US Army Corps of Engineers BUILDING STRONG ® Darrell Buxton Chief, Civil Works Branch March 20, 2014

Transcript of 2- Buxton SAME Presentation - 20 Mar 14 Civil

US Army Corps of EngineersBUILDING STRONG®

Darrell BuxtonChief, Civil Works BranchMarch 20, 2014

BUILDING STRONG®

Project management for the District’s Civil Works program. • Lead multi-disciplined Project Delivery Teams. • Prepare schedules, budgets and Project Management

Plans.

Civil Works BranchPrograms and Project Management

Responsibilities

BUILDING STRONG®

Civil Works Project Purposes• Navigation• Flood Risk Management• Ecosystem Restoration• Water Supply (Water Conservation)• Recreation

Sub-Programs• O&M• General Investigations• Construction General• CAP• Section 219 – Environmental Infrastructure• Planning Assistance to States• Dam Safety• Etc.

Seven Oaks Dam

Port of Los Angeles

Tres Rios Eco. Rest.

BUILDING STRONG®

Civil WorksProject Delivery Process

Reconnaissance Phase1- 2 years$100,000

Feasibility Phase3 years$3 million

Preconstruction Engineering and Design PhaseDuration dependant on complexityApproximately 10% of construction estimate

Construction PhaseDuration dependant on complexity$millions

BUILDING STRONG®

Tres Rios Environmental RestorationRecognitions and Awards

Phase 3A and 3B

Phase 3 of the Tres Rios Environmental Restoration project removed salt cedar trees, salvaged existing native plants and revegetated a 3-mile-long, 2,000-acre stretch of open-water and wetland marshes at the confluence of the Gila,Salt and Agua Fria rivers. The project has created 44 acres of new open-water reaches along with 10 acres of marsh habitat and 46acres of riparian habitat. The Tres Rios project has inspired and united all stakeholders involved,andhas increased the value of the area as a regional attraction and a destination for local residents,recreationalists and visitors..

91st

Aven

ue

Tres Rios Flood Control Levee

Open Water Marshes

Tres Rios Overbank Wetlands

Tres Rios Demonstration Cobble Wetlands Tres Rios

Demonstration Hayfield Wetlands

Riparian Corridors

Tres Rios Flow Regulating Wetlands

N

BUILDING STRONG®

Flood Risk Management Projects

Santa Ana River Mainstem, Prado

Santa Maria Levee – Bradley Canyon

BUILDING STRONG®Slide 7

Matilija Dam

Tres Rios Rio Salado

Upper Newport Bay

LA River Restoration

Ecosystem Restoration

BUILDING STRONG®8

FY10 FY11 FY12 FY13 FY14 FY15 FY16GI $3 $4 $3 $3 $4 $3 $0OM $28 $32 $34 $28 $44 $39 $30CG (incl CAP) $19 $38 $43 $19 $58 $31 $37Total $102 $157 $113 $80 $140 $106 $95

$0$20$40$60$80

$100$120$140$160$180

Dol

lars

($k)

Civil Works ProgramFY 10 - 16

SPL Program Projections

Data as of: 01/01/2014

BUILDING STRONG®

FY14 Forecasted Project Acquisition Strategy PA Amount Anticipated

Award Santa Ana River Mainstem,Environmental Mitigation Contract

GSA-Competitive $500K-1M 3rd Qtr

IDIQ – Civil Engineering (Regional Use) Unrestricted $5-10M 3rd Qtr

IDIQ – Civil Engineering (Regional Use) SBSA $5-10M 3rd Qtr

Santa Ana River Mainstem, Prison Dike Construction SBSA >$10M 4th Qtr

Rio Salado Phoenix & Tempe, Environmental Restoration

SBSA $1-5M 4th Qtr

Los Angeles-Long Beach Harbor SBSA $5-10M 4th Qtr

Civil Works FY14 Opportunities

BUILDING STRONG®

FY15 Forecasted Project Acquisition Strategy PA Amount Anticipated

Award Santa Ana River Mainstem,BNSF Bridge Protection and Pier Nose Extension

Unrestricted >$10M 1st Qtr

South Perris Well Construction TBD $5-10M 2nd Qtr

Santa Ana River Mainstem,Reach 9 Phase 4 – Bank Protection Soil Cement

SBSA >$10M 2nd Qtr

Civil Works FY15 Opportunities

BUILDING STRONG®

Darrell Buxton, Civil Works Branch Chief(213)[email protected]

Charles S. Dwyer, Navigations Branch Chief(213) [email protected]

Tomas Beauchamp-Hernandez, Operations Branch Chief(626) [email protected]

Points of ContactLos Angeles District