BUILDING STRONG®
Project management for the District’s Civil Works program. • Lead multi-disciplined Project Delivery Teams. • Prepare schedules, budgets and Project Management
Plans.
Civil Works BranchPrograms and Project Management
Responsibilities
BUILDING STRONG®
Civil Works Project Purposes• Navigation• Flood Risk Management• Ecosystem Restoration• Water Supply (Water Conservation)• Recreation
Sub-Programs• O&M• General Investigations• Construction General• CAP• Section 219 – Environmental Infrastructure• Planning Assistance to States• Dam Safety• Etc.
Seven Oaks Dam
Port of Los Angeles
Tres Rios Eco. Rest.
BUILDING STRONG®
Civil WorksProject Delivery Process
Reconnaissance Phase1- 2 years$100,000
Feasibility Phase3 years$3 million
Preconstruction Engineering and Design PhaseDuration dependant on complexityApproximately 10% of construction estimate
Construction PhaseDuration dependant on complexity$millions
BUILDING STRONG®
Tres Rios Environmental RestorationRecognitions and Awards
Phase 3A and 3B
Phase 3 of the Tres Rios Environmental Restoration project removed salt cedar trees, salvaged existing native plants and revegetated a 3-mile-long, 2,000-acre stretch of open-water and wetland marshes at the confluence of the Gila,Salt and Agua Fria rivers. The project has created 44 acres of new open-water reaches along with 10 acres of marsh habitat and 46acres of riparian habitat. The Tres Rios project has inspired and united all stakeholders involved,andhas increased the value of the area as a regional attraction and a destination for local residents,recreationalists and visitors..
91st
Aven
ue
Tres Rios Flood Control Levee
Open Water Marshes
Tres Rios Overbank Wetlands
Tres Rios Demonstration Cobble Wetlands Tres Rios
Demonstration Hayfield Wetlands
Riparian Corridors
Tres Rios Flow Regulating Wetlands
N
BUILDING STRONG®
Flood Risk Management Projects
Santa Ana River Mainstem, Prado
Santa Maria Levee – Bradley Canyon
BUILDING STRONG®Slide 7
Matilija Dam
Tres Rios Rio Salado
Upper Newport Bay
LA River Restoration
Ecosystem Restoration
BUILDING STRONG®8
FY10 FY11 FY12 FY13 FY14 FY15 FY16GI $3 $4 $3 $3 $4 $3 $0OM $28 $32 $34 $28 $44 $39 $30CG (incl CAP) $19 $38 $43 $19 $58 $31 $37Total $102 $157 $113 $80 $140 $106 $95
$0$20$40$60$80
$100$120$140$160$180
Dol
lars
($k)
Civil Works ProgramFY 10 - 16
SPL Program Projections
Data as of: 01/01/2014
BUILDING STRONG®
FY14 Forecasted Project Acquisition Strategy PA Amount Anticipated
Award Santa Ana River Mainstem,Environmental Mitigation Contract
GSA-Competitive $500K-1M 3rd Qtr
IDIQ – Civil Engineering (Regional Use) Unrestricted $5-10M 3rd Qtr
IDIQ – Civil Engineering (Regional Use) SBSA $5-10M 3rd Qtr
Santa Ana River Mainstem, Prison Dike Construction SBSA >$10M 4th Qtr
Rio Salado Phoenix & Tempe, Environmental Restoration
SBSA $1-5M 4th Qtr
Los Angeles-Long Beach Harbor SBSA $5-10M 4th Qtr
Civil Works FY14 Opportunities
BUILDING STRONG®
FY15 Forecasted Project Acquisition Strategy PA Amount Anticipated
Award Santa Ana River Mainstem,BNSF Bridge Protection and Pier Nose Extension
Unrestricted >$10M 1st Qtr
South Perris Well Construction TBD $5-10M 2nd Qtr
Santa Ana River Mainstem,Reach 9 Phase 4 – Bank Protection Soil Cement
SBSA >$10M 2nd Qtr
Civil Works FY15 Opportunities
BUILDING STRONG®
Darrell Buxton, Civil Works Branch Chief(213)[email protected]
Charles S. Dwyer, Navigations Branch Chief(213) [email protected]
Tomas Beauchamp-Hernandez, Operations Branch Chief(626) [email protected]
Points of ContactLos Angeles District