62
2011 COST DATA Maintenance Projects Compiled By Engineering Estimates and Market Analysis Unit of the Agreements and Market Analysis Branch March 12, 2012

Transcript of 2011 · projects bid from 01/01/11 through 12/31/11-----bid contractor/ letting project number...

  • 2011 COST DATA

    Maintenance Projects

    Compiled By

    Engineering Estimates and Market Analysis Unit of the

    Agreements and Market Analysis Branch

    March 12, 2012

  • COLORADO COST DATA MAINTENANCE PROJECTS *

    FOREWORD

    The Colorado Department of Transportation’s Engineering Estimates and Market Analysis (EEMA) Unit, of the Agreements

    and Market Analysis Branch, publishes the Cost Data Book annually. A joint effort has been made between the Department’s

    sections and the EEMA Unit to gather and record cost data for this publication.

    The following data includes weighted average prices for items on highway maintenance projects that were bid during the 2011

    calendar year. Caution should be used in applying these historical averages to specific projects. Allowances for varying

    geographic, climatic, social, economic conditions and type of project should be made.

    Changes and improvements are continually being made to update and increase the usefulness for future issues. Comments

    and suggestions for improvements for users of this publication are welcome.

    * Note: These costs should only be applied to Maintenance projects, and are not representative of the

    majority of CDOT Construction projects.

  • 2011 COST DATA

    MAINTENANCE PROJECTS

    TABLE OF CONTENTS

    BRIDGE COST PER SQUARE FEET

    LIST OF 2005 BID MAINTENANCE PROJECTS

    ITEM AVERAGE BID PRICES

    ITEM UNIT COSTS BY PROJECT

    # OF PAGES

    1

    2

    5

    51

  • Colorado Department of Transportation 14:27 Monday, March 12, 2012 1

    2011 Cost Data - Maintenance

    BRIDGE COST PER SQUARE FOOT

    (01/01/11 THROUGH 12/31/11)

    ------------------------------------------------------------------------------------------------------------------------------------

    PROJECT NUMBER/ TERR/ TOTAL TOTAL COST PER

    DATE LET PROJECT LOCATION BRIDGE ID LENGTH WIDTH SQUARE FT COST SQUARE FOOT

    ------------------------------------------------------------------------------------------------------------------------------------

    BRIDGE REPAIR

    110203 MTCE 133A-038 M

    I-07P SH-133A MM 18.9 I-07-P 290.0000 43.0000 12470.0 $57,155 $4.58

    WEIGHTED AVERAGE COST:

    NEW STRUCTURES 12470.0 $57,155 $4.58

    POST TENSIONED BOX GIRDER

    111117 MTCE 0702-315 R

    I-70 MM 125.83 EB STRUCTURE F- F-08-AR 1307.7500 36.5000 47732.9 $134,009 $2.81

    WEIGHTED AVERAGE COST:

    NEW STRUCTURES 47732.9 $134,009 $2.81

  • Colorado Department of Transportation 14:27 Monday, March 12, 2012 1

    2011 Cost Data - Maintenance

    PROJECTS BID FROM 01/01/11 THROUGH 12/31/11

    ------------------------------------------------------------------------------------------------------------------------------------

    BID CONTRACTOR/

    LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX

    ------------------------------------------------------------------------------------------------------------------------------------

    20110106 HIGHMARK TRAFFIC SERVICES, INC. 5 $1,169,787.50 106.43

    MTCER300-171 REGION 3 FY 11 REGION WIDE EPO 3 M

    20110127 ROADSAFE TRAFFIC SYSTEMS, INC 4 $1,597,276.30 108.91

    MTCER500-116 REGION 5 VARIOUS HIGHWAYS 5 M

    20110203 MUELLER CONSTRUCTION SERVICES 8 $86,866.00 60.01

    MTCE 133A-038 I-07P SH-133A MM 18.9 3 M

    20110203 ROCKY MOUNTAIN ENTERPRISES, INC. 5 $213,370.00 95.60

    MTCER500-118 SH 145, US 160, US 491, US 285 5 M

    20110210 KOLBE STRIPING INC. 1 $135,060.00 68.21

    MTCE R500-117 R5 VARIOUS HIGHWAYS 5 M

    20110217 CC ENTRPRS TRAFFIC CONTROL SPECIALISTS 4 $102,264.00 85.44

    MTCER300-172 REGION 3 INTERSTATE 70 CORRIDO 3 M

    20110217 ALERT TRAFFIC CONTROL, INC. 4 $304,782.00 121.60

    MTCE R100-188 I-25 SIGN REPLACEMENT PROJECT 1 R

    20110217 HIGHWAY TECHNOLOGIES 5 $312,364.00 111.63

    MTCE R100-187 REGION 1 EAST STENCIL PROJECT 1 R

    20110217 AMERICAN DIRECTIONAL BORING INC. 6 $707,438.65 116.88

    MTCE085A-016 SH85 BETWEEN MP127.65 & MP 136 2 R

    20110217 STREAMLINE MARKINGS 3 $646,189.75 95.50

    MTCER300-173 REGION 3 FY 11 SH 40 EPOXY STR 3 M

    20110310 OLDCASTLE SW GROUP, INC. 5 $977,659.16 84.79

    MTCE R500-108 US 550 R5 MP 38.2 TO MP 49.8 5 M

    20110602 ROADSAFE TRAFFIC SYSTEMS, INC 2 $347,917.00 123.88

    MTCE R300-177 US 50, SH 114,149,347 3 M

    20110707 ROADSAFE TRAFFIC SYSTEMS, INC 2 $1,591,680.00 102.93

    MTCE R600-398 VARIOUS LOCATIONS IN REGION 6 6 U

    20110728 W.L. CONTRACTORS, INC. 2 $689,082.90 108.97

    MTCE082A-011 SH 82 MM 39.38 TO 41.23 IN PIT 3 M

    20110728 HIGHMARK TRAFFIC SERVICES, INC. 5 $398,488.00 96.65

    MTCER300-181 SH 50A MM 95.41 - 81.60, SH 13 3 M

    20110728 ROADSAFE TRAFFIC SYSTEMS, INC 3 $248,800.00 122.92

    MTCE 070-011 INTERSTATE 70A, MM 155 TO MM 1 3 M

    20110804 KOLBE STRIPING INC. 2 $753,320.00 99.56

    MTCE1602-131 REGION 5 5 U

  • Colorado Department of Transportation 14:27 Monday, March 12, 2012 2

    2011 Cost Data - Maintenance

    PROJECTS BID FROM 01/01/11 THROUGH 12/31/11

    ------------------------------------------------------------------------------------------------------------------------------------

