2013 02 28 Lync2013 Planning Tool Available

18
1 Dean Suzuki Blog Title: Lync 2013 Planning Tool Created: 2/28/2013 Description: Microsoft just released the Lync 2013 version of the Planning Tool. This is a great tool to help you get started planning your Lync 2013 deployment. The tool can be downloaded from: http://www.microsoft.com/en-us/download/details.aspx?id=36823 In this post, we walkthrough how to download, install, and then use the Lync 2013 Planning Tool. References: http://technet.microsoft.com/en-us/library/gg398447.aspx ; Lync 2013 Planning Documentation http://technet.microsoft.com/en-us/library/gg412892.aspx ; Deploying Lync Server 2013 http://technet.microsoft.com/en-us/library/gg398205.aspx ; Preparing the Infrastructure and Systems http://technet.microsoft.com/en-us/library/gg412883.aspx ; Server and Tools Operating System Support http://technet.microsoft.com/en-us/library/jj721939.aspx ; Managing Lync Server 2013 Disaster Recovery, High Availability, and Backup Service http://technet.microsoft.com/en-us/library/gg398347.aspx ; Planning for Central Site Voice Resiliency http://www.microsoft.com/en-us/download/details.aspx?id=36823 ; Lync 2013 Planning Tool Disclaimer: Contents of this blog and article represent the opinions of Dean Suzuki, and do not reflect the views of my employer. (C) 2012 Dean Suzuki, All Rights Reserved Procedure: Table of Contents 1 Installing the Lync 2013 ........................................................................................................................ 2 2 Using the Lync 2013 Planning Tool ....................................................................................................... 3 2.1 Requirements Gathering............................................................................................................... 3 2.2 Site Design..................................................................................................................................... 5 2.3 Review the Results ........................................................................................................................ 9

Transcript of 2013 02 28 Lync2013 Planning Tool Available

Page 1: 2013 02 28 Lync2013 Planning Tool Available

1

Dean Suzuki Blog

Title: Lync 2013 Planning Tool

Created: 2/28/2013

Description:

Microsoft just released the Lync 2013 version of the Planning Tool. This is a great tool to help you get

started planning your Lync 2013 deployment. The tool can be downloaded from:

http://www.microsoft.com/en-us/download/details.aspx?id=36823

In this post, we walkthrough how to download, install, and then use the Lync 2013 Planning Tool.

References:

http://technet.microsoft.com/en-us/library/gg398447.aspx ; Lync 2013 Planning Documentation

http://technet.microsoft.com/en-us/library/gg412892.aspx ; Deploying Lync Server 2013

http://technet.microsoft.com/en-us/library/gg398205.aspx ; Preparing the Infrastructure and Systems

http://technet.microsoft.com/en-us/library/gg412883.aspx ; Server and Tools Operating System Support

http://technet.microsoft.com/en-us/library/jj721939.aspx ; Managing Lync Server 2013 Disaster

Recovery, High Availability, and Backup Service

http://technet.microsoft.com/en-us/library/gg398347.aspx ; Planning for Central Site Voice Resiliency

http://www.microsoft.com/en-us/download/details.aspx?id=36823 ; Lync 2013 Planning Tool

Disclaimer:

Contents of this blog and article represent the opinions of Dean Suzuki, and do not reflect the views of my employer. (C) 2012 Dean Suzuki, All Rights Reserved

Procedure:

Table of Contents 1 Installing the Lync 2013 ........................................................................................................................ 2

2 Using the Lync 2013 Planning Tool ....................................................................................................... 3

2.1 Requirements Gathering ............................................................................................................... 3

2.2 Site Design ..................................................................................................................................... 5

2.3 Review the Results ........................................................................................................................ 9

Page 2: 2013 02 28 Lync2013 Planning Tool Available

2

2.4 Exporting to Visio, Excel, Print, or Save ...................................................................................... 10

2.5 Examining the Server Configuration ........................................................................................... 11

2.6 Edge Network Diagram ............................................................................................................... 13

2.7 Edge Admin Report ..................................................................................................................... 15

2.8 Site Summary Tab ....................................................................................................................... 16

2.9 Additional Actions ....................................................................................................................... 18

1 Installing the Lync 2013

Go to the Lync 2013 Planning Tool download site (http://www.microsoft.com/en-

us/download/details.aspx?id=36823)

Note that this tool will work on the following operating systems: Windows 7 Service Pack 1, Windows

8, Windows Server 2008 R2, Windows Server 2012

You must also uninstall any prior versions of the tool.

After downloading, double-click the MSI to begin the installation:

Page 3: 2013 02 28 Lync2013 Planning Tool Available

3

2 Using the Lync 2013 Planning Tool

After installing, launch the tool to begin using it. Select “Get Started” to begin planning your topology.

2.1 Requirements Gathering The tool begins a series of questions to gather your requirements on how you plan to use Lync 2013 in

your organization.

Page 4: 2013 02 28 Lync2013 Planning Tool Available

4

I strongly recommend deploying the

monitoring server to understand and

troubleshoot any issues with audio/video

quality and to understand how Lync is

being used.

If you have Exchange 2013 deployed, you

maybe able to use it as the archiving store.

