    A Case Study of waterproofing Strategiesfor a Typical Mat and Deep Foundation System

    Andrea B. Bono, PE, LEED AP BD+C; and Stephen T. Bono, SESimpson Gumpertz & Heger Inc.

    The Landmark @ One Market, Suite 600, San Francisco, CA 94105 Phone: 415-495-3700 Fax: 415-495-3550 E-mail: [email protected]

    2 8t h R C I In te R n a t I o n a l C o n v e n tI o n a n d t R a d e S h o w M a R C h 1 4- 1 9 , 2 0 1 3 B o n o a n d B o n o 1

    mailto:[email protected]:[email protected]
  • 8/12/2019 2013 CTS Bono Bono

    2/12

    Abstract

    Cunt cnstuctin mthds such as is, micis, and tibacks mit buiding f

    fundatins at sits that w viusy imssib imactica. Cdinatin f a fuy

    intgatd bw-gad watng dsign is quid t nsu succssfu fmanc

    f buidings mying ths stuctua fundatin systms. As th cntag f nw

    cnstuctin at sits with ss-than-ida si incass, watng dtaiing shud b

    cnsidd duing th schmatic has f a jct and cntinu thughut cnstuctin.

    This sntatin wi incud watng cnsidatins f tyica stuctua fundatin

    systms thugh sva cas studis wh th watng was cnsidd indndnt

    f th fundatin.

    Speakers

    Stephen T. Bono, SE Simpson Gumpertz & Heger Inc. - San Francisco, CA

    STepHeN T. BoNo, Se, is a Sni Staff I at natina ngining m Simsn

    Gumtz & Hg Inc. His xinc incuds bth fmanc-basd and cd-basd

    dsign, vauatin, and ai f st, cnct, and masny w- t high-is stuctus

    incating bth ina and nnina tchniqus. H sciaizs in vauatin and ha-

    biitatin f cmmcia and institutina faciitis. H is a mmb f th existing BuidingsCmmitt, th Buiding ratings Subcmmitt, and th Sustainab Dsign Cmmitt f

    th Stuctua engins Assciatin f Nthn Caifnia (SeAoNC).

    Andrea B. Bono, PE, LEED AP BD+C S impson Gumpertz & Heger Inc. - San Francisco, CA

    ANDreA B. BoNo, pe, leeD Ap BD+C, is a Staff II at natina ngining m

    Simsn Gumtz & Hg Inc. Sh has xinc in th dsign, invstigatin, and ha-

    biitatin f cmmcia, hathca, civic, and sidntia buidings atd t bw-gad

    sacs, dium dcks, xti cmnnts and cadding, and fs. Anda wks csy

    with achitcts and cnsutants wh sciaiz in th scicatin and dsign f ng,

    watng, and xti wa systms t dsign, anayz, and ai ascts f th buid-

    ing nv. Sh is th banch sctay f th U.S. Gn Buiding Cuncis Nthn

    Caifnia Chat, San Fancisc Bay Bidg Banch.

    1 2 8 B o n o a n d B o n o 2 8t h R C I In te R n a t I o n a l C o n v e n tI o n a n d t R a d e S h o w M a R C h 1 4- 1 9 , 2 0 1 3

  • 8/12/2019 2013 CTS Bono Bono

    3/12

    A Case Study of waterproofing Strategiesfor a Typical Mat and Deep Foundation System

    INTRODUCTIONA cas study f a w-is buiding is

    sntd t iustat that cdinating

    a fuy intgatd bw-gad watf-

    ing dsign amng a disciins f a j-

    ct tam can tct th buiding and its

    ccuants fm tntiay advs sit

    cnditins. In aticua, th cdinatd

    fft btwn th stuctua ngin and

    watng cnsutant is discussd. As

    th cntag f nw cnstuctin at sits

    with ss-than-ida si incass, stuc-

    tua and watng intgatin shudccu in th schmatic has f a jct

    and cntinu thughut cnstuctin t

    nsu succssfu buiding fmanc.

