2009 Wheaton Submarine Works “Scuba-Doo II” By Nate and Luke Leibolt.

15
SCUBA-DO WHEATON SUBMARINE WORKS 2009 Wheaton Submarine Works “Scuba-Doo II” By Nate and Luke Leibolt

Transcript of 2009 Wheaton Submarine Works “Scuba-Doo II” By Nate and Luke Leibolt.

Page 1: 2009 Wheaton Submarine Works “Scuba-Doo II” By Nate and Luke Leibolt.

SCUBA-DO

WHEATON SUBMARINE WORKS

2009 Wheaton Submarine Works“Scuba-Doo II”

By Nate and Luke Leibolt

Page 2: 2009 Wheaton Submarine Works “Scuba-Doo II” By Nate and Luke Leibolt.

SCUBA-DO

WHEATON SUBMARINE WORKS

WHEATON SUBMARINE WORKSTeam

• Ed Leibolt Team Leader• Nate Leibolt Pilot/Support Diver• Sean Wills Pilot• Luke Leibolt Recovery Leader• Thien Nguyendo Recovery• Lowell Cole Support Diver• Matt Powell Support Diver• Eric Silberg Support Diver• Josh Rast Support Diver• Joanne Daniel Support Diver/Swimmer• Mary Leibolt Support Swimmer

Page 3: 2009 Wheaton Submarine Works “Scuba-Doo II” By Nate and Luke Leibolt.

SCUBA-DO

WHEATON SUBMARINE WORKS

HISTORY OF SCUBA DOO

•LOGAN RAINARD DEVELOPED THE DESIGN WHILE PARTICIPATING IN THE SEAPPROGRAM IN 2000

• LOGAN RAINARD AND ED LEIBOLT FORMED THE WHEATON SUBMARINE WORKS TEAM IN JANUARY 2001 TO BUILD, TEST, AND ENTER THE SCUBA DOO HPS IN THE 6TH ISR

•IT WAS THE SECOND FASTEST ONE PERSON SUBMARINE AT THE 6TH ISR ANDFASTEST INDEPENDENT ONE PERSON SUBMARINE AT THE 7TH ISR.

•THIS IS THE FOURTH RACE THAT SCUBADOO HAS BEEN ENTERED IN.

Page 4: 2009 Wheaton Submarine Works “Scuba-Doo II” By Nate and Luke Leibolt.

SCUBA-DO

WHEATON SUBMARINE WORKS

Training/Testing

• Team/Pilot Training- SubTaxi: January 2009

• ScubaDoo II Test- March 2009

• Bring Your Child to Work Day- Demo: April 2009

• ScubaDoo Test/Pilot Training- May 2009

• In-Water Safety Test Training- June 2009

Page 5: 2009 Wheaton Submarine Works “Scuba-Doo II” By Nate and Luke Leibolt.

SCUBA-DO

WHEATON SUBMARINE WORKS

SCUBA DOO II FEATURES

SCUBA-DOO

5/28/2001

HatchView Dome

Controls

Air SupplyCycilc Power Unit

Lower Rudder

Upper Rudder

Strobe Light

Pop-up Buoy

Two Bladed Propellor

Hatch Release

Bow Plane Fixed Stern Plane

Page 6: 2009 Wheaton Submarine Works “Scuba-Doo II” By Nate and Luke Leibolt.

SCUBA-DO

WHEATON SUBMARINE WORKS

SCUBA-DOO SPECIFICATIONS

VOLUME OF DISPLACEMENT: 76 CUBIC FEET LENGTH: 12 FEET MAXIMUM DIAMETER: 28 INCHES WEIGHT IN AIR: 300 # CREW: 1 PERSON (Nate Leibolt-PILOT) PROPELLOR: 2 BLADED OPEN POWER UNIT: CYCLIC LIFE SUPPORT: 80 CU. FT DIVE TANK/REGULATOR CONTROL SURFACES: 2 MOVEABLE BOW PLANES/ 2 MOVABLE

RUDDERS/ 2 FIXED STERN PLANES

Page 7: 2009 Wheaton Submarine Works “Scuba-Doo II” By Nate and Luke Leibolt.

SCUBA-DO

WHEATON SUBMARINE WORKS

Changes/Improvements

•New Propeller Design

•Improved Hull Fairing

•Hydrodynamic Viewport Dome

•Removable Stern Plane Tips

•New Style Clipless Pedals

• Adjustable High Flow Rate Regulator

Page 8: 2009 Wheaton Submarine Works “Scuba-Doo II” By Nate and Luke Leibolt.

SCUBA-DO

WHEATON SUBMARINE WORKS

Logan1 Hull Offsets

-2

-1

0

1

2

3

4

5

6

7

0 2 4 6 8 10 12 14

Distance from FP (ft)

Radiu

s (f

t)

Series1

Series2

HULL FORM

Page 9: 2009 Wheaton Submarine Works “Scuba-Doo II” By Nate and Luke Leibolt.

SCUBA-DO

WHEATON SUBMARINE WORKS PROPELLER DESIGN

-3 blades, 32 inches in diameter-Design developed by NSWC Carderock division andwas built with a rapid proto-type machine-Optimum Operation Conditions: 1-hp input @ 7 knots,at which it will produce 44 lbs of thrust-Designed with the more hydro-dynamic version of thehull in mind

Page 10: 2009 Wheaton Submarine Works “Scuba-Doo II” By Nate and Luke Leibolt.

SCUBA-DO

WHEATON SUBMARINE WORKS PROPELLER DESIGN

Page 11: 2009 Wheaton Submarine Works “Scuba-Doo II” By Nate and Luke Leibolt.

SCUBA-DO

WHEATON SUBMARINE WORKS

VIEWPORT DOME DESIGN

Page 12: 2009 Wheaton Submarine Works “Scuba-Doo II” By Nate and Luke Leibolt.

SCUBA-DO

WHEATON SUBMARINE WORKS

HULL FAIRING

•Removal of Fastener Heads

•Reduce Gap size of the Hatch

Page 13: 2009 Wheaton Submarine Works “Scuba-Doo II” By Nate and Luke Leibolt.

SCUBA-DO

WHEATON SUBMARINE WORKS

Removable Stern-Plane Tips

12”

17”

Page 14: 2009 Wheaton Submarine Works “Scuba-Doo II” By Nate and Luke Leibolt.

SCUBA-DO

WHEATON SUBMARINE WORKS

COST TO BUILD

Original Cost: $1900 (abt.)

Additional Cost: $1000 (abt.)

Additional Fabrication Hours: 200 hrs. (abt.)

Page 15: 2009 Wheaton Submarine Works “Scuba-Doo II” By Nate and Luke Leibolt.

SCUBA-DO

WHEATON SUBMARINE WORKS

PLAN OF ATTACK

1. PASS IN-AIR AND IN-WATER SAFETY INSPECTIONS

2. TEAM GETS A TIME ON THE RACE COURSE FOR BASELINE CONFIGURATION

3. INSTALL A VIEWPORT /NEW PROPELLER DURING ADDITIONAL RUNS

4. ROTATE PILOTS

5. HAVE FUN

6. WIN THE RACE!!!