2 International Conference on Timber Bridges · 3/10/2019  · Las Vegas, 2013 . TWO BRIDGES BUILT...

33
Two Bridges Built Using Black Locust Wood 2 nd International Conference on Timber Bridges Ryan Woodward Ted Zoli Las Vegas, 2013

Transcript of 2 International Conference on Timber Bridges · 3/10/2019  · Las Vegas, 2013 . TWO BRIDGES BUILT...

Page 1: 2 International Conference on Timber Bridges · 3/10/2019  · Las Vegas, 2013 . TWO BRIDGES BUILT USING BLACK LOCUST WOOD 2 ... 2.0 2.5 3.0 3.5 4.0 A1 A3 A5 A7 A9 1 3 5 7 9 1 3 5

Two Bridges Built Using Black Locust Wood

2nd International Conference on Timber Bridges

Ryan Woodward

Ted Zoli

Las Vegas, 2013

Page 2: 2 International Conference on Timber Bridges · 3/10/2019  · Las Vegas, 2013 . TWO BRIDGES BUILT USING BLACK LOCUST WOOD 2 ... 2.0 2.5 3.0 3.5 4.0 A1 A3 A5 A7 A9 1 3 5 7 9 1 3 5

TWO BRIDGES BUILT USING BLACK LOCUST WOOD 2

Squibb Bridge

Brooklyn, NY

Page 3: 2 International Conference on Timber Bridges · 3/10/2019  · Las Vegas, 2013 . TWO BRIDGES BUILT USING BLACK LOCUST WOOD 2 ... 2.0 2.5 3.0 3.5 4.0 A1 A3 A5 A7 A9 1 3 5 7 9 1 3 5

TWO BRIDGES BUILT USING BLACK LOCUST WOOD 3

FURMAN STREET

121’-0”

SQUIBB PARK

(BEYOND)

17’-0”

CL

.

5%

121’-0”

HOTEL/RESIDENTIAL

(BEYOND)

DRIVEWAY 12’-6”

CL

.

Underslung Suspension Bridge: • Highly efficient form

• Material palette from BBP

• Small dia. Black Locust

• Steel cables & connections

VIEW A-A

PLAN

Page 4: 2 International Conference on Timber Bridges · 3/10/2019  · Las Vegas, 2013 . TWO BRIDGES BUILT USING BLACK LOCUST WOOD 2 ... 2.0 2.5 3.0 3.5 4.0 A1 A3 A5 A7 A9 1 3 5 7 9 1 3 5

TWO BRIDGES BUILT USING BLACK LOCUST WOOD 4

Page 5: 2 International Conference on Timber Bridges · 3/10/2019  · Las Vegas, 2013 . TWO BRIDGES BUILT USING BLACK LOCUST WOOD 2 ... 2.0 2.5 3.0 3.5 4.0 A1 A3 A5 A7 A9 1 3 5 7 9 1 3 5

TWO BRIDGES BUILT USING BLACK LOCUST WOOD 5

Black Locust Timber:

• Sustainable • Small diameters – harvested young • Fast growth • Locally sourced • Rot resistant – no coating required

• Strong • Low shrinkage

(11.4% vol.)

Galvanized steel cables & hardware

Page 6: 2 International Conference on Timber Bridges · 3/10/2019  · Las Vegas, 2013 . TWO BRIDGES BUILT USING BLACK LOCUST WOOD 2 ... 2.0 2.5 3.0 3.5 4.0 A1 A3 A5 A7 A9 1 3 5 7 9 1 3 5

TWO BRIDGES BUILT USING BLACK LOCUST WOOD 7

Page 7: 2 International Conference on Timber Bridges · 3/10/2019  · Las Vegas, 2013 . TWO BRIDGES BUILT USING BLACK LOCUST WOOD 2 ... 2.0 2.5 3.0 3.5 4.0 A1 A3 A5 A7 A9 1 3 5 7 9 1 3 5

TWO BRIDGES BUILT USING BLACK LOCUST WOOD 8

Ratios of dry to green clear wood properties

Modulus of Rupture Modulus of Elasticity Compression Parallel to Grain

1.40 1.11 1.50

(ASTM D2555)

