMBH Austria
38 Phoceenne France
39 ETS Trouvay & Cauvin France
40 Vallourec France
41 Seikmann Anlagen-Technik GMBH. Germany
42 TPS-Technitube Rohrenwerke GMBH Germany43 Mannesmann Handel AG Germany
44 Horst Kurvers GmbH Germany
45 Dalmine SPA Italy
46 Gam Raccordi S.P.A Italy
47 IBF Seamless Pipes SPA Italy
48 IND Meccanica Bassi Luigi & C. SPA Italy
49 Mantovani SpA Italy
50 Raccortubi Srl Italy
51 Techno Forge SPA Italy
52 Marubeni Itochu Steel Japan
53 Nippon Kokan Japan
54 Nishitani & co. Ltd. Japan
55 Nissho Iwai Corporation Japan
56 Okura & co. Ltd. Japan
57 Sojitz Corporation Japan
58 Sumitomo Metal Industries Ltd. Japan
59 Avesta Candvite Tube AD Sweden
60 Helens Energy Sweden
61 Haitima Corporation Sweden
62 Corus Tubes Limited U.K.
63 British Steel Corporation U.K.64 Eurotube Limited U.K.
65 Vomal International Limited U.K.
66 Bonney Forge U.S.A.
Forged Flanges
1. Ajay Forging Pvt. Ltd India
2 Amforge Industries India
3 Anandmayee Forgings PVT. LTD. India
4 C D Engineering India
5 Chaudhary Hammer Works (P) LTD. India
6. Echjay Industries Ltd India
7. Ferrous Alloys Forging Pvt. Ltd India
8 Golden Iron & Steel Works India
9. GOOD LUCK ENGINEERING CO. ("-12" (Upto 2500#), 14"-16" (Upto 900#), India
-
8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT
41/72
INSTALLATION OF PURGE GAS RECOVERY
UNIT PACKAGE IN AMMONIA-II
AT NFL, VIJAIPUR
PC65/E-1/ P-II/11.00
DOCUMENT NO REV
Page 9 of 26
FORM NO: 02-0000-0021 F2REV2 All rights reserved
18"-32" (Upto 600#),
10. J.K Forgings India
11 Kunj Forgings Pvt. Ltd.(Material CS/SS/AS) India
12 MAHESH INDUSTRIES (Upto 8" (150#, Material: ASTM A105 only)) India
13 Perfect Marketing (P) Ltd India
14 Punjab Steel India
15. RAJENDRA FORGE INDUSTRIES (CS & SS : Upto 12", 300#) India
16 R D Forge (A Unit Of R D Chemicals Pvt Ltd) India
17 Sanghvi Forgings & Engineering Ltd India
18 Sawan Engineers India
19 S & G ENGINEERS (P) LTD. India
20 TECHNO FORGE LTD. (Upto 42" (upto 300#), upto 24" (600#), upto 20" (900#),upto 16" (1500#),
India
21 Tube Bend (Calcutta) Pvt Ltd India
22 Viraj, Tarapur India
23 Phoceenne France
24 ETS Trouvay & Cauvin France
25 Horst Kurvers GmbH Germany
26 I.S. International Italy
27 Mantovani spa Italy
28 Officine Nicola Galperti & Figlio S.P.A Italy
29 Raccortubi Srl Italy
30 Nichinan Sangyo CO. Ltd., Japan
31 Nishitani & CO. Ltd. Japan
32 Sojitz Corporation Japan33 Vomal International Limited U.K.
Gate/ Globe/ Check Valves CS/SS/AS > =900 Lbs
1 Audco India Limited (L&T Valves Divn.) India
2 BHEL (Valves Division) India
3 BDK Engineering Industries Ltd. (upto 2500#) India
4 FLOVEL VALVES PVT. LTD. (Dual Plate Check Valves only: Upto 24" (900#)) India
5 KSB Pumps Limited (Valves Divn) India
6 Larsen & Toubro Limited (1/2" to 2") India
7 Leader Valves Limited (1500 & 2500# upto 12",forging upto 2" 2500#) India
8 NSSL Limited India
9 Oswal Industries Ltd. (1500 & 2500, 1/2" to 2" size) India
10 Sempell Valves Pvt Limited India
11 Tyco valves & Controls India Pvt Ltd, India
12 Hoerbiger Ventilwerke,(For Plate Type Check Valves only) India
13 Babcock Borsig Espana, S.A. Berlin
14 Velan Inc. Canada
15 FRIULCO SPA (Upto 32" (900#); 24" (1500#); 14" (2500#)) Italy
16 Valvitalia SPA Italy
17 BFE Bonney Forge Valve Licensee Italy
18 Cesare Bonetti Italy
19 Fasani S.P.A. Italy20 GTC Italia, S.R.L. Italy
21 OMB S.P.A. Italy
-
8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT
42/72
INSTALLATION OF PURGE GAS RECOVERY
UNIT PACKAGE IN AMMONIA-II
AT NFL, VIJAIPUR
PC65/E-1/ P-II/11.00
DOCUMENT NO REV
Page 10 of 26
FORM NO: 02-0000-0021 F2REV2 All rights reserved
22 Petrol Valves S.R.L Italy
23 Matsura H. P Machine Works Co.Ltd. Japan
24 NishitanI & Co. Ltd. Japan
25 POYAM VALVES, (AMPO S. COOP.) (Size upto 30" (Rating upto 2500#)) Spain
26 Sufa Limited U.A.E.
27 BEL Valves U.K.
Ball valves (Metal Seated)
