India’s Project Database Vol. 12 No. 5 l September 1, 2016 www.ProjectReporter.co.in 182 Projects & Tenders Annual Subscription: `3500/- (Downloadable PDF) ® Project Reporter 1 September 1, 2016

Transcript of 182 Projects & Tenders - योजना तथा वास्तुकला ... · PDF...

India’s Project DatabaseVol. 12 No. 5 l September 1, 2016www.ProjectReporter.co.in

182 Projects & Tenders

Annual Subscription: `3500/- (Downloadable PDF)

®

Project Reporter • 1 • September 1, 2016

Project Reporter • 2 • September 1, 2016

Project Reporter • 3 • September 1, 2016

Highlights

PROJECT SNO.SECTORIndia’s Project Database

India Opportunities � � � � � � � � � � � � � � � � � � � Pg 4

Focus: Hydro Power Projects� � � � � � � � � � � Pg 34

Power Statistics � � � � � � � � � � � � � � � � � � � � � Pg 39

Economic Statistics � � � � � � � � � � � � � � � � � � Pg 40

Road Watch� � � � � � � � � � � � � � � � � � � � � � � � � Pg 43

www.ProjectReporter.co.inPublished by: ASAPP Info Global Services Pvt Ltd, A-303, Navbharat Estates, Zakaria Bunder Road, Sewri (West), Mumbai-400 015. Tel: 022-24193000. Fax: 022-2417 5734.

Editor-in-Chief Pratap Vijay PadodeE-mail: [email protected]@ProjectReporter.co.in

Executive EditorSandeep Sharma*[email protected]

[email protected].: 022-2419 3000 / 6526 7838

Branch Offices• Delhi: Tel: 011 - 4131 5000 / 4656 1818• Bangalore: Tel: 080 - 4556 4556• Pune: Tel: 020 - 2605 2987 / 020-6602 5990• Chennai: 044 - 4299 1234

Representative OfficesAustria, Switzerland & Germany Gunter Schneider - [email protected]

*Responsible for selection of news under the PRB Act. All rights reserved. While all efforts are made to ensure that the information published is correct, PROJECT REPORTER holds no responsibility for any unlikely errors that might have occurred. Printed and Published by Tarun Pal on behalf of ASAPP Info Global Services Pvt Ltd. And Published from A-303, Navbharat Estates, Zakaria Bunder Road, Sewri (West), Mumbai-400 015. Editor : Pratap Vijay Padode.The information on products and projects on offer is being provided for the reference of readers. However, readers are cautioned to make inquiries and take their decisions on purchase or investment after consulting experts on the subject. PROJECT REPORTER holds no responsibility for any decision taken by readers on the basis of information provided herein. Subject to Mumbai Jurisdiction only.

Airport � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � (1, 2,55, 66)Passenger terminal building at Jharsuguda . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 66Automobile � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(3)Automobile manufacturing unit in Tamil Nadu . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3Aviation � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(4, 67)Batteries � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(5)BPO � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(6)Canal/Dam/Irrigation � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(68)Implementation of tarped medium irrigation scheme . . . . . . . . . . . . . . . . . . . . . . . . . 68Cement � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(7)Chemicals and Fertilizers � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(8)Construction � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(9, 45, 69, 70)Medical college campus at Barmer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45Engineering� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(10)Food and Beverages � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � (11)Food Park � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(12, 56, 71, 72)Heavy Duty Storage Racks for Food Park . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12Gas pipeline � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(73)Healthcare � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(13, 14, 74)Child hospital at Pirjain village in Fatehgarh . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 74Hospitality � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(57, 58)Trance Greenfield hotel project . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58Housing � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(15)Industrial Park � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � (16 to 18, 59, 75)Industrial Park at Hyderabad . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18IT/ITES � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(60)Material Handling � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(46)Pet Coke Handling System in Haldia . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46Oil and Gas � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(19)Expansion of Visakh Refinery . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19Ports & Shipping � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � (20 to 22)VOC port development works . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22Power� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � (47, 76 to 78)765 KV transmission line works for Bhuj-Banaskanta . . . . . . . . . . . . . . . . . . . . . . . . 47Railways � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � (23 to 33, 61 to 63, 79 to 81)Sabari railway line project . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28Doubling of Daund-Gulbarga section . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 80Renewable Energy � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(48, 64, 82)Ghatampur Thermal Power Project . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 48Roads/Highways/Bridges � � � � � � � � � � � � � � � � � � � � � � � � (34, 35, 49 to 51, 83 to 87)Sangareddy-Choutuppal road development. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35Shopping Mall� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(36)Smart Cities � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(37)Telecom � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(38, 38, 88)Tourism � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(40)Transport � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(65)Tyres � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(89)Water Sanitation � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(90)Water Sector � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � (41, 52 to 54)Water Treatment � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(42, 43)120 MLD capacity water treatment plant at Sarthana . . . . . . . . . . . . . . . . . . . . . . . . 43Wires & Cables � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(44)Wire-rod plant at Dahej . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44

PROJECTS ARE CLASSIFIED AS FOLLOWS:Conceptual / Planning Stage (1 to 44)

Contract Award (45 to 54)

Project Update / Commissioned Project (55 to 65)

Under Implementation Stage (66 to 90)

Realty Projects (91 to 99)

Consultancy Bids (100 to 109)

B2B Opportunities (110 to 139)

Equipment Tenders (140 to 153)

Industrial Projects (154 to 182)

Project Reporter • 4 • September 1, 2016

Revival of Uran road biogas plant Panvel Municipal Council

(PMC) plans to revive the defunct 5 MT bio-gas plant located in the market yard area on Uran road. The plant was functional from 2008 to 2014. Bhabha Atomic Research Centre (BARC) has submitted a revival proposal that would cost around Rs 25 lakh. BARC has recommended various modifications and measures to revive the plant.

INDIA OPPORTUNITIESAIRPORT CEMENT

BIO-GAS

HOSPITALITY

LOGISTICS PARK

Greenfield airport may come at Rajgurunagar

Pune International Airport project is likely to take off soon. In the first week of September, the Airport Authority of India (AAI) technical team is likely to visit and conduct preliminary study of Rajgurunagar, near Khed Special Economic Zone. The Greenfield airport project will come up at Rajgurunagar or Chakan is still not decided. As per media reports, around 1,500 hectare would be provided for the airport development. Out of this around 60 per cent would be private land and the rest would be provided by the government.

MHA allows Voluptas to bid for Navi Mumbai AirportThe consortium of Voluptas Developers (Hiranandani Group)

and Zurich Airport got a green signal from the Union ministry of home affairs (MHA) to go ahead and participate in Navi Mumbai Airport project. The project is likely to face further delay with the entry of the fourth player. Cidco had already issued the RFP document to the existing three players and now have to issue RFP documents to the Voluptas Developers (Hiranandani Group) and Zurich Airport consortium. The bid submission deadline would be extended in this regard as more time would be required by the fourth player.

Sagar Cement plans expansion

Sagar Cements is one of the prominent player in the field of cement in the state of Andhra Pradesh for more than three decades. Different varieties of cement like Ordinary Portland Cement (OPC) of 53 grade, 43 grade, Portland Pozzolana Cement (PPC) and Sulphate Resistant Cement (SRC) are manufactured and sold by the company under the Brand Name “Sagar”. The company plans to invest Rs 100 crore in the current financial year to increase the production capacity. Around Rs 45 crore of investment is planned for the next financial year.

The proposed investment includes around Rs 66 crore for acquisition of Toshali Cements unit comprising 1,81,500 tonne grinding unit located at Bayyavaram in Vizag district of Andhra Pradesh. Sagar Cement proposes to scale up capacity to 3,00,00 tonnes per annum with an additional capital expenditure.

IRCTC proposes budget hotel in SawantwadiIRCTC proposes to construct a 30-bed budget hotel in

Sawantwadi benefiting the passengers. The project is under consideration. Deepak Kesarkar, Minister of state for home (rural) is keen to follow it up with the state government and the railway administration.

Allcargo to set up logistics park near DelhiAllcargo Logistics is planning to set up a logistics park at

Jhajjar in the state of Haryana on the outskirts of Delhi. Land is likely to be acquired at Rs 200 crore. Apart from the company is looking to set up a container freight station (CFS) in Kolkata which would involve investment of Rs 40 crore for land in the current fiscal. The company further plans to invest Rs 30 crore for the projects and equipment business.

Project Reporter • 5 • September 1, 2016

India Opportunities

RAILWAYS

ROADS/HIGHWAYS/BRIDGES

RENEWABLE ENERGY

PCMC undertakes road widening projectThe municipal corporation is undertaking road widening

project. So far four roads are widened out of 15 planned which includes 12km Nigdi-Dapodi highway stretch, 45-metre Aundh Ravet BRTS corridor - Nashik Phata to Wakad, and another road in Pimple Saudagar. The road stretch between Alandi Road and Pimpri Dairy Farm Road going to Pimprigaon and Pimpri Camp are pending for widening.

NLC commences work on 3rd solar plant at NevyeliNLC India Ltd is setting up its third solar power plant spread

over 325 acre in Neyveli. The plant would have a capacity of 65 MW in Neyveli and is likely to cost Rs 350 crore. The commissioning is targeted by June, 2017. BHEL is the EPC contractor for this project. Approximately 2.38 lakh solar photovoltaic module each with power generating capacity between 280 and 310watt would be installed. Power will be fed to Tamil Nadu generation and distribution corporation (Tangedco).

Jakson is implementing solar power project for NLCJakson Engineering Ltd is implementing the solar power

project with a capacity of 65 MW for NLC India Ltd. Jakson is the EPC contractor for this project. The work is on and the commissioning is likely to complete by June, 2017. Power generated from the plant will be fed to the Tangedco.

Waaree Energies installs rooftop solar plant at Growel MallWaaree energies is one of the prominent Solar PV module

manufacturer in India with a capacity of 500 MW at its plant near Surat in the state of Gujarat. The company has recently

EAST-WEST Signal Free Corridor in Delhi

The Government Of NCT Of Delhi has planned 20-km long East West corridor starting from Anand Vihar railway terminal - New Delhi railway station - Punjabi Bagh in West Delhi. The government has written a letter to the Delhi Division of Northern Railways and have planned an integrated signal free East-West corridor as a joint initiative. The benefit would be in terms of travel time being cut down from 90 minutes to 30 minutes. The estimated cost of this elevated rail corridor project would be Rs 2,500 crore. The corridor will have at least six access roads to points like Karkardooma, ITO, DDU Marg, New Delhi station and Punjabi Bagh among others.

Private sector investment sought for Kolhapur-Vaibhavwadi railway line

Union railway minister Suresh Prabhu is keen to take up construction of Kolhapur-Vaibhavwadi railway line on priority. The project was announced in the Railway budget 2016-17. Indian Railways also proposes to extend this line to the Vijaydurg port. The funds for the project would be raised through extra budgetary resources mainly through private investment. As of now, the detailed project report preparation is in the last phase.

Rail minister approves Sawantwadi Terminus Phase-IISawantwadi Terminus construction Phase-I got over in June,

2016 at a cost of Rs 11.42 crore. The Railway Minister Suresh Prabhu has sanctioned Phase-II works of Sawantwadi Terminus. The infrastructure work that would be taken up in this phase includes construction of terminus building, ticket window, waiting hall, and train watering arrangement.

MOU for rail line connecting Jaigarh PortJaigarh Port Ltd has signed a memorandum of understanding

with the Konkan railway to construct a rail line that will connect the port with Dingni railway station. Jaigarh port is estimated to invest Rs 770 crore out of the overall project cost of Rs 1,100 crore.

RIDF for remunerative projectsIndian Railways is planning to set up a special fund named

‘Railways of India Development Fund (RIDF)’ with Rs 30,000 crore. The aim is to use these funds for undertaking remunerative projects across the country mainly with regard to expansion and modernisation of rail infrastructure. Multilateral funding agencies like World Bank, National Infrastructure Investment Fund, pension and insurance fund and other institutional investors are likely to be part of this fund. Funds would be invested only in those rail projects which promises higher rate of return in the range of 14-16 per cent such as redevelopment of stations and new lines for

freight movement. Before taking up the project, a detailed survey would be conducted. The cabinet nod will be sought before setting up the infrastructure fund. A survey will be carried out before taking up the project. Projects with minimum rate of return ranging between 14 per cent and 16 per cent will be taken up by the RIDF. The cabinet nod will be taken before setting up this infrastructure fund.

Karad-Chiplun railway lineKarad-Chiplun railway line announced in the last railway

budget has moved forward. The Government of Maharashtra and the Konkan Railway Corporation Ltd have roped in a private sector partner for the construction of this line and memorandum of understanding was signed in this regard on August 14, 2016 in Mumbai.

Centre plans redevelopment of 400 stations across the country

Boston Consulting Group (BCG) the global management consulting firm has got the contract from Indian Railways at an estimated value of Rs 8 crore. BCG will analyse the identified stations and advise the Government of India on the best way forward for the redevelopment of the 400 stations across the country.

Project Reporter • 6 • September 1, 2016

India Opportunities

completed installation of solar rooftop panels at Growel’s corporate office located in Growel’s Mall located at Kandivali suburb in Mumbai. The comprehensive solar panel system was installed using Waaree’s exclusive 310 Watt-peak (Wp) modules and are powered by 33kW and 40 kW Huawei inverters. The solar energy generated by this system is projected to reach 2,79,000 units per year.

Hitesh Doshi, Chairman & Managing Director, Waaree Energies has said, “At Waaree Energies, we aim to eventually establish solar power as the most viable alternative to grid. With our latest solar panel system at Growel’s, we wish to achieve the same while also helping the establishment in significantly reducing its carbon footprint. Our plan is to gradually introduce multiple solar projects across India in hopes of creating a self-sustaining system that promises energy conservation in the long run.”

SMART BUILDINGS

WIRES & CABLES

TELECOM

WASTE-TO-ENERGY

TECH PARK

Gionee gearing up to set a new manufacturing unit in IndiaSmartphone manufacturer Gionee

is looking forward to set up its own manufacturing plant in India. Arvind Vohra, Gionee India CEO and MD Arvind Vohra is not in favour of running after online sales model, instead focusing on build its brand for long term sales offline. With regard to setting up its production unit, the company is in the process of finalising land somewhere in Northern India and expects the plant to be ready in two years. Around 50-acre of land will be used for setting up this unit as per media reports which could churn out 30 million units per annum.

Jivi Mobiles to set up new unit at LonavalaJivi Mobiles plans to set a new manufacturing unit

for churning out mobile phone at Lonavala in the state of Maharashtra. The investment is estimated to be around Rs 200 crore. The production capacity would be around 5 lakh units per month. Jivi Mobiles CEO Pankaj Anand is optimistic of selling 10 lakh units per month by 2017-18.

Bhubaneswar civic body plans smart office The Bhubaneswar

Municipal Corporation (BMC) plans to build a smart office comprising a state-of-the-art building with seven floors, which will be its new head office at Unit-VIII.. The project is estimated to cost Rs 33 crore. Administrative approval from the government is awaited. It is likely that the work of the new office would start soon. The project comprises two basement parkings, conference hall, corporation lounge, recreation, media gallery, sprawling garden on the ground floor and a rooftop.

Ascendas-Singbridge unveils International Tech Park Gurgaon (ITPG)

Ascendas-Singbridge, Asia’s leading sustainable urban and business space solutions provider, has recently announced the launch of International Tech Park Gurgaon (ITPG), an integrated IT park within the upcoming business district in India’s National Capital Region (NCR). ITPG is being set up near Sector 59, Gurgaon spread over 60-acre. The project comprises 8 million sqft of international standard business space catering to an estimated 60,000 professionals. The project also includes spacious food courts and conveniences such as banking, transport and covered parking spaces. The first phase of the project comprises two buildings offering approximately 1 million sqft of Grade-A business space. Currently under development, the first building in Phase 1 is scheduled to be completed in Q4 of 2017.