Page 8: 2 International Conference on Timber Bridges · 3/10/2019  · Las Vegas, 2013 . TWO BRIDGES BUILT USING BLACK LOCUST WOOD 2 ... 2.0 2.5 3.0 3.5 4.0 A1 A3 A5 A7 A9 1 3 5 7 9 1 3 5

TWO BRIDGES BUILT USING BLACK LOCUST WOOD 9

Locust Borer

(Megacyllene robiniae)

Lunch

Page 9: 2 International Conference on Timber Bridges · 3/10/2019  · Las Vegas, 2013 . TWO BRIDGES BUILT USING BLACK LOCUST WOOD 2 ... 2.0 2.5 3.0 3.5 4.0 A1 A3 A5 A7 A9 1 3 5 7 9 1 3 5

TWO BRIDGES BUILT USING BLACK LOCUST WOOD 10 Timber Piles – standard and proprietary connections

Page 10: 2 International Conference on Timber Bridges · 3/10/2019  · Las Vegas, 2013 . TWO BRIDGES BUILT USING BLACK LOCUST WOOD 2 ... 2.0 2.5 3.0 3.5 4.0 A1 A3 A5 A7 A9 1 3 5 7 9 1 3 5

TWO BRIDGES BUILT USING BLACK LOCUST WOOD 11

Page 11: 2 International Conference on Timber Bridges · 3/10/2019  · Las Vegas, 2013 . TWO BRIDGES BUILT USING BLACK LOCUST WOOD 2 ... 2.0 2.5 3.0 3.5 4.0 A1 A3 A5 A7 A9 1 3 5 7 9 1 3 5

TWO BRIDGES BUILT USING BLACK LOCUST WOOD 12

Structural Systems - Triakonta:

Page 12: 2 International Conference on Timber Bridges · 3/10/2019  · Las Vegas, 2013 . TWO BRIDGES BUILT USING BLACK LOCUST WOOD 2 ... 2.0 2.5 3.0 3.5 4.0 A1 A3 A5 A7 A9 1 3 5 7 9 1 3 5

TWO BRIDGES BUILT USING BLACK LOCUST WOOD 13

Turning a Black Locust Log, Cornell University, 2010

Page 13: 2 International Conference on Timber Bridges · 3/10/2019  · Las Vegas, 2013 . TWO BRIDGES BUILT USING BLACK LOCUST WOOD 2 ... 2.0 2.5 3.0 3.5 4.0 A1 A3 A5 A7 A9 1 3 5 7 9 1 3 5

TWO BRIDGES BUILT USING BLACK LOCUST WOOD 14

Structural Systems – Prestressed Segmented Arch:

Page 14: 2 International Conference on Timber Bridges · 3/10/2019  · Las Vegas, 2013 . TWO BRIDGES BUILT USING BLACK LOCUST WOOD 2 ... 2.0 2.5 3.0 3.5 4.0 A1 A3 A5 A7 A9 1 3 5 7 9 1 3 5

TWO BRIDGES BUILT USING BLACK LOCUST WOOD 15

Annular band connections on communication towers up to 40 m tall.

Page 15: 2 International Conference on Timber Bridges · 3/10/2019  · Las Vegas, 2013 . TWO BRIDGES BUILT USING BLACK LOCUST WOOD 2 ... 2.0 2.5 3.0 3.5 4.0 A1 A3 A5 A7 A9 1 3 5 7 9 1 3 5

TWO BRIDGES BUILT USING BLACK LOCUST WOOD 16

• Capped end connections

• Modular kit-of-parts

• Simple fabrication & erection

Page 16: 2 International Conference on Timber Bridges · 3/10/2019  · Las Vegas, 2013 . TWO BRIDGES BUILT USING BLACK LOCUST WOOD 2 ... 2.0 2.5 3.0 3.5 4.0 A1 A3 A5 A7 A9 1 3 5 7 9 1 3 5

