2011 Seven Year Electricity Planning Statement (2012-2018) Attachments Power Network Development Department Asset Management Directorate November 2011 400 kV OHL 220 kV OHL Power Station 400kV Grid Station 220kV Substation 400 kV Cable 220 kV Cable 132 kV Cable Legend KSA Border Liwa Madinat Zayed Sila Shuweihat S1 & S2 Ruwais Mirfa Central SAS Mussafah AAPS Dahma Al Hayer Maziyad Al Wagon Sanaiya Arad Sultanate of Oman Dhaid GIC E48 City Centre Asab BuHasa Cent r al & W e stern Regio n A bu Dhabi Isl ands Al Ain R egion Salamat Khazna Mahawi Sweihan ADST Dabiya Rumaithy E19 Gaithy Bab UAN Bahia SASN REEM ADST E48 E19 To TANE SADIYAT Abu Dhabi Islands 400 kV OHL 400 kV U/G Cable To GCC Interconnection ICAD Steel I Qidfa Umm Al Oush To Mahawi Bahia Sadiyat Reem Delma Island Ras Al Khaimah Qusahwira Shah- SGD Masdar Shams Ghantoot Emal AAIC Ajman New Fujairah To TWPS Sir Baniyas AASW Al Foah Ramah Zakher WASIT (OMAN) Al Maqam Shamkha Samha TANE Taweela-P.S Ain Al Faydha Masdar Hydrogen Braka Hameem Warsan Sharjah Steel II Asab Switching Shahama Gasco-Elixier 400 kV OHL 220 kV OHL Power Station 400kV Grid Station 220kV Substation 400 kV Cable 220 kV Cable 132 kV Cable Legend KSA Border Liwa Madinat Zayed Sila Shuweihat S1 & S2 Ruwais Mirfa Central SAS Mussafah AAPS Dahma Al Hayer Maziyad Al Wagon Sanaiya Arad Sultanate of Oman Dhaid GIC E48 City Centre Asab BuHasa Cent r al & W e stern Regio n A bu Dhabi Isl ands Al Ain R egion Salamat Khazna Mahawi Sweihan ADST Dabiya Rumaithy E19 Gaithy Bab UAN Bahia SASN REEM ADST E48 E19 To TANE SADIYAT Abu Dhabi Islands 400 kV OHL 400 kV U/G Cable To GCC Interconnection ICAD Steel I Qidfa Umm Al Oush To Mahawi Bahia Sadiyat Reem Delma Island Ras Al Khaimah Qusahwira Shah- SGD Masdar Shams Ghantoot Emal AAIC Ajman New Fujairah To TWPS Sir Baniyas AASW Al Foah Ramah Zakher WASIT (OMAN) Al Maqam Shamkha Samha TANE Taweela-P.S Ain Al Faydha Masdar Hydrogen Braka Hameem Warsan Sharjah Steel II Asab Switching Shahama Gasco-Elixier 400 kV OHL 220 kV OHL Power Station 400kV Grid Station 220kV Substation 400 kV Cable 220 kV Cable 132 kV Cable Legend KSA Border Liwa Madinat Zayed Sila Shuweihat S1 & S2 Ruwais Mirfa Central SAS Mussafah AAPS Dahma Al Hayer Maziyad Al Wagon Sanaiya Arad Sultanate of Oman Dhaid GIC E48 City Centre Asab BuHasa Cent r al & W e stern Regio n A bu Dhabi Isl ands Al Ain R egion Salamat Khazna Mahawi Sweihan ADST Dabiya Rumaithy E19 Gaithy Bab UAN Bahia SASN REEM ADST E48 E19 To TANE SADIYAT Abu Dhabi Islands 400 kV OHL 400 kV U/G Cable To GCC Interconnection ICAD Steel I Qidfa Umm Al Oush To Mahawi Bahia Sadiyat Reem Delma Island Ras Al Khaimah Qusahwira Shah- SGD Masdar Shams Ghantoot Emal AAIC Ajman New Fujairah To TWPS Sir Baniyas AASW Al Foah Ramah Zakher WASIT (OMAN) Al Maqam Shamkha Samha TANE Taweela-P.S Ain Al Faydha Masdar Hydrogen Braka Hameem Warsan Sharjah Steel II Asab Switching Shahama Gasco-Elixier

Transcript of 2011 Seven Year Electricity Planning Statement (2012 … Year Electricity Planning Statement... ·...

  • 2011 Seven Year Electricity Planning Statement (2012-2018) Attachments

    Power Network Development Department Asset Management Directorate

    November 2011

    400 kV OHL

    220 kV OHL

    Power Station

    400kV Grid Station

    220kV Substation

    400 kV Cable

    220 kV Cable

    132 kV Cable

    Legend

    KSA Border

    Liwa

    Madinat Zayed

    Sila

    ShuweihatS1 & S2

    Ruwais

    Mirfa

    Central

    SAS

    Mussafah

    AAPS

    Dahma

    Al Hayer

    Maziyad

    Al Wagon

    Sanaiya

    Arad

    Sultanate of Oman

    Dhaid

    GIC

    E48

    City Centre

    Asab

    BuHasa

    Central & Western Region

    Abu

    Dhab

    i Islan

    ds

    Al AinRegion

    SalamatKhazna

    Mahawi

    Sweihan

    ADST

    Dabiya

    Rumaithy

    E19

    Gaithy

    Bab

    UAN

    Bahia

    SASN

    REEM

    ADST

    E48

    E19

    To TANE

    SADIYAT

    Abu Dhabi Islands400 kV OHL

    400 kV U/G Cable

    To

    GCC

    Inte

    rcon

    nect

    ion

    ICAD

    Steel I

    Qidfa

    Umm Al Oush

    To Mahawi

    Bahia

    Sadiyat

    ReemDelma Island

    Ras Al Khaimah

    QusahwiraShah- SGD

    Masdar Shams

    Ghantoot

    Emal

    AAIC

    Ajman

    New Fujairah

    To TWPS

    Sir Baniyas

    AASW

    Al FoahRamah

    Zakher

    WASIT(OMAN)

    Al Maqam

    Shamkha

    SamhaTANE

    Taweela-P.S

    Ain Al Faydha

    Masdar Hydrogen

    Braka

    Hameem

    Warsan

    Sharjah

    Steel II

    Asab

    Switching

    Shahama

    Gasco-Elixier

    400 kV OHL

    220 kV OHL

    Power Station

    400kV Grid Station

    220kV Substation

    400 kV Cable

    220 kV Cable

    132 kV Cable

    Legend

    KSA Border

    Liwa

    Madinat Zayed

    Sila

    ShuweihatS1 & S2

    Ruwais

    Mirfa

    Central

    SAS

    Mussafah

    AAPS

    Dahma

    Al Hayer

    Maziyad

    Al Wagon

    Sanaiya

    Arad

    Sultanate of Oman

    Dhaid

    GIC

    E48

    City Centre

    Asab

    BuHasa

    Central & Western Region

    Abu

    Dhab

    i Islan

    ds

    Al AinRegion

    SalamatKhazna

    Mahawi

    Sweihan

    ADST

    Dabiya

    Rumaithy

    E19

    Gaithy

    Bab

    UAN

    Bahia

    SASN

    REEM

    ADST

    E48

    E19

    To TANE

    SADIYAT

    Abu Dhabi Islands400 kV OHL

    400 kV U/G Cable

    To

    GCC

    Inte

    rcon

    nect

    ion

    ICAD

    Steel I

    Qidfa

    Umm Al Oush

    To Mahawi

    Bahia

    Sadiyat

    ReemDelma Island

    Ras Al Khaimah

    QusahwiraShah- SGD

    Masdar Shams

    Ghantoot

    Emal

    AAIC

    Ajman

    New Fujairah

    To TWPS

    Sir Baniyas

    AASW

    Al FoahRamah

    Zakher

    WASIT(OMAN)

    Al Maqam

    Shamkha

    SamhaTANE

    Taweela-P.S

    Ain Al Faydha

    Masdar Hydrogen

    Braka

    Hameem

    Warsan

    Sharjah

    Steel II

    Asab

    Switching

    Shahama

    Gasco-Elixier

    400 kV OHL

    220 kV OHL

    Power Station

    400kV Grid Station

    220kV Substation

    400 kV Cable

    220 kV Cable

    132 kV Cable

    Legend

    KSA Border

    Liwa

    Madinat Zayed

    Sila

    ShuweihatS1 & S2

    Ruwais

    Mirfa

    Central

    SAS

    Mussafah

    AAPS

    Dahma

    Al Hayer

    Maziyad

    Al Wagon

    Sanaiya

    Arad

    Sultanate of Oman

    Dhaid

    GIC

    E48

    City Centre

    Asab

    BuHasa

    Central & Western Region

    Abu

    Dhab

    i Islan

    ds

    Al AinRegion

    SalamatKhazna

    Mahawi

    Sweihan

    ADST

    Dabiya

    Rumaithy

    E19

    Gaithy

    Bab

    UAN

    Bahia

    SASN

    REEM

    ADST

    E48

    E19

    To TANE

    SADIYAT

    Abu Dhabi Islands400 kV OHL

    400 kV U/G Cable

    To

    GCC

    Inte

    rcon

    nect

    ion

    ICAD

    Steel I

    Qidfa

    Umm Al Oush

    To Mahawi

    Bahia

    Sadiyat

    ReemDelma Island

    Ras Al Khaimah

    QusahwiraShah- SGD

    Masdar Shams

    Ghantoot

    Emal

    AAIC

    Ajman

    New Fujairah

    To TWPS

    Sir Baniyas

    AASW

    Al FoahRamah

    Zakher

    WASIT(OMAN)

    Al Maqam

    Shamkha

    SamhaTANE

    Taweela-P.S

    Ain Al Faydha

    Masdar Hydrogen

    Braka

    Hameem

    Warsan

    Sharjah

    Steel II

    Asab

    Switching

    Shahama

    Gasco-Elixier

  • TRANSCO 2011 7YPS (2012-2018) November 2011 AMD/PNDD Attachments

    Table of Contents

    Attachment-A

    Electricity demand forecast at the grid supply points and demand supply exit points.

    Electricity generation capacity expansion plan.

    Attachment-B

    Electricity transmission network topology (400kV, 220kV, 132kV system).

    Geo-map of transmission network topology (400kV and 220kV system) for Year 2011 & 2018.

    Attachment-C

    Forecast power flows and loading on the transmission system for Year 2011-2018.

    Attachment-D

    Fault levels at the transmission nodes for Year 2011-2018.

    Attachment-E

    Transmission system dataset.

    Attachment-F

    Major existing generation plants and planned committed generation projects.

  • Attachment-AElectricity Demand Forecast, Electricity Generation Capacity Expansion Plan

    Table-A1 Summary of regio-wise peak demand forecast for 16GW scenario, 20GW scenario and 24GW scenario(MW)

    Table-A2 Area-wise/zone-wise peak demand forecast for16GW scenario, 20GW scenario and 24GW scenario(MW)

    Table-A3 Abu Dhabi Emirate peak demand forecast for 16GW scenario at demand supply exit poits(MW)

    Table-A4 Abu Dhabi Emirate peak demand forecast for 24GW scenario at demand supply exit poits(MW)

    Table-A5 Sum of region-wise peak demand forecast for 20GW scenario(MW)

    Table-A6 Abu Dhabi Emirate peak demand forecast for 20GW scenario at demand supply exit points(MW)

    Table-A7 Northern Emirates peak demand forecast for 20GW scenario(MW)

    Table-A8 Electricity generation capacity expansion plan to meet the 20GW scenario demand forecast(Gross MW)

    Table-A9 List of substations transferred from one gid zone to another for 20GW scenario

    Table-A10 Capacity deficit/ surplus of ADST, E19, E48,Reem,SASN & Mahawi 400/132kV grid stations before transfer for 20GW scenario

    Table-A11 Capacity deficit/ surplus of ADST, E19, E48,Reem,SASN & Mahawi 400/132kV grid stations after transfer for 20GW scenario

    Attachment-B Electricity Transmission Network Topology (400kV,220kV,132kV System), Geo-Map of Transmission Network Topology (400kV,220kV System) for Year 2011 & 2018

    Fig.B1 400kV & 220kV Electrical Power System Topology - Yr 2011

    Fig.B2 400kV & 220kV Electrical Power System Topology - Yr 2012

    Fig.B3 400kV & 220kV Electrical Power System Topology - Yr 2013

    Fig.B4 400kV & 220kV Electrical Power System Topology - Yr 2014

    Fig.B5 400kV & 220kV Electrical Power System Topology - Yr 2015

    Fig.B6 400kV & 220kV Electrical Power System Topology - Yr 2016

    Fig.B7 400kV & 220kV Electrical Power System Topology - Yr 2017

    Fig.B8 400kV & 220kV Electrical Power System Topology - Yr 2018

    Fig.B9 132kV Electrical Power System Topology - Yr 2011

    Fig.B10 132kV Electrical Power System Topology - Yr 2012

    Fig.B11 132kV Electrical Power System Topology - Yr 2013

    Fig.B12 132kV Electrical Power System Topology - Yr 2014

    Fig.B13 132kV Electrical Power System Topology - Yr 2015

    Fig.B14 132kV Electrical Power System Topology - Yr 2016

    Fig.B15 132kV Electrical Power System Topology - Yr 2017

    Fig.B16 132kV Electrical Power System Topology - Yr 2018

    Fig.B17 TRANSCO 400kV & 220kV Transmission System (Year 2011)

    Fig.B18 TRANSCO 400kV & 220kV Transmission System (Year 2018)

    List of Tables and Figures

    TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) List of Tables and Figures Sheet 1 of 3

  • List of Tables and Figures

    Attachment-C Forecast Power Flows and Loading on the Transmission System for Year 2011-2018

    Fig.C1 LF for Year 2011; 400kV Network- Peak Load

    Fig.C2 LF for Year 2011; 220kV Network- Peak Load

    Fig.C3 LF for Year 2011; 132kV Network- Peak Load

    Fig.C4 LF for Year 2012; 400kV Network- Peak Load

    Fig.C5 LF for Year 2012; 220kV Network- Peak Load

    Fig.C6 LF for Year 2012; 132kV Network- Peak Load

    Fig.C7 LF for Year 2013; 400kV Network- Peak Load

    Fig.C8 LF for Year 2013; 220kV Network- Peak Load

    Fig.C9 LF for Year 2013; 132kV Network- Peak Load

    Fig.C10 LF for Year 2014; 400kV Network- Peak Load

    Fig.C11 LF for Year 2014; 220kV Network- Peak Load

    Fig.C12 LF for Year 2014; 132kV Network- Peak Load

    Fig.C13 LF for Year 2015; 400kV Network- Peak Load

    Fig.C14 LF for Year 2015; 220kV Network- Peak Load

    Fig.C15 LF for Year 2015; 132kV Network- Peak Load

    Fig.C16 LF for Year 2016; 400kV Network- Peak Load

    Fig.C17 LF for Year 2016; 220kV Network- Peak Load

    Fig.C18 LF for Year 2016; 132kV Network- Peak Load

    Fig.C19 LF for Year 2017; 400kV Network- Peak Load

    Fig.C20 LF for Year 2017; 220kV Network- Peak Load

    Fig.C21 LF for Year 2017; 132kV Network- Peak Load

    Fig.C22 LF for Year 2018; 400kV Network- Peak Load

    Fig.C23 LF for Year 2018; 220kV Network- Peak Load

    Fig.C24 LF for Year 2018; 132kV Network- Peak Load

    Fig.C25 LF for Year 2018; 400kV Network- Peak Load; Option ( Hamria)

