18OTCA Floor Plan Full - OTC Asia 2018 -...

4
Overview Overview LEVEL 3 PLENARY THEATRE LEVEL 1 GROUND LEVEL HALL 1 HALL 2 HALL 3 HALL 4 HALL 5 PARK ENTRANCE EXHIBITOR SERVICE COUNTER AND EXHIBITOR REGISTRATION GRAND HYATT KUALA LUMPUR MAIN ENTRANCE TRADERS HOTEL KLCC MEDIA REGISTRATION AND MEDIA CENTRE PLENARY HALL OPENING CEREMONY / EXECUTIVE PLENARY SESSION 305 PANEL SESSIONS CONFERENCE REGISTRATION AUTHOR PREPARATION ROOM MANDARIN ORIENTAL KL HALL 6 BANQUET HALL COUNTRY SESSIONS (21-23 March) GRAND BALLROOM CONFERENCE LUNCHEON (21-23 March) PLENARY HALL OPENING CEREMONY / EXECUTIVE PLENARY SESSION LEVEL 4 TECHNICAL SESSIONS SPECIAL SESSIONS CONFERENCE HEADQUARTERS & AUTHOR CHECK-IN CLOSING SESSION THE NEXT WAVE (19 March) HIGH SCHOOL STUDENT STEM (22 March) UNIVERSITY R&D SHOWCASE AND CHALLENGE (23 March) VISITOR REGISTRATION CONFERENCE HALL 2 CONFERENCE HALL 3 3 4 5 6 7 1 2 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 KNOWLEDGE SHARING ePOSTER STATIONS 403 404 405 301 303 302 304 305 306 310 309 308 307 402 401 SELF CHECK-IN KIOSK SELF CHECK-IN KIOSK SELF CHECK-IN KIOSK SELF CHECK-IN KIOSK LEGEND: Conference Self Check-In Kiosk SELF CHECK-IN KIOSK Prayer Room Medical Room SELF CHECK-IN KIOSK Visitor Self Check-In Kiosk Cafeteria

Transcript of 18OTCA Floor Plan Full - OTC Asia 2018 -...

OverviewOverview

LEVEL 3

PLENARY THEATRE

LEVEL 1

GROUND LEVEL

HALL 1

HALL 2HALL 3

HALL 4

HALL 5PARKENTRANCE

EXHIBITOR SERVICECOUNTER AND

EXHIBITOR REGISTRATION

GRAND HYATTKUALA LUMPUR

MAINENTRANCE

TRADERSHOTEL KLCC

MEDIA REGISTRATIONAND MEDIA CENTRE

PLENARY HALL

OPENING CEREMONY / EXECUTIVE PLENARY SESSION

305PANEL SESSIONS

CONFERENCEREGISTRATION

AUTHORPREPARATIONROOM

MANDARINORIENTAL KL

HALL 6

BANQUET HALL

COUNTRY SESSIONS (21-23 March)

GRAND BALLROOM

CONFERENCE LUNCHEON(21-23 March)

PLENARY HALL

OPENING CEREMONY / EXECUTIVE PLENARY SESSION

LEVEL 4

TECHNICAL SESSIONS

SPECIALSESSIONS

CONFERENCEHEADQUARTERS &AUTHOR CHECK-IN

CLOSING SESSION

THE NEXT WAVE (19 March)HIGH SCHOOL STUDENT STEM (22 March)UNIVERSITY R&D SHOWCASE AND CHALLENGE (23 March)

VISITOR REGISTRATION

CONFERENCE HALL 2

CONFERENCE HALL 3

3 4 5 6 7

1 2

8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

KNOWLEDGESHARINGePOSTERSTATIONS

403

404

405

301

303302304305306

310309308307

402

401

SELFCHECK-IN

KIOSK

SELFCHECK-IN

KIOSK

SELFCHECK-IN

KIOSK

SELFCHECK-IN

KIOSK

LEGEND:

Conference Self Check-In KioskSELF

CHECK-INKIOSK Prayer Room Medical Room

SELFCHECK-IN

KIOSK Visitor Self Check-In Kiosk Cafeteria

E201

13

MMHEHALLIBURTON

Hall 1 & 2 (Ground Level)

LEGEND :

