BOBASIO/6−WP/02
2nd November-4th November 2016
The Sixth ATS Coordination meeting of Bay of Bengal, Arabian Sea
and Indian Ocean Region (BOBASIO/6)
Eden Island, Seychelles, 2nd November -4th November 2016.
Page 1 of 13
Agenda Item 2-Review of progress on action Items of BOBASIO/5
REVIEW OF ACTIONS ITEMS FROM BOBASIO/5
(Presented by Secretariat)
SUMMARY
This paper presents a brief on tasks identified during the Fifth Meeting of Bay
of Bengal, Arabian Sea And Indian Ocean Region and review the progress
made on these action items.
1. INTRODUCTION
1.1 The Fifth ATS Coordination Meeting of the Bay of Bengal Arabian Sea and Indian Ocean
(BOBASIO) Region was held at Hotel Radisson Blue, Delhi, India from 31st August to 2nd
September, 2015.
1.2 The fifth meeting was attended by 67 participants including 19 international delegates from
Maldives, Nepal, Seychelles, Singapore, Somalia, Thailand, MAAR and IATA.
1.3 Thirteen (13) Working Papers (WPs) and Seven (7) Information Papers (IPs) were
presented to the meeting
1.4 The final report of BOBASIO/5 is available at http://www.aaians.org.
2. DISCUSSION
2.1 The action items adopted at BOBASIO/5 are presented in “Annexure A”.
2.2 Details of the conclusions and decisions can be found in the BOBASIO/5 Meeting report.
3. ACTION BY THE MEETING
3.1 The meeting is invited to:
a) Note the follow-up of action items adopted in BOBASIO/5,
b) Discuss the follow-up of action items of BOBASIO/5, as necessary.
………………………….
BOBASIO/6−WP/02
2nd November-4th November 2016
Page 2 of 13
Action
Item
ID
Description Responsible
State/
Organisation
Remarks Status
3/2 States to consider
declaring airspace
corresponding to its ATM
capability and consider
non-exclusive type of
airspace classification, to
allow for utilization of such
airspace by aircraft not
meeting the requirements.
BOBASIO
States
States requested
ICAO APAC
regional Office to
provide guidance
material
Open
3/3 India to follow up the task
of joint routes design with
neighbouring States for
mutual benefit.
India and
neighbouring
States
Ongoing
3/4 India, Malaysia, Indonesia
and other BOBASIO
States to collaborate, to
establish RNP 4 routes in
the Bay of Bengal to
support 30/30 NM
separation.
India,
Malaysia
Indonesia
and other
BOBASIO
States
India introduced
30NM Reduced
Longitudinal
Separation wef 18th
September 2014 on
4 ATS Routes.
Other States to
collaborate.
Indonesia will be
ready by March,
2015.
(No Update from
Indonesia.
Indonesia did not
attend BOBASIO/5
meeting).
Revised timeline
from Malaysia, and
Muscat awaited.
(No update from
Malaysia and
Muscat.
Malaysia and
Muscat did not
Open
To be discussed
in the proposed
trilateral
meeting
between India,
Malaysia &
Indonesia.
Confirmation of
participation
from Indonesia
awaited.
BOBASIO/6−WP/02
2nd November-4th November 2016
Page 3 of 13
attend BOBASIO/5
meeting).
3/7 Malaysia and India to
provide an update on
possibility of sharing of
Port Blair ADS-B data
with Malaysia and enable
seamless transfer of
communication at the FIR
boundary for
implementation of 50-50
NM separation, at the
SAIOACG meeting in
February 2014.
Malaysia and
India
Timeline Revised to
March 2016.
(Malaysia did not
attend BOBASIO/5
meeting).
Open
Commissioning
of Port Blair
ADS-B is
pending (PDC
31-01-2017)
data sharing
will be worked
out after
commissioning.
Meanwhile
Malaysia may
confirm its
readiness and
propose an LoA
in this regard.