TWO BRIDGES BUILT USING BLACK LOCUST WOOD 17 Four Bar Linkage

Page 17: 2 International Conference on Timber Bridges · 3/10/2019  · Las Vegas, 2013 . TWO BRIDGES BUILT USING BLACK LOCUST WOOD 2 ... 2.0 2.5 3.0 3.5 4.0 A1 A3 A5 A7 A9 1 3 5 7 9 1 3 5

TWO BRIDGES BUILT USING BLACK LOCUST WOOD 18

Page 18: 2 International Conference on Timber Bridges · 3/10/2019  · Las Vegas, 2013 . TWO BRIDGES BUILT USING BLACK LOCUST WOOD 2 ... 2.0 2.5 3.0 3.5 4.0 A1 A3 A5 A7 A9 1 3 5 7 9 1 3 5

TWO BRIDGES BUILT USING BLACK LOCUST WOOD 19

Page 19: 2 International Conference on Timber Bridges · 3/10/2019  · Las Vegas, 2013 . TWO BRIDGES BUILT USING BLACK LOCUST WOOD 2 ... 2.0 2.5 3.0 3.5 4.0 A1 A3 A5 A7 A9 1 3 5 7 9 1 3 5

TWO BRIDGES BUILT USING BLACK LOCUST WOOD 20

Squibb Bridge

Brooklyn, NY

Page 20: 2 International Conference on Timber Bridges · 3/10/2019  · Las Vegas, 2013 . TWO BRIDGES BUILT USING BLACK LOCUST WOOD 2 ... 2.0 2.5 3.0 3.5 4.0 A1 A3 A5 A7 A9 1 3 5 7 9 1 3 5

TWO BRIDGES BUILT USING BLACK LOCUST WOOD 21

TA Footbridge

Vassar College, Poughkeepsie, NY

Page 21: 2 International Conference on Timber Bridges · 3/10/2019  · Las Vegas, 2013 . TWO BRIDGES BUILT USING BLACK LOCUST WOOD 2 ... 2.0 2.5 3.0 3.5 4.0 A1 A3 A5 A7 A9 1 3 5 7 9 1 3 5

TWO BRIDGES BUILT USING BLACK LOCUST WOOD 22

Pressure treated wood deck, on unpainted steel beams

Advanced corrosion, significant section loss

Page 22: 2 International Conference on Timber Bridges · 3/10/2019  · Las Vegas, 2013 . TWO BRIDGES BUILT USING BLACK LOCUST WOOD 2 ... 2.0 2.5 3.0 3.5 4.0 A1 A3 A5 A7 A9 1 3 5 7 9 1 3 5

TWO BRIDGES BUILT USING BLACK LOCUST WOOD 23

Elevation

Axial force in lattice members (kips)

AASHTO STR-I combo

Axial force in chords & arch rib (kips)

X

Y

Z

-1.0

-1.3

-2.0

-2.5

-3.2

-5.6

X

Y

Z

60.0

-47.9

Elevation

Axial force in lattice members (kips)

AASHTO STR-I combo

Axial force in chords & arch rib (kips)

X

Y

Z

-1.0

-1.3

-2.0

-2.5

-3.2

-5.6

X

Y

Z

60.0

-47.9

Axial force in chords & arch rib (kips) Axial force in lattice members (kips)

AASHTO Strength-I Combination

Elevation

Page 23: 2 International Conference on Timber Bridges · 3/10/2019  · Las Vegas, 2013 . TWO BRIDGES BUILT USING BLACK LOCUST WOOD 2 ... 2.0 2.5 3.0 3.5 4.0 A1 A3 A5 A7 A9 1 3 5 7 9 1 3 5

TWO BRIDGES BUILT USING BLACK LOCUST WOOD 24

-4-2024

V0 VAB VBC VCD VD

Shea

r (k

ips)

Peg Shear Diagrams Top Chord

Section - Top Chord

0

1

2

3

4

0.00.51.01.52.02.53.03.54.0

B1

B3

B5

B7

B9

B1

1B

13

B1

5B

17

B1

9B

21

B2

3B

25

B2

7

No

. of P

egs

Bo

tto

m C

ho

rdM

ax. S

hea

r (k

ips)

0

1

2

3

4

0.00.51.01.52.02.53.03.54.0

T1 T4 T7 T10

T13

T16

T19

T22

T25

T28

No

. of P

egs

Top

Ch

ord

Max

. Sh

ear

(kip

s)

L BRIDGE (SYMM.)

