The Tichborne Family TrustTrustees:
Date: 26 February 2012
Frank Tichborne
Southview, Gibbet Lane
Norton Malreward
NE Somerset
BS14 0BX
Tel: 01275 832904
Mob: 0788 5858588
Caroline Tichborne Sarychkin
101 High Street
Burnham on Crouch
Essex
CM0 8AH
Tel: 0162 1782828
Mob: 0798 0859136
Issued without prejudice and with no implied contractual agreement. Page 1 of 10
Request for QuotationStatus of building at 9 December 2011 during construction
1 Introduction
This Request for Quotation (RFQ) is for the final fit of the upper two floors of a new
building at the Bunns Lane Works industrial estate located at Bunns Lane, Mill Hill, London
NW7 2AJ. Note the fit of the Ground floor is underway and is not part of this RFQ.
The site and new building are owned by the Tichborne Family Trust.
The Building is in the final phase of general construction and the occupier of the top 2 floor
floors will be a new Company (Mill Hill Space Co Ltd) associated with the provision of
Work-Space hire for the purposes of Arts recreation and training. To supplement this activity
there will be a number of offices and some storage capability.
-
8/2/2019 2012 03 02 Request for Quotation RFQ-013
2/10
The Tichborne Family TrustRequest for Quotation
Issued without prejudice and with no implied contractual agreement. Page 2 of 10
References
Design Plans TBD (in accordance with Figure 1 and Figure 2)
Electricity supply: BS7671:2008 17th
Edition.
Fire Precautions (Workplace): BS5839 Regulations 1997 (As Amended 1999)Note: if later regulations are in force then these shall apply
Terms
In this document:
1. The Client means The Tichborne Family Trust2. The Supplier means The building services supplier or builder
Site:
Frogmore House
Bunns Lane Works
Bunns LaneMill Hill
London NW7
Building:
The construction work involves interior work only as follows:
1. Mezzanine construction to form floor 2 as per Figure 2.2. Lift construction (floor 1 to 2) as per Figure 1 & Figure 2. (See also appendix 2)3. Stairway construction (floor 1 to 2) as per Figure 1 & Figure 2.4. Block wall partition construction to form Floor 1 as per Figure 1.5. Block wall construction continuation to full height of Floor 2 as per Figure 2.6. Stud wall (timber & dryline) construction of internal partition walls as per Figure 1 &
Figure 2.
7. Fitting all doors, doorframes and locks as per Figure 1 & Figure 2.8. Installation of Sanitary equipment in toilet & washroom areas as per Figure 1.9. Installation of secure steel storage boxes with datalocks as per Figure 1. (Big
Yellow/Safestore equivalent type)
10. Installation of two Electric ring-mains (one per floor) with outlets as per electricspecification in Table 1. (Note: positioning to be agreed at a site meeting)
11.Installation of Ethernet & security wiring ducting, cable and outlets as per Table 1.(Note: positioning to be agreed at a site meeting)
12.Installation of Air conditioning equipment as per Table 1.13.Installing Harlequin floor to main double height area and to Teaching space area. (See
also Appendix 1)
14.Painting and decorating to finish in agreement with client. (Including greenwall inmain double height area)
-
8/2/2019 2012 03 02 Request for Quotation RFQ-013
3/10
The Tichborne Family TrustRequest for Quotation
Issued without prejudice and with no implied contractual agreement. Page 3 of 10
Figure 1: Floor 1 showing Office/Teaching, storage layout and double height training areas.
.
