1R 3R - Oakville planning/sp-16170570101-landscape.pdf · bm 10 bm 7 bm 9 bm 14 bm 11 bm 8 bm 9 bm...

1
2.8m 13.82m 6.00m 6.2m 6.3m 1.2m 2.0m 3.2m 2.9m 3.0mm 3.1mm 3.1mm 1.7m 2.3m 5.4m 5.9m 5.9m 5.9m 5.9m 5.4m 6.0m EX. CEDAR HEDGE TO REMAIN NEW CEDAR HEDGE TO MATCH EXISTING HEIGHT (4.5 - 5.5m) 6.0m (TYP.) 60-90cm SPACING TO 10 TO 10 TO 10 FD 1 FD 1 FD 1 FD 1 FD 1 FD 1 FD 1 JW 10 6.5m TO 10 JW 10 JW 10 JW 10 JW 10 JW 10 JW 10 BM 10 BM 7 BM 9 BM 14 BM 11 BM 8 BM 9 BM 14 TH 12 hh 12 ms 8 hh 12 ms 8 hh 14 ms 10 12 10 ms 8 tp 14 TH 7 tp 12 TH 6 tp 14 TH 7 tp 6 TH 5 3R 5R 3R 3R 3R 1R BM 9 BM 6 BM 8 BM 13 hh 10 ms 7 hh 12 ms 8 tp 10 TH 5 TH 12 tp 12 TH 6 2R 2R 3R 3R 3R 3R 3R 3R 3R 3R 3R 3R 3/$ M QA 1 TH 11 QM 1 QR 1 0 5 metres 3/$ M 75mm min. WATER AND MULCH PLANTS IMMEDIATELY FOLLOWING PLANTING. SHRUBS TO BE PLANTED AT THE SAME LEVEL AS PREVIOUSLY PLANTED IN NURSERY, ALLOWING FOR SETTLEMENT. PLANTING ON 3:1 SLOPE, CREATE TEMPORARY 100mm HIGH SOIL MIX BERM ON DOWNHILL SIDE OF PLANTING PIT TO RETAIN WATER. CUT AND REMOVE ALL SYNTHETIC AND TREATED TWINE/ROPE. PLANT STOCK WITH A GIRDLED ROOT SYSTEM WILL BE REJECTED AND SHALL BE REPLACED WITH APPROVED PLANT STOCK AT THE CONTRACTOR'S EXPENSE REMOVE POT OR TOP 1 2 OF BURLAP AND/OR WIRE BASKET ON ROOT BALL 75mm SHREDDED PINE MULCH (SPM) 100mm HIGH TEMPORARY TOPSOIL BERM AROUND PLANTING PIT SPECIFIED PLANTING MEDIUM PREPARED PLANTING BED TO SPECIFIED DEPTH (SEE PLANTING BED PREPARATION NOTES) COMPACTED PLANTING MEDIUM SCARIFY ALL SIDES AND BOTTOM OF TREE PIT UNDISTURBED SUBGRADE 250mm min. 150mm min. REMOVE WRAP FROM TRUNK AND INSPECT FOR DAMAGE STAKES NOT TO BE INSTALLED ON BALLED OR BURLAPPED TREES BACKFILL IN 150mm (6 in.) LIFTS AND LAMP TO REVENT AIR POCKETS ADD SANDY LOAM SOIL IF ADDITIONAL BACKFILL IS REQUIRED. SOIL TO CONSIST OF: 50-60% SAND 20-40% SILT 6-10% CLAY 2-5% ORGANIC MATTER 7.5 pH OR LESS TREE SHALL BEAR SAME RELATION TO GRADE AS BORE TO IT'S PREVIOUSLY EXISTING GRADE. PLANT TREE 100-150mm ABOVE FINISHED GRADE TO ALLOW FOR SETTLEMENT PRUNE ONLY AS NECESSARY TO REMOVE DEAD, BROKEN AND DISEASED BRANCHES ACCORDING TO STANDARD HORTICUTURAL PRACTICES. PRESERVE THE NATURAL FORM AND CHARACTER OF THE PLANT. DO NOT CUT THE LEADER. DETAIL FOR DECIDUOUS TREE PLANTING FOR 50mm CALIPER TREES OR GREATER NOTE: FORM A SOIL SAUCER 125mm (5") IN DEPTH AND FILL WITH WATER. SOON AFTER WATER HAS BEEN ABSORBED, COVER WITH APPROXIMATELY 100mm (4") OF SHREDDED PINE MULCH (SPM) TAPERED TO GROUND LEVEL AT THE TRUNK CAREFULLY REMOVE ANY LOOSE SOIL AROUND TRUNK, TOP OF ROOTBALL SHOULD NOT BE DISTURBED OR COVERED WITH SOIL ENSURE THAT TREES DO NOT DRY OUT PRIOR TO