1 Larsen & Toubro Limited India
2 NSSL Limited (2" NB to 12" NB, Ratings:150# & 300# (Material: Cast CS/AS/SS)) India
3 OSWAL INDUSTRIES LTD. (Upto 24" (150#, 300#, & 600#)) India
4 VIRGO ENGINEERS LTD. (Upto16" (Upto 600#)) India
5 WEIR BDK VALVES (A UNIT OF WEIR INDIA PVT. LTD.) (Cast: Upto 30" (150# & 300#);20" NB
India
6 VELAN INC. (Size upto 16" (Rating upto 600#)) canada
7 Alfa Valvole SRL Italy
8 CESARE BONETTI SPA (Upto 24" (150#) & 4" (Upto 1500#) Trunnion Mounted only) Italy
9 GE power (Nuovo Pignone SPA) Italy
10 GTC Italia, S.R.L. Italy
11 Petrol Valves S.R.L Italy
12 Valvitalia Spa Italy
13 PERRIN GmbH (Size upto 24" (Rating upto 2500#)) Germany
14 Red point alloys Bv Netherland
15 FRIULCO SPA (Upto 48" (150# & 300#); 20" (Upto 1500#); 12" (2500#)) Italy
16 POYAM VALVES, (AMPO S. COOP.) (Size upto 42" (Rating Upto 2500#)) Spain
17 Metso Automation Singapore18 Orbit Valves PLC Singapore
Butterfly Valves
1. Advance Valves (rubber lined and metal seated) India
2 Audco India Limited (L&T Valves Divn.) India
3 BDK Process Control Pvt Ltd. (upto 1600mm) India
4 Crawley & Ray (F&E) Pvt. Ltd. (40mm - 1000mm) India
5 Delval Flow Controls Private Limited (2" NB to 24" NB; for Classes: 150#,300#,)
India
6 Fisher-Xomox Sanmar Ltd. India
7 Flocon systems pvt. Ltd. (CS upto 12" 150#) India
8 Fouress Engineering (I) Ltd. India9 Hawa valves india pvt. Ltd. India
10 Hawa Engineers, Ahmedabad
11 Hi-tech butterfly valves India Pvt. Ltd (
-
8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT
43/72
INSTALLATION OF PURGE GAS RECOVERY
UNIT PACKAGE IN AMMONIA-II
AT NFL, VIJAIPUR
PC65/E-1/ P-II/11.00
DOCUMENT NO REV
Page 11 of 26
FORM NO: 02-0000-0021 F2REV2 All rights reserved
21 Griss Sapag Industrail Valves France
22 Adams Armaturen Germany
23 GTC Italia, S.R.L. Italy
24 Haitima Corporation Taiwan
25 Weir valves & controls division. U.K
26 Leeds Valve Ltd U.K
27 Curtis Wright Flow Control Corpoaration (COPES-VULCAN LTD) U.S.A.
28 Lear siegler meas. Ctrls. Corp U.S.A.
29 Tyco International INC.,U.S.A. U.S.A.
30 Emerson Process Mgt U.S.A.
31 Spx Valves & Controls U.S.A.
32 XOMOS (Crane Co) U.S.A.
Plug Valves (Non Lubricated)
1. A V VALVES LIMITED (Upto 20" (150#) (CS & SS) India2 Audco India Ltd (L&T Valves Divn.) India
3 AZ ARMATUREN GMBH (" NB to 20" NB, 150#, 300#, 600# (Matl. CS, SS & AS)) India
4 BDK Process Control Pvt Ltd. India
5. Crawley & Ray (Founders & Engineers) Pvt. Ltd (DN 200) India
6 L&T Ltd ( 1/2" to 24") India
7. WEIR BDK VALVES (A UNIT OF WEIR INDIA PVT. LTD.) (Upto 16"(150#), 12"(300#), 3" (600#))
India
8. Xomox Sanmar Limited (Fisher Xomox) India
9. O.M.S. Saleri Di Saleri P & Figli S.M.C. Italy
10. POYAM VALVES, (AMPO S. COOP.) (Upto 30" (Upto 900#) for Lift Plug valves only.) Spain
