2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June 24 -27, Santa Barbara, CA SR 46 Improvement...

53
2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June 24 -27, Santa Barbara, CA SR 46 Improvement PSR/PDS Study

Transcript of 2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June 24 -27, Santa Barbara, CA SR 46 Improvement...

Page 1: 2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June 24 -27, Santa Barbara, CA SR 46 Improvement PSR/PDS Study.

2012 ITE Annual Conference

Allen Nie, PhD, PE, HMM

June 24 -27, Santa Barbara, CA

SR 46 Improvement PSR/PDS Study

Page 2: 2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June 24 -27, Santa Barbara, CA SR 46 Improvement PSR/PDS Study.

Presentation Outline

Background

Improvement Alternatives

Traffic Modeling

Traffic Operations Analysis

Project Status

Lessons Learned

Page 3: 2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June 24 -27, Santa Barbara, CA SR 46 Improvement PSR/PDS Study.

Project Location – Paso Robles

CambriaWasco

Page 4: 2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June 24 -27, Santa Barbara, CA SR 46 Improvement PSR/PDS Study.

SR 46 E in Paso Robles

Page 5: 2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June 24 -27, Santa Barbara, CA SR 46 Improvement PSR/PDS Study.

Past Studies

SR 46 E Comprehensive Traffic Survey, 2005

Golden Hill Retail Center TIA, 2007

State Route 46 E Parallel Routes Study, 2008

SR 46 E Comprehensive Corridor Study, 2009

Paso Robles General Plan Update, 2011

Page 6: 2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June 24 -27, Santa Barbara, CA SR 46 Improvement PSR/PDS Study.

Existing Intersection & Mainline LOS

Page 7: 2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June 24 -27, Santa Barbara, CA SR 46 Improvement PSR/PDS Study.

2025 Intersection & Mainline LOS

Page 8: 2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June 24 -27, Santa Barbara, CA SR 46 Improvement PSR/PDS Study.

Delays

Source: Caltrans SR 46 E CCS

Page 9: 2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June 24 -27, Santa Barbara, CA SR 46 Improvement PSR/PDS Study.

Paso Robles Land Use

Page 10: 2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June 24 -27, Santa Barbara, CA SR 46 Improvement PSR/PDS Study.

Traffic Issues – Local Perspective

S

Page 11: 2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June 24 -27, Santa Barbara, CA SR 46 Improvement PSR/PDS Study.

Improvements along SR 46

Location Improvement Status

US 101/SR 46 SB Ramps

Add WBL and EBT lanes In construction, to be completed in 2014

US 101 / SR 46 NB Ramps

Add WBT lanes To be completed by CT in the future

SR 46 / Golden Hill Rd Restriping, add left turn lanes on all approaches;

widen northbound approach to

Completed

SR 46 E / Airport Rd Widen SR 46 to 4 lanes from Airport Rd to

Shandon

Completed

SR 46 / Union Rd TBD by this study PSR

Page 12: 2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June 24 -27, Santa Barbara, CA SR 46 Improvement PSR/PDS Study.

The PSR Project Team

Page 13: 2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June 24 -27, Santa Barbara, CA SR 46 Improvement PSR/PDS Study.

Alignment Alternatives

ALT 1 –Two-way Stop-controlled (No Build)

ALT 2 – Signalization

ALT 3 – Roundabout (West)

ALT 4 – Roundabout (East)

ALT 5 – Overcrossing

ALT 6 – Interchange

Page 14: 2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June 24 -27, Santa Barbara, CA SR 46 Improvement PSR/PDS Study.

ALT 4 – Roundabout (East)

Page 15: 2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June 24 -27, Santa Barbara, CA SR 46 Improvement PSR/PDS Study.

ALT 6 – Interchange

Page 16: 2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June 24 -27, Santa Barbara, CA SR 46 Improvement PSR/PDS Study.

Caltrans’ Responsibility

Maintain / Increase Hwy 46 throughput

Reduce travel delay• Traffic controls (signal)

• Congestion (queue spillovers, weaving issues, etc)

Improve travel time reliability

Multimodal and safety

Vision - grade separation, limited # of access points

Page 17: 2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June 24 -27, Santa Barbara, CA SR 46 Improvement PSR/PDS Study.

