1st Qatar BIM User DAY Market demand/requirements

27
1 Miles Walker, KEO International Consultants BIM Market Demand/Requirements Miles Walker, Corporate BIM Coordinator KEO International Consultants

description

Speaker: Miles Walker, KEO -What is the market demand to implement BIM? -Who is asking for BIM processes – clients, contractors, consultants? -What about standards to force the industry? About the Qatar BIM User Day: Qatar University, HOCHTIEF ViCon and Teesside University proudly take the initiative to facilitate modern and innovative methods in the Gulf construction industry. The focus is Building Information Modeling (BIM), and our aim is to establish a knowledge platform with government, research and industry experts. The User Day aims to help people to share knowledge, discuss new technologies, and identify new potentials for BIM. More information: www.bimuserday.com Follow BUD on Twitter @bimuserday

Transcript of 1st Qatar BIM User DAY Market demand/requirements

Page 1: 1st Qatar BIM User DAY  Market demand/requirements

1Miles Walker, KEO International Consultants

BIM Market Demand/Requirements

Miles Walker, Corporate BIM Coordinator

KEO International Consultants

Page 2: 1st Qatar BIM User DAY  Market demand/requirements

2Miles Walker, KEO International Consultants

Summary

• What is the market demand to implement BIM? 

• Who is asking for BIM processes – clients, contractors, consultants? 

• What about standards to force the industry?

• Open discussion, Q&A

Page 3: 1st Qatar BIM User DAY  Market demand/requirements

3Miles Walker, KEO International Consultants

How is it asked for?

BIM is Not being asked on many projects!– 62% have not been asked for BIM!– 43% don’t know anyone who uses BIM!

Now….BIM is asked for at RFP…..in a single line requirement

Now….BIM is asked for at RFP…..in a multiple page requirement and BIM specifications

Source: 2011 ME BIM Survey

Page 4: 1st Qatar BIM User DAY  Market demand/requirements

4Miles Walker, KEO International Consultants

“Design team to supply coordinated IFC model for use by Main contactor”‘BIM shall be developed using Revit Architecture, Revit Structure and Revit MEP or other IFC/BIM compatible software and be compatible with Navisworks’

Courtesy of Mark Baldwin

RFP’s

Clients are demanding BIM in RFP’s!

Page 5: 1st Qatar BIM User DAY  Market demand/requirements

5Miles Walker, KEO International Consultants

What is being asked for?

• BIM Experience: an understanding of BIM and project examples

• BIM Standards: need to follow specified project requirements and BIM standards

• Integrated Design: collaborative working with coordinated model  approach

• Digital models: Revit, Microstation, Navisworks, IFC models• Quality models: accuracy, compliance and 3D coordination 

clash detections, model checking• Simulation: walkthroughs and 3D views• Cost accuracy: quantity take‐off from models• Construction v Design comparisons: 4D simulation against 

programme

Page 6: 1st Qatar BIM User DAY  Market demand/requirements

6Miles Walker, KEO International Consultants

Market Demand: Clients

Image courtesy of Abu Dhabi Airports Company

Arch Span: 180m (20m wider than the largest arch span at Heathrow Terminal 5), weighing around 700 tonnes

Large ME projects are leading and demanding BIM!

Page 7: 1st Qatar BIM User DAY  Market demand/requirements

7Miles Walker, KEO International Consultants

Images courtesy of BAA and Skanska UK

BAA T5 SWISS RE LONDON HOSPITALS

15 years (1997 – 2012)

Market Demand: Major Projects

Page 8: 1st Qatar BIM User DAY  Market demand/requirements

8Miles Walker, KEO International Consultants

Market Demand: Contractors

Images courtesy of Skanska UK

Page 9: 1st Qatar BIM User DAY  Market demand/requirements

9Miles Walker, KEO International Consultants

Market Demand: Contractors

20002005 2009

2011 2012

2007

2010

2 sites, 78 buildings, 200,000m2, 190 departments, 10000 rooms, 0.5m items of medical equipment 