    Fig.C26 LF for Year 2018; 400kV Network- Peak Load; Option ( Mirfa)

    Fig.C27 LF for Year 2012; 400kV Network- Off Peak Load

    Fig.C28 LF for Year 2012; 220kV Network- Off Peak Load

    Fig.C29 LF for Year 2012; 132kV Network- Off Peak Load

    Fig.C30 LF for Year 2018; 400kV Network- Off Peak Load

    Fig.C31 LF for Year 2018; 220kV Network- Off Peak Load

    Fig.C32 LF for Year 2018; 132kV Network- Off Peak Load

    TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) List of Tables and Figures Sheet 2 of 3

  • List of Tables and Figures

    Attachment-D Fault Levels at the Transmission Nodes for Year 2011-2018

    Table-D1 3-Phase and 1-Phase Short Circuit Levels(kA) for Peak Load Condition

    Table-D2 3-Phase and 1-Phase Short Circuit Levels(kA) for Off Peak Load Condition(Year 2012 & 2018)

    Table-D3 Maximum 3-ph Fault Contribution from 220/33kV Transformer at 33kV Level

    Table-D4 Maximum 3-ph Fault Contribution from132/33kV, 132/22kV & 132/11kV Transformer at LV

    Attachment-E Transmission System Dataset

    Table-E1 Generators & Generator Step-up Transformers Dataset Summary

    Table-E2 400kV Grid Transformers Dataset Summary

    Table-E3 220kV Transformers Dataset Summary

    Table-E4 132kV Transformers Dataset Summary

    Table-E5 Line Data Type(Year 2011/2018)

    Table-E6 Line Dataset Summary - Year 2011

    Table-E7 Line Dataset Summary - Year 2018

    TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) List of Tables and Figures Sheet 3 of 3

  • Transco 2011 7YPS (2012-2018), Attachments

    TRANSCO/AMD/PNDD November 2011

    ATTACHMENT-A

    Electricity Demand Forecast Electricity Generation Capacity Expansion Plan

  • Attachment - A

    2012 2014 2016 2018 2012 2014 2016 2018 2012 2014 2016 2018

    Abu Dhabi Island 1,970 2,110 2,300 2,410 2,087 2,359 2,657 3,031 2,140 2,480 2,830 3,580

    Eastern Region 3,060 3,625 4,235 4,465 3,197 3,786 4,845 5,678 3,270 4,070 5,725 6,875

    Al-Ain Region 1,745 1,800 1,930 1,980 2,000 2,182 2,349 2,522 2,030 2,285 2,465 2,820

    Gharbia Region 1,245 2,095 2,520 2,800 1,375 2,454 3,019 3,345 1,425 2,940 3,710 4,700

    Northern Emirates 2,270 3,295 3,720 3,810 2,385 3,755 4,460 5,040 2,390 4,380 4,935 5,595

    Losses 106 146 200 210 123 194 252 430 150 212 440 550

    Total Demand 10,396 13,071 14,905 15,675 11,167 14,730 17,582 20,046 11,405 16,367 20,105 24,120

    Table-A1 Summary of region-wise peak demand forecast(MW) for 16GW scenario, 20GW scenario and 24GW scenario

    16GW Scenario 20GW Scenario 24GW ScenarioRegion

    TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A1 Sheet 1 of 1

  • Attachment - A

    2012 2014 2016 2018 2012 2014 2016 2018 2012 2014 2016 2018

    1 ADST 575 600 625 650 603 702 758 823 625 750 800 825

    2 Al-Qurm (E19) 700 740 775 800 731 754 821 909 750 800 850 910

    3 Beach (E48) 650 675 725 735 694 784 887 925 700 800 890 925

    4 Reem Island 30 60 125 150 40 75 131 260 45 85 155 320

    5 Sadiyat Island 15 35 50 75 19 44 60 114 20 45 135 200

    6 Zayed Sports City 400

    1,970 2,110 2,300 2,410 2,087 2,359 2,657 3,031 2,140 2,480 2,830 3,580

    1 SASN/UAN 425 550 575 600 428 564 638 816 465 620 700 850

    2 Mahawi 550 650 700 725 586 654 730 812 600 700 800 900

    3 North Watbha/Capital Dist

    4 Bahia 150 300 350 375 160 345 477 636 160 400 500 600

    5 Shamkha 100 125 150 175 100 125 151 204 100 125 150 250

    6 Shahama 160 175 200 225 198 228 259 320 200 250 300 350

    7 Mussafah 500 550 850 875 525 550 800 900 525 600 850 900

    8 ICAD 475 525 585 640 480 545 850 900 500 600 850 900

    9 Hameem Jun 400 750

    10 Taweela/KPIZ 50 100 175 200 70 125 290 440 70 125 400 600

    11 Aux & Desal loads at TWPS/TANE 520 520 520 520 520 520 520 520 520 520 520 520

    12 Aux & Desal loads at Taweela-C 125 125

    13 Aux & Desal loads at SASN/UAN 130 130 130 130 130 130 130 130 130 130 130 130

    3,060 3,625 4,235 4,465 3,197 3,786 4,845 5,678 3,270 4,070 5,725 6,875

    1 Al-Ain South West 575 600 625 655 654 747 816 900 655 750 815 900

    2 Sweihan 450 475 520 525 561 610 666 722 575 685 750 800

    3 Dahma 720 725 785 800 785 825 867 900 800 850 900 900

    4 Al-Ain Airport 220

    1,745 1,800 1,930 1,980 2,000 2,182 2,349 2,522 2,030 2,285 2,465 2,820Al-Ain Region (MW)

    Table-A2 Area-wise/zone-wise peak demand forecast(MW) for for 16GW scenario, 20GW scenario and 24GW scenario

    Zone/Area

    Abu Dhabi Islands (MW)

    Eastern Region (MW)

    16GW Scenario 20GW Scenario 24GW ScenarioS.N

    TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A2 Sheet 1 of 2

  • Attachment - A

    2012 2014 2016 2018 2012 2014 2016 2018 2012 2014 2016 2018

    Table-A2 Area-wise/zone-wise peak demand forecast(MW) for for 16GW scenario, 20GW scenario and 24GW scenario

    Zone/Area16GW Scenario 20GW Scenario 24GW Scenario

    S.N

    1 Bab 200 225 250 275 220 225 330 340 245 285 560 565

    2 Buhasa 80 100 110 125 100 100 131 135 100 105 245 250

    3 ASAB 125 150 175 200 153 155 260 300 155 155 360 380

    4 Mirfa-NGI 190 190 190 190 190 190 190 190 190 190 190 190

    5 Shah-SGD 295 295 100 295 295 330 330 330

    6 Central 80 90 100 120 105 110 135 173 110 110 140 175

    7 Ruwais 650 650 650 800 800 800 885 885 885

    8 ChemawEyaat 50 110 800

    9 Mirfa 40 55 60 70 55 65 75 90 55 65 75 100

    10 Shuweihat 200 250 275 300 210 314 373 402 220 350 375 405

    11 Madinat Zayed 200 220 250 275 212 230 265 320 220 250 275 320

    12 Aux & Desal loads at Shuweihat (S1/S2/S3) 130 165 165 165 130 165 165 165 130 165 165 165

    13 Aux & Desal loads at Braka 135 135 135

    1,245 2,095 2,520 2,800 1,375 2,454 3,019 3,345 1,425 2,940 3,710 4,700

    1 Dhaid 910 910 910 910 910 910 910 910 910 910 910 910

    2 Fujairah-Qidfa 375 400 450 450 390 450 450 450 395 450 450 450

    3 Ras Al Khaimah 425 450 500 525 470 545 655 745 470 700 750 900

    5 Ajman 150 400 425 450 180 465 570 765 180 650 740 900

    6 Fujairah City 125 300 335 350 150 540 655 790 150 625 700 900

    7 Sharjah 500 650 675 510 660 820 600 750 900

    8 Aux & Pumping loads in NE 285 335 450 450 285 335 450 450 285 335 450 450

    9 Aux loads in F3 75 75

    10 Aux & Desal loads in Hamria 110 110 110 110 110

    2,270 3,295 3,720 3,810 2,385 3,755 4,460 5,040 2,390 4,380 4,935 5,595

    92 146 200 210 123 194 252 430 150 212 440 550

    10,382 13,071 14,905 15,675 11,167 14,730 17,582 20,046 11,405 16,367 20,105 24,120Grand Total (MW)

    Western Region (MW)

    Northern Emirates (MW)

    Losses (MW)

    TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A2 Sheet 2 of 2

  • Attachment-A

    S.N Substation Name/Code Capacity (MVA)Firm Capacity

    (MVA)2010 2012 2014 2016 2018

    Utilisation

    in 2018 (%)

    1 ADST (132/33kV S/S) 2 x 120 120 71 75 45 35 35 32

    2 Market 1-MKT1 (W1) - 132/11kV 4 x 40 120 74 50 55 55 60 55

    3 Capital Gardens-CPGR (E08) - 132/11kV 4 x 40 120 89 90 96 80 80 73

    4 Firdous-FRDS (E09) - 132/11kV 4 x 40 120 53 60 65 65 70 64

    5 Zayed 2nd St-ZYD2 (E11) - 132/11kV 4 x 40 120 76 85 90 90 90 82

    6 Tourist Club-TCLB (E15) - 132/11kV 4 x 40 120 71 75 82 85 85 78

    7 Port (E14) - 132/11kV 4 x 40 120 46 50 65 65 65 60

    8 Market-MRKT (W02) - 132/11kV 3 x 40 80 48

    9 New W02 (Replacement of old W02) - 132/11kV 4 x 40 120 60 67 68 70 64

    10 Souq (E01) - 132/11kV 4 x 40 120 30 35 37 40 37

    11 Corniche Hosp/Saraya (E12) - 132/11kV 4 x 40 120 25 25 23

    12 E03 - 132/11kV 4 x 40 120 20 30 27

    528 575 600 625 650

    1 QURM (E19) - 132/11kV 4 x 40 120 64 73 80 85 85 78

    2 Madinat Zayed-MDZD (E04) - 132/11kV 4 x 40 120 98 99 61 67 70 64

    B) AL-QURM (E19) Zone (1000MVA firm capacity)

    Table-A3 Abu Dhabi Emirate peak demand forecast for 16GW scenario at demand supply exit points(MW)

    A) ADST Zone (1000MVA firm capacity)

    ADST Zone Total (MW)

    TRANSCO/AMD/PNDDNovember 2011

    Transco 2011 7YPS (2012-2018) Table A3 Sheet 1 of 10

  • Attachment-A

    S.N Substation Name/Code Capacity (MVA)Firm Capacity

    (MVA)2010 2012 2014 2016 2018

    Utilisation

    in 2018 (%)

    Table-A3 Abu Dhabi Emirate peak demand forecast for 16GW scenario at demand supply exit points(MW)

    3 Khalidiya-KLDY (W09) - 132/11kV 4 x 40 120 93 95 103 103 105 96

    4 Al Jazeira Hosp-JZRH (W13) - 132/11kV 4 x 40 120 98 100 95 90 90 82

    5 Bateen-BATN (W16) - 132/11kV 4 x 40 120 88 90 98 95 95 87

    6 Bateen Bus Station-BSTN (W17) - 132/11kV 4 x 40 120 84 85 91 95 95 87

    7 Conference Palace (CONH) - 132/11kV 4 x 40 120 46 50 55 60 66 60

    8 Marina Mall-MRML - 132/11kV 4 x 40 120 27 28 34 40 44 40

    9 CLNS (E16/02) - 132/11kV 4 x 40 120 54 55 67 70 75 69

    10 Green Head-GRHD (W41) - 132/11kV 4 x 40 120 25 28 40 45 41

    11 Presidential Palace (Ras Al Akdar) - 132/11kV 3 x 40 80 28 30 30 41

    652 700 740 775 800

    1 Beach-BECH (E48) - 132/11kV 4 x 40 120 100 90 95 95 100 92

    2 Al Salam-ALSM (E18) - 132/11kV 3 x 40 80 64 65 55 50 50 69

    3 Falah-FLAH (E18/02) - 132/11kV 4 x 40 120 90 85 90 90 95 87

    4 Mushrif -MSRF (W24) - 132/11kV 4 x 40 120 81

    5 New W24 (Replacement of Old W24) - 132/11kV 4 x 40 120 85 85 90 85 78

    C) BEACH (E48) Zone (1000MVA firm capacity)

    E19 Zone Total (MW)

    TRANSCO/AMD/PNDDNovember 2011

    Transco 2011 7YPS (2012-2018) Table A3 Sheet 2 of 10

  • Attachment-A

    S.N Substation Name/Code Capacity (MVA)Firm Capacity

    (MVA)2010 2012 2014 2016 2018

    Utilisation

    in 2018 (%)

    Table-A3 Abu Dhabi Emirate peak demand forecast for 16GW scenario at demand supply exit points(MW)

    6 Embassy-EMBS (W59) - 132/11kV 4 x 40 120 85 90 90 95 96 88

    7 Higher Tech. College-HTCO (E25) - 132/11kV 4 x 40 120 87 90 75 80 81 74

    8 GLFA (W47) - 132/11kV 4 x 40 120 98 100 100 100 100 92

    9 Khalifa Park-KHPK - 132/11kV 4 x 40 120 4 25 52 55 58 53

    10 DANET-DANT (E40) - 132/11kV 4 x 40 120 20 33 40 40 37

    11 ADNEC (W59/02)- 132/11kV 4 x 40 120 30 30 27

    609 650 675 725 735

    1Reem Island - 132/22kV S/S (each 4 x 80MVA)

    [T1-REEM; S1-SRUH; R1-RMDV; T2-Tomouh] 1280 960 15 35 90 100 11

    2 Suwa Island - 132/22kV 4 x 80 240 15 25 35 50 23

    30 60 125 150

    1Sadiyat Island - 132/22kV S/S (each 4 x 80MVA)

    [SS1-SDYT; SS4-SDBB; SS5-SDCC; SS6-SDDD] 1280 960 15 35 50 75 9

    15 35 50 75

    1,789 1,970 2,110 2,300 2,410Abu Dhabi Islands' Grand Total (MW)

