    2012 London Olympics Security Management Programme: A Brief Risk Management Analysis J une 2012

    David Rubens Associates 20121

    2012 London OlympicsSecurity Management Programme- A Brief Risk Management Analysis

    June 2012

  • 7/28/2019 2012London Olympics Security Management DRA 8

    2/24

    2012 London Olympics Security Management Programme: A Brief Risk Management Analysis J une 2012

    David Rubens Associates 20122

    David Rubens Associates

    David Rubens Associates is a specialist corporate security consultancy offering strategic securityservices to individuals and organisations across the world.

    DRA has worked with government agencies, NGOs, international conglomerates and major globalevents, and brings a mixture of strategic vision, operational experience and academic research to allof its projects, however large or small.

    David Rubens, MSc FSyI holds an MSc in Security and Risk Management (LeicesterUniversity), and is a Visiting Lecturer and Dissertation Supervisor on their Security, Terrorism andPolicing MSc programme. He was a Visiting Fellow at the Security and Resilience Department,

    Cranfield University, UK Defence Academy (2009-10), where he was a Visiting Lecturer on theStrategic Leadership programme, specialising in terrorism & public policy and the management oflarge-scale, complex multi-agency operations.

    He has written specialist reports for government agencies in J apan, Russia, Dubai, Nigeria, Liberiaand the Caribbean, and is highly-regarded as a speaker on the international security conferencecircuit. He is currently on the Professional Doctorate programme at Portsmouth UniversityDepartment of Criminology & J ustice.

    For further reports, or to discuss the contents, please contactDavid Rubens

    [email protected]

    David Rubens AssociatesThe Arches,

    Maygrove Road

    London NW6 2EE

    [email protected]

  • 7/28/2019 2012London Olympics Security Management DRA 8

    3/24

    2012 London Olympics Security Management Programme: A Brief Risk Management Analysis J une 2012

    David Rubens Associates 20123

    2012 London Olympics Security Management Programme:A Br ief Risk Management Analysis

    Introduction

    The awarding of the 2012 Olympic Games to London on 6th

    J une 2005 marked the start of what has been

    widely labelled as the largest security operation in Europe since the end of the Second World War. As well

    as triggering a major construction programme, it was also an opportunity for UK plc to demonstrate a world-

    class level of strategic management capability operating at the extremes of operational complexity, whether

    at the highest reaches of national and regional government or across the gamut of commercial

    organisations, administrative infrastructure and a wide range of security agencies. The unmentioned 300lb

    gorilla in the corner of the room was always the fact that UK plc has not been particularly good at large-

    scale infrastructural project management Terminal 5 and the Millennium Dome are just two of the more

    noteworthy failures to deliver a functioning project in line with demanding and non-negotiable deadlines.

    There is no doubt that the scale and complexity of the London Olympics security management programme

    is unprecedented, and that it has created challenges that have demanded a level of strategic project

    management that has gone beyond anything that has been previously seen in this country. However, froma theoretical and academic perspective, all of the fundamental issues that should have been taken into

    consideration and accounted for from the beginning of the project seven years ago were well known, and it

    was always part of the responsibility of project and programme managers tasked with creating a unified

    security management programme to take on board all of the lessons that have been learned in previous

    similar mega-event programmes. Whilst I certainly wish all participants in the management of the London

    Games every success, it also seems clear to me that there are major systemic flaws built into the fabric of

    the Games management structures that create genuine vulnerabilities and which are almost certain to be

    stretched to the limit of their capabilities (and beyond) under the pressures of the delivery of the actual

    Games events. I have no doubt that once the Games are over (and hopefully they will be the great success

    that we are all hoping for), ) there will be no shortage of people using the clear-sightedness that 20/20

    hindsight inevitably brings to highlight those shortfalls in strategic, tactical and operational planning that will

    allow any failures that might occur to be seen as being inevitable, but I hope that by putting down some

    thoughts before the event, it will be equally clear that neither success nor failure just happens, but are

    both no more than the final realisation of a long causal chain that should be clearly visible to those that

    have the necessary technical understanding and the eyes to see.

  • 7/28/2019 2012London Olympics Security Management DRA 8

    4/24

    2012 London Olympics Security Management Programme: A Brief Risk Management Analysis J une 2012

    David Rubens Associates 20124

    I have tried to maintain the balance between offering a level of analysis that might not normally be available

    to the general reader, with an attempt to make this information as relevant and accessible as possible

    without it becoming bogged down in academic citations or footnotes. I believe that the information in this

    paper will have relevance for anyone involved in any aspect of project management, whatever its nature,

    and I would of course be happy to receive any comments or feedback, and to enter into correspondencewith anyone who might wish to discuss further any of the issues raised. You can also make comments at

    my blog at

    www.davidrubens-associates.com/DRA/

    I am grateful to those people involved in various aspects of the Olympics delivery and management

    programmes who have agreed to talk with me, and in order to ensure their anonymity I have used the

    information that they have shared with me as background information for this paper, rather than in order to

    highlight specific shortcomings in any individual organisation.

  • 7/28/2019 2012London Olympics Security Management DRA 8

    5/24

    2012 London Olympics Security Management Programme: A Brief Risk Management Analysis J une 2012

    David Rubens Associates 20125

    Olympic Secur ity Management: Spectacular vs Mundane

    As with all modern Olympic Games, the relevant authorities have been mindful of two distinct but intricately

    related responsibilities to avoid the impression that there is an oppressive securitisation of the wholeOlympics experience, at the same time as they need to give respect to what are increasingly seen as

    unanswerable threats. The London Olympics has continued the tendency of all recent Olympic Games to

    suffer from a security inflation, in that the perceived threats, the proposed security responses and above

    all, the cost of each Olympics security management programme has gone beyond what was perceived of

    as sufficient in previous Games. Although this tendency has accelerated since the events of 9/11 in 2001

    (with an almost ten-fold increase from the $179m security budget for Sydney 2000 to $1.5bn budget for

    Athens 2004), there was already at that time a clear awareness that normal security management was no

    longer appropriate for the global media event that the Olympics had become, and since the development of

    the Atlanta Rules at the Atlanta Olympics in 1996 (and even before then since the first political Games in

    Mexico City in 1968), the role of Spectacular Security has played a central role in the management and

    meta-management of all subsequent Olympic Games.(1), (2), (3)

    In recent years there has been a growing academic interest in the impact of securing what have come to be

    known as mega events, and there is no shortage of academic articles investigating both the actual

    securitising of Olympic Games as well as the implications for other areas of security and social control, but

    these have tended to concentrate on seeing security as involving counter-terrorism and the threat of high-

    profile major-impact terrorist attacks. Although this is undoubtedly a significant and necessary strand of

    Olympics security management, the truth is that since the hostage-taking by eight Palestinian Black

    September personnel in the Olympic Village in Munich in 1972, leading to the death of eleven Israeli

    athletes and coaches, the only major attack to take place at an Olympics was the bomb set off at an

    Olympic concert in Atlanta, which led to the death of two people and the injuring of 111 others, and was

    planted by a US domestic terrorist who was captured five years later after setting off other bombs outside

    abortion clinics.