    Uncertainties in Design

    pi t any nw dvmnt, a sit

    assssmnt is tyicay fmd t va-

    uat a sits abv-gund and subsu-

    fac chaactistics, incuding its stuc-

    tu, ggy, and hydgy. Hwv, du

    t siz, quantity, and cst cnstaints f

    sam cctin, nt a sit cnditins

    can b discvd fm a sit assssmnt.

    Dsigns shud b cgnizant f ths

    unctaintis and undstand that tntia

    ndings duing cnstuctin cud imact

    thi dsign and th dsign f th dis-

    ciins. If vaiatins f th cnditins d

    ccu and dsign changs a mad, cab-

    ativ cdinatin amng a disciins,

    as w as inut fm th buiding wn,

    a ncssay t nsu th jct bjc-

    tivs a mt.

    T mitigat ncuntd dsign unc-

    taintis, a cabativ fft amng adisciins gnats th bst sutin t

    tct th buiding and its ccuants.

    Figure 1 dmnstats hw cabatin is

    ssntia as mdicatin t buiding sys-

    tms bcms signicanty m chang-

    ing and csty as cnstuctin bgins and

    accss bcms stictd.

    Common Means of Protecting Structure

    Stuctua ngins can ng th

    svic if f a buiding by dsigning th utants, and/ cntaminants. Cmm

    stuctu against si cnditins such stuctua tctin mthds incud:

    as th snc f high and vaiab wat Sacicia (xta) st

    tabs, iquab sis, csiv and dt- Incasd cnct cv

    iating agnts, hazadus substancs, exy catings

    Figure 1 Below-grade waterproong membrane under mat slab reinforcement(shown horizontal) and concrete column reinforcement (shown vertical) with a ro

    anchor centered in the column.

    2 8t h R C I In te R n a t I o n a l C o n v e n tI o n a n d t R a d e S h o w M a R C h 1 4- 1 9 , 2 0 1 3 B o n o a n d B o n o 1

  • 8/12/2019 2013 CTS Bono Bono

    4/12

    Figure 2 Elevation view of a foundation wall with negative-side waterproongand a foundation wall with positive-side waterproong.

    passiv activ cathdic tctin

    Ths mans f tctin a gnay

    intndd t sv ny th stuctua -

    mnts f a buiding f a nit amunt f

    tim. Hwv, watng is a nnstuc-

    tua mans f tcting and xtnding th

    if f stuctua mnts, with th addd

    bnt f tcting ccuants and inti

    cntnts fm uncntd wat intatin

    and cnsquntia damag. Watng

    dsign statgis a immntd at ith

    th sitiv ngativ sid f th stuctu

    as shwn in Figure 2. psitiv-sid wat-

    ng tcts a stuctu at th suc

    f hydstatic ssu by acing a bai

    at th xti fac f th stuctu, whas

    ngativ-sid watng is aid at th

    sit sid f th suc f hydstatic

    ssu and mits wat t ass thugh

    th stuctu bf mting a bai at th

    inti sac. Bth statgis tct thinti cntnts fm damag; hwv, ng-

    ativ-sid watng ds nt tct th

    stuctu in fnt f th mmban. Cmmn

    mthds f sitiv- and ngativ-sid wat-

    ng incud s-aid adhd sht

    mmbans, iquid-aid suy-aid

    catings, and cnct admixtus.

    Ths watng statgis qui

    cdinatin with th stuctua ngin.

    A w-intgatd and w-dsignd wat-

    ng systm can tct th stuctu,

    its ccuants, and inti cntnts, thus

    making th intgatin f stuctua cm-

    nnts and watng systms citica f

    bth buiding duabiity and fmanc.

    Integrating for Performance

    In d t dsign a fuy intgatd

    watng systm, it is imtant t

    idntify th ky sns invvd in th

    dsign f a buiding. Ths sns incud

    an achitct, a cntact, a gtchnica

    ngin, an wn tnant, astuctua

    ngin, and if hid, a watng cn-

    sutant. Withut a watng cnsutant

    n th dsign tam, watng systms

    may b sctd withut th fu cnsid-

    atin f isk f wat va intusin, and

    th imact f wat va n ccuantsand th intndd us f inti sacs

    stuctua svic if. Dsigns can

    dv aiat dsign citia basd

    un th sit cnditins, thi vius

    xinc, and an wns inttatin

    f acctab unacctab fmanc;

    hwv, a dsign cnsidatins by ky

    snn shud b dvd cncunty

    in d t satisfy and manag wn tn-

    ant xctatins f th na dsign.