    BID CONTRACTOR/

    LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX

    ------------------------------------------------------------------------------------------------------------------------------------

    20110825 STURGEON ELECTRIC COMPANY, INC 3 $194,749.00 107.72

    MTCE R600-400 VARIOUS LOCATIONS IN REGION 6 6 U

    20110915 HIGHWAY TECHNOLOGIES 3 $183,462.00 76.61

    MTCE0403-054 VARIOUS HWYS, WESTERN R1, CLEA 1 M

    20111117 G.A. WESTERN CONSTRUCTION CO. 5 $150,634.00 60.26

    MTCE 0702-315 I-70 MM 125.83 EB STRUCTURE F- 3 R

    20111201 MOUNTAIN VALLEY HYDROSEED, LLC 4 $699,566.12 116.83

    R200-179 REGION-WIDE 2 U

    ======= ================ ======

    TOTALS 81 $11,510,756.38 101.71

  • Colorado Department of Transportation 14:27 Monday, March 12, 2012 1

    2011 Cost Data - Maintenance

    INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/11 THROUGH 12/31/11

    ------------------------------------------------------------------------------------------------------------------------------------

    ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE

    ------------------------------------------------------------------------------------------------------------------------------------

    201-00000 Clearing and Grubbing 1 Lump Sum 5,264.70 5,264.70

    202-00037 Removal of End Section 1 Each 233.91 233.91

    202-00195 Removal of Median Cover 150 Sq Yard 1,207.50 8.05

    202-00200 Removal of Sidewalk 60 Sq Yard 586.80 9.78

    202-00203 Removal of Curb and Gutter 36 Lin Foot 564.12 15.67

    202-00220 Removal of Asphalt Mat 30 Sq Yard 493.15 16.44

    202-00250 Removal of Pavement Marking 725,220 Sq Foot 324,810.00 0.45

    202-00251 Removal of Pavement Marking (Asphalt Grooving) 10,100 Sq Foot 15,150.00 1.50

    202-00500 Removal of Portions of Present Structure 2 Each 19,032.50 9,516.25

    202-00503 Removal of Portions of Present Structure 2 Sq Yard 1,100.00 550.00

    202-00504 Removal of Expansion Device 176 Lin Foot 10,048.50 57.09

    202-00700 Removal of Light Standard 5 Each 1,375.00 275.00

    202-00705 Removal of Light Standard Foundation 5 Each 1,375.00 275.00

    202-00750 Removal of Luminaire 15 Each 1,575.00 105.00

    202-00805 Removal of Overhead Sign Structure 4 Each 17,669.56 4,417.39

    202-00810 Removal of Ground Sign 550 Each 24,118.48 43.85

    202-00821 Removal of Sign Panel 2,752 Each 64,297.44 23.36

    202-00827 Removal of Pull Box 39 Each 10,047.50 257.63

    202-00848 Removal of Traffic Signal Controller and Cabinet 1 Each 1,351.25 1,351.25

    202-01130 Removal of Guardrail Type 3 325 Lin Foot 2,528.50 7.78

    202-05100 Sandblasting Reinforcing Steel 21 Sq Yard 420.00 20.00

    202-05150 Sandblasting 425 Sq Foot 2,122.50 4.99

    203-00060 Embankment Material (Complete In Place) 2,000 Cubic Yard 48,280.00 24.14

    203-01597 Potholing 50 Hour 7,000.00 140.00

    203-01622 Sweeping (With Pickup Broom) 250 Hour 37,500.00 150.00

    208-00002 Erosion Log (12 Inch) 435 Lin Foot 2,120.30 4.87

    208-00005 Erosion Log 50 Lin Foot 550.00 11.00

    208-00011 Erosion Bales (Weed Free) 20 Each 345.00 17.25

    208-00020 Silt Fence 500 Lin Foot 625.00 1.25

    208-00034 Gravel Bag 1,192 Lin Foot 4,458.00 3.74

    208-00045 Concrete Washout Structure 3 Each 2,640.00 880.00

    208-00050 Storm Drain Inlet Protection 11 Each 1,678.75 152.61

    208-00051 Storm Drain Inlet Protection 10 Lin Foot 300.00 30.00

    208-00103 Removal and Disposal of Sediment (Labor) 60 Hour 3,300.00 55.00

    210-00425 Reset Bridge Railing 12 Lin Foot 396.00 33.00

    210-00750 Reset Light Standard 15 Each 2,122.50 141.50

    210-00755 Reset Light Standard Steel High Mast 2 Each 4,950.00 2,475.00

    210-00810 Reset Ground Sign 5 Each 1,550.00 310.00

  • Colorado Department of Transportation 14:27 Monday, March 12, 2012 2

    2011 Cost Data - Maintenance

    INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/11 THROUGH 12/31/11

    ------------------------------------------------------------------------------------------------------------------------------------

    ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE

    ------------------------------------------------------------------------------------------------------------------------------------