Sanjay Dutt, CEO, India Operations, Ascendas-Singbridge India, said“Gurgaon is the focal point of economic growth in NCR and second largest office market in India with significant investments made by large multinational corporations.With over two decades of experience in India, we will bring our best practices to ITPG and provide best-in-class business space and asset management services in Gurgaon, offering our clients an attractive business environment to operate in.”

Waste-to-Energy project planned for Agra Agra Municipal

Corporation is actively working on the waste management system for the last three years. The civic body has decided to set up waste-to-energy project. Even it was decided to sign a contract with multinational company Spark Bresson to produce energy out of municipal solid waste (MSW). The said company has sought approval from Uttar Pradesh Pollution Control Board (UPPCB) and applied for selling electricity with the state energy department.

BWRL set up Wire ropes greenfield unit at ChalisgaonWire ropes manufacturer has set up a new Greenfield project in

MIDC, Chalisgaon, Maharashtra at an investment of Rs 507 crore. The plant capacity is spread over spread over a sprawling 64-acre land and has got an installed capacity of 66,000 MTPA. The wire ropes with diameter ranging between 6 mm and 125 mm, and tensile strength up to 2160 N/sq. mm will be produced at this unit. Mayank Mittal, Director of Operations says, “We have managed to make our Chalisgaon facility fully functional in a record time of eighteen months - a feat that we at BWRL are proud of.

**Images used are for illustration purpose only.

PROJECTS

CONCEPTUAL / PLANNING STAGE

Project Reporter • 7 • September 1, 2016

Project Reporter • 8 • September 1, 2016

*Figures are approximate ( `. Crore)

Sno Organisation Project Title / Details Location Budget* Contacts Sector

Conceptual/Planning Stage

1 Airport Authority of India (AAI)

The survey works in the Pettah and Muttathara villages have commenced for the expansion of Thiruvanan-thapuram International Airport. The district administration is undertaking the survey works to acquire 8 hectare of land for further airport development. Airports Authority of India had been insisting on the state government for providing 32.8 hectare to set up a new domestic terminal and ancillary facilities.

Thiruvanan-thapuram Kerala

NA P.C. Mahavar, First floor, Technical Block, AAI, Trivandrum International Airport, Thiruvananthapuram-695008, Karela. T: 0471-2501464, 2702600, Extn-2303, [email protected], (George.G.Tarakan)

Airport

2 Airport Authority of India (AAI)

Tiruchirapalli International Airport expansion is planned. Around 370 acre of the 510 acre of land required is already acquired. AAI is scouting for a consultant to handle the expansion project. Tenders have already been floated. The work is expected to commence before March 2017

Tirucharapalli Tamil Nadu

740.00 K Gunasekaran, Airport Director, Tiruchirapalli Airport, Tiruchirapalli-620007, Tamil Nadu. T: 0431-2341810, 2341547, M: 7373774163, F: 0431-2341812, [email protected]

Airport

3 KIA Motors A part of Seoul-based automobile manufacturer Hyundai Motors plans to set up manufacturing unit in Tamil Nadu. The state government has offered about 400 acre of land for the same.

Tamil Nadu NA 1) Han-Woo Park, CEO & President, 231, Yangjae-dong, Seocho-gu, Seoul, 137-938, South Korea. T: +82 2 3464 1114, F: +82 2 3464 6845, www.kia.co.kr. 2) 12, Heolleung-ro, Seocho-gu, Seoul, Korea. [email protected]

Automobile

4 Ministry of Civil Aviation

Plans to set up 50 regional airports over the next three years to enhance air transportation. Ten of these airports would be ready by the end of this year. The cost of each of these airports would be about Rs. 50-100 crore.

Nationwide 50-100 Arun Kumar, Joint Secretary (AK), MCA, B Block, Rajeev Gandhi Bhavan, New Delhi-110003, Delhi. T: 011-24643246, [email protected], (Civil Aviation Minister Ashok Gajapathi Raju)

Aviation

5 Okaya Power Pvt Ltd

Battery manufacturer plans investment to expand business and build around 200 warehouses across the country.

Multiple 1,000.00 Navin Sharma, Vice President (Media Relations & Advertising), D-7,Udyog Nagar, Rohtak Road, New Delhi-110041, Delhi. T: 011-49803300, [email protected], (Rajesh Gupta, Director)

Batteries

6 HDFC Bank Ltd

Plans to set up a 200 seater business process outsourcing (BPO) centre in IT park at Bhubaneswar. The centre would be operational by mid 2017.

Bhubane-swar Odisha

NA Neeraj Jha, Head (Corp Comm), HDFC Bank House, Senapati Bapat Marg, Lower Parel (West), Mumbai-400013, Maharashtra. T: 022-66521308, 66521000, [email protected], [email protected] www.hdfcbank.com (Aditya Puri, MD)

BPO

7 Birla Corporation

Plans to set up 3 MTPA clinker plant in Maharashtra.

Maharashtra Maharashtra

NA 1) Alok Agarwal, Executive President, 1, Shakespeare Sarani 2nd Floor, Kolkata-700071, West Bengal. T: 033-66033300 to 3302, F: 22884426, [email protected], 2) B. Matila, Corporate Communication 1, Shakespeare Sarani 2nd Floor, Kolkata-700071, West Bengal. T: 033-66033300 to 3302, [email protected], (B R Nahar, MD)

Cement

Project Reporter • 9 • September 1, 2016

*Figures are approximate ( `. Crore)

Sno Organisation Project Title / Details Location Budget* Contacts Sector

Conceptual/Planning Stage

8 Mangalore Chemicals and Fertilisers (MCFL)

Plans to set up an additional Diammo-nium phosphate (DAP) and NPK fertiliser capacity of one million tonne per annum (TPA), 1,40,400 TPA of urea, 81,000 TPA of ammonia and 18,000 TPA of Poly carboxyl Ether (PCE) plants in Mangalore under its expansion plan. Environmental impact study is being conducted.

Mangalore Karnataka

1,547.00 1) K K Sharma, Head (Corporate Affairs), Flat No.1002, 10th Flr, Bhikaji Cama Bhavan, Bhikaji Cama Place, New Delhi - 110066, Delhi. T: 011-26181760 2) Shakun Udupa, Project Manager, Panambur, Mangalore-575010, Karnataka. T: 0824-2220621, [email protected], (N Suresh Krishnan, MD)

Chemicals and Fertilizers

9 Ministry of Food and Consumer Affairs

Plans to set up a Centre of Excellence (CENEX) on food security in Delhi. The proposed centre would be an institution which will act as an inter-ministerial think-tank and support government initiatives.

Delhi NA Manoj Kumar, Joint Secretary, Krishi Bhawan, New Delhi-110001, Delhi. T: 011-23382956, [email protected]

Construction

10 Tube Invest-ments of India (TII) Ltd

Murugappa Group company plans investment to expand its tube manufacturing capacity.

Chennai Tamil Nadu

40-50 Sandanand, Senior General Manager, (Project), Dare House, 2, (Old No. 234), N S C Bose Road, Chennai-600001. T: 044-42177770-6, F: 42110404, M: 9840708581, (L Ramkumar, MD)

Engineering

11 Kaira District Co-opera-tive Milk Producers Union Ltd

Amul Dairy has signed a MoU with Khed Economic Infrastructure Pvt. Ltd. (KEIPL) for setting up a state-of-the-art Ice Cream manufacturing facility at Khed. The facility is likely to come up over 4,200 acre of land and com-mence operation in 12-18 months.

Pune Maharashtra

120.00 Amit Vyas, General Manager (Projects and Engineering), Amul Dairy, Anand-388001, Gujarat. T: 02692-225638, 256124, 256224, 256324, F: 240225, [email protected] (Dr. K. Rathnam, MD)

Food and Beverages

12 Jangipur Bengal Mega Food Park Pvt. Ltd

The company is looking to assign the design, manufacturing, supply and erection of Heavy Duty Storage Racks for its Mega Food Park Project at Raghu-nathganj 1 Block, Jangipur Subdivision, Murshidabad District, West Bengal.

Murshi-dabad West Bengal

1.50 A.Sarker, Senior Manager (Buisiness Development), DB 67 Sector I Salt Lake City, Kolkata-700064, West Bengal. T: 033-23348775, (Ajijur Rehman, Managing Director)

Food Park

13 Cytecare Plans to launch 150 bedded cancer speciality hospital in Bengaluru. The completion is targeted by November 2016.

Bengaluru Karnataka

165.00 Suresh Kumar, Project Manager, Cyte Space Reasearch Pvt Ltd, 1st Floor, Nitesh Timesquare, No-8, M G Road, Bengaluru-560001, Karnataka. T: 080-65681912

Healthcare

14 Road Transport Authority (RTA)

Telangana government has planned to set up 19 trauma care centres (TCCs) in addition to its existing 13 TCCs. Six government hospitals and 13 private hospitals are identified to set up the trauma care centres under the NTR Vaidyaseva programme.

Hyderabad Telangana

NA S.A.V. Prasada Rao, Joint Transport Commissioner (I.T,V&E&Road Safety), 3rd Floor, Dr Ambedkar Transport Bhavan, Khairtabad, Hyderabad - 500004, Telangana. T: 040-23321263, F: 23321263, [email protected], M: 9948838599, (LSM Ramasree, Deputy Transport Commissioner)

Healthcare

15 The Pimpri Chinchwad Municipal Corpora-tion

The corporation has invited bids for appointing an agency for conducting the survey in all the six zones of the city. The corporation will provide the survey agency all the existing information about housing beneficiar-ies of the National Urban Renewal Mission and slum dwellers.

Pimpri Maharashtra

NA Prakash Thakur, Deputy Director, Town Planning, Ground floor, Main building PCMC, Pimpri-411018, Pune, Maharashtra. T: 020-67333333, [email protected], (Dinesh Waghmare, I.A.S., Commissioner)

Housing

16 Andhra Med Tech Zone Ltd

Plans to set up medical devices manufacturing park spread over 226 acre at Nadupuru in Peda Gantyada mandal near Visakhapatnam Steel Plant. The foundation stone has been laid recently.

Vishakapat-nam Andhra Pradesh

NA Jitendra Sharma, CEO, AMTZ, Hill No. 2, IT Park, Madhurwada, Distt Visakhapat-nam, Andhra Pradesh. T: 8885092122, [email protected], www.amtz.in (Poonam Malaykondaya, MD)

Industrial Park

Project Reporter • 10 • September 1, 2016

*Figures are approximate ( `. Crore)

Sno Organisation Project Title / Details Location Budget* Contacts Sector

Conceptual/Planning Stage

17 Hiranan-dani Communi-ties

Plans to set up its first industrial park at Pune over 250 acres of land in phases. The phase one is planned over 50 acre and construction is likely to start by the end of the year.

Pune Maharashtra

500.00 Chintan Khona, General Manager (Commercial Sales), 1st Floor, Olympia , Central Avenue, Hiranandani Business Parks, Hiranandani Gardens, Powai, Mumbai-400076, Maharashtra. T: 022-25763705, F: 25706450, M: 9619185041, [email protected], [email protected] (Niranjan Hiranandani, CMD)

Industrial Park

18 Telangana State Industrial Infrastruc-ture Corpora-tion (TSIIC)

TSIIC and Hyderabad chapter of FICCI Ladies Organisation (FLO) plans to set up a Women Entrepre-neur's Industrial Park over 50 acre of land Hyderabad. The park will house women-owned and women-run businesses.

Hyderabad Telangana

200.00 Suraj Kumar, Marketing Manager, Parisrama Bhavan, 6th Floor, 5-9-58/B, Basheerbagh, Fateh Maidan Road, Hyderabad-500004, Telangana. T: 040-23237625/26 (Extn.565), F: 23240205, M: 9951955044, [email protected], (E V Narasimha Reddy, VCMD)

Industrial Park

19 Hindustan Petroleum Corpora-tion Ltd

The expansion of Visakh Refinery is approved by HPCL board. The project aims to expand the refining capacity from the current 8.33 mmtpa (Million metric tonne per annum) to 15 mmtpa. Environmental clearance for this project is already received. Around 167.5 acre of land is required. The expansion project would include a 9 mmtpa new crude distillation unit, 2.5 MMTPA slurry hydrocracker unit, solvent de-asphalting unit of 2.5 mmtpa, full conversion hydrocracker unit, 96 TPD propylene recovery unit and various other works.

Vishakhapa-tnam Andhra Pradesh

20,928.00 Rajeev Goel, Dy. General Manager (PR and CC), 3rd floor, Petroleum House, 17, Jamshedji Tata Road, Mumbai-400020, Maharashtra. T: 022-22845158, 22863315, 22863243, [email protected], (Nishi Vasudeva, CMD)

Oil and Gas

20 Mumbai Port Trust (MbPT)

Plans to revamp port trust land on the eastern coast of Mumbai. Consultant services is sought to prepare a master plan to develop the port land compris-ing marina, a tourist village, passenger terminal, etc.

Mumbai Maharashtra

NA Shekar Lagwankar, Superintendent Engineer, Port Bhavan, Surjiwallabdas Marg, Ballard Estate, Mumbai-400001, Maharashtra. T: 022-66564040, (Ravi Parmar, Chairman)

Ports & Shipping

21 IL&FS Engineer-ing and Construc-tion Company Ltd

Plans to set up a captive port in Cuddalore district in Tamil Nadu. The port will be developed and run by Adani Port. The proposed port will handle 15-25 million tonnes per annum (MTPA) of imported coal for the power plant and it will have two coal berths of 600 metre length with breakwaters.

Cuddalore Tamil Nadu

300.00 Tarun Kumar Udwala, Sr Manager (Corp Comm), Door No. 8-2-120/113/3, 4th Floor, Sanali Info Park, Road No. 2, Banjara Hills, Hyderabad-500033, Telangana. T: 040-40409333, F: 40409444, [email protected], [email protected], (M D Khattar, MD)

Ports & Shipping

22 V.O. Chidam-baranar Port Trust

The port trust plans to undertake development of shallow draught berth for handling general cargo, north cargo berth- III for handling coal, north cargo berth- IV for handling containers and clean cargo. Apart from this the port aims to construct truck parking terminal, upgradation of coal jetty-I and coal jetty-II, installation of 5 MW solar power plant and other related works.

Tuticorin Tamil Nadu

1,531.31 Balamurali, Assistant Executive Engineer, Tuticorin-628004, Tamil Nadu, T: 0461-2352252, 2352290, 2352500, M: 9677456479, [email protected], (S P Patel, Chief Engineer)

Ports & Shipping

Project Reporter • 11 • September 1, 2016

*Figures are approximate ( `. Crore)

Sno Organisation Project Title / Details Location Budget* Contacts Sector

Conceptual/Planning Stage

23 Indian Railways

The Cabinet Committee on Economic Affairs has recently approved the construction of third line with 287.67 km length between Vijaywada Junction and Gudur Junction. The completion is targeted in six years.

Vijaywada Andhra Pradesh

3,246.26 Anil Saxena, Additional Director General (PR), Room No. 310, Rail Bhavan, Raisina Road, New Delhi-110001, Delhi. T: 011-23381332, 23303665, M: 9810046241, 9868679525, F: 23385215, [email protected]

Railways

24 Northeast Frontier Railway

Plans to undertake construction of second line between New Bongaigaon and Kamakhya in Assam covering length of 176-km. The project is recently approved by the Cabinet Committee on Economic Affairs. The completion is targeted during 12th and 13th Plan period.

Bongaigaon Assam

2,232.32 A K Yadav, Chief Engineer/Con-II, N.F.Railway, Maligaon, Maligaon, Guwahati-781011, Assam. T: 0361-2571794, M: 9957556201, [email protected]

Railways

25 Indian Railways

The proposal to undertake construction of fourth line between Jharsuguda and Bilaspur covering 206 km has got the approval from the Cabinet Committee on Economic Affairs recently. Jharsuguda-Bilaspur route forms a part of Howrah-Mumbai trunk route passing through major industrial areas. The completion is targeted in five years.