FIRE EXTINGUISHER

HOSE REEL

FIRE ALARM

FIRE BREAK GLASSFB

FAHR

FR

DC DOOR CONTROLLER

SB SUIS BOARDMAX HIGH STRUCTURE 3.0m& THE SET BACK 1.0m FROM THE WALL

NON BUILD UP AREA

EMERGENCYEXIT

HALL 2

UTILITY 2

LOADING BAY 1

INFORMATION

UTILITY 1ELEC.ROOM

CORE 4

WALL STORAGELIFTLIFT SERVICE DESK

EXHIBITORSTORELIFTLIFT

ELEC

T / T

EL

IT/TEL

IT

ROOMELECTRICAL

LIFTLIFT

OPENINGOPENING

FEMALEMALEDISABLED

FEMALE

HOUSEKEEPING

UTILITY

FEMALE

MALE

DISABLED

REGISTRATION

INFORMATION

REGISTRATIONREGISTRATION

LIFT LH 9

LIFT LH 8

LH 10LIFT

LOADING BAY 2ROLLER SHUTTER TO

ROLLER SHUTTERLIFT DOORLIFT DOOR

ROLLER SHUTTER

5.0

FRFR

(SB) (SB) (SB)

HR

HR HR FR

S

FR

(FB/FA)(FB/FA)

HRGLASS PLASMA

HR(SB)

(SB)(FB/FA) (FB/FA)

CEILING HEIGHT LIMIT = 3000mm

HR(SB) (SB)

(FB/FA)(DC)

(SB)FD HR

(SB) PLASMA GLASS

(FB/FA)(DC)

(SB) (SB)(SB) (SB)

(FB/FA)(DC) (FB/FA)(DC)

(SB) (SB)

HRFR HR(SB) (SB) (FB/FA)

(FB/FA)

HR FR HR(FB/FA)(FB/FA) (DC) (FB/FA)(DC)

(SB) (SB)

CEILING HEIGHT LIMIT = 3000mm

(SB) (FB/FA) (FB/FA)

MALE

DISABLE

HR

(DC)

PLASMA GLASS

ENTRANCE/

HALL 1

FR

EMERGENCYEXIT

EMERGENCYEXIT

EMERGENCYEXIT

A111

3

9

EXITTRADERSEXIT TO

HOTEL

B111

9

6

E101

21

12

F111

12

G101

12

G1116

12

KIOSK 1 KIOSK 2

3.55

TO / FROMHALL 3, 4 & 5

CORE 8

LP19LIFT

LP20LIFT

CEILING HEIGHT LIMIT= 2750 mmCEILING HEIGHT LIMIT= 2750 mm

C111

10

6

12

6

D111

12.5

D101

16

A201

12

A2116

12

B201

12

B2116

12

C201

15

C2116

15

D2116

12

E2116

13

1.1

S203S202S2010.500.50 0.50

12.512.5 12.5 12.5 12.5

1.13.0

2.5 2.5

3.0 3.0 3.0

2.52.5

2.5 2.5 2.5

2.5

3.0

2.5 2.5 2.5 2.5 2.5

5.0 5.0 5.0

2.5 2.5

3.03.0

F101

12.5

6

122.5

ENTRANCE/EXIT

S205S204 S2063

1.50.50

2.5

WEATHERFORD UZMAWESTSTARDIALOG

DELEUMSAPURA ENERGY BAKER HUGHES,A GE COMPANY

TECHNIPFMC

CHINA PETROLEUMPIPELINE BUREAU

SCHLUMBERGER

UPDATED AS OF 8 MARCH 2018

6.25

B102

7.25

6.25

B1016.25

C102

7.25

6.25

C1012.5LLOYD’S

REGISTER

BUMI ARMADA

MODEC

PTTEP CONOCOPHILLIPSSUBSEA 7

FRANK’SINTERNATIONALSWAGELOK

MCDERMOTT

A101

3

9

3.0

SITCOINDUSTRIES

AIR DRILLINGASSOCIATES

AAPGASME

IEEE-OESMTS

SEGSPE

2.5

6

12

OTC

LEGEND :