    Case Study

    Th fwing cas study dmnstatsth imtanc f cdinatin and cmmu-

    nicatin amng th dsign tam, with a-

    ticua mhasis n th intactin btwn

    th stuctua ngin and watf-

    ing cnsutant. Th subjct buiding is a

    six-sty, st-famd stuctu v tw

    vs f bw-gad aking sutd

    by a cnct fundatin. Th tw stis

    bw gad a within th wat tab.

    Th sit is in an industia aa, and th

    fm sit us cntaminatd th si with

    sing-has hydcabns (SpH) and havy

    Figure 3 Isometric view of foundation mat, piles, and rock anchors that support

    the structure.

    1 3 0 B o n o a n d B o n o 2 8t h R C I In te R n a t I o n a l C o n v e n tI o n a n d t R a d e S h o w M a R C h 1 4- 1 9 , 2 0 1 3

  • 8/12/2019 2013 CTS Bono Bono

    5/12

    mtas. Th sit was xcavatd t mdiat

    tum-cntaminatd sis and back-

    d with ganua matia. Du t th

    sits cs ximity t a bay, th si has

    a high cncntatin f sats. Th suth-n dg f th sit was viusy usd

    as a shiing chann, cating additina

    jct changs. oiginay, th shiing

    chann was unsystmaticay d with

    ganua matia that incudd as ag

    as cbbs. This d shiing chann acts

    as a dict suc f wat int th sit. Th

    bays tida inuncs and high wat tab

    w as cnsidatins in th bw-gad

    stuctua and watng dsign.

    bw th basmnt

    Figure 4 Steel HP members being driven into rock.

    Figure 5 Shotcrete leveling layer with wire meshcast against secant auger-cast pile walls to addre

    out-of-plane variation and surface irregularities.

    Foundation

    Design

    As th stuc-

    tua ngin

    f cd, w

    dsignd a mat

    fundatin t

    ba msty n

    si, with th

    maining aa

    sutd by

    is and ck

    anchs sckt-

    d int bdck

    stuctu. Figure 3

    shws an ismtic viw f th fundatin

    mat, is, and ck anchs and indicats

    th gna gins f th fundatin. onsma gin f th mat bas dicty n

    nativ ck. Th agst gin f th mat

    bas n 2 ft. f ngind (cmtnt

    si). Th maining gin f th fundatin

    is sutd n gus f is at th f-

    m shiing chann, which a scktd

    int nativ ck. pis a usd t tansf

    ads thugh th si t th nativ

    ck bw. Th is usd n this jct

    a 150-tn, nmina-caacity, Hp st

    mmbs (as knwn as baing i

    (Figure 4 shws th quimnt usd

    div th Hp mmbs thugh th si a

    int th ck.) Gus f is a ac

    bw basmnt sha was and cum

    A thicknd mat vids additina sh

    and xua sistanc at th i gu

    Th maind f th mat is nminay 2

    thick. Sumnta ck anchs, usd

    sist hydstatic fcs at gins f t

    mat that a nt sutd n is, v

    th stuctu fm uifting.

    Duing xcavatin f th sit, sca

    i was, with atnat is infc

    with st W-sctin (wid ang) sd

    mmbs, vidd shing t aw

    xcavatin f th sit (shwn in Fig

    5). Ths scant i was as actd a dwating cutff t duc th amu

    f dwating within th sit. An int

    infcd-cnct stuctua sha w

    was cnstuctd inbad f th scant

    wa and svs th fwing us

    tansf f sustuctu ads t t

    fundatin, tctin f th vtica b

    gad watng mmban, and at

    staint f hydstatic ssu du t t

    vatin f th wat tab.

