    Experience sheet of the Firm during Last Five Year

    Transtek Engineers & Services Private Ltd

    Project Name: Consultancy Assignment for FeasibilityStudies and Preparation of DPR for 500 Km. Length  of

    Rural Roads falling under Nawada District of Bihar under

    RWD, Govt. of Bihar.

    Country : India

    Project location within country : State of Bihar

     Name of Client: IL&FS Infrastructure DevelopmentCorporation Ltd., New Delhi

    Professional Staff provided by TRANSTEK:

     No. of Staffs : 12 No. of Man-Months : 246

    Date of Start :(Month/Year) : March

    2009

    Date of Completion:(Month/Year) : May 2010

    Approximate Value of Services (in Lakhs Rs.) :Rs.. 80.00 Lakhs (approx.)

     Name of Associated Firm, If any : None Number of Man-Month of professional staff provided

     by associated firm : None

    Senior Staff involved and function Performed :

    1. Mr. P.D. S. Prasad: Senior Highway Engineer –cum- Team Leader

    2. S. M. Hussain : Highway cum Pavement Expert

    3. Mr. P. Pandey : Bridges Specialist

    4. Mr. S. Narain : Geotechnical –cum- Materials Engineer5. Mr. B. Saravanan : Survey engineer

    6. Mr. R. K. Sinha : Sr. Traffic cum CADD Expert 

    A Team of Senior Level Expert is involved in this Project and they are performing various Survey / Investigation works

    (detailed below), Detailed topographic survey, Feasibility Study, Geometric Design for Four Lane Highway and

     preparation of detailed drawings, Design of Bridges and cross drainage structure, Preparation of Feasibility Study

    Report, Preliminary & Detailed Project Report, Tender Document.

    Narrative Description of Project: This project Widening and Strengthening work including Geometric Improvement

    of Single lane Rural Roads Section in the Bihar State includes Survey / Investigation, Feasibility Study, Preparation of

    Detailed Engineering Report, Cost Estimate, Drawings Tender Document for the Project.

    Description of Actual Service to be Provided by TRANSTEK:

    • Preliminary Survey Work. Detailed Topographic Survey. Entire Traffic survey work.

     Borrow pit Soil and Material Survey.• Preparation Land Acquisition Plan and Report.

    • Pavement Investigations (Soil Investigation & Testing work).

    •  Drainage Study on entire project stretch

    • Condition survey work on Bridges & Cross Drainage Structure

    •  Hydrological survey work for Bridges and preparation of Hydraulic Particulars

    • Geotechnical Investigation for Entire High Embankment Zone & Bridges.

    • Preparation of Feasibility Study Report.

    •  Highway Geometric design and preparation of drawings

    •  Detailed design & Preparation of drawing for bridges.

    • Preparation of Detailed Project Report & Tender document.

    • Obtaining Clearance of DPR from STA.

  • 8/18/2019 2-2. Widening of Road NH, SH & REO Roads

    2/11

    Experience sheet of the Firm during Last Five Year

    Transtek Engineers & Services Private Ltd

    Project Name: Preparation of Feasibility Study and Detailed

    Project Report for Widening to two lane including

    Strengthening and Geometric Improvement of StateHighway No. 56, 62, 63: Package No. 11 (Araria, Kishanganj

    and Katihar District) under RSVY Scheme Total 138 Km.

    Country: India

    Project location within Country: State of Bihar Name of Client : CSO, CPWD, Nirman Bhawan, N. Delhi

    & CPWD, Patna

    Professional Staff provided by TRANSTEK: No. of Staffs : 14

     No. of Man-Months :64

    Date of Start :

    (Month/Year) :December 2005

    Date of Completion:

    (Month/Year) : Oct. 2006

    Approximate Value of Services (in Lakhs Rs.) :

    Rs.. 78.65 Lakhs.