    Security Expenditure for Olympic Summer Games, 1984-2004(4)

  • 7/28/2019 2012London Olympics Security Management DRA 8

    6/24

    2012 London Olympics Security Management Programme: A Brief Risk Management Analysis J une 2012

    David Rubens Associates 20126

    Whilst it is easy to focus on large-scale terrorist attacks, (and the placement of anti-aircraft missile

    batteries in various residential areas around London, as well as the deployment of Typhoon fighter jets,

    have led to such headlines as Defending the Olympics from terror attack: Fighter planes at Northolt for first

    time since WWII as elite RAF say they will shoot down passenger jets to protect London (5)), it seems

    more likely that the security management issues that will have an immediate and more significant impacton the Games will be the more mundane issues of day-to-day security management around the venues,

    and in particular the integration and management of the vast numbers of Olympic volunteers, short-term

    contract security stewards, police and military personnel who have been seconded to the security operation,

    as well as the simple fact of moving tens of thousands of people around London on a daily basis. It is this

    area of enhanced normality security management, however large-scale it might be, that is most open to

    analysis based on traditional risk management frameworks.

  • 7/28/2019 2012London Olympics Security Management DRA 8

    7/24

    2012 London Olympics Security Management Programme: A Brief Risk Management Analysis J une 2012

    David Rubens Associates 20127

    Tame, Loosely Structured and Wicked Problems

    From a strategic project management perspective, the initial conception of the delivery of the London

    Olympics could be divided into three separate components, each of which falls under a separate section of

    the classical risk management triumvirate of Tame Problems, Loosely Structured Problems, and Wicked

    Problems(6)

    , and each of which has required their own particular development and management framework.

    The first, and undoubtedly most straightforward, was the delivery of the built environment stadia, housing,

    support buildings, access roads, water, heating, lighting, etc. Although the design and build of the stadia,

    and the development of the wider Olympic Park area, were certainly ambitious in scale and scope, and

    undoubtedly threw up their own internal problems and challenges, they were, in essence, what are called in

    risk management parlance Tame Problems. The fundamental requisites of the delivery of the build project

    were well-understood, there were few if any major issues that were outside the control of the planners, and

    the overall capabilities required for the delivery of the built environment were not radically different from

    similar construction projects that all of the major players had been involved in on different continents acrossthe world. In short, on the day that the contracts were signed, the people responsible for the delivery of that

    aspect of the Games probably had a pretty good idea of what it was they needed to do, and how they were

    going to achieve it.

    If the issues of the built environment could be characterised as Tame Problems, with clearly identified

    solutions, underlying skills and a well-developed and widely-accepted professional body of knowledge, then

    the issue of the security management of the Games would clearly need a different set of development tools,

    with a much higher level of innovation and creative development. The initial stage of the security

    development programme, that would see the various agencies working together to create an appropriate

    Olympic security management framework, would come under the general heading of what are usually

    described as Loosely Structured Problems, which whilst they may each be unique in their own ways, are

    also bounded by well-developed and understood principles of large-scale project management.

    However, it will be the third and critical stage, the Real Time Management of the actual Games, with all of

    the thousands of uncontrollables inter-acting on an ever-changing basis, that will be the ultimate test of the

    event managers. (To be pedantic, the security management of the event could then itself be sub-divided in

    turn into Left of Bang normal management of the event, including all of the Expected Unexpecteds that

    will certainly arise, but which could be considered as coming under Normal Operational Situations, and

    finally the Right of Bang responses to fast-escalating potentially crisis situations which could have thepossible consequence of derailing the whole Olympic experience).

  • 7/28/2019 2012London Olympics Security Management DRA 8

    8/24

    2012 London Olympics Security Management Programme: A Brief Risk Management Analysis J une 2012

    David Rubens Associates 20128

    Tame Problems are those that fall within normal working parameters, which are conducive to well-defined

    responses, and which we should be able to manage using a range of Standard Operating Procedures. An example

    would be a traffic light in central London breaking down. Once that is flagged up in the control room, it should be possible

    to send out an engineer who, because of his training and experience, would already have a good idea of what the

    potential causes of that problem could be, as well as a range of appropriate solutions. His function would be to arrive at

    the scene, identify the problem, fix it, and report back that the situation has been returned to normal operational status.

    The root of successful response to Tame Problems are well-understood SOPs that all members of the team are aware

    of, and have the ability to implement.

    Loosely Structured Problemsare those that dont fit into a tightly-defined scenario, but which are never-

    the-less analogous to other similar situations. They call on a higher level of creative response, often involving

    coordination and interaction between other agencies , but which still fall within Planned Situations. An example wouldbe all of the traffic light in Piccadilly Circus in London, or Times Square in New York, going out of action at the same time.

    Although this would have immediate effects beyond the immediate environment of the situation itself, as an Incident

    Management situation it requires the same response framework as a wide range of other comparable scenarios, such

    as a serious traffic accident, a major crime scene, a suspected VBIED (car bomb) or a spill of toxic chemicals. There

    should be a well-recognised process for creating a multi-agency response that could assess the situation, look at the

    various secondary consequences and then develop and implement a response programme that would isolate as much

    as possible the specific incident from the wider community, minimising the potential area of disruption, at the same time

    steps are put in place to fix the original problem and manage a return to normal operation status. The secret to the

    success of the response is not so much specific response plans, but the ability of the representatives of various agencies

    to work together, share information and expertise, and create and implement a response programme appropriate to that

    specific situation.

