1st NV OHV on the Ground Project Funded

Logandale Trails - PIC • Toilets installed and

doors fixed!

• Inspected by BLM and

NVOHV

• Grant closed $29,739

under budget

https://youtu.be/WffQBFFbEBM

https://youtu.be/pa6CWQ7p5j8

Page 3: 1st NV OHV on the Ground Project Funded Logandale Trails - PIC

KOKOPELLI ATV CLUB Staff attended club meeting and confirmed

5 day-routes with GIS Analyst for mapping!

Caliente Route Stake work events -assembled road markers to trial run installing

them from Abbott Wash North into Lincoln

County.

Rock substrate requires rock/drill/hammer!

NV-OHV on every sign.

Assistance from GBI Laura on mapping

https://youtu.be/zDDAzPMK9S8

Page 4: 1st NV OHV on the Ground Project Funded Logandale Trails - PIC

SAR Polaris Project

Douglas SO

PNMTA Purchase of SAR UTV

and trailer are

complete.

They are putting the

decals on and we will

get photos for marketing

of the project.

Sheriff's Dept/Search and Rescue -

https://youtu.be/7OFnYRFvHLI

Pine Nut Trails - https://youtu.be/d7f06PVLx5I

Page 5: 1st NV OHV on the Ground Project Funded Logandale Trails - PIC

Snowmobile Education 2017 Completed

Sierra Avalanche finished their second and final snowmobile and avalanche safety course.

Avalanche safety online course 2018

Videographer and athletes hired, script and shot list created, and on-snow scenes shot at Mt Rose.

Off-snow scenes scheduled for early May, editing to take place over summer.

For book/e-book: Illustrator hired, illustrations begun, content outline complete. Print and digital layout, and printing next to come. Content scheduled for completion over summer.

For distribution and in-person presentations: Planned for fall and winter 18/19

Page 6: 1st NV OHV on the Ground Project Funded Logandale Trails - PIC

Gold Butte National MonumentRoad signing and Maintenance

Install 52 directional signs and 3

interpretive kiosks along the Gold

Butte Backcountry Byway.

350 miles roads and trails to be

inventoried and accessed for

maintenance needs.

Volunteer crew will be deployed

to restore damaged areas.

Purchase of directional signs

with grant match-REI dollars.

Training and installation of

signs in progress.

Page 7: 1st NV OHV on the Ground Project Funded Logandale Trails - PIC

Projects in Progress Yerington LE, purchase of SxS complete, photo shoot soon!

Washoe LE, patrol – County Commission passed.

West Wendover shared use – quotes received .

Boulder City LE, planning meeting with Staff/crew late summer.

Dance Hill USFS, pre-inspection complete.

Douglas LE - Patrol starting now.

Esmeralda LE, purchasing truck soon.

INYO National Forest seasonals on last week.

Kings Canyon restoration planning, in progress.

NDOW enforcement starting April.

Shoshone trail planning in progress. Partner RTP project maintenance almost complete. https://youtu.be/rQ2rxJCQDIs https://youtu.be/YieUC0w_f3U

Prison Hill preliminary mapping and public meetings complete.

Peavine Mt. Trail Maintenance almost complete. https://youtu.be/pCC4llx_K_U

Page 8: 1st NV OHV on the Ground Project Funded Logandale Trails - PIC

Moapa Valley, LV MetroQuotes received on machine.

Warning citations - tracking - “fix it tickets”

Grant for updating tracking in LE databases?”

Performance Metric 1st Qtr# of hours spent on OHV activities 16

# of contacts made regarding OHV registrations 32

# of citations issued on OHV registrations, laws, etc. 22

# of emergencies/search and rescue OHV related 0

# of registration events VIN 1

# of VIN inspections 17

Page 9: 1st NV OHV on the Ground Project Funded Logandale Trails - PIC

Humboldt SO Ride Safe and Smart

Nevada Outdoor School

Kevin Malone

https://y

outu.be/

krhI1s1

ek0U

Page 10: 1st NV OHV on the Ground Project Funded Logandale Trails - PIC

SILVER STATE TRAIL EXPANSION

Ely/WHITE PINE COUNTY

Staff and GBI Trail coordinator meeting with BLM, USFS, and

High Sierra Trail Blazers.

All in favor

NEPA review and alternative refinement mapping this fall

Decision Document aiming for April, 2019.

Multiple USFS routes confirmed

Caliente/Mesquite/ LINCOLN COUNTY

Staff and GBI met with BLM and Kokopelli ATV Club

Refining routes for mapping!

Page 11: 1st NV OHV on the Ground Project Funded Logandale Trails - PIC

Mapping ProjectLaura Schmidt, GBI - OHV Program State Trails Coordinator

Nikhil Narkhede, Field supervisor

Chelsea Nielsen, crew. GIS – Collaboration

Agencies and Clubs

Grant Program

Tourism

Geo-referenced maps

GPX/KMZ files

Downloadable

And Printable

Grant project database

OHV Mapping - https://youtu.be/YwNQ6_wsRyk

Page 12: 1st NV OHV on the Ground Project Funded Logandale Trails - PIC

What can we do now

administratively

What can we do now

through grant priorities?

Change the LAW? (NRS).

Page 13: 1st NV OHV on the Ground Project Funded Logandale Trails - PIC

LETS TALK

REGISTRATION

NUMBERS

Page 14: 1st NV OHV on the Ground Project Funded Logandale Trails - PIC

2016 – 2018, REGISTRATION MARKETINGCLARK COUNTY, MXT MEDIA +1,914.