City’s Expectation

Easy access to Highway 46 and US 101

Better & reliable connectivity

Support multimodal transportation (bike & Ped)

Fit into the City’s Circulation Master Plan

Cost concerns

Phased development

Page 18: 2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June 24 -27, Santa Barbara, CA SR 46 Improvement PSR/PDS Study.

City’s Circulation Master Plan

Page 19: 2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June 24 -27, Santa Barbara, CA SR 46 Improvement PSR/PDS Study.

Work Process

Kickoff Meeting

Traffic Modeling

Operational Analysis

Alternative Assessment

Project Management

and QA/QC

Traffic Data

Field Survey

Alternative Development

Page 20: 2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June 24 -27, Santa Barbara, CA SR 46 Improvement PSR/PDS Study.

City of Paso Robles Traffic Model

City model based on the SLOCOG county model

Three-step highway model

Feedback loop

Detailed GIS roadway network

Horizon years modeled• 2008

• 2030

Page 21: 2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June 24 -27, Santa Barbara, CA SR 46 Improvement PSR/PDS Study.

Traffic Model Enhancement

Post-processing

Page 22: 2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June 24 -27, Santa Barbara, CA SR 46 Improvement PSR/PDS Study.

Model Enhancement

Study Area

City Area

The rest

Page 23: 2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June 24 -27, Santa Barbara, CA SR 46 Improvement PSR/PDS Study.

Day of Week Fluctuation

Highway 46Vs.

Local Arterial

Page 24: 2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June 24 -27, Santa Barbara, CA SR 46 Improvement PSR/PDS Study.

Traffic Model Calibration

Comparison Coefficient (slope) R^2 Intercept

Before CalibrationAM Peak 1.16 0.84 65

PM Peak 1.34 0.89 86

After CalibrationAM Peak 0.99 0.99 3

PM Peak 0.99 0.99 3

Comparison % (GEH <5)

Before CalibrationAM Peak 50%PM Peak 53%

After CalibrationAM Peak 100%PM Peak 100%

Before Model Calibration After Model Calibration

Page 25: 2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June 24 -27, Santa Barbara, CA SR 46 Improvement PSR/PDS Study.

GEH Statistics

1 2 3 4 5 6 7 8 9 10

GEH<X 63.2% 79.4% 92.6% 98.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%

0.0%

20.0%

40.0%

60.0%

80.0%

100.0%

120.0%

% o

f Sam

ples

with

(GEH

<X)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

GEH<X 8.8% 27.9% 39.7% 44.1% 50.0% 58.8% 63.2% 72.1% 77.9% 85.3% 92.6% 95.6% 95.6% 97.1% 97.1% 98.5% 98.5% 100.0%

0.0%

20.0%

40.0%

60.0%

80.0%

100.0%

120.0%

% o

f Sam

ples

wit

h (G

EH<X

)

(Before)

(After)

Traffic Simulation Criteria:

85% (GEH < 5)

Page 26: 2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June 24 -27, Santa Barbara, CA SR 46 Improvement PSR/PDS Study.

Seasonal Fluctuation

Page 27: 2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June 24 -27, Santa Barbara, CA SR 46 Improvement PSR/PDS Study.

Ramifications of Traffic Fluctuation

Data Collection• Use of old counts – consistency issue

Model Calibration• which month?

• Previous studies failed to consider this

Traffic operations • Worst or average

Design• For the worst?

Page 28: 2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June 24 -27, Santa Barbara, CA SR 46 Improvement PSR/PDS Study.

Traffic Operations Analysis

Intersections• Signalized

• Stop-controlled

Roundabout

Hwy 46 multilane highway

Hwy 46 Weaving

Simulation (optional)

Page 29: 2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June 24 -27, Santa Barbara, CA SR 46 Improvement PSR/PDS Study.