Bilaspur District Chhattisgarh

1,973.46 Anil Saxena, Additional Director General (PR), Room No. 310, Rail Bhavan, Raisina Road, New Delhi-110001, Delhi. T: 011-23381332, 23303665, M: 9810046241, 9868679525, [email protected]

Railways

26 Indian Railway Station Development Corporation (IRSDC)

IRSDC along with China Railway Construction Engineering Group are likely to take up development of Baiyappanahalli station in Bengaluru, Karnataka under the proposed Foreign Rail Technology Cooperation Scheme (FRTCS).

Bengaluru Karnataka

NA Parag Verma, Chief Operating Officer, 4th, Floor, Palika Bhawan, Sector XIII, R.K.Puram, New Delhi-110066, Delhi. T: 011-24672718, 24672719, 24672723, F: 24672720, [email protected], [email protected], (S.K Lohia, CEO, [email protected])

Railways

27 Indian Railways

Plans to construct 168.289 KM broad gauge railway line from Hubli to Ankola in Uttara Kannada District. The Supreme Court-appointed Central Empowered Committee (CEC) had disapproved this project in 2015 citing irreparable damage likely to be caused to the ecology. The National Green Tribunal gave its nod to Railways in February, 2016 and had recommended to take this further with the state government and can apply for converting forest land into non-forest land.

Hubballi Karnataka

NA Anil Saxena, Additional Director General (PR), Room No. 310, Rail Bhavan, Raisina Road, New Delhi-110001, Delhi. T: 011-23381332, 23303665, M: 9810046241, 9868679525, F: 23385215, [email protected]

Railways

28 Indian Railways

The Government of Kerala has asked the Railways to implement the Sabari railway line project. The project is likely to benefit Ayappa pilgrims who visit Sabarimala every year. The proposed line starts from Angamally in Ernakulam district and ends at Erumelli. The railways insist on the state government to bear part of the cost which is not agreeable to the state as it's an old project.

Ernakulam District Kerala

1,566.00 Anil Saxena, Additional Director General (PR), Room No. 310, Rail Bhavan, Raisina Road, New Delhi-110001, Delhi. T: 011-23381332, 23303665, M: 9810046241, 9868679525, F: 23385215, [email protected]

Railways

Project Reporter • 12 • September 1, 2016

*Figures are approximate ( `. Crore)

Sno Organisation Project Title / Details Location Budget* Contacts Sector

Conceptual/Planning Stage

29 Indian Railways

The Cabinet Committee on Economic Affairs has recently approved the construction of third line between Jhansi and Bina covering 152.57-km length. The completion is targeted in four years.

Jhansi Madhya Pradesh

2,001.63 Anil Saxena, Additional Director General (PR), Room No. 310, Rail Bhavan, Raisina Road, New Delhi-110001, Delhi. T: 011-23381332, 23303665, M: 9810046241, 9868679525, F: 23385215, [email protected]

Railways

30 Indian Railways

The Cabinet Committee on Economic Affairs has recently given its approval for construction of third line between Itarsi and Nagpur covering 280 km length. The completion is targeted in five years.

Nagpur Maharashtra

2,449.91 Anil Saxena, Additional Director General (PR), Room No. 310, Rail Bhavan, Raisina Road, New Delhi-110001, Delhi. T: 011-23381332, 23303665, M: 9810046241, 9868679525, F: 23385215, [email protected]

Railways

31 Indian Railway Station Development Corporation (IRSDC)

IRSDC along with China Railway Construction Engineering Group are likely to take up development of New Bhubaneswar in Odisha under the proposed Foreign Rail Technology Cooperation Scheme (FRTCS).

Bhubane-swar Odisha

NA Parag Verma, Chief Operating Officer, 4th, Floor, Palika Bhawan, Sector XIII, R.K.Puram, New Delhi - 110066, Delhi. T: 011-24672718, 24672719, 24672723, F: 24672720, [email protected], [email protected], (S.K Lohia, Chief Executive Officer, [email protected])

Railways

32 Indian Railways

The Cabinet Committee on Economic Affairs has recently approved the construction of third line between Ballarshah and Kazipet covering 201.04 km length. The completion is targeted in five years.

Kazipet Telangana

2,063.03 Anil Saxena, Additional Director General (PR), Room No. 310, Rail Bhavan, Raisina Road, New Delhi-110001, Delhi. T: 011-23381332, 23303665, M: 9810046241, 9868679525, F: 23385215, [email protected]

Railways

33 North Eastern Railway

Plans to construct new line between Mau station of North Eastern Railway and Tarighat station of East Central Railway. The project was approved by the Cabinet Committee on Economic Affairs in June, 2016. This line would provide alternative route between New Delhi and Howrah.

Howrah West Bengal

1,765.92 Amit Kumar Singh, CPRO, N. E. Railway, Gorakhpur-273012, Uttar Pradesh. T: 0551-2201290, 2200587

Railways

34 Ministry of Road Transport, Highways and Shipping

The Centre is keen to invest in the development of the Belekeri port in Uttara Kannada as a ‘Gateway of Karnataka’ provided the state government sends a proposal in this regard.

Karnataka 4,000.00 Akil Ahmad, General Manager (Technical, Karnataka), G-5&6, Sector-10, Dwarka, New Delhi-110075, Delhi. T: 011-25074100, M: 9999188298, [email protected]

Roads/Highways/Bridges

35 Telangana Roads and Buildings Department

Plans to develop 140-km Sangareddy-Narsapur-Toopran-Gajwel-Jagdevpur-Bhongir-Choutuppal road and the 160-km Ibrahimpatnam-Amangal- Shadnagar-Chevella-Shankarpally-Kandi highway into regional ring road around the State capital.

Sangareddy Telangana

NA S Surender, Executive Engineer (R&B), National Highways Circle, Hyderabad, Telangana. T: 040 -23318800, M: 9440818105, [email protected]

Roads/Highways/Bridges

36 LuLu Group

Abu Dhabi-based retailer plans to develop second LuLu shopping mall with a built-up area of more than two million square feet across four floors along with the 150-room luxury hotel and convention centre.The foundation stone for this project has be laid. The completion is targeted by 2019.

Thiruvanan-thapuram Kerala

1,995.00 Y-Tower Building, Al Nahyan Camp, Abu Dhabi, U.A.E, P.O.Box: 4048, T: 971-24182000, [email protected]

Shopping Mall

Project Reporter • 13 • September 1, 2016

*Figures are approximate ( `. Crore)

Sno Organisation Project Title / Details Location Budget* Contacts Sector

Conceptual/Planning Stage

37 Ludhiana Smart City Ltd (LSCL)

AECOM Asia Ltd and Price Water House Coopers (PWC) are the Project Management Consultant (PMC) who will assist LSCL to design, develop, manage and implement Smart City Projects under Smart City Mission (SCM) in Ludhiana, Punjab. The consultants have started working on this project and are asked to submit estimates of various projects by September, 15, 2016.

Ludhiana Punjab

NA 1) Ghanshyam Thori (IAS), CEO, T: 0161-2454500, F: 25053539, M: 9779779970 2) V P Singh, GM (Project), PMIDC, Punjab Municipal Bhawan, Dept. of Local Govt., Punjab, Plot No. 3A, Sector 35-A, Chandigarh-160035. T: 0172-2619162, [email protected]

Smart Cities

38 Karbonn Mobiles Pvt Ltd

Indian smartphone and tablet brand Karbonn is coming up with its first manufacturing plant at Tirupati in the state of Andhra Pradesh.

Tirupati Andhra Pradesh

100.00 Naveen Gupta, Vice President (Sales & Distribution), D-170, Okhla Industrial Area, Phase-1, New Delhi-110020, Delhi. T: 011- 46604666, (Pardeep Jain, Managing Director)

Telecom

39 Gionee Syntech Technology Pvt Ltd

China-based smartphone maker plans to set up a manufacturing unit in India that would be operational in two years. Location is yet to be finalised.

NA 500.00 Apurv Bhargava, Head (Retail Sales), E-9. Block No. B-1, Ground Floor, Mohan Cooperative Industrial Estate, Mathura Road, New Delhi-110044, Delhi. T: 18002081166, [email protected] (Arvind Vohra, MD)

Telecom

40 Visakhapa-tnam port Trust

Plans to set up a museum on the maritime history of the region on the premises of the old lighthouse which was renovated and thrown open to the public in June last year.

Visakhapat-nam Andhra Pradesh

NA Harihara Rao, Chief Mechanical Engineer (Incharge), Port Area, Visakhapatnam-530035, Andhra Pradesh. T: 0891-2873210, 2873400 , 2563904, F: 2565023, [email protected] (M.T. Krishna Babu, I.A.S., Chairman)

Tourism

41 Airports Authority of India

Plans to assign the construction of overhead tank and sump at Tirupati Airport. Sub Head: Design, supply and installation of water treatment plant with PSF & ACF.

Tirupati Andhra Pradesh

0.80 Tresamm Joseph, Joint GM (Engg-Civil)-I, Tirupati Airport, Renigunta, Tirupati-517520, Andhra Pradesh. T: 0877-2275354, F: 2275353, [email protected], (H Pulla, Airport Director)

Water Sector

42 South Eastern Coalfields Ltd

Plans to assign construction of 2.25 MLD capacity water treatment plant including planning, designing. drawing, testing and commissioning and trial run on turnkey basis at GM complex of Bhatgaon Area.

Surguja district Chhattisgarh

1.42 M S Ahluwalia, General Manager (Civil), HQ, SECL Bhawan, Seepat Road, Post Box No 60, Bilas-pur-495006, Chhattisgarh. T: 07752-246301, 246302, M: 9425531229, [email protected], (B R Reddy, CMD)

Water Treatment

43 Surat Municipal Corpora-tion

Plans to assign design, construction, testing & commissioning of 120 MLD capacity water treatment plant at Sarthana Water Works, Surat on turnkey basis under Amrut (IB) Zero Liquid Discharge System for 590 MLD.

Sarthana Gujarat

46.11 K H Khatwani, Add.City Engineer (Elec./Elec. & Mech), Hydraulic Department, SMC, Surat, Gujarat. T: 0261-2423751, M: 9724345442, [email protected]

Water Treatment

44 Hindalco Industries

Plans to set up new wire-rod plant at Dahej with a capacity of 2.50 lakh tonne. The current production capacity of the company is around 1.50 lakh tonne. The plant will commence production by 2018.

Dahej Gujarat

250.00 Pragnya Ram, Group Executive, President-Corp Comm, S K Ahire Marg, Worli, Mumbai-400025, Maharashtra. T: 022-24995160, 66525000, [email protected], (Satish Pai, MD)

Wires & Cables

Project Reporter • 14 • September 1, 2016

CONTRACT AWARD

Project Reporter • 15 • September 1, 2016

*Figures are approximate ( `. Crore)

Sno Organisation Project Title / Details Location Budget* Contacts Sector

Contract Award

45 Nila Infrastruc-tures Ltd

Bagged an order from Engineering Projects (India) Ltd (EPIL) for the construction of medical college campus and residences at Barmer spread over 19.38 acre of land on NH-15. The development is of 300,000 sq. ft. The completion is targeted in 12 months.

Barmer Rajasthan

87.46 Jignesh Patel, Head (Project), 1st Floor, Sambhaav House, Opp.Chief Justice's Bungalow, Bodakdev, Ahmedabad-380015. Gujarat. T: 079-40036817, 26870258, [email protected] (Manoj Vadodaria, CMD)

Construction

46 Larsen & Toubro Ltd

The Metallurgical and Material Handling Business has bagged an order from Indian Oil Corporation Ltd for the construction of Pet Coke Handling System in Haldia.

Haldia West Bengal

NA Anupam Kumar, VP (Metallurgical and Material Handling), Godrej Water Site, Salt Lake City, Sector 5, Kolkata-700091, West Bengal. T: 033-44141562, [email protected], (S. N. Subrahmanyan Deputy Managing Director & President)

Material Handling

47 IL&FS Engineering and Construction Company Ltd

Bagged a PGCIL order along with Unitech Power Transmission for the turnkey works of 765 KV transmission line works for Bhuj-Banaskanta Transmission Line (Part-V) in Gujarat. The completion period is targeted in 23 months from the date of issue of the LOA.

Bhuj Gujarat 136.26 Tarun Kumar Udwala, Sr Manager (Corp Comm), Door No. 8-2-120/113/3, 4th Floor, Sanali Info Park, Road No. 2, Banjara Hills, Hyderabad-500033, Telangana. T: 040-40409333, F: 40409444, [email protected], [email protected], (M D Khattar, MD)

Power

48 Larsen & Toubro Ltd

The Power Business of Larsen & Toubro Ltd (L&T) through its joint venture company L&T-MHPS Boilers Private Ltd (LMB) has secured an order from Neyveli Uttar Pradesh Power Ltd. The contract includes design, engineering, manufacture, supply, erection and commissioning of 3x660 MW Ghatampur Thermal Power Project - Steam Generator and Auxiliaries package for NUPPL at Ghatampur Tehsil, Uttar Pradesh.

Ghatampur Uttar Pradesh

3,860.00 Vinod Chacko, Head (Corporate Communication), Mount Poonamallee Road, Manapakkam, P.B.No.979, Chennai-600089, Tamil Nadu. T: 044-22526000, 22526440, F: 22493317, M: 9841416233, [email protected], (Shailendra Roy, CEO and Managing Director-Power)

Renewable Energy

49 Gammon India

Bagged an order EPC order from NHAI for four laning of Hospet – Bellary – Karnataka / AP Border from Km.280.080 (Design Ch.) to Km.375.450 (Design Ch.), design length 98.370, NH-63 in the State of Karnataka under NHDP Phase-IVB on EPC mode.

Bellary Karnataka

869.99 Gita Bade, Company Secretary, Gammon House, Veer Savarkar Marg, P.O. Box No. 9129, Prabhadevi, Mumbai-400075, Maharashtra. T: 022-61153000, 61114000, 24306761, F: 24300221, [email protected], [email protected], www.gammonindia.com, (Abhijit Rajan, CMD)

Roads/Highways/Bridges

50 National Highways Authority of India (NHAI)

NHAI has issued Letter of Award (LOA) to H. G. Infra Pvt. Ltd for two laning with paved shoulder of Tonk – Sawaimadhopur section National Highway in Rajasthan under NHDP Phase-IV

Tonk Rajasthan

400.00 Vibhav Mittal, Project Director, A 575, Talwandi, Kota-324005, Rajasthan. T: 0744-2433396, 2980230, M: 8890300309, [email protected], [email protected]

Roads/Highways/Bridges

Project Reporter • 16 • September 1, 2016

*Figures are approximate ( `. Crore)

Sno Organisation Project Title / Details Location Budget* Contacts Sector

51 Dilip Buildcon Ltd

Bagged an order from NHAI for four laning of Lucknow-Sultanpur section of NH-56 from 11.500 km to 134 .70 km in the state of Uttar Pradesh under NHDP Phase IV on a hybrid annuity basis.

Lucknow Uttar Pradesh

2,016.00 Nitin Shrivastava, Project Manager, Plot No. 5, Inside Govind Narayan Singh Gate, Chuna Bhatti, Kolar Road, Bhopal-462016, Madhya Pradesh. T: 0755-4029999, F: 4029998, [email protected], (Devendra Jain, Executive Director and CEO)

Roads/Highways/Bridges

52 Larsen & Toubro Ltd

The Water & Effluent Treatment Business has bagged an order from the Rashtriya Ispat Nigam Ltd (RINL) for the construction of a second water storage reservoir in their Visakhapat-nam Steel Plant. The scope includes construction of an additional Balancing Reservoir of 12.32 million cubic meters storage capacity and erection of associated structures which will meet the water requirements and ensure uninterrupted production from the Vizag Steel plant taking care of its expansion plans too.