C

0

1

2

3

4

0.00.51.01.52.02.53.03.54.0

A1

A3

A5

A7

A9

A1

1A

13

A1

5A

17

A1

9A

21

A2

3A

25

A2

7

No

. of P

egs

Arc

h R

ibM

ax. S

hea

r (k

ips)

Panel Point

Max Shear Force per shear plane (kips) No. of Pegs Figure 6 TA Bridge: maximum shear force per peg

shear plane and no. of pegs at each panel point.

-4-2024

V0 VAB VBC VCD VD

Shea

r (k

ips)

Peg Shear Diagrams Top Chord

Section - Top Chord

0

1

2

3

4

0.00.51.01.52.02.53.03.54.0

B1

B3

B5

B7

B9

B1

1B

13

B1

5B

17

B1

9B

21

B2

3B

25

B2

7

No

. of P

egs

Bo

tto

m C

ho

rdM

ax. S

hea

r (k

ips)

0

1

2

3

4

0.00.51.01.52.02.53.03.54.0

T1 T4 T7 T10

T13

T16

T19

T22

T25

T28

No

. of P

egs

Top

Ch

ord

Max

. Sh

ear

(kip

s)

L BRIDGE (SYMM.)

C

0

1

2

3

4

0.00.51.01.52.02.53.03.54.0

A1

A3

A5

A7

A9

A1

1A

13

A1

5A

17

A1

9A

21

A2

3A

25

A2

7

No

. of P

egs

Arc

h R

ibM

ax. S

hea

r (k

ips)

Panel Point

Max Shear Force per shear plane (kips) No. of Pegs Figure 6 TA Bridge: maximum shear force per peg

shear plane and no. of pegs at each panel point.

Mode V (peg shear failure)

(Miller, Schmidt, & Bulleit)

TA Footbridge Peg Shear Diagrams

Sh

ear

(k

ips)

4

2

0

2

4

Section – Top Chord

Yield modes of failure for doweled connections

(Timber Framers Guild)

1 2 3

1 2 3

Page 24: 2 International Conference on Timber Bridges · 3/10/2019  · Las Vegas, 2013 . TWO BRIDGES BUILT USING BLACK LOCUST WOOD 2 ... 2.0 2.5 3.0 3.5 4.0 A1 A3 A5 A7 A9 1 3 5 7 9 1 3 5

TWO BRIDGES BUILT USING BLACK LOCUST WOOD 25

Elevation

Axial force in lattice members (kips)

AASHTO STR-I combo

Axial force in chords & arch rib (kips)

X

Y

Z

-1.0

-1.3

-2.0

-2.5

-3.2

-5.6

X

Y

Z

60.0

-47.9

-4-2024

V0 VAB VBC VCD VD

Shea

r (k

ips)

Peg Shear Diagrams Top Chord

Section - Top Chord

0

1

2

3

4

0.00.51.01.52.02.53.03.54.0

B1

B3

B5

B7

B9

B1

1B

13

B1

5B

17

B1

9B

21

B2

3B

25

B2

7

No

. of P

egs

Bo

tto

m C

ho

rdM

ax. S

hea

r (k

ips)

0

1

2

3

4

0.00.51.01.52.02.53.03.54.0

T1 T4 T7 T10

T13

T16

T19

T22

T25

T28

No

. of P

egs

Top

Ch

ord

Max

. Sh

ear

(kip

s)

L BRIDGE (SYMM.)

C

0

1

2

3

4

0.00.51.01.52.02.53.03.54.0

A1

A3

A5

A7

A9

A1

1A

13

A1

5A

17

A1

9A

21

A2

3A

25

A2

7

No

. of P

egs

Arc

h R

ibM

ax. S

hea

r (k

ips)

Panel Point

Max Shear Force per shear plane (kips) No. of Pegs Figure 6 TA Bridge: maximum shear force per peg

shear plane and no. of pegs at each panel point.