    D) REEM Zone (1500MVA firm capacity)

    E) SADIYAT Zone (1500MVA firm capacity)

    REEM Zone Total (MW)

    E48 Zone Total (MW)

    SADIYAT Zone Total (MW)

    TRANSCO/AMD/PNDDNovember 2011

    Transco 2011 7YPS (2012-2018) Table A3 Sheet 3 of 10

  • Attachment-A

    S.N Substation Name/Code Capacity (MVA)Firm Capacity

    (MVA)2010 2012 2014 2016 2018

    Utilisation

    in 2018 (%)

    Table-A3 Abu Dhabi Emirate peak demand forecast for 16GW scenario at demand supply exit points(MW)

    1 Salt & Chlorine (SLTC) - 132/11kV 3 x 40 80 21 42 52 55 55 76

    2 S18 (JSRN) - 132/11kV 4 x 40 120 79 67 77 80 80 73

    3 Mussafah (MOS1) - 132/11kV 4 x 40 120 98 100 91 95 100 92

    4 Khalifa A (MKAA) - 132/11kV 4 x 40 120 109 105 105 105 100 92

    5 Old Airport (NADIA) - 132/11kV 4 x 40 120 44 56 61 61 65 60

    6 Khalifa B (MKBB) - 132/11kV 4 x 40 120 28 55 70 75 80 73

    7 Capital District/Mafraq -132/22kV 4 x 80 240 50 50 60 27

    8 Khalifa C (MKCC) [Watani & others]- 132/11kV 4 x 40 120 43 54 60 55

    379 425 550 575 600

    1 Watbha (WATH) - 220/33kV - existing 2 x 100 + 140+140 200 235 235 150

    2 Watbha (WATH) - 132/33kV 3 x 120 240 100 215 215 98

    3 Mahawi (MHWG) - 220/33kV - existing 3 x 140 280 205 271 200

    4 Mahawi (MHWG) - 132/33kV 4 x 120 360 100 310 320 98

    5 220/33kV Mobile Station at Mafraq (F1/ F2) 140 N/A 44 N/A

    F) SASN Zone (500MVA firm capacity upto Yr 2013; 1000MVA firm capacity from Yr 2014)

    G) MAHAWI Zone (1000MVA firm capacity)

    SASN Zone Total (MW)

    TRANSCO/AMD/PNDDNovember 2011

    Transco 2011 7YPS (2012-2018) Table A3 Sheet 4 of 10

  • Attachment-A

    S.N Substation Name/Code Capacity (MVA)Firm Capacity

    (MVA)2010 2012 2014 2016 2018

    Utilisation

    in 2018 (%)

    Table-A3 Abu Dhabi Emirate peak demand forecast for 16GW scenario at demand supply exit points(MW)

    6 Mussafah M12 - 132/11kV 4 x 40 120 27 36 45 41

    7 Mohd Bin Zayed (MBZ) - 132/22kV 4 x 80 240 14 47 50 23

    8 Al Nahda -132/33kV 3 x 120 240 59 92 95 43

    440 550 650 700 725

    1 BAHYA (BHYA)-132/33kV 2 x 140 140 86 83 85 90 95 75

    2 Yas Island S1 (YAS1)- 132/22kV 4 x 80 240 24 52 55 60 65 30

    3 Raha-B (RBBB) - 132/22kV 4 x 80 240 2 15 40 48 50 23

    4 Raha-A (RBAA) - 132/22kV 4 x 80 240 NL 20 24 25 11

    5 Al Falah S1 -132/22kV 4 x 80 240 30 35 95 43

    6 New Airport-132/22kV 4 x 80 240 40 45 45 21

    112 150 270 303 375

    1 220/33kV Mobile Stations 90 + 2 x 80 N/A 80 100 125

    2 Shamkha-132/33kV 3 x 120 240 98 105 48

    3 South Shamkha/Shamkha Housing-132/22kV 4 x 80 240 52 70 32

    80 100 125 150 175

    MAHAWI Zone Total (MW)

    BAHIA Zone Total (MW)

    I) SHAMKHA Zone (500MVA firm capacity)

    SHAMKHA Zone Total (MW)

    H) BAHIA Zone (1500MVA firm capacity)

    TRANSCO/AMD/PNDDNovember 2011

    Transco 2011 7YPS (2012-2018) Table A3 Sheet 5 of 10

  • Attachment-A

    S.N Substation Name/Code Capacity (MVA)Firm Capacity

    (MVA)2010 2012 2014 2016 2018

    Utilisation

    in 2018 (%)

    Table-A3 Abu Dhabi Emirate peak demand forecast for 16GW scenario at demand supply exit points(MW)

    1 Mussafah (MOSG) - 220/33kV 3 x 140 280 284 250 250 250 250 98

    2 MGIC - 220/33kV 4 x 140 420 186 246 280 290 300 78

    3ICAD Steel -GHC & Emirates (MOSF) - 220/11kV (40+2x60+2x90) &

    220/33kV (2x180+2x60+63)

    (40+2x60+2x90)+

    (2x180+2x60+63)TBC 140 450 450 450 450 TBC

    4 ICAD - 220/33kV 2 x 3 x 100 200 + 200 29 95 100 170 47

    5 ICAD/Emirates Steel Extension TBC TBC 345 345 N/A

    610 975 1,075 1,435 1,515

    1 Taweela A -132/33kV (KPIZ loads) 3x100 + 2x140 200+140 35 50 100 175 200 65

    35 50 100 175 200

    1 Shahama East (SHME) - 220/33kV 3 x 140 280 114 115 120 140 150 59

    2 Samha (SMHG) - 220/33kV 2 x 140 140 44 45 45 50 55 43

    3 Ghantoot - 220/33kV 2 x 140 140 10 10 20 16

    158 160 175 200 225

    1,814 2,410 2,945 3,537 3,815

    L) Other 220/33kV Substations in Abu Dhabi Mainland

    J) MUSSAFAH (1000MVA firm capacity) & ICAD Zone (1000MVA firm capacity)

    Eastern Region Grand Total ( MW)

    Others (MW)

    K) TAWEELA/KPIZ Zone

    TAWEELA/KPIZ Zone Total (MW)

    MUSSAFAH & ICAD Zone Total (MW)

    TRANSCO/AMD/PNDDNovember 2011

    Transco 2011 7YPS (2012-2018) Table A3 Sheet 6 of 10

  • Attachment-A

    S.N Substation Name/Code Capacity (MVA)Firm Capacity

    (MVA)2010 2012 2014 2016 2018

    Utilisation

    in 2018 (%)

    Table-A3 Abu Dhabi Emirate peak demand forecast for 16GW scenario at demand supply exit points(MW)

    1 Liwa (LWWR) - 220/33kV 3 x 100 200 141 105 138 150 180 99

    2 Madinat Zayed (WMZD) - 220/33kV 2x100+140 200 93 95 95 100 120 66

    3 Sila (SLWR) - 220/33kV 2 x 80 + 80 160 24 40 50 55 55 38

    4 Mirfa (MRWR) - 220/33kV 2 x 100 100 36 40 55 60 70 77

    5 Ruwais (RWWR) - 220/33kV 2 x 140 140 71 75 82 95 95 75

    6 Central (CNTG)-220/33kV 2 x 140 140 8 15 22 26 30 24

    7 Liwa West 220/33kV Mobile Station 80 N/A 16 18 18 18 18 N/A

    8 Ghayathi - 220/33kV 2 x 140 140 4 26 45 45 45 35

    9 Delma Island (132/11kV) 2 x 40 40 14 21 22 22 22 60

    10 Hameem 220/33kV Mobile Station (Qasr Al Sarab) 80 N/A 25 25 25 25 N/A

    11 220/33kV Mobile (Qusahwira/Umm Al Zamool) 100 N/A 15 15 15 15 N/A

    12 Sir Baniyas Island - 132/11kV 3 x 40 80 20 20 27

    407 475 567 631 695

    1 DABIYA 220/33kV 2 x 110 110 47 50 53 54 70 70

    Sub-Total-1 (MW)

    M) 220kV and 132kV Substations in Western Region

    N) 220kV Substations in Western Region for ADNOC Group

    TRANSCO/AMD/PNDDNovember 2011

    Transco 2011 7YPS (2012-2018) Table A3 Sheet 7 of 10

  • Attachment-A

    S.N Substation Name/Code Capacity (MVA)Firm Capacity

    (MVA)2010 2012 2014 2016 2018

    Utilisation

    in 2018 (%)

    Table-A3 Abu Dhabi Emirate peak demand forecast for 16GW scenario at demand supply exit points(MW)

    2 RUMAITHY 220/33kV 2 x 50 50 14 15 15 20 20 44

    3 BUHASA 220/33kV 2x140 + 2x140 280 58 80 100 110 125 49

    4BAB- 220/132kV (2x320MVA); 220/33kV (2x150MVA)-Bab

    compressor; 220/33kV (2x140MVA)-OGD III2x320+2x150+2x140 320+150+140 88 200 225 250 275 50

    5 ASAB - 220/132kV (2 x 200MVA) 2 x 200 200 44 65 90 95 100 55

    6 Qusahwira - 220/33kV (for ADCO 1.8MMBD Proj) TBC TBC 20 20 40 60

    7 AL HOSN GAS (SHAH-SGD) TBC TBC 295 295

    8 ELIXIER-II GASCO (Near Mirfa P.S) - 220/33kV 2x140 + 2x140 280 190 190 190 190 75

    9 RUWAIS TBC TBC 650 650 650

    251 620 1,343 1,704 1,785

    658 1,095 1,910 2,335 2,480

    1 Sweihan (SWHG) 2x80+140 160 81 90 95 98 98 67

    2 Al-Hayer (AHYG) 3 x 80 160 62 70 75 77 77 53

    3 Ramah (RMAG) 3 x 140 280 106 110 115 115 115 45

    4 Al Khazna (KHZG) 2 x 140 140 38 50 55 55 55 43

    5 Al Salamat (SLMG) 3 x 140 280 117 130 135 140 140 55

    O) Sweihan Grid (1000MVA firm capacity)

    Gharbia Region Grand Total (MW)

    Sub-Total-2 (MW)

    TRANSCO/AMD/PNDDNovember 2011

    Transco 2011 7YPS (2012-2018) Table A3 Sheet 8 of 10

  • Attachment-A

    S.N Substation Name/Code Capacity (MVA)Firm Capacity

    (MVA)2010 2012 2014 2016 2018

    Utilisation

    in 2018 (%)

    Table-A3 Abu Dhabi Emirate peak demand forecast for 16GW scenario at demand supply exit points(MW)

    6 Al-Mukkam 3 x 120 240 35 40 18

    404 450 475 520 525

    1 Al Foah (AOHG) 2 x 140 140 76 76 78 80 80 63

    2 Dahma (DHMG) 3 x 80 160 108 110 110 115 120 82

    3 AAPS (2x100+2x80+2x80) (2x100+2x80+2x80) 100+80+80 182 182 182 182 182 77

    4 City Centre (CTCG) 3 x 140 280 140 142 145 148 148 58

    5 Zakher (ZAKG) 3x120 + 2x140 380 211 210 210 210 220 64

    6 New Grid Station in Al-Ain Power House 3 x 120 240 50 50 23

    717 720 725 785 800

    1 Mazyad (MZDG) 2x140+140 280 97 100 105 110 110 43

    2 Sanaiya (SNYG) 3 x 140 280 185 185 200 215 215 84

    3 Al-Ain South West (ASWG) 3 x 140 280 58 60 65 70 70 27

    5 Al-Arad (ARDG) 2 x 140 140 84 85 85 85 85 67

    Q) Al-Ain South West Grid (1000MVA firm capacity)

    Subtotal (Sweihan Grid Zone)

    P) Dahma Grid (1000MVA firm capacity)

    Subtotal (Dahma Grid Zone)

    TRANSCO/AMD/PNDDNovember 2011

    Transco 2011 7YPS (2012-2018) Table A3 Sheet 9 of 10

  • Attachment-A

    S.N Substation Name/Code Capacity (MVA)Firm Capacity

    (MVA)2010 2012 2014 2016 2018

    Utilisation

    in 2018 (%)

    Table-A3 Abu Dhabi Emirate peak demand forecast for 16GW scenario at demand supply exit points(MW)

    6 Al-Wagon (AWGG) 3 x 80 160 103 60 60 60 60 41

    7 Umn Al Oush 2 x 140 140 35 35 35 35 27

    8 Al-Ain Industrial City (AAIC) 3 x 140 280 50 50 50 50 20

    9 Ain Al Fydha 3 x 120 240 30 14

    527 575 600 625 655

    1,648 1,745 1,800 1,930 1,980

    Subtotal (Al-Ain South West Grid Zone)

    Al-Ain Region Grand Total (MW)

    TRANSCO/AMD/PNDDNovember 2011

    Transco 2011 7YPS (2012-2018) Table A3 Sheet 10 of 10

  • Attachment-A

    S.N Substation Name/Code Capacity (MVA)Firm Capacity

    (MVA)2010 2012 2014 2016 2018

    Utilisation

    in 2018 (%)

    1 ADST (132/33kV S/S) 2 x 120 120 71 77 46 37 37 34

    2 Market 1-MKT1 (W1) - 132/11kV 4 x 40 120 74 50 56 63 65 60

    3 Capital Gardens-CPGR (E08) - 132/11kV 4 x 40 120 89 95 96 90 95 87

    4 Firdous-FRDS (E09) - 132/11kV 4 x 40 120 53 65 70 78 80 73

    5 Zayed 2nd St-ZYD2 (E11) - 132/11kV 4 x 40 120 76 90 100 105 105 96

    6 Tourist Club-TCLB (E15) - 132/11kV 4 x 40 120 71 78 82 86 90 82

    7 Port (E14) - 132/11kV - See Note 1 4 x 40 120 46 60 70 83 85 78

    8 Market-MRKT (W02) - 132/11kV 3 x 40 80 48

    9 New W02 (Replacement of old W02) - 132/11kV 4 x 40 120 65 70 80 85 78

    10 Souq (E01) - 132/11kV 4 x 40 120 45 55 68 70 64

    11 Corniche Hosp/Saraya (E12) - 132/11kV 4 x 40 120 50 53 58 53

    12 E03 - 132/11kV 4 x 40 120 55 57 60 54

    528 625 750 800 830

    1 QURM (E19) - 132/11kV 4 x 40 120 64 74 90 99 109 100

    2 Madinat Zayed-MDZD (E04) - 132/11kV 4 x 40 120 98 99 65 68 73 67

    B) AL-QURM (E19) Zone (Firm capacity 1000MVA)

    Table-A4 Abu Dhabi Emirate peak demand forecast for 24GW scenario at demand supply exit points(MW)