    210-00815 Reset Sign Panel 21 Each 2,210.00 105.24

    210-00827 Reset Pull Box 6 Each 1,380.00 230.00

    210-00855 Reset Traffic Signal Controller Cabinet 1 Each 5,727.00 5,727.00

    212-00006 Seeding (Native) 1 Acre 2,613.86 2,613.86

    212-00032 Soil Conditioning 1 Acre 548.00 548.00

    213-00002 Mulching (Weed Free Hay) 1 Acre 766.50 766.50

    213-00012 Spray-on Mulch Blanket 0 Acre 2,234.78

    213-00061 Mulch Tackifier 100 Pound 323.00 3.23

    216-00201 Soil Retention Blanket (Straw-Coconut) 500 Sq Yard 845.00 1.69

    304-06000 Aggregate Base Course (Class 6) 225 Ton 6,655.50 29.58

    403-00720 Hot Bituminous Pavement (Patching) (Asphalt) 65 Ton 11,430.85 175.86

    403-32741 Hot Bituminous Pavement (Grading SG) (75) (PG 64-22) 295 Ton 24,995.35 84.73

    409-03055 Place Cover Coat Material 462,462 Sq Yard 106,366.26 0.23

    411-10216 Emulsified Asphalt (CRS-2P) 237,838 Gallon 487,567.90 2.05

    411-10255 Emulsified Asphalt (Slow-Setting) 29,069 Gallon 58,138.00 2.00

    503-00042 Drilled Caisson (42 Inch) 66 Lin Foot 22,921.80 347.30

    503-00048 Drilled Caisson (48 Inch) 80 Lin Foot 35,885.60 448.57

    503-00054 Drilled Caisson (54 Inch) 138 Lin Foot 76,806.66 556.57

    515-00410 Concrete Sealer (Calcium Nitrite) 21 Sq Yard 903.00 43.00

    518-01004 Bridge Expansion Device (0-4 Inch) 142 Lin Foot 8,490.00 59.79

    518-01015 Bridge Expansion Device (0-15 Inch) 34 Lin Foot 106,362.50 3,128.31

    518-02010 Elastomeric Concrete End Dam 38 Cubic Foot 19,000.00 500.00

    518-02030 Polyester Concrete End Dam 174 Cubic Foot 17,052.00 98.00

    601-01000 Concrete Class B 33 Cubic Yard 11,726.55 355.35

    601-03000 Concrete Class D 22 Cubic Yard 12,928.30 587.65

    601-03040 Concrete Class D (Bridge) 3 Cubic Yard 3,650.00 1,216.67

    602-00020 Reinforcing Steel (Epoxy Coated) 700 Pound 2,345.00 3.35

    606-00301 Guardrail Type 3 (6-3 Post Spacing) 1,300 Lin Foot 22,958.00 17.66

    606-01340 End Anchorage Type 3D 4 Each 3,227.96 806.99

    606-02003 End Anchorage (Nonflared) 3 Each 6,210.30 2,070.10

    607-52910 Corner and Line Brace Post (Chain Link) 6 Each 690.00 115.00

    607-53172 Fence Chain Link (72 Inch) 400 Lin Foot 10,776.00 26.94

    607-60274 24 Foot Gate Double (Chain Link) 1 Each 2,694.45 2,694.45

    608-00000 Concrete Sidewalk 40 Sq Yard 6,946.00 173.65

    610-00030 Median Cover Material (Concrete) 160 Sq Foot 5,520.00 34.50

    612-00001 Delineator (Type I) 6 Each 114.60 19.10

    612-00003 Delineator (Type III) 6 Each 128.64 21.44

    612-00260 Location Marker (Fiber Optic)(Dome) 72 Each 2,566.80 35.65

  • Colorado Department of Transportation 14:27 Monday, March 12, 2012 3

    2011 Cost Data - Maintenance

    INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/11 THROUGH 12/31/11

    ------------------------------------------------------------------------------------------------------------------------------------

    ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE

    ------------------------------------------------------------------------------------------------------------------------------------

    613-00150 1-1/2 Inch Electrical Conduit 1,970 Lin Foot 41,370.00 21.00

    613-00206 2 Inch Electrical Conduit (Bored) 8,151 Lin Foot 150,793.50 18.50

    613-00208 2 Inch Electrical Conduit (Bored) (Install Only) 100 Lin Foot 4,000.00 40.00

    613-00306 3 Inch Electrical Conduit (Bored) 3,880 Lin Foot 85,360.00 22.00

    613-00700 Inspection Trip 12 Each 34,920.00 2,910.00

    613-01200 2 Inch Electrical Conduit (Plastic) 40,605 Lin Foot 274,489.80 6.76

    613-01202 2 Inch Electrical Conduit (Plastic) (Install Only) 150 Lin Foot 2,250.00 15.00