-
8/2/2019 2012 03 02 Request for Quotation RFQ-013
4/10
The Tichborne Family TrustRequest for Quotation
Issued without prejudice and with no implied contractual agreement. Page 4 of 10
Figure 2: Floor 2 showing upper mezzanine floor office and training space layout
-
8/2/2019 2012 03 02 Request for Quotation RFQ-013
5/10
The Tichborne Family TrustRequest for Quotation
Issued without prejudice and with no implied contractual agreement. Page 5 of 10
Floor Room Mains supply Lighting Ethernet
ducting1 TR1 4 double, wall 2 ceiling
motion sense1
1 TR2 4 double, wall 2 ceiling
motion sense
1
1 TR3 4 double, wall 2 ceiling
motion sense
1
1 TR4 8 double, wall
1 quad, floor
4 ceiling
motion sense
2
1 TR5 4 double, wall 2 ceilingmotion sense
1
1 Storage Room 2 double, wall 2 ceiling
motion sense
1
1 Service cupboard 2 double, wall 2 ceilingmotion sense 1
1 Reception 4 double, wall 2 ceiling 2
1 Toilets 0 1 ceiling per cubicle
motion sense
0
1 Double height
multi-use space
12 double, wall 12 ceiling 2
2 Office 1 8 double, wall
1 quad, floor (under cover)
4 ceiling
motion sense
2
2 Office 2 8 double, wall
1 quad, floor (under cover)
4 ceiling
motion sense
2
2 Kitchen 4 double, wall 1 ceiling
motion sense
0
2 Teaching space 8 double, wall1 quad, floor (under cover)
4 ceilingmotion sense
2
2 Storage 2 double, wall 1 ceiling
motion sense
1
2 Lobby area 2 double, wall 2 ceiling
motion sense
1
1/2 Stairs 0 2 ceiling always lit 0
1/2 Lift 0 Integral with lift always lit 0
1 Lift Control Supply Separate to Consumer Unit N/A N/A
1/2 Emergency signs &
lighting
N/A To building regs N/A
1 External Reception
signage
N/A 1 Switched in reception N/A
1 Air Conditioning 10 wall A/C units external
wall mounted plus ducting
to TR3 & TR5
Room controlled
N/A N/A
2 Air Conditioning 5 wall A/C units external
wall mounted
Room controlled
N/A N/A
1/2 Security Ducting to all datalocks on
storage boxes, as well as to
doors, windows, camera and
movement sensors, to be
agreed at site meeting with
client.
N/A N/A
Table 1: Electrical Services
-
8/2/2019 2012 03 02 Request for Quotation RFQ-013
6/10
The Tichborne Family TrustRequest for Quotation
Issued without prejudice and with no implied contractual agreement. Page 6 of 10
Construct the building interior according to the attached plans (TBD) with the
following inspection points:
1. The Supplier shall construct the Mezzanine and Lift structure and shall have the finishedpart inspected and approved by the building inspector*
Note2.
2. The Supplier shall construct the upper two floors to plans and shall have the finished partinspected and approved by the building inspector*
Note2.
3. The Supplier shall Install Harlequin Floor to the main double height area and to theTeaching space area.
4. The Supplier shall complete the internal fitting of all services: Air conditioning units and connection to electrics, and heat/cool distribution ducting
as needed for internal rooms
Toilets/washrooms with hot and cold water (to plans reference TBD).
Electricity supply: Two separate ring main feeds to consumer units and separatemeters (located in store room on ground floor),
Electricity supply: two separate main feeds for the Heating/Air Conditioning. Electricity supply: two separate main feeds for floor 1 & 2 main/lighting and a third
single phase for the upper two floors safety lighting.
Electricity supply: separate feed to Lift. (to floor 2 consumer unit) Light fittings. All lighting to low energy type and to be movement and ambient light
sensitive (except safety lights) for power saving. In the offices lighting consistent
with a modern office environment. In the store rooms a single ceiling mounted light
fitting.
Floor 1 Reception-front weatherproof sign lighting outlet. Data service ducting and outlets (Telephone, Ethernet & Security including CCTV)
Two telephone points on the first floor reception and one telephone point in each
office. Ethernet points (including ducting and wiring) are required as per Table 1.
Security wiring ducting to all external windows and all external and internal doors as
well as to movement sensors in ceilings (2 per floor). Security CCTV wiring to 2
points on each floor and 4 external building wall locations terminating in ground floor
office. (The telephone, security and Ethernet ducting can be common where they
converge)
Security System (Specification to be provided). Supply and fit Fire Alarm, sensors and sprinkler system to floors 1 &2 in compliance
with BS5839;Fire Precautions (Workplace) Regulations 1997 (As Amended 1999).5. The Supplier shall complete the internal finishing of the Building to a Colour scheme to
be agreed with the Tichborne Family Trust prior to commencement of that activity.