    A) ADST Zone (Firm capacity 1000MVA)

    ADST Zone Total (MW)

    TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A4 Sheet 1 of 10

  • Attachment-A

    S.N Substation Name/Code Capacity (MVA)Firm Capacity

    (MVA)2010 2012 2014 2016 2018

    Utilisation

    in 2018 (%)

    Table-A4 Abu Dhabi Emirate peak demand forecast for 24GW scenario at demand supply exit points(MW)

    3 Khalidiya-KLDY (W09) - 132/11kV 4 x 40 120 93 100 103 105 105 96

    4 Al Jazeira Hosp-JZRH (W13) - 132/11kV 4 x 40 120 98 102 95 92 100 92

    5 Bateen-BATN (W16) - 132/11kV 4 x 40 120 88 95 97 100 103 94

    6 Bateen Bus Station-BSTN (W17) - 132/11kV 4 x 40 120 84 90 95 100 103 94

    7 Conference Palace (CONH) - 132/11kV 4 x 40 120 46 53 60 65 72 66

    8 Marina Mall-MRML - 132/11kV 4 x 40 120 27 38 50 65 71 65

    9 CLNS (E16/02) - 132/11kV 4 x 40 120 54 65 70 75 80 73

    10 Green Head-GRHD (W41) - 132/11kV 4 x 40 120 35 40 55 60 55

    11 Presidential Palace (Ras Al Akdar) - 132/11kV 3 x 40 80 35 35 35 48

    652 750 800 860 911

    1 Beach-BECH (E48) - 132/11kV 4 x 40 120 100 93 103 105 105 96

    2 Al Salam-ALSM (E18) - 132/11kV 3 x 40 80 64 67 63 58 60 82

    3 Falah-FLAH (E18/02) - 132/11kV 4 x 40 120 90 85 90 95 95 87

    4 Mushrif -MSRF (W24) - 132/11kV 4 x 40 120 81

    C) BEACH (E48) Zone (Firm capacity 1000MVA)

    E19 Zone Total (MW)

    TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A4 Sheet 2 of 10

  • Attachment-A

    S.N Substation Name/Code Capacity (MVA)Firm Capacity

    (MVA)2010 2012 2014 2016 2018

    Utilisation

    in 2018 (%)

    Table-A4 Abu Dhabi Emirate peak demand forecast for 24GW scenario at demand supply exit points(MW)

    5 New W24 (Replacement of Old W24) - 132/11kV 4 x 40 120 95 104 82 85 78

    6 Embassy-EMBS (W59) - 132/11kV 4 x 40 120 85 95 90 99 100 92

    7 Higher Tech. College-HTCO (E25) - 132/11kV 4 x 40 120 87 100 75 83 85 78

    8 GLFA (W47) - 132/11kV 4 x 40 120 98 103 103 103 103 94

    9 Khalifa Park-KHPK - 132/11kV 4 x 40 120 4 32 52 66 67 61

    10 DANET-DANT (E40) - 132/11kV 4 x 40 120 30 50 70 70 64

    11 ADNEC (W59/02)- 132/11kV 4 x 40 120 50 74 75 69

    12 E25/02 - 132/11kV 4 x 40 120 20 28 30 27

    13 W24/02 - 132/11kV 4 x 40 120 28 30 27

    14 Zayed Sports City (W57) - 132/11kV 4 x 40 120 20 18

    609 700 800 890 925

    1132/11kV Substations (4 Nos) to meet demand requirements in

    E48 & SASN/UAN Zone4 x (4 x 40) 480 400

    1Reem Island - 132/22kV S/S (each 4 x 80MVA)

    [T1-REEM; S1-SRUH; R1-RMDV; T2-Tomouh] 1280 960 30 60 120 260 30

    2 Suwa Island - 132/22kV 4 x 80 240 15 25 35 60 27

    45 85 155 320

    E) REEM Zone (Firm capacity 1500MVA)

    REEM Zone Total (MW)

    D) Zyed City Zone (Firm capacity 1000MVA)

    E48 Zone Total (MW)

    TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A4 Sheet 3 of 10

  • Attachment-A

    S.N Substation Name/Code Capacity (MVA)Firm Capacity

    (MVA)2010 2012 2014 2016 2018

    Utilisation

    in 2018 (%)

    Table-A4 Abu Dhabi Emirate peak demand forecast for 24GW scenario at demand supply exit points(MW)

    1Sadiyat Island - 132/22kV S/S (each 4 x 80MVA)

    [SS1-SDYT; SS4-SDBB; SS5-SDCC; SS6-SDDD] 1280 960 20 45 135 200 23

    20 45 135 200

    1,789 2,140 2,480 2,840 3,586

    1 Salt & Chlorine (SLTC) - 132/11kV 3 x 40 80 21 50 52 60 70 96

    2 S18 (JSRN) - 132/11kV 4 x 40 120 79 75 77 90 105 96

    3 Mussafah (MOS1) - 132/11kV 4 x 40 120 98 100 91 105 105 96

    4 Khalifa A (MKAA) - 132/11kV 4 x 40 120 109 105 105 105 100 92

    5 Old Airport (NADIA) - 132/11kV 4 x 40 120 44 56 61 68 74 68

    6 Khalifa B (MKBB) - 132/11kV 4 x 40 120 28 79 70 82 100 92

    7 Capital District/Mafraq -132/22kV 4 x 80 240 80 100 120 55

    8 Khalifa C (MKCC) [Watani & others]- 132/11kV 4 x 40 120 83 90 100 92

    9 Khalifa D (MKDD) - 132/11kV 4 x 40 120 76 70

    379 465 620 700 850

    F) SADIYAT Zone (Firm capacity 1500MVA)

    Abu Dhabi Islands' Grand Total (MW)

    SASN Zone Total (MW)

    SADIYAT Zone Total (MW)

    F) SASN Zone (Firm capacity 500MVA upto Yr 2013; 1000MVA firm capacity from Yr 2013)

    TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A4 Sheet 4 of 10

  • Attachment-A

    S.N Substation Name/Code Capacity (MVA)Firm Capacity

    (MVA)2010 2012 2014 2016 2018

    Utilisation

    in 2018 (%)

    Table-A4 Abu Dhabi Emirate peak demand forecast for 24GW scenario at demand supply exit points(MW)

    1 Watbha (WATH) - 220/33kV - existing 2 x 100 + 140+ 140 200 235 235 150

    2 Watbha (WATH) - 132/33kV 3 x 120 240 100 215 215 98

    3 Mahawi (MHWG) - 220/33kV - existing 3 x 140 280 205 270 200

    4 Mahawi (MHWG) - 132/33kV 4 x 120 360 100 310 320 98

    5 220/33kV Mobile Station for Mafraq F1/ F2 140 N/A 70 N/A

    6 Mussafah M12 - 132/11kV 4 x 40 120 30 55 80 73

    7 Mohd Bin Zayed (MBZ) - 132/22kV 4 x 80 240 55 100 125 57

    8 Al Nahda -132/33kV 3 x 120 240 65 120 160 73

    440 575 700 800 900

    1 BAHYA (BHYA)-132/33kV 2 x 140 140 86 83 103 115 125 98

    2 Yas Island S1 (YAS1)- 132/22kV 4 x 80 240 24 62 96 110 135 62

    3 Raha-B (RBBB) - 132/22kV 4 x 80 240 2 15 46 56 70 32

    4 Raha-A (RBAA) - 132/22kV 4 x 80 240 NL 20 24 30 14

    5 Al Falah S2 (Global Foundaries) - 132/22kV 4 x 60 180 50 100 61

    G) MAHAWI Zone (Firm capacity 1000MVA)

    H) BAHIA Zone (Firm capacity 1500MVA)

    MAHAWI Zone Total (MW)

    TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A4 Sheet 5 of 10

  • Attachment-A

    S.N Substation Name/Code Capacity (MVA)Firm Capacity

    (MVA)2010 2012 2014 2016 2018

    Utilisation

    in 2018 (%)

    Table-A4 Abu Dhabi Emirate peak demand forecast for 24GW scenario at demand supply exit points(MW)

    6 Al Falah S1 -132/22kV 4 x 80 240 40 55 100 46

    7 New Airport-132/22kV 4 x 80 240 40 70 80 37

    112 160 345 480 640

    1 220/33kV Mobile Stations 90 + 2 x 80 N/A 80 100 125

    2 Shamkha-132/33kV 3 x 120 240 98 135 62

    3 South Shamkha/Shamkha housing-132/22kV 4 x 80 240 52 115 53

    80 100 125 150 250

    1 Mussafah (MOSG) - 220/33kV 3 x 140 280 284 250 250 250 250 98

    2 MGIC - 220/33kV: See Note 8 4 x 140 420 186 275 300 330 360 94

    3ICAD Steel -GHC & Emirates (MOSF) -220/11kV (40+2x60+2x90)

    & 220/33kV (2x180+2x60+63)

    (40+2x60+2x90)+

    (2x180+2x60+63)TBC 140 450 450 450 450 TBC

    4 ICAD - 220/33kV 2 x 3 x 100 200 + 200 50 200 220 290 80

    5 ICAD/Emirates Steel Extension TBC TBC 450 450 N/A

    6 Hameem Junction 400 750

    610 1,025 1,200 2,100 2,550

    BAHIA Zone Total (MW)

    J) MUSSAFAH & ICAD Zone (Firm Capacity 1000MVA + 1000MVA)

    I) SHAMKHA Zone (Firm capacity 500MVA)

    SHAMKHA Zone Total (MW)

    MUSSAFAH & ICAD Zone Total (MW)

    TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A4 Sheet 6 of 10

  • Attachment-A

    S.N Substation Name/Code Capacity (MVA)Firm Capacity

    (MVA)2010 2012 2014 2016 2018

    Utilisation

    in 2018 (%)

    Table-A4 Abu Dhabi Emirate peak demand forecast for 24GW scenario at demand supply exit points(MW)

    1 TaweelahA -132/33kV (KPIZ loads) 3x100 + 2x140+140 200+280 35 70 125 400 450 103

    2 Taweela - 220/33kV 3 x 100 200 150 150 82

    35 70 125 550 600

    1 Shahama East (SHME) - 220/33kV 3 x 140 280 114 128 145 166 191 75

    2 Samha (SMHG) - 220/33kV 2 x 140 140 44 73 85 95 100 78

    3 Ghantoot - 220/33kV 2 x 140 140 20 40 60 47

    158 201 250 301 351

    1,814 2,596 3,365 5,081 6,141

    1 Liwa (LWWR) - 220/33kV 3 x 100 200 141 117 131 141 175 96

    2 Madinat Zayed (WMZD) - 220/33kV 2x100+140 200 93 97 122 129 151 83

    3 Sila (SLWR) - 220/33kV 2 x 80 + 80 160 24 40 90 99 109 75

    4 Mirfa (MRWR) - 220/33kV 2 x 100 100 36 57 70 75 90 99

    5 Ruwais (RWWR) - 220/33kV 2 x 140 140 71 75 86 95 106 83

    Eastern Region Grand Total -MW

    Others (MW)

    K) TAWEELA/KPIZ Zone

    TAWEELA/KPIZ Zone Total (MW)

    L) Other 220/33kV Substations in Abu Dhabi Mainland

    M) 220kV and 132kV Substations in Western Region

    TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A4 Sheet 7 of 10

  • Attachment-A

    S.N Substation Name/Code Capacity (MVA)Firm Capacity

    (MVA)2010 2012 2014 2016 2018

    Utilisation

    in 2018 (%)

    Table-A4 Abu Dhabi Emirate peak demand forecast for 24GW scenario at demand supply exit points(MW)

    6 Central (CNTG)-220/33kV 2 x 140 140 8 45 45 48 79 62

    7 Liwa West 220/33kV Mobile Station 80 N/A 16 18 18 18 18 N/A

    8 Ghayathi - 220/33kV 2 x 140 140 4 49 66 73 84 66

    9 Delma Island (132/11kV) 2 x 40 40 14 21 22 22 22 60

    10 Hameem 220/33kV Mobile Station (Qasr Al Sarab) 80 N/A 25 25 25 25 N/A

    11 220/33kV Mobile (Qusahwira/Umm Al Zamool) 100 N/A 15 15 15 15 N/A

    12 Sir Baniyas Island - 132/11kV 3 x 40 80 40 45 45 62

    13 ChemawEyaat 50 110 800

    407 559 780 895 1,720

    1 DABIYA 220/33kV 2 x 110 110 47 50 50 72 76 76

    2 RUMAITHY 220/33kV 2 x 50 50 14 15 15 20 20 44

    3 BUHASA 220/33kV 2x140 + 2x140 280 58 105 105 245 250 98

    4BAB- 220/132kV (2x320MVA); 220/33kV (2x150MVA)-Bab

    compressor; 220/33kV (2x140MVA)-OGD III2x320+2x150+2x140 320+150+140 88 245 285 560 565 102

    5 ASAB - 220/132kV (2 x 200MVA) 2 x 200 200 44 125 125 300 300 165

    6 Qusahwira - 220/33kV (for ADCO 1.8MMBD Proj) TBC TBC 30 30 60 80

    Sub-Total-1 (MW)

    N) 220kV Substations in Western Region for ADNOC Group

    TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A4 Sheet 8 of 10

  • Attachment-A

    S.N Substation Name/Code Capacity (MVA)Firm Capacity

    (MVA)2010 2012 2014 2016 2018

    Utilisation

    in 2018 (%)

    Table-A4 Abu Dhabi Emirate peak demand forecast for 24GW scenario at demand supply exit points(MW)

    7 AL HOSN GAS (SHAH-SGD) TBC TBC 330 330 330

    8 ELIXIER-II GASCO (Near Mirfa P.S) - 220/33kV 2x140 + 2x140 280 190 190 190 190 75

    9 RUWAIS TBC TBC 885 885 885

    251 760 2,015 2,662 2,696

    658 1,319 2,795 3,557 4,416

    1 Sweihan (SWHG) 2x80 + 140 160 81 115 120 130 141 97

    2 Al-Hayer (AHYG) 3 x 80 160 62 75 85 95 100 69

    3 Ramah (RMAG) 3 x 140 280 106 110 120 135 145 57

    4 Al Khazna (KHZG) 2 x 140 140 38 75 80 90 95 74

    5 Al Salamat (SLMG) 3 x 140 280 117 200 180 190 200 78

    6 Al-Mukkam 3 x 120 240 100 110 120 55

    404 575 685 750 800

    1 Al Foah (AOHG) 2 x 140 140 76 95 100 115 115 90

    2 Dahma (DHMG) 3 x 80 160 108 140 140 145 145 100

    O) Sweihan Grid (1000MVA firm capacity)

    Subtotal (Sweihan Grid Zone)

    P) Dahma Grid (1000MVA firm capacity)

    Gharbia Region Grand Total (MW)