Spirally Wound Gaskets1. Gaskets (India) Pvt. Ltd India
2 Goodrich gasket Pvt. Ltd. India
3 IGP Engineers Limited India
4 Madras Industrial Products India
5 Packings & Jointings Pvt. Ltd India
6. Perfect marketing (P) Ltd, India
7. Prashant Engg Stores India
8 Spiraseal gaskets pvt. Ltd. India
9. Starflex sealing india pvt. Ltd. India
10. Uniklinger Gaskets, Pune India
11 Garlock Sealing systems Ltd., Pune India
12 TEADIT gaskets, Mumbai India
13 THE BENGAL MILL STORES SUPPLY CO.(TRADER) India
14 UNIQUE INDUSTRIAL PACKINGS PVT.LTD. (Upto 42"(600#) & Upto 24" (2500#))
Expansion Joints & Bellows
1. Cori Engineers PVT. Ltd. India
2 D.Wren & Co. India
3 Flexatherm Expanllow Pvt. Ltd India
4 Flexican Bellows & Hoses Pvt. Ltd India
5 Fluidyne Engg. (I) Pvt. Ltd India
6. Keld Ellentoft India Pvt. Ltd India7. Lonestar Industries India
8 Metallic Bellows (India) Pvt. Ltd India
-
8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT
44/72
INSTALLATION OF PURGE GAS RECOVERY
UNIT PACKAGE IN AMMONIA-II
AT NFL, VIJAIPUR
PC65/E-1/ P-II/11.00
DOCUMENT NO REV
Page 12 of 26
FORM NO: 02-0000-0021 F2REV2 All rights reserved
9. Prashant Engg Stores India
10. Standard Precision Bellows India
11 Tuboflex Germany
12 FLEXIDER S.P.A. Italy
13 Ke-Burgmann India Pvt. Ltd., India
STRAINERS (PERMANENT INCLUDING Y-TYPE)
1 FLAIR STRAINERS & FILTERS (Size upto 42" (Rating upto 1500#)) India
2 GRAND PRIX ENGINEERING PVT. LTD. (upto 60" pipeline, upto ANSI 1500#) India
3 GREAVES LIMITED India
4 GUJARAT OTOFILT India
5 KWIKFLO FILTERS PVT. LTD. India
6. LEADER VALVES LIMITED (upto 300# & upto 12"size) India
7. MOD FABRICATORS India
8 MULTITEX FILTERATION ENGINEERS LTD India9. ZOLOTO INDUSTRIES (15mm to 100mm) India
10. BOTELI VALVE GROUP CO. LTD. (Y - Type only: 14" (150#) & 3" (300# & 600#)) China
STEAM TRAPS
1 Spirax Marshall Ltd., Pune
2 YARWAY CORPORATION India
3 GESTRA AG Germany
4 ARMSTRONG INTERNATIONAL INC. U.S.A
5 OGONTZ CORPORATION U.S.A
6 TYCO INTERNATIONAL INC.,U.S.A. U.S.A
7 TLV Co. Ltd., Japan, Japan
SPRING SUPPORTS
1. MYRICS PIPING SYSTEM PVT.LTD. India
2 PIPE SUPPORTS INDIA PVT. LTD. India
3 PIPING & ENERGY PRODUCTS (P) LTD. India
4 SARATHI ENGG. ENTERPRISES PVT. LTD. India
5 SPRING SUPPORTS MFG. CO. India
6. FLEXIDER S.P.A. Italy
FASTENERS
1 AEP COMPANY India
2CAPITAL INDUSTRIES
India
3 CONSOLE ENGG. & FASTNERS INDUSTRIES India
4 EBY FASTNERS India
5 FIT TIGHT NUTS & BOLTS LTD. India
6 FIX FIT FASTENERS MFG. PVT. LTD. India
7 INDUSTRIAL ENGINEERING CORPORATION (Size upto 4" (M100)) India
8 MEGA ENGINEERING PRIVATE LIMITED (" to 3" Material: CS/AS/SS) India
9 METRO MECHANICAL PVT.LTD. India
10 NAGBHUSHANAM INDUSTRIES India
11 NIREKA ENGG. CO. PVT. LTD. India
12 PACIFIC FORGING & FASTENERS PVT. LTD. (M 10 to M125) India