     Name of Associated Firm, If any: None Number of Man-Month of professional staff provided

     by associated firm: None

    Senior Staff involved and function Performed :1. Mr. S.B. Pd. Sinha. : Senior Highway Engineer –cum- Team Leader2. Mr. S. M. Husaain : Highway cumPavement Specialist

    3. Mr. S. Chatterjee : Bridges Specialist4. Mr. Pankaj Pandey : Sr. Bridge Design Expert

    5. Mr. S. Narain : Geotechnical –cum- Materials Engineer

    6. Mr. B. Sarvanan : Survey engineer

    7. Mr. R. K. Sinha : Traffic engineer8. Mr. M.V. Ramdas : Transport Economist

    9. Mrs. S. K. Srivastava : Social & R&R Expert

    10. Mr. M. K. Sinha : Environmental Expert11. Mr. T. P. Sinha : Q/S cum Documentation Expert 

    A Team of Senior Level Expert is involved in this Project and they are performing various Survey / Investigation

    works (detailed below), Detailed topographic survey, Feasibility Study, Geometric Design for Four Lane Highway and preparation of detailed drawings, Design of Bridges and cross drainage structure, Preparation of Feasibility Study

    Report, Preliminary & Detailed Project Report, Tender Document.

    Narrative Description of Project : This project Widening and Strengthening work to Two Lane includingGeometric Improvement of Single lane State Highway Section in the Bihar State includes Survey / Investigation,

    Feasibility Study, Preparation of Technical Appraisal Report , Detailed Engineering Report, Cost Estimate,

    Construction Drawing and Tender Document.

    Description of Actual Service to be Provided by TRANSTEK:

    • Preliminary Survey Work. Detailed Topographic Survey. Entire Traffic survey work including Axle Load Survey. Entire

    Pavement Condition Survey work.

    •  Borrow pit Soil and Material Survey.

    •  Detailed Environmental & Social Survey, Preparation of Environmental & Social Screening Report, EIA Report, SIA Report,

     EMP & Rap Report.

    • Preparation Land Acquisition Plan and Report.

    • Pavement Investigations (Soil Investigation & Testing work, Roughness Measurement, Benkelman Beam Deflection Study.

    •  Drainage Study on entire project stretch

    • Condition survey work on Bridges & Cross Drainage Structure

     Hydrological survey work for Bridges and preparation of Hydraulic Particulars• Geotechnical Investigation for Entire High Embankment Zone & Bridges.

    • Preparation of Techno Economic Feasibility Study Report.

    •  Highway Geometric design and preparation of drawings

    •  Detailed design & Preparation of drawing for bridges.

    • Preparation of Preliminary Project Report.

    • Preparation of Detailed Project Report & Tender document.

  • 8/18/2019 2-2. Widening of Road NH, SH & REO Roads

    3/11

    Experience sheet of the Firm during Last Five Year

    Transtek Engineers & Services Private Ltd

    Project Name : Preparation of Feasibility Study and Detailed

    Project Report for Widening to two lane includingStrengthening and Geometric Improvement of State

    Highway No.-19 & 22 : Package No. 14 (Banka District )

    under RSVY Scheme Total 106 Km.

    Country : India

    Project location within country : State of Bihar

     Name of Client : CSO, CPWD, Nirman Bhawan, N. Delhi

    & CPWD, Patna

    Professional Staff provided by TRANSTEK :

     No. of Staffs : 14

     No. of Man-Months :66

    Date of Start :

    (Month/Year) :

    December 2005

    Date of Completion :

    (Month/Year) : Oct. 2006

    Approximate Value of Services (in Lakhs Rs.) :

    Rs.. 69.54 Lakhs.

     Name of Associated Firm, If any : None Number of Man-Month of professional staff provided by associated firm : None

    Senior Staff involved and function Performed :1. Mr. P.. D. S. Pd.. : Senior Highway Engineer –cum- Team Leader2. Mr. Jaj Singh : Highway cumPavement Specialist

    3. Mr. B.B. Verma : Bridges Specialist

    4. Mr. Pankaj Pandey : Sr. Bridge Design Expert

    5. Mr. O. P. Banka : Geotechnical –cum- Materials Engineer6. Mr. Ranjeet Kumar : Survey engineer

    7. Mr. A. K. Singh : Traffic Expert

    8. Mr. M.V. Ramdas : Transport Economist

    9. Mrs. A. Khan : Social & R&R Expert10. Mr. S. N. Pandey : Environmental Expert

    11. Mr. A.K. Singh : Q/S cum Documentation Expert 

    A Team of Senior Level Expert is involved in this Project and they are performing various Survey / Investigation

    works (detailed below), Detailed topographic survey, Feasibility Study, Geometric Design for Four Lane Highway and preparation of detailed drawings, Design of Bridges and cross drainage structure, Preparation of Feasibility Study

    Report, Preliminary & Detailed Project Report, Tender Document.