FIRE EXTINGUISHER

HOSE REEL

FIRE ALARM

FIRE BREAK GLASSFB

FAHR

FR

DC DOOR CONTROLLER

SB SUIS BOARDMAX HIGH STRUCTURE 3.0m& THE SET BACK 1.0m FROM THE WALL

NON BUILD UP AREA

F501

LOUNGE

3

4

B407 B408

B405 B406

B403 B404B401 B402

3

3

B425

B423 B424

B421 B4223

3

C525 C528

C526

C523 C522

C521

3.0

G4016

12

F401

UPDATED AS OF 8 MARCH 2018

2.5

3

3 C501

C503 C502

C506

C505 C508

CHINA NATIONAL PAVILION

3.0

Hall 3, 4 & 5 (Ground Level)

FR

FR

LP9

LP10

LOBBY OF

HALL 3

UP

UP

(FB/FA)

(DC) (FB/FA)

(FB/

FA)

(DC)

(FB/FA) (SB)

UTILITY 4ELECTRICAL

ROOMLIFTLIFTLP5LP6

LIFT LIFT

ELEC.

UTILITYLIFTLP7

LIFTLP8

WALLSTORAGEELEC

LOBBY

MALE

TFAHS YRA TIN AS

DISABLEDROOM

PARENTING

REGISTRATION

INFORMATION

MALE

FEMALE

DISABLEDHOUSEKEEPING

SAN

ITAR

Y SH

AFT

MALE

FEMALE

DISABLEDHOUSEKEEPING

CH

W

HOSPITALITY LOUNGE 4UP TO 1ST FLR

VOID

VOID

UTILITY

1ST FLRUP TO

CH

W

FA

CAFE WEST

IT

HR/WR

REGISTRATION

INFORMATION

LIFTdp

UTILITY 3

HR HR

(FB/FA)

(SB)

FR

HRHR FR

(FB/FA)

(SB) (SB)

HRHRFR

HR HRFRFR

(DC) (FB/FA)

(FB/FA)(FB/FA)(SB) (SB)

CEILING HEIGHT LIMIT = 3000mm

FEMALE

(SB)(SB)FD HR

(FB/FA)(SB) (SB)

S

PLASMAHR

GLASS PLASMAHR FD

(SB) (SB) (FB/FA) (SB)(SB)

CEILING HEIGHT LIMIT = 3000mm

HALL 4 HALL 5

(SB)(SB)