Page 15: 1st NV OHV on the Ground Project Funded Logandale Trails - PIC

REGISTRATION NUMBERSSTATE Total REG's POPULATION % WHAT IF?

AZ 127,663 7,016,270 2%

CO 360,322 5,607,154 6%

ID 157,781 1,716,943 9%

MT 44,956 1,050,493 4%

NM 23,279 2,088,070 1%

UT 202,000 2,088,070 10%

OR 105,000 4,143,000 3%

NV 44,212 2,998,039 1% $928,452.00

AVERAGE % 5% 150,064.95

$ 3,151,364.05

$ 3,151,364.05

Page 16: 1st NV OHV on the Ground Project Funded Logandale Trails - PIC

INOHVAA - WESTERN STATESINTERNATIONAL OFF-HIGHWAY VEHICLE ADMINISTRATORS ASSOCIATION

• CO - Requires by law all dealers to sell a registration at the point of sale for all vehicles sold.

• CO - Out of state sticker is souvenir worthy, anyone can purchase at vendors.

• NM - Out of state stickers (no reciprocity)

• AZ – New law - Out of state stickers (no reciprocity)

• WY - ALL off-road vehicles display a Wyoming permit (no reciprocity)

• ID – WY must purchase ID sticker, others reciprocity

• All having problems with lack of enforcement.

Page 17: 1st NV OHV on the Ground Project Funded Logandale Trails - PIC

REGISTRATION NUMBERS 2017 – ‘18

• 10 events MXT and partners – 1,714

• NOS -HUMBOLDT SO – 24

• Kerry Lee and Lincoln County – 27

• Michaels Cycle Works CC alone over +500 Reno +800

• Other dealerships unknown.

1. LOSS OF RENEWALS IS SIGNIFICANT.

2. Requirement of LE agencies to hold

registration events if OHV funded.

3. Require reg. with sale of vehicle.4. Make registration and renewal easier.

Page 18: 1st NV OHV on the Ground Project Funded Logandale Trails - PIC

DMV – DCNR BRAINSTORMING SESSIONS

TO DO AS SOON AS POSSIBLE WITHOUT NRS

CHANGE:

• Revamp website to mirror the DMV portal.

• Email reminders for renewal

• Contact non-renewals

• Change of address online

• Funded from main OHV Acct.

• Dealer registration at pt. of sale (NAC)?

Page 19: 1st NV OHV on the Ground Project Funded Logandale Trails - PIC

What can we do now

administratively

What can we do now

through grant priorities?

Change the LAW? (NRS).

Page 20: 1st NV OHV on the Ground Project Funded Logandale Trails - PIC
Page 21: 1st NV OHV on the Ground Project Funded Logandale Trails - PIC

AB29 Survey

The Statute Presumption and Other Questions

Commission comments back to Staff by end of June.

The survey process

DCNR/Commission Official request: does the NRS need amending?

Municipalities, Federal, State, LE/PD (also include survey questions)

Other survey questions

Website embedding and Facebook messaging (415+) DCNR (4000)

Listserve OHVNEWS (592+)

All current and past grantees from OHV and RTP 100+

Manually entering survey (Team in field)

Team gathers and compiles for 3 months July – Sept

Team prepare report

Staff report with recommendation to Commission - vote not later than

December 11 meeting.

Recommendation to LCB before end of year.

Page 22: 1st NV OHV on the Ground Project Funded Logandale Trails - PIC

Survey and OHV Friendly Communities.

Goal is to have local municipalities

applying for grants:

Planning

complete resolutions

signing

mapping

Page 23: 1st NV OHV on the Ground Project Funded Logandale Trails - PIC

NOHVCC motorized recreation report for NV

1. Develop high quality georeferenced

maps: Maps on Website, download

and print capability.

2. Better communication, working

groups. Work with groups and clubs.

3. Promotion of trails coordination with

Agencies.

4. Provide and maintain access routes

to trailheads.

5. Training and education (laws, trail

building and safety).

6. Trail loops!

7. Improve and upgrade current facilities

Page 24: 1st NV OHV on the Ground Project Funded Logandale Trails - PIC

VOTING ON PRIORITIES

• Projects that increase registration ## Enforcement strategy. registration

events.

• Public Education rider classes, safety, trail building, outdoor ethics.

• Law Enforcement, SAR no reg## component

• Trail mapping, signing and maintenance of existing trails and facilities

• Securing Access and mapping that access.

• Connectivity/loops

• Planning, environment studies: conservation and NEPA to get trails mapped

and signed.

• Existing Facilities

• Leveraging and Partnerships

• Economic Integration

• New Facilities

Page 25: 1st NV OHV on the Ground Project Funded Logandale Trails - PIC

NAC 490

Nevada Administrative Code

Staff Draft of NAC’s.

1. Commission comments due at next Commission Meeting 8/28/18

2. Workshop

o Two Commissioners to attend/assist.

o Staff report of public comments and final draft

3. Commission Meeting vote on NAC draft

4. Submit to LCB - draft (unknown timeframe)

5. 30 days notice – HEARING Commission Meeting;

6. Consider comments – rewrite if needed send to LCB for final draft

7. Commission Adoption of final draft

8. Final submission to LCB for Legislature.

Page 26: 1st NV OHV on the Ground Project Funded Logandale Trails - PIC
Page 27: 1st NV OHV on the Ground Project Funded Logandale Trails - PIC

2019 INTERNATIONAL OHV CONFERENCE

RENO NEVADAHosted by:

NVCOHV

DCNR-NVOHV

GBI-AmeriCorps

Partners

NDSP-RTP

More to come…

https://www.youtube.com/watch?v=Gc8k60k5Gmg