Visakhapat-nam Andhra Pradesh

NA S.Raja Vel, Sr VP (Water) Mount Poonamallee Road, Manapakkam, P.B.No.979, Chennai-600089, Tamil Nadu. T: 044-22526000, 22528000, [email protected], (S. N. Subrahmanyan Deputy Managing Director & President)

Water Sector

53 Larsen & Toubro Ltd

The Water & Effluent Treatment Business of the company has bagged an order from Public Health & Municipal Engineering Department (PHMED), Government of Andhra Pradesh for providing comprehensive Storm Water Drainage Scheme for Vijayawada city.

Vijayawada Andhra Pradesh

NA S.Raja Vel, Sr VP (Water) Mount Poonamallee Road, Manapakkam, P.B.No.979, Chennai-600089, Tamil Nadu. T: 044-22526000, 22528000, [email protected], (S. N. Subrahmanyan Deputy Managing Director & President)

Water Sector

54 Larsen & Toubro Ltd

The Water & Effluent Treatment Business has bagged an order from the Karnataka Urban Water Supply & Distribution Board (KUWSDB) for 24/7 Pressurized Water Supply for Tumkuru City. This contract encompasses upgrading the existing water supply system for conversion to 24/7 supply. The scope of the project includes improvements to the 50 MLD WTP, laying of 560 km pipeline network, metered house service connections and other associated infrastructure works

Tumkuru Karnataka

NA S.Raja Vel, Sr VP (Water) Mount Poonamallee Road, Manapakkam, P.B.No.979, Chennai-600089, Tamil Nadu. T: 044-22526000, 22528000, [email protected], (S. N. Subrahmanyan Deputy Managing Director & President)

Water Sector

PROJECT UPDATE / COMMISSIONED PROJECT55 Airports

Authority of India

AAI is undertaking the construction of new integrated Terminal Building at VSI Airport Port Blair. Bids are currently invited for the balance work. The completion is targeted in 42 months.

Port Blair Andaman and Nicobar Islands

404.73 R K Nirwal, General Manager (Engg-C), Directorate Of Engineering, Rajiv Gandhi Bhawan, Safdarjung Airport, New Delhi-110003, Delhi. T: 011-24655718, M: 8527569995

Airport

56 Jangipur Bengal Mega Food Park Pvt Ltd

Mega Food Park at Jangipur is recently commissioned in Murshidabad, West Bengal. The food processing infrastructure would benefit the farmers in this region mainly from North 24 Parganas, Birbhum, Malda and Burdwan districts. The project got the final approval in 2010.

Murshi-dabad West Bengal

132.71 A.Sarker, Senior Manager (Buisiness Development), DB 67 Sector I Salt Lake City, Kolkata 700064, West Bengal. T: 033-23348775, (Ajijur Rehman, Managing Director)

Food Park

Contract Award

Project Reporter • 17 • September 1, 2016

*Figures are approximate ( `. Crore)

Sno Organisation Project Title / Details Location Budget* Contacts Sector

Project Update / Commissioned project

57 AccorHotels and InterGlobe Hotel

ibis Hyderabad HITEC City with 178 well-appointed rooms. The hotel features two modern and stylish meeting rooms with state-of-the-art technology, restaurants etc.

Hyderabad Telangana

NA Arun Raju, VP-Projects, Pegasus One, Behind ibis Hotel, DLF Phase V, Golf Course Road, Sector 53, Gurgaon-122002. Haryana. T: 0124-4392900, F: 4392959, [email protected], (J.B. Singh, President & CEO)

Hospitality

58 Trance Hotels

Trance Greenfield hotel with 50-key has come up over 12-acre plot with large banqueting facilities. The hotel has 16,000 sq ft of pillar-less banquet hall, and 50,000 sq ft of open lawn for large weddings, events, etc.

Hyderabad Telangana

NA Anuj Khatter, General Manager, 8-2-5771/A, Road no.7, Banjara Hills, Opp. Iranian Consulate, Hyderabad-500034, Telangana. T: 040-64505959, M: 9177773998, (Veer Vijay Singh, MD and CEO)

Hospitality

59 Ganesh Housing Corpora-tion Ltd

Plans to undertake development of an IT special economic zone 'Million Minds' in village Chharodi, Taluka Daskroi of Ahmedabad district.

Ahmedabad Gujarat

750.00 Vishal Hirani, Marketin Manager, 100 FT. Hebatpur- Thaltej Road, Nr. Sola Bridge, OFF: S.G. Highway, Ahmedabad 380054, Gujarat. T: 079-61608888, M: 9913520445, [email protected], (Shekhar G. Patel, MD)

Industrial Park

60 AGS Health Pvt Ltd

Healthcare analytics and medical coding service provider has set up state-of-the-art facility in Hyderabad with a seating capacity of over 1,000 employees.

Hyderabad Telangana

20.00 Balaji, Manager (Administration), 2nd Floor, Wall Street Plaza, 1-11-256, Street No.1, Begumpet, Hyderabad 500016, Telangana. T: 040-69000405, (Devendra Saharia, Founder and CEO)

IT/ITES

61 Indian Railway Station Development Corporation (IRSDC)

Bijwasan is an existing station on Delhi-Rewari line of Indian Railways network, proposed to be redeveloped as a world-class station in the National Capital Region of Delhi near Dwarka. Bid evaluation process is on.

Delhi NA S.P.Sharma, DGM (General), 4th Floor, Palika Bhawan, Sector-13, R.K.Puram, New Delhi-110066, Delhi. T: 011-24672718, [email protected], [email protected], (S.K Lohia, Chief Executive Officer)

Railways

62 Indian Railway Station Development Corporation (IRSDC)

"Redevelopment of Anand Vihar Railway Station in the National Capital Region of Delhi is planned. The station is closed to the inter-state bus terminus."

Delhi NA S.P.Sharma, DGM (General), 4th Floor, Palika Bhawan, Sector-13, R.K.Puram, New Delhi-110066, Delhi. T: 011-24672718, [email protected], [email protected], (S.K Lohia, Chief Executive Officer)

Railways

63 Indian Railway Station Development Corporation (IRSDC)

Redevelopment of Habibganj railway station in Bhopal district is planned over 40.91 ha of land. The land would be used for development of existing station and proposed railway colony. The project is being implemented by a consortium of Bansal Construction Works and Prakash Asphalting and Toll Highways through SPV - Bansal Pathways Habibganj Pvt Ltd. The project comprises provision of modern amenities like escalators, lifts, parking lot, landscaping, concourse, walkway, travelators, parcel corridor, subways, food plaza, clinic, office complex, etc as part of the redevelopment of the station. Habibganj Railway station, is the first station to be redeveloped through Public Private Partnership (PPP) route under the station redevelopment program of Indian Railways

Bhopal Madhya Pradesh

450.00 Parag Verma, Chief Operating Officer, 4th, Floor, Palika Bhawan, Sector XIII, R.K.Puram, New Delhi-110066, Delhi. T: 011-24672718, 24672719, 24672723, F: 24672720, [email protected], [email protected], (S.K Lohia, Chief Executive Officer, [email protected])

Railways

Project Reporter • 18 • September 1, 2016

*Figures are approximate ( `. Crore)

Sno Organisation Project Title / Details Location Budget* Contacts Sector

Project Update / Commissioned project

64 Airport Authority of India (AAI)

Relyon Solar Pvt Ltd has installed a new 1.5 MW roof top solar power plant at the integrated international cargo complex of the Chennai airport .

Chennai Tamil Nadu

NA Deepak Shastri, Airport Director, CIA Chennai-600027,Tamil Nade. T: 044-22561122, [email protected] 9940192926

Renewable Energy

65 Amaravati Metrorail Corpora-tion Ltd (AMRC)

Vijayawada metro project completion is targeted by December 2018. The phase-I project is proposed to have a 11-km corridor being divided into two parts, 5 km and 6 km. Around 75 acre of land would be required as per initial estimates for building metro depot and the stations. Centre has so far allocated only Rs 100 crore for the project in the last Budget. The state government has released Rs 300 crore for land acquisition. JICA has agreed to fund 60% of the project estimated cost.

Vijayawada Andhra Pradesh

6,769.00 N.P. Ramakrishna Reddy, MD, 1st Floor, Jawaharlal Nehru Building Canal Road, Vijayawada Municipal Corporation, Vijayawada, Srikakulam-520001, Andhra Pradesh. [email protected]

Transport

PROJECT UNDER IMPLEMENTATION66 Airport

Authority of India (AAI)

The development of Jharsuguda airport is being carried out through joint funding from AAI and Odisha Government. The agreement was signed in July, 2014 to develop the airstrip. The state government has handed over 106.23 acre of land out of which 51.8 acre is government land.The contracts are awarded for the construction of passenger terminal building, pavement, service block, staff quarters and ATC tower. The completion is envisaged by June 2018.

Jharsuguda Odisha

210.00 P.Battacharya, Deputy General Manager (CNS), Jharsuguda Airport, Jharsuguda, Odisha. T: 06645-284112, F: 284112, M: 9433893219, [email protected]

Airport

67 Ministry of Civil Aviation

The aviation ministry has signed an MoU with Maharashtra Government to facilitate regional air connectivity by making it affordable by enacting different concessions offered by the Union government. The work on Shirdi airport is on and commercial operations are likely by November 2016. The other airports that will be ready include the ones at Sholapur, Jalgaon, Gondia, Nanded, Akola and Kolhapur.

Maharashtra NA Arun Kumar, Joint Secretary (AK), MCA, B Block, Rajeev Gandhi Bhavan, New Delhi-110003, Delhi. T: 011-24643246, [email protected], (Civil Aviation Minister Ashok Gajapathi Raju)

Aviation

68 Madhya Pradesh Water Resources Department

The water resources department is implementing tarped medium irrigation scheme with capicity of 42.1 MMTPA in Chhatarpur district. The completion is targeted by June, 2017.

Chhatarpur District Madhya Pradesh

82.74 S.K Khare, Zone-I, Maharana Pratap Nagar, Bhopal-462023, Madhya Pradesh. T: 0755-2553096, M: 9425849553, (J.S Kusre, Superintendent Engineer)

Canal/Dam/Irrigation

Project Reporter • 19 • September 1, 2016

Sno Organisation Project Title / Details Location Budget* Contacts Sector

*Figures are approximate ( `. Crore)

Project Under Implementation

69 Bangaluru Metropolitan Tranportation Corporation

Plans to set up modern bus terminal at Kalasipalya spread over 4 acre with score of amenities including a subway connectivity to the metro rail.

Bengaluru Karnataka

60.00 Nagaraj R T, Executive Engineer, Civil Engineering Department, K.H.Road, Shanthinagar, Bengaluru-560027, Karnataka. T: 080-22537447, 455, M: 7760991174, [email protected], (Dr. Ekroop Caur, IAS, MD)

Construction

70 Bangalure Metropolitan Tranportation Corporation

Plans to construct a bus depot at Anjanapura over an area of 1 acre.

Bengaluru Karnataka

NA Nagaraj R T, Executive Engineer, Civil Engineering Department, K.H.Road, Shanthina-gar, Bengaluru-560027, Karnataka. T: 080-22537447, 455, M: 7760991174, [email protected], (Dr. Ekroop Caur, IAS, MD)

Construction

71 JVL Mega Food Park Pvt Ltd

The company is undertaking the development of food park spread over 85 acre at Dehri in Rohtas district. The work has started and is likely to complete by 2018.

Rohtas Bihar

150.00 Hemant Rao, VP (Food Park), Jhunjhunwala Bhavan, Nati Imli, Varanasi-221001, Uttar Pradesh, T: 0542-2211312, 2211313, F: 2210480, M: 8795818612, [email protected]

Food Park

72 Sukhjit Starch & Chemicals Ltd

Plans to undertake development of mega food park with the capacity of 55.0 acre at Rihana Jattan village, Phagwara Tehsil in Kapurthala district.

Kapurthala Punjab

128.00 Bhavdeep Sardhana, Chief Fianancial Officer, Sarai Rd., Phagwara-144401, Punjab, T: 01824-468800, 260314, 260216, F: 01824-261669, 262077, [email protected], (I.K. Sardana, MD)

Food Park

73 Gas Transmis-sion India Pvt Ltd

The company is laying natural gas pipeline of 430 km with capacity of 36 MMSCMD from Ennore-Sulurpeta-Renigunta-Krishnapatnam-Nellore in the state of Andhra Pradesh.

Thiruvallur District Tamil Nadu

625.00 Aishwarya Enclave, Plot No.C-156, Walkers Road, Venkateswara Nagar, Rajahmundry-533103, Andhra Pradesh. T: 0883-2423562, F: 2427576

Gas pipeline

74 Punjab Health Systems Corporation

The corporation is undertaking the construction of mother and child hospital at Pirjain village in Fatehgarh Sahib district.

Fatehgarh Sahib Punjab

5.30 Jaspal Singh, EE, State Institute of Health and Family Welfare Complex, Phase VI, SAS Nagar, Moha-li-160056, Punjab. T: 0172-2262938, 2263938, 2270533,M: 9855808256, [email protected]

Healthcare

75 Odisha Industrial Infrastruc-ture Development Corporation

The corporation is undertaking the development of Biotech Park at Andharua in Bhubaneswar.

Bhubane-swar Odisha

100.00 P.Naik, Chief General Manager, IDCO Tower, Janpath, Bhubaneswar-751022, Odisha, T: 0674-2540820, 2543506, F: 2542956

Industrial Park

76 Bihar State Power Transmission Company Ltd

The company is laying of 132 kV LILO line of both circuit of 132 kV BTPS-Purnea transmission line to new GSS near Korha (Katihar).

Bihar 66.69 P.K Govil, 4th Floor, Vidyut Bhawan, Bailey Road, Patna-1, Bihar. T: 0612-2504442, F: 0612-2504305, M: 7763817701, [email protected]

Power

77 Maharashtra State Electricity Transmisson Company Ltd

The company is implementing the laying of 400kV DCQ line from 400 kV Koradi-II substation to 765 kV Koradi-III substation. The completion is targeted by December, 2016.

Koradi Maharashtra

108.64 Rahul Nandurkar, Deputy Executive Engineer, Construction Division I, Vidyut Bhavan, Katol Road, Nagpur-440013, Maharashtra. M: 8554993570, [email protected]

Power

Project Reporter • 20 • September 1, 2016

Sno Organisation Project Title / Details Location Budget* Contacts Sector

*Figures are approximate ( `. Crore)

*Figures are approximate ( `. Crore)

Project Under Implementation

For Advertising: Contact Sandeep Sharma on +91-22-24193000 / 24193096 Email: [email protected]

India’s Project Database

Vol. 11 No. 23 l June 1, 2016

www.ProjectReporter.co.in

195 Projects & Tenders

Annual Subscription: `3500/- (Downloadable PDF)

®

L&T Hyderabad Metro Station – Hyderabad, Telangana

Advertise in Project Reporter Digital Edition and reach out to 50,000 Prospects from all over India.

78 Transmission Corporation of Telangana Ltd

Setting up of 400/200 kV substation at Julurupada (Bommanapalli) in Khammam district

Khammam District Telangana

114.00 Latha Vinod, Chief Engineer (Projects), Vidyut Soudha, Khairatabad, Hyderabad-500082, Telangana. T: 040-23393453, M: 9440907399, [email protected], (D.Prabhakar Rao, CMD)

Power

79 Rail Vikas Nigam Ltd

The project involves doubling of Daund-Gulbarga doubling (Phase II) in connection with Solapur division in Maharashtra and Karnataka. It includes construction of roadbed, major and minor bridges, track linking, outdoor signaling and electrical works in Hotgi-Gulbarga section. The completion is targeted in 30 months.

Gulbarga Karnataka

238.15 Sanjay Kulkarni, Joint General Manager, VRM Solapur Office, 1st Floor, Construction Bldg, Solapur-413003, Maharashtra. M: 9004444015, [email protected], (S.C Agnihotri, CMD)

Railways

80 Rail Vikas Nigam Ltd

The project involves doubling of Daund-Gulbarga section (Phase I) at Solapur division in Maharashtra and Karnataka. It includes construction of roadbed, major and minor bridges, track linking, outdoor signaling and electrical works in Bigwan-Mohol section.

