200tph cone crusher

5
1 页共 5 Page 1 Henan Winnermac Heavy Industrial Machinery Co.,Ltd Email: [email protected] Add: Cuizhu Road,Hi-tech Fax:0086 371 86223360 developing and Industrial Mob:+86 186 37192252 Zone,Zhengzhou City, Skype: evitalee55 China,Postcode: 450001 COMMERCIAL OFFER CS Cone Crusher Technical Parameter and Price : Model Model Cavity Type Adjusting Range Of Output Size (mm) Max. Feeding Size(mm) Capacity (t/h) Motor Power (kw) Overall Dimension (L*W*H)(mm) Unit Price CS-110 CSC-110 Coarse (Standard) 13-38 160 70-215 110 2290*1530*2036 $70000 CIF Price CSB-110 Medium (Standard) 10-25 115 55-135 CSD-110 Medium (Short Head) 6-19 80 47-90

Transcript of 200tph cone crusher

Page 1: 200tph cone crusher

第 1 页 共 5 页

Page1

Henan Winnermac Heavy Industrial Machinery Co.,Ltd

Email: [email protected] Add: Cuizhu Road,Hi-techFax:0086 371 86223360 developing and IndustrialMob:+86 186 37192252 Zone,Zhengzhou City,Skype: evitalee55 China,Postcode: 450001

COMMERCIALOFFER

CS Cone Crusher

Technical Parameter and Price :

Model ModelCavity

Type

Adjusting

Range Of

Output Size

(mm)

Max.

Feeding

Size(mm)

Capacity

(t/h)

Motor

Power (kw)

Overall Dimension

(L*W*H)(mm)Unit Price

CS-110

CSC-110Coarse

(Standard)13-38 160 70-215

110 2290*1530*2036$70000

CIF Price

CSB-110Medium

(Standard)10-25 115 55-135

CSD-110

Medium

(Short

Head)

6-19 80 47-90

Page 2: 200tph cone crusher

第 2 页 共 5 页

Page2

General Drawing of our CS 110 Cone Crusher:

Running Plant of our CS 110 Cone Crusher:

Page 3: 200tph cone crusher

第 3 页 共 5 页

Page3

2. Terms and Conditions: 其他条款

A. Package: Bare package for equipments and wooden box for spare parts.B. Time of Delivery: 20 days after receipt of your deposit.C, Terms of Payment, the deposit (30% of the total) when we sign the contract and the rest 70% of the money should be paid by

Page 4: 200tph cone crusher

第 4 页 共 5 页

Page4

T/T or confirmed irrevocable L/C at sight before goods leaves factory.D, Port of Loading: Qingdao Port BasisE, Warranty: 100% brand new when leaving the factory. The seller shall guarantee that the commodity for 1 year, excluding thewearing parts, and the seller will offer the buyer the wearing parts all the time with favorable price.F, Installation: If the buyer requires the seller to send the engineer to guide to install the machine, the buyer should prepare thematerials needed and should be responsible for the technician’s travel expense, insurance, accommodation abroad and salary. Thesalary for the engineer is 60 dollars per day.

Page 5: 200tph cone crusher

第 5 页 共 5 页

Page5

If you have other questions, welcome contact with me, we shall feel happy to be at your service all the time!

Evita

Skype:evitalee55

Cellphone:0086 18637192252 (whatssap id & Viber)