    Narrative Description of Project : This project Widening and Strengthening work to Two Lane including

    Geometric Improvement of Single lane State Highway Section in the Bihar State includes Survey / Investigation,

    Feasibility Study, Preparation of Technical Appraisal Report , Detailed Engineering Report, Cost Estimate,Construction Drawing and Tender Document.

    Description of Actual Service to be Provided by TRANSTEK:

    • Preliminary Survey Work. Detailed Topographic Survey. Entire Traffic survey work including Axle Load Survey. Entire

    Pavement Condition Survey work.

    •  Borrow pit Soil and Material Survey.

    •  Detailed Environmental & Social Survey, Preparation of Environmental & Social Screening Report, EIA Report, SIA Report,

     EMP & Rap Report.

    • Preparation Land Acquisition Plan and Report.

    • Pavement Investigations (Soil Investigation & Testing work, Roughness Measurement, Benkelman Beam Deflection Study.

    •  Drainage Study on entire project stretch

    • Condition survey work on Bridges & Cross Drainage Structure

    •  Hydrological survey work for Bridges and preparation of Hydraulic Particulars

    • Geotechnical Investigation for Entire High Embankment Zone & Bridges.

    Preparation of Techno Economic Feasibility Study Report.•  Highway Geometric design and preparation of drawings

    •  Detailed design & Preparation of drawing for bridges.

    • Preparation of Preliminary Project Report .

    • Preparation of Detailed Project Report & Tender document.

  • 8/18/2019 2-2. Widening of Road NH, SH & REO Roads

    4/11

    Experience sheet of the Firm during Last Five Year

    Transtek Engineers & Services Private Ltd

    Project Name : Preparation of Feasibility Study and DetailedProject Report for Widening to two lane including

    Strengthening and Geometric Improvement of State

    Highway No. 19, 24 & 25 of Length 95 km. under Package No. 16 under RSVY Scheme

    Country : India

    Project location within Country: State of Bihar Name of Client : CSO, CPWD, Nirman Bhawan, N. Delhi

    & CPWD, Patna

    Professional Staff provided by TRANSTEK: No. of Staffs : 14

     No. of Man-Months :64

    Date of Start :

    (Month/Year) : January2006

    Date of Completion :

    (Month/Year) : Nov. 2006

    Approximate Value of Services (in Lakhs Rs.) :

    Rs.. 66.56 Lakhs.

     Name of Associated Firm, If any : None Number of Man-Month of professional staff provided

     by associated firm : None

    Senior Staff involved and function Performed :1. Mr. V. K. Verma. : Senior Highway Engineer –cum- Team Leader

    2. Mr. K. Kumar : Highway cum Pavement Specialist

    3. Mr. K. Prasad : Bridges Specialist4. Mr. Pankaj Pandey : Sr. Bridge Design Expert

    5. Mr. K. Vimal : Geotechnical –cum- Materials Engineer

    6. Mr. S.C. Pd. Verma : Survey engineer

    7. Mr. S. N. Singh : Traffic engineer

    8. Mr. M.V. Ramdas : Transport Economist9. Mrs. D. Ghosh : Social & R&R Expert

    10. Mr. B. K. Sinha : Environmental Expert11. Mr. R. Singh : Q/S cum Documentation Expert A Team of Senior Level Expert is involved in this Project and they are performing various Survey / Investigationworks (detailed below), Detailed topographic survey, Feasibility Study, Geometric Design for Four Lane Highway and

     preparation of detailed drawings, Design of Bridges and cross drainage structure, Preparation of Feasibility StudyReport, Preliminary & Detailed Project Report, Tender Document.

    Narrative Description of Project : This project Widening and Strengthening work to Two Lane including

    Geometric Improvement of Single lane State Highway Section in the Bihar State includes Survey / Investigation,Feasibility Study, Preparation of Technical Appraisal Report , Detailed Engineering Report, Cost Estimate,

    Construction Drawing and Tender Document.

    Description of Actual Service to be Provided by TRANSTEK :

    • Preliminary Survey Work. Detailed Topographic Survey. Entire Traffic survey work including Axle Load Survey. Entire

    Pavement Condition Survey work.

    •  Borrow pit Soil and Material Survey.

    •  Detailed Environmental & Social Survey, Preparation of Environmental & Social Screening Report, EIA Report, SIA Report,

     EMP & Rap Report.

    • Preparation Land Acquisition Plan and Report.