    Wicked Problemsare those problems that because of their scale, complexity and inter-connectedness with other

    factors, are not conducive to solutions in the classic sense of the word. It was originally used to describe problems of

    urban planning, where simple (and simplistic) solutions continuously failed to solve the problems they were tasked with

    resolving. An example of a Wicked Problem would be if, for whatever reason (technical malfunction, human error, cyber-

    terrorism), every traffic light in London simultaneously turned to green, and stayed there. Within one minute, the

    consequences of that would bring the whole city to a stand-still, and any Response Options that might have been on the

    table would immediately become inoperable. Within one hour, there would be a range of problems created by the original

    situation that could easily cause a breakdown in the social control of the city, and which would be beyond the scope of

    any normal Incident Response Management programme.

    TameProblems

    WickedProblems

    LooselyStructuredProblem

    Stage 1:Built

    Environment

    Stage 2: Development ofSecurity Management

    Frameworks

    Stage 3:Management ofOlympic Event

  • 7/28/2019 2012London Olympics Security Management DRA 8

    9/24

    2012 London Olympics Security Management Programme: A Brief Risk Management Analysis J une 2012

    David Rubens Associates 20129

    The effective delivery of the Games themselves, from the Opening Ceremony on 27th

    J uly to the closing

    ceremony of the Paralympics on 9th

    September 2012, will be dependent on the ability to move hundreds of

    thousands of people from place to place , to get their tickets to them (a total of 11 million tickets in all), to

    feed them, and allow them to enjoy the Games in a safe, well-structured and socially acceptable manner

    at the same time ensuring that an Incident Response and Crisis Response capability is on hand that willallow event managers to respond speedily and effectively to those unexpected challenges that will

    inevitably arise. This ability to create on-the-spot solutions to problems that will undoubtedly have

    numerous secondary effects given the high-level of inter-connectedness and systems-dependence of the

    whole Olympic project will be the ultimate test of the seven years preparation of the events strategic

    planners and managers.

    It should also be remembered that, despite the fact that these are officially The London Games, events will

    in fact be taking place across the country, either as one-off events (such as football matches at football

    stadia in Glasgow, Cardiff, Manchester, Newcastle and Coventry, besides Wembley Stadium in London), or

    as on-going events such as the sailing, which takes place in a small town on the south coast of England,

    120 miles away from the main Olympic stadium, and which continues for almost the whole of the Olympics.

    Whether it is for the potential protester, the problem of traffic and access management or any of the other

    administrative problems that are likely to beset these venues, it will be necessary to have the same range

    and level of response capability available for these events as it is for the main events in the Olympic Park.

    From 2012 Olympics UK Venues Map www.golondon.about.com

  • 7/28/2019 2012London Olympics Security Management DRA 8

    10/24

    2012 London Olympics Security Management Programme: A Brief Risk Management Analysis J une 2012

    David Rubens Associates 201210

    Creating Appropriate Capabili ties

    The fundamental difference between the Tame Problem stage of the stadia build and the Loosely

    Structured Problems of the capability development stage is that whilst all of the skills, resources and

    professional frameworks to build the Olympic stadia already existed, and had been tried and tested on

    similar projects across the world, the operational frameworks and capabilities required to deliver the

    London Olympics did not exist, and in a very real sense had to be created from scratch. Whether it was the

    development of the traffic management system (including the creation of Olympic Routes and the

    management of four thousand cars provided by BMW for the use of the Olympic Family), the recruitment

    and training of tens of thousands of people, from different backgrounds and with different capabilities, who

    would be integral to the successful delivery of the Games in their roles as Olympic Volunteers and short-

    term contract security personnel, or the integration of blue (police), green (military) and civilian personnel

    into a unified security management framework, these Loosely Structured Problems, even though they may

    be unique each in their own way, are also bounded by well-understood principles of large-scale multi-agency project management. (The fact that each of the different organisations would come to the table with

    their own culture, world-view and in some cases active antagonism to other agencies, only added to the

    necessity to create an effective conceptualisation of a possible delivery framework from the start of the

    project).

    In fact, the basic principles of creating project management capability within a framework of multi-agency

    organisational complexity is so well understood, that it would have been feasible to identify the handful of

    issues that would be most likely to have a significant impact on the ability of the project managers and

    strategic developers to create a fully integrated and functional project delivery framework on the first day

    that the project was founded, as well as to identify the likely fail points that would cause greatest problems

    and potential failure.

    The first critical issue would be the fact that the London Olympics would require the integration of a

    massive number of organisations, each of which had specialist knowledge in a particular area of

    significance to the over-all success of the Olympic delivery project. The issue of multi-agency integration is

    one that has been well-studied at the highest level of strategic capability development, especially in terms

    of security and crisis management, and is a subject which would have real significance in the creation of an

    effective Olympics delivery framework.

    The two competing paradigms of project management are Instructionalist and Innovative, and both are

    represented in the over-all Olympic design programme. Instructionalist project management is extremely

    effective when all aspects of the project are well understood, and the general working environment is under

    the control of the managers. The construction of the Olympic Park would fall under this label, in that all

    participants in the project would have clearly identified roles, and it would be their function to use their skills

    and experience to fulfil those roles according to the Master Plan, which to a large extent would have been

    reasonably well-developed even before the first digger arrived on the first site. If, however, the nature of the

    project is such that it is moving into unknown territory, and requires as a fundamental part of its remit the

    development of new frameworks and working procedures, then it is clear that the project will demand a

    high-degree of in-process learning and selectionism, ie the creation of effective problem-solving strategies

    whilst the on-going project delivery process is already in action. (An example of this on-going process was

  • 7/28/2019 2012London Olympics Security Management DRA 8

    11/24

    2012 London Olympics Security Management Programme: A Brief Risk Management Analysis J une 2012

    David Rubens Associates 201211

    the decision to include military personnel in the Olympic security programme, a decision that was only

    made public in December 2011. This major change in the Olympic security management design clearly had

    significant implications for integrated command and control, roles and responsibilities, lines of

    communication, legal responsibility and chain of command, all of which would need to go through many

    levels of fine tuning before an operational management system could be developed). This openness to thecreation of innovative solutions to problems that cannot be predicted when the project is initiated is of

    paramount importance. Within this understanding of innovative project management, it is clearly not the

    role of the project managers to develop and deliver a well-defined project management outline from the

    outset, telling the individual units what to do, but rather to create the space and opportunity for the different

    expertises held within the different specialist agencies to be brought together in order to create appropriate

    and effective solutions to what are in essence unknown problems. This free jazz model of framework

    development is hardly revolutionary, being recognised as early as the 1960s:

    Organismic systems are adapted to unstable conditions where new and unfamiliar problems and

    requirements continually arise which cannot be broken down and distributed amongst specialist

    roles within a hierarchy.. Responsibilities and functions and even methods and powers have to

    be constantly redefined through interactions with others participating in common tasks or in the

    solutions to common problems

    Burns, T Mechanistic and Organismic Structures

    New Society, January 1963: 17-20(7)

    The problem in creating such ad hoc groupings, as is clearly required in the Olympic project, is that it is

    dependent on a high-level of non-hierarchical interaction between many different organisations, each ofwhich is prepared to throw their own knowledge and expertise into the pot for the sake of the greater good.

    In case of process innovation, what is learned is often tacit, intangible and context-

    dependent.Such learning is not only difficult to measure and evaluate, it is also difficult to

    capture in explicit forms, in ways that can be captured and understood in new contexts.In such

    circumstances, the challenge may not be so much to make tacit knowledge explicit, but to work out

    how social practices are organised, and to find ways of aligning them

    Bresnan et al (2003:160)

    Social Practices and the Management of

    Knowledge in Project Environments (8)

    However, a related issue associated with a high-level of process innovation is that an integral component of

    the development of a management framework as complex as that required for the Olympics would be a

    high degree of test and improve, in that operational protocols that were developed on a multi-agency basis

    would by their very nature be best approximations, and would need to be checked and revised as part of

    the over-all development process. This iterative decision making involves a continuous loop of constant

    self-monitoring, assessing changing situations and then creating new decision-paths, which in turn are

    monitored, assessed and adapted . The nature of such capability development can be gauged by the

    language used to describe it: a probe and learn methodology, where the project itself is seen as a

  • 7/28/2019 2012London Olympics Security Management DRA 8

    12/24

    2012 London Olympics Security Management Programme: A Brief Risk Management Analysis J une 2012

    David Rubens Associates 201212

    learning, reflective process, progressing through a series of failures and improvement and where

    managers can do no more than grope along(9)

    .

    Although it is possible to conceive of a programme of extreme complexity that does deliver First time and

    every time, (the NASA moon landing programme was the outstanding example of that concept, wheredespite the cutting-edge nature of what was at the time the most complex technical development

    programme in history, each new stage in the progression to putting a man on the moon was tried out for

    the first time when they did it for real), in reality the lack of appropriate testing time is a clear indication of

    potential (and, some would say, inevitable) failure(10)

    .

    From talking with people involved in many of the organisations participating in the Olympics delivery project,

    it seems clear that they are, in the main, happy that they have the capability and expertise to deliver the

    necessary level of support and logistical management as required. Whether it is the Metropolitan Police

    Olympic Command, the people involved in City Hall or the support teams around them, it is very much a

    feeling of Enhanced Normality, in that the required services are similar to what they do every day, just on

    a greater scale. The problems come in, however, when organisations are tasked with doing something that

    is completely new, and for which they have little experience or corporate knowledge. The two organisations

    that are suffering most under this burden, though for different reasons, are G4S and LOCOG itself.

    The significant difference between LOCOG and the other agencies and organisation involved in the

    delivery of the Olympics is that whereas all of the other organisations have created a corporate knowledge

    base over many years, and therefore have a strong bank of shared experiences and expertise as well as a

    well-developed operating culture, LOCOG is an artificial organisation that has been created specifically for

    the London Olympics, and which to a large degree has little if any unifying corporate ethos or identity thatcould act as the underlying foundation on which policies can be developed and decisions made.

    Although a private company (originally supposed to be funded by sponsorship, ticket sales and

    merchandising, though the economic downturn has meant that it has been funded by the government by

    around 300m), LOCOG is responsible for the organising of the Olympic Games on behalf of the IOC,

    which means that it has come to be seen as the enforcement arm of the Friendly Games. Whether it is

    threatening small shop-keepers with criminal charges for using the Olympic logo, initially denying Hamden

    Park in Scotland the right to fly the Scottish flag during the football matches to be held there, managing the

    allocation and distribution of Olympic tickets or arranging traffic programmes for the duration of the Games,

    LOCOG has been the interface between The London Olympics and all of the various organisations that

    are actually working towards the success of the Games, whether it is government ministries, private

    companies, transport officials, public health and safety managers or the hundreds of companies that are

    involved as sponsors. As such, LOCOG is both the public face of Olympic management as well as the

    private company that makes demands on all of its various partners.

    G4S, the company that has won the contract to supply all non-governmental security services to the

    Games, is suffering because the nature of the operation and the scale of the number of personnel involved

    means that its existing organisational experience and corporate wisdom are neither robust nor

    sophisticated enough to deliver the capabilities and protocols appropriate to the London Olympics. Having

    originally won the contract on the basis that they would require 10,000 stewards (2,000 paid personnel and

  • 7/28/2019 2012London Olympics Security Management DRA 8

    13/24

    2012 London Olympics Security Management Programme: A Brief Risk Management Analysis J une 2012

    David Rubens Associates 201213

    8,000 unpaid volunteers), and a budget of 86m, by the start of 2012 it was clear that that was going to be

    completely inadequate, and the figures rose to 23,000 stewards and a budget of 284m(11)

    . The problems

    faced by G4S are intrinsic to the nature of the recruitment, training and deployment programme, and their

    implications can be judged by the fact that even six weeks before the Opening Ceremony, they were still

    advertising on LinkedIn for front-line security personnel as well as Team Leaders and even Olympic VenueSecurity Managers (12).