    2 8t h R C I In te R n a t I o n a l C o n v e n tI o n a n d t R a d e S h o w M a R C h 1 4- 1 9 , 2 0 1 3 B o n o a n d B o n o 1

  • 8/12/2019 2013 CTS Bono Bono

    6/12

    Figure 6 Mat foundation supported on soil.DESIGN PARAMETERSGeotechnical Considerations and

    Resulting Waterproofng Design

    Th vatin f th wat tab vidd

    by th gtchnica ngin indicatd that

    th subtanan cnct mat sab sids

    in th wat tab. Duing cnstuctin, sit

    dwating was quid t w th va-tin f th wat tab unti w dtmind

    that th buidings sf-wight cud sist

    th hydstatic uift ssu. Du t th

    si chaactistics n-sit and th vatin

    f th wat tab, a scant aug-cast i

    wa was sctd t sh th xcavatin.

    Sit dwating was quid t catu th

    inw f gundwat int th xcavatin.

    Structural Foundation Wall Construction

    and Resulting Waterproofng Design

    In gna, vy shing systm -

    quis tatmnt mdicatin t vid

    a sund substat f instaatin f wat-

    ng. Unmdid shing systms ad

    t high babiity f wat intusin int

    buiding stuctus. In u cas, scant

    aug-cast i was actd as vtica sh-

    ing and wud qui a ving ay f

    acmnt f th watng. W c-

    mmndd th instaatin f a shtct

    ving ay t vid a smth substat

    t cmnsat f th ut-f-an sufac

    iguaitis, i t aicatin f th

    watng mmban (Figure 5).pi t dtminatin f th basmnt

    sha wa cnstuctin, w discussd bth

    stuctua and watng cncns with

    th buiding cntact gading a -

    fd cnstuctin mthd. Stuctuay,

    th stngth f ith cast-in-ac sht-

    ct is cmaab as ng as th cnct

    is w cnsidatd. Fm th cntacts

    sctiv, shtct is tyicay fast

    and ss xnsiv t insta. Fm a wat-

    ng sctiv, us f shtct with

    watng is cunty ss iab than

    cast-in-ac cnct with watng.1

    Whn utiizing cast-in-ac cnct, th

    acmnt and vibatin f astic cnct

    aws it t th majity f vids but ds

    qui th us f n-sidd fms in shd

    xcavatins. In cntast, whn shtctingfundatin was, watng bms

    can dv bcaus f vids and shadwing

    duing th acmnt css and fm b-

    kn ntatin sas suting fm ba

    cag anch vibatin.

    As th wns watng cnsu-

    tants, w dnd th vs f isk f wat

    intusin basd n cmmn

    watng duct s-

    vic ivs. Watng -

    fmanc vs w dnd

    as xctd systm bhav-

    ia vaiab amunt f

    bsvab mistu insid

    th buiding. F xam, a

    fmanc bjctiv at th

    highst fmanc v

    wud b ngigib stain-

    ing n stuctua sufacs,

    whas a fmanc

    bjctiv at a w f-

    manc v wud b wat

    w at isatd aas: a ak.

    Undstanding that w-

    thught-ut dsign can imitbuiding damag but cannt

    iminat it, w cmmnd-

    d a watng systm

    that cnsidd th dsign

    wat tab, acctab isk

    f incidnt wat intusin,

    and assumd cnstuctin

    squnc f th fundatin

    and bw-gad xti

    was. Th cntact icd Figure 7 Mat foundation rebar.

    th diffnt cmbinatins f stuctua

    and watng systms. Th wn thn

    dtmind thi acctab isk/cst basis

    f th watng and stuctua sys-

    tms, and w dsignd u watng

    systm t th wn-acctd fmanc

    v. At this sit, th wn wud acct a

    v f isk f wat intusin suting in

    isatd staining.