    • Pavement Investigations (Soil Investigation & Testing work, Roughness Measurement, Benkelman Beam Deflection Study.

    •  Drainage Study on entire project stretch

    • Condition survey work on Bridges & Cross Drainage Structure

    •  Hydrological survey work for Bridges and preparation of Hydraulic Particulars

    Geotechnical Investigation for Entire High Embankment Zone & Bridges.• Preparation of Techno Economic Feasibility Study Report.

    •  Highway Geometric design and preparation of drawings

    •  Detailed design & Preparation of drawing for bridges.

    • Preparation of Preliminary Project Report .

    • Preparation of Detailed Project Report & Tender document.

  • 8/18/2019 2-2. Widening of Road NH, SH & REO Roads

    5/11

    Experience sheet of the Firm during Last Five Year

    Transtek Engineers & Services Private Ltd

    Project Name: Consultancy Assignment for Feasibility

    Studies and Preparation of DPR for 500 Km. Length  of

    Rural Roads falling under Supaul District of Bihar underRWD, Govt. of Bihar.

    Country : India

    Project location within country : State of Bihar Name of Client: IL&FS Infrastructure Development

    Corporation Ltd., New Delhi

    Professional Staff provided by TRANSTEK: No. of Staffs : 12

     No. of Man-Months : 246

    Date of Start :

    (Month/Year) :

    December 2007

    Date of Completion:

    (Month/Year) : January 2009

    Approximate Value of Services (in Lakhs Rs.) :

    Rs.. 80.00 Lakhs (approx.)

     Name of Associated Firm, If any : None Number of Man-Month of professional staff provided

     by associated firm : None

    Senior Staff involved and function Performed :

    1. Mr. P.D. S. Prasad: Senior Highway Engineer –cum- Team Leader

    2. S. M. Hussain : Highway cum Pavement Expert

    3. Mr. P. Pandey : Bridges Specialist4. Mr. S. Narain : Geotechnical –cum- Materials Engineer

    5. Mr. B. Saravanan : Survey engineer

    6. Mr. R. K. Sinha : Sr. Traffic cum CADD Expert 

    A Team of Senior Level Expert is involved in this Project and they are performing various Survey / Investigation works

    (detailed below), Detailed topographic survey, Feasibility Study, Geometric Design for Four Lane Highway and

     preparation of detailed drawings, Design of Bridges and cross drainage structure, Preparation of Feasibility StudyReport, Preliminary & Detailed Project Report, Tender Document.

    Narrative Description of Project: This project Widening and Strengthening work including Geometric Improvement

    of Single lane Rural Roads Section in the Bihar State includes Survey / Investigation, Feasibility Study, Preparation of

    Detailed Engineering Report, Cost Estimate, Drawings Tender Document for the Project.

    Description of Actual Service to be Provided by TRANSTEK:

    • Preliminary Survey Work. Detailed Topographic Survey. Entire Traffic survey work.

    •  Borrow pit Soil and Material Survey.

    • Preparation Land Acquisition Plan and Report.

    • Pavement Investigations (Soil Investigation & Testing work).

    •  Drainage Study on entire project stretch

    • Condition survey work on Bridges & Cross Drainage Structure

    •  Hydrological survey work for Bridges and preparation of Hydraulic Particulars

    • Geotechnical Investigation for Entire High Embankment Zone & Bridges.

    • Preparation of Feasibility Study Report.

    •  Highway Geometric design and preparation of drawings

    •  Detailed design & Preparation of drawing for bridges.

    • Preparation of Detailed Project Report & Tender document.

    • Obtaining Clearance of DPR from STA.

  • 8/18/2019 2-2. Widening of Road NH, SH & REO Roads

    6/11

    Experience sheet of the Firm during Last Five Year

    Transtek Engineers & Services Private Ltd

    Project Name: Preparation of Detailed Project Report for Up-grading and Strengthening work of Rural roads (Total = 373

    Km. Length including Bridges), in East Champaran and

    Gopalganj District of Bihar Funded by World Bank Funded asRural Road Project –II PMGSY Scheme.

    Country : India

    Project location within country : State of Bihar Name of Client: RWD, Govt of Bihar

    Professional Staff provided by TRANSTEK: No. of Staffs : 11

     No. of Man-Months : 44

    Date of Start :

    (Month/Year) : March2007

    Date of Completion:

    (Month/Year) : Nov. 2007

    Approximate Value of Services (in Lakhs Rs.) :

    Rs.. 89.65 Lakhs.