PLANTING. STORE PLANTS IN A SHADED LOCATION. WATER AND MULCH TREE IMMEDIATELY FOLLOWING PLANTING. PLANT SLIGHTLY HIGHER THAN PREVIOUSLY PLANTED IN NURSERY TO ALLOW FOR SETTLEMENT. COMPACT PLANTING SOIL WITH WATER PRESSURE ALONE TO PREVENT OVERCOMPACTION AND SETTLEMENT FOLLOWING PLANTING. FOR PLANTING ON SLOPES, CREATE A 100mm HIGH SOIL MIX BERM ON DOWNHILL SIDE OF PLANTING PIT TO RETAIN WATER. CUT AND REMOVE ALL SYNTHETIC AND TREATED TWINE/ROPE. PLANT STOCK WITH A GIRDLED ROOT SYSTEM WILL BE REJECTED AND SHALL BE REPLACED WITH APPROVED PLANT STOCK AT THE CONTRACTOR'S EXPENSE NOTES: BACKFILL WITH SPECIFIED PLANTING SOIL MIX. SOAK BACKFILLED AREA TO ENSURE FULL CONTACT BETWEEN ROOTBALL AND BACKFILL LOOSEN AND SCARIFY ALL SIDES AND BOTTOM OF TREE PIT COMPACTED OR UNDISTURBED SUBGRADE CUT, LOOSEN, AND REMOVE 1 2 OF TWINE, BURLAP AND WIRE ON ROOTBALL FINISHED GRADE REMOVE WRAP FROM TRUNK AND INSPECT FOR DAMAGE STAKES NOT TO BE INSTALLED ON BALLED OR BURLAPPED TREES BACKFILL IN 150mm (6 in.) LIFTS AND LAMP TO REVENT AIR POCKETS ADD SANDY LOAM SOIL IF ADDITIONAL BACKFILL IS REQUIRED. SOIL TO CONSIST OF: 50-60% SAND 20-40% SILT 6-10% CLAY 2-5% ORGANIC MATTER 7.5 pH OR LESS TREE SHALL BEAR SAME RELATION TO GRADE AS BORE TO IT'S PREVIOUSLY EXISTING GRADE. PLANT TREE 100-150mm ABOVE FINISHED GRADE TO ALLOW FOR SETTLEMENT DETAIL FOR DECIDUOUS TREE PLANTING FOR 50mm CALIPER TREES OR GREATER NOTE: FORM A SOIL SAUCER 125mm (5") IN DEPTH AND FILL WITH WATER. SOON AFTER WATER HAS BEEN ABSORBED, COVER WITH APPROXIMATELY 100mm (4") OF SHREDDED PINE MULCH (SPM) TAPERED TO GROUND LEVEL AT THE TRUNK ENSURE THAT TREES DO NOT DRY OUT PRIOR TO PLANTING. STORE PLANTS IN A SHADED LOCATION. WATER AND MULCH TREE IMMEDIATELY FOLLOWING PLANTING. PLANT SLIGHTLY HIGHER THAN PREVIOUSLY PLANTED IN NURSERY TO ALLOW FOR SETTLEMENT. COMPACT PLANTING SOIL WITH WATER PRESSURE ALONE TO PREVENT OVERCOMPACTION AND SETTLEMENT FOLLOWING PLANTING. FOR PLANTING ON SLOPES, CREATE A 100mm HIGH SOIL MIX BERM ON DOWNHILL SIDE OF PLANTING PIT TO RETAIN WATER. CUT AND REMOVE ALL SYNTHETIC AND TREATED TWINE/ROPE. PLANT STOCK WITH A GIRDLED ROOT SYSTEM WILL BE REJECTED AND SHALL BE REPLACED WITH APPROVED PLANT STOCK AT THE CONTRACTOR'S EXPENSE NOTES: BACKFILL WITH SPECIFIED PLANTING SOIL MIX. SOAK BACKFILLED AREA TO ENSURE FULL CONTACT BETWEEN ROOTBALL AND BACKFILL LOOSEN AND SCARIFY ALL SIDES AND BOTTOM OF TREE PIT COMPACTED OR UNDISTURBED SUBGRADE CUT, LOOSEN, AND REMOVE 1 2 OF TWINE, BURLAP AND WIRE ON ROOTBALL CAREFULLY REMOVE ANY LOOSE SOIL AROUND TRUNK, TOP OF ROOTBALL SHOULD NOT BE DISTURBED OR COVERED WITH SOIL FINISHED GRADE PLANTS