Finalized Study Scenarios & Elements

No. Description AM PM Fri Sun AM PM Fri Sun1 No Build X X X X X X X X2 Signalization X X X X X X X X3 Roundabout West X X X X X X X X4 Roundabout East X X X X X X X X5 Overcrossing X X X X X X X X6 Interchange X X X X X X X X

Near Term (2016) Long Term (2035)Improvement Alternative

Element QuanitySignalized Intersection 2

Unsignalized Intersection 6Roundabout 2

Multilane 2Weaving 1

Page 30: 2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June 24 -27, Santa Barbara, CA SR 46 Improvement PSR/PDS Study.

Preliminary Results: 2016 No Build

No. Name Type Approach AM PM Fri Sun AM PM Fri Sun1 SR 46 / Golden Hill Rd Signal 28.5 35.7 38.6 30.2 C D D C Synchro

Overall 30.0 24.9 77.0 8.1NB 176.4 146.1 479.5 65.1 F F F FSB 0.0 0.0 0.0 0.0 A A A A

Overall 710.0 24.6 55.0 2.7SB >710.0 106.8 242.1 35.7 F F F E

82.8 115.3 77.6 17.2 F F F C Traffi xSynchro

Overall 44.5 39.4 83.1 18.7NB 154.2 191.8 413.9 40.3 F F F E

Overall 5.5 8.3 7.4 5.7EB 9.5 9.5 9.2 9.4 A A A AWB 15.3 15.6 12.9 11.2 C C B B

Overall 2.7 11.2 14.1 4.8EB 9.0 10.5 10.7 9.3 A B B AWB 17.5 31.9 42.9 13.7 C D E B

2 SR 46 / Union Rd TWSC Synchro

3 SR 46 / Airport Rd OWSC Synchro

Intersection Control Delay (Seconds) LOSMethodology

Synchro

6 Dallons Dr / Golden Hill Rd TWSC Synchro

4 Union Rd / Golden Hill Rd AWSCSynchro does not support AWSC analysis for more than 2 lanes per leg intersection.

5 Union Rd / Union Rd Connector

OWSC

D B Synchro

8 Dry Creek Rd / Union Rd TWSC Synchro

20.3 36.8 15.5 B C7 Golden Hills Plaza Driveway / Golden Hill Rd

Signal 13.1

Segment Direction AM PM Friday Sunday AM PM Friday SundayEB 9.6 10.3 11.2 14.2 A A A BWB 10.3 12.9 13.9 9.5 A B B A

Union Road - Airport Road

Hwy 46 Weaving Density (pc/mi/ln) LOS

Page 31: 2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June 24 -27, Santa Barbara, CA SR 46 Improvement PSR/PDS Study.

Performance Comparison

No. Description AM PM Fri Sun AM PM Fri Sun1 No Build D D D D E E E E2 Signalization C C D D D D E E3 Roundabout West C C C C D D D D4 Roundabout East C C C C D D D D5 Overcrossing B B C C C C D D6 Interchange B B B B C C C C

Improvement Alternative Near Term (2016) Long Term (2035)

To be updated!

Page 32: 2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June 24 -27, Santa Barbara, CA SR 46 Improvement PSR/PDS Study.

Project Status

Data Collection - done

Alignment Alternative - 90%

Model Development & Calibration - Approved

Traffic Forecast – 85%

Traffic Operations Analysis – 25%

Overall project - Ahead of schedule

Page 33: 2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June 24 -27, Santa Barbara, CA SR 46 Improvement PSR/PDS Study.

Challenges & Lessons Learned

Data Collection• Seasonal & day of week fluctuation

• Timing / consistency

• Always validate your data

Scenarios Management

Communication• Work closely with all stokeholds

Consensus Building• Use your traffic model

Page 34: 2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June 24 -27, Santa Barbara, CA SR 46 Improvement PSR/PDS Study.

Thank you! Questions & Answers

Page 35: 2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June 24 -27, Santa Barbara, CA SR 46 Improvement PSR/PDS Study.