    613-01300 3 Inch Electrical Conduit (Plastic) 1,090 Lin Foot 8,175.00 7.50

    613-04010 Conduit 1 Lump Sum 5,669.50 5,669.50

    613-07000 Pull Box (Special) 67 Each 40,535.50 605.01

    613-07018 Pull Box (18"x12"x8") 2 Each 851.00 425.50

    613-07023 Pull Box (24"x36"x24") 14 Each 26,600.00 1,900.00

    613-07026 Pull Box (16"x24"x12") 37 Each 33,670.00 910.00

    613-07039 Pull Box (30"x48"x18") 58 Each 56,361.50 971.75

    613-07199 Pull Box (Install Only) 10 Each 3,450.00 345.00

    613-08100 Electric Vault (6'x5'x6.5') Deep 1 Each 6,785.00 6,785.00

    613-10000 Wiring 2 Lump Sum 53,339.75 26,669.88

    613-20100 Light Standard (Install Only) 5 Each 1,025.00 205.00

    613-20200 Luminaire (Install Only) 15 Each 3,075.00 205.00

    613-20215 Luminaire Arm (Install Only) 15 Each 1,575.00 105.00

    613-40005 Concrete Foundation Pad (Install Only) 5 Each 3,725.00 745.00

    613-50102 Lighting Control Center (Install Only) 2 Each 2,320.00 1,160.00

    613-50150 Secondary Service Pedestal 3 Each 12,633.00 4,211.00

    613-50155 Secondary Service Pedestal (Install Only) 2 Each 3,400.00 1,700.00

    613-60600 Lighting Repair 600 Hour 45,000.00 75.00

    613-60700 Troubleshooting 200 Hour 15,000.00 75.00

    613-60800 Locate Utilities 100 Hour 5,000.00 50.00

    614-00011 Sign Panel (Class I) 893 Sq Foot 15,293.00 17.13

    614-00012 Sign Panel (Class II) 3,847 Sq Foot 77,060.60 20.03

    614-00013 Sign Panel (Class III) 11,367 Sq Foot 238,396.43 20.97

    614-00025 Sign Panel (Class I) (Install Only) 15,091 Sq Foot 64,244.00 4.26

    614-00027 Sign Panel (Class II) (Install Only) 11,839 Sq Foot 92,665.00 7.83

    614-00028 Sign Panel (Class III) (Install Only) 9,333 Sq Foot 45,730.00 4.90

    614-00612 Steel Sign Post (W 6x12) 84 Lin Foot 2,940.00 35.00

    614-00615 Steel Sign Post (W 6x15) 92 Lin Foot 3,680.00 40.00

    614-00818 Steel Sign Post (W 8x18) 34 Lin Foot 1,700.00 50.00

    614-00821 Steel Sign Post (W 8x21) 70 Lin Foot 3,266.32 46.66

    614-01026 Steel Sign Post (W 10x26) 32 Lin Foot 1,888.00 59.00

  • Colorado Department of Transportation 14:27 Monday, March 12, 2012 4

    2011 Cost Data - Maintenance

    INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/11 THROUGH 12/31/11

    ------------------------------------------------------------------------------------------------------------------------------------

    ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE

    ------------------------------------------------------------------------------------------------------------------------------------

    614-01512 Steel Sign Support (2-Inch Round)(Post) 1,619 Lin Foot 10,419.00 6.44

    614-01522 Steel Sign Support (2-Inch Round)(Socket) 49 Each 5,010.00 102.24

    614-01573 Steel Sign Support (2-1/2 Inch Round NP-40)(Post & Sl 2 Each 573.08 286.54

    614-01575 Steel Sign Support (2-1/2 Inch Round NP-40)(Post) 5,521 Lin Foot 92,852.00 16.82

    614-01578 Steel Sign Support (2-1/2 Inch Round NP-40)(Slipbase) 421 Each 78,970.00 187.58

    614-01585 Steel Sign Support (2-1/2 Inch Round Sch 80) (Post) 1,163 Lin Foot 21,979.00 18.90

    614-01588 Steel Sign Support (2-1/2 Inch Round Sch 80)(Slipbase 77 Each 18,075.00 234.74

    614-03001 Concrete Footing (Type 1) 6 Each 6,300.00 1,050.00

    614-03002 Concrete Footing (Type 2) 6 Each 6,900.00 1,150.00

    614-03003 Concrete Footing (Type 3) 2 Each 2,560.00 1,280.00

    614-03004 Concrete Footing (Type 4) 4 Each 5,195.24 1,298.81

    614-03006 Concrete Footing (Type 6) 2 Each 3,600.00 1,800.00

    614-10110 LED Warning Sign System (_Signs) 1 Each 5,000.00 5,000.00

    614-32400 Monotube Overhead Sign Cantilever (24 Inch Diameter) 4 Each 150,778.40 37,694.60

    614-41800 Monotube Overhead Sign Bridge (18 Inch Diameter) 1 Each 53,027.40 53,027.40

    614-42400 Monotube Overhead Sign Bridge (24 Inch Diameter) 2 Each 136,650.22 68,325.11

    614-70150 Pedestrian Signal Face (16) (Countdown) 32 Each 17,600.00 550.00

    614-72860 Pedestrian Push Button 32 Each 3,136.00 98.00

    614-72875 Loop Detector Wire 8,244 Lin Foot 39,983.40 4.85

    614-72876 Traffic Signal Vehicle Detector Amplifier (Loop Type) 45 Each 8,100.00 180.00

    614-72892 Power Feed Wire 110 Lin Foot 440.00 4.00

    614-75875 Loop Detector Wire (Install Only) 10,000 Lin Foot 22,500.00 2.25

    614-86000 Traffic Signal Controller (Master) 2 Each 48,540.00 24,270.00

    614-86920 Modification of Traffic Signal Controller Cabinet 8 Each 18,960.00 2,370.00

    614-87010 Fiber Optic Cable (Single Mode) (12 Fiber) 13,033 Lin Foot 26,066.00 2.00

    614-87012 Fiber Optic Termination Panel - 12 Fiber 8 Each 5,616.00 702.00

    614-87020 Optical Transceiver 8 Each 17,560.00 2,195.00

    614-87350 Test Fiber Optic Cable 1 Lump Sum 4,025.00 4,025.00

    614-87401 Fiber Optic Cable (Special) 56,150 Lin Foot 32,567.00 0.58

    614-87424 Fiber Optic Cable (Single Mode) (24 Strands) 1,500 Lin Foot 870.00 0.58

    614-87506 Splice Fiber Optic Cable (6 Strand) 126 Each 27,357.12 217.12

    620-00020 Sanitary Facility 5 Each 825.00 165.00

    625-00000 Construction Surveying 2 Lump Sum 5,214.10 2,607.05

    626-00000 Mobilization 20 Lump Sum 608,667.79 30,433.39

    626-01000 Public Information Services 3 Lump Sum 22,685.00 7,561.67

    627-00005 Epoxy Pavement Marking 96,394 Gallon 3,877,926.55 40.23

    627-00007 Epoxy Pavement Marking (Special) 2,750 Gallon 281,875.00 102.50

    627-00011 Pavement Marking Paint (Waterborne) 2,367 Gallon 71,010.00 30.00

  • Colorado Department of Transportation 14:27 Monday, March 12, 2012 5

    2011 Cost Data - Maintenance

    INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/11 THROUGH 12/31/11

    ------------------------------------------------------------------------------------------------------------------------------------

    ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE

    ------------------------------------------------------------------------------------------------------------------------------------

    627-00032 Raised Flexible Pavement Marker (Temporary) 1,000 Each 2,500.00 2.50

    627-01010 Preformed Plastic Pavement Marking (Type I)(Inlaid) 62,158 Sq Foot 583,412.00 9.39