     Name of Associated Firm, If any : None Number of Man-Month of professional staff provided

     by associated firm: None

    Senior Staff involved and function Performed

    1. Mr. S. B. Prasad : Senior Highway Engineer –cum- Team Leader

    2. Mr. P. Pandey : Bridges Specialist

    3. Mr. S. Narain : Geotechnical –cum- Materials Engineer4. Mr. P. R. Kumar : Survey engineer

    5. Mr. R. K. Sinha : Sr. Traffic cum CADD Expert

    6. Mr. Mukesh Kumar : Environmental Expert

    7. Mr. S. K. Srivastava : Social & R&R Expert

    8. Mr. T. P. Sinha : Q/S cum Documentation Expert 

    A Team of Senior Level Expert is involved in this Project and they are performing various Survey / Investigation works

    (detailed below), Detailed topographic survey, Feasibility Study, Geometric Design of Highway and preparation of

    detailed drawings, Design of Bridges and cross drainage structure, Preparation of Feasibility Study Report, Preliminary& Detailed Project Report, Tender Document.

    Narrative Description of Project: This world Bank Funded project is upgrading and strengthening of existing Rural

    Road to Single lane standards including Geometric Improvement which includes Survey / Investigation, Feasibility

    Study, Preparation of Detailed Engineering Report, Cost Estimate, Drawings Tender Document for the Project.

    Description of Actual Service to be Provided by TRANSTEK:

    • Preliminary Survey Work. Detailed Topographic Survey. Entire Traffic survey work.

    •  Borrow pit Soil and Material Survey.

    • Pavement Investigations (Soil Investigation & Testing work).

    •  Drainage Study on entire project stretch

    • Condition survey work on Bridges & Cross Drainage Structure

    •  Hydrological survey work for Bridges and preparation of Hydraulic Particulars

    • Geotechnical Investigation for Bridges.

    •  Highway Geometric design and preparation of drawings

    •  Detailed design & Preparation of drawing for bridges.

    • Preparation of Detailed Project Report & Tender document.

    • Obtaining Clearance of DPR from STA.

  • 8/18/2019 2-2. Widening of Road NH, SH & REO Roads

    7/11

    Experience sheet of the Firm during Last Five Year

    Transtek Engineers & Services Private Ltd

    Project Name: Preparation of Detailed Project Report for up-grading and strengthening work of Rural roads (Totall = 496

    Km. Length) Baxaur, Bhabhua and Rohtas District of Bihar

    under PMGSY Scheme, Executed by NPCC, Patna.

    Country : India

    Project location within country : State of Bihar

     Name of Client: NPCC, 404-S, Udaygiri Apartments, BudhaMarg, Patna - 800 001

    Professional Staff provided by TRANSTEK:

     No. of Staffs : 9 No. of Man-Months : 46

    Date of Start :

    (Month/Year) : October

    2004

    Date of Completion:

    (Month/Year) : Nov. 2005

    Approximate Value of Services (in Lakhs Rs.) :

    Rs.. 44.35 Lakhs.

     Name of Associated Firm, If any : None Number of Man-Month of professional staff provided

     by associated firm : None

    Senior Staff involved and function Performed :

    1. Mr. V. K. Verma: Senior Highway Engineer –cum- Team Leader2. S. N. Singh : Highway cum Pavement Expert

    3. Mr. P. Pandey : Bridges Specialist4. Mr. S. Narain : Geotechnical –cum- Materials Engineer

    5. Mr. B. Saravanan : Survey engineer

    6. Mr. R. K. Sinha : Sr. Traffic cum CADD Expert 

    A Team of Senior Level Expert is involved in this Project and they are performing various Survey / Investigation works(detailed below), Detailed topographic survey, Feasibility Study, Geometric Design for Four Lane Highway and

     preparation of detailed drawings, Design of Bridges and cross drainage structure, Preparation of Feasibility Study

    Report, Preliminary & Detailed Project Report, Tender Document.

    Narrative Description of Project: This project Widening and Strengthening work including Geometric Improvement

    of Single lane Rural Roads Section in the Bihar State includes Survey / Investigation, Feasibility Study, Preparation of

    Detailed Engineering Report, Cost Estimate, Drawings Tender Document for the Project.

