2006 Building Code - Siding Contractors Association of Alberta of Flashing Details.pdf · 2...
Transcript of 2006 Building Code - Siding Contractors Association of Alberta of Flashing Details.pdf · 2...
![Page 1: 2006 Building Code - Siding Contractors Association of Alberta of Flashing Details.pdf · 2 Building Code Changes The material in this presentation is a summary of minimum building](https://reader031.fdocuments.net/reader031/viewer/2022022422/5a9cade27f8b9ad96f8e9ca0/html5/thumbnails/1.jpg)
1
2006 Building Code –
Flashing Changes
![Page 2: 2006 Building Code - Siding Contractors Association of Alberta of Flashing Details.pdf · 2 Building Code Changes The material in this presentation is a summary of minimum building](https://reader031.fdocuments.net/reader031/viewer/2022022422/5a9cade27f8b9ad96f8e9ca0/html5/thumbnails/2.jpg)
2
Building Code Changes� The material in this presentation is a summary of
minimum building code requirements � per the 2006 Alberta Building Code which is an
extension of the National Building Code of Canada
� Developed by National Research Council of Canada
� 2006 Building Code changes will be incorporated into all new building permits� The only way a contractor should build anything less
than code requirements would be
� The Authority have jurisdiction authorizing the deviation from code
� A design professional (architect, engineer) stamp of approval is obtained on the blueprints
Be sure to get detailed flashing requirementsfrom your builder’s blueprints
![Page 3: 2006 Building Code - Siding Contractors Association of Alberta of Flashing Details.pdf · 2 Building Code Changes The material in this presentation is a summary of minimum building](https://reader031.fdocuments.net/reader031/viewer/2022022422/5a9cade27f8b9ad96f8e9ca0/html5/thumbnails/3.jpg)
3
Section 9.27.3.8 Flashing Installation
� Flashing must be installed at� every horizontal change in cladding element
� every horizontal offset in the cladding
� every horizontal line where the cladding substrate
changes, and
� top and bottom of all penetrations
![Page 4: 2006 Building Code - Siding Contractors Association of Alberta of Flashing Details.pdf · 2 Building Code Changes The material in this presentation is a summary of minimum building](https://reader031.fdocuments.net/reader031/viewer/2022022422/5a9cade27f8b9ad96f8e9ca0/html5/thumbnails/4.jpg)
4
� the upper cladding elements overlap the lower cladding elements by at least 25mm
� Where drained & vented air spaces are used
Section 9.27.3.8 Flashing Can Be
Omitted Where…….
25mm
overlap
![Page 5: 2006 Building Code - Siding Contractors Association of Alberta of Flashing Details.pdf · 2 Building Code Changes The material in this presentation is a summary of minimum building](https://reader031.fdocuments.net/reader031/viewer/2022022422/5a9cade27f8b9ad96f8e9ca0/html5/thumbnails/5.jpg)
5
WRB
25mm
End Dam 50mm
Upwards
6% slope
10mm lap over
buildingelement below
5mm
offset
� Extend at least 50mm upward (1997) behind the weather resistant membrane.*
� Have a minimum 6% positive slope (2006)
� Have end-dams not less than 25mm high
� Lap a minimum of 10mm vertically over the building element below (2006)
� Terminate with a drip that extends at least 5mm out from the face of the building element (2006)
Section 9.27.3.8 Flashing
Specifications
*Note: in a siding application where the J-Trim is placed above the 25mm up dam,
the upward leg of the flashing must be 75mm high to meet code requirements
![Page 6: 2006 Building Code - Siding Contractors Association of Alberta of Flashing Details.pdf · 2 Building Code Changes The material in this presentation is a summary of minimum building](https://reader031.fdocuments.net/reader031/viewer/2022022422/5a9cade27f8b9ad96f8e9ca0/html5/thumbnails/6.jpg)
6
Perimeter
Flashing
![Page 7: 2006 Building Code - Siding Contractors Association of Alberta of Flashing Details.pdf · 2 Building Code Changes The material in this presentation is a summary of minimum building](https://reader031.fdocuments.net/reader031/viewer/2022022422/5a9cade27f8b9ad96f8e9ca0/html5/thumbnails/7.jpg)
7
Installation of
Perimeter
Flashing
Siding can be clipped over the
Perimeter Flashing
or
set on top of the flashing in a
J Trim
![Page 8: 2006 Building Code - Siding Contractors Association of Alberta of Flashing Details.pdf · 2 Building Code Changes The material in this presentation is a summary of minimum building](https://reader031.fdocuments.net/reader031/viewer/2022022422/5a9cade27f8b9ad96f8e9ca0/html5/thumbnails/8.jpg)
8
6 % SLOPE6 % SLOPE6 % SLOPE6 % SLOPE
6 % SLOPE6 % SLOPE6 % SLOPE6 % SLOPE
Typical Wall
Cross-section
![Page 9: 2006 Building Code - Siding Contractors Association of Alberta of Flashing Details.pdf · 2 Building Code Changes The material in this presentation is a summary of minimum building](https://reader031.fdocuments.net/reader031/viewer/2022022422/5a9cade27f8b9ad96f8e9ca0/html5/thumbnails/9.jpg)
9
6 % slope6 % slope6 % slope6 % slope
![Page 10: 2006 Building Code - Siding Contractors Association of Alberta of Flashing Details.pdf · 2 Building Code Changes The material in this presentation is a summary of minimum building](https://reader031.fdocuments.net/reader031/viewer/2022022422/5a9cade27f8b9ad96f8e9ca0/html5/thumbnails/10.jpg)
10
� Weather Resistant Barrier to overlap 9” on vertical joints
� Weather Resistant Barrier to overlap 4” on horizontal shingle laps
� Caulk behind batten & J Trim on verticals
� Caulk behind reverse flashing on horizontals.