    627-02010 Preformed Plastic Pavement Marking (Type II) (Inlaid) 103,350 Sq Foot 928,490.00 8.98

    627-30205 Thermoplastic Pavement Marking (Word-Symbol) 3,520 Sq Foot 45,232.00 12.85

    627-30405 Preformed Thermoplastic Pavement Marking (Word-Symbol 13,601 Sq Foot 81,606.00 6.00

    627-30410 Preformed Thermoplastic Pavement Marking (Xwalk-Stop 33,612 Sq Foot 168,060.00 5.00

    627-40003 Methyl Methacrylate Pavement Marking (Inlaid) 24,097 Sq Foot 282,758.00 11.73

    630-00000 Flagging 5,398 Hour 106,366.80 19.70

    630-00007 Traffic Control Inspection 52 Day 5,197.44 99.95

    630-00012 Traffic Control Management 768 Day 241,444.20 314.38

    630-80305 Flagging Station Light 2 Each 800.00 400.00

    630-80335 Barricade (Type 3 M-A) (Temporary) 10 Each 1,754.30 175.43

    630-80341 Construction Traffic Sign (Panel Size A) 266 Each 6,107.40 22.96

    630-80342 Construction Traffic Sign (Panel Size B) 574 Each 14,984.30 26.11

    630-80343 Construction Traffic Sign (Panel Size C) 44 Each 930.30 21.14

    630-80344 Construction Traffic Sign (Special) 127 Sq Foot 1,888.00 14.87

    630-80350 Vertical Panel 170 Each 3,230.00 19.00

    630-80355 Portable Message Sign Panel 5 Each 5,002.00 1,000.40

    630-80357 Advance Warning Flashing or Sequencing Arrow Panel (B 13 Each 6,006.92 462.07

    630-80358 Advance Warning Flashing or Sequencing Arrow Panel (C 14 Each 5,053.00 360.93

    630-80359 Portable Message Sign Panel 230 Day 15,858.80 68.95

    630-80360 Drum Channelizing Device 315 Each 3,835.50 12.18

    630-80380 Traffic Cone 3,530 Each 13,291.50 3.77

    630-80510 Mobile Pavement Marking Zone 4 Lump Sum 19,000.00 4,750.00

    630-85040 Impact Attenuator (Truck Mounted Attenuator) (Tempora 6 Each 24,334.60 4,055.77

    630-85041 Mobile Attenuator 110 Day 21,070.00 191.55

  • COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 1

    ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA

    ------------------------------------------------------------------------------------------------------------------------------------

    ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/

    PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID

    ------------------------------------------------------------------------------------------------------------------------------------

    =============== 201-00000 Clear and Grub LUMP SUM ===============================================

    MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 1.00 1500.00 3854.12 5264.70

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1500.00 3160.52 3889.85

    ============== =============== =============== ===============

    WEIGHTED AVERAGE FOR THE YEAR 1.00 1500.00 3160.52 3889.85

    =============== 202-00037 Rem of End Section Each ===================================================

    R200-179 REGION-WIDE 12/01/11 1.00 500.00 247.98 233.91

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 500.00 247.98 233.91

    ============== =============== =============== ===============

    WEIGHTED AVERAGE FOR THE YEAR 1.00 500.00 247.98 233.91

    =============== 202-00195 Rem of Median Cover Sq Yard ================================================

    MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 150.00 30.00 26.15 8.05

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE FIRST QUARTER 150.00 30.00 26.15 8.05

    ============== =============== =============== ===============

    WEIGHTED AVERAGE FOR THE YEAR 150.00 30.00 26.15 8.05

    =============== 202-00200 Rem Sidewalk Sq Yard ================================================

    MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 60.00 23.00 26.44 9.78

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE FIRST QUARTER 60.00 23.00 26.44 9.78

    ============== =============== =============== ===============

    WEIGHTED AVERAGE FOR THE YEAR 60.00 23.00 26.44 9.78

    =============== 202-00203 Rem Curb and Gutter Lin Foot ===============================================

    MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 36.00 10.00 17.54 15.67

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE FIRST QUARTER 36.00 10.00 17.54 15.67

    ============== =============== =============== ===============

    WEIGHTED AVERAGE FOR THE YEAR 36.00 10.00 17.54 15.67

    =============== 202-00220 Rem Asphalt Mat Sq Yard ================================================

    MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 25.00 8.00 39.89 9.20

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE FIRST QUARTER 25.00 8.00 39.89 9.20

  • COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 2

    ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA

    ------------------------------------------------------------------------------------------------------------------------------------

    ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/

    PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID

    ------------------------------------------------------------------------------------------------------------------------------------

    =============== 202-00220 Rem Asphalt Mat Sq Yard ================================================

    R200-179 REGION-WIDE 12/01/11 5.00 60.00 110.91 52.63

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 60.00 110.91 52.63

    ============== =============== =============== ===============

    WEIGHTED AVERAGE FOR THE YEAR 30.00 16.67 48.25 16.44

    =============== 202-00250 Rem Pavement Marking Sq Foot ================================================

    MTCER300-171 REGION 3 FY 11 REGION WIDE EP 01/06/11 150,000.00 0.30 0.29 0.25

    MTCER500-116 REGION 5 VARIOUS HIGHWAYS 01/27/11 500.00 3.50 4.15 0.50

    MTCER300-173 REGION 3 FY 11 SH 40 EPOXY ST 02/17/11 214,000.00 0.30 0.38 0.23

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE FIRST QUARTER 364,500.00 0.30 0.33 0.24

    MTCE R600-398 VARIOUS LOCATIONS IN REGION 6 07/07/11 310,000.00 0.40 0.67 0.44

    MTCE1602-131 REGION 5 08/04/11 50,720.00 1.00 5.00 2.00

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE THIRD QUARTER 360,720.00 0.48 1.18 0.64

    ============== =============== =============== ===============

    WEIGHTED AVERAGE FOR THE YEAR 725,220.00 0.39 0.54 0.45

    =============== 202-00251 Rem Pvmt Marking (Asph Grooving) Sq Foot ================================================