    Sub-Total-2 (MW)

    TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A4 Sheet 9 of 10

  • Attachment-A

    S.N Substation Name/Code Capacity (MVA)Firm Capacity

    (MVA)2010 2012 2014 2016 2018

    Utilisation

    in 2018 (%)

    Table-A4 Abu Dhabi Emirate peak demand forecast for 24GW scenario at demand supply exit points(MW)

    3 AAPS (2x100+2x80+2x80) N/A 260 182 210 190 175 175 74

    4 City Centre (CTCG) 3 x 140 280 140 145 150 160 160 63

    5 Zakher (ZAKG) 3x120 + 2x140 380 211 210 210 240 240 69

    6 New Grid Station in Al-Ain Power House 3 x 120 240 60 65 65 30

    717 800 850 900 900

    1 Mazyad (MZDG) 2 x 140 + 140 280 97 115 120 139 150 59

    2 Sanaiya (SNYG) 3 x 140 280 185 190 200 215 220 86

    3 Al-Ain South West (ASWG) 3 x 140 280 58 90 95 100 115 45

    4 Al-Arad (ARDG) 2 x 140 140 84 95 100 110 120 94

    5 Al-Wagon (AWGG) 3 x 80 160 103 60 70 80 85 58

    6 Umn Al Oush 2 x 140 140 35 45 50 85 67

    7 Al-Ain Industrial City (AAIC) 3 x 140 280 70 70 70 70 27

    8 Ain Al Fydha 3 x 120 240 50 50 55 25

    527 655 750 815 900

    220

    1,648 2,030 2,285 2,465 2,820

    Q) Al-Ain South West Grid (1000MVA firm capacity)

    Subtotal (Dahma Grid Zone)

    Al-Ain Region Grand Total (MW)

    Al-Ain Airport

    Subtotal (Dahma Grid Zone)

    TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A4 Sheet 10 of 10

  • Attachment-A

    2010 2011 2012 2013 2014 2015 2016 2017 2018

    1,789 1,981 2,086 2,239 2,359 2,472 2,657 2,835 3,031

    1,814 2,129 2,547 2,811 3,136 3,968 4,195 4,530 5,028

    658 1,031 1,247 1,710 2,289 2,765 2,840 2,980 3,030

    1,648 1,835 2,000 2,094 2,182 2,249 2,350 2,421 2,522

    5,909 6,976 7,879 8,854 9,966 11,454 12,041 12,765 13,611

    757 780 780 780 815 940 940 990 1,075

    6,666 7,756 8,659 9,634 10,781 12,394 12,981 13,755 14,686

    1,445 1,700 2,100 3,324 3,420 3,790 3,899 4,236 4,480

    270 285 285 323 335 450 450 450 450

    1,715 1,985 2,385 3,647 3,755 4,240 4,349 4,686 4,930

    104 104 123 155 194 217 252 342 430

    8,485 9,845 11,167 13,436 14,730 16,851 17,582 18,783 20,046

    Table-A5 Sum of region-wise peak demand forecast for 20GW scenario (MW)

    Grand Total (MW)

    C) Estimated Transmission Losses (MW)

    1) Northern Emirates (MW)

    Sub-Total1 (MW)

    Description/Region

    2) Eastern Region

    3) Gharbia (Western) Region

    4) Al-Ain Region

    Total - Northern Emirates (MW)

    Total -Abu Dhabi Emirate (MW)

    A) Abu Dhabi Emirate

    Aux & Desal Loads in Abu Dhabi Emirate (MW)

    2) Water pumping & Aux Loads in N.E (MW)

    B) Northern Emirates

    1) Abu Dhabi Islands

    TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A5 Sheet 1 of 1

  • Attachment - A

    S.N Substation Name/Code Capacity (MVA)Firm Capacity

    (MVA)2010 2011 2012 2013 2014 2015 2016 2017 2018

    Utilisation

    in 2018 (%)

    1 ADST (132/33kV S/S) 2 x 120 120 71 74 77 51 46 37 37 37 37 34

    2 Market 1-MKT1 (W1) - 132/11kV 4 x 40 120 74 70 50 53 55 58 61 64 65 60

    3 Capital Gardens-CPGR (E08) - 132/11kV 4 x 40 120 89 92 95 98 96 83 87 92 95 87

    4 Firdous-FRDS (E09) - 132/11kV 4 x 40 120 53 58 63 59 60 65 73 77 80 74

    5 Zayed 2nd St-ZYD2 (E11) - 132/11kV 4 x 40 120 76 83 87 92 96 100 105 105 105 96

    6 Tourist Club-TCLB (E15) - 132/11kV - See Note 1 4 x 40 120 71 74 78 82 82 82 86 90 90 82

    7 Port (E14) - 132/11kV - See Note 1 4 x 40 120 46 51 56 61 67 70 73 77 80 74

    8 Market-MRKT (W02) - 132/11kV 3 x 40 80 48 35

    9 New W02 (Replacement of old W02) - 132/11kV 4 x 40 120 28 66 67 70 73 77 80 85 77

    10 Souq (E01) - 132/11kV 4 x 40 120 29 30 32 44 59 62 65 68 63

    11 Corniche Hosp/Saraya (E12) - 132/11kV 4 x 40 120 43 48 50 51 54 57 53

    12 E03 - 132/11kV 4 x 40 120 21 38 40 46 57 60 54

    528 594 603 658 702 717 758 798 823

    1 QURM (E19) - 132/11kV 4 x 40 120 64 70 74 77 81 85 89 94 98 90

    2 Madinat Zayed-MDZD (E04) - 132/11kV 4 x 40 120 98 101 99 78 61 64 67 71 74 68

    3 Khalidiya-KLDY (W09) - 132/11kV 4 x 40 120 93 98 100 100 103 103 105 105 105 96

    4 Al Jazeira Hosp-JZRH (W13) - 132/11kV 4 x 40 120 98 99 103 90 95 88 92 97 102 93

    5 Bateen-BATN (W16) - 132/11kV 4 x 40 120 88 94 95 95 98 98 100 100 103 94

    6 Bateen Bus Station-BSTN (W17) - 132/11kV 4 x 40 120 84 87 90 91 91 95 100 100 103 94

    Table-A6 Abu Dhabi Emirate peak demand forecast for 20GW scenario at demand supply exit points (MW)

    A) ADST Zone (Firm capacity 1000MVA)

    ADST Zone Total (MW)

    B) AL-QURM (E19) Zone (Firm capacity 1000MVA)

    TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A6 Sheet 1 of 9

  • Attachment - A

    S.N Substation Name/Code Capacity (MVA)Firm Capacity

    (MVA)2010 2011 2012 2013 2014 2015 2016 2017 2018

    Utilisation

    in 2018 (%)

    Table-A6 Abu Dhabi Emirate peak demand forecast for 20GW scenario at demand supply exit points (MW)

    7 Conference Palace (CONH) - 132/11kV 4 x 40 120 46 50 53 55 58 61 64 67 70 64

    8 Marina Mall-MRML - 132/11kV 4 x 40 120 27 28 28 32 34 38 41 43 78 71

    9 CLNS (E16/02) - 132/11kV - See Note 1 4 x 40 120 54 58 61 64 67 70 74 77 81 74

    10 Green Head-GRHD (W41) - 132/11kV 4 x 40 120 9 29 30 32 41 54 57 60 55

    11 Presidential Palace (Ras Al Akdar) - 132/11kV 3 x 40 80 20 35 35 35 35 35 48

    652 694 731 733 754 778 821 845 909

    1 Beach-BECH (E48) - 132/11kV 4 x 40 120 100 91 93 100 103 105 105 105 105 96

    2 Al Salam-ALSM (E18) - 132/11kV 3 x 40 80 64 65 67 69 63 55 58 59 60 82

    3 Falah-FLAH (E18/02) - 132/11kV 4 x 40 120 90 95 85 87 90 90 95 95 95 87

    4 Mushrif -MSRF (W24) - 132/11kV 4 x 40 120 81

    5 New W24 (Replacement of Old W24) - 132/11kV 4 x 40 120 85 95 104 104 94 82 84 85 78

    6 Embassy-EMBS (W59) - 132/11kV 4 x 40 120 85 90 95 80 89 94 99 99 100 92

    7 Higher Tech. College-HTCO (E25) - 132/11kV 4 x 40 120 87 94 100 103 75 79 83 83 85 78

    8 GLFA (W47) - 132/11kV 4 x 40 120 98 100 103 103 103 103 103 103 103 94

    9 Khalifa Park-KHPK - 132/11kV - See Note 2 4 x 40 120 4 16 31 41 52 63 66 66 67 61

    10 DANET-DANT (E40) - 132/11kV 4 x 40 120 15 25 40 42 44 67 70 70 64

    11 ADNEC (W59/02)- 132/11kV - See Note 2 4 x 40 120 20 45 59 74 74 75 69

    12 E25/02 - 132/11kV 4 x 40 120 5 18 22 28 28 30 27

    E19 Zone Total (MW)

    C) BEACH (E48) Zone (Firm capacity 1000MVA)

    TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A6 Sheet 2 of 9

  • Attachment - A

    S.N Substation Name/Code Capacity (MVA)Firm Capacity

    (MVA)2010 2011 2012 2013 2014 2015 2016 2017 2018

    Utilisation

    in 2018 (%)

    Table-A6 Abu Dhabi Emirate peak demand forecast for 20GW scenario at demand supply exit points (MW)

    13 W24/02 - 132/11kV 4 x 40 120 15 28 28 30 27

    14 Zayed Sports City (W57) - 132/11kV - See Note 2 4 x 40 120 20 18

    609 651 694 752 784 823 887 894 925

    1Reem Island - 132/22kV S/S (each 4 x 80MVA)

    [T1-REEM; S1-SRUH; R1-RMDV; T2-Tomouh] 1280 960 18 25 40 50 72 96 160 200 23

    2 Suwa Island - 132/22kV 4 x 80 240 10 15 20 25 30 35 50 60 27

    28 40 60 75 102 131 210 260

    1Sadiyat Island - 132/22kV S/S (each 4 x 80MVA)

    [SS1-SDYT; SS4-SDBB; SS5-SDCC; SS6-SDDD] 1280 960 14 19 36 44 52 60 88 114 13

    14 19 36 44 52 60 88 114

    1,789 1,981 2,086 2,239 2,359 2,472 2,657 2,835 3,031

    1 Salt & Chlorine (SLTC) - 132/11kV 3 x 40 80 21 38 45 50 52 54 60 70 70 96

    2 S18 (JSRN) - 132/11kV 4 x 40 120 79 64 67 70 77 85 90 99 105 96

    3 Mussafah (MOS1) - 132/11kV 4 x 40 120 98 98 100 83 91 100 105 105 105 96

    4 Khalifa A (MKAA) - 132/11kV 4 x 40 120 109 105 105 105 105 105 105 90 100 92

    5 Old Airport (NADIA) - 132/11kV 4 x 40 120 44 53 56 58 61 64 68 70 74 68

    6 Khalifa B (MKBB) - 132/11kV 4 x 40 120 28 43 55 60 70 78 80 90 100 92

    7 Capital District/Mafraq -132/22kV 4 x 80 240 22 50 56 60 73 112 51

    F) SASN Zone (Firm capacity 500MVA upto Yr 2013; 1000MVA firm capacity from Yr 2014)

    REEM Zone Total (MW)

    E) SADIYAT Zone (Firm capacity 1500MVA)

    SADIYAT Zone Total (MW)

    Abu Dhabi Islands' Total (MW)

    E48 Zone Total (MW)

    D) REEM Zone (Firm capacity 1500MVA)

    TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A6 Sheet 3 of 9

  • Attachment - A

    S.N Substation Name/Code Capacity (MVA)Firm Capacity

    (MVA)2010 2011 2012 2013 2014 2015 2016 2017 2018

    Utilisation

    in 2018 (%)

    Table-A6 Abu Dhabi Emirate peak demand forecast for 20GW scenario at demand supply exit points (MW)

    8 Khalifa C (MKCC) [Watani & others]- 132/11kV 4 x 40 120 29 57 62 70 80 100 92

    9 Khalifa D (MKDD) - 132/11kV 4 x 40 120 30 50 46

    379 401 428 477 564 604 638 707 816

    1 Watbha (WATH) - 220/33kV - existing see Note 9 2 x 100 + 140+140 200 235 235 235 235 150

    2 Watbha (WATH) - 132/33kV 3 x 120 240 100 215 215 215 215 98

    3 Mahawi (MHWG) - 220/33kV - existing 3 x 140 280 205 236 271 275 200

    4 Mahawi (MHWG) - 132/33kV 4 x 120 360 100 300 310 320 320 98

    5 220/33kV Mobile Station for Mafraq F1/ F2 140 N/A 35 55 60 N/A

    6 Mussafah M12 - 132/11kV - See Note 12 4 x 40 120 25 27 31 36 41 47 54 50

    7 Mohd Bin Zayed (MBZ) - 132/22kV 4 x 80 240 14 28 47 52 66 73 33

    8 Al Nahda -132/33kV 3 x 120 240 45 100 112 140 150 69

    440 506 586 611 654 697 730 788 812

    1 BAHYA (BHYA)-132/33kV 2 x 140 140 86 70 83 91 103 113 115 125 125 98

    2 Yas Island S1 (YAS1)- 132/22kV 4 x 80 240 24 35 62 81 96 106 110 121 133 61

    3 Raha-B (RBBB) - 132/22kV 4 x 80 240 2 7 15 31 46 51 56 61 67 31

    4 Raha-A (RBAA) - 132/22kV 4 x 80 240 NL NL 12 20 22 24 27 29 13

    5 Al Falah S2 (Global Foundaries) - 132/22kV 4 x 60 180 30 50 70 100 61

    H) BAHIA Zone (Firm capacity 1500MVA)

    SASN Zone Total (MW)

    G) MAHAWI Zone (Firm capacity 1000MVA upto Yr 2016; firm capacity 1500MVA from Yr 2017)

    MAHAWI Zone Total (MW)

    TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A6 Sheet 4 of 9

  • Attachment - A

    S.N Substation Name/Code Capacity (MVA)Firm Capacity

    (MVA)2010 2011 2012 2013 2014 2015 2016 2017 2018

    Utilisation

    in 2018 (%)

    Table-A6 Abu Dhabi Emirate peak demand forecast for 20GW scenario at demand supply exit points (MW)