Solapur Maharashtra

223.94 Anand Swarup, Chief Project Manager, 7th Floor, New Admin Building, D N Road, Central Railway, Mumbai-400001, Maharashtra. T: 022-22626343, [email protected], (S.C Agnihotri, CMD)

Railways

81 V.O. Chidam-baranar Port Trust

The project involves laying of Port Marshalling Yard-Hare Island railway line in Tuticorin district.

Tuticorin Tamil Nadu

70.12 Balamurali, Assistant Executive Engineer, Tuticorin-628004, Tamil Nadu, T: 0461-2352252, 2352290, 2352500, M: 9677456479, [email protected], (S P Patel, Chief Engineer)

Railways

82 Suzlon Enegry Ltd

Setting up of 100 MW solar based power unit at Veltoor in Mahboob Nagar district.

Mahboob Nagar District Telangana

760.00 Viswakumar Menon, Group Head, (Corporate Communications), One Earth, Hadapsar, Pune-411028, Maharashtra. T: 020-67022000, 61356135, 67202500, M: 9820069928, [email protected], (Tulsi Tanti, CMD)

Renewable Energy

83 National Highways Authority of India (NHAI)

NHAI is implementing four/six laning of Raipur-Simga (PKG-1) on NH-200 under NHDP-IV.

Raipur Chhattisgarh

513.00 Sanjay Verma, Project Director, House No.- A-7, VIP Estate Shankar Nagar, Raipur-492001, Chhattisgarh, T: 0771-2442358, [email protected]

Roads/Highways/Bridges

Project Reporter • 21 • September 1, 2016

*Figures are approximate ( `. Crore)

Sno Organisation Project Title / Details Location Budget* Contacts Sector

84 National Highways Authority of India (NHAI)

The road authority is undertaking the work to strengthen and widen the two lanes with paved shoulders covering Vijaypura- Hubballi section of National Highway 218. The foundation stone was laid in June, 2016.

Hubballi Karnataka

462.00 Akil Ahmad, General Manager (Technical, Karnataka), G-5&6, Sector-10, Dwarka, New Delhi-110075, Delhi. T: 011-25074100 F: 25074100, M: 9999188298, [email protected]

Roads/Highways/Bridges

85 Madhya Pradesh Road Development Corporation Limited (MPRDC)

MPRDC is implementing upgradation of Tawa Bridge-Itarasi Mandi (MDR-30-06) in length of 11.15 km and Itarasi-Dulariya-Tigariya (MDR-30-04) in length of 25.70 km in Hoshangabad district. The completion is targeted by December, 2016.

Hoshang-abad Madhya Pradesh

65.92 B.S Meena, General Manager, 45-A, Arera Hills, Bhopal-462011, Madhya Pradesh. T: 0755-2765205, F: 0755-2572643, M: 9425606161, [email protected]

Roads/Highways/Bridges

86 Odisha Public Works Department

PWD is implementing the construction of high level bridge over river Mahanadi at Nelson Mandela Chowk (Kacheri Chowk) to Chaurpur road along with both side approaches in Sambalpur district. The completion is targeted by November, 2016.

Sambalpur Odisha

93.86 M. M. Biswal, EE (Sambalpur), Deputy EE, Odisha Secretariat Building, Bhubaneswar- 752001, Odisha. T: 0663-2412370, 0674-2393122, 2536668, 2322800, F: 2391651, M: 9437166366, 9437057260, (O P Patel, C.E. DPI & Roads)

Roads/Highways/Bridges

87 Uttar Pradesh Public Works Department

PWD is undertaking the four laning of Palia-Shahjahanpur-Hardoi-Lucknow road (SH-25) in chainage 104.00 km to 117.00 km in Shahjahanpur district.

Shahjahan-pur Uttar Pradesh

74.89 Vijay Kumar Singh, Chief Engineer, Centar Zone, 96 M.G.Marg, Opp.Raj Bhavan, Lucknow-226001, Uttar Pradesh, T: 0522-2235214, 2235433, 2237323, M: 7054222222

Roads/Highways/Bridges

88 Magicon Impex Pvt Ltd

Delhi based smartphone maker Jivi Mobiles plans to set up new manufacturing facility at Lonavala catering to the south and western parts of the country. The completion is targeted in Jan 2017.

Lonavala Maharashtra

200.00 Harshvardhan Saxena Marketing Head, B-1/625, Janakpuri New Delhi - 110058. T: 011-25552294, 25552295, 41045357, [email protected], (Gurdeep Singh Suddan, Co-founder & Director)

Telecom

89 Apollo Tyres

The company is increasing production capacity of truck-bus radials to 12,000 and 16,000 car tyres a day at its Chennai unit by 2018. The first phase work is on. The funding is planned through internal accruals and borrowing.

Chennai Tamil Nadu

1,700.00 Rohit Sharan, Divisional Head, Corporate Communications, Apollo House 7 Institutional AreaSector 32, Gurgaon-122001, Haryana. T: 0124-2721133, 2721000, [email protected], (Neeraj kanwar, Vice Chairman & MD)

Tyres

90 Maharashtra Industrial Development Corporation

The corporation is implemeting centralized water supply scheme of 72.0 MLD for Shendra & Jalna from new Jackwell at Paithan. It also includes providing, laying & jointing 900mm dia DI K-9 pipeline from new Jackwell to Shendra with construction of water treatment plant and service road.

Paithan Maharashtra

159.64 R.S Kulkarni, Executive Engineer, MIDC, Railway Station, Aurangabad-431001, Maharashtra. M: 8805450450, [email protected], (Kedar Nagpure, CE)

Water Sanitation

Project Under Implementation

REALTY PROJECTS

Project Reporter • 22 • September 1, 2016

Project Reporter • 23 • September 1, 2016

Realty Projects

Architect: Genesis Planners Pvt Ltd, P-559, Phase-3 Road-92, Jubilee Hills, Jubilee Hills, Hyderabad-500033, Telangana. T: 040-23554300

91 | Blue Birds

Details: The residential project is coming up at Srinagar Colony, Hyderabad. The project offers 1 towers with 2B+G+5 floors, having 63 units of 3 BHK apartments. Apart from the basic amenities, the project offers piped gas, property staff, vastu compliant, video door security, waiting lounge, water softener plant, wi-fi connectivity , landscape garden, paved compound, rain water harvesting, sewage treatment, multipurpose court ,swimming pool, multipurpose hall, gymnasium, etc.

Location: Hyderabad Telangana

Completion: December 2017Type: Residential ApartmentStage: Under Construction

Shanta Sriram Constructions Pvt Ltd

Contacts: Ramu V, General Manager (Marketing), 501, Oasis Center, Somajiguda - Begumpet, Main Road, Hyderabad-500016, Telangana. T: 040-65656500, M: 9849955885, [email protected], [email protected], (M. Narsaiah, Managing Director)

92 | Lorena

Details: The residential villas is coming up at Velimela in Hyderabad spread across 20 acre of land. The project offers G+1 floors, having 200 units of 3 BHK villas. Apart from basic amenities, the project offers basketball court lawn, tennis court, skating rink, amphitheatre, landscape garden, wi-fi connectivity, swimming pool, table tennis, etc.

Location: Hyderabad Telangana

Completion: December 2016Type: Residential VillasStage: Under Construction

BricMor Infrastructure Ltd

Contacts: R Sun D, Marketing Manager, Plot No. 293, Road No. 7 Telecom Nagar, Gachibowli, Hyderabad-500032, Telangana. T: 040 - 64102099, M: 7799793311, [email protected], [email protected], (Srinivas Reddy, Managing Director)

93 | Prime Gardenia

Details: The residential villas is coming up at Bachupally in Hyderabad spread across 4 acre of land. The project offers G+1 floors, having 43 units of 3 BHK villas. Apart from basic amenities, the project offers swimming pool, children recreation zone, gymnasium, table-tennis, common water softener and ro system, wi fi, indoor games, etc.

Location: Hyderabad Telangana

Completion: June 2017Type: Residential VillasStage: Under Construction

Prime Constructions

Contacts: Shiva Krishna, Marketing Manager, 101,Siddhartha Towers, Sumithra Nagar, Kukatpally, Hyderabad - 500072, Telangana. T: 040-23069000, M: 9908178940, [email protected], (K Venkateswara Rao, MD)

Architect: Charan Associates, Flat No 106, Siddhartha Towers, Kukatpally, Hyderabad - 500072, Telangana. T: 040-23065153

Project Reporter • 24 • September 1, 2016

Realty Projects

94 | Active Greens

Details: The project is coming up at E M Bypass, Kolkata East spread across 1.50 acre of land. It offers 2 towers with stlit+11 floors, having 2 & 3 BHK apartments. Apart from basic amenities, the project offers high speed lifts, earthquake resistant, water softener plant, wi-fi connectivity, Badminton Court, jogging track, banquet hall, rain water harvesting, etc.

Location: Kolkata West Bengal

Completion: January 2017Type: Residential ApartmentStage: Under Construction

Ruchi Realty Holdings Ltd

Contacts: Raghav Vohra, Marketing Head, 10 Paymental Garden Lane, Near ITC Sonar Off E.M. Bypass, Kolkata -700015, West Bengal. T: 66066777, 23296960, [email protected], (Manish Shahra, Managing Director)

Architect: Agrawal & Agrawal, JP Agarwal, Architect, 2/5, Sevak Baidya Street, Kolkata-700029, West Bengal. T: 033-40732125, 40604100-03, [email protected], [email protected]

95 | Bhawani Sunvalley

Details: The project is coming up at Kalindi, Kolkata North spread across 1.40 acre of land. It offers 5 towers with G+5 floors, having 136 units of 1, 2, 3 & 4 BHK apartments. Apart from the basic amenties, the project offers Billiards, carrom, community Hall, sun deck, CCTV camera security, jogging track, water softener plant, rain water harvesting, fountain, etc.

Location: Kolkata West Bengal

Completion: December 2018Type: Residential ApartmentStage: Under Construction

Satellite Martin Developers

Contacts: Niranjan Shah, Project Head, 4D, Chatan Seth Street, Diamond Tower, 4th Floor, Kolkata-700007, West Bengal. M: 7278762839, 9836476434

96 | Convicity

Details: The project is coming up at Newtown Area, Rajarhat, Kolkata East spread across 8.26 acre of land. It offers 13 towers with G+4 floors, having 208 & 137 Bungalows built on 1.5 kathas, 2 kathas and 3 kathas of 1, 2 & 3 BHK apartments. Apart from basic amenities, the project offers club house, gymnasium, party banquet hall, play ground, pet park cum kennel, swimming pool, games room, pool side party area, jogging track, etc.

Location: Kolkata West Bengal

Completion: December 2018Type: Residential ApartmentStage: Under Construction

Bloomsbury Infrastructure Pvt Ltd

Contacts: Biswajit Mondal, Area Manager, Vikram Building, 3rd Floor, AE-41, Street No-70, Action Area I, New Town, Kolkata-700156, West Bengal. T: 83369 57491, 8336957523, [email protected], (Sambit Basu, Director)

Architect: DJ Consultants & Associates, 255 Dum Dum Park, Opp. U.B.I., Ground Floor, Kolkata-700055, West Bengal. T: 033-25906003, M: 9830268487

Architect: Anupam Maiti, Architect, Mozaik, P-543, Raja Basanta Roy Road, Kolkata 700 029, West Bengal. T: 033-40670094, M: 9831180114, [email protected]

Project Reporter • 25 • September 1, 2016

Realty Projects

97 | Magnolia Oxygen

Details: The project is coming up at Rajarhat, Kolkata East spread across 4 acre of land. The project offers 6 towers with stlit+13 floors, having 400 units of 1, 2 & 3 BHK apartments. Apart from basic amenities, the project offers swimming pool, health club, gymnasium, AC baquest hall, indoor games, yoga and meditation zone, landscape greens, tennis court, car parking, power backup facility, etc.

Location: Kolkata West Bengal

Completion: January2018Type: Residential ApartmentStage: Under Construction

Magnolia Infrastructure Development Ltd

Contacts: Vivek Poddar, Executive Director, DLF Galleria, Suite No. 1101, 11TH Floor, Plot No: BG-8, Action Area 1B, Street No – 124, New Town, Rajarhat, Kolkata – 700156, West Bengal. T: 033-6541-1453, M: 9874871156, 9163372000, [email protected]

98 | Oxford Square

Details: The residential project is coming up at Barasat, Kolkata North. It offers 5 towers with G+4 floors, having 170 units of 1 and 2 BHK apartments. Apart from basic amenities, the project offers earthquake resistant, landscape garden, rain water harvesting, swimming pool, library, power back up lift, etc.

Location: Kolkata West Bengal

Completion: December 2018Type: Residential ApartmentStage: Under Construction

Riya Projects

Contacts: Niraj Agarwal, marketing Head, Narayani Building, 3rd Floor, Room No. 310, 27, Brabourne Road, Kolkata-700001, West Bengal. T: 033-60506666, M: 9830315566, [email protected], (Nitesh Bhopalka, Director)

99 | Unimark Springfield

Details: The project is coming up at Rajarhat, Kolkata spread across 8 acre of land. It offers 15 towers with Stilt+10 floors, having 797 units of 2 & 3 BHK apartments. Apart from basic amenities, the project offers cricket pitch, multipurpose court, swimming pool, yoga/meditation area, landscape garden, community hall, sewage treatment, water softener plant, etc.

Location: Kolkata West Bengal

Completion: June 2018Type: Residential TowersStage: Under Construction

Unimark Group

Contacts: Samrat Mitra, Assitant General Manager, 204, Acharya Jagadish Chandra Bose Rd, Mullick Bazar, Park Street area, Kolkata-700017, West Bengal. T: 033-40710180, 22871357, M: 9831716633, 9831494000, [email protected], [email protected]

Architect: Design Forum International, Anand Sharma, Partner, Regus Business Centre, Level 8, RDB Boulevard, Plot K-1, Sector V, Block EP & GP, Salt Lake City, Kolkata-700091, West Bengal. T: 033-66374418, F: 66374747

Architect: Raj Agarwal and Associates, 06/1A, Tollygunge Rd, Sahanagar, Kolkata-700026, West Bengal. T: 033-32933925, [email protected]

Architect: Raj Agarwal and Associates, 06/1A, Tollygunge Rd, Sahanagar, Kolkata-700026, West Bengal. T: 033-32933925, [email protected]

Project Reporter • 26 • September 1, 2016

100 | Reconstruction of N-1 & N-3 Jetty at VisakhapatnamDDG and CE V Token 07 of 2016-17 | Tenders are invited for hiring consultancy services for reconstruction of N- 1 & N-3 Jetty at Visakhapatnam.Submission Date: 15/09/2016Tender Value (Rs): 10500000Location: Visakhapatnam Andhra PradeshIndian NavyContact Address: DG, Naval project, Naval base port, Visakhapatnam- 530014, T: 0891-2577238

101 | ATC tower at Vadodara0900303980599cef | Engineering consultancy for construction of ATC tower cum technical block at Civil Aerodrome, Vadodara.Submission Date: 19/09/2016Tender Value (Rs): 4478000Location: Vadodara GujaratAirports Authority of IndiaContact Address: Asim Sayeed, Manager, AAI, Safdarjung Airport i, New Delhi-110003, Delhi. T: 011-24642005

102 | Bhiwani-Hansi-Barwala-Tohana-Punjab border7580-hrpwd4 | Consultancy services for carrying out feasibility study and detailed project preparation Bhiwani-Hansi-Barwala-Tohana-Punjab border (NH-148B).Submission Date: 08/09/2016Location: Bhiwani district HaryanaHaryana PWD (B & R)Contact Address: Executive Engineer, Haryana PWD B&R, Sector 19-B, Chandigarh-160019, Haryana. T: 0172-2568063