EMERGENCYEXIT

EMERGENCYEXIT

EMERGENCYEXIT

EMERGENCYEXIT

ENTRANCE/EXIT

F511

6

6

TO / FROMHALL 1, 2 & 3

TO / FROMHALL 3, 4 & 5

B302

B303

6

3

0.75

3.01

0.50

A301

0.50

9

3

9

A303

6

3

0.75

HR

LP3LIFTLIFT

LP4

CEILING HEIGHT LIMIT= 2750 mmCEILING HEIGHT LIMIT= 2750 mmKIOSK 4 KIOSK 5

3

0.50

6

E501

6

12

E511

6

6

D501

6

6

D505

D511

6

6

C401

12

12

C411

12

6

B411

12

6

A401

A411

6

6

6

12

2.9

6.52

0.50

2.5

5.0

2.5 2.5

3.0

3.0

3.0

3.0

5.0

3.0

3.0

5.0

3.0

3.03.0

3.03.0

2.52.5

5.05.0

3.0

6

ENTRANCE/EXIT

S401 S402 S403 S4043

1.5 S4050.50

3.0

3

S4060.50 0.50

A3026

6B301

NORWAYNATIONALPAVILION

KOREANATIONALPAVILION

PANTECH

SHAWCOR

BARDOT

6

6

B502

B501

BUREAUVERITAS

KROHNEEMASA501

3

4

6

3

2.5 3.0

G402

G403G404

G406

G407 G408

A506

A507

NETHERLANDS NATIONALPAVILION

2.52.5

6

B511 C513C511

6

6

12

6

A511

12

6

G411

6

6

F411

6

66

E411D411

6

6

6

STRESS MTQTRELLEBORG FUGROABS2.5 2.5 2.5 2.5 2.5

SANDVIK

HEMPEL

RUBBER-ATKINS

G501

9

6

6

G505

G511

INTERTEK

DAIDO STEEL

GULF MARINESERVICES GOFORTHAKER SOLUTIONS

A510

6

12

HUNTINGENERGY

3

3

E405 E406

E403 E404

E401 E402

3.02.5 3.0

USA NATIONALPAVILION

SINGAPORE NATIONALPAVILION

OIL STATES

SHPI

YINSON AFGLOBAL

DRAEGER

INTECSEARED WING

SHOE PAL-FINGER

OCEANEERING

B504

B5036WILD WELL

CONTROL

2

3

36

3

SINGAPORE NATIONAL PAVILIONB401 SENSITRON SINGAPORE (SENSING) PTE LTDB402 HOERBIGER KT ASIA SERVICES PTE LTDB403 MARSHALL CAVENDISH BUSINESS INFORMATION PTE LTDB404 ASSOCIATION OF SINGAPORE MARINE INDUSTRIES (ASMI)B405 ONE OFFSHORE PTE LTDB406 YONG FAH INTERNATIONAL PTE LTDB407 GLOBAL MARINE SAFETY (S) PTE LTDB408 TECHNOLOGY CENTRE FOR OFFSHORE AND MARINE, SINGAPORE LTD (TCOMS)B421 KM KINLEY MARKETING PTE LTDB422 HYDROGROUP ASIA PTE LTDB423 SPECTEC ASIA PACIFIC PTE LTDB424 NRGEDGE PTE LTDB425 KEPPEL OFFSHORE & MARINE LTD

USA NATIONAL PAVILIONE401 NIPPON TITANIUM METAL CORPORATIONE402 COLUMBIA SOUTHERN EDUCATION GROUPE403 INDUSTRIAL INFO RESOURCESE404 SAFEGUARD TECHNOLOGY, INC.E405 DERRICK SOLUTIONS INTERNATIONAL PTE LTD E406 DRAWWORKS, L.P.

6

NETHERLANDS NATIONAL PAVILIONG401 VAN LEUSDEN B.V.G402 SOLUFORCEG403 AMPELMANN OPERATIONSG404 HMSAG406 DCN DIVINGG407 AIRBORNE OIL & GASG408 HUISMAN EQUIPMENT B.V.A501 GUSTOMSCA503 HOLLAND LOUNGEA506 PARADIGM TECHNOLOGY SERVICESA507 IHC IQIP SINGAPORE PTE LTD

HOLLANDLOUNGE

NORWAY NATIONAL PAVILIONAPITEQARCHERWELLDNV GLFISHBONES ASHYDRAWELL INTERVENTIONINTERWELLRESMAN ASRUSTIBUS OIL & GASRYSTAD ENERGYSALCON PETROLEUM SERVICES SDN BHDT.D. WILLIAMSON, INC.TAMROTOR MARINE COMPRESSORS ASTELENOR MARITIMEWELLBARRIER

CHINA NATIONAL PAVILIONC501 WENZHOU ZHIJU PIPE CO., LTDC502 ZTT INTERNATIONAL LIMITEDC503 SAILUOKE FLUID EQUIPMENT INC. C505 M.GELDBACK (SHANXI) FLANGE&FITTINGS CO., LTDC506 LUOYANG SENDE PETROCHEMICAL ENGINEERING CO., LTDC508 WUHAN LINMEI HEAD PLATE CO., LTD C521 CANGZHOU LONGTAIDI PIPING TECHNOLOGY CO., LTDC522 HEBEI HENG AN TAI PIPELINE CO., LTD C523 TIANJIN LILIN PETROLEUM MACHINERY CO., LTDC525 NINGBO ORIENT WIRED & CABLES CO., LTDC526 HEBEI LEAGOO INSTRUMENT CO., LTDC528 CM SEALED PARTS FACTORY

6

6

6

6

PANAHJAYA

3

MPRCMOGSC

HUBER + SUHNER

CANADANATIONALPAVILION

MATRADEIMM

IMARESTGD

KOREA NATIONAL PAVILIONBMT CO.,LTDDONGHAW PNEUTECECOWAVE CO., LTDHOSEUNG ENT.CO.,LTDJEONJIN ENTECH,.LTDNAVUTEC CO.,LTDYNV CO.,LTD

