2 Post Open Rack assembly instructions
2
2 Post Open Rack A C ITEM – C TOP ANGLE BAR QTY: 2 NO B ITEM – B BASE ANGLE BAR QTY: 2 NO ITEM –A 45 U VERTICAL MEMBER QTY: 2 NO 1)M8 X 25MM HEX BOLT -12 NO, 2)M8 HEX NUT - 12 NO, 3)M8 PLIN WASHER -24 NO, 4)M8 SPRING WASHER -12 NO. KIT PACK
-
Upload
guillermo-vega -
Category
Documents
-
view
215 -
download
2
description
How to assemble our 2 post racks.
Transcript of 2 Post Open Rack assembly instructions
2 Post Open Rack
A
C
ITEM – C
TOP ANGLE BAR
QTY: 2 NO
B
ITEM – B
BASE ANGLE BAR
QTY: 2 NO
ITEM –A
45 U VERTICAL MEMBER
QTY: 2 NO
1)M8 X 25MM HEX BOLT -12 NO,
2)M8 HEX NUT - 12 NO,
3)M8 PLIN WASHER -24 NO,
4)M8 SPRING WASHER -12 NO.
KIT PACK
2 Post Open Rack
1 3 BASE ANGLEBAR ASSEMBLY
TOP ANGLEBAR ASSEMBLY
1)M8 X 25MM HEX BOLT ,
2)M8 HEX NUT,
3)M8 PLIN WASHER,
4)M8 SPRING WASHER
24