103 | Jind-Gohana-Sonepat road7581-hrpwd4 | Consultancy services for carrying out feasibility study and detailed project preparation Jind-Gohana-Sonepat (NH-352A).Submission Date: 08/09/2016Location: Sonepat HaryanaHaryana PWD (B & R)Contact Address: Executive Engineer, Haryana PWD B&R, Sector 19-B, Chandigarh-160019, Haryana. T: 0172-2568063

104 | Rehabilitation and upgradation to 2-laneHP/Shimla/10HP/Shimla/11HP/Shimla/12HP/Shimla/13HP/Shimla/14 | Tenders are invited for consultancy services for carrying out feasibility study and detailed project preparation for redesigning, rehabilitation and upgradation to 2-lane/2-lane with paved shoulders or its strengthening in the state of Himachal Pradesh. Sataun (NH-707) - Renuka - Dadahu - Jamta - Do-sarka (NH-907A). Haripurdhar –Songarh – Renuka Trimti Bailya - Dholakuana Kandaghat (NH) Sadhupul – Chail – Kufri (NH). Sainj (NH-705) -Deha – Chopal - Nerwa – Feduspul (NH) i). Solan –Subathu Kainchi Mor =23.00 Kms ii). Kunihar to Domehar to Piplughat to Dhundhan to Bhararighat.Submission Date: 20/09/2016Location: Sirmaur district Himachal PradeshPublic Works Department, Government of Himachal PradeshContact Address: SE, NH Circle, Shimla, Himachal Pradesh. T: 0177-2657551, F: 2814801, [email protected]

105 | 45 bedded hospital at Poonch district87742-A | Tenders are invited for completion of incomplete work for consultancy services for provision of technical accommodation for 45 bedded hospital at Poonch district.Submission Date: 16/09/2016Tender Value (Rs): 1900000Location: Poonch district Jammu & KashmirMilitary Engineer Services (MES)Contact Address: Chief Engineer, HQ, Udhampur Zone, P.O. Garhi, Udhampur-182121,T: 01992-243355

106 | Development of Ibblur & Siddapura LakeTenders are invited for project management consultancy for development of Ibblur lake & Siddapura lake.Submission Date: 04/10/2016Tender Value (Rs): 82500000Location: Bengaluru KarnatakaBruhat Bangalore Mahanagara PalikeContact Address: Deputy Conservator

of Forest, BBMP. #308, 3rd Floor, Annex Building-3, Head Office Premises, N.R. Square, Bangalore-560002, Karnataka. T: 080-22975520/22975582

107 | Reconstruction of composite building at BhopalPWD/TENDER NO -32092 & Work No: 1 | Tenders are invited for design and project management consultancy services for construction/renovation/re-construction of composite building for directorate for education department at Bhopal.Submission Date: 13/09/2016Tender Value (Rs): 18000000Location: Bhopal Madhya PradeshPublic Works Department, BhopalContact Address: Shashikant Nimade, Chief Architect, PWD, Nirman Bhawan, Bhopal, Madhya Pradesh. T: 0755-2555297, 2551372

108 | Consultancy services to develop super speciality hospitalTenders are invited for consultancy services to develop combined project of super speciality hospital with infrastructure on design-build-finance-operate-transfer basis along with automobile engineering college to be built and handed over to MSRTC.Submission Date: 22/09/2016Location: MaharashtraMaharashtra State Road Transport CorporationContact Address: Vice Chairman and Managing Director, M.S.R.T.C. Maharashtra Vahatuk Bhavan, Dr Anandrao Nair Marg, Mumbai- 400008, T: 022-23023900

109 | Development of office premises at JalandharROJ PND SCO 113-114 | Appointment of project architect/consultant for development of office premises at SCO 113-114 urban estate Phase II, Jalandhar.Submission Date: 12/09/2016Location: Jalandhar PunjabUnion bank of India (UBI)Contact Address: Dy General Manager, Shastri Market, Veer Partap Bhawan Jalandhar, Punjab. T: 0181-2457247, 2226956, 4622468

CONSULTANCY BIDS

Project Reporter • 27 • September 1, 2016

Airport

110 | Installation of ILS for Allahabad AirportTenders are invited for provision of work services for installation of ILS for Allahabad Airport at AF Stn Bamrauli.Submission Date: 17/09/2016 Tenders Value (Rs): 16800000Location: Allahabad Uttar PradeshMilitary Engineer Services (MES)Contacts: Chief Engineer, AF, Allahabad, Uttar Pradesh. T: 0532-2581110, F: 2580371

111 | Supply of 40 nos.cargo four wheel trolleysTenders are invited for supply of 40 nos.cargo four wheel trolleys at Chennai Airport.Submission Date: 26/09/2016Tenders Value (Rs): 965000Location: Chennai Tamil NaduAirports Athority of IndiaContacts: Jt. General Manager (Technical), Chennai Airport, Chennai-600027, Tamil Nadu. T: 044-22561122

Building Construction

112 | Three technical buildings at AF station AdampurTenders are invited for construction of three technical buildings at AF station Adampur.Submission Date: 29/09/2016 Tenders Value (Rs): 157456000Location: DelhiMilitary Engineer Services (MES)Contacts: CE (AF) Wac Palam, Delhi Cantt-110010. T: 011-25675321, F: 25671907

113 | Renovation of ONGC residential complex at UranTenders are invited for renovation of ONGC residential complex, Uran. Sh: Renovation of A5 to A8 blocks (56 Flats). Phase-II.Submission Date: 13/10/2016Tenders Value (Rs): 32997890Location: Raigad district MaharashtraOil and Natural Gas Corporation Ltd

Contacts: S K Sahu, Plant Manager, ONGC, Dronagiri Bhawan, Uran, district Raigad-400702, Maharashtra. T: 022-27222802, F: 27222811

114 | Construction of multi storied bank’s buildingsTenders are invited for construction of multi storied bank’s buildings (Office/Residence) at different places of Odisha state.Submission Date: 16/09/2016Location: OdishaState Bank of India (SBI)Contacts: Assistant General Manager (Premises & Estate), PT.J.N.Marg, Bhubaneswar-751001, Odisha. T: 0674-2394637, F: 2396696, [email protected]

115 | Construction of type III railway housesTenders are invited for construction of type III railway houses 320 Nos for providing residential accommodation to modern coach factory personnel including internal electrical and telecom works internal sanitary and plumbing works garages and miscellaneous works in Prashanti Parisar Township of MCF RBL.Submission Date: 15/09/2016Tenders Value (Rs): 542388000Location: Uttar PradeshIRCON International LtdContacts: General manager /MCF /RBL, Right Wing, Administrative Block, MCF Rae Bareli Project, Lalganj-229206, Distt. Raebareli, Uttar Pradesh. T: 0535-2704382-83, [email protected]

EPC/Civil Works/Fencing/Wall Works

116 | Erection of 220 KV & 66kV equipments on EPC basisTenders are invited for supply, erection, testing and commissioning of 220 KV & 66kV equipments, & materials on EPC basis excluding civil works for 220KV Amod Substation to be operated from 66KV Amod S/S.Submission Date: 21/09/2016Tenders Value (Rs): 113957292Location: Bharuch district Gujarat

Gujarat Energy Transmission CorporationContacts: Chief Engineer, S.P. Vidyut Bhavan, Race Course, Vadodara-390007, Gujarat. T: 0265 2323362, F: 2337918

117 | Improvement of training centre at Deep Bhawan KolkataTenders are invited for improvement of training centre at Deep Bhawan Kolkata Phase II (Civil Works Indoor Development).Submission Date: 12/09/2016Tenders Value (Rs): 7761201Location: Kolkata West BengalDirectorate General of Lighthouses and LightshipsContacts: Director, Deepbhavan, D-372/2, Taratalla Road, Kolkata-700088, West Bengal. T: 033-24017660, F: 24016757

Port

118 | Retaining wall and certain LBW worksTenders are invited for provision of retaining wall and certain LBW works under age B/R I at Minniebay Port Blair.Submission Date: 26/09/2016Tenders Value (Rs): 45000000Location: Andaman and Nicobar Islands (UT)Military Engineer Services (MES)Contacts: Garrison Engineer, Minniebay-744102, Portblair, Andman Nicobar Iceland (UT). T: 03192-232554

119 | Maintenance dredging of Mumbai Harbour ChannelTenders are invited for post monsoon 2016 maintenance dredging of Mumbai Harbour Channel and JN Port Channel.Submission Date: 16/09/2016 Tenders Value (Rs): 993700000Location: Mumbai MaharashtraJawaharlal Nehru Port TrustContacts: Chief Manager (PPD), Admin Building, Sheva, Uran, Navi Mumbai – 400707, Maharashtra. T: 022-27244020, 66165600, 27242233

Power

120 | Installation of energy metersTenders are invited for supply of material, survey, installation, testing and commissioning of 33/llkV S/s,

B2B OPPORTUNITIES

Project Reporter • 28 • September 1, 2016

B2B Opportunities

augmentation/additional power transformer in existing 33/llkV S/s, 33kV & llkV feeders, additional 33kV & llkV bays, replacement of conductor in existing 33kV & llkV lines, distribution transformer ll/0.433kV, replacement of bare conductor of existing LT line by AB cable, new LT line with AB cable, shifting/installation of energy meters, replacement of stop/defective meters & roof top solar panel under Integrated Power Development Scheme (IPDS) of Central Discom on full turnkey basis against Lot-IC to Lot-XIII and Lot-IA for 1 no. 33/llkV GIS S/s at Shivpuri City (Lot-XIl).Submission Date: 26/09/2016Tenders Value (Rs): 174569000M.P. Madhya Kshetra Vidyut Vitaran Company LtdContacts: CGM (Urban Project), Bijunagar, ovindpura, Bhopal-462023, Madhya Pradesh. T: 0755 2602033-36

121 New 33 by 11 KV substationTenders are invited for scope of work under the subject package include supply of materials, survey, installation, testing and commissioning of Rural Electrification works including construction works of new 33 by 11 KV substation, additional and augmentation power transformer in existing 33 by 11 KV substation,33 and 11 KV bay extension, construction, reconductoring of 33 KV,11 KV and LT lines, installation of distribution transformer, shifting and replacement of existing and stop defective meters and providing new service connection to BPL and APL consumers spread all over the District,installation of 11 KV Capacitor Bank under Deen Dayal Upadhayay Gram Jyoti Yojna on turnkey basis in Ashok Nagar District, Madhya Pradesh.Submission Date: 24/09/2016Tenders Value (Rs): 195501000M.P. Madhya Kshetra Vidyut Vitaran Company LtdContacts: Surendra Kr. Sachdeva, General Manager, MPMKVVCL, Nishtha Parisar Bijli Colony Bhopal - 462023, Madhya Pradesh. T: 0755-2588339

122 | Installation of 33/llkV S/sTenders are invited for supply of material, survey, installation, testing and commissioning of 33/llkV S/s, augmentation / additional power transformer in existing 33/llkV S/s, 33kV

& llkV feeders, additional 33kV & llkV bays, replacement of conductor in existing 33kV & llkV lines, distribution transformer ll/0.433kV, replacement of bare conductor of existing LT line by AB cable, new LT line with AB cable, shifting/installation of energy meters, replacement of stop/defective meters & roof top solar panel under Integrated Power Development Scheme (IPDS) of Central Discom on full turnkey basis against Lot-IC to Lot-XIII and Lot-IA for 1 no. 33/llkV GIS S/s at Sheopur City , Madhya Pradesh (Lot-XIIl).Submission Date: 26/09/2016Tenders Value (Rs): 121667000M.P. Madhya Kshetra Vidyut Vitaran Company LtdContacts: CGM (Urban Project), Bijunagar, ovindpura, Bhopal-462023, Madhya Pradesh. T: 0755 2602033-36

123 | New 33 by 11 KV substationTenders are invited for scope of work under the subject package include supply of materials, survey, installation, testing and commissioning of Rural electrification works including construction works of new 33 by 11 KV substation, additional and augmentation power transformer in existing 33 by 11 KV substation, 33 and 11 KV bay extension, construction, reconductoring of 33 KV,11 KV and LT lines, installation of distribution transformer, shifting and replacement of existing and stop defective meters and providing new service connection to BPL and APL consumers spread all over the district, installation of 11 KV capacitor bank under Deen Dayal Upadhayay Gram Jyoti Yojna on turnkey basis in Hoshangabad and Harda District.Submission Date: 23/09/2016Tenders Value (Rs): 781798000Location: Harda District Madhya PradeshM.P. Madhya Kshetra Vidyut Vitaran Company LtdContacts: Surendra Kr. Sachdeva, GM, MPMKVVCL, Nishtha Parisar Bijli, Bhopal - 462023, T: 0755-2588339

124 | Integrated power development schemeTenders are invited for integrated power development scheme works in Siddipet division.Submission Date: 19/09/2016Tenders Value (Rs): 108860667Location: Medak district Telangana

TSPDCLContacts: Chief General Manager, projects/ TSSPDCL, 4th floor, Mint compound, Hyderabad-500063, Telangana. T: 040-23431320, F: 23431006

125 | Deen Dayal Upadhyaya Gram Jyoti YojanaTenders are invited for Deen Dayal Upadhyaya Gram Jyoti Yojana (DDUGJY) scheme works in Nalgonda division in Nalgonda district, Telangana.Submission Date: 19/09/2016Tenders Value (Rs): 154642868Location: Nalgonda district TelanganaTelangana Southern Power Distribution Company LtdContacts: CGM, Projects/ TSSPDCL, 4th floor, Mint compound, Hyderabad-500063, Telangana. T: 040-23431320, F: 23431006

126 | Integrated Power Development SchemeTenders are invited for Integrated Power Development Scheme (IPDS) scheme works in Hyderabad (South) circle.Submission Date: 19/09/2016Tenders Value (Rs): 123592811Telangana Southern Power Distribution Company LtdContacts: CCGM, Projects, 4th floor, Mint compound, Hyderabad-500063, Telangana. T: 040-23431320, F: 23431006

Railways

127 | Straightening of leaned OHE mastsTenders are invited for straightening of leaned OHE masts and muff raising over Ambala division.Submission Date: 23/09/2016Tenders Value (Rs): 1149000Northern RailwayContacts: Prem Singh MeeSr. Divl. Elect. Engineer/TRD, N.Rly, Ambala Cantt, Haryana. T: 0171-2610800, 2610103

128 | OHE modification workTenders are invited for OHE modification work in existing OHE in connection with crossing of 765 kv DC Aurangabad to Padghe electrical overhead line to electrified BG railway track under Central Railway (Between km.76/9 & 76/11 in Vasind-Khadavli section of Mumbai division of central railway).Submission Date: 28/09/2016Tenders Value (Rs): 3089371Location: Aurangabad district Maharashtra

Project Reporter • 29 • September 1, 2016

Central RailwayContacts: Sr Divisional Electrical Engineer (Tracion Distribution), Near PF 7, Kalyan (East), Dist-Thane, Maharashtra. T: 0251-2362235

Roads/Highways/Bridges

129 | Widening of the Chattarpur-Japla roadTenders are invited for strengthening and widening / reconstruction of the Chattarpur-Japla (MDR-127) road to two lane with paved shoulder on EPC mode.Submission Date: 19/09/2016Tenders Value (Rs): 974200000Location: JharkhandState Highways Authority of JharkhandContacts: Member (Technical), Booty Road, Ranchi-834008, Jharkhand. T: 0651-2361306

130 | Upgradation of Pithoria, Thakurgaon, Burmu, Raikhelari roadTenders are invited for improvement and upgradation to 2 lane, 2 lane with paved shoulders of Pithoria, Thakurgaon, Burmu, Raikhelari road (Total Length 37.00 KM.) including construction of bridges and culverts.Submission Date: 16/09/2016Tenders Value (Rs): 1050700000Location: Ranchi district JharkhandState Highways Authority of JharkhandContacts: Member (Technical), Booty Road, Ranchi-834008, Jharkhand. T: 0651-2361306dges