3/8 All BOBASIO States to
report occurrences of LLDs
and LLEs to BOBASMA in
timely manner. They
should sensitize their
controllers to report the
occurrences of LLDs and
LLE.
States
obliged to
submit data
to
BOBASMA
Ongoing
3/10 Mumbai OCC to submit a
study on traffic pattern
to/from AFI regions in
terms of time of operation
and density to facilitate
the evaluation of the FLAS
and its review.
India Mumbai submitted
study report.
An ongoing process
for evaluation of
FLAS
Open
3/14 LOA between Kolkata
ACC and Yangon ACC to
be signed by Appropriate
Authority of Yangon and
sent to Airports Authority
of India.
Yangon Response from
Yangon is awaited.
(Myanmar did not
attend the meeting)
Open
3/16 Coordination Procedures
between Chennai OCC and
Kuala Lumpur ACC to be
signed by the appropriate
India and
Malaysia
LOAs exchanged
but not signed
(Malaysia did not
attend the meeting)
Open
BOBASIO/6−WP/02
2nd November-4th November 2016
Page 4 of 13
authorities of Malaysia
and India.
3/17 LOA/Coordination
Procedures for AIDC data
exchange between
Chennai and Kuala
Lumpur to be finalized
India and
Malaysia
Trials are Ongoing Open
The Draft
MoA was sent
to Kuala
Lumpur for
their perusal
and signature
by GM(ATM),
Chennai on
27/09/2016.
However, reply
is awaited from
Kuala Lumpur.
3/18 Development of ATM
Contingency Plan Level
2/3
(Note: ATMTF meeting
scheduled in the 3rd week
of Nov, 2013 and is being
attended by India)
BOBASIO
States
Discussion ongoing
for developing ATM
Contingency Plan
Open
3/19 Neighbouring States to
expedite execution of SAR
agreement(s), providing
details of the
responsibility of States
and their agencies,
especially in Cross Border
Areas.
BOBASIO
States
(Update from the
states required)
Open
Draft Letter of
agreement with
Sri Lanka
submitted with
the Govt. for
consideration
and approval.
The same
template will be
used for LOA
with Maldives,
Mauritius,
Seychelles,
Mogadishu,
Sana, Oman,
Indonesia,
Malaysia as
these States are
also having
common FIR
boundaries only
BOBASIO/6−WP/02
2nd November-4th November 2016
Page 5 of 13
over oceanic
area.
The template
for LOA with
Bangladesh,
Myanmar,
Nepal and
Pakistan are
being amended
accordingly
3/20 BOBASIO States which
are planning A-CDM to
ensure the “Business
Rules”; terminology and
procedures were aligned
regionally to ensure that
user interfaces with
various A-CDM systems
are common.
BOBASIO
States
ICAO RSO has
circulated the
Template for the
states to Comply
with the Business
rules.
(Other BOBASIO
states may follow
with their
respective RSOs).
Open
3/21 Neighboring Centers
adjacent India to share
their plan with India for
AIDC implementation in a
time bound manner.
Neighbouring
BOBASIO
States to
India
Target date of
implementation
Indonesian Oct
2015.
(No update
received)
Draft LOA
exchanged
between
Myanmar and
India
Open
1. LoA for
trial AIDC
data
exchange
between
MALE and
Chennai UTV
has been
signed.
2. During
ICAO
Afghanistan
Airspace
Contingency
Planning
Meeting
at Dubai on 25th
August
BOBASIO/6−WP/02
2nd November-4th November 2016
Page 6 of 13
2016Pakistan
assured that
AIDC system of
Pakistan will be
upgraded to
version 3 by mid
of 2017 for full
implementation
of
AIDC between
India and
Pakistan.
3/22 ICAO to standardize single
ICD version within APAC
region and all the regions
of ICAO to achieve
harmonious
implementation.