    Despite the fact that the government has consistently claimed that there is a real and significant threat of

    terrorist activity around the Games, and that the front-line stewarding staff will be the people primarily

    responsible for policing the events, ensuring the smooth flow of people into and out of the venues, and

    acting as an option of first-response in the event that anything untoward happens around the stadia, the

    truth is that the vast majority of the people involved will have had inadequate training, inadequate

    orientation of the venues that they are working in, and an inadequate understanding of the various roles

    that they are supposed to be fulfilling. The scale of the recruitment - up to twenty thousand short-hire

    personnel - and the lack of time for structured training or the creation of an effective graduated start-up

    process, means that it will not be possible to have a fail and learn period where the problems that will

    inevitably arise can be identified, countered and then solved, with those solutions then being progressively

    embedded into future processes and protocols. It will also mean that the very people who will be at the

    critical inter-face with the public, responsible for ensuring speedy access to the events and venues as well

    as a fast response to any incident that might occur, will lack the skills and experience necessary that will

    enable them to act responsibly and respond effectively in the event that something does happen. Rather

    than being responsible for Olympic security, it is more likely that the stewards will be responsible for

    policing the general Olympic environment on behalf of LOCOG (and indirectly, the IOC) in matters

    pertaining to the protection of sponsors brands and advertising, and the prevention of guerrilla advertising,as was seen at FIFA World Cup in South Africa in 2010. (It has already been announced that it will be

    forbidden to bring water, picnic hampers or food coolers into the Olympic venues, an issue that is likely to

    be contentious as people are forced into leaving such goods at the entrance to the venues, and then

    queuing at sponsors stalls to buy what has been widely criticised as over-priced meals and water)(13)

    .

    Although there have certainly been test events in the final run-up to the Olympics, and a number of

    simulated security management scenarios involving a wide range of government and other agencies, the

    fact that the vast majority of the ground-level personnel are only going to be recruited immediately before

    the Olympics, and will have had little if any time to go through effective training, means that the likelihood is

    that the lack of effective planning and preparation will cause major problems at the very start of the

    Olympics that will not have been accounted for, and which will demand a high level of fast-response

    decision-making from event managers for which they may well lack the necessary skills, resources and

    training.

    Traffic management in London isnot a modern problem

  • 7/28/2019 2012London Olympics Security Management DRA 8

    14/24

    2012 London Olympics Security Management Programme: A Brief Risk Management Analysis J une 2012

    David Rubens Associates 201214

    Pathways to Disaster

    If there is one thing that can be categorically stated in risk management, it is that nothing Just happens.

    Every Incident is only the final stage of a long period of gestation and development, whether the time that

    process has taken to be triggered, escalate and then come to fruition can be measured in terms of minutes

    and seconds or months and years.

    The concept that the transition from Incident to Crisis is a process that is based not so much on the

    nature and scale of the outside event, but rather is a function of the lack of response or management

    capability within the specific organisation, is well recognised (14) .

    The development process from potential vulnerability to actual full-blown crisis (which can be defined as a

    state which threatens an entire systems collapse) can be encapsulated in the following six steps. It is these

    simple statements that can be used to judge any major meltdown, whether it is BP and the DeepwaterHorizon oil spill in the Gulf of Mexico, the collapse of the western banking system, or the continual failures

    on the London public transport system which will almost certainly have some effect on the London

    Olympics at some stage during the coming weeks.

    Statement 1:The cause of the systemic failure is due to an in-built fault within the system itself, not

    any particular outside event. Whether it is a lack of training, high turnover of personnel, lack of clear

    responsibility and chain of commands, cutting back on safety and oversight procedures or any other reason,

    it is these intrinsic weaknesses that create the the environment and opportunity for a crisis situation to

    develop.

    Statement 2: There will be a series of Normal Accidents that will highlight the existence of the in-built

    systemic weaknesses but they will be ignored. It is highly unlikely that any crisis is a unique event, but

    rather is the result of the escalation of a minor event that has happened repeatedly before.

    Statement 3: When the Normal Accident does begin to escalate into a true crisis situation, there will

    be an Awareness Lag before the organisation becomes aware of the new status of the situation, and a

    further lag whilst time is taken to decide what to do about it. This will allow the escalating Normal Accident

    to reach Crisis Status, which in turn will mean that the solutions that are finally suggested will no longer be

    appropriate.

    Statement 4:When the situation is finally recognised as a crisis, there will be a significant lack in three

    specific areas: manpower, resources and, most importantly, effective management skills. This time lag will

    allow the escalating Normal Accident to reach Crisis Status, which in turn will mean that the solutions that

    are finally suggested will no longer be appropriate.

  • 7/28/2019 2012London Olympics Security Management DRA 8

    15/24

    2012 London Olympics Security Management Programme: A Brief Risk Management Analysis J une 2012

    David Rubens Associates 201215

    Statement 5: When the management teams do finally take action, the situation will not respond as

    planned. Their actions will create unintended consequences, which will in turn become serious issues that

    will become potential crisis situations in their own right.

    Statement 6: None of this is unknown. When something does go wrong, it will be clear that it was not a

    random event, but an inevitable result of inbuilt weaknesses. The reason that the crisis will happen is that

    previous lessons will not have been learned.

    Predictions.

    President George W. Bush made a Category Error, when he confused the successful achievement of theTame Problem stage of the invasion of Iraq with successful completion of the entire mission. Thesuccessful delivery of the built environment of the London Olympics, plus everything that takes place in thebuild-up to the Games, is important, but the Mission Objective by which it will all be judged is the successfuldelivery and management of the Olympics and Paralympic Games themselves.

    Although it is always easy to second-guess the management from the safety of the stands, it seems clear

    from a number of statements from both London Olympic managers and IOC spokesmen that they are

    making the same category error that was made over Heathrow T5, namely that the successful construction

    of the built environment (which is undoubtedly impressive) can be mistaken for the effective delivery of a

    fully functioning operation. If, as British Prime Minister Harold Macmillan said in 1960, the main problem

    with politics was Events, dear boy, events, then the fundamental problem with a major public event, and

    especially one as complex as the Olympics, is surely People, dear boy, people.

    That fact that something will go wrong (in fact, many things will go wrong), is not the problem. That is

    something that is inevitable in an operation as complex as the London Olympics. The question that needs

    to be asked, and which will undoubtedly be answered unambiguously by the 9th

    September, is whether the

    fundamental appropriate management systems were in place to respond to those problems, and if not, why

    not and who will be held responsible.

  • 7/28/2019 2012London Olympics Security Management DRA 8

    16/24

    2012 London Olympics Security Management Programme: A Brief Risk Management Analysis J une 2012

    David Rubens Associates 201216

    A basic understanding of project and security management would suggest that despite of, or even because

    of, the sophistication of the Olympics management system, beyond the ever-present danger of terror attack,

    the most likely crisis scenarios are exactly those situations that could have been highlighted on the same

    day that the Olympics were awarded to London seven years ago.

