1E. Tsitrone Progress report DITS 27/04/2007 Overview : E. Tsitrone (20 + 5 mn) Experimental...

16
1 E. Tsitrone Progress report DITS 27/04/2007 Overview : E. Tsitrone (20 + 5 mn) • Experimental campaign : B. Pégourié (15 + 5 mn) • TPL analysis program : C. Brosset (25 + 5 mn) • Integrated planning : M. Houry (10 + 5 mn) • General discussion : all (30 mn) Progress report on the DITS project : Agenda

Transcript of 1E. Tsitrone Progress report DITS 27/04/2007 Overview : E. Tsitrone (20 + 5 mn) Experimental...

Page 1: 1E. Tsitrone Progress report DITS 27/04/2007 Overview : E. Tsitrone (20 + 5 mn) Experimental campaign : B. Pégourié (15 + 5 mn) TPL analysis program :

1E. Tsitrone Progress report DITS 27/04/2007

• Overview : E. Tsitrone (20 + 5 mn)

• Experimental campaign : B. Pégourié (15 + 5 mn)

• TPL analysis program : C. Brosset (25 + 5 mn)

• Integrated planning : M. Houry (10 + 5 mn)

• General discussion : all (30 mn)

Progress report on the DITS project :Agenda

Page 2: 1E. Tsitrone Progress report DITS 27/04/2007 Overview : E. Tsitrone (20 + 5 mn) Experimental campaign : B. Pégourié (15 + 5 mn) TPL analysis program :

2E. Tsitrone Progress report DITS 27/04/2007

Progress report on the DITS project :Overview

• What happened since the last project board ?• Management plan• Final finger selection• Erosion / redeposition (confocal microscopy)• Safety analysis

• What’s next ?• On going activities• Collaboration agreement• Planning

Page 3: 1E. Tsitrone Progress report DITS 27/04/2007 Overview : E. Tsitrone (20 + 5 mn) Experimental campaign : B. Pégourié (15 + 5 mn) TPL analysis program :

3E. Tsitrone Progress report DITS 27/04/2007

Internal review (CCAT, 20/12/2006) : project approved

Technical :• sample conditionning for storage• samples from other PFCs (bumpers, outboard limiter)• safety regulations regarding sample activation• measurements for erosion/redep (confocal microscopy) : critical path, funding

Management :• definition of milestones / deliverables• risk analysis• budget• regular reporting to our internal and external partners, web site• integrated in the EU PWI TF work programme

External review (08/12/2006) :Assessment from advisory board (J. Roth -EU PWI TF, M. Mayer-IPP, P. Roubin -PIIM)

• great relevance for predictions of the tritium inventory in ITER• international collaborations world-wide available expertise• preparatory discharge programme of high importance

C. Brosset

Since the last project board …

B. Pégourié

E. Tsitrone

Page 4: 1E. Tsitrone Progress report DITS 27/04/2007 Overview : E. Tsitrone (20 + 5 mn) Experimental campaign : B. Pégourié (15 + 5 mn) TPL analysis program :

4E. Tsitrone Progress report DITS 27/04/2007

Management plan underway

DITS : Deuterium Inventory in TS

• Compare particle balance / post mortem analysis in TS• Identify retention mechanisms (bulk diffusion)

implications for ITER

Page 5: 1E. Tsitrone Progress report DITS 27/04/2007 Overview : E. Tsitrone (20 + 5 mn) Experimental campaign : B. Pégourié (15 + 5 mn) TPL analysis program :

5E. Tsitrone Progress report DITS 27/04/2007

Management : project phasing

Objectives Review

Phase 0a – Definition Scientific objectives

Feasibility study

Project board 08/12/07

CCAT (20/12/2006)

Phase 0b – Organisation Budget / planning / resources, risk analysis, management plan Progress report 1 (27/04/07)

Execution phase 1 :

Experimental campaign

D loading of TPL

Monitor particle balance

Progress report 2 : experimental campaign (july)

Execution phase 2 :

Dismantling / reassembly of TPL

In situ analysis (lock in + erosion/redeposition)

Extraction of selected fingers

Progress report 3 : TPL dismantling/ in situ analysis (september)

Execution phase 3 :

Samples preparation

Samples extracted and ready for analysis

Progress report 4 : samples (november)

Execution phase 4 :

Samples analysis

Perform analysis program

Collect data

Analysis and publication of results

Intermediate meetings : partial results (tbd - 2008)

Progress report 5 : global results (tbd – 2008/2009)

Close out phase 5 Feedback Closeout review (tbd)