-4-2024

V0 VAB VBC VCD VD

Shea

r (k

ips)

Peg Shear Diagrams Top Chord

Section - Top Chord

0

1

2

3

4

0.00.51.01.52.02.53.03.54.0

B1

B3

B5

B7

B9

B1

1B

13

B1

5B

17

B1

9B

21

B2

3B

25

B2

7

No

. of P

egs

Bo

tto

m C

ho

rdM

ax. S

hea

r (k

ips)

0

1

2

3

4

0.00.51.01.52.02.53.03.54.0

T1 T4 T7 T10

T13

T16

T19

T22

T25

T28

No

. of P

egs

Top

Ch

ord

Max

. Sh

ear

(kip

s)

L BRIDGE (SYMM.)

C

0

1

2

3

4

0.00.51.01.52.02.53.03.54.0

A1

A3

A5

A7

A9

A1

1A

13

A1

5A

17

A1

9A

21

A2

3A

25

A2

7

No

. of P

egs

Arc

h R

ibM

ax. S

hea

r (k

ips)

Panel Point

Max Shear Force per shear plane (kips) No. of Pegs Figure 6 TA Bridge: maximum shear force per peg

shear plane and no. of pegs at each panel point.

-4-2024

V0 VAB VBC VCD VD

Shea

r (k

ips)

Peg Shear Diagrams Top Chord

Section - Top Chord

0

1

2

3

4

0.00.51.01.52.02.53.03.54.0

B1

B3

B5

B7

B9

B1

1B

13

B1

5B

17

B1

9B

21

B2

3B

25

B2

7

No

. of P

egs

Bo

tto

m C

ho

rdM

ax. S

hea

r (k

ips)

0

1

2

3

4

0.00.51.01.52.02.53.03.54.0

T1 T4 T7 T10

T13

T16

T19

T22

T25

T28

No

. of P

egs

Top

Ch

ord

Max

. Sh

ear

(kip

s)

L BRIDGE (SYMM.)

C

0

1

2

3

4

0.00.51.01.52.02.53.03.54.0

A1

A3

A5

A7

A9

A1

1A

13

A1

5A

17

A1

9A

21

A2

3A

25

A2

7

No

. of P

egs

Arc

h R

ibM

ax. S

hea

r (k

ips)

Panel Point

Max Shear Force per shear plane (kips) No. of Pegs Figure 6 TA Bridge: maximum shear force per peg

shear plane and no. of pegs at each panel point. Computed shear force per peg shear plane

Axial force in chords & arch rib (kips) Axial force in lattice members (kips)

AASHTO Strength-I Combination

Page 25: 2 International Conference on Timber Bridges · 3/10/2019  · Las Vegas, 2013 . TWO BRIDGES BUILT USING BLACK LOCUST WOOD 2 ... 2.0 2.5 3.0 3.5 4.0 A1 A3 A5 A7 A9 1 3 5 7 9 1 3 5

TWO BRIDGES BUILT USING BLACK LOCUST WOOD 26

Page 26: 2 International Conference on Timber Bridges · 3/10/2019  · Las Vegas, 2013 . TWO BRIDGES BUILT USING BLACK LOCUST WOOD 2 ... 2.0 2.5 3.0 3.5 4.0 A1 A3 A5 A7 A9 1 3 5 7 9 1 3 5

TWO BRIDGES BUILT USING BLACK LOCUST WOOD 27

Page 27: 2 International Conference on Timber Bridges · 3/10/2019  · Las Vegas, 2013 . TWO BRIDGES BUILT USING BLACK LOCUST WOOD 2 ... 2.0 2.5 3.0 3.5 4.0 A1 A3 A5 A7 A9 1 3 5 7 9 1 3 5

TWO BRIDGES BUILT USING BLACK LOCUST WOOD 28

Page 28: 2 International Conference on Timber Bridges · 3/10/2019  · Las Vegas, 2013 . TWO BRIDGES BUILT USING BLACK LOCUST WOOD 2 ... 2.0 2.5 3.0 3.5 4.0 A1 A3 A5 A7 A9 1 3 5 7 9 1 3 5