    MAT FOUNDATION SYS TEMINTEGRATION

    Mat fundatins a a shaw funda-

    tin systm and gnay ncmass a

    buidings nti ftint and cnsist f

    haviy infcd cnct. Mat funda-

    tins a aiat f th fwing sit

    cnditins:

    Si tys that a susctib tsignicant diffntia sttmnts

    xansin that cud caus diffn-

    tia havs

    Undictab stuctua ads andata ads that a nt quay

    distibutd

    lwst vatin f th fundatin iswithin th wat tab

    Figure 6 shws a mat fundatin ba-

    ing dicty n cmtnt si. In a mat

    1 3 2 B o n o a n d B o n o 2 8t h R C I In te R n a t I o n a l C o n v e n tI o n a n d t R a d e S h o w M a R C h 1 4- 1 9 , 2 0 1 3

  • 8/12/2019 2013 CTS Bono Bono

    7/12

    fundatin, th ads fm th sustuc-

    tu a assumd t b vny distibutdthugh th mat t th si bw. In th cn-

    ditin wh th mat fundatin is in cntact

    with th wat tab, such as at this sit,

    watng bcms an imtant cnsid-

    atin whn dsigning th mat fundatin.

    Mat Foundation Waterproofng

    Recommendations

    In bw-gad cnstuctin, bcaus th

    watng is acd bw sva ft f

    cnct and ays f st infcing, th

    abiity t mak ais t th watng,

    quiing si xcavatin cnct mva

    f mitigatin f akag, is ftn infasib

    (as indicatd by Figures 1 and 7). T mini-

    miz akag tntia, w cmmndd

    th fwing imay watf-

    ing systms f bind-sid, bw-

    gad watng in hydstat-

    ic cnditins: (1) s-aid sht

    mmban, (2) fuy adhd sht

    watng, (3) bntnit-

    basd systms. (S Figures 8-10 f

    xams f ach ty f watf-

    ing systm.)rgadss f th bw-gad

    mmban ty, w cmmndd

    instaatin f an uninfcd mud

    sab t vid a suitab substat

    f instaatin f th hiznta

    bw-gad mmban, simia t

    th shtct aid t th aug-

    cast is. on t f th instad

    watng, w cmmndd a

    4-in. infcd tctin sab t

    Figure 8 Blind-side, below-gradewaterproong: loose-laid sheet membrane.

    Figure 9 Blind-side, below-gra

    waterproong: fully adhersheet waterproon

    Figure 10 Blindside, below-grade

    waterproong:bentonite-basedsystem.

    2 8t h R C I In te R n a t I o n a l C o n v e n tI o n a n d t R a d e S h o w M a R C h 1 4- 1 9 , 2 0 1 3 B o n o a n d B o n o 1

  • 8/12/2019 2013 CTS Bono Bono

    8/12

    vnt damag t th mmban du-ing cnstuctin fm ba acmnt,std matias, wding, and quimnt.

    Th th bw-gad watng tys

    as sntd t th wn, as w as

    thi advantags and disadvantags, a

    dscibd bw. Utimaty, w dsignd

    th watng systm basd n th

    cst/isk dtminatin f th wn.

    PRIMARY wATERPROOFINGSYSTEMSLoose-Laid Sheet Membrane Systems

    Taditina yviny chid (pVC) sys-

    tms cud nt b usd at this sit du t

    tntia SpH cntaminatin fm adjacnt

    sits v th if cyc f th buiding. Whi

    atnat matias xist that cmbin th

    bnts f hat-wdd sams, isatin

    fm substat cacking, and ag sht

    instaatin with hydcabn sistanc,

    it wud hav bn cst-hibitiv whn

    cmad t th th mmbans. As,bcaus f its s-aid natu, wat that

    byasss th mmban thugh min

    dfcts cud migat atay bhind th

    mmban, making it difcut t cat th

    suc f wat nty.

    Fully Adhered Sheet Waterproofng

    Fuy adhd mmbans a instad

    n cast-in-ac cnct. Th mmban

    can ith cnsist f ubbizd ashat with

    a ythyn cai sht f sitiv-sid

    aicatins adh t th cnct as

    it is acd in bind-sid aicatins. This

    ty f mmban cnsists f an int high-

    dnsity ythyn (HDpe) sht with a

    itay adhsiv and acyic bind that

    bnds t astic (wt) cnct. laks in th

    fuy adhd mmban a caizd s

    that ai catins can b asiy idntid.