CANADA NATIONAL PAVILIONBITCAN GEOSCIENCES & ENGINEERING INC. CANADIAN GLOBAL EXPLORATION FORUM (CGEF) / SONORO ENERGY COUGAR DRILLING SOLUTIONSINNOVATION CENTRIC GROUPKMG INDUSTRIAL LUBRICANTS CANADA, INC DBA SEALWELDNATIONAL COMPRESSED AIR (NCA)SSI ARTIFICIAL LIFT, A TUNDRA PROCESS SOLUTIONS COMPANY TECHNO CANADA TELETICS & GUARDIANTRANS CANADA TURBINES XRF SOLUTIONS

SERBADINAMIK

3.0

C621

C622

C624

3

3

CLASSNKUPSTREAM

JFD

C617 C618

C619 C620

3

3

3

DROPSAFE

MASER &QUARTZELEC REMITITE

ZERLUX

D605GLOAZURE

3INNOCORROFFSHORE

LEGEND :

FIRE EXTINGUISHERFR

NON BUILD UP AREA

(5m W x 6m H)RS ROLLER SHUTTER

FAN HEIGHT = 3000mm

MAX BOOTH HEIGHT FOR PERIMETER BOOTH = 2500mm

MAX BOOTH HEIGHT FOR CENTER BOOTH = 4000mm

ENTRANCE / EXITFROM / TO HALL 5

EXIS

TIN

GPA

SSAG

E W

AY

ACCESS TO RAMP

ORIENTALHOTEL

MANDARIN

3P603

P601

6

0.50

0.50

0.50

6

3P606

P604

6

A6176

3

A605

9

6

A601

6

B617

B609

6

6

B6066

3

B601

6

D615

3

3

C603

D601 D602

D603 D604

3

36

P622

P623P624

P631

P632 0.50

3

3

3

3

3

3

6

18

6

6

3

ROLLERSHUTTER

ACCESS TO RAMP

B &FN

OITUBI

RTSID

AERA

6

6

A613

6

6

A609

3

3

6 6

3

614.6

A618

3B618

3

A621 A622

3

B621 B622 3

3 13

OTCafé8.6

5

11.6

318

C6013

C604

C602

FR

FR

FR

FR

FR

FR

FR

FR

FR

EXIT

FR

EMER

GEN

CY

EXIT

D1

D2

D3

D4

D5

D6

EMER

GEN

CY

EXIT

FR

HR

HR

HR

HR

FR

AIR RETURNAIR RETURNAIR RETURNAIR RETURN

PA SYSTEMIT SERVER /

3 D

RAOB-B

US2

DRA

OB-BUS

SUB-BOARD 1

EMER

GEN

CY

EXIT

EMER

GEN

CY

EXIT

Hall 6 (Ground Level)

UPDATED AS OF 8 MARCH 2018

MALAYSIA NATIONAL PAVILION

IN-SITU

A-HAK

WASCO NGL TECH

MIDA CITECH

EUREKAEFEKTIF

BARAKAH BIZWORTHPETROSEAL

KEJURUTERAANTRILLENNIUM

LAMAN ASIA

DPI GROUP

REDTECH

AWALTEK TNB REPAIR &MAINTENANCE

TURCOMP

SERIMATIK

B620

1.0

3.0

3.0

3.0

3.0

3.0

2.5

2.5

1.5

2.6

3.73

3

2.5

2.6

2.5

2.6

1.15

3.0

3.0

3.0

3.0

3.0

3.0

3.0

2.6

2.5

2.5

3.0

1.5

1.15

WIRECO RADEXPRO

CERAM-KOTE

RIGZONEINFLATABLEPACKERS

A*STAR

LUX ASSURE

SQA

OMEGAWELL

BOCCARD

CHANGZHOUHUALI

SENKO

ZILICORR LEAK

WUXIQIANHAN

3

B6133

6

B615 B6163

3

CRESCENTENGINEERING

IO SETIA ATLASMERGER

PIETRO FIORENTINID609

NOV

D617 D618

D619 D620TROLEX

KOC OTP TIANJINGHUILITONG

TOOLS &MACHINERY

P609ICEP

UNIVERSITYR&D

SHOWCASED607 D6083

TSMARITIME PSS