13 PERFECT MARKETING (P) LTD, India14
PIONEER NUTS & BOLTS PVT. LTD.India
15 PRECISION AUTO ENGINEERS India
-
8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT
45/72
INSTALLATION OF PURGE GAS RECOVERY
UNIT PACKAGE IN AMMONIA-II
AT NFL, VIJAIPUR
PC65/E-1/ P-II/11.00
DOCUMENT NO REV
Page 13 of 26
FORM NO: 02-0000-0021 F2REV2 All rights reserved
16 PRECISION ENGINEERING INDUSTRIES India
17 PTD FASTNERS PVT. LTD. India
18 SANGHVI METALS (TRADER) India
19 SUNDARAM FASTENERS LIMITED India
20 UDHERA FASTENERS India
4.0 ELECTRICAL
Induction Motors LV (415 V) (Safe Area)
1 Ansaldo Robicon Italy
2 Siemens AG Germany
3 BHEL (Electrical Machines Divn.) India
4 Asea Brown Boveri Ltd. India
5 Siemens Ltd. India
6 Toshiba Corporation Japan7 Fuji Electric Systems Co. Ltd. Japan
8 Crompton Greaves Ltd. India
9 Kirloskar Electric Company Ltd. India
10 Bharat Bijlee Ltd. India
Induction Motors LV (415 V) (For Hazardous Area)
1. Asea Brown Boveri Ltd. India/Sweden
2. Crompton Greaves Ltd. India
3. Bharat Bijlee Ltd. India
4. Siemens AG Germany
5. Kirloskar Electric Company Ltd. India6. Mitsubishi Corporation Japan
7. Toshiba Corporation Japan
8. General Electric Co. USA
9. Fuji Electric Systems Co. Ltd. Japan
LT (1.1 KV) Power Cables
1 Cable Corporation of India Ltd. India
2 Ravin Cables Limited India
3 RPG Cables Limited India
4 Finolex Cables Ltd. India
5 KEI Industries Ltd. India
6 Torrent Cables Limited India
7 Industrial Cables (I) Limited India
8 NICCO Corporation Limited India
9 Universal Cables Ltd. India
10 KEC International ltd.(Formerly RPG Cables Limited) India
11 Gemscab industries Limited India
12 Special Cable Pvt. Limited India
13 Friends Cables Industries India
14 Polycab Wires Pvt. Limited India
LT (1.1 KV) Control Cables
1 Cable Corporation of India Ltd. India2 RPG Cables Limited India
3 Finolex Cables Ltd. India
-
8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT
46/72
INSTALLATION OF PURGE GAS RECOVERY
UNIT PACKAGE IN AMMONIA-II
AT NFL, VIJAIPUR
PC65/E-1/ P-II/11.00
DOCUMENT NO REV
Page 14 of 26
FORM NO: 02-0000-0021 F2REV2 All rights reserved
4 KEI Industries Ltd. India
5 Cords Cable Industries Ltd. India
6 NICCO Corporation Limited India
7 Universal Cables Ltd. India
8 KEC International ltd.(Formerly RPG Cables Limited) India
9 Gemscab industries Limited India
10 Special Cable Pvt. Limited India
11 Friends Cables Industries India
12 Polycab Wires Pvt. Limited India
Switchboards LV (415 V) (MCC/PCC/PMCC)
1. Larsen & Toubro Ltd. India
2. GE Power Controls India Pvt. Ltd. India
3. Siemens Ltd. India
Control & Relay Panel
1. AREVA India
2. Asea Brown Boveri Ltd. India
3. Controls & Switchgear Co. Ltd. India
4. Elecmech Corporation India