    Hwv, this systm has th isk that fai-

    us cud ccu at mmban sams du t

    incct instaatin.

    Bentonite-Based Systems

    Sdium bntnit is a natuay ccu-ing mina that, in th snc f uncn-

    taminatd wat and cnning ssu,

    sws t fm a watng g ay v

    was and und sabs, vnting wat

    intatin. Th mmban cnsists f a

    ay f bntnit suundd by gtxti

    fabic n ith sid t fm a mmban.

    Th must b adquat cvag and cn-

    ning ssu f th wat-g actin t

    b ffctiv in watng. Bntnit ds

    nt xand in th snc f satwat.

    Hwv, ducts with additivs a avai-

    ab that fm u t a givn cncnta-

    tin f sat in th wat.

    Basd n th abv cnsidatins f

    ach f th systms and th wns cst/

    isk fnc, w dsignd a bntnit-

    basd systm f th mat fundatins

    watng. As a cnditin f scifying

    this duct, w cmmndd that thgundwat b tstd f chid cntnt

    t dtmin if bntnit-basd systms

    w aiat.

    SECONDARY (BACKUP)wATERPROOFING SYSTEMS

    Du t th cst-hibitiv natu f

    ais and systm faius, w cm-

    mndd incuding dundancy int th

    bw-gad watng systm dsign.

    Th tw cmmndd mthds f backu

    watng incudd inti dainag

    and cnct admixtus.

    Interior Drainage

    In iu f a dainag d bw th

    basmnt sab quiing an additina tw

    ft f xcavatin, th wn chs an

    inti dainag systm t cct wat.

    This byasss th imay systm and thn

    tansts it t a sum catin f mva

    fm th buiding. At basmnt sab-t-

    xti wa catins, w cmmndd a

    tugh (shwn in Figure 11) t intct and

    cct any wa-wat akag.

    Crystalline Waterproofng AdmixturesW as cmmndd cystain wat-

    ng admixtus f th mat fundatin.

    Cystain watng admixtus can

    h minimiz wat migatin by acting

    with wat t gw cystas that bck as-

    sag thugh th cnct stuctu.

    Th admixtu hs th cnct sist

    uid w f wat thugh its wn s

    and ducs th isk f inti akag

    and/ staining.

    F hydstatic cnditins, w cm-

    mnd against cnct admixtus as

    th imay watng sinc cnctadmixtus a imitd by th quaity f th

    cnct acmnt. Additinay, cnct

    tnds t cack du t shinkag and/

    buiding mvmnt, and if cacks widths

    Figure 11 Perimeter waterproong section.

    1 3 4 B o n o a n d B o n o 2 8t h R C I In te R n a t I o n a l C o n v e n tI o n a n d t R a d e S h o w M a R C h 1 4- 1 9 , 2 0 1 3

  • 8/12/2019 2013 CTS Bono Bono

    9/12

    xcd th watng caabiitis fth cnct admixtus in th snc f

    wat, aks can ccu. Du t this ssibi-

    ity, w cnsidd th admixtu as scnd-

    ay (backu) watng. S Figure 11

    f a dtai indicating th stuctua and

    watng mnts f th mat funda-

    tin at a basmnt sha wa.

    ROCK ANCHOR SYSTEMINTEGRATION

    Anchs a a d fundatin systm

    and a usd t stain fundatins sist-

    ing tnsi fcs uift du t hydstatic

    ssus, si hav, sustuctuads. A ck anch, shwn in Figure 12,

    is n ty f anch with a sma-diamt,

    high-caacity d. rck anchs a cn-

    stuctd by diing thugh th si int

    ck; acing th ck anch int th h;

    guting th anch; tnsining th d;

    guting, if ncssay; and cking th d

    int sitin. (Figure 13 shws ck anchs

    sisting hydstatic ssu in a mat

    fundatin.) Th mat sab sans btwn

    Photo 12 Rock anchors with lower mat reinforcing in place.

    ck anchs and sists hydstatic wat

    ssu fm th undsid f th mat. Thck anchs tansf th hydstatic wat

    ssu d int th si, wh th tn-

    sin ads can b sistd and k th mat

    fm ifting u.