    The ability to identify potential fail-points, and then reinforce them so that in fact they become one of the

    strongest links in the over-all operation, thus creating a Virtuous Spiral of continuous improvement, is a

    fundamental skill for all operation managers. It is hoped that in the event that the situations listed below do

    develop, all of which could be considered as High Likelihood / High Impact on a classical Risk

    Assessment matrix, there will be a clear and well-managed series of contingency options in place.

    1. Traffic Management

    Both road transport (including Olympic Routes) and public transport are critical components in the

    delivery of hundreds of thousands of people across the city each day including stadium staff, security

    staff, journalists, athletes, event administrators, sponsors and the tens of thousands of visitors

    attached to the Olympic Family. Any breakdown, or even mild interruption, in the free-flow of the

    traffic management system will have secondary effects that will affect the whole of the Olympic

    programme. The London tube system is subject to a high level of interruptions at the best of time, but

    the Olympics will put a completely different level of pressure on the entire system. Besides the

    technological problems, the sheer weight of numbers could mean that station infrastructure is over-

    loaded, leading to closure of stations whilst the over-load of passengers is cleared.

    The delivery of Olympic personnel to the various stadia is based on use of the Olympic Route

    Networks, and the 4,000 vehicles supplied by BMW. Anyone who has ever run a security operation

    knows that the pick-up and drop-off is always a tense time, and open to any number of potential

    mishaps. On a basic calculation, 4,000 vehicles making two return journeys a day (pick-up in the

    morning, drop-off at the venue, pick-up and drop-off on the return journey, then the same for evening

    activities), are going to generate 32,000 separate stages. With even three messages per stage, that

    will create a hundred thousand separate messages a day even if every single one of those

    operations goes without a hitch. Given the likelihood of misunderstandings, lack of coordination at the

    venues themselves and last-minute changes of plans, this is an area where any operations manager

    would be seriously worried. The fact that the BMW drivers are Olympic volunteers who have in all

    likelihood never worked commercially before, never used a radio and have received only half a days

    training each, only adds to the likelihood that this is an area where something could go seriously wrong.

    2. Security Personnel

    The sheer numbers of personnel involved in the Olympics security project, coupled with the lack of

    time to run effective training programmes or orientation of their specific venues and locations, means

    that the deployment of the security / stewarding teams requires a well-managed process of low-skilled

    but high-volume personnel with high-skilled (and hopefully well-trained) Team Leaders and

    Operational Managers. The on-ground personnel will be charged mainly with creating a presence on

    the ground, giving an impression of ownership of the territory that they are covering to all visitors and

    guests, together with the provision of general public support and direction. It will be at the level of

    Team Leaders and Operational Managers that the critical skill levels will come in,

  • 7/28/2019 2012London Olympics Security Management DRA 8

    17/24

    2012 London Olympics Security Management Programme: A Brief Risk Management Analysis J une 2012

    David Rubens Associates 201217

    allowing them to adapt to changing situation as required, and to respond to the range of problems that

    will undoubtedly be thrown up.

    The problems associated with the stewards and security personnel will be as much of a logistical

    nature as a security management one ensuring that the correct people are in the correct place at theright time; that they have been fed and watered, and given necessary rest breaks; that they are briefed,

    equipped and prepared effectively for what will be a low-profile but high-impact role. The overall

    significance of the general security and stewarding programme can be gauged by the fact that a

    friendly, helpful and supportive stewarding and security presence will make a greater and longer

    lasting impression on the visitors and guests to the Olympic venues than all of the government

    announcements in the world.

    3. Communications, Information Transfer and Decision Making

    It is a truism in all security operations that as soon as something goes wrong, communications and

    transfer of information is found to be the first casualty in managing the response. Given the highly

    intricate nature of the Olympic security management programme, as well as the interconnectedness of

    the traffic management, venue management, technology and other aspects of the Games, it is highly

    likely that at some stage the inability of different sections of the operation to communicate effectively

    with each other will create a significant systems failure, which in turn will trigger a domino effect

    creating secondary consequences beyond the scale of the original problem.

    Given that any situation that does occur, however minor and innocuous it might seem at the time, will

    require real-time solutions to be decided and implemented on an immediate basis, the ability to create

    effective solutions to minor problems and to ensure that they are transmitted to various teams, ,

    understood by them and implemented as directed, is in fact a highly-complex and systems-critical

    process. The success of such responses, which will undoubtedly be needed on an on-going and

    continuous basis, will be dependent on the ability of all participants, from the tactical decision-makers

    to the operators on the ground, to transfer information speedily and accurately, and to work together in

    a tightly-integrated yet loosely managed framework. If they do succeed, showing an ability to be

    creative, adaptable and highly disciplined, it will be a clear indication of the skill, professionalism and

    effective planning of all of the people involved in the operation.

    4. Breakdown in Technology

    Given the high level of dependency on technology, it is highly likely that at some stage technological

    systems will fail to deliver that which they promised, causing immediate high-impact consequences

    that will cascade into other areas of operation. As any operations manager knows, it is likely that not

    only will the technological systems on which the management of the Games are dependent ticket

    identification, access control, security management systems fail to deliver what they have promised,

    but they will do so at the most awkward of times. The failure of technology is not something

    unfortunate that happens out of the blue, but is something that should be factored in to every level of

    the project management. These are the What if. scenarios that should have been modelled and

    tested to destruction.

  • 7/28/2019 2012London Olympics Security Management DRA 8

    18/24

    2012 London Olympics Security Management Programme: A Brief Risk Management Analysis J une 2012

    David Rubens Associates 201218

    5. Something Else (UNK- UNKs)

    Anyone who has any experience of operations management will know that however wonderful the

    management plans are when they are discussed in detail on the PowerPoint presentation, once the

    operation actually kicks off, the Unknown Unknowns start to fly in from all angles. It will be the ability of

    event managers at every level of operation to adapt and respond to the unexpected Unknown

    Unknowns that will be the foundation of a successful London Games.