TO BE SELECTED AND MAINTAINED AS UNSHEARED SPECIMEN 3315 Tallmast Cres. Mississauga ON L5L 1K1 416-557-9298 | [email protected] www.treeandravine.com Contact: Sebastian Bravo, ISA Certified Arborist Tree and Ravine Inc. 231 - 237 Rebecca Street Oakville, Ontario General Notes The Contractor is to carefully review the site in conjunction with the plans, details and specifications prepared for the project and report any discrepancies or need for clarification to the Project Manager before proceeding. The Contractor is to check and confirm property boundaries in the field. The Contractor is to confirm the location of all subsurface utilities before any excavation work. The Contractor is to confirm extent of demolition before proceeding. All surplus materials and debris is to be removed from the site. The Contractor is responsible for any damages to private or City property caused by their forces or Sub-contractors. Tree and Ravine Inc. - #16018 - 06 September 2017 THIS DRAWING IS THE PROPERTY OF TREE AND RAVINE INC. AND SHALL NOT BE COPIED OR ELECTRONICALLY ALTERED WITHOUT WRITTEN AUTHORIZATION www.treeandravine.com 1 06 Sept 2017 Large Scale Landscape Plan AW SB 1:100 AW SB Oct. 2016 #16018 By Date No. Description Ck. L1 Sheet No Landscape Plan Title Revision PLEASE MARK VOID ALL SUPERCEDED COPIES Scale Drawn Checked Date Job No PLANTING SCHEDULE ALL EXISTING GRADES AT PROPERTY LINES ARE TO BE MAINTAINED IN COMPLIANCE WITH SECTION 9.14.6.1 OF THE ONTARIO BUILDING CODE. THIS SITE IS TO BE GRADED SO THAT WATER WILL NOT ACCUMULATE AT OR NEAR THE BUILDING UNDER CONSTRUCTION AND WILL NOT ADVERSELY AFFECT ANY ADJACENT PROPERTIES. PLANTING SCHEDULE NOTES: All substitutions (including subspecies and cultivars) to the list are to be approved by the Project Manager prior to shipment to the site. All plants are to be laid out on site with the Project Manager present. Not all of the plants on the list are shown on the plan. If there is a discrepancy between the quantities on the Planting Schedule and those on the plan, the Planting Schedule shall be assumed to be correct. All substitutions to the Plant List are to be approved prior to shipment to the site. LANDSCAPE NOTES: - ALL DISTURBED LANDSCAPE AREAS TO BE SODDED - ALL PLANTING BEDS TO BE COVERED WITH 3" OF SHREDDED PINE MULCH (SPM) Existing Deciduous Tree Existing Cedar Legend Property Line Proposed Deciduous Tree Proposed Plant Species Plant Key Quantity EH 1 Proposed Cedar Proposed Yews Proposed Forbs/ Groundcover SHRUB PLANTING DETAIL LARGE DECIDUOUS TREE PLANTING DETAIL LARGE EVERGREEN TREE PLANTING DETAIL 1 L1 NTS 2 L1 NTS 3 L1 NTS Project