    6 Al Falah S1 -132/22kV 4 x 80 240 28 40 45 55 70 100 46

    7 New Airport-132/22kV 4 x 80 240 35 40 62 68 74 82 37

    112 112 160 278 345 428 477 548 636

    1 220/33kV Mobile Stations - See Note 3 90 + 2 x 80 N/A 80 90 100 110 125

    2 Shamkha-132/33kV 3 x 120 240 94 95 102 112 51

    3 South Shamkha/Shamkha housing-132/22kV 4 x 80 240 55 56 68 92 42

    80 90 100 110 125 149 151 170 204

    1 Mussafah (MOSG) - 220/33kV 3 x 140 280 284 263 250 250 250 250 250 250 250 98

    2 MGIC - 220/33kV: See Note 4 4 x 140 420 186 235 276 286 300 310 320 342 360 94

    3ICAD Steel -GHC & Emirates (MOSF) - 220/11kV

    (40+2x60+2x90) & 220/33kV (2x180+2x60+63)

    (40+2x60+2x90)+

    (2x180+2x60+63)TBC 140 300 450 450 450 450 450 450 450 TBC

    4 ICAD - 220/33kV 2 x 3 x 100 200 + 200 29 30 95 139 180 200 290 80

    5 ICAD/Emirates Steel Extension (Phase-3/4) N/A N/A 450 450 450 450 N/A

    610 798 1,005 1,016 1,095 1,599 1,650 1,692 1,800

    1 TaweelahA -132/33kV (KPIZ loads) - See Note 5 3x100 + 2x140+140 200+280 35 47 70 100 125 250 290 345 440 101

    35 47 70 100 125 250 290 345 440

    1 Shahama East (SHME) - 220/33kV 3 x 140 280 114 120 126 132 135 138 145 152 160 63

    L) Other 220/33kV Substations in Abu Dhabi Mainland

    J) MUSSAFAH & ICAD Zone (Firm capacity 1000MVA + 1000MVA)

    MUSSAFAH & ICAD Zone Total (MW)

    K) TAWEELA/KPIZ Zone

    TAWEELA/KPIZ Zone Total (MW)

    BAHIA Zone Total (MW)

    I) SHAMKHA Zone (Firm capacity 500MVA)

    SHAMKHA Zone Total (MW)

    TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A6 Sheet 5 of 9

  • Attachment - A

    S.N Substation Name/Code Capacity (MVA)Firm Capacity

    (MVA)2010 2011 2012 2013 2014 2015 2016 2017 2018

    Utilisation

    in 2018 (%)

    Table-A6 Abu Dhabi Emirate peak demand forecast for 20GW scenario at demand supply exit points (MW)

    2 Samha (SMHG) - 220/33kV 2 x 140 140 44 56 72 82 83 88 92 97 102 80

    3 Ghantoot - 220/33kV 2 x 140 140 5 10 15 22 31 58 46

    158 176 198 219 228 241 259 280 320

    1,814 2,129 2,547 2,811 3,136 3,968 4,195 4,530 5,028

    1 Liwa (LWWR) - 220/33kV 3 x 100 200 141 110 117 123 128 135 135 155 160 88

    2 Madinat Zayed (WMZD) - 220/33kV 2x100+140 200 93 98 103 108 112 124 125 138 140 77

    3 Sila (SLWR) - 220/33kV - See Note 6 2 x 80 + 80 160 24 27 30 57 60 80 85 89 105 72

    4 Mirfa (MRWR) - 220/33kV 2 x 100 100 36 40 45 59 64 70 70 77 85 93

    5 Ruwais (RWWR) - 220/33kV 2 x 140 140 71 71 75 78 82 86 90 102 103 81

    6 Central (CNTG)-220/33kV 2 x 140 140 8 23 40 45 45 59 61 70 77 60

    7 Liwa West 220/33kV Mobile Station 80 N/A 16 18 18 18 18 18 18 18 18 N/A

    8 Ghayathi - 220/33kV 2 x 140 140 4 24 30 32 55 58 70 74 80 63

    9 Delma Island (132/11kV) 2 x 40 40 14 20 21 21 22 22 22 22 22 60

    10 Hameem 220/33kV Mobile Station (Qasr Al Sarab) 80 N/A 25 25 25 25 25 25 25 25 N/A

    11 220/33kV Mobile (Qusahwira/Umm Al Zamool) 100 N/A 10 15 15 15 15 15 15 15 N/A

    12 Sir Baniyas Island - 132/11kV 3 x 40 80 16 30 46 46 46 46 63

    407 466 519 597 656 738 762 831 876

    1 DABIYA 220/33kV 2 x 110 110 47 47 50 50 50 54 54 73 76 76

    Sub-Total-1 (MW)

    N) 220kV Substations in Gharbia Region for ADNOC Group

    Others (MW)

    Eastern Region Total -MW

    M) 220kV and 132kV Substations in Gharbia Region

    TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A6 Sheet 6 of 9

  • Attachment - A

    S.N Substation Name/Code Capacity (MVA)Firm Capacity

    (MVA)2010 2011 2012 2013 2014 2015 2016 2017 2018

    Utilisation

    in 2018 (%)

    Table-A6 Abu Dhabi Emirate peak demand forecast for 20GW scenario at demand supply exit points (MW)

    2 RUMAITHY 220/33kV 2 x 50 50 14 15 15 15 15 15 20 20 20 44

    3 BUHASA 220/33kV 2x140 + 2x140 280 58 99 100 100 100 130 131 133 135 53

    4BAB- 220/132kV (2x320MVA); 220/33kV (2x150MVA)-Bab

    compressor; 220/33kV (2x140MVA)-OGD III2x320+2x150 +2x140 320+150+140 88 139 220 225 225 330 330 340 340 61

    5 ASAB - 220/132kV (2 x 200MVA) 2 x 200 200 44 75 123 125 125 156 200 220 220 121

    6 Qusahwira - 220/33kV (for ADCO 1.8MMBD Proj) TBC TBC 30 30 30 60 60 80 80

    7 AL HOSN GAS (SHAH-SGD) TBC TBC 100 295 295 295 295

    8 ELIXIER-II GASCO (Near Mirfa P.S) - 220/33kV 2x140 + 2x140 280 190 190 190 190 190 190 190 190 75

    9 RUWAIS TBC TBC 378 797 797 797 797 797

    251 565 728 1,113 1,632 2,028 2,078 2,149 2,154

    658 1,031 1,247 1,710 2,289 2,765 2,840 2,980 3,030

    1 Sweihan (SWHG) - See Note 11 2x80 + 140 160 81 95 110 100 100 105 110 115 121 83

    2 Al-Hayer (AHYG) 3 x 80 160 62 72 70 75 80 85 90 95 100 69

    3 Ramah (RMAG) 3 x 140 280 106 108 110 115 120 120 125 130 137 54

    4 Al Khazna (KHZG) 2 x 140 140 38 55 70 75 80 80 90 90 95 74

    5 Al Salamat (SLMG) 3 x 140 280 117 125 201 230 170 175 180 185 194 76

    6 Al-Mukkam 3 x 120 240 60 68 71 72 76 35

    404 455 561 595 610 633 666 687 722

    O) Sweihan Grid (Firm capacity 1000MVA)

    Sweihan Zone Total (MW)

    Sub-Total-2 (MW)

    Gharbia Region Total (MW)

    TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A6 Sheet 7 of 9

  • Attachment - A

    S.N Substation Name/Code Capacity (MVA)Firm Capacity

    (MVA)2010 2011 2012 2013 2014 2015 2016 2017 2018

    Utilisation

    in 2018 (%)

    Table-A6 Abu Dhabi Emirate peak demand forecast for 20GW scenario at demand supply exit points (MW)

    1 Al Foah (AOHG) 2 x 140 140 76 85 95 95 100 105 110 115 115 90

    2 Dahma (DHMG) 3 x 80 160 108 113 125 130 135 140 140 140 145 100

    3 AAPS (2x100+2x80+2x80) 2x100+2x80+2x80 100+80+80 182 182 210 230 190 170 175 175 175 74

    4 City Centre (CTCG) 3 x 140 280 140 143 145 160 140 145 150 155 160 63

    5 Zakher (ZAKG) - See Note 7 3x120 + 2x140 380 211 210 210 210 210 219 230 240 240 69

    6 New Grid Station in Al-Ain Power House 3 x 120 240 50 60 62 64 65 30

    717 733 785 825 825 839 867 889 900

    1 Mazyad (MZDG) - See Note 8 2 x 140 + 140 280 97 118 115 115 120 126 132 139 150 59

    2 Sanaiya (SNYG) 3 x 140 280 185 194 190 190 200 205 215 215 220 86

    3 Al-Ain South West (ASWG) 3 x 140 280 58 65 90 95 95 100 105 110 115 45

    4 Al-Arad (ARDG) 2 x 140 140 84 90 94 95 100 105 110 115 120 94

    5 Al-Wagon (AWGG) 3x80 160 103 77 60 70 70 75 80 85 85 58

    6 Umn Al Oush 2 x 140 140 32 35 39 43 47 52 57 85 67

    Q) Al-Ain South West Grid (Firm capacity 1000MVA)

    P) Dahma Grid (Firm capacity 1000MVA)

    Dahma Zone Total (MW)

    TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A6 Sheet 8 of 9

  • Attachment - A

    S.N Substation Name/Code Capacity (MVA)Firm Capacity

    (MVA)2010 2011 2012 2013 2014 2015 2016 2017 2018

    Utilisation

    in 2018 (%)

    Table-A6 Abu Dhabi Emirate peak demand forecast for 20GW scenario at demand supply exit points (MW)

    7 Al-Ain Industrial City (AAIC) 3 x 140 280 70 70 70 70 70 70 70 70 27

    8 Ain Al Fydha 3 x 120 240 50 50 52 54 55 25

    527 646 654 674 747 777 816 845 900

    1,648 1,835 2,000 2,094 2,182 2,249 2,350 2,421 2,522

    12) M12 demand will be initially fed from a temporary 132/11kV 40MVA mobile station for the period 2012-2014

    9) Existing Watbha 220/33kV S/S is planned to be converted to 132/33kV (3x120MVA) by Yr 2014 as part of Mahawi Scheme. Existing Mahawi 220/33kV S/S shall be phased out.

    New Mahawi 132/33kV (4x120MVA) S/S shall be built as part of Mahawi 400/132/33kV G.S Works by Yr 2014. Existing 220/33kV S/S Capacity in Mahawi is 3x140MVA and in Watbha is 2x100MVA+140MVA. Additional 140MVA transfomer is

    planned to be connected at existing Watbha 220/33kV S/S in 2012.

    10) NL - no load; TBC - To be confirmed.

    11) Additional capacity 140MVA at Sweihan 220/33kV S/S is planned in Yr 2011.

    5) Additional Capacity 132/33kV S/S (3x100MVA) @ Taweela A is planned in Year 2013 to meet the demand requirements of KPIZ. Additional capacity (3rd 140MVA transformer) is required in 2017 if Taweela-C generation or new 400/220kV grid

    station does not materialize by 2018.

    6) 3rd 220/33kV 80MVA transformer is planned in Yr 2013.

    7) Existing capacity at Zakher (2x90MVA + 2x140MVA) is planned to be converted to 3x120MVA + 2x140MVA in Yr 2014.

    8) 3rd 220/33kV 140MVA transformer is planned in Yr 2014.

    1) Planned to be transferred to Reem Zone in Yr 2016.

    2) Planned to be transferred to SASN Zone in Yr 2018.

    3) Shamkha 220/33kV Mobile Station-3 (80MVA) is planned in Yr 2013.

    4) 4th 220/33kV 140MVA transformer is planned in Yr 2011.

    Al-Ain South West Zone Total (MW)

    Al-Ain Region Total (MW)

    Notes

    TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A6 Sheet 9 of 9

  • Attachment-A

    S.N Grid Station Capacity

    (MVA)2010 2011 2012 2013 2014 2015 2016 2017 2018

    1 Dhaid 400/220kV 3 x 500 905 910 910 910 910 910 910 910 910

    2 Fujairah (Qidfa) 400/132kV 2 x 500 315 365 390 450 450 450 450 450 450

    3 Ras Al Khaimah 400/132kV 3 x 500 225 425 470 520 545 639 655 675 745

    4 Ajman 400/132kV 3 x 500 180 444 465 540 570 743 765

    5 Fujairah City 400/132kV 3 x 500 150 520 540 630 655 720 790

    6 Sharjah 400/132kV 3 x 500 480 510 621 660 738 820

    1,445 1,700 2,100 3,324 3,420 3,790 3,899 4,236 4,480Grand Total - Northern Emirates (MW)

    Table-A7 Northern Emirates peak demand forecast for 20GW scenario (MW)

    TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A7 Sheet 1 of 1

  • Attachment-A

    S.N Power Stations/IWPPs/IPPs 2010 2011 2012 2013 2014 2015 2016 2017 2018

    1 UAN Plant - APC 778 778 778 778 778 778 778 778 778

    2 SASN Plant - APC 1,652 1,652 1,652 1,652 1,652 1,652 1,652 1,652 1,652

    3 TAW B1 + TAW B2 (TAPCO) - Total 1,183 1,183 1,183 1,183 1,183 1,183 1,183 1,183 1,183

    4 TANE (TAPCO) 1,037 1,037 1,037 1,037 1,037 1,037 1,037 1,037 1,037

    5 TAW A1 + TAW A10 (GTTPC) - Total 1,670 1,670 1,670 1,670 1,670 1,670 1,670 1,670 1,670

    6 TAW A2 (ECPC) 760 760 760 760 760 760 760 760 760

    7,080 7,080 7,080 7,080 7,080 7,080 7,080 7,080 7,080

    1 Al Ain Power Station (AAPS) - AMPC 256 256 256 256 256 256 256 256 256

    256 256 256 256 256 256 256 256 256

    1 Al Mirfa Power Station - AMPC 186 186 186 186 186 186 186 186 186

    2 Madinat Zayed Power Station - AMPC 109 109 109 109 109 109 109 109 109

    3 Shuweihat Power Co (SCIPCO) S1 1,615 1,615 1,615 1,615 1,615 1,615 1,615 1,615 1,615

    4 Shuweihat S2 (RSTPC) 1,627 1,623 1,621 1,619 1,618 1,616 1,616 1,616

    5 Shuweihat S3 490 1645 1645 1645 1645 1645

    TableA8- Electricity generation capacity expansion plan to meet the 20GW scenario demand forecast (Gross MW)

    Eastern Region

    Subtotal 1- Eastern Region (MW)

    Al-Ain Region

    Subtotal 2- Al-Ain Region (MW)

    Gharbia (Western) Region

    TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A8 Sheet 1 of 2

  • Attachment-A

    S.N Power Stations/IWPPs/IPPs 2010 2011 2012 2013 2014 2015 2016 2017 2018

    TableA8- Electricity generation capacity expansion plan to meet the 20GW scenario demand forecast (Gross MW)