Images courtesy of Skanska UK

Page 10: 1st Qatar BIM User DAY  Market demand/requirements

10Miles Walker, KEO International Consultants

Images courtesy of Skanska UK

Page 11: 1st Qatar BIM User DAY  Market demand/requirements

11Miles Walker, KEO International Consultants

Courtesy of Skanska UK and Reading University

Page 12: 1st Qatar BIM User DAY  Market demand/requirements

12Miles Walker, KEO International Consultants

Images courtesy of Crossrail and Aedas

Market Demand: Major Projects

11 years (2007 – 2018)

Page 13: 1st Qatar BIM User DAY  Market demand/requirements

13Miles Walker, KEO International Consultants

Market Demand: Consultants

LUSAIL, MIXED DEVELOPMENT550,000m2

EARLY BIMMODELING & SOFTWARE 

EVALUATION:

Archicad / Revit Revit

CEO BIM REQUIREMENT

GHERNATAKUWAIT10,000m2

201220112008 2009 2010

SAFE HANDSSUADI ARABIA

AL MANSHARKUWAIT

200,000m2

Page 14: 1st Qatar BIM User DAY  Market demand/requirements

14Miles Walker, KEO International Consultants

Market Demand: Consultants

Page 15: 1st Qatar BIM User DAY  Market demand/requirements

15Miles Walker, KEO International Consultants

Al Manshar, Kuwait

Page 16: 1st Qatar BIM User DAY  Market demand/requirements

16Miles Walker, KEO International Consultants

Al Manshar, Kuwait

Page 17: 1st Qatar BIM User DAY  Market demand/requirements

17Miles Walker, KEO International Consultants

Al Manshar, Kuwait

Page 18: 1st Qatar BIM User DAY  Market demand/requirements

18Miles Walker, KEO International Consultants

2009 May 20122007

US demand for change

2008

C191‐2009 Standard Form Multi‐Party 

Agreement for Integrated Project Delivery (IPD)

Page 19: 1st Qatar BIM User DAY  Market demand/requirements

19Miles Walker, KEO International Consultants

US demand for change

http://network.aia.org/technologyinarchitecturalpractice/home/buildinginformationmodelingawardsprogram/

8 years of BIM Awards!!

Page 20: 1st Qatar BIM User DAY  Market demand/requirements

20Miles Walker, KEO International Consultants

http://network.aia.org/technologyinarchitecturalpractice/home/buildinginformationmodelingawardsprogram/

Page 21: 1st Qatar BIM User DAY  Market demand/requirements

21Miles Walker, KEO International Consultants

UK demand for change…

Page 22: 1st Qatar BIM User DAY  Market demand/requirements

22Miles Walker, KEO International Consultants

May 2012 2016March 2011

Deadline forUK Government£5m+ projects required to be BIM Level 2

UK demand for change

2012

Page 23: 1st Qatar BIM User DAY  Market demand/requirements

23Miles Walker, KEO International Consultants

?

Middle East

BuildingSMARTGovernmentMeetings

?

Images courtesy of BuildingSMART

Page 24: 1st Qatar BIM User DAY  Market demand/requirements

24Miles Walker, KEO International Consultants

Mobile technology is leading to  change..$546

16 May 2012

Page 25: 1st Qatar BIM User DAY  Market demand/requirements

25Miles Walker, KEO International Consultants

• Quick retrieval of drawings, models and information! • Information at literally @ fingertips• Reduction of waste (paper, man hours)• Savings through rapid take up of mobile is requiring industry to get to BIM (information, models, analysis, 4D and 5D)

Mobile technology provides..

Page 26: 1st Qatar BIM User DAY  Market demand/requirements

26Miles Walker, KEO International Consultants

Images courtesy of Vela Systems, Inc.

http://www.velasystems.com/ipa

d‐for‐construction‐vela‐mobile/

Market Demand: Contractors

Page 27: 1st Qatar BIM User DAY  Market demand/requirements

27Miles Walker, KEO International Consultants

Open discussion, Q&A

• What Government initiatives/standards are influencing change?

• What projects will greatly influence future BIM direction in ME?