5. Larsen & Toubro Ltd. (El. Products Divn) India
6. Siemens Ltd. India
7. Lotus Powergear Pvt. Ltd. India
Flameproof Local Control Station, Junction Box, Lighting Fitting, Plug, Socket, Hand Lamp,
Accessories L ight ing, Dist ribu tion Board & Contro l Panel
1. FCG Flameproof Control Gears Pvt. Ltd. India
2. Baliga Lighting Equipments Ltd. India
3. Sudhir Switchgears Pvt. Ltd. India
4. Flameproof Equipments Pvt. Ltd. India
5. Flexpro Electricals Pvt. Ltd. India
6. R. Stahl India/Germany
7. Siemens A.G. Germany
8. Legrand S.A. France
9. FCG Power Industries Pvt. Ltd. India
10. SCG Ex D Tech Pvt. Ltd. IndiaCable Trays
1 Globe Electrical Industries India India
2 Metalite Industries India India
3 Stealite Engineering Co. India India
4 Indiana Cable trays corporation India India
5 Sadhana Engineering Corporation India India
6 ATP Engineering Works India
7. MEK Engineer & construction India
8 Slotco steel products Pvt. Ltd. India
Earthing & Lightning Protection Material (Al/GI) Wire/Strip
1 .Anand Electric Trading Co. India
2 Bharti Exports India India
-
8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT
47/72
INSTALLATION OF PURGE GAS RECOVERY
UNIT PACKAGE IN AMMONIA-II
AT NFL, VIJAIPUR
PC65/E-1/ P-II/11.00
DOCUMENT NO REV
Page 15 of 26
FORM NO: 02-0000-0021 F2REV2 All rights reserved
3 Controls & Switchgear Co. Ltd. India
4 Jayant Metal Mfg. Co. India
5
Metalite Industries India
India6 Premier Power Products (Calcutta) Pvt. Ltd. India
7 Control & switchgear Ltd. India
8 Jamna Metal Co. India India
Protective Relays (other than BMR)
1 AREVA (HV & MV switchboard) India
2 ABB Limited India
5.0 INSTRUMENTATION
Gas Analysers (IR, Thermal Conductivi ty, Paramagnetic)
1 ChemtrolsEnginnering Limited (Maihak Make) India
2 Emerson Process Management (I) Pvt. Ltd India3 Siemens AG Germany
4 Emerson Process Management Singapore Ltd Singapore
5 M.S.A International U.S.ApH, conductivi ty & ORP Analyser
1 Emerson Process Management (I) Pvt. Ltd India
2 Forbes PolymetronPvt. Ltd India
3 Zellweger SA France
4 Yokogawa Electric Corporation Japan
5 Emerson Process Management Singapore Ltd Singapore
6 Foxbaro Far East Pte Ltd Singapore
7 Hach company U.S.A
Trace Analyser/ Ion Selective1 Forbes PolymetronPvt. Ltd India
2 Zellweger SA France
3 Bran &Luebbe Ltd U.K
4 Hach company U.S.ASOX/ NOXAnalyser
1 Emerson Process Management (I) Pvt. Ltd India
2 Sick AG Germany
3 Siemens AG Germany
4 Horiba Ltd. Japan
5 Yokogawa Electric Corporation Japan
6 Emerson Process Management Singapore Ltd Singapore
7 Lear Siegler Meas. Controls Corp. U.S.A
8 M.S.A International U.S.A9 Thermo Environment Instruments Inc U.S.A
Mass Spectrometer
1 VG Gas Analysis Systems U.K
2 Orbital Science Corporation U.S.A
3 Thermofisher U.K / India
Gas Chromatograph