Page 6: 1E. Tsitrone Progress report DITS 27/04/2007 Overview : E. Tsitrone (20 + 5 mn) Experimental campaign : B. Pégourié (15 + 5 mn) TPL analysis program :

6E. Tsitrone Progress report DITS 27/04/2007

Management : information sharing tools

• Slides available on the EU PWI TF web site (http://www.efda-taskforce-pwi.org/) in the SEWG on particle balance

• Participative web site underway : edoc (collaborative work, file archiving)

Page 7: 1E. Tsitrone Progress report DITS 27/04/2007 Overview : E. Tsitrone (20 + 5 mn) Experimental campaign : B. Pégourié (15 + 5 mn) TPL analysis program :

7E. Tsitrone Progress report DITS 27/04/2007

Initial fingers selection

Fluence dependance in erosion zones

Thin / thick deposits

Fast particles in ripple

1.7 MA, no perp. flux

Courtesy of R. Mitteau, C. Brosset

Page 8: 1E. Tsitrone Progress report DITS 27/04/2007 Overview : E. Tsitrone (20 + 5 mn) Experimental campaign : B. Pégourié (15 + 5 mn) TPL analysis program :

8E. Tsitrone Progress report DITS 27/04/2007

Final fingers selection (satellite projects) Migration C/retention D (41 tiles, fing 5, 27, 28) Structure CFC (6 tiles) PFC (2 tiles, fing 1 et 17) IR (6 tiles, fing 4 et 26) Detritiation (fing 6 et 10)

Page 9: 1E. Tsitrone Progress report DITS 27/04/2007 Overview : E. Tsitrone (20 + 5 mn) Experimental campaign : B. Pégourié (15 + 5 mn) TPL analysis program :

9E. Tsitrone Progress report DITS 27/04/2007

Erosion/redeposition measurements Selected : Confocal microscopysurface mapping image difference for ero/redep. 2007 = starting point – next : in situ in TS

Budget ~ 100 kEurosCall for support from regional funding (50 kEuros)Optical part : call for tender launchedMechanical part : final design approvedIntegration and test : july 2007Measurements on sector : august 2007

on fingers : september 2007

?

ero

redep

Max resolution : 1 m in z, 20m in x-yReference inserted between fingersZones : 200 mm (radial) x 100 mm (toroidal)20° on TPL sector : 30 + 10 zones 11 days

Planning optimization :• sector equipped with new fingers• extracted fingers (no impact on shutdown)

zy

x

Page 10: 1E. Tsitrone Progress report DITS 27/04/2007 Overview : E. Tsitrone (20 + 5 mn) Experimental campaign : B. Pégourié (15 + 5 mn) TPL analysis program :

10E. Tsitrone Progress report DITS 27/04/2007

Sample activation Aim : TPL fingers and tiles = conventional samples

7Be (period = 53 days) : limit at 100 Bq/cm2 for surface contamination (1/10 of exemption limit)

Previous measurements : scraping on TPL : 1-5 Bq/cm2 (mobile)full deposits : < 50 Bq/cm2 (fixed + mobile)

Proposal for agreement on safety procedures underway :

• 3 phase control :On TPL sector monitored area in DRFC (sector dismantling, measurements, fingers extraction)On extracted fingers non monitored area in DRFC (tile extraction, analysis in DRFC)On tiles non monitored area outside CEA (conventional transport, sample cutting, analysis in our partners labs)

• Exchange protocol with external partners• Annual report on samples

Page 11: 1E. Tsitrone Progress report DITS 27/04/2007 Overview : E. Tsitrone (20 + 5 mn) Experimental campaign : B. Pégourié (15 + 5 mn) TPL analysis program :

11E. Tsitrone Progress report DITS 27/04/2007

What’s next ?

Page 12: 1E. Tsitrone Progress report DITS 27/04/2007 Overview : E. Tsitrone (20 + 5 mn) Experimental campaign : B. Pégourié (15 + 5 mn) TPL analysis program :

12E. Tsitrone Progress report DITS 27/04/2007

On going activities …• WP0 : Management :• Management plan, information sharing tool (E. Tsitrone, L. Jourdheuil)• Integrated planning (M. Houry, echange/DITS/PLANNING)

• Safety aspects : ok for conventional operation (K. Zunino), agreement on specific procedures for sample activation (F. Saint Laurent)

• WP1 : Experimental campaign : • Preparatory experiment (11/05/2007), diagnostics strategy (P. Moreau)• Dedicated campaign manning (B. Pégourié)

• WP2 : TPL dismantling :• Specific tooling for TPL sector and fingers protection (A. Martinez)• SATIR test (new fingers selection) (J. Schlosser)• Planning / human resources for summer shutdown (F. Samaille, M. Houry)