    Description of Actual Service to be Provided by TRANSTEK:

    • Preliminary Survey Work. Detailed Topographic Survey. Entire Traffic survey work.

    •  Borrow pit Soil and Material Survey.

    • Preparation Land Acquisition Plan and Report.

    • Pavement Investigations (Soil Investigation & Testing work).

    •  Drainage Study on entire project stretch

    • Condition survey work on Bridges & Cross Drainage Structure

    •  Hydrological survey work for Bridges and preparation of Hydraulic Particulars

    • Geotechnical Investigation for Entire High Embankment Zone & Bridges.

    • Preparation of Feasibility Study Report.

    •  Highway Geometric design and preparation of drawings

    •  Detailed design & Preparation of drawing for bridges.

    • Preparation of Detailed Project Report & Tender document.

    • Obtaining Clearance of DPR from STA.

  • 8/18/2019 2-2. Widening of Road NH, SH & REO Roads

    8/11

    Experience sheet of the Firm during Last Five Year

    Transtek Engineers & Services Private Ltd

    Project Name :  Widening and Strengthening to twolane including Geometric Improvement of N.H.-23(Kolebira – Birmitrapur Section) from Km. 135 to Km.

    211.200 (76.80 km. length) under N.H. Division, Gumla.

    Country : India

    Project location within country:State of Jharkhand

     Name of Client : Engineer – in – Chief,PWD (Roads), Jharkhand .

    Professional Staff provided by TRANSTEK :

     No. of Staffs : 10 No. of Man-Months : 30

    Date of Start :(Month/Year) : Oct., 2001

    Date of Completion :(Month/Year) : August, 2002 

    Approximate Value of Services(in Lakhs Rs.) :

    Rs. 19.20 Lakhs.

     Name of Associated Firm, If any : None Number of Man-Month of professional staff provided by associated firm : None

    Senior Staff involved and function Performed :

    1. Mr. B. L. Tikoo : Chief Advisor

    2. Mr. S. B. Pd. Sinha. : Senior Highway Engineer –cum- Team Leader2. Mr. T. P. Singh : Pavement Specialist

    3. Mr. B. B. Verma : Bridges Specialist4. Mr. S. Narain : Geotechnical –cum- Materials Engineer

    5. Mr. B. Sarvanan : Survey engineer

    6. Mr. R. K. Sinha : Traffic engineer7. Mr. T. P. Sinha : QS cum Documentation Expert 

    Senior Staff involved and function Performed : A Team of Senior Level Expert was involved in this Project and thefunctions performed by them includes, Study on alignment plans of the Project Stretch submitted by Department, Soil & materialSurvey, Drainage Condition Survey, Pavement Condition Survey, Soil & Material Survey, Geotechnical investigation, Pavement

    design, Design of Cross Drainage Structures, Feasibility Study, Preparation of Technical Appraisal and Detailed Project Report

    for widening to two lane with strengthening including Geometric improvement of this National Highway.

     Narrative Description of Project : This project Widening and Strengthening work to Two Lane including GeometricImprovement of Single lane National Highway section of NH-23 is long awaited project under M/oRT&H, New Delhi for

    Jharkhand State. The service provided includes Survey / Investigation, Feasibility Study, Preparation of Technical Appraisal Report ,Detailed Engineering Report and Cost Estimate of this Project.

    Description of Actual Service Provided by TRANSTEK :

    • Preliminary Survey Work. Detailed Topographic Survey. Entire Traffic survey work including Axle Load

    Survey. Entire Pavement Condition Survey work.

    •  Borrow pit Soil and Material Survey.

    • Pavement Investigations (Soil Investigation & Testing work, Roughness Measurement, Benkelman

     Beam Deflection Study etc.). Drainage Study on entire project stretch

    • Condition survey work on Bridges & Cross Drainage Structure

    • Preparation of Techno Economic Feasibility Study Report.

    •  Highway Geometric design and preparation of drawings

    • Preparation of Preliminary Project Report .

    • Preparation of Detailed Project Report & Tender document.

  • 8/18/2019 2-2. Widening of Road NH, SH & REO Roads

    9/11

    Experience sheet of the Firm during Last Five Year

    Transtek Engineers & Services Private Ltd

    Project Name : Widening and Strengthening to twolane including Geometric Improvement of Bengabad

     – Chatro Road Section from Km. 0 to Km. 32.00 (32.00

    km. length) under Road Division, Giridih.