6 % slope6 % slope6 % slope6 % slope
![Page 11: 2006 Building Code - Siding Contractors Association of Alberta of Flashing Details.pdf · 2 Building Code Changes The material in this presentation is a summary of minimum building](https://reader031.fdocuments.net/reader031/viewer/2022022422/5a9cade27f8b9ad96f8e9ca0/html5/thumbnails/11.jpg)
11
![Page 12: 2006 Building Code - Siding Contractors Association of Alberta of Flashing Details.pdf · 2 Building Code Changes The material in this presentation is a summary of minimum building](https://reader031.fdocuments.net/reader031/viewer/2022022422/5a9cade27f8b9ad96f8e9ca0/html5/thumbnails/12.jpg)
12
Batten & Flashing Detail Above
Window
25mm
25mm Up Dam
![Page 13: 2006 Building Code - Siding Contractors Association of Alberta of Flashing Details.pdf · 2 Building Code Changes The material in this presentation is a summary of minimum building](https://reader031.fdocuments.net/reader031/viewer/2022022422/5a9cade27f8b9ad96f8e9ca0/html5/thumbnails/13.jpg)
13
Flashing of Curved or Round Windows
� A curved topped or round window must be
flashed but the flashing does not need to be
terminated with an end dam
![Page 14: 2006 Building Code - Siding Contractors Association of Alberta of Flashing Details.pdf · 2 Building Code Changes The material in this presentation is a summary of minimum building](https://reader031.fdocuments.net/reader031/viewer/2022022422/5a9cade27f8b9ad96f8e9ca0/html5/thumbnails/14.jpg)
14
Metal Battens
� Must be flashed on the top and the bottom
unless the profile of the batten meets code
requirementsmin 50mm
behind cladding 6 % slope
element above
min 25mm over lap
of lower cladding
element
![Page 15: 2006 Building Code - Siding Contractors Association of Alberta of Flashing Details.pdf · 2 Building Code Changes The material in this presentation is a summary of minimum building](https://reader031.fdocuments.net/reader031/viewer/2022022422/5a9cade27f8b9ad96f8e9ca0/html5/thumbnails/15.jpg)
15
Penetrations
� All Penetrations must be flashed top and
bottom
� Reverse flashings are not acceptable at the bottom of a
penetration
� Flashings must end in 25mm up dam
� Self draining/flashed covers can only be used if they
meet code requirements
![Page 16: 2006 Building Code - Siding Contractors Association of Alberta of Flashing Details.pdf · 2 Building Code Changes The material in this presentation is a summary of minimum building](https://reader031.fdocuments.net/reader031/viewer/2022022422/5a9cade27f8b9ad96f8e9ca0/html5/thumbnails/16.jpg)
16
In Summary
� The 2006 flashing requirements
� have created additional complexity
� Number of locations requiring flashings has increased
� Configuration of the flashing
� Up dams
� “Leg” length may vary depending on application
� Will result in additional cost due to
� increased install time required
� increased amount of flashing materials
� Be sure to share you ideas and experiences with the Association members
� Improves the quality of our workmanship
� Minimizes issues for all members
![Page 17: 2006 Building Code - Siding Contractors Association of Alberta of Flashing Details.pdf · 2 Building Code Changes The material in this presentation is a summary of minimum building](https://reader031.fdocuments.net/reader031/viewer/2022022422/5a9cade27f8b9ad96f8e9ca0/html5/thumbnails/17.jpg)
17
Additional Resources and
Information
� Questions on acceptable solutions
� Local Code Authority
� Municipal Affairs help line (866-421-6929)
� Flashing Details
� Siding Contractors Association of Alberta
(403-291-9707)
� CMHC Flashing Guide (www.cmhc-schl.gc.ca)
![Page 18: 2006 Building Code - Siding Contractors Association of Alberta of Flashing Details.pdf · 2 Building Code Changes The material in this presentation is a summary of minimum building](https://reader031.fdocuments.net/reader031/viewer/2022022422/5a9cade27f8b9ad96f8e9ca0/html5/thumbnails/18.jpg)
18
� Questions?
� Thank you!