1 Applied Automation Inc Singapore
2 Foxbaro Far East Pte Ltd SingaporeFlue Gas Analyser (ZrO2type)
1 Emerson Process Management (I) Pvt. Ltd India
2 AmetekInc U.S.A
3 GE Panametrics IrelandH2S/ Total Sulphur Analysers
1 Barton Instrument Systems Limited U.K
2 Thermofisher U.K/ India
-
8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT
48/72
INSTALLATION OF PURGE GAS RECOVERY
UNIT PACKAGE IN AMMONIA-II
AT NFL, VIJAIPUR
PC65/E-1/ P-II/11.00
DOCUMENT NO REV
Page 16 of 26
FORM NO: 02-0000-0021 F2REV2 All rights reserved
3 Teledyne India
System House Analysers
1 ChemtrolsEnginnering Limited India
2 Emerson Process Management (I) Pvt. Ltd India3 Intech Italy
Density Analysers
1 Emerson Process Management (I) Pvt. Ltd (coriolis type) India
2 Bopp & Reuther MesstechnikGmbh (coriolis type) Germany
3 SolartronMobrey U.K
4 Chemtrolls for Sarasota (thermo electron corporation) India
5 Sarasota (thermo electron corporation) USA
Moisture Analysers
1 GE Panametrics Italy
2 AmetekInc U.S.AGas & Fire Detection System
1 Andrew Yule & Company Ltd. (Fire) India
2 Honeywell Automation India Limited (Gas) India
3 J B Boda And Brothers Pvt. Ltd. (Gas Make-International Sensor Technology) India
4 Pollution Protection System Mumbai Pvt Ltd (Gas) India
5 Teledyne Fluid Systems (Gas) Thailand
6 General Monitors (Gas) U.KFlow Element: Orifice/ Venturi/ Flow Nozzle
1 Baliga Lighting Equipments Limited (Only Orifice) India
2 General Instruments Consortium (Only Orifice) India
3 Instrumentation Ltd, Palakkad India
4 Micro Precision Products Private Ltd. India
5 Eureca Industrial Eqipments Pvt Ltd. India
6 Bopp & Reuther MesstechnikGmbh Germany
7 Technomatic Spa Italy8 ISA Controls Limited U.K
9 Daniel Measurement & Control U.S.APitot Tube/ Annubar
1 Control Engineers India
2 Emerson Process Management (I) Pvt. Ltd. India
3 Micro Precision Products Private Ltd. India
4 Technomatic Spa Italy
5 ISA Controls Limited U.K
6 Daniel Measurement & Control U.S.ARotameters
1 Instrumentation Engineers Pvt. Ltd. India
2 Krohne Marshall Pvt. Ltd. India3 Placka Instruments & Controls Pvt. Ltd. (Purge Rotameter Only) India
4 Rota Instrumentation India
5 Eureca Industrial Eqipments Pvt Ltd. India
6 Krohne Germany
7 Rota Yokogawa Gmbh& Co. Kg Germany
8 Tokyo Keiso Co. Ltd. Japan
9 Yamatake Corporation Japan
10 Emerson Process Mgt U.S.AMass Flow Meter (Coriol is Type)
1 Emerson Process Management (I) Pvt. Ltd. India
2 Bopp & Reuther MesstechnikGmbh Germany
3 Endress + Hauser Gmbh& Co. Germany
4 Krohne Germany5 Schlumberger Resource Management Ltd. U.S.A
6 Yokogawa Electric Corporation, Japan (M/s Yokogawa India Limited) India
7 FmcSanmar Ltd. India
-
8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT
49/72
