20/10/201511 Paul Webb, Stewart Millar MARINE DIVISION – OVERSEAS SUPPLY ISSUES.

20
04/07/22 1 1 Paul Webb, Stewart Millar MARINE DIVISION – OVERSEAS SUPPLY ISSUES

Transcript of 20/10/201511 Paul Webb, Stewart Millar MARINE DIVISION – OVERSEAS SUPPLY ISSUES.

Page 1: 20/10/201511 Paul Webb, Stewart Millar MARINE DIVISION – OVERSEAS SUPPLY ISSUES.

21/04/23 11

Paul Webb, Stewart Millar

MARINE DIVISION – OVERSEAS SUPPLY ISSUESMARINE DIVISION – OVERSEAS SUPPLY ISSUES

Page 2: 20/10/201511 Paul Webb, Stewart Millar MARINE DIVISION – OVERSEAS SUPPLY ISSUES.

NucSIG Event – 9th June 2010

• Submarine 1st Level Quality Assurance

PURPOSE

To ensure that submarines are operated and maintained to the correct Standard and to the correct Specifications so that they are capable of achieving their design performance throughout their operational life.

SCOPE

Applicable in 3 main systems areas:

Submarine Safety Reactor Safety

Personnel Safety

Page 3: 20/10/201511 Paul Webb, Stewart Millar MARINE DIVISION – OVERSEAS SUPPLY ISSUES.

NucSIG Event – 9th June 2010

• High precision items of equipment such as Submarine 1st Level Items:

– PUMPS

– VALVES

– ACTUATORS etc, etc.

Are subjected to a high level of control throughout the design, manufacture, assembly, operation and overhaul phases. It becomes a real challenge to ensure the intended operation of the item meets the customers exacting requirements.

Page 4: 20/10/201511 Paul Webb, Stewart Millar MARINE DIVISION – OVERSEAS SUPPLY ISSUES.

NucSIG Event – 9th June 2010

• Even basic items can at times present a challenge!

Example one being: A Weld Insert

Page 5: 20/10/201511 Paul Webb, Stewart Millar MARINE DIVISION – OVERSEAS SUPPLY ISSUES.

NucSIG Event – 9th June 2010

• What is a Weld Insert?

Page 6: 20/10/201511 Paul Webb, Stewart Millar MARINE DIVISION – OVERSEAS SUPPLY ISSUES.

NucSIG Event – 9th June 2010

• A Formed Insert - to form the root of a weld

Page 7: 20/10/201511 Paul Webb, Stewart Millar MARINE DIVISION – OVERSEAS SUPPLY ISSUES.

NucSIG Event – 9th June 2010

Page 8: 20/10/201511 Paul Webb, Stewart Millar MARINE DIVISION – OVERSEAS SUPPLY ISSUES.

NucSIG Event – 9th June 2010

• Associated Problem

– Welding Issue– Material Analysis– Documentation Checks– Wider concern and further checks– Supply Chain– Audit and Findings

Page 9: 20/10/201511 Paul Webb, Stewart Millar MARINE DIVISION – OVERSEAS SUPPLY ISSUES.

NucSIG Event – 9th June 2010

• Second example is something as basic as:-

Locking Wire

Page 10: 20/10/201511 Paul Webb, Stewart Millar MARINE DIVISION – OVERSEAS SUPPLY ISSUES.

NucSIG Event – 9th June 2010

Page 11: 20/10/201511 Paul Webb, Stewart Millar MARINE DIVISION – OVERSEAS SUPPLY ISSUES.

NucSIG Event – 9th June 2010

• Where is it used?

– Inside the Steam Generator

Purpose - to wirelock the fasteners which hold Chevrons and Driers etc

Page 12: 20/10/201511 Paul Webb, Stewart Millar MARINE DIVISION – OVERSEAS SUPPLY ISSUES.

NucSIG Event – 9th June 2010

• Associated Problem

– Material Shortcoming

– Material Analysis

– Documentation Checks

– Supply Chain

– Audit and Findings.

– Additional Issues

Page 13: 20/10/201511 Paul Webb, Stewart Millar MARINE DIVISION – OVERSEAS SUPPLY ISSUES.

NucSIG Event – 9th June 2010

Page 14: 20/10/201511 Paul Webb, Stewart Millar MARINE DIVISION – OVERSEAS SUPPLY ISSUES.

NucSIG Event – 9th June 2010

• How might you procure steel tubing at short notice?

Use a detailed QA Statement of Requirements?

Use an ISO certificated steel stockist?

Use a major UK stockist of steels, alloys & plastics?

Use a local stockist we have approved?

Use a stockist with a proven track record?

Page 15: 20/10/201511 Paul Webb, Stewart Millar MARINE DIVISION – OVERSEAS SUPPLY ISSUES.

NucSIG Event – 9th June 2010

• Our Purchase Order Specification demanded material certification for:

Chemical, Mechanical, Heat Treatment, Ultrasonic, Surface Finish, Pressure & Dimensional

• Demonstrates design intent maintained• Safety Case reliability targets not undermined

Page 16: 20/10/201511 Paul Webb, Stewart Millar MARINE DIVISION – OVERSEAS SUPPLY ISSUES.

NucSIG Event – 9th June 2010

But what if the certification reads?

Page 17: 20/10/201511 Paul Webb, Stewart Millar MARINE DIVISION – OVERSEAS SUPPLY ISSUES.

NucSIG Event – 9th June 2010

• All examples are basic items• All examples involved additional testing• Some involved concession action• One supplier no longer used• Other given additional supply conditions • Each example incurred extra costs

• No budget for additional supply chain assurance Especially Overseas!

Page 18: 20/10/201511 Paul Webb, Stewart Millar MARINE DIVISION – OVERSEAS SUPPLY ISSUES.

NucSIG Event – 9th June 2010

Babcock International GroupMarine Division

Babcock Engineering Services

Babcock Naval Services

Devonport Management Ltd.

Strachan & Henshaw

SSMGIntec

Marine Division Evolution - Recent History

Page 19: 20/10/201511 Paul Webb, Stewart Millar MARINE DIVISION – OVERSEAS SUPPLY ISSUES.

NucSIG Event – 9th June 2010

• Changing our approach:

– Marine Division Supplier Development Programme (SC21)

– Shared Supplier Intelligence

– Integrated Supplier Assessment

– Shared Supplier Performance Monitoring

– Assessor Training & Development

Page 20: 20/10/201511 Paul Webb, Stewart Millar MARINE DIVISION – OVERSEAS SUPPLY ISSUES.