131 | Santraswadi cross to ring road via Basaveshwar circleTenders are invited for package no.- 10 improvement of road from Santraswadi cross to ring road via Basaveshwar circle in Kalaburagi city. (3rd 100.00 crore Nagarothana grant)Submission Date: 06/10/2016 Tenders Value (Rs): 24247571.52Location: Gulbarga KarnatakaDirectorate of Municipal AdministrationContacts: M.R.Sangma, CE, Lower Lacliuniiere, Shillong-793001, Meahalaya. T: 0364-2501556

132 | Major bridge at WarulTenders are invited for construction of major bridge at Warul in Km. 83/800 across River Kadavi on Ratanagair Tink Pali Kolhapur Miraj Sangola Solapur road NH.166 in the state of Maharashtra.Submission Date: 03/10/2016

Tenders Value (Rs): 75413521Location: Kolhapur MaharashtraMinistry of Road Transport and HighwaysContacts: Executive Engineer, Bandhkam Bhawan, Near Head Post office, Tarabai park, Kolhapur-416003, Maharashtra. T: 0231-2652960

133 | Garobadha to Mankachar roadTenders are invited for upgradation to double lane with paved/ hard shoulder of Garobadha - Mankachar road from km 34.483 to km 48.848 under inter state connectivity (ISC) scheme on EPC mode in the state of Meghalaya.Submission Date: 24/10/2016Tenders Value (Rs): 572500000Location: Garobadha MeghalayaMinistry of Road Transport and HighwaysContacts: Pradeep kr Lal, Executive Engineer, Morth, Guwahati Rajgarh Road, Guwahati- 781003, Assam. T: 0361-2522552, 2525943, F: 2464169

134 | Construction of road and CD worksTenders are invited for construction of road and CD works including maintenance under PMGSY works. Package No. OR-20-24/VII (Balance Work).Submission Date: 16/09/2016Tenders Value (Rs): 121237000Location: OdishaRural Development Department, Govt. of OdishaContacts: Superintending Engineer, Southern Circle, Rural Works, Sunabeda, Koraput-763002, Odisha. M: 9437255371 9437255372

Water Sector

135 | Water supply and electrification servicesTenders are invited for water supply and electrification services augmentation of SDD pump house at ND, Visakhapatnam.Submission Date: 15/09/2016Tenders Value (Rs): 1100000000Location: Visakhapatnam Andhra PradeshIndian NavyContacts: Director General, Naval Project, Visakhapatnam, Andhra Pradesh. T: 0891-2577238

136 | 590 MLD capacity water treatment plantsTenders are invited for design, construction, testing and commissioning of 120 MLD capacity zero liquid discharge system on turnkey basis and operation &

maintenance of 590 MLD capacity water treatment plants with zero liquid discharge system for 5 years at Sarthana Water Works, Surat under “AMRUT”.Submission Date: 17/09/2016Tenders Value (Rs): 461100000Location: Surat GujaratSurat Municipal CorporationContacts: M N Chaudhari, Executive Engineer (Electrical), Muglisara, Main Road, Surat-395003, Gujarat. T: 0261-2423751-6, F: 2451935

137 | Installation of water treatment plant at ShillongTenders are invited for procurement & installation of iron removal water treatment plant at NES HQR, CRPF, Shillong (Meghalaya).Submission Date: 15/09/2016Location: Shillong MeghalayaCentral Reserve Police Force, government of indiaContacts: NES, HQR, CRPF, Bishop, Cotton Road, Shillong, Meghalaya. T: 0364–2223436/2224777, [email protected]

138 | Construction of 3 nos piped water supply schemeTenders are invited for construction of 3 nos piped water supply scheme in different Gram Panchayats of district Allahabad.Submission Date: 16/09/2016Tenders Value (Rs): 67000000Location: Allahabad Uttar PradeshUttar Pradesh Jal NigamContacts: Superintending Engineer, 2nd Circle, Ashok Nagar, Allahabad, Uttar Pradesh. T: 0522-2620172, 2620272, [email protected]

139 | Water detention structure at Purulia districtTenders are invited for construction of water detention structure at Mouza Paschim Bero JL no 194 plot no 736 738 740 741 under block Raghunathpur I, district Purulia.Submission Date: 16/09/2016Tenders Value (Rs): 6398007Location: Purulia district West BengalWater Resources Development DirectorateContacts: Superintending Engineer (AI), Pranabananda Sarani, Kenduadihi, Bankura-722102, West Bengal. T: 03242-243607, [email protected]

Project Reporter • 30 • September 1, 2016

Equipment Tender

140 | Neyveli Lignite CorporationDetails: CO CONTS/0023D/MI,IA,MII/BACKHOES dt.17.08.16 | 12 nos. crawler mounted hydraulic backhoes of bucket capacity not less than 0.9 Cu.M without FMC required for Neyveli Mines.Submission Date: 21/09/2016Location: Neyveli, Tamil NaduContact: General Manager / Contracts, Vigilance Department, J-26, J.N.Salai, Block-8, Neyveli 607801, Tamil Nadu.T: 04142-250326, 252205, 252384

141 | South Eastern Coalfields LtdDetails: SECL/DCC/07/F-018/16-17/ENQ.016 dated 26.08.2016 | Bids are invited for supply of different sizes of conveyor rollers to Dankuni Coal Complex.Submission Date: 19/09/2016Location: Dankuni, West BengalTender Value (Rs.): 274000Contact: Madhumita Sen, General Manager, Dankuni Complex, Kolkata, West Bengal. T: 033-26593302

142 | Eastern Coalfields LtdDetails: ECL/Hq/Pur/51611056/16-17/Belt Conveyor/059 | Tenders are ivited for procurement of various rating of belt conveyors complete with FLP electricals (Without Belting) used in under ground coal mines.Submission Date: 12/09/2016Location: Dishergarh, West BengalTender Value (Rs.): 285378000Contact: Kaushik Gupta, Sr. Manager (PR), ECL, Sanctoria Dishergarh, Burdwan-713333, West Bengal. T: 0341-6451079, [email protected]

143 | Bharat Heavy Electricals LtdDetails: NIT_29076 | Tenders ate invited for bought out items for 5 ton EOT crane (4 Items).Submission Date: 23/09/2016Location: New Delhi, DelhiContact: GM, BHEL, Asiad, New Delhi, Delhi. T: 011-23365279

144 | KIOCL LtdDetails: KIOCL MNG CS TPT 001 | Tenders are invited for shifting of P and H and grove cranes from Kudremukh to MangaloreSubmission Date: 16/09/2016Location: Mangalore, KarnatakaContact: Saminathan T. Jt. GM, II Block, Koramangala, Bangalore - 560034, Karnataka. T: 080-25532023, F: 25532163

145 | Central Coalfields LtdDetails: R/s Kuju/CCL/PUR/EOTE//16-17/21 | Tenders are invited for spares for BD155 & BD355 dozer.Submission Date: 17/09/2016Location: JharkhandTender Value (Rs.): 939181Contact: G K Singh, HOD (MM), P.O.: Kuju Dist. Ramgarh-825316, Jharkhand. T: 0898-7785016, F: 281928

146 | Public Works Department (Water Resource), Govt. of TripuraDetails: PNIT 06 EE WRD V KMP 2016-17 DT 18-08-2016 | Tenders are invited for drilling & development of 12 nos. deep tube wells with contractor’s direct rotary drilling RIG and other accessories & equipments at different locations under W.R, Divn. No. V, Kamalpur, during the year 2016-17 (NABARD/SPA).Submission Date: 15/09/2016Location: Kamalpur, TripuraTender Value (Rs.): 6876984Contact: Executive Engineer, W.R, Division No. - V., Kamalpur, Dhalai, Tripura. T: 03826-262166

147 | Public Works Department (Water Resource), Govt. of TripuraDetails: 27/EE/WR/D-V/KMP/2016-17 | Bids are invited for drilling and development of deep tube well scheme (NABARD LOAN) under Dhalai District/SH:- Vertical Electrical sounding (VES) study for ground water exploration (for 15 Nos. DTW Schemes) during the year 2016-17.Submission Date: 15/09/2016Tender Value (Rs.): 126000Contact: Executive Engineer, W.R, Division No. - V., Kamalpur, Dhalai, Tripura. T: 03826-262166, [email protected]

148 | Satluj Jal Vidyut Nigam LtdDetails: DDN/PCD-59/2016 | Tenders are invited for core drilling of ex holes (270m) for geo-technical investigation in cross cut of drift (1.80m x 2.10m) at the power house location of NMHEP.Submission Date: 05/10/2016Location: Dehradun, UttarakhandTender Value (Rs.): 2527470Contact: A.K. Srivastava, Sr. Manager (P&C), 09, Phase-II, Vasant Vihar, Dehradun- 248006, Uttarakhand. T: 0135-2760076, F: 2762771

149 | Eastern Coalfields Ltd (ECL)Details: ECL/Hq/Pur/G/61611061/LHDM/063 | Tenders are invited for

procurement of DGMS approved long hole drilling machine (Jumbo Drilling Machine) with cable reeler arrangement along with gate end box.Submission Date: 01/10/2016Location: Dishergarh, West BengalTender Value (Rs.): 28986300Contact: Kaushik Gupta, Sr. Manager (PR), ECL, Sanctoria Dishergarh, Burdwan-713333, West Bengal. T: 0341-6451079, [email protected]

150 | Central Coalfields ltdDetails: R/s Kuju/CCL/PUR/EOTE//16-17/20 | Tenders are invited for procurement of coolant for L and T komatsu dumperSubmission Date: 17/09/2016Location: JharkhandTender Value (Rs.): 604922Contact: G K Singh, HOD (MM), Darbhabga House, Ranchi-834001, Jharkhand. T: 0651-2360716

151 | HMT Machine Tools LtdDetails: T201606009 | Tenders are invited for supply of forklift tyres and trolley tyres.Submission Date: 16/09/2016Location: Bangalore, KarnatakaContact: K Santosharekha, Machine Tools Division, Bangalore Complex, Jalahalli P.O, Bangalore-560013, Karnataka. T: 080-66626958, F: 28382797, [email protected]

152 | Bharat Heavy Electricals LtdDetails: IEX/WC/OP/16-17/01 | Tenders are invited for works contract for providing 110 operators for operation of material handling vehicles (i.e. Battery Operated Trucks / Fork Lifters and Diesel Operated Fork Lifters) in BHEL Bhopal.Submission Date: 16/09/2016Location: Bhopal, Madhya PradeshContact: AGM (IEX & PYX), 5’ Floor, Administrative Building, Bhopal, Madhya Pradesh. T: 0755-2505004 / 2502504

153 | Central RailwayDetails: SNPD/RS/WKS/15/36 | Tenders are invited for hiring of 9 MT truck/ lorry for transportation of Railway material.Submission Date: 27/09/2016Location: Navi Mumbai, MaharashtraTender Value (Rs.): 1965000Contact: Sanpada EMU, CarShed Sanpada , Sector-9, Navi Mumbai - 400705, Maharashtra. T: 022-27709798, [email protected]

INDUSTRIAL OPPORTUNITIES

Project Reporter • 31 • August 1, 2016

Project Reporter • 32 • September 1, 2016

Industrial Projects

154 | A2Z Infraservices LtdIndustrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 17/06/2016 Gigabit passive optical network equipmentLocation: Gurgaon, HaryanaContact: O-116, 1st Floor, Dlf Shopping Mall, Arjun Marg, Dlf City Phase - I, Gurgaon - 122002, Haryana.T: 0124-4300426, 2566582, F: 2566651

155 | Acecon Vitrified Pvt LtdIndustrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 13/06/2016 for the manufacture of vitrified and ceramic tiles.Location: Rajkot, GujaratContact: Lakhan Patel, 8-a, National Highway, Matel Road, Morbi - 363642, Gujarat. M: 9067766666, [email protected]

156 | Achampet Solar Pvt LtdIndustrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 16/06/2016 to set up Electric power generation unit using solar energy.Location: Mahbubnagar, TelanganaContact: Neeraj Kaul, Director, 4th Floor, D-4,rectangle One, District Centre, Saket, New Delhi - 110017, Delhi. [email protected]

157 | Adani Wilmar LtdIndustrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 09/06/2016 for the production of refined vegetable oils.Location: Nellore, Andhra PradeshContact: Fortune House, Near Navrangpura Railway Crossing, Ahmedabad - 380009, Gujarat. T: 079-25555750, 26565555

158 | Aditya Spinners LtdIndustrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 07/06/2016 for the preparation of man made fiber including blended.Location: Chittoor, Andhra PradeshContact: R.Shivkumar, 6-3-668/10/66, Durganagar Colony, Punjagutta, Hyderabad - 500082, Telangana. T: 040-23404708, M: 9618001201, 9703219119, [email protected]

159 | Akshara Spinning Mills (P) LtdIndustrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 14/06/2016 for the preparation and spg. of cotton fibre including blended cotton - 32400 spindles.Location: Erode, Tamil NaduContact: Krishnasamy Ramesh Krishnan, Director, No.10a, Puliamarathottam, 1st Street, Diamond Theatre Backside, Tirupur - 641604, Tamil Nadu. [email protected]

160 | Anup Malleables LtdIndustrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 08/06/2016 for the manufacture of specialized parts of railways.Location: Dhanbad, JharkhandContact: G.t. Road, Govindpur, Kandra, Bhitia, Dhanbad - 828109, Jharkhand. T: 06540-283002, 283176, F: 283163, [email protected]

161 | Arcvac Forge Cast Pvt LtdIndustrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 13/06/2016 for the manufacture of iron and steel in primary / semi finished forms in mini steel plants.Location: Hooghly, West BengalContact: Raj Kumar Chhajer, Director, Nh-2, Durgapur Expressway Chanditalla, panchgara, Hooghly - 712306, West Bengal. T: 033-26598000, [email protected]

162 | Asahi India Glass LtdIndustrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 06/06/2016 for the manufacturing of wooden boxes, barrels, vats, tubes, packing cases etc.Location: Haridwar, UttarakhandContact: Global Business Park, Tower - B,5th Floor, Mehrauli-gurgaon Road, Gurgaon - 122002, Haryana. T: 0124-4062212, F: 41001691

163 | Ashapura International LtdIndustrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 16/06/2016 for processed bentonite lumps.Location: Kutch, GujaratContact: Amal G, Senior Manager, Jeevan Udyog Building, 278, D.n. Road,fort, Mumbai - 400001,

Maharashtra. T: 022-66651700, F: 22079395, 2207 4452, M: 9099004493, [email protected]

164 | ASR IndustriesIndustrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 16/06/2016 for the manufacturing of machine tools for turning, drilling milling, shaping planning, boring, grinding etc.Location: Aurangabad, MaharashtraContact: Ashok, Marketing Manager, Plot No.m-61,64 & 168, Midc Walij, Gangapur, Aurangabad - 431136, Maharashtra. T: 0240-6645002, F: 2564274, M: 9225317081

165 | Axison Vitrified Pvt LtdIndustrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 15/06/2016 for the manufacturing of vitrified tiles.Location: GujaratContact: Ashvin Laljibhai Ghodasara, Director, Shop No.7/10 Krishna Complex, Lati Plot Main Road, Morbi - 363641, Gujarat. [email protected]

166 | Aym Syntex LtdIndustrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 16/06/2016 for the manufacture of knitted and synthetic fabrics.Location: Vadodara, GujaratContact: B/9, Trade World,b Wing, Senapati Bapat Marg, Kamala Mills Compound, Lower Parel, Mumbai - 400013, Maharashtra. T: 022-24908000, F: 24908020

167 | Baerlocher India Additives Pvt LtdIndustrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 09/06/2016 for the manufacture of various other chemical products n.e.c ( antiknock preparations, anti freeze preparation).Location: Dewas, Madhya PradeshContact: 1st Floor, Thirumalai House,plot No. 101-102, Road No.29, Near Sion Fort,sion East, Mumbai - 400022, Maharashtra. T: 022-49220407, M: 9967643629

168 | Berger Paints India LtdIndustrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on