    6 Al Mirfa P.S Retrofit [Al Zawra Relocation + Conversion to CC] 400 400 400 400

    7 Masdar Hydrogen (net capacity) 380 380

    8 Nuclear Power Station at Braka (each unit 1400MW) 1,400 2,800

    1,910 3,537 3,533 4,021 5,174 5,573 5,571 7,351 8,751

    1 Fujairah F1 + F1 Extension - ESWPC 861 861 861 861 861 861 861 861 861

    2 Fujairah F2 (FAPCO) 2,114 2,114 2,114 2,114 2,114 2,114 2,114 2,114 2,114

    3 Existing FEWA Reserve standby generation 700 700 700 700

    4 Potential generation in Northern Emirates (e.g. Hamria/RAK) See Note 1 2,100 2,100 2,100 2,100

    2,975 2,975 2,975 3,675 3,675 5,775 5,775 5,075 5,075

    1 IWPP Peak capacity in excess of PWPA contracted capacity 200 200 200 200

    2Potential Renewables available at peak

    (e.g. Concentric solar power) 50 50 50 150 250 350 450

    50 250 250 350 450 350 450

    12,221 13,848 13,894 15,282 16,435 19,034 19,132 20,112 21,612

    1Potential additional renewables ( e.g. CSP, Wind & PV, Solar Roof Program ) -

    non firm capacity (MW)50 150 300 450 600 650 700 750

    Note-1: Potential other generation sites could be Mirfa(in Gharbia Region) or Taweelah C(in Eastern Region)

    Subtotal 5 (Others)

    Capacity Lifetime Extension

    Subtotal 3- Gharbia Region (MW)

    Northern Emirates

    Subtotal 4- Northern Emirates (MW)

    Others

    Grand Total (Gross MW)

    TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A8 Sheet 2 of 2

  • Attachment-A

    Yr 2011 Yr 2018

    1Tourist Club-TCLB (E15) -

    132/11kV 4 x 40 120 81 99 ADST Reem Yr 2016

    2 Port (E14) - 132/11kV 4 x 40 120 56 88 ADST Reem Yr 2016

    3 CLNS (E16/02) - 132/11kV 4 x 40 120 64 89 Al Qurm (E19) Reem Yr 2016

    4Khalifa Park-KHPK -

    132/11kV 4 x 40 120 18 74 Beach (E48) SASN Yr 2018

    5Zayed Sports City (W57) -

    132/11kV 4 x 40 120 - 22 Beach (E48) SASN Yr 2018

    6ADNEC (W59/02)-

    132/11kV 4 x 40 120 - 82 Beach (E48) SASN Yr 2018

    7Mussafah (MOS1) -

    132/11kV4 x 40 120 108 115 SASN Mahawi Yr 2014

    8New Capital District -

    132/22kV4 x 80 240 - 123 SASN Mahawi Yr 2017

    Table-A9 List of substations transferred from one grid zone to another for 20GW scenario

    S.N Substation Name/CodeCapacity

    (MVA)

    Firm

    Capacity

    (MVA)

    Peak Demand (MVA) Year of

    TransferTransferred From Transferred To

    TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A9 Sheet 1 of 1

  • Attachment-A

    Capacity Deficit/

    Surplus (MVA)

    Yr 2011 Yr 2018 Yr 2018

    1 ADST 3 x 500 1,000 653 904 96 90.4

    2 Al Qurm (E19) 3 x 500 1,000 763 999 1 99.9

    3 Beach (E48) 3 x 500 1,000 715 1016 -16 101.6

    4 Reem 4 x 500 1,500 31 286 1214 19.1

    5 SASN 2 x 500 + (500 in Yr 2014) 1,000 441 897 103 89.7

    6 Mahawi 3 x 500 + (500 in Yr 2017) 1,500 - 892 608 59.5

    Table-A10 Capacity deficit/ surplus of ADST, E19, E48,Reem,SASN & Mahawi 400/132kV grid stations before

    transfer for 20GW scenario

    % Utilisation in

    Yr 2018

    Peak Demand (MVA)

    S.N Grid Station Capacity (MVA)

    Firm

    Capacity

    (MVA)

    TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A10 Sheet 1 of 1

  • Attachment-A

    Capacity Deficit/

    Surplus (MVA)

    Yr 2010 Yr 2018 Yr 2018

    1 ADST 3 x 500 1,000 653 717 283 71.7

    2 Al Qurm (E19) 3 x 500 1,000 763 910 90 91.0

    3 Beach (E48) 3 x 500 1,000 715 838 162 83.8

    4 Reem 4 x 500 1,500 31 562 938 37.5

    5 SASN 2 x 500 + (500 in Yr 2014) 1,000 441 837 163 83.7

    6 Mahawi 3 x 500 + (500 in Yr 2017) 1,500 - 1130 370 75.3

    Table-A11 Capacity deficit/ surplus of ADST, E19, E48,Reem,SASN & Mahawi 400/132kV grid stations after transfer

    for 20GW scenario

    % Utilisation in

    Yr 2018

    Peak Demand (MVA)S.N Grid Station Capacity (MVA)

    Firm

    Capacity

    (MVA)

    TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A11 Sheet 1 of 1

  • Transco 2011 7YPS (2012-2018), Attachments

    TRANSCO/AMD/PNDD November 2011

    ATTACHMENT-B

    Electricity Transmission Network Topology (400kV, 220kV, 132kV System) Geo-Map of Transmission Network Topology (400kV and 220kV System) for Year 2011 & 2018

  • RUWAIS

    (RUWS)

    SILA

    (SLWR)

    MADINAT ZAYED

    (WMZD)

    BUHASA

    (BHSA)

    LIWA

    (LWWR)

    2 x 320MVA

    4 x 140MVA

    220/33kV

    80MVA Mobile

    2 x 80MVA

    2 x 500MVA

    2 x 36MVAr

    3 x 500MVA

    3 x 36MVAr

    3 x 100MVA

    2 x 100MVA

    2x100MVA +

    140MVA

    SAS AL NAKHEL

    (SASN)

    Al QURM (E19)

    BEACH (E48)

    CENTRAL

    (CNTG)

    2 x 140MVA

    3 x 500MVA

    3 x 36 MVAr

    SAMHA

    2x140MVA

    3 x 140MVA

    AL-AIN SOUTH WEST

    (AASW)

    SALAMAT (SLMG)

    RAMAH (RMAG)

    KHAZNA (KHZG)

    3 x 140MVA

    2 x 140MVA

    3 x 140MVA

    3 x 500 MVA

    3 x 36MVAr

    3 x 500MVA

    3 x 36MVAr

    WRSN (DEWA)

    DHAID

    (DHID)

    SHAHAMA

    (SHME)

    ZAKHER

    (ZAKG)

    ARAD (ARDG)

    AL WAGON (AWGG)

    MAZIYAD (MZDG)

    SANAIYA (SNYG)

    AL HAYER (AHYG)

    AL FOAH

    (AOHG)

    3 x 80MVA

    2 x 140MVA

    2 x 140MVA

    3 x 140MVA

    3 x 80MVA

    2 x 140MVA

    3 x 80MVA

    3 x 140MVA

    TANE

    SWEIHAN (SWHN)

    3 x 500MVA

    3 x 500MVA

    3 x 500MVA

    RAS AL KHAIMAH

    (FILA)

    MGIC

    3 x 140MVA

    + 140MVA

    2 x 140MVA

    2 x 140MVA RUMAITHY

    (RMTH)

    2 x 50MVA

    STEEL (MOSF)

    SVC

    SVC

    UMM Al OUSH

    2 x 500MVA

    SAJJA

    2 x 140MVA

    2 x 200MVA

    REEM

    ADST

    ABU DHABI ISLANDS REGION

    WESTERN REGION

    NORTHERN EMIRATES

    Al-AIN REGION

    2 x 500MVA

    4 x 500MVA

    4 x 50 MVAr

    4 x 500MVA

    4 x 50MVAr

    3 x 500MVA

    2 x 100MVAr

    2 x 100MVAr

    2 x 100 MVAr

    DABIYA (DBYA)

    2 x 110MVA

    DAHMA (DHMG)

    TAWEELA P.S

    TAW-BTAW-A

    2 x 500 MVA

    2x140 MVA

    EMAL

    3 x 140MVA

    2 x 500MVA

    2 x 36 MVAr

    3 x 275MVA

    2 x 20MVAr

    2 x 50MVAr

    3 x 500MVA

    3 x 300MVA

    AL-AIN

    INDUSTRIAL CITY

    (AAIC)

    3 x 140MVA

    2 x 80MVA+140MVA

    3 x 500MVA

    3 x 36MVAr

    BAB

    2 x 40MVA

    DELMA Island

    OGD III

    2 x 140MVA

    2 x 70MVAr

    2 x 20MVAr

    SHUWEIHAT S1 & S2

    (SHPS)

    2 x 140MVA

    + 2 x 90MVA

    ASAB

    220/132kV

    2 x 200MVA

    2 x 140MVA

    ASGS

    To Salwa

    GCC Interconnection

    KSA

    SILA-400 CITY CENTRE

    (CTCG)

    3 x 140MVA

    320MVA

    2 x 100MVA

    2 x 80MVA

    2 x 80MVA

    SVC

    + 2 x 90 MVAr

    - 2 x 45 MVAr

    AL AIN POWER HOUSE

    LEGEND

    400kV XLPE

    220kV XLPE

    400kV OHL

    220kV OHL

    132kV System

    Attachment-B

    Fig. B1 400kV & 220kV Electrical Power System Topology- Yr 2011AMD/PNDD, TRANSCO

    Transco 2011 7YPS (2012-2018) November 2011

    SADIYAT (SDYT)

    GAITHY

    (GTHY)

    MIRFA

    (MRFA)

    Gasco-Elixier-II

    2 x 70MVAr

    Khor

    Khwair

    3 x 140MVA

    RAK Main

    132kV XLPE

    Qusayidat Main

    (QSMN)

    UMM AL NAR

    (UAN)

    2 x 250MVA

    ADNOC

    220/33kV

    140MVA Mobile

    for Mafraq

    2 x 36MVAr

    MAHAWI (MHWG)

    3 x 140MVA

    2 x 100MVA

    + 140MVA

    220/33kV

    90MVA Mobile-2

    (Shamkha Area)

    FUJAIRAH QIDFA

    (QDFA) F1Ext + F2

    2x150MVA

    (For ADCO Gas

    Compression Project)

    Fujairah Main

    (FUMN)

    F1PS

    FEWA

    NEW ASSETS

    220/33kV

    80MVA Mobile-1

    (Shamkha Area)

    Toshiba

    Siemens

    Calor Emag

    220/33kV

    80MVA Mobile

    (Hameem-Qsr Al Sarab)

    WATHBA

    (WATH)

    Sheet 1 of 16

    220/33kV

    100MVA Mobile

    (Umm Al Zamool)

    Mahadha

    (OMAN)

    ICAD

    3 x 100MVA

    MUSSAFAH (MOSG)

    Qidfa Main

    (QDMN)

  • RUWAIS

    (RUWS)

    SILA

    (SLWR)

    MADINAT ZAYED

    (WMZD)

    BUHASA

    (BHSA)

    LIWA

    (LWWR)

    2x320MVA

    4x140MVA

    220/33kV

    80MVA Mobile

    2x80MVA

    2x500MVA

    2x36MVAr

    3x500MVA

    3x36MVAr

    3 x 100MVA

    2x100MVA

    2x100MVA +

    140MVA

    SAS AL NAKHEL

    (SASN)

    Al QURM (E19)

    BEACH (E48)

    Mussafah (MOSG)

    CENTRAL

    (CNTG)

    2x140MVA

    3x500MVA

    3x36 MVAr

    Samha

    2x140MVA

    3x140MVA

    Al-Ain South West

    (AASW)

    Salamat (SLMG)

    Ramah (RMAG)

    Khazna (KHZG)

    3x140MVA

    2x140MVA

    3x140MVA

    3x500MVA

    3x36MVAr

    3x500MVA

    3x36MVAr

    WRSN (DEWA)

    DHAID (DHID)

    Shahama

    (SHME)

    Zakher

    (ZAKG)

    Arad (ARDG)

    Al Wagon (AWGG)

    Maziyad (MZDG)

    Sanaiya (SNYG)

    Al Hayer (AHYG)

    Al Foah

    (AOHG)

    3x80MVA

    2x140MVA

    2x140MVA

    3x140MVA

    3x80MVA

    2x140MVA

    3x80MVA

    3x140MVA

    TANE

    Sweihan (SWHN)

    3x500MVA

    3x500MVA

    3x500MVA

    RAS AL KHAIMAH

    (FILA)

    FUJAIRAH QIDFA

    (QDFA) F1Ext + F2

    MGIC

    4x140MVA

    2x140MVA

    2x140MVARUMAITHY (RMTH)

    ICAD

    2 x 50MVA

    3x500MVA

    Steel (MOSF)

    SVC

    SVC

    Umm Al Oush

    2x500MVA

    SAJJA

    2x140MVA

    2x200MVA

    REEM

    ADST

    ABU DHABI ISLANDS REGION

    WESTERN REGION

    NORTHERN EMIRATES

    Al-AIN REGION

    2x500MVA

    4x500MVA

    4x50 MVAr

    4x500MVA

    4x50MVAr

    3x500MVA

    2x100MVAr

    2x100MVAr

    2x100 MVAr

    DABIYA (DBYA)

    2 x 110MVA

    Dahma (DHMG)

    TAWEELA P.S

    2x500 MVA

    2x140 MVA

    EMAL

    3x140MVA

    2x500MVA

    2x36 MVAr

    3x275MVA

    AJMAN

    2x20MVAr

    2x50MVAr

    New Fujairah

    3x500MVA

    3x500MVA

    3x500MVA

    3x300MVA

    Al-Ain Industrial City

    (AAIC)

    3x140MVA

    2x80MVA+140MVA

    3x500MVA

    3x36MVAr

    BAB

    2 x (3 x 100MVA)

    2x40MVA DELMA Island

    OGD III

    2x140MVA

    2x70MVAr

    2x20MVAr

    SHUWEIHAT S1 & S2

    (SHPS)

    2x140MVA+2x90MVA

    ASAB220/132kV

    2 x 200MVA

    220/33kV

    80MVA Mobile

    (Hameem -Qsr Al Sarab)

    QUSAHWIRA

    2 x 140MVA

    ASGS

    220/33kV

    100MVA Mobile

    (Umm Al Zamool)

    To Salwa

    GCC Interconnection

    KSA

    SILA-400City Centre

    (CTCG)

    3x140MVA

    2 x 320MVA

    2x100MVA

    2x80MVA

    2x80MVA

    SVC

    + 2x90 MVAr

    - 2x45 MVAr

    Al-Ain Power House (AAPS)

    LEGEND

    400kV XLPE

    220kV XLPE

    400kV OHL

    220kV OHL

    132kV System

    Attachment-B

    Fig. B2 400kV & 220kV Electrical Power System Topology- Yr 2012

    SADIYAT (SDYT)

    GAITHY

    (GTHY)