TWO BRIDGES BUILT USING BLACK LOCUST WOOD 29

Page 29: 2 International Conference on Timber Bridges · 3/10/2019  · Las Vegas, 2013 . TWO BRIDGES BUILT USING BLACK LOCUST WOOD 2 ... 2.0 2.5 3.0 3.5 4.0 A1 A3 A5 A7 A9 1 3 5 7 9 1 3 5

TWO BRIDGES BUILT USING BLACK LOCUST WOOD 30

Page 30: 2 International Conference on Timber Bridges · 3/10/2019  · Las Vegas, 2013 . TWO BRIDGES BUILT USING BLACK LOCUST WOOD 2 ... 2.0 2.5 3.0 3.5 4.0 A1 A3 A5 A7 A9 1 3 5 7 9 1 3 5

TWO BRIDGES BUILT USING BLACK LOCUST WOOD 31

Page 31: 2 International Conference on Timber Bridges · 3/10/2019  · Las Vegas, 2013 . TWO BRIDGES BUILT USING BLACK LOCUST WOOD 2 ... 2.0 2.5 3.0 3.5 4.0 A1 A3 A5 A7 A9 1 3 5 7 9 1 3 5

TWO BRIDGES BUILT USING BLACK LOCUST WOOD 32

Testing Full-Size Members for Squibb Bridge

(Univ. of Maine)

150 mm diameter x 1.83 m logs

(6” dia. x 72”)

50 mm x 200 mm x 2.49 m beams

(4” x 10½” x 98”)

Page 32: 2 International Conference on Timber Bridges · 3/10/2019  · Las Vegas, 2013 . TWO BRIDGES BUILT USING BLACK LOCUST WOOD 2 ... 2.0 2.5 3.0 3.5 4.0 A1 A3 A5 A7 A9 1 3 5 7 9 1 3 5

TWO BRIDGES BUILT USING BLACK LOCUST WOOD 33

Compression

Parallel to Grain n

Ultimate

Compressive Strength

Modulus of

Elasticity

Moisture

Content

Specific

Gravity

Me

an (

ksi)

CO

V (

%)

PT

L

Me

an (

ksi)

CO

V (

%)

MC

(%

)

CO

V (

%)

Me

an

CO

V (

%)

FPL

Wh

ite

Oak

20 3,560 18 2,321 * 1,250 22 Grn - 0.60 10

FPL

Bla

ck

Locu

st

20 6,800 18 4,434 * 1,850 22 Grn - 0.66 10

Sq

uib

b

Bri

dg

e

45 5,219 12.2 4,051 * 1,770 16.2 24.8 17.0 0.61 4.1

TA

Foo

t

bri

dg

e

41 7,156 20.8 4,424 * 1,327 49.5 - - - -

Compression Strength: Two rounds of testing

* PTL = lower 5% at 75% confidence

(ASTM D2915)

Page 33: 2 International Conference on Timber Bridges · 3/10/2019  · Las Vegas, 2013 . TWO BRIDGES BUILT USING BLACK LOCUST WOOD 2 ... 2.0 2.5 3.0 3.5 4.0 A1 A3 A5 A7 A9 1 3 5 7 9 1 3 5

TWO BRIDGES BUILT USING BLACK LOCUST WOOD 34

0

5

10

15

20

25

1,0

00

2,0

00

3,0

00

4,0

00

5,0

00

6,0

00

7,0

00

8,0

00

9,0

00

10

,00

01

1,0

00

Co

un

ts

UCS (psi)

0

5

10

15

20

25

1,0

00

2,0

00

3,0

00

4,0

00

5,0

00

6,0

00

7,0

00

8,0

00

9,0

00

10

,00

01

1,0

00

Co

un

ts &

Wei

bu

ll P

rob

abili

ty

UCS (psi)

0

5

10

15

20

25

1,0

00

2,0

00

3,0

00

4,0

00

5,0

00

6,0

00

7,0

00

8,0

00

9,0

00

10

,00

01

1,0

00

UCS (psi)

Block ABlock BCombined WeibullBlock A WeibullBlock B Weibull

Compression Strength: Two rounds of testing

Squibb Bridge

TA Footbridge

Use caution drawing comparisons.

It may not be reasonable to combine the data sets.