    MTCE R500-117 R5 VARIOUS HIGHWAYS 02/10/11 10,100.00 1.50 1.50 1.50

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE FIRST QUARTER 10,100.00 1.50 1.50 1.50

    ============== =============== =============== ===============

    WEIGHTED AVERAGE FOR THE YEAR 10,100.00 1.50 1.50 1.50

    =============== 202-00500 Rem Port Present Str Each ===================================================

    MTCE 133A-038 I-07P SH-133A MM 18.9 02/03/11 2.00 4000.00 5190.91 9516.25

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 4000.00 5190.91 9516.25

    ============== =============== =============== ===============

    WEIGHTED AVERAGE FOR THE YEAR 2.00 4000.00 5190.91 9516.25

  • COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 3

    ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA

    ------------------------------------------------------------------------------------------------------------------------------------

    ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/

    PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID

    ------------------------------------------------------------------------------------------------------------------------------------

    =============== 202-00503 Rem Port Present Str Sq Yard ================================================

    MTCE 0702-315 I-70 MM 125.83 EB STRUCTURE F 11/17/11 2.00 700.00 4211.00 550.00

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 700.00 4211.00 550.00

    ============== =============== =============== ===============

    WEIGHTED AVERAGE FOR THE YEAR 2.00 700.00 4211.00 550.00

    =============== 202-00504 Rem Exp Device Lin Foot ===============================================

    MTCE 133A-038 I-07P SH-133A MM 18.9 02/03/11 141.50 100.00 107.75 40.00

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE FIRST QUARTER 141.50 100.00 107.75 40.00

    MTCE 0702-315 I-70 MM 125.83 EB STRUCTURE F 11/17/11 33.50 120.00 537.60 131.00

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE FOURTH QUARTER 33.50 120.00 537.60 131.00

    ============== =============== =============== ===============

    WEIGHTED AVERAGE FOR THE YEAR 175.00 103.83 163.16 57.42

    =============== 202-00700 Rem Light Standard Each ===================================================

    MTCE R600-400 VARIOUS LOCATIONS IN REGION 6 08/25/11 5.00 350.00 308.33 275.00

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 350.00 308.33 275.00

    ============== =============== =============== ===============

    WEIGHTED AVERAGE FOR THE YEAR 5.00 350.00 308.33 275.00

    =============== 202-00705 Rem Light Standard Foundation Each ===================================================

    MTCE R600-400 VARIOUS LOCATIONS IN REGION 6 08/25/11 5.00 150.00 341.67 275.00

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 150.00 341.67 275.00

    ============== =============== =============== ===============

    WEIGHTED AVERAGE FOR THE YEAR 5.00 150.00 341.67 275.00

    =============== 202-00750 Rem Luminaire Each ===================================================

    MTCE R600-400 VARIOUS LOCATIONS IN REGION 6 08/25/11 15.00 80.00 82.00 105.00

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE THIRD QUARTER 15.00 80.00 82.00 105.00

    ============== =============== =============== ===============

    WEIGHTED AVERAGE FOR THE YEAR 15.00 80.00 82.00 105.00

  • COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 4

    ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA

    ------------------------------------------------------------------------------------------------------------------------------------

    ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/

    PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID

    ------------------------------------------------------------------------------------------------------------------------------------

    =============== 202-00805 Rem Overhead Sign Str Each ===================================================

    R200-179 REGION-WIDE 12/01/11 4.00 3000.00 7935.60 4417.39

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 3000.00 7935.60 4417.39

    ============== =============== =============== ===============

    WEIGHTED AVERAGE FOR THE YEAR 4.00 3000.00 7935.60 4417.39

    =============== 202-00810 Rem Ground Sign Each ===================================================

    MTCER500-118 SH 145, US 160, US 491, US 28 02/03/11 55.00 40.00 144.30 30.00

    MTCE R100-188 I-25 SIGN REPLACEMENT PROJECT 02/17/11 136.00 25.00 54.25 105.00

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE FIRST QUARTER 191.00 29.32 41.53 34.92

    MTCE R300-177 US 50, SH 114,149,347 06/02/11 330.00 35.00 33.50 17.00

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE SECOND QUARTER 330.00 35.00 33.50 17.00

    MTCE0403-054 VARIOUS HWYS, WESTERN R1, CLE 09/15/11 28.00 125.00 171.67 90.00

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE THIRD QUARTER 28.00 125.00 171.67 90.00

    R200-179 REGION-WIDE 12/01/11 1.00 50.00 323.87 58.48

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 50.00 323.87 58.48

    ============== =============== =============== ===============

    WEIGHTED AVERAGE FOR THE YEAR 550.00 37.64 43.31 30.54

    =============== 202-00821 Rem Sign Panel Each ===================================================

    MTCER500-118 SH 145, US 160, US 491, US 28 02/03/11 25.00 15.00 78.60 15.00

    MTCER300-172 REGION 3 INTERSTATE 70 CORRID 02/17/11 320.00 15.00 21.75 22.00

    MTCE R100-188 I-25 SIGN REPLACEMENT PROJECT 02/17/11 853.00 14.00 30.81 50.00

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,198.00 14.29 29.65 41.70

  • COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 5

    ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA

    ------------------------------------------------------------------------------------------------------------------------------------

    ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/

    PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID

    ------------------------------------------------------------------------------------------------------------------------------------

    =============== 202-00821 Rem Sign Panel Each ===================================================

    MTCE R300-177 US 50, SH 114,149,347 06/02/11 1,540.00 15.00 17.00 9.00

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,540.00 15.00 17.00 9.00

    MTCE0403-054 VARIOUS HWYS, WESTERN R1, CLE 09/15/11 2.00 14.00 135.00 40.00

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 14.00 135.00 40.00

    R200-179 REGION-WIDE 12/01/11 12.00 250.00 446.59 24.37

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12.00 250.00 446.59 24.37

    ============== =============== =============== ===============

    WEIGHTED AVERAGE FOR THE YEAR 2,752.00 15.71 27.35 23.34

    =============== 202-00827 Rem of Pull Box Each ===================================================

    MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 11.00 60.00 143.96 172.50

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE FIRST QUARTER 11.00 60.00 143.96 172.50

    MTCE082A-011 SH 82 MM 39.38 TO 41.23 IN PI 07/28/11 23.00 80.00 335.00 325.00

    MTCE R600-400 VARIOUS LOCATIONS IN REGION 6 08/25/11 5.00 60.00 125.00 135.00

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE THIRD QUARTER 28.00 76.43 186.51 241.80

    ============== =============== =============== ===============

    WEIGHTED AVERAGE FOR THE YEAR 39.00 71.79 177.87 231.22

    =============== 202-00848 Rem Traf Sig Control+Cab Each ===================================================

    MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 1.00 1000.00 787.04 1351.25

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1000.00 787.04 1351.25

    ============== =============== =============== ===============

    WEIGHTED AVERAGE FOR THE YEAR 1.00 1000.00 787.04 1351.25

  • COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 6

    ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA

    ------------------------------------------------------------------------------------------------------------------------------------

    ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/

    PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID

    ------------------------------------------------------------------------------------------------------------------------------------

    =============== 202-01130 Rem Gdrail Ty 3 Lin Foot ===============================================

    R200-179 REGION-WIDE 12/01/11 325.00 2.75 8.20 7.78

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE FOURTH QUARTER 325.00 2.75 8.20 7.78

    ============== =============== =============== ===============

    WEIGHTED AVERAGE FOR THE YEAR 325.00 2.75 8.20 7.78

    =============== 202-05100 Sandblasting Reinf Steel Sq Yard ================================================

    MTCE 0702-315 I-70 MM 125.83 EB STRUCTURE F 11/17/11 21.00 6.00 42.20 20.00

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE FOURTH QUARTER 21.00 6.00 42.20 20.00

    ============== =============== =============== ===============

    WEIGHTED AVERAGE FOR THE YEAR 21.00 6.00 42.20 20.00

    =============== 202-05150 Sandblasting Sq Foot ================================================

    MTCE 133A-038 I-07P SH-133A MM 18.9 02/03/11 424.50 0.50 3.91 5.00

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE FIRST QUARTER 424.50 0.50 3.91 5.00

    ============== =============== =============== ===============

    WEIGHTED AVERAGE FOR THE YEAR 424.50 0.50 3.91 5.00

    =============== 203-00060 Emb Matl (CIP) Cubic Yard =============================================

    MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 2,000.00 8.00 17.05 24.14

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,000.00 8.00 17.47 24.09

    ============== =============== =============== ===============

    WEIGHTED AVERAGE FOR THE YEAR 2,000.00 8.00 17.47 24.09

    =============== 203-01597 Potholing Hour ===================================================

    MTCE082A-011 SH 82 MM 39.38 TO 41.23 IN PI 07/28/11 50.00 180.00 282.50 140.00

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE THIRD QUARTER 50.00 180.00 164.21 168.19

    ============== =============== =============== ===============

    WEIGHTED AVERAGE FOR THE YEAR 50.00 180.00 162.43 150.55

    =============== 203-01622 Sweeping (With Pickup Broom) Hour ===================================================

    MTCE1602-131 REGION 5 08/04/11 250.00 150.00 142.50 150.00

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE THIRD QUARTER 250.00 150.00 142.50 150.00

    ============== =============== =============== ===============

    WEIGHTED AVERAGE FOR THE YEAR 250.00 150.00 142.50 150.00

  • COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 7

    ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA

    ------------------------------------------------------------------------------------------------------------------------------------

    ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/

    PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID

    ------------------------------------------------------------------------------------------------------------------------------------

    =============== 208-00002 Erosion Log (12 In) Lin Foot ===============================================

    MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 335.00 6.00 5.28 5.18

    MTCE R500-108 US 550 R5 MP 38.2 TO MP 49.8 03/10/11 100.00 5.00 14.43 3.85

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE FIRST QUARTER 435.00 5.77 6.06 4.39

    ============== =============== =============== ===============

    WEIGHTED AVERAGE FOR THE YEAR 435.00 5.77 4.20 4.00

    =============== 208-00005 Erosion Log Lin Foot ===============================================

    MTCE082A-011 SH 82 MM 39.38 TO 41.23 IN PI 07/28/11 50.00 3.35 19.00 11.00

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE THIRD QUARTER 50.00 3.35 4.70 5.29

    ============== =============== =============== ===============

    WEIGHTED AVERAGE FOR THE YEAR 50.00 3.35 4.74 5.68

    =============== 208-00011 Erosion Bales (Weed Free) Each ===================================================

    MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 20.00 20.00 20.79 17.25

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 20.00 20.79 17.25

    ============== =============== =============== ===============

    WEIGHTED AVERAGE FOR THE YEAR 20.00 20.00 20.79 17.25

    =============== 208-00020 Silt Fence Lin Foot ===============================================

    MTCE R500-108 US 550 R5 MP 38.2 TO MP 49.8 03/10/11 500.00 2.50 21.47 1.25

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE FIRST QUARTER 500.00 2.50 21.47 1.25

    ============== =============== =============== ===============

    WEIGHTED AVERAGE FOR THE YEAR 500.00 2.50 21.47 1.25

    =============== 208-00034 Gravel Bag Lin Foot ===============================================

    MTCE 133A-038 I-07P SH-133A MM 18.9 02/03/11 96.00 7.00 8.40 11.00

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE FIRST QUARTER 96.00 7.00 6.03 6.00

    MTCE R600-400 VARIOUS LOCATIONS IN REGION 6 08/25/11 1,000.00 4.00 4.47 3.21

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,000.00 4.00 4.48 3.89

  • COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 8

    ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA

    ------------------------------------------------------------------------------------------------------------------------------------

    ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/

    PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID

    ------------------------------------------------------------------------------------------------------------------------------------

    =============== 208-00034 Gravel Bag Lin Foot ===============================================

    MTCE 0702-315 I-70 MM 125.83 EB STRUCTURE F 11/17/11 96.00 5.00 7.20 2.00

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE FOURTH QUARTER 96.00 5.00 7.20 2.00

