A. D'Auria CERN/PH-DT-DI 119/02/2014
2013 Maintenance ID flushing system: Maintenance 2 dryers Installation 2 flow meters Maintenance of several hygrometers (flushing system, N2 supply
from membrane system, …)
ID fl
ushi
ng sy
stem
PH-DT-DI 2013/2014 CMS activities
2013 Consolidation ID flushing system: 3 new gas distribution racks Analysis rack SX5 pixel lab dry air flushing and cooling
distribution systems
Maintenance 2014 ID flushing system:▫ Replace filters in distribution racks▫ Calibration MFMs▫ Calibration safety valves
A. D'Auria CERN/PH-DT-DI 219/02/2014
Muon Detector gas systems (CSC, DT, RPC)
Maintenance 2013
▫ Maintenance gas systems and analysis racks▫ Leak campaign test on RPC ▫ Installation heating tape on RPC new pipe.
Consolidation/Upgrades 2013 ▫ RPC Pump upgrade in USC55▫ DT high flow setup.▫ Commissioning RPC RE+4.
Gas
syst
ems
for M
uon
dete
ctor
sPH-DT-DI 2013/2014 CMS activities
A. D'Auria CERN/PH-DT-DI 319/02/2014
Stan
dard
mai
nten
ance
list
PH-DT-DI 2013/2014 CMS activities
2013/2014 Gas systems/Analysis maintenance list:
circulation pumpssafety valves and bubblers
power suppliesprofibus qualitypressure regulatorsanalysis devices
change absorber in purifiercheck/repair pneumatic valves
check/repair electro valvescheck/repair heating cables/connectorscheck/repair pressure regulatorsflow cells checkingcalibrations MFC
A. D'Auria CERN/PH-DT-DI 419/02/2014
LS1
extr
aord
inar
y m
aint
enan
ce li
stPH-DT-DI 2013/2014 CMS activities
2013/2014 Gas Detectors/Analysis extraordinary maintenance:
Software upgradeRPC modifications to open output for Xmas 2014Commissioning RPC RE-4.Repair recovery purifier column.CSC recovery CF4 - analysis rackCF4 maintenance/modifications/tests
A. D'Auria CERN/PH-DT-DI 519/02/2014
A lot of activities completed/on-going during 2014
Many new consolidation projects for all experiments
Conc
lusi
ons
Conclusions