• WP3 : TPL analysis :• Preparation for confocal microscopy (E. Gauthier, H. Roche)• Validation of tile extraction process (J. Schlosser)• Integrated analysis program (C. Brosset)• Sampling from other PFCs (C. Brosset)

Page 13: 1E. Tsitrone Progress report DITS 27/04/2007 Overview : E. Tsitrone (20 + 5 mn) Experimental campaign : B. Pégourié (15 + 5 mn) TPL analysis program :

13E. Tsitrone Progress report DITS 27/04/2007

WP4 : Satellite projects

Dust :Characterisation + effect of maintenance, sampling location, analysis program (MEB)

IR : low cost option• Thermal properties of deposited layers (power balance for IR on TPL) : with available laser (Speckle)• IR monitoring of neutralisers : simple fiber replacement• Cancelled : upgrade of calorimetry, active thermography, TPL cleaning procedure

PFCs :• Lock in thermography on extracted sector• Analysis of defective tiles on Q6A• Oxydation of cooling channels• Cancelled : finger repair• Added : acoustic sensor for CHF detection (feasibility)

Detritiation :Test on deposited layers + gaps : • laser cleaning (CEA) : lab through safety procedures before commisionning• oxydation/scavengers : CIEMAT, MEPHI

Page 14: 1E. Tsitrone Progress report DITS 27/04/2007 Overview : E. Tsitrone (20 + 5 mn) Experimental campaign : B. Pégourié (15 + 5 mn) TPL analysis program :

14E. Tsitrone Progress report DITS 27/04/2007

Collaboration agreement for analysis

• Integrated into EU PWI TF (STAC), preferential support in 2008 for EU participating labs ?

NRA NRA SIMS TDS Structure Porosity

Detritiation

CEA-DRFC (JY Pascal, H. Roche)

X X

CEA-LECA (L. Desgranges)

X

CEA-LPS (H. Khodja)

X

CP2M – Tecsen (W. Saikaly, F. Boquet)

X

PIIM (P. Roubin)

X

IPP (M. Mayer)

X

IPP (W. Jacobs)

X

FZ Juelich (A. Kreter)

X ? X ? X ?

JSI (P. Pelicon)

X

VTT-Tekes (J. Likonen)

X

VR (M. Rubel)

?

CIEMAT (P. Tabares)

X

Sandia R. Causey

X (virgin CFC)

MEPHI (L. Begranbekov)

X X

• Call for interest after last project board : all needed measurements covered

• Collaboration agreement :• Integrated analysis program• Sample preparation / identification• Experimental protocol for all measurements involved• Data collection (data format, intermediate reports …)• Strategy for global analysis• Publication policy : editorial board (TS + participating labs)

Suggestions welcome !

Page 15: 1E. Tsitrone Progress report DITS 27/04/2007 Overview : E. Tsitrone (20 + 5 mn) Experimental campaign : B. Pégourié (15 + 5 mn) TPL analysis program :

15E. Tsitrone Progress report DITS 27/04/2007

Provisionnal planning for TS

Jan Feb.Jan Feb. March April May June July. Aug. Sept. Oct. Nov. Dec.

Arrêt hiver 06/073 4,5 2 1 5 4

AIA (V+T)AIA (PA)

Winter shutdown Winter SD07/06 Summer Shutdown 01/10

Cat.1Dismantling

3D Meas.

Install ICRH Iter-like

12/06 DITS 12/09

3 4,5 23 4,5 2 1 5 4 1 5 5 3 4

SpecConsult.

Real.Assemb.

3D Diagnostic manufact.

Page 16: 1E. Tsitrone Progress report DITS 27/04/2007 Overview : E. Tsitrone (20 + 5 mn) Experimental campaign : B. Pégourié (15 + 5 mn) TPL analysis program :

16E. Tsitrone Progress report DITS 27/04/2007

Provisionnal planning for DITS

11/05/07 Validation of plasma scenario

23/05/07 Carbonisation + boronisation

24/05/07 up to 07/06/07

Dedicated campaign (10 days, long shift)

June 2007 •TS openingControl TS + TPL sector

• TPL dismantling• Lock in Thermography

• Extraction selected fingers

Control on fingers Replacement by new fingers

July 2007 Leakage test of TPL sector

August 2007 Confocal microscopy on TPL sector

September 2007

• Confocal microscopy on extracted fingers• Tile extractionControl on tiles

• Samples cutting from tiles

TPL reassembly in TS

October 2007

• Samples characterization• Sample ready for analysis

TS restart