    ============== =============== =============== ===============

    WEIGHTED AVERAGE FOR THE YEAR 1,192.00 4.32 4.90 4.12

    =============== 208-00045 Conc Washout Str Each ===================================================

    MTCE 133A-038 I-07P SH-133A MM 18.9 02/03/11 1.00 1000.00 535.00 650.00

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1000.00 748.20 537.67

    MTCE082A-011 SH 82 MM 39.38 TO 41.23 IN PI 07/28/11 1.00 560.00 1600.00 1940.00

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 560.00 936.12 1104.00

    MTCE 0702-315 I-70 MM 125.83 EB STRUCTURE F 11/17/11 1.00 800.00 655.70 50.00

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 800.00 655.70 50.00

    ============== =============== =============== ===============

    WEIGHTED AVERAGE FOR THE YEAR 3.00 786.67 904.36 649.91

    =============== 208-00050 Storm Drain Inlet Protection Each ===================================================

    MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 5.00 100.00 122.54 143.75

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 100.00 122.54 143.75

    MTCE082A-011 SH 82 MM 39.38 TO 41.23 IN PI 07/28/11 6.00 51.00 280.00 160.00

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 51.00 280.00 160.00

    ============== =============== =============== ===============

    WEIGHTED AVERAGE FOR THE YEAR 11.00 73.27 167.53 152.61

  • COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 9

    ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA

    ------------------------------------------------------------------------------------------------------------------------------------

    ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/

    PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID

    ------------------------------------------------------------------------------------------------------------------------------------

    =============== 208-00051 Storm Drain Inlet Protection (Type 1) Lin Foot ===============================================

    MTCE1602-131 REGION 5 08/04/11 10.00 12.00 125.00 30.00

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 12.00 125.00 30.00

    ============== =============== =============== ===============

    WEIGHTED AVERAGE FOR THE YEAR 10.00 12.00 125.00 30.00

    =============== 208-00103 Removal and Disposal of Sediment (Labor) Hour ===================================================

    MTCE R600-400 VARIOUS LOCATIONS IN REGION 6 08/25/11 60.00 40.00 45.00 55.00

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE THIRD QUARTER 60.00 40.00 53.05 76.47

    ============== =============== =============== ===============

    WEIGHTED AVERAGE FOR THE YEAR 60.00 40.00 49.27 66.57

    =============== 210-00425 Res Bridge Railing Lin Foot ===============================================

    MTCE 0702-315 I-70 MM 125.83 EB STRUCTURE F 11/17/11 12.00 30.00 162.40 33.00

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12.00 30.00 162.40 33.00

    ============== =============== =============== ===============

    WEIGHTED AVERAGE FOR THE YEAR 12.00 30.00 162.40 33.00

    =============== 210-00750 Res Light Standard Each ===================================================

    MTCE R600-400 VARIOUS LOCATIONS IN REGION 6 08/25/11 15.00 600.00 440.50 141.50

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE THIRD QUARTER 15.00 600.00 440.50 141.50

    ============== =============== =============== ===============

    WEIGHTED AVERAGE FOR THE YEAR 15.00 600.00 440.50 141.50

    =============== 210-00755 Res Light Standard Steel High Mast Each ===================================================

    MTCE R600-400 VARIOUS LOCATIONS IN REGION 6 08/25/11 2.00 5000.00 3263.67 2475.00

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 5000.00 3263.67 2475.00

    ============== =============== =============== ===============

    WEIGHTED AVERAGE FOR THE YEAR 2.00 5000.00 3263.67 2475.00

    =============== 210-00810 Res Ground Sign Each ===================================================

    MTCE R300-177 US 50, SH 114,149,347 06/02/11 5.00 200.00 300.00 310.00

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 200.00 300.00 310.00

    ============== =============== =============== ===============

    WEIGHTED AVERAGE FOR THE YEAR 5.00 200.00 300.00 310.00

  • COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 10

    ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA

    ------------------------------------------------------------------------------------------------------------------------------------

    ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/

    PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID

    ------------------------------------------------------------------------------------------------------------------------------------

    =============== 210-00815 Res Sign Panel Each ===================================================

    MTCER300-172 REGION 3 INTERSTATE 70 CORRID 02/17/11 10.00 60.00 108.75 150.00

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 60.00 108.75 150.00

    MTCE R300-177 US 50, SH 114,149,347 06/02/11 2.00 50.00 55.00 40.00

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 50.00 55.00 40.00

    MTCE0403-054 VARIOUS HWYS, WESTERN R1, CLE 09/15/11 9.00 150.00 138.33 70.00

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE THIRD QUARTER 9.00 150.00 138.33 70.00

    ============== =============== =============== ===============

    WEIGHTED AVERAGE FOR THE YEAR 21.00 97.62 116.97 105.24

    =============== 210-00827 Res Pull Box Each ===================================================

    MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 6.00 375.00 230.50 230.00

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 375.00 230.50 230.00

    ============== =============== =============== ===============

    WEIGHTED AVERAGE FOR THE YEAR 6.00 375.00 230.50 230.00

    =============== 210-00855 Res Traf Sig Control Cab Each ===================================================

    MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 1.00 1500.00 2661.67 5727.00

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1500.00 2661.67 5727.00

    ============== =============== =============== ===============

    WEIGHTED AVERAGE FOR THE YEAR 1.00 1500.00 2661.67 5727.00

    =============== 212-00006 Seeding (Native) Acre ===================================================

    MTCE085A-016 SH85 BETWEEN MP127.65 & MP 13 02/17/11 0.30 1500.00 1869.17 4500.00

    -------------- --------------- --------------- ---------------

    WEIGHTED AVERAGE FOR THE FIRST QUARTER 0.30 1500.00 1165.19 1958.91

  • COLORADO DEPARTMENT OF TRANSPORTATION 15:35 Monday, March 12, 2012 11

    ITEM UNIT COSTS BY PROJECTS -- 2011 MAINT. COST DATA

    -