191 Suncoast Drive East

13
191 Suncoast Drive East Fire Flow Analysis Report Project Location: 191 Suncoast Drive East, Goderich, ON Prepared for: GSP Group Inc. 72 Victoria Street South, Suite 201 Kitchener, ON N2G 4Y9 Prepared by: MTE Consultants Inc. 520 Bingemans Centre Drive Kitchener, ON N2B 3X9 June 16, 2021 MTE File No.: 48570-100

Transcript of 191 Suncoast Drive East

191 Suncoast Drive East

Fire Flow Analysis Report

Project Location: 191 Suncoast Drive East, Goderich, ON Prepared for: GSP Group Inc. 72 Victoria Street South, Suite 201 Kitchener, ON N2G 4Y9 Prepared by: MTE Consultants Inc. 520 Bingemans Centre Drive Kitchener, ON N2B 3X9 June 16, 2021 MTE File No.: 48570-100

Contents

1.0 Introduction ..................................................................................................................... 1

2.0 Water Distribution ............................................................................................................ 1

3.0 Analysis Of On-Site Fire Protection ................................................................................. 2

4.0 Conclusions And Recommendations ............................................................................... 3

Tables Table 2.1 - Results Of Flow Tests Completed (April 30, 2021) .................................................. 1 Appendices Appendix A Flow Test Results Appendix B Calculations

MTE Consultants | 48570-100 | 191 Suncoast Drive East | June 16, 2021 1

1.0 Introduction MTE Consultants Inc. has been retained by GSP Group Inc. to conduct a fire flow analysis for the proposed six-storey residential building at 191 Suncoast Drive East located in the Town of Goderich. Proposed servicing works include the installation of sanitary, storm and water services for the proposed building. It’s our understanding that the building will be sprinklered. There is an existing municipal hydrant located on the north side of Suncoast Drive East, approximately 35m away from the proposed building’s Fire Department Connection (FDC). The purpose of this report is to confirm the available fire flows and residual pressure from the existing 200mm diameter watermain along Suncoast Drive East.

2.0 Water Distribution The development will be serviced from an existing 200mm diameter watermain located within the Suncoast Drive East right-of-way. The proposed 150mm diameter water service will be extended into the Site and will service the proposed building. Based on the distance from the existing hydrant located on Suncoast Drive East and the proposed fire department connection, a private hydrant on-site should not be required. The pressures and flows must be sufficient for firefighting conditions as established by the Ontario Building Code (2012). The minimum residual pressure under fire fighting conditions is 140kPa (20.3 psi) per OBC 2012 A-3.2.5.7 3(b). For this design, we have utilized the information obtained from the municipal hydrants located on Suncoast Drive East. The following table illustrates the results of the testing completed by B.M. Ross and Associates Limited.

Table 2.1 - Results Of Flow Tests Completed (April 30, 2021) Test #

Outlet Inside Dia. (in.)

Number of Outlets

Pitot Pressure (PSI)

Residual Pressure (PSI)

Flow @ Residual (gal/min)

1 n/a n/a n/a 58 n/a

2 2.5 1 35 50 1,982

Refer to Appendix A for the information obtained by B.M. Ross and Associates Limited.

MTE Consultants | 48570-100 | 191 Suncoast Drive East | June 16, 2021 2

3.0 Analysis of On-Site Fire Protection Section A-3.2.5.7.2 of the OBC relates to water supply for firefighting in sprinklered buildings. For sprinklered buildings, water supply additional to that required by the sprinkler systems should be provided for firefighting using fire hoses in accordance with the hose stream demands and water supply durations for different hazard classifications as specified in National Fire Protection Association’s (NFPA) NFPA 13, “Standard for the Installation of Sprinkler Systems”. The site-specific system demand for the proposed sprinkler system is not known at this time. Based on past experience, an assumed demand of 2,000L/min has been used to represent the fire demand for the proposed building. The actual sprinkler demand will be provided by a qualified contractor and this calculation will need to be confirmed. The residual pressure at the existing hydrant was calculated to be 395kPa for a flow rate of 2,000L/min, which is greater than the minimum allowable pressure of 140kPa per OBC 2012. See Appendix B for calculations. However, in case the fire demand for the proposed building was found to be over 2,000L/min, a demand of 9,000L/min was also used to determine the residual pressure at the existing municipal hydrant. The residual pressure at the existing municipal hydrant was calculated to be 323kPa for a flow rate of 9,000 L/min, which is greater than the minimum allowable pressure of 140kPa per OBC 2012. See Appendix B for calculations. Following the hydrant flow testing, B.M. Ross and Associates noted that the flow test results may overestimate the maximum flow available from the hydrant at 140kPa, on account of the relatively large 200mm diameter of the watermain along Suncoast Avenue East. Nevertheless, B.M. Ross and Associates estimates that the hydrant can provide in excess of 13,500 L/min at 140kPa, which is a much larger demand than what will be required for firefighting purposes, as previously discussed.