Hatch Mott MacDonald

Allen Nie, PhD, PE Tel: 925.469.8016

[email protected]

Richard Davis, VPTel: 925.469.5356

[email protected]

4301 Hacienda Dr., Suite 300 Pleasanton, CA 94588

Fax: 925.469.8011 www.hatchmott.com

Page 36: 2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June 24 -27, Santa Barbara, CA SR 46 Improvement PSR/PDS Study.

Stop right here

Stop right here

Page 37: 2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June 24 -27, Santa Barbara, CA SR 46 Improvement PSR/PDS Study.

City Zoning

Page 38: 2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June 24 -27, Santa Barbara, CA SR 46 Improvement PSR/PDS Study.

Project Development Process

Caltrans

Page 39: 2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June 24 -27, Santa Barbara, CA SR 46 Improvement PSR/PDS Study.

Project Study Report

Initial document of the project

Include• Scoping of the physical work

• Budget and schedule to deliver the project

• Define the needs and purpose

Timeframe• 6 months to 12 months

Page 40: 2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June 24 -27, Santa Barbara, CA SR 46 Improvement PSR/PDS Study.

Draft Project Report

A decision making document

Document the need for a project

Summarize• Key points from the Draft Env. Doc

• The studies of the scope, cost

• Overall impact of alternatives

Help make informal decision whether to proceed to the public hearing phase of the project

Page 41: 2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June 24 -27, Santa Barbara, CA SR 46 Improvement PSR/PDS Study.

ALT 1 – Two-way Stop-controlled (No Build)

Page 42: 2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June 24 -27, Santa Barbara, CA SR 46 Improvement PSR/PDS Study.

ALT 2 – Signalization

Page 43: 2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June 24 -27, Santa Barbara, CA SR 46 Improvement PSR/PDS Study.

ALT 3 – Roundabout West

Page 44: 2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June 24 -27, Santa Barbara, CA SR 46 Improvement PSR/PDS Study.

ALT 5 – Overcrossing

Page 45: 2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June 24 -27, Santa Barbara, CA SR 46 Improvement PSR/PDS Study.

Future Year O-D Calculation

),0(. ODgrowthbasefuture forecastedODcalibratedMaxODAdj

basefutureODgrowth ODforecastedODForecastedForecasted

The Difference Method

Page 46: 2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June 24 -27, Santa Barbara, CA SR 46 Improvement PSR/PDS Study.

Half Clover Leaf Interchange

Page 47: 2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June 24 -27, Santa Barbara, CA SR 46 Improvement PSR/PDS Study.

Roundabout Alternative

Page 48: 2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June 24 -27, Santa Barbara, CA SR 46 Improvement PSR/PDS Study.

Background

Page 49: 2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June 24 -27, Santa Barbara, CA SR 46 Improvement PSR/PDS Study.

The Consideration of Recession

People are talking about it

Not enough data to fully measure the impact on traffic level in the project study area

Would be a decision from the City and Caltrans• To consider it at all?

• Which growth pattern to choose?

Page 50: 2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June 24 -27, Santa Barbara, CA SR 46 Improvement PSR/PDS Study.

The Impact of Recession

12 3

45

LegendLine 1: w/o recession

Lines 2 - 5: w/ recession

Page 51: 2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June 24 -27, Santa Barbara, CA SR 46 Improvement PSR/PDS Study.

Traffic Modeling Task

Forecast future year traffic• 2016, 2020, 2025, 2035

Forecast traffic under different alignment alternatives• Traffic assignment

Explore traffic circulation pattern to support traffic operations analysis• E.g. weaving analysis

Support alternative development

Page 52: 2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June 24 -27, Santa Barbara, CA SR 46 Improvement PSR/PDS Study.

Model Validation

Supply side

• Link attributes

• Network coding

• Turn penalties

Demand side

• Land use consolidation (type, quantity)

• Zone disaggregation

• Trip rates review

Page 53: 2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June 24 -27, Santa Barbara, CA SR 46 Improvement PSR/PDS Study.

Additional Model Improvement & Testing

Upgrade to TransCAD 5.0

Additional tools in GISDK for OD operations

Sensitivity testing in the project area

Through trip assessment (select link analysis)

Trip patterns (select link / zone analysis)