    6. And finally.

    Despite what we might hear before and during the Games, as in most parties, if something does go

    wrong, expect a high level of finger-pointing and responsibility-evading once they are over and the

    guests have gone home. It is in the nature of multi-agency operations that internal tensions can be

    covered up when things are going well (though those tensions will still most certainly be there), but

    once things start going wrong, it will not take much for the equivalent of shouting, slamming doors and

    the throwing of crockery to take place. It is during this process that fundamental flaws in the planningprocess will come to light, flaws that created the vulnerabilities that led to an almost inevitable

    breakdown in service delivery at the exact moment when it was required.

  • 7/28/2019 2012London Olympics Security Management DRA 8

    19/24

    2012 London Olympics Security Management Programme: A Brief Risk Management Analysis J une 2012

    David Rubens Associates 201219

    Appendix 1:

    Learning f rom Experience: Heathrow T5 and a National Embarrassment

    In case anyone thinks that my comments are small-minded and driven by a desire to fail, it is worthwhile

    looking at a similar (though much smaller scale) national event that suffered from almost exactly the same

    problems, as well as similar underlying systemic weaknesses that are almost certain to figure in the

    management of the London Olympics.

    As an example of a situation where lack of appropriate preparation in a major national project causedsignificant failures both operationally on the day, and reputationally across the world, one needs look no

    further than what happened during the opening of Heathrow Airports brand new Terminal 5 in March, 2008.

    Widely lauded as an example of the best of British technology, and a gateway to a new, modern UK, T5

    was an interface between highly complex IT systems and the need to move tens of thousands of people

    through a highly-managed through-flow system, including check-ins, security checks and separate parallel

    systems for baggage management. Although the failure of the baggage management system to stand up to

    the pressures of the workload made the biggest headlines, leading to a situation where 20,000 bags were

    unprocessed and the entire baggage handling system had eventually to be suspended, the problems

    actually started much earlier than that and are an indicator of some of the problems that could be

    expected at the Olympics. Both staff and passengers arriving at the airport had difficulty in finding their

    respective car-parks, and in some cases the staff that were meant to have opened them up had not arrived,

    leading to a significant breakdown in the very first link of a highly intricate and tightly-bounded chain. This

    meant that there was a delay in opening up and manning check-in desks, resulting in additional pressure

    on both staff and systems before they had even got into the rhythm of their first working day.(17)

    Given that the London Olympics are dependent on exactly the same combination of high levels of staff who

    are working in a complex environment for which they have not received adequate training, compounded by

    a high level of technological dependency in all aspects of access control into the stadiums, Olympic

    managers are no doubt fearing similar headlines to those that met T5 managers in a parliamentary

    6t

    May, 2012

    No Border Control: UK Border Chiefwarns of Summer Chaos at Airport(16)

    8th

    May, 2008

    BA ch ief Willie Walsh b randsHeathrow's Terminal 5 a 'nationalembarrassment'

    (15)

  • 7/28/2019 2012London Olympics Security Management DRA 8

    20/24

    2012 London Olympics Security Management Programme: A Brief Risk Management Analysis J une 2012

    David Rubens Associates 201220

    transport committee report that stated that [W]hat should have been an occasion of national pride was, in

    fact, an occasion of national embarrassment.(18)

    Arrival at the Olympic Park is in itself a highly complex and systems-critical operation, consisting as it does

    of public transport which is dependent on a tube line that is notorious for breakdowns at the best of times,or by private car, which in itself is dependent on a single access road into the Olympic Park area, and

    which then leads into a highly-restrictive one-way system that means that if people miss their drop-off

    points they will have to remain in the one-way system until they have completed a complete loop of the

    Olympic Park. Based on the T5 experience, there is a high possibility that difficulties in getting staff to their

    respective positions on the first morning of the Olympics could create a chain-reaction that it is highly likely

    will cause high levels of disruption to both staff and visitors, which in turn will have a significant impact on

    the ability to adhere to projected rates of flow-through into the stadia.

    Going back to the basic principle that the causes of such failures are often simple to identify, and are in fact

    symptomatic of endemic management weaknesses, it is worth taking note of the official report by the

    House of Commons Transport Committee into the opening of T5, which highlighted the lack of effective

    preparation: [M]ost of these problems were caused by one of two main factors: insufficient communication

    between owner and operator, and poor staff training and systems testing(19)

    . In fact, reading through the

    official government report, one has the feeling that the outline ofOlympic Report has already been written:

    Staff Training(p5)

    We found that the programme of training for many workers had been inadequate. There were high levels

    of staff participation in, and completion of the training courses. However, [a British Airways employees

    spokesman] argued that training was insufficient. He told us that: People were taken to a hotel and shown

    some sort of film or slides and were told this is what it looked like. They were then given familiarisation

    training for three days to cover an area as big as Hyde Park. That was not sufficient at all. For that reason,

    people were totally confused. Two days out of three were devoted to putting them into a coach to show

    them x, y and z, and where to enter and exit and so on, but what was missing was hands on training as to

    where the spurs were, where the bags would come in and so on. For baggage in particular it was still a

    building site. You cannot start to train people there unless you have on a hard hat and all the rest of it.

    Therefore, the only time available to show these people around was the very last few weeks.

    Public Trials (p6)

    Prior to the opening of T5, 15,000 volunteers took part in 66 public trials, creating 50,00 passenger profiles

    and 400,000 bags of various shapes and sizes. The failure of the testing process to recreate a realistic

    simulacrum of the range of problems facing handlers in actual operation was admitted by BAA: [D]espite

    the rigorous tests that took place, it was inevitable that once real passenger bags were introduced into the

    system, there would be bedding-in issues. As Colin Matthews, Chief Executive of Heathrow Airport said in

    his evidence to the committee, It may have been that the baggage we were testing was too uniform.

    [M]aybe the reality of the baggage that people put into the system was more diverse than our test

    represented .

  • 7/28/2019 2012London Olympics Security Management DRA 8

    21/24

    2012 London Olympics Security Management Programme: A Brief Risk Management Analysis J une 2012

    David Rubens Associates 201221

    Communications between Staff and Management(p7)

    Trade union representatives gave evidence to the committee that based on their experience in working in

    similar conditions in various airports, they were convinced that management projections as to the efficacy

    of baggage handling systems were inaccurate, and that there would be inevitable failures of the system.

    However, the response from management was that [N]o, it was a state-of-the-art building and everything

    would work and be all right.