MTE Consultants | 48570-100 | 191 Suncoast Drive East | June 16, 2021 3

4.0 Conclusions and Recommendations Based on the flow test provided by B.M. Ross and Associates Limited, it can be concluded that the minimum water supply flow rate of 9,000L/min can be delivered to the existing municipal hydrant located south of the proposed building with a residual pressure (at the nozzle of the hydrant) under fire fighting conditions of 323kPa, thus meeting the minimum requirements of the Ontario Building Code (2012). We understand that the building will be sprinklered, therefore, the fire demands will be far less than 9,000L/min. Given that there is adequate supply and pressure for a demand of 9,000L/min, we conclude that the existing municipal hydrant can adequately service the proposed residential building. All of which is respectfully submitted,

MTE CONSULTANTS INC.

Nathan Katerberg, E.I.T. Jeff Lerch, P.Eng. Designer Design Engineer 519-743-6500 ext.1369 519-743-6500 ext.1307 [email protected] [email protected]

NGK:scm \\mte85.local\mte\Proj_Mgmt\48570\100\Reports\Fire Flow\2021-06-16_Fire Flow Report.docx

Appendix A

Flow Test Results

GODERICH MOUNT FOREST SARNIA

VIA EMAIL ONLY

May 3, 2021

Jeff Lerch, P. Eng. MTE Consultants Inc. 520 Bingemans Centre Drive Kitchener, ON N2B 3X9

Dear Sir

RE: Hydrant Flow Test on Suncoast Drive

Background

MTE is completing a Functional Servicing Report for 191 Suncoast Drive in Goderich and requested that BMROSS complete a hydrant flow test adjacent to the property to provide flow and pressure data. BMROSS completed the testing with support from Veolia, the operator for the Town of Goderich. The purpose of this letter is to report the findings of the hydrant flow test.

Technical Analysis – Hydrant Flow Tests

On April 30, 2021, staff of BMROSS and Veolia conducted a hydrant flow test on Suncoast Drive. Figure 1 (enclosed) illustrates the general location of the hydrants used for the test. A full copy of the hydrant test results is also enclosed. The hydrant of primary interest is labelled EAST on Figure 1. Table 1 provides the measured pressures and theoretical flow rates available at each test location.

Table 1: Measured Pressure and Theoretical Flow

Flowing Hydrant

Residual Hydrant

# of Ports

Flowed

Static Pressure at Residual Hydrant

(kPa)

Residual Pressure at Residual Hydrant

(kPa)

Flow at Flowing Hydrant

(L/s)

Theoretical Flow at Residual

Hydrant at 140 kPa (L/s)

WEST EAST 2 400 345 125 289

File No. 20123

B. M. ROSS AND ASSOCIATES LIMITEDEngineers and Planners62 North Street, Goderich, ON N7A 2T4p. (519) 524-2641 www.bmross.net

- 2 -

Z:\20123-Goderich-Suncoast_Retirement_Site_Plan_Review\WP\20123-2021-05-03-Hydrant Tests Let.docx

It is noted that even with two ports fully open on the flowing hydrant, it was not possible to induce a pressure drop of 25% at the test hydrant. This is likely a result of relatively large diameter watermain feeding the 200 mm diameter watermain on Suncoast Drive from both west and east directions. Though the theoretical calculations suggest an available fire flow of 289 L/s at a residual pressure of 140 kPa, this is a relatively extreme flow value. We suggest it may be more appropriate to consider the hydrant could provide >225 L/s at 140 kPa.

Conclusions

A hydrant flow test was conducted in the vicinity of the 191 Suncoast Drive property in Goderich. On April 30, 2021, test results indicate the existing municipal water distribution system in Goderich would be able to provide a flow of >225 L/s at a residual pressure of 140 kPa.

If you have any questions, or require additional information, please call.