Transcript of 1R 3R - Oakville planning/sp-16170570101-landscape.pdf · bm 10 bm 7 bm 9 bm 14 bm 11 bm 8 bm 9 bm...

Page 1: 1R 3R - Oakville planning/sp-16170570101-landscape.pdf · bm 10 bm 7 bm 9 bm 14 bm 11 bm 8 bm 9 bm 14 th 12 hh 12 ms 8 hh 12 ms 8 hh 14 ms 10 12 10 ms 8 tp 14 th 7 tp 12 th 6 tp 14

2.8m

13.82m

6.00m

6.2m

6.3m

1.2m 2.0m

3.2m

2.9m

3.0mm

3.1mm

3.1mm

1.7m

2.3m

5.4m 5.9m 5.9m 5.9m 5.9m 5.4m

6.0m

EX. CEDAR HEDGETO REMAIN

NEW CEDAR HEDGE TO MATCHEXISTING HEIGHT (4.5 - 5.5m)

6.0m (TYP.)

60-90cmSPACING

TO10

TO10

TO10

FD1

FD1

FD1

FD1 FD

1

FD1

FD1

JW10

6.5m

TO10

JW10

JW10

JW10 JW

10JW10

JW10

BM10 BM

7

BM9 BM

14 BM11 BM

8

BM9 BM

14

TH12

hh12 ms

8 hh12

ms8

hh14

ms10

1210 ms

8

tp14

TH7

tp12

TH6

tp14

TH7

tp6

TH5

3R

5R 3R

3R

3R1R

BM9 BM

6

BM8 BM

13

hh10 ms

7 hh12

ms8

tp10

TH5

TH12

tp12

TH6

2R 2R

3R3R 3R3R

3R

3R3R

3R

3R3R

SOD (6m²)

QA1

TH11

QM1

QR1

0 5 metres SOD (6m²)

75mm min.

WATER AND MULCH PLANTS IMMEDIATELY FOLLOWING PLANTING. SHRUBS TO BEPLANTED AT THE SAME LEVEL AS PREVIOUSLY PLANTED IN NURSERY, ALLOWINGFOR SETTLEMENT. PLANTING ON 3:1 SLOPE, CREATE TEMPORARY 100mm HIGH SOILMIX BERM ON DOWNHILL SIDE OF PLANTING PIT TO RETAIN WATER.

CUT AND REMOVE ALL SYNTHETIC AND TREATED TWINE/ROPE.

PLANT STOCK WITH A GIRDLED ROOT SYSTEM WILL BE REJECTED AND SHALL BEREPLACED WITH APPROVED PLANT STOCK AT THE CONTRACTOR'S EXPENSE

REMOVE POT OR TOP 12OF BURLAP AND/OR WIRE BASKETON ROOT BALL

75mm SHREDDED PINE MULCH (SPM)

100mm HIGH TEMPORARY TOPSOILBERM AROUND PLANTING PITSPECIFIED PLANTING MEDIUM

PREPARED PLANTING BED TO SPECIFIED DEPTH(SEE PLANTING BED PREPARATION NOTES)

COMPACTED PLANTING MEDIUMSCARIFY ALL SIDES AND BOTTOMOF TREE PITUNDISTURBED SUBGRADE

250mmmin.

150mmmin.

REMOVE WRAP FROM TRUNKAND INSPECT FOR DAMAGE

STAKES NOT TO BE INSTALLED ONBALLED OR BURLAPPED TREES

BACKFILL IN 150mm (6 in.) LIFTS AND LAMP TO REVENT AIR POCKETS

ADD SANDY LOAM SOIL IF ADDITIONAL BACKFILL ISREQUIRED. SOIL TO CONSIST OF:

50-60% SAND20-40% SILT6-10% CLAY2-5% ORGANIC MATTER7.5 pH OR LESS

TREE SHALL BEAR SAME RELATION TO GRADEAS BORE TO IT'S PREVIOUSLY EXISTING GRADE. PLANTTREE 100-150mm ABOVE FINISHED GRADE TO ALLOW FORSETTLEMENT

PRUNE ONLY AS NECESSARY TO REMOVE DEAD,BROKEN AND DISEASED BRANCHES ACCORDING TOSTANDARD HORTICUTURAL PRACTICES. PRESERVE THENATURAL FORM AND CHARACTER OF THE PLANT. DONOT CUT THE LEADER.