    Gasco-Elixier-II

    2x70MVAr

    Khor

    Khwair

    3x140MVA

    2x100MVA

    Al Hayl

    132/33kV

    Sudah Port

    132/33kV

    3x100MVA

    RAK Main

    132kV XLPE

    Qusayidat Main

    (QSMN)

    FUMN

    GHMN

    UMM AL NAR

    (UAN)

    2x250MVA

    ADNOC

    220/33kV

    140MVA Mobile for

    Mafraq

    2x36MVAr

    Mahawi (MHWG)

    3x140MVA

    2x150MVA

    220/33kV

    90MVA Mobile-2

    (Shamkha Area)

    220/33kV

    80MVA Mobile-1

    (Shamkha Area)

    Toshiba

    Siemens

    Calor Emag

    NEW ASSETS

    WATHBA

    (WATH)

    2x100MVA

    140MVA+

    140MVA

    MIRFA

    (MRFA)

    Sheet 2 of 16

    Mahadha

    (OMAN)

    ADCO 1.8MMBD

    Project

    Masdar Shams

    To FEWA/SEWA Network To

    FEWA

    Network

    TAW-BTAW-A

    Qidfa Main

    (QDMN)

    F1PS

    To FEWA Network

    165MVA

    AMD/PNDD, TRANSCO

    Transco 2011 7YPS (2012-2018) November 2011

  • SILA

    (SLWR)

    Madinat Zayed

    (WMZD)

    Buhasa (BHSA)

    Liwa

    (LWWR)

    2x320MVA

    4x140MVA

    220/33kV

    80MVA Mobile

    2x80MVA + 80MVA

    2x500MVA

    2x36MVAr

    3x500MVA

    3x36MVAr

    3x100MVA

    2x100MVA

    2x100MVA +

    140MVA

    Sas Al Nakheel

    (SASN)

    Al Qurm (E19)

    Beach (E48)

    Mussafah (MOSG)

    Central

    (CNTG)

    2x140MVA

    3x500MVA

    3x36 MVAr

    Samha

    2x140MVA

    3x140MVA

    Al-Ain South West

    (AASW)

    Salamat (SLMG)

    Ramah (RMAG)

    Khazna (KHZG)

    3x140MVA

    2x140MVA

    3x140MVA

    3x500MVA

    3x36MVAr

    3x500MVA

    3x36MVAr

    WRSN (DEWA)

    Dhaid

    (DHID)

    Shahama (SHME)

    Zakher

    (ZAKG)

    Arad (ARDG)

    Al Wagon (AWGG)

    Maziyad (MZDG)

    Sanaiya (SNYG)

    Al Hayer (AHYG)

    Al Foah

    (AOHG)

    3x80MVA

    2x140MVA

    2x140MVA

    3x140MVA

    3x80MVA

    2x140MVA

    3x80MVA

    3x140MVA

    TANE

    Sweihan (SWHN)

    3x500MVA

    3x500MVA

    3x500MVA

    Ras Al Khaimah

    (FILA)

    Fujairah Qidfa (QDFA)

    F1Ext + F2

    MGIC

    4x140MVA

    2x140MVA

    2x140MVA

    Rumaithy

    (RMTH)

    Bahia

    ICAD

    2x50MVA

    3x500MVA

    Steel (MOSF)

    SVC

    SVC

    Umm Al Oush

    Sajja

    2x140MVA

    2x200MVA

    Reem

    ADST

    4x500MVA

    4x50MVAr

    ABU DHABI ISLANDS REGION

    WESTERN REGION

    NORTHERN EMIRATES

    Al-AIN REGION

    2x500MVA

    4x500MVA

    4x50 MVAr

    4x500MVA

    4x50MVAr

    3x500MVA

    2x100MVAr

    2x100MVAr

    2x100 MVAr

    Dabiya (DBYA)

    2x110MVA

    Dahma (DHMG)

    TAWEELA P.S

    EMAL

    3x140MVA

    2x500MVA

    2x36MVAr

    2x20MVAr

    3x500MVA

    3x500MVA

    3x300MVA

    Al-Ain Industrial City

    (AAIC)

    3x140MVA

    2x80MVA+140MVA

    3x500MVA

    3x36MVAr

    BAB

    2x(3x100MVA)

    2x40MVADELMA Island

    OGD III

    2x140MVA

    2x70MVAr

    2x20MVAr

    Shuweihat S1 & S2 (SHPS)

    Masdar Shams

    2x140MVA+2x90MVA

    ASAB

    220/132kV

    2x200MVA

    2x140MVA

    ASGS

    To Salwa

    GCC Interconnection

    KSA

    SILA-400

    City Centre

    (CTCG)

    3x140MVA

    2x320MVA

    Sir Baniyas Island

    2x100MVA

    2x80MVA

    2x80MVA

    SVC

    + 2x90 MVAr

    - 2x45 MVAr

    Al Ain Power House

    LEGEND

    400kV XLPE

    220kV XLPE

    400kV OHL

    220kV OHL

    132kV System

    Attachment-B

    Fig. B3 400kV & 220kV Electrical Power System Topology- Yr 2013

    Sadiyat (SDYT)

    Gaithy (GTHY)

    Gasco-Elixier-II

    2x70MVAr

    Khor

    Khwair

    3x140MVA

    RAK Main

    132kV XLPE

    Qusayidat Main

    (QSMN)

    Umn Al Nar

    (UAN)

    220/33kV

    140MVA Mobile for

    Mafraq

    2x36MVAr

    2x140MVA

    Ghantoot

    2x150MVA

    Mahadha

    (OMAN)

    Shuweihat S3

    Takreer Loads

    (Ruwais Refinery

    Expansion & GUP)

    3x500MVA

    ADCO 1.8MMBD

    Project

    220/33kV

    80MVA Mobile

    (Hameem -Qsr Al

    Sarab)

    220/33kV

    100MVA Mobile

    (Umm Al Zamool)

    3x40MVA

    Toshiba

    Siemens

    Calor Emag

    220/33kV

    80MVA Mobile-1

    (Shamkha Area) 220/33kV

    90MVA Mobile-2

    (Shamkha Area)

    NEW ASSETS

    Sheet 3 of 16

    MIRFA

    (MRFA)

    2x500MVA2x50MVAr

    New Fujairah

    3x500MVA

    2x100MVA

    Al Hayl

    132/33kV

    FJMN

    GHMN

    Kalba

    132/33kV

    2x100MVA

    Masdar Noor

    AJMAN

    To FEWA/SEWA Network

    Tawyeen

    132/33kV

    To Shaggi

    Dadnh

    3x100MVA

    Sudah Port

    132/33kV

    2x100MVA

    2x140MVA

    WATHBA

    (WATH)

    Mahawi (MHWG)

    3x140MVA

    To

    FEWA

    Network

    2x250MVA

    220/33kV

    80MVA Mobile-3

    (Shamkha Area)

    New Ruwais

    Grid Station

    Existing Ruwais

    (RUWS)

    KHFK

    132/33kV

    2x120MVA

    2x120MVA

    Dibba

    120MVA

    165MVA

    2x500 MVA

    2x140 MVA

    3x275MVA

    3x100 MVA

    TAW-BTAW-A

    AMD/PNDD, TRANSCO

    Transco 2011 7YPS (2012-2018) November 2011

  • Existing Ruwais

    (RUWS)

    Sila

    (SLWR)

    Madinat Zayed

    (WMZD)

    Liwa

    (LWWR)

    220/33kV

    80MVA Mobile

    3x80MVA

    2x500MVA

    2x36MVAr

    3x500MVA

    3x36MVAr

    3x100MVA

    2x100MVA

    2x100MVA+140MVA

    Sas Al Nakheel -

    SASN

    Al Qurm (E19)

    Beach (E48)

    Mussafah (MOSG)

    Central (CNTG)

    2x140MVA

    3x500MVA

    3x36 MVAr

    Mahawi

    Samha

    2x140MVA

    3x140MVA

    Al-Ain South West

    (AASW)

    Salamat (SLMG)

    Ramah (RMAG)

    Khazna (KHZG)

    3x140MVA

    2x140MVA

    3x140MVA

    3x500 MVA

    3x36MVAr

    3x500MVA

    3x36MVAr

    WRSN (DEWA)

    Dhaid

    (DHID)

    Shahama (SHME)

    Zakher

    (ZAKG)

    Arad (ARDG)

    Al Wagon (AWGG)

    Maziyad (MZDG)

    Sanaiya (SNYG)

    Al Hayer (AHYG)

    Al Foah

    (AOHG)

    3x80MVA

    2x140MVA

    3x140MVA

    3x140MVA

    3x80MVA

    2x140MVA

    3x80MVA

    3x140MVA

    TANE

    Sweihan (SWHN)

    3x500MVA

    3x500MVA

    3x500MVA

    Ras Al Khaimah

    (FILA)

    Fujairah Qidfa (QDFA)

    MGIC

    4x140MVA

    2x140MVA

    2x140MVARumaithy (RMTH)

    Bahia

    ICAD

    2x50MVA

    3x500MVA

    Steel (MOSF)

    SVC

    SVC

    Umm Al Oush

    Sajja

    2x140MVA

    2x200MVA

    Reem

    ADST

    ABU DHABI ISLANDS REGION

    WESTERN REGION

    NORTHERN EMIRATES

    Al-AIN REGION

    4x500MVA

    4x50MVAr

    4x500MVA

    4x50MVAr

    3x500MVA

    2x100MVAr

    2x100MVAr

    2x100 MVAr

    Dabiya (DBYA)

    2x110MVA

    Dahma (DHMG)

    TAWEELA P.S

    2x500 MVA

    2x140 MVA

    EMAL

    3x140MVA

    2x500MVA

    2x36 MVAr

    3x275MVA

    Ajman

    2x20MVAr

    3x500MVA

    3x500MVA

    3x300MVA

    Al-Ain Industrial City

    (AAIC)

    3x140MVA

    Al-Maqam

    3x120MVA

    2x80MVA+140MVA

    3x500MVA

    3x36MVAr

    2x(3x100MVA)

    3x100MVAr

    2x40MVADELMA Island

    3x100 MVA

    2x70MVAr

    2x20MVAr

    Shuweihat S1&S2

    (SHPS)

    Masdar Shams

    3x100 MVAr

    3x500MVA

    3x50MVAr

    2x140MVA+ 3x120MVA

    To Salwa

    GCC Interconnection

    KSA

    SILA-400City Centre

    (CTCG)

    3x140MVA

    3x120MVA

    2x320MVA

    3x40MVA

    Sir Baniyas Island

    Toshiba

    Siemens

    2x100MVA

    2x80MVA

    2x80MVA

    SVC

    + 2x90 MVAr

    - 2x45 MVAr

    Calor Emag

    Al Ain Power House

    (AAPS)

    LEGEND

    400kV XLPE

    220kV XLPE

    400kV OHL

    220kV OHL

    132kV System

    Attachment-B

    Fig. B4 400kV & 220kV Electrical Power System Topology- Yr 2014

    Sadiyat (SDYT)

    Gaithy

    (GTHY)

    2x150MVAr

    New 220kV G.S in AAPS

    Gasco-Elixier-II

    2x70MVAr

    2x140MVA

    Ghantoot

    3x500MVA

    Khor

    Khwair

    3x140MVA

    RAK Main

    Takreer Loads

    (Ruwais Refinery

    Expansion & GUP)

    132kV XLPE

    Qusayidat Main

    (QSMN)

    Shuweihat S3

    Ain Al Faydha

    3x120MVA

    2x500MVA

    2x36MVAr

    Masdar Noor

    Umn Al Nar

    (UAN)

    NEW ASSETS

    Sheet 4 of 16

    2x36MVAr

    2x500MVA2x50MVAr

    New Fujairah

    3x500MVA

    2x100MVA

    Al Hayl

    132/33kV

    Sudah Port

    132/33kV

    3x100MVA

    FJMN

    GHMN

    Kalba

    132/33kV

    2x100MVA

    Buhasa

    (BHSA)

    2x320MVA

    4x140MVA

    2x150MVA

    BAB

    OGD III

    2x140MVA

    3x500MVA

    SHAH-SGD

    ASAB

    220/132kV

    2x200MVA

    2x140MVA

    ASGS

    220/33kV

    80MVA Mobile

    (Hameem -Qsr Al Sarab)

    ADCO 1.8MMBD

    Project

    3x100 MVAr MSC

    ASAB

    Switching Station

    To Habshan

    Fields

    Sharjah

    3x500MVA

    Wasit/

    Mahadha

    (OMAN)

    MIRFA

    (MRFA)

    TAW-A TAW-B

    4x500MVA

    4x50MVAr

    To SEWA Network

    220/33kV

    100MVA Mobile

    (Umm Al Zamool)

    To FEWA/SEWA Network

    2x100MVA

    New Ruwais

    Grid Station

    To

    FEWA

    Network

    220/33kV

    80MVA Mobile-1

    (Shamkha Area) 220/33kV

    90MVA Mobile-2

    (Shamkha Area)

    220/33kV

    80MVA Mobile-3

    (Shamkha Area)

    2x100MVA

    2x140MVA

    WATHBA

    (WATH)

    Mahawi (MHWG)

    3x140MVA

    220/33kV

    140MVA Mobile for

    Mafraq

    Dadnh

    KHFK

    132/33kV

    2x120MVA

    2x120MVA

    Dibba

    Tawyeen

    132/33kV

    To Shaggi

    open

    3x500MVA

    2x250MVA

    Open

    Open

    Wasit/

    Mahadha

    (OMAN)

    120MVA

    165MVA

    AMD/PNDD, TRANSCO

    Transco 2011 7YPS (2012-2018) November 2011

  • Ruwais

    (RUWS)

    Sila

    (SLWR)

    Madinat Zayed

    (WMZD)

    Liwa

    (LWWR)

    220/33kV

    80MVA Mobile

    3x80MVA

    2x500MVA

    2x36MVAr

    3x500MVA

    3x36MVAr

    3x100MVA

    2x100MVA

    2x100MVA+140MVA

    Sas Al Nakheel - SASN

    Al Qurm (E19)

    Beach (E48)

    Mussafah (MOSG)

    Central (CNTG)

    2x140MVA

    3x500MVA

    3x36 MVAr

    Mahawi

    Samha

    2x140MVA

    3x140MVA

    Al-Ain South West

    (AASW)

    Salamat (SLMG)

    Ramah (RMAG)

    Khazna (KHZG)

    3x140MVA

    2x140MVA

    3x140MVA

    3x500 MVA

    3x36MVAr

    3 x 500MVA

    3 x 36MVAr

    WRSN (DEWA)

    Dhaid

    (DHID)

    Shahama (SHME)

    Zakher

    (ZAKG)

    Arad (ARDG)

    Al Wagon (AWGG)

    Maziyad (MZDG)

    Sanaiya (SNYG)

    Al Hayer (AHYG)

    A