Yours very truly

B. M. ROSS AND ASSOCIATES LIMITED

Per _________________________________ Andrew Garland, P. Eng.

AJG:es Encl.

c.c. Sean Thomas, Town of GoderichJohn Graham, Veolia

Hydrant Flow Test Locations

Town of Goderich191 Suncoast Drive

eng in e e r i ng be t t e r commun i t i e s

20123

1FIGURE No.

PROJECT No.

N.T.S.

SCALE

Apr. 30, 2021

DATE

BMROSS 20123

Test Hydrant Number:

Client:

N.F.P.A. Colour Code: Date:Time:

kPa Location:kPa

kPa

140 kPa = 289.4 L/s

Flow Hydrant(s) Information:

Hydrant # Outlet# Ports Diameter

Flowed (mm)West 2 63.5

Comments: Operator Cory DulongOperator (Veolia)

Pressure ZoneTower LevelPumps (on/off)

in general accordance with the NFPA 291 guidelines

Town of Goderich

30-Apr-219:30:00 AM

20123

No (drop is < 75 kPa)

(kPa)400 125.07

Flow(L/s)

TheoreticalPressure

0.90(kPa)

AdjustmentCoefficients(if applicable)

Total Flow (L/s) 125.07

StaticPressure

GoderichSuncoast between

Bayfield and Walnut55

13.8% Flow Hyd. @

400345

No (drop is < 25%)

241

FIRE FLOW TESTING REPORT

Flow At Test Hydrant at

Residual

Reasonably accurate test:

PRESSURE DROP:% PRESSURE DROP:

NFPA 291 Conformance:West

Residual/Test Hydrant Information:

STATIC PRESSURE:RESIDUAL PRESSURE

Light blue

Residual Hyd. @ East

0

100

200

300

400

500

0 50 100 150 200 250 300 350

Pres

sure

(kPa

)

Flow Rate (L/s)

Pressure-Flow Graph at Test Hydrant

Appendix B

Calculations

191 Suncoast Drive EastFIRE FLOW ANALYSISGoderich, ONProject Number: 48570-100Date: May 25, 2021Design By: NGKChecked By: JPLFile:

CALCULATION OF RESIDUAL PRESSURE AT ON-SITE HYDRANT1. Boundary Conditions (Based on Fire Flow Test Results):

P0 - Starting Pressure 40.79 m 58 psiP1 - Pressure at Q1 35.16 m 50 psi

0Q1 - From Fire Flow Test 7503 L/min 1982 U.S. gal/minQ2 - Required Flow 2000 L/min 528 U.S. gal/min Assumed site demand, Mech. Eng. to confirm.P-loss 1 5.63 m 8 psiP-loss 2 0.49 m 1 psi

P2 - Residual Pressure 40.30 m 57 psi Extrapolated from Fire Flow Test Results

ANALYSIS SUMMARY

Total Losses 0.000 m0.00 kPa 0.0 psi

Residual Pressure after Losses 40.30 m395 kPa 57.3 psi PASS

Allowable Residual Pressure 140 kPa 20.3 psi

Q:\48570\100\Water\43650-200_Site Fire Flow Analysis_2021-05-25.xls

ImperialMetric

191 Suncoast Drive EastFIRE FLOW ANALYSISGoderich, ONProject Number: 48570-100Date: May 25, 2021Design By: NGKChecked By: JPLFile:

CALCULATION OF RESIDUAL PRESSURE AT ON-SITE HYDRANT1. Boundary Conditions (Based on Fire Flow Test Results):

P0 - Starting Pressure 40.79 m 58 psiP1 - Pressure at Q1 35.16 m 50 psi

0Q1 - From Fire Flow Test 7503 L/min 1982 U.S. gal/minQ2 - Required Flow 9000 L/min 2378 U.S. gal/min Assumed site demand, Mech. Eng. to confirm.P-loss 1 5.63 m 8 psiP-loss 2 7.88 m 11 psi

P2 - Residual Pressure 32.91 m 47 psi Extrapolated from Fire Flow Test Results

ANALYSIS SUMMARY

Total Losses 0.000 m0.00 kPa 0.0 psi

Residual Pressure after Losses 32.91 m323 kPa 46.8 psi PASS

Allowable Residual Pressure 140 kPa 20.3 psi

Q:\48570\100\Water\43650-200_Site Fire Flow Analysis - Max Demand_2021-05-25.xls

ImperialMetric