ICAO
Regional
Office
Completed in
APANPIRG25
(Other BOBASIO
states may give
update for their
respective regions)
Open
3/23 India to coordinate
through POC for further
feasibility studies on
GAGAN and feedback
from the member States.
India Ongoing
4/1 Establishing POC for
follow up actions of
BOBASIO Meetings
All BOBASIO
States
POC to be
forwarded to
BOBASIO
Secretary
o
Open
4/3 BOBASIO States to share
information on strategies
being adopted to
establish Cyber security
framework
All BOBASIO
States
BOBASIO/5 Ongoing
4/4 Identification and
prioritization ATS routes
for implementation of
RHS (50/50 and 30/50)
Meeting to identify point
of contacts and
coordinators for the task.
Muscat
Bangladesh
Indonesia
Malaysia
Myanmar
Pakistan
Sri Lanka
Maldives
Indonesia will be
ready by March,
2015
Response from
other States
awaited.
(Maldives can
implement 50/50
Open
Implemented
by India.
BOBASIO/6−WP/02
2nd November-4th November 2016
Page 7 of 13
lateral separation
(Ref Annex 11) ; but
- Maldives cannot
implement 50/50
Longitudinal
Separation due to
unavailability of
ADS-C /DCPC
-
Maldives cannot
Implement 30/30
RHS due to
Unavailability
Of ADS-C/DCPC)
4/5 Review the draft letter of
agreement and formalize
SAR LOAs with adjacent
RCCs
All BOBSIO
States
Maldives has
already submitted
draft letter of
agreement for SAR
LOAs to India and
awaiting comments
from India
Open
Please refer to
update in 3/19.
4/6 Maldives, India, Sri Lanka
and Mauritius to
collaborate for ATM
Contingency Plan.
Maldives to establish POC
for other affected FIR
All affected
States
Maldives
Maldives provided
POC
Open
4/8 AAI to assess the
requirement of ATS/DS
between Mumbai and
Somalia
India and
Somalia Mogadishu had
proposed ATS/DS
between
Mogadishu and
Mumbai through
WP/4 in
BOBASIO/4.
Mogadishu also
informed that the
AMHS
installation at
Mogadishu was in
final stages and
as Mumbai is
already AIDC
capable in future
AIDC would be
Open
A dedicated
number in
Mumbai OCC,
which is
neither
circulated nor
provided in
directory is
provided to
Mogadishu for
coordination.
Mogadishu
will keep it on
BOBASIO/6−WP/02
2nd November-4th November 2016
Page 8 of 13
implemented
between
Mogadishu and
Mumbai. In a side
meeting held
during
BOBASIO/4 the
Mumbai ATC
representative
had submitted
that as the
frequency of calls
was very less, the
existing practice
of coordination
through ISDN
calling was
sufficient. The
CNS
representatives of
AAI were
however
requested to
study feasibility
of ATS/DS.
trial until
they are
satisfied with
the service.
4/12 Controller exchange
programme between
Seychelles and Mumbai for
understanding the other’s
working environment
which will help in
resolving the human
factors issues
India and
Seychelles Proposal is
acceptable to
Mumbai ATC.
AAI CHQ may
consider to extend
invitation to
ANSP of
Seychelles.
Revised timeline
July, 2016
Open
4/13 The introduction of an
International Route
connectivity between
Guwahati and Bangkok,
via GGT VOR- B593 –
CML (COMILLA) VOR –
India
Bangladesh
July 2015
Status update to be
provided by
Bangladesh on
Open
Bangladesh
informed that
they have
submitted the
BOBASIO/6−WP/02
2nd November-4th November 2016
Page 9 of 13
ONEKA – G463 – CTG
(CHITTAGONG) VOR –
G463-BGO
VOR(YANGON)-Bangkok
status of PfA of
BANP
PfA to BANP.
Status to be
confirmed by
Bangladesh.
.
4/14 Exchange of ATS
messages via AFTN
between Kolkata and
Myanmar to be done on
trial basis during lean
period with prior
coordination.