INSTALLATION OF PURGE GAS RECOVERY
UNIT PACKAGE IN AMMONIA-II
AT NFL, VIJAIPUR
PC65/E-1/ P-II/11.00
DOCUMENT NO REV
Page 17 of 26
FORM NO: 02-0000-0021 F2REV2 All rights reserved
8 Bopp & Reuther MesstechnikGmbh Germany
9 Instromet International N.V Holland
10 Itochu Corporation (Rep.KubotaCorpn.) Japan
11 Yamatake Corporation Japan12 Oval Asea Pacific Pte Ltd Singapore
13 Barton Instrument Systems Limited U.K
14 Emerson Process Mgt U.K
15 Emerson Process Mgt U.S.A
16 Rockwell International Corpn. U.S.AVortex meter
1 Krohne Marshall Pvt. Ltd. India
2 Yokogawa Limited India
3 Bopp & Reuther MesstechnikGmbh Germany
4 Endress + Hauser Gmbh& Co., Germany
5 Krohne Germany
6 Itochu Corporation (Rep.KubotaCorpn.) Japan
7 Schlumberger Resource Management Ltd. U.S.APD Meter
1 Rockwin Flow Meters (I) Pvt. Ltd. India
2 Bopp & Reuther MesstechnikGmbh Germany
3 Oval Asea Pacific Pte Ltd Singapore
4 Emerson Process Mgt U.S.A
5 Schlumberger Resource Management Ltd. U.S.A
Magnetic Flow meter
1 Emerson Process Management (I) Pvt. Ltd. India
2 Krohne Marshall Pvt. Ltd. India
3 Bopp & Reuther MesstechnikGmbh Germany
4 Krohne Germany
5 Yamatake Corporation Japan6 Yokogawa Electric Corporation, Japan (M/s Yokogawa India Limited) India
Pressure Gauges
1 A N Instruments Pvt. Ltd. India
2 General Instruments Consortium, India
3 H.Guru Industries India
4 Manometer (India) Pvt. Ltd India
5 PeejeeEngg. Works India
6 Precision Industries Ltd. (standard normal type) India
7 Premium Inst. & Controls Ltd. India
8 Waaree Instruments Ltd. India
9 Walchandnagar Industries Ltd. India
10 Ashcroft India(P) Ltd. (standard normal type) India11 Dresser Europe S.A Germany
12 WikaAlexenderWiegardGmbh& Co. Germany
13 Spriano Spa Italy
14 Nagano Keiki Seisakusho Japan
15 Rueger SA Switzerland
16 Budenberg Gauge Co. Ltd U.KVol. Seal Pr. Gauges
1 A N Instruments Pvt. Ltd. (=
-
8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT
50/72
INSTALLATION OF PURGE GAS RECOVERY
UNIT PACKAGE IN AMMONIA-II
AT NFL, VIJAIPUR
PC65/E-1/ P-II/11.00
DOCUMENT NO REV
Page 18 of 26
FORM NO: 02-0000-0021 F2REV2 All rights reserved
2 Barton Instrument Systems Limited U.K
3 Delta Controls Ltd. U.K
Pressure & D/P Transmitters
1 Emerson Process Management (I) Pvt. Ltd. India2 Honeywell Automation India Limited India
3 Yokogawa Limited India
4 Siemens Ag, Germany Germany
5 Yamatake Corporation Japan
6 Yokogawa Electric Corporation Japan
7 Emerson Process Mgt Singapore Ltd Singapore
8 SmarSingaporePte. Ltd. Singapore
9 Honeywell Inc. U.S.A
10 Moore Products Company U.S.A
11 M/s Fuji Electric Co JapanTemperature Transmitters
1 Emerson Process Management (I) Pvt. Ltd. India
2 Honeywell Automation India Limited India
3 Yokogawa Limited India
4 Siemens Ag, Germany Germany
5 F