    Rock Anchor Waterproofng

    Recommendations

    In tms f watng, ck anchs

    cat a byass in th mat fundatins

    hiznta bw-gad watng sys-

    Figure 13 Rock anchors in a foundati

    resisting hydrostatic pressu

    tm (f t Figure 12). rck anchs

    as staws aching t bw-gad dtint th wat tab, binging chd wa

    t th sufac fm subsufac dths

    caiay fc. With thi igua

    anchs can b difcut t dtai and qu

    cdinatin btwn th stuctua n

    n and th watng cnsutant

    nsu bth adquat baing-at mb

    mnt and sufcint hight t insta wat

    ng t th anch.

    T sa any vids btwn th

    2 8t h R C I In te R n a t I o n a l C o n v e n tI o n a n d t R a d e S h o w M a R C h 1 4- 1 9 , 2 0 1 3 B o n o a n d B o n o 1

  • 8/12/2019 2013 CTS Bono Bono

    10/12

    Figure 14 3-D rendering of waterproong at a rock

    anchor including bentonite waterproong membrane,

    bentonite waterproong membrane patch, bentonite mastic,block waterstop, and injection tube waterstop.

    Figure 15 Typical detailing around a rock anchor.anchs and th mat fundatin u, w

    cmmndd instaatin f injctin tub

    watsts. Ths injctin tub watsts

    a in additin t th bck watsts

    nmay dtaid as at f a bntnit

    watng systm. Injctin tub wat-

    sts cnsist f wi tubing cvd by a

    infcd mmban that is injctd with

    yuthan gut. S Figures 14 and 15

    1 3 6 B o n o a n d B o n o

    f a dtai indi-

    cating th stuc-

    tua and wat-

    Figure 16 Installed detailing around a rock anchor prior to bentonite mastic,

    block waterstop, and injection tube waterstop installation.

    ng mnts

    f th ck anch. Figure 16 shws th

    dtaiing f bntnit aund th igua

    ck anch ntatin. In gna, injc-

    tin tub watsts a injctd aft th

    cnct mat sab has sufcinty cud

    2 8t h R C I In te R n a t I o n a l C o n v e n tI o n

    th manufactus quimnts but i

    t dcmmissining th sit dwating

    ws. on this jct, injctin tub wat-

    sts w instad as a backu mans in

    th vnt f wat intusin. Cunty, th

    injctin tub watsts a nt gutd

    and a ft in ac as a sumnta

    watng masu.

    PILE SYSTEM INTEGRATIONAnth d fundatin systm usd

    n th jct was is with i cas.

    pis a fabicatd stuctua mmbs

    mad f wd, cnct, st (as in this

    cas) did divn int th gund and

    tyicay xtndd t dths n th d

    f 50 ft. bw th gund sufac, but

    that can as xtnd t dths f 150 ft.

    gat. Th is tansf ads fm

    th sustuctu, thugh wak si ay-s that cannt sut th aid ads,

    t cmtnt ays f si. D funda-

    tins a usd whn cmtnt si ays

    a catd w bw th sufac, and it

    is nt actica t xcavat dwn t thi

    vatin. (Figure 17 shws a i-sutd

    mat fundatin with is baing dicty

    n ck.) A i ca is th infcd cn-

    ct mnt that cnncts a cumn fm

    th sustuctu t a gu f is,

    a n d t R a d e S h o w M a R C h 1 4- 1 9 , 2 0 1 3

  • 8/12/2019 2013 CTS Bono Bono

    11/12

    Figure 17 Pile-supported mat foundation with piles bearing in rock.tying thm a tgth. Summaizd fmFoundation Design: Principles and Practices,

    whn dsigning i fundatins, dsigns

    must cnsid th fwing aamts:2

    Aid ads rquid diamt rquid ngth Avaiabiity f i ty Duabiity Anticiatd diving cnditins In th d, th imssibiity f dt-

    mining assumd dsign stngths

    Du t th abv cnsidatins, addi-

    tina is may nd t b instad. This

    can inunc cnstuctin tim and cst,

    ang with ating buiding fmanc.