India and
Myanmar
Commencement of
trial by 31st Oct,
2014.
Open
4/16 India to send proposal to
Bangladesh for
unidirectional route
between CEA and AAT
and Bangladesh to
respond on proposal.
India
Bangladesh
Proposal and
reminder sent to
Bangladesh
Open
Under Process
Refer IP/02 of
BOBASO/6
4/19 Jakarta and Chennai to
review the no pre-
coordinated level for
westbound traffic on N563
Indonesia
and India
Through
correspondence and
Side line meetings
during ICAO
meetings
Open
To be discussed
in the proposed
trilateral
meeting
between India,
Malaysia &
Indonesia.
5/1 Establish new ATS routes
in Kolkata-Dhaka FIR,
Northern Bay of Bengal
and over Arabian Sea for
capacity enhancement and
route optimization
India,
Bangladesh,
Myanmar,
Thailand and
Indonesia
BOBASIO/6 Route proposals
will be reviewed
and discussed in
BIMT meeting
again with
Myanmar and
Bangladesh.
Under Process
Refer IP/02 of
BOBASO/6
5/2 Consider to develop
structured program for
BOBASIO Geographical
Area for Upper airspace
UPR development
All BOBASIO
States
BOBASIO/6 i. For
implementing
UPRs in
continental
airspace the
issue is likely
to be
discussed at
BOBASIO/6−WP/02
2nd November-4th November 2016
Page 10 of 13
ASIOACG
INSPIRE
Meeting at
Johannesburg
during Nov
2016.
ii. For
implementing
UPRs in
BOBASIO’s
Bay of Bengal
portion of
airspace, the
meeting may
consider to
adopt the
process
followed by
ASIOACG
INSPIRE.
5/3 Consider the proposal for
inclusion of the segment
between ELKEL and Male
of G465 in Male FIR as
Contingency Route with
FLAS as FL280 (WB) and
FL270 (EB) to harmonize
the ATM Contingency
Plan of India, Maldives
and Srilanka
Maldives 31st October 2015 Pertains to Male
& Srilanka
5/4 Consider the Letter of
Agreement template for
the ATM Contingency
Plan
Level 2. (Attached as
Annexure IV to WP 06)
All BOBASIO
States
31st October 2015
5/5 Establish a procedure for
supervisors or controllers
on duty of transferring and
accepting ATS units to
discuss and investigate, in
a timely manner, the
occurrences relating to the
breakdown in
coordination, and then
BOBASIO
States
31st December
2015 for Draft
Procedure
BOBASIO/6−WP/02
2nd November-4th November 2016
Page 11 of 13
report the LHD to the
corresponding RMAs
5/6 Consider to share ADS-B
data with the MAAR for
height keeping
performance monitoring
Willing
BOBASIO
States
Ongoing
5/7 Establish POC for
coordinating the
preliminary activities for
the feasibility and efficacy
of BOBASIO Contingency
Team.
India/IATA 31st December
2015
5/8 Review the draft Letter of
Agreement (enclosed as
Annexure IV to the
report) for the
coordination/co-operation
on operational matters of
SAR services with India
All
Concerned
States
31st December
2015
Open
No feed back
has been
received.
5/9
BOBASMA to present a
working paper conveying a
decision of BOBASIO 5 to
RASMAG for providing
RMA services to the
member States of
BOBASMA in addition to
the EMA services.
BOBASMA RASMAG/21
5/10 MAAR to constitute a
mechanism for timely
coordination of LHD
occurrences between
concerned ATS units.
MAAR 31st October 2015
5/11 Establish a small working
group consisting of
BOBASMA, AAI, MAAR,
and States directly
involved with the
identified hot spots to
analyze the occurrences
and propose remedial
actions to BOBASIO
India 31st October 2015
BOBASIO/6−WP/02
2nd November-4th November 2016
Page 12 of 13
BOBASIO/6−WP/02
2nd November-4th November 2016
Page 13 of 13