DETAIL FOR DECIDUOUS TREE PLANTINGFOR 50mm CALIPER TREES OR GREATER

NOTE:

FORM A SOIL SAUCER 125mm (5") IN DEPTH AND FILLWITH WATER. SOON AFTER WATER HAS BEENABSORBED, COVER WITH APPROXIMATELY 100mm(4") OF SHREDDED PINE MULCH (SPM) TAPERED TOGROUND LEVEL AT THE TRUNK

CAREFULLY REMOVE ANY LOOSE SOIL AROUND TRUNK,TOP OF ROOTBALL SHOULD NOT BE DISTURBED ORCOVERED WITH SOIL

ENSURE THAT TREES DO NOT DRY OUT PRIOR TO PLANTING. STORE PLANTS IN ASHADED LOCATION.

WATER AND MULCH TREE IMMEDIATELY FOLLOWING PLANTING.

PLANT SLIGHTLY HIGHER THAN PREVIOUSLY PLANTED IN NURSERY TO ALLOW FORSETTLEMENT.

COMPACT PLANTING SOIL WITH WATER PRESSURE ALONE TO PREVENTOVERCOMPACTION AND SETTLEMENT FOLLOWING PLANTING.

FOR PLANTING ON SLOPES, CREATE A 100mm HIGH SOIL MIX BERM ON DOWNHILLSIDE OF PLANTING PIT TO RETAIN WATER.

CUT AND REMOVE ALL SYNTHETIC AND TREATED TWINE/ROPE.

PLANT STOCK WITH A GIRDLED ROOT SYSTEM WILL BE REJECTED AND SHALL BEREPLACED WITH APPROVED PLANT STOCK AT THE CONTRACTOR'S EXPENSE

NOTES:

BACKFILL WITH SPECIFIED PLANTING SOIL MIX. SOAKBACKFILLED AREA TO ENSURE FULLCONTACT BETWEEN ROOTBALL AND BACKFILL

LOOSEN AND SCARIFY ALL SIDESAND BOTTOM OF TREE PIT

COMPACTED OR UNDISTURBED SUBGRADE

CUT, LOOSEN, AND REMOVE 12 OFTWINE, BURLAP AND WIRE ON ROOTBALL

FINISHED GRADE

REMOVE WRAP FROM TRUNKAND INSPECT FOR DAMAGE

STAKES NOT TO BE INSTALLED ONBALLED OR BURLAPPED TREES

BACKFILL IN 150mm (6 in.)LIFTS AND LAMPTO REVENT AIR POCKETS

ADD SANDY LOAM SOIL IFADDITIONALBACKFILL IS REQUIRED.SOIL TO CONSIST OF:

50-60% SAND20-40% SILT6-10% CLAY2-5% ORGANICMATTER7.5 pH OR LESS

TREE SHALL BEAR SAME RELATION TO GRADEAS BORE TO IT'S PREVIOUSLY EXISTING GRADE. PLANTTREE 100-150mm ABOVE FINISHED GRADE TO ALLOW FORSETTLEMENT

DETAIL FOR DECIDUOUS TREE PLANTINGFOR 50mm CALIPER TREES OR GREATER

NOTE:

FORM A SOIL SAUCER 125mm (5") IN DEPTH AND FILLWITH WATER. SOON AFTER WATER HAS BEENABSORBED, COVER WITH APPROXIMATELY 100mm(4") OF SHREDDED PINE MULCH (SPM) TAPERED TOGROUND LEVEL AT THE TRUNK

ENSURE THAT TREES DO NOT DRY OUT PRIOR TO PLANTING. STORE PLANTS IN ASHADED LOCATION.

WATER AND MULCH TREE IMMEDIATELY FOLLOWING PLANTING.

PLANT SLIGHTLY HIGHER THAN PREVIOUSLY PLANTED IN NURSERY TO ALLOW FORSETTLEMENT.

COMPACT PLANTING SOIL WITH WATER PRESSURE ALONE TO PREVENTOVERCOMPACTION AND SETTLEMENT FOLLOWING PLANTING.

FOR PLANTING ON SLOPES, CREATE A 100mm HIGH SOIL MIX BERM ON DOWNHILLSIDE OF PLANTING PIT TO RETAIN WATER.