If not, you’ll have to use SQL to store the

archive.

Page 5: 2013 02 28 Lync2013 Planning Tool Available

5

Lync 2013 supports XMPP which enables

federation with XMPP systems (e.g.

GoogleTalk)

Lync 2013 disaster recovery provides you the

ability to setup Lync in a separate location and

be able to failover to it in the case that the

primary site goes down. This is a key new

capability in Lync 2013.

2.2 Site Design Once the tool has gathered your requirements, the next step is to start entering your locations (or sites).

There are two kinds of sites in Lync: Central Sites and Branch Offices. Central Sites are locations where

there will be Lync servers. Branch offices are locations without Lync servers. Branch offices could

contain voice gateways or Survivable Branch Servers or Survivable Branch Appliances.

Page 6: 2013 02 28 Lync2013 Planning Tool Available

6

Enter your first location that will hold Lync servers (a central site).

Enter your SIP domain. Your SIP domain is very similar to your e-mail address domain (called an SMTP address). Note, the SIP and SMTP addresses don’t have to be the same for a user but there are assumed integrations between the two (e.g. in Outlook, a user’s presence is shown which links the SMTP address and SIP addresses) together. If the SIP and SMTP addresses are not the same, then extra steps need to be made to enable the integration. A best practice is to match them if possible.

Page 7: 2013 02 28 Lync2013 Planning Tool Available

7

Estimate the conferencing usage. Multi-view is a new Lync 2013 capability that allows you to see up to 5 concurrent video streams from the meeting participants. Data collaboration requires the new Office Web Apps server. I wrote a blog article on setting this up in an earlier post.

Estimate the voice usage. Hybrid voice is a new capability that allows users of Office 365 to leverage an on-premise Lync 2013 for tighter integration with on-premise PBXs.

Page 8: 2013 02 28 Lync2013 Planning Tool Available

8

Estimate Unified Messaging usage.

Page 9: 2013 02 28 Lync2013 Planning Tool Available

9

You can deploy standalone mediation servers if you estimate a high call volume. Look at the Lync 2013 Capacity Planning documentation for sizing guidance.

Branch sites are tied to central sites to get their services from the Lync servers in the central sites. The next step is to input your branch offices that will be serviced by the central site.

2.3 Review the Results

Click Draw

Page 10: 2013 02 28 Lync2013 Planning Tool Available

10

Double-click the Irvine Central Site and it bring up the recommendation for the Lync 2013 architecture

for that site.

2.4 Exporting to Visio, Excel, Print, or Save Note the top row of buttons. You can save, export the architecture to Visio or Excel, or print the

architecture out.

Here is the Visio output. Note that there are multiple sheets in the Visio workbook breaking out each

location.

The tool outputs an xml file which you export to Excel and it can be opened in Excel. The output is an

Excel workbook with all of the configurations.

Page 11: 2013 02 28 Lync2013 Planning Tool Available

11

2.5 Examining the Server Configuration From the main view, you can double-click a server to learn about its configuration.

To go back to the main view, click “View Site Topology” on the right hand side.

Page 12: 2013 02 28 Lync2013 Planning Tool Available

12

Here is the view of the Lync Front End servers.

Note that the port requirements are also listed.

You can click the firewall in the diagram and get a view of the firewall report:

Page 13: 2013 02 28 Lync2013 Planning Tool Available

13

2.6 Using the Edge Network Diagram

At the bottom of the screen is a series of tab, if you select “Edge Network Diagram”, you will get the

view below.

If you click the “Click here to update your options”

Page 14: 2013 02 28 Lync2013 Planning Tool Available

14

You can change the architecture for IP addresses on the external edge of the Lync edge. There are two

options, use a different IP address and same ports for each function (by default). Or use the same

FQDN and IP addresses, but use different ports for edge services.

I like to use different IP addresses but standard ports (default option), since if you change it to use

different ports, some companies don’t open those ports to the Internet and thus your users at those

locations won’t be able to connect since those ports are blocked.

If you click any of the host name, you can update the hostname and the IP addresses to match the host

names and IP addresses you plan to use in your deployment.

Page 15: 2013 02 28 Lync2013 Planning Tool Available

15

2.7 Using Edge Admin Report If you click that the “Edge Admin Report” tab in the Planning Tool, you will get the following view.

You can get the Summary, Certificates, Firewall, and DNS records needed for your deployment.

This is great because this caused a lot of confusion in earlier releases and helps to understand all the

DNS records that need to be created and what needs to be included in the certificate.

I would use this as a starting point. As you refine your design, you may need to add more DNS records

and additional entries on the subject alternative name on the certificate.

Page 16: 2013 02 28 Lync2013 Planning Tool Available

16

2.8 Site Summary Tab The Site Summary Tab summarizes the configuration at this site.

Page 17: 2013 02 28 Lync2013 Planning Tool Available

17

Page 18: 2013 02 28 Lync2013 Planning Tool Available

18

2.9 Additional Actions

On the right hand side of the Planning tool, you see some additional options. You can go back to the overall global topology. View the Planning and Deployment steps which takes you to the Technet documentation outlining how to do the Planning and Deployment for the Lync components. A list of the hardware required is also produced.