    Cnsidatin must as b givn t th

    watng dtaiing f is within th

    wat tab.

    Pile Waterproofng Recommendations

    Simia t ck anchs and mat fun-

    datins, is a bst dtaid with cab-

    ativ ffts. D fundatins, bcaus

    thy tansmit sm th nti aidad t sis w bw th gund sufac,

    a iky t ntat th gundwat tab

    and bing wat t th sufac thugh ca-

    iay fc.

    on this sit, w cmmndd wat-

    ng ach individua i ang with th

    i cas. T a th is f instaa-

    tin f watng, th st ats w

    wdd t th st Hp mmbsn at th

    t nd f th i and th tw wdd t

    sit angst fm a mta ca. Thisst ca vidd a suitab substat f

    instaatin f watng at ach is

    imt. S Figures 18-20 (th ast

    ths is a dtai indicating th stuctu

    and watng mnts f th tyi

    i and i ca).

    SUMMARY OF wATERPROOFINGRECOMMENDATIONS

    In summay, w dsignd th wat

    ng systm basd n th fwi

    sit cnditins and stuctua fundatisystm:

    Subtanan vs in th watab

    ptntia SpH cntaminatin ptntia satwat cntact Aug-cast i shing wa Mat fundatin rck anchs pis and i casBasd n ths dsign aamts,

    cmmndd th fwing instaatin:

    Shtct skim cat v aug-cai-shing wa t act as a wat

    ng substat

    Figure 18 3-D rendering of a pile and pile cap.

    2 8t h R C I In te R n a t I o n a l C o n v e n tI o n a n d t R a d e S h o w M a R C h 1 4- 1 9 , 2 0 1 3 B o n o a n d B o n o 1

  • 8/12/2019 2013 CTS Bono Bono

    12/12

    Figure 19 3-D rendering of waterproong at a pile in a pile cap showingbentonite waterproong membrane, bentonite mastic, block waterstop, and

    injection tube waterstop.

    An uninfcd cnct mud sabt vid a suitab substat f

    th sht watng

    Wdd st ats at Hp mmbst vid a suitab substat t

    tminat watng

    Watng th subtananv with bntnit mmban with

    ad and fastnd sams and

    dtaid ntatins rinfcd tctin sab v th

    hiznta bw-gad watf-

    ing t tct th watng fm

    cnstuctin damag (nt im-

    mntd)

    Cystain watng admixtuat mat sab and cast-in-ac was

    Dainag channs Sumnta injctin tub wat-

    sts

    Ths cmmndatins w basd n

    th watng fmanc dsid byth wn, cst cnsidatins fm th cn-

    tact, avaiab cnstuctin tchniqus at

    th tim f cnstuctin, and ast xi-

    nc n simia bw-gad ca jcts.

    CONCLUSIONDsign tam cdinatin btwn th

    stuctua ngin and th watng

    cnsutant d t a w-intgatd stuctu-

    a and watng systm. Withut this

    tam fft, tunitis t sct th bst

    watng systm f a buiding may nt

    hav bn ssib nc cnstuctin had

    bgun. Hwv, vn with cdinatin and

    intgatin, cnicts and s may nt b

    iminatdbut thi svity is minimizd,

    viding th wn an cnmica and

    suitab buiding that mts fmanc

    xctatins.

    REFERENCES1. D.G. Gibbns and J.l. Tw, Wat-

    ng Bw-Gad Shtct

    Was, The Construction Specifer, V.

    62, N. 3, Mach 2009, . 48-55.2. D.p. Cdut, Foundation Design:

    Principles and Practices, scnd di-

    tin, pntic Ha, U Sadd

    riv, Nw Jsy, 2001.

    Figure 20 Waterproong at a typical pile cap.

    1 3 8 B o n o a n d B o n o 2 8 t h R C I I n te R n a t I o n a l C o n v e n tI o n a n d t R a d e S h o w M a R C h 1 4 1 9 2 0 1 3