CUT AND REMOVE ALL SYNTHETIC AND TREATED TWINE/ROPE.

PLANT STOCK WITH A GIRDLED ROOT SYSTEM WILL BE REJECTED AND SHALL BEREPLACED WITH APPROVED PLANT STOCK AT THE CONTRACTOR'S EXPENSE

NOTES:

BACKFILL WITH SPECIFIED PLANTING SOIL MIX. SOAKBACKFILLED AREA TO ENSURE FULLCONTACT BETWEEN ROOTBALL AND BACKFILL

LOOSEN AND SCARIFY ALL SIDESAND BOTTOM OF TREE PIT

COMPACTED OR UNDISTURBED SUBGRADE

CUT, LOOSEN, AND REMOVE 12 OFTWINE, BURLAP AND WIRE ON ROOTBALL

CAREFULLY REMOVE ANY LOOSESOIL AROUND TRUNK, TOP OFROOTBALL SHOULD NOT BEDISTURBED OR COVERED WITH SOIL

FINISHED GRADE

PLANTS TO BE SELECTED ANDMAINTAINED AS UNSHEARED SPECIMEN

3315 Tallmast Cres. Mississauga ON L5L 1K1416-557-9298 | [email protected]: Sebastian Bravo, ISA Certified Arborist

Tree and Ravine Inc.

231 - 237Rebecca StreetOakville, Ontario

General Notes

The Contractor is to carefully review the site in conjunctionwith the plans, details and specifications prepared for theproject and report any discrepancies or need for clarificationto the Project Manager before proceeding.

The Contractor is to check and confirm property boundaries inthe field.

The Contractor is to confirm the location of all subsurfaceutilities before any excavation work.

The Contractor is to confirm extent of demolition beforeproceeding.

All surplus materials and debris is to be removed from thesite.

The Contractor is responsible for any damages to private orCity property caused by their forces or Sub-contractors.

Tree and Ravine Inc. - #16018 - 06 Sep

temb

er 2017

THIS DRAWING IS THE PROPERTY OF TREE AND RAVINE INC. ANDSHALL NOT BE COPIED OR ELECTRONICALLY ALTERED WITHOUTWRITTEN AUTHORIZATION

ww

w.treeand

ravine.com

1 06 Sept 2017 Large Scale Landscape Plan AW SB

1:100

AW

SB

Oct. 2016

#16018

ByDateNo. Description Ck.

L1Sheet No

Landscape PlanTitle

Revision PLEASE MARK VOID ALL SUPERCEDED COPIES

Scale

Drawn

Checked

Date

Job No

PLANTING SCHEDULE

ALL EXISTING GRADES AT PROPERTY LINES ARE TO BEMAINTAINED IN COMPLIANCE WITH SECTION 9.14.6.1OF THE ONTARIO BUILDING CODE. THIS SITE IS TO BEGRADED SO THAT WATER WILL NOT ACCUMULATE ATOR NEAR THE BUILDING UNDER CONSTRUCTION ANDWILL NOT ADVERSELY AFFECT ANY ADJACENTPROPERTIES.

PLANTING SCHEDULE NOTES:

All substitutions (including subspecies and cultivars) to the list are to be approved by the Project Managerprior to shipment to the site. All plants are to be laid out on site with the Project Manager present.

Not all of the plants on the list are shown on the plan.

If there is a discrepancy between the quantities on the Planting Schedule and those on the plan, thePlanting Schedule shall be assumed to be correct. All substitutions to the Plant List are to be approvedprior to shipment to the site.

LANDSCAPE NOTES:- ALL DISTURBED LANDSCAPE AREAS TO BE SODDED- ALL PLANTING BEDS TO BE COVERED WITH 3" OF SHREDDED PINE MULCH (SPM)

ExistingDeciduous Tree

ExistingCedar

Legend

Property Line

ProposedDeciduousTree

Proposed Plant SpeciesPlant KeyQuantity

EH1

ProposedCedar

ProposedYews

ProposedForbs/Groundcover

SHRUB PLANTING DETAIL

LARGE DECIDUOUS TREE PLANTING DETAIL

LARGE EVERGREEN TREE PLANTING DETAIL

1L1

NTS

2L1

NTS

3L1

NTS

Project