    Country : India

    Project location within country: State of Jharkhand

     Name of Client : Engineer – in – Chief,

    PWD (Roads), Jharkhand .

    Professional Staff provided by TRANSTEK :

     No. of Staffs : 7

     No. of Man-Months : 24

    Date of Start :(Month/Year) : Oct., 2001

    Date of Completion :(Month/Year) : July, 2002 

    Approximate Value of Services(in Lakhs Rs.) :

    Rs. 08.00 Lakhs.

     Name of Associated Firm, If any : None Number of Man-Month of professional staff

     provided by associated firm : None

    Senior Staff involved and function Performed :

    1. Mr. B. L. Tikoo : Chief Advisor2. Mr. P. D. S. Pd. . : Senior Highway Engineer –cum- Team Leader

    2. Mr. T. P. Sinha : Pavement Specialist

    3. Mr. K. Prasad : Bridges Specialist

    4. Mr. S. Ranjan : Geotechnical –cum- Materials Engineer5. Mr. P.R. Kumar : Survey engineer

    6. Mr. A. K. Singh : Traffic engineer

    7. Mr. S. K. Verma : QS cum Documentation Expert

    A Team of Senior Level Expert was involved in this Project and the functions performed by them includes, Study on alignment

     plans of the Project Stretch submitted by Department, Soil & material Survey, Drainage Condition Survey, Pavement Condition

    Survey, Soil & Material Survey, Geotechnical investigation, Pavement design, Design of Cross Drainage Structures, FeasibilityStudy, Preparation of Technical Appraisal and Detailed Project Report for widening to two lane with strengthening including

    Geometric improvement of this National Highway.

     Narrative Description of Project : This project Widening and Strengthening work to Two Lane including GeometricImprovement of Single lane State Highway Section in the Jharkhand State. The service provided includes Survey / Investigation,Feasibility Study, Preparation of Technical Appraisal Report , Detailed Engineering Report and Cost Estimate of this Project.

    Description of Actual Service Provided by TRANSTEK :

    The actual service provided by Trasntek  Team are as follow :

    • Preliminary Survey Work. Detailed Topographic Survey. Entire Traffic survey work including Axle Load

    Survey. Entire Pavement Condition Survey work.

    •  Borrow pit Soil and Material Survey.

    • Pavement Investigations (Soil Investigation & Testing work, Roughness Measurement, Benkelman

     Beam Deflection Study etc.). Drainage Study on entire project stretch

    • Condition survey work on Bridges & Cross Drainage Structure

    • Preparation of Techno Economic Feasibility Study Report.

    •  Highway Geometric design and preparation of drawings

    • Preparation of Preliminary Project Report .

    • Preparation of Detailed Project Report & Tender document.

  • 8/18/2019 2-2. Widening of Road NH, SH & REO Roads

    10/11

    Experience sheet of the Firm during Last Five Year

    Transtek Engineers & Services Private Ltd

    Project Name :  Widening and Strengthening to twolane including Geometric Improvement of Sisai –

    Lapung - Dorma Section from Km. 01 to Km. 43.20

    (43.20 km. length) under Road Division, Khunti.

    Country : India

    Project location within country:State of Jharkhand

     Name of Client : Engineer –in - Chief,

    PWD (Roads), Jharkhand .

    Professional Staff provided by TRANSTEK :

     No. of Staffs : 8

     No. of Man-Months : 26

    Date of Start :

    (Month/Year) : Oct., 2001

    Date of Completion :

    (Month/Year) : July 2002

    Approximate Value of Services

    (in Lakhs Rs.) :

    Rs. 11.00 Lakhs.

     Name of Associated Firm, If any : None Number of Man-Month of professional staff

     provided by associated firm : None

    Senior Staff involved and function Performed :

    1. Mr. B. L. Tikoo : Chief Advisor

    2. Mr. P. D. S. Pd. . : Senior Highway Engineer –cum- Team Leader

    2. Mr. T. P. Singh : Pavement Specialist

    3. Mr. K. Prasad : Bridges Specialist

    4. Mr. S. Narain : Geotechnical –cum- Materials Engineer5. Mr. P. R. Kumar : Survey engineer

    6. Mr. R. K. Sinha : Traffic engineer

    7. Mr. T. P. Sinha : QS cum Documentation Expert 

    A Team of Senior Level Expert was involved in this Project and the functions performed by them includes, Study on alignment plans of the Project Stretch submitted by Department, Soil & material Survey, Drainage Condition Survey, Pavement Condition

    Survey, Soil & Material Survey, Geotechnical investigation, Pavement design, Design of Cross Drainage Structures, Feasibility

    Study, Preparation of Technical Appraisal and Detailed Project Report for widening to two lane with strengthening including

    Geometric improvement of this National Highway.