    Communications between BAA and British Airways (p7)

    Colin Matthews, Chief Executive of Heathrow Airport, told the committee However well the airport operator

    and the airline operator, BA, are working it is also vital that the two are absolutely integrated and together. I

    think that during the construction of Terminal 5 that appeared to be the case. Around about or just prior to

    the opening of T5 it seems that that togetherness deteriorated. It is that togetherness that allows you to

    cope with the issues that varies on the day. He added that, if he had his time again, he would focus

    resolutely and determinedly on keeping British Airways and BAA in the same room tightly together.

  • 7/28/2019 2012London Olympics Security Management DRA 8

    22/24

    2012 London Olympics Security Management Programme: A Brief Risk Management Analysis J une 2012

    David Rubens Associates 201222

    Notes

    1) For an insightful academic consideration of the increased risk aversion across major public events

    (as evidenced by the positioning of anti-aircraft missile batteries across London), see Boyle and

    Haggertys Spectacular Security: Mega-Events and the Security Complex, International Political

    Sociology (2009, 3:257-274)

    2) See From Olympic Massacre to the Olympic Stress System, Andreas Selliaas, International

    Review for the Sociology of Sport, (2012), 47:379-396 for a review of how Olympic security

    demands have increased in response to significant world events: (Munich 1972 Black

    September killing of Israeli athletes;Atlanta 1996 Response to urban terrorism of New York

    WTC (1993), Oklahoma Bombing (1995) and Tokyo Subway Sarin attack (1995);Athens 2004 -

    International CT cooperation in response to 9/11 and global terrorist threat; and Beijing 2008

    Total security control against both internal (domestic) and international terrorism).

    3) See Governing Security at the 2008 Beijing Olympic Games by Ying Yu, Francis Klauser and

    Gerald Chan, in The International J ournal of the History of Sport, (2009), 3:389-405 for a detailed

    investigation of how the Beijing authorities used the excuse of the Olympics to create a sterile

    area, completely under their control, within which it would have been virtually impossible to carry

    out any terrorist acts, which in Chinese eyes were more concerned with Xianjing independence

    groups, East Turkistan terrorists, Tibetan separatists and the Falun Gong religious group. It is also

    interesting to note the extent to which the Beijing Olympics security management programme was

    supported by western governments and private corporations, despite the public criticisms of

    Chinas record on human rights and its lack of openness to free and democratic protest.

    4) Wall Street J ournal, August 22nd

    , 2004, in Boyle & Haggerty Spectacular Security: Mega-Events

    and the Security Complex, (p 261)

    5) Daily Mail: http://www.dailymail.co.uk/news/article-2138488/Typhoon-fighter-planes-stationed-

    RAF-Northolt-Olympics-military-build-up.html#ixzz1y9KmB1C9

    6) See Rittel and Webbers Dilemmas in a General Theory of Planning, Policy Sciences (1973) for

    the classic introduction to Tame and Wicked Problems

    7) Burns, T Mechanistic and Organismic Structures

    New Society, J anuary 1963: 17-20

    8) Bresnan, M, Edelman, L, Newell, S, Scarbrough,H and Swan, J (2003) Social practices and the

    management of knowledge in project environments nternational J ournal of Project Management

    (2003), 157-166

    9) Pich, Michael, Loch, Christopher and DeMeyer, Arnold (2002) On Uncertainty, Ambiguity and

    Complexity in Project Management Management Science,

    Vol 48, 8:1008-1023

  • 7/28/2019 2012London Olympics Security Management DRA 8

    23/24

    2012 London Olympics Security Management Programme: A Brief Risk Management Analysis J une 2012

    David Rubens Associates 201223

    10) For an in-depth introduction into the concept that increased complexity creates an inevitability of

    systems breakdown, which in turn creates a domino effect of cascading failures, see Charles

    Perrows seminal Normal Accidents: Living with High Risk Technologies (1984), Princeton

    University Press.

    11) London 2012 Olympics: G4S blame 283 million security costs on Government and Locog

    http://www.telegraph.co.uk/sport/olympics/9288289/London-2012-Olympics-G4S-blame-283-

    million-security-costs-on-Government-and-Locog.html

    12) G4S are looking for someone with excellent leadership skills, who has managed over 20

    operation staffs in the security industry or Military or the Police force at the Olympics. Application

    ends soon! The hourly rate is approximately 14.00 per hour with the possibility of being

    considered for a more senior role. If you are interested please send your CV to

    [email protected]) G4 LinkedIn Olympic posting (Accessed12/06/2012)

    http://www.linkedin.com/groupItem?view=&gid=2909014&type=member&item=109149324&qid=a

    cc6e9f9-681c-47c5-9fd8-10ce0c9938ff&trk=group_most_popular-0-b-

    ttl&goback=%2Egmp_2909014

    13) Olympic security ban on your bottled water: But you can buy it in the stadium - at inflated prices

    Mail Online, 7th

    May 2012 (accessed 20/06/2012)

    http://www.dailymail.co.uk/news/article-2140568/London-2012-Olympics-security-ban-bottled-

    water.html

    14) See Turner, BA and Pidgeon, NF Man-Made Disasters (Butterworth-Heinemann,1978), and Toft,

    B and Reynolds, S Learning from Disasters (Perpetuity Press, 1994) for the classic introduction

    to these concepts.

    15) Mail Online, 8th

    May, 2008

    http://www.dailymail.co.uk/news/article-564523/BA-chief-Willie-Walsh-brands-Heathrows-

    Terminal-5-national-embarrassment.html#ixzz1yVfGkAXG

    16) Daily Mirror, 12th May, 2012

    http://www.mirror.co.uk/news/uk-news/uk-border-chief-warns-of-summer-822130

    17) IT failure at T5: What really happened (07/04/2001) (Accessed 14/06/2012)

    www.zdnet.com/blog/projerctfailure/it-failure-at-heathrow-t%-what-really-happened/681

    18) The Opening of Heathrow Terminal 5 p3 House of Commons Transport Committee, Twelfth

    Report of Session 2007-08 (Stationery Office, 2008)

    19) ibid, p3

  • 7/28/2019 2012London Olympics Security Management DRA 8

    24/24

    2012 London Olympics Security Management Programme: A Brief Risk Management Analysis J une 2012

    David Rubens Associates

    The Arches,

    Maygrove Road

    London NW6 2EE

    [email protected]

    www.davidrubens-associates.com