6. The Supplier shall issue an Electrical Certificate of Conformance to BS7671:2008 17thEdition. (or later if appropriate)
7. The Supplier shall arrange a final inspection and approval by the building inspector* Note2.8. The Supplier shall clean up the site and remove all rubbish, plant and construction
equipment prior to handover to the Client.
Note 1: In the RFQ response the Supplier shall provide all specific requirements itemised and
costed separately.
Note 2: Building Inspection will be by Barnet Borough Council or private nominee Inspectoras appropriate.
-
8/2/2019 2012 03 02 Request for Quotation RFQ-013
7/10
The Tichborne Family TrustRequest for Quotation
Issued without prejudice and with no implied contractual agreement. Page 7 of 10
Conditions of Contract:
1. The Supplier shall provide a proposal as follows: Itemised fixed price estimate, including any proposed stage payments with any
caveats or exemptions/suggestions to be detailed. Itemised guaranteed timescale from start to completion, with any caveats or
exemptions to be detailed.
Detail of any constraints or conditions to be met by the Tichborne Family Trust. Detail of any risks to either cost or schedule.
2. The Supplier shall provide their standard Contract Conditions which will then benegotiated and agreed between parties prior to start.
3. The Supplier shall visit the site to take note of any special issues, which thenceforth shallnot be accepted by the Client as not known once work commences.
4. Any modifications caused by the Client following work commencement shall benegotiated on a pro-rata basis and will be deemed as extra to this contract, and paid for by
the Client by mutual agreement.5. Any modifications undertaken by the Supplier without the Clients consent shall not be
invoiced to the Client, and may be reversed by the Supplier at the Clients discretion.
6. The Supplier shall have their own indemnity Insurance against any loss or damage,caused by the Supplier or his associates, to the Clients property.
Response to RFQ:
1. In order to be considered for this contract, the Supplier shall respond to this RFQ no later
than 22nd
March 2012 with a validity of 2 months. Any variation to this shall be requested
prior to the deadline, and if granted that deadline may be extended to other bidders, all at the
discretion of the Tichborne Family Trust trustees.
Contract Award timeframe:1. Contract award is anticipated to be within 1 month of receipt of satisfactory Quotation.
2. Work is anticipated to be commenced immediately on contract award.
-
8/2/2019 2012 03 02 Request for Quotation RFQ-013
8/10
The Tichborne Family TrustRequest for Quotation
Issued without prejudice and with no implied contractual agreement. Page 8 of 10
Appendix 1: Example Cost of Harlequin floor
British Harlequin Tel: +44 (0)1892 514 888
Education dance floor pack D
Product Code: EDPDCC
Harlequin's education dance floor pack D - Harlequin Liberty is a professional sprung
floor composed of sprung panels, which fit together quickly and easily by means of a unique
latching system.
Harlequin Liberty is the ideal sprung floor for a dance studio, rehearsal room or stage
floor, with uniform flexion across the whole floor. It provides consistent shock absorption,
which dramatically reduces injury risk and enhances performance, while being remarkably
quiet in use due to its high technology composite construction.
Harlequin's education dance floor pack D comprises:
36 full size Harlequin Liberty panels Eight half size Harlequin Liberty panels 17 long edge trims One long ramp Four lengths of 10m x 2m width Harlequin Reversible (colour choices as packs 'A'
and 'B')
18 rolls of clear joining tape Eight Harlequin roll straps (two per roll) Four Harlequin storage bags with carrying handles Teacher's education pack notes
-
8/2/2019 2012 03 02 Request for Quotation RFQ-013
9/10
The Tichborne Family TrustRequest for Quotation
Issued without prejudice and with no implied contractual agreement. Page 9 of 10
Appendix 2: Example of Mezzanine lift
-
8/2/2019 2012 03 02 Request for Quotation RFQ-013
10/10
The Tichborne Family TrustRequest for Quotation