     Narrative Description of Project : This project Widening and Strengthening work to Two Lane including GeometricImprovement of Single lane State Highway Section in the Jharkhand State. The service provided includes Survey / Investigation,

    Feasibility Study, Preparation of Technical Appraisal Report , Detailed Engineering Report and Cost Estimate of this Project.

    Description of Actual Service Provided by TRANSTEK :

    • Preliminary Survey Work. Detailed Topographic Survey. Entire Traffic survey work including Axle Load

    Survey. Entire Pavement Condition Survey work.

    •  Borrow pit Soil and Material Survey.

    • Pavement Investigations (Soil Investigation & Testing work, Roughness Measurement, Benkelman

     Beam Deflection Study etc.). Drainage Study on entire project stretch

    • Condition survey work on Bridges & Cross Drainage Structure

    • Preparation of Techno Economic Feasibility Study Report.

    •  Highway Geometric design and preparation of drawings

    • Preparation of Preliminary Project Report .

    • Preparation of Detailed Project Report & Tender document.

  • 8/18/2019 2-2. Widening of Road NH, SH & REO Roads

    11/11

    Experience sheet of the Firm during Last Five Year

    Transtek Engineers & Services Private Ltd

    Project Name :  Widening and Strengthening to twolane including Geometric Improvement of Domchach- Dhab Section from Km. 0 to Km. 26.40 (26.40 km.

    length) under Road Division, Koderma.

    Country : India

    Project location within country:State of Jharkhand

     Name of Client : Engineer in Chief,PWD (Roads), Jharkhand .

    Professional Staff provided by TRANSTEK :

     No. of Staffs : 7 No. of Man-Months : 24

    Date of Start :(Month/Year) : Oct., 2001

    Date of Completion :(Month/Year) : July, 2002 

    Approximate Value of Services(in Lakhs Rs.) :

    Rs. 08.10 Lakhs.

     Name of Associated Firm, If any : None Number of Man-Month of professional staff provided by associated firm : None

    Senior Staff involved and function Performed :

    1. Mr. B. L. Tikoo : Chief Advisor

    2. Mr. P. D. S. Pd. . : Senior Highway Engineer –cum- Team Leader2. Mr. V. K. Verma : Pavement Specialist

    3. Mr. K. Prasad : Bridges Specialist4. Mr. O. P. Banka : Geotechnical –cum- Materials Engineer5. Mr. Ranjeet Kumar : Survey engineer

    6. Mr. A. K. Singh : Traffic engineer7. Mr. S. K. Verma : QS cum Documentation Expert

    A Team of Senior Level Expert was involved in this Project and the functions performed by them includes, Study on alignment

     plans of the Project Stretch submitted by Department, Soil & material Survey, Drainage Condition Survey, Pavement ConditionSurvey, Soil & Material Survey, Geotechnical investigation, Pavement design, Design of Cross Drainage Structures, Feasibility

    Study, Preparation of Technical Appraisal and Detailed Project Report for widening to two lane with strengthening including

    Geometric improvement of this National Highway.

     Narrative Description of Project : This project Widening and Strengthening work to Two Lane including GeometricImprovement of Single lane State Highway Section in the Jharkhand State. The service provided includes Survey / Investigation,

    Feasibility Study, Preparation of Technical Appraisal Report , Detailed Engineering Report and Cost Estimate of this Project.

    Description of Actual Service Provided by TRANSTEK :

    • Preliminary Survey Work. Detailed Topographic Survey. Entire Traffic survey work including Axle Load

    Survey. Entire Pavement Condition Survey work.

    •  Borrow pit Soil and Material Survey.

    • Pavement Investigations (Soil Investigation & Testing work, Roughness Measurement, Benkelman

     Beam Deflection Study etc.). Drainage Study on entire project stretch

    • Condition survey work on Bridges & Cross Drainage Structure

    • Preparation of Techno Economic Feasibility Study Report.

    •  Highway Geometric design and preparation of drawings

    • Preparation of Preliminary Project Report .

    • Preparation of Detailed Project Report & Tender document.