Project Reporter • 33 • September 1, 2016

Industrial Projects

09/06/2016 for the manufacture of water base emulsion paints.Location: Nagaon, AssamContact: 129, Park Street, Kolkata - 700017, West Bengal. T: 033-22299724, 22296005-06, F: 22499009, [email protected]

169 | Bhilosa Industries (P) LtdIndustrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 07/06/2016 for the manufacture of Polyester staple fibre (PSF).Location: Silvassa, Dadra & Nagar HaveliContact: 3rd Floor, Bakhtawar, Behind Trident Hotel, Nariman Point, Mumbai - 400021, Maharashtra. T: 022-67441200

170 | Bhilosa Industries Pvt LtdIndustrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 09/06/2016 for the manufacture of knitted and crocheted synthetic fabrics - circuler warp knitting fabrics.Location: Silvassa, Dadra & Nagar HaveliContact: 3rd Floor, Bakhtawar, Behind Trident Hotel, Nariman Point, Mumbai - 400021, Maharashtra. T: 022-67441200

171 | Bhimashankar Sahakari Sakhar Karkhana LtdIndustrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 09/06/2016 for the manufacture of Industrial alcohol (Un denatured ethyl alcohol of an alcoholic strength by volume of 80% or higher).Location: Pune, MaharashtraContact: Manchar Shirur Road, Dattatraynagar, Pargaon Taree Awasari Bk, Pune - 412406, Maharashtra. T: 020-280443, F: 284270, M: 9975466990

172 | Cadillac Granito Pvt LtdIndustrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 06/06/2016 for the manufacturing of vitrified tilesLocation: GujaratContact: Rajesh Ganeshbhai Detroja, Director, Divyajivan Society, Sanala Road, Morbi - 363641, Gujarat. M: 9512300022, [email protected]

173 | CBM EnterprisesIndustrial Entrepreneurs Memorandum (IEM) was filed with Department of

Industrial Policy & Promotion on 14/06/2016 for Electric power generation using solar energy.Location: Chitradurga, KarnatakaContact: Cts No.123/52b, Chandrashekar, Hosur, Opp To Ksrtc Depo, Hosur, Dharwad - 580021, Karnataka. T: 0836-2227255, 2227244

174 | Clean Coal Enterprises Pvt LtdIndustrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 06/06/2016 to set up Railway siding for handling of coal iron ore and other allied materialsLocation: Janjgir - Champa, ChattisgarhContact: Pawan Kumar Agrawal, Director, Shri Sai Parisar Complex, Room No 1 First Floor, shrikant Verma, Marg, Bilaspur - 495001, Chhattisgarh. [email protected]

175 | Flavour Granito LLPIndustrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 06/06/2016 for the manufacturing of vitrified tile.Location: GujaratContact: Jayantilal Tarshibhai Rupala, Designated Partners, Sr No.282, Khokhara Hanuman Temple Road, Bela, Vill - Bela, Morbi - 363642, Gujarat. [email protected]

176 | GE Diesel Locomotive (P) LtdIndustrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 14/06/2016 for the repair maintenance of railway desel locomotives.Location: Uttar PradeshContact: Nalin Jain, Managing Director, 401,402, 4th Floor, Aggarwal, E-1,2,3, Netaji Subhash Place, Wazipur, New Delhi - 110034, Delhi. [email protected]

177 | GE India Industrial Pvt LtdIndustrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 14/06/2016 for the manufacture of parts and accessories of the aircraft and spacecraft of this class.Location: Pune, MaharashtraContact: A 78/1, Chakan Midc Ph-ii Vasuli, Pune - 410501, Maharashtra. T: 020-40101610

178 | Ghanpur Solar Pvt LtdIndustrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 13/06/2016 to set up Electric power generation using solar energy.Location: Mahbubnagar, TelanganaContact: Neeraj Kaul, Director, 4th Floor, D-4,rectangle One, District Centre, Saket, New Delhi-110017, Delhi. [email protected]

179 | Golden Fibres LLPIndustrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 07/06/2016 for the manufacture of Cotton/linen/jute and all type of yarns.Location: Amravati, MaharashtraContact: A7,trade World, Kamala City, Senapati Bapat Marg Lower Parel (w), Mumbai - 400013, Maharashtra. [email protected]

180 | Gujarat Credo Alumina Chemicals Pvt LtdIndustrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 16/06/2016 for the manufacture of Speciality alumina.Location: Kutch, GujaratContact: Rakesh Sukhraj Shah, Director, A-702, Safal Profitaire, Corporate Road, Prahladnagar, Ahmedabad - 380006, Gujarat. [email protected]

181 | Gulbarga Cement LtdIndustrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 08/06/2016 for the manufacture of clinkers and cement.Location: KarnatakaContact: Adventz Centre, 2nd & 3rd Floor, No.28 Cubbon Road, Bengaluru - 560001, Karnataka. [email protected]

182 | Gummadidala Solar Pvt LtdIndustrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 16/06/2016 to set up Electric power generation unit using solar energy.Location: Medak, TelanganaContact: Neeraj Kaul, Director, 4th Floor, D-4,rectangle One, District Centre, Saket, New Delhi - 110017, Delhi. [email protected]

Project Reporter • 34 • September 1, 2016

Focus: Hydro Power

NEEDS ATTENTIONIndia is the seventh largest producer of hydroelectric power in the world. Hydro power is one of the largest renewable sources of energy available for power generation in India. Hydroelectric potential of India is vast due to the presence of number of rivers and other water bodies across the length and breadth of the country. The hydro potential is estimated to be around 1,48,701 MW and ranks fifth globally. Bulks of these opportunities are in the North Eastern part of the country. Off late the focus has shifted more on Solar energy and the hydro power generation as a renewable source of energy has taken a back seat. The Government of India aims to rectify this scenario and take necessary steps to revive the hydro power sector. Sandeep Sharma takes a look at the languishing hydro power sector in India.

FACTS & FIGURESElectricity generation during April 2016 to June 2016

through Hydro was 30.800 Billion Units (BU) compared to 34.785 BU in the corresponding period of the previous year. The generation capacity addition during April 2016 to June 2016 was 65 MW compared to 730 MW in the corresponding period of the previous year. The installed capacity of hydroelectric power as on 30th June, 2016 is 42848.43 MW. The proposed hydro power capacity addition is 10,897 MW during the 12th Plan period. The 12th plan target seems to be not achievable with the present status of the project. Due to favourable monsoon in the current year, the hydro power generation got a boost in the month of June, 2016 and gaps were narrowed by 2% compared to last year.

HYDRO POWER PROJECTSTo set up hydroelectric power projects, the detailed project

reports are required to be submitted for concurrence or appraisal of Central Electricity Authority (CEA). As of July, around 50 proposals are received from various states for setting up hydro power projects. Out of this 35 are awaiting the CEA concurrence or appraisal.

To fast track hydro power projects, the Government of Himachal Pradesh has announced certain amendments in State Hydro power Policy. The amendments aim to facilitate faster approval in case of delay in obtaining clearances from National Board of Wildlife, Terms of Reference (ToR) approval by Ministry of External Affairs, domain change, Policy provisions, environment clearances and diversion of forest and government land and various other issues.

Some of the recent hydroelectric projects include:• Environment nod received for Kiru hydroelectric project

which is planned to come up on Chenab river in Kishtwar district of Jammu and Kashmir. The cost is estimated to be Rs 4,640.88 crore. Chenab Valley Power Projects (CVPP) Ltd is implementing Kiru HEP and other projects such as 1,000 MW Pakal Dul HEP, 540 MW Kwar HEP and 550 MW Dulhasti (Stage-II) HEP in Chenab river basin.

• NHPC Ltd aims to commission two units of 40 MW each of the 160 MW Teesta Low Dam Project Stage IV in West Bengal, 330 MW Kishanganga projects and one unit of 200 MW of the 800 MW Parbati II in Himachal Pradesh during

Project Reporter • 35 • September 1, 2016

Focus: Hydro Power

STATE WISE NUMBERS AND AGGREGATE CAPACITY OF SHP PROJECTS (UPTO 25 MW)

POTENTIAL, INSTALLED & UNDER IMPLEMENTATION (as on 31.03.2014)

Sl. No.

State Potential Projects Installed Projects under Implementation

Nos. Total Capacity (MW)

Nos. Capacity (MW) Nos. Capacity (MW)

1 Andhra Pradesh 387 978.40 68 221.030 13 32.04

2 Arunachal Pradesh 677 1341.38 149 103.905 44 22.23

3 Assam 119 238.69 6 34.110 3 12.00

4 Bihar 93 223.05 29 70.700 5 17.70

5 Chattisgarh 200 1107.15 9 52.000 4 115.25

6 Goa 6 6.50 1 0.050 - -

7 Gujarat 292 201.97 5 15.600 - -

8 Haryana 33 110.05 7 70.100 2 3.35

9 Himachal Pradesh 531 2397.91 158 638.905 33 76.20

10 J&K 245 1430.67 37 147.530 7 17.65

11 Jharkhand 103 208.95 6 4.050 8 34.85

12 Karnataka 834 4141.12 147 1031.658 23 173.09

13 Kerala 245 704.10 25 158.420 11 52.75

14 Madhya Pradesh 299 820.44 11 86.160 3 4.90

15 Maharashtra 274 794.33 58 327.425 9 43.70

16 Manipur 114 109.13 8 5.450 3 2.75

17 Meghalaya 97 230.05 4 31.030 3 1.70

18 Mizoram 72 168.90 18 36.470 1 0.50

19 Nagaland 99 196.98 11 29.670 3 3.20

20 Orissa 222 295.47 10 64.625 4 3.60

21 Punjab 259 441.38 47 156.200 11 19.45

22 Rajasthan 66 57.17 10 23.850 - -

23 Sikkim 88 266.64 17 52.110 1 0.20

24 Tamil Nadu 197 659.51 21 123.050 - -

25 Tripura 13 46.86 3 16.010 - -

26 Uttar Pradesh 251 460.75 9 25.100 - -

27 Uttarakhand 448 1707.87 99 174.820 46 174.04

28 West Bengal 203 396.11 23 98.400 17 84.25

29 A&N Islands 7 7.91 1 5.250 - -

Total 6474 19749.44 997 3803.678 254 895.40

Project Reporter • 36 • September 1, 2016

Focus: Hydro Power

the current fiscal.• In July, 2016 BHEL has commissioned third unit of the

NHPC’s 4x40 MW Teesta Low Dam hydroelectric project stage-IV in West Bengal. The project is run-of-the-river greenfield project located in Darjeeling district on Teesta river.

• NHPC is hopeful about resuming work on the stalled 2000 MW Lower Subansiri hydro power project along Assam-Arunachal Pradesh border.

KEY PLAYERSPublic sector enterprises like National Hydroelectric Power

Corporation (NHPC) (5987 MW installed capacity), Northeast Electric Power Company (NEEPCO) (755 MW), Satluj Jal Vidyut Nigam Ltd (SJVNL) (1500 MW), THDC (1400 MW), NTPC-Hydro are the active players in hydro power generation in India. The companies in the private sector include Jaiprakash Associates Ltd (1700 MW), Lanco (586 MW), Greenko (258 MW) and Tata Power (573 MW).

Private sector projects were given a big push in the previous regime. Many of the projects did not see the light of the day due to legal and regulatory issues. The Government of the day is gearing up to push the sector forward with corrective measures.

HYDRO PROJECTS CLASSIFICATIONHydropower projects in India are generally categorized in

two segments i.e. small and large hydro. Small Hydro Power (SHP) in India has been standardized up to the level of 25MW. Ministry of Power, Government of India is responsible for large hydro projects; the mandate for the subject small hydro power (up to 25 MW) is given to Ministry of New and Renewable Energy (MNRE). Small hydro power projects are further

classified as Micro (upto 100 kW), Mini (between 101 to 2000 kW) and Small Hydro (between 2001 to 25000 Kw). MNRE is encouraging development of small hydro projects both in the public as well as private sector. Equal attention is being paid to grid-interactive and decentralized projects.

Discussions are on to increase the capacity of small hydro projects to 100 MW from 25 MW so that tax benefits and subsidies can be availed by those power producers who are in >25 MW slab. The subsidies in the range of Rs 1.5 crore to Rs 20 crore per Mw are given to small hydro projects. Renewable energy also enjoys accelerated tax benefit

SMALL HYDRO PROJECTS (SHP)India has an estimated SHP potential of about 15,000MW of

which only 20% has been tapped. As per PIB release dated 31st August, 2016, as many as 60 Small Hydro Power Projects up to 25 MW, capacity aggregating to 223 MW, were commission during the last two years. Of which, 12 Small Hydro Projects (SHP), aggregating to 15 MW, are in the North-Eastern Region. Besides, quality standards for Micro Hydro Projects have also been developed. Development Real Time Digital Simulator for Small Hydro Projects has been initiated at IIT, Roorkee. Global Information System (GIS) based Renewable Energy Resource Potential Mapping has been initiated by the Ministry in 2005.

Small hydro power projects are preferable and environment friendly. Most of these projects are normally run-of-river and construction of dam is not required. Issues associated with large scale hydro projects like deforestation, resettlement and rehabilitation are to the bare minimum. The Government of India is working on a comprehensive policy to revive stalled hydro power projects, including small projects of less than 25 MW.

Project Reporter • 37 • September 1, 2016

HYDRO PROJECTS

Sr. No.

Name of Project Unit No. State/ Implem. AgencyCapacity

(MW)Likely

Commissioning

CENTRAL SECTOR

1 Kishanganga 3x110= 330 MW U-1 to U-3 Jammu & Kashmir / NHPC 330 2016-17

2 Parbati St. II 4x200= 800 MW U-1 to U-4 Himachal Pradesh / NHPC 800 2018-19

3 Tapovan Vishnugad 4x130=520 MW U-1 to U-4 Uttarakhand / NTPC 520 2018-19

4 Tehri PSS 4x250= 1000 MW U-1 to U-4 Uttarakhand / THDC 1000 2018-19

5 Lata Tapovan 3x57= 171 MW U-1 to U-3 Uttarakhand / NTPC 171 2021-22

6 Vishnugad Pipalkoti 4x111= 444 MW U-1 to U-4 Uttarakhand / THDC 444 2019-20

7 Polavaram 12x80= 960 MW U-1 to U-12Andhra Pradesh / Polavaram Project Authority

960 13th Plan

8Teesta Low Dam-IV 4x40= 160 MW

U-1 to U-4 West Bengal / NHPC 160 2015-17

9 Subansiri Lower 8x250= 2000 MW U-1 to U-8 Arunachal Pradesh / NHPC 2000 2019-21

10 Kameng 4x150= 600 MW U-1 to U-4 Arunachal Pradesh / NEEPCO 600 2016-17

11 Pare 2x55= 110 MW U-1 to U-2 Arunachal Pradesh / NEEPCO 110 2016-17

12 Tuirial 2x30= 60 MW U-1 to U-2 Mizoram / NEEPCO 60 2016-17

13 Rammam III 3x40=120 MW U-1 to U-3 West Bengal / NTPC Ltd. 120 2019-20

SUB- TOTAL (CENTRAL) 7275

STATE SECTOR

14Shahpurkandi 3x33+3x33+1x8= 206 MW

U-1 to U-7 Punjab / Irr. Deptt. & PSPCL 206 2018-19

15 Uhl-III 3x33.33= 100 MW U-1 to U-3Himachal Pradesh/ Beas Valley Power Corp. Ltd. (BVPC)

100 2017-18

16 Kashang-I 1x65 =65 MW U-1 Himachal Pradesh / HPPCL 65 2015-16

17Kashang-II & III 1x65 + 1x65= 130 MW

U- 1 & U- 2 Himachal Pradesh / HPPCL 130 2018-19

18 Sainj 2X50=100 MW U- 1 & U- 2 Himachal Pradesh / HPPCL 100 2016-17

19 Swara Kuddu 3x37= 111 MW U-1 to U-3 Himachal Pradesh / HPPCL 111 2018-19

20Shongtong Karcham 3x150= 450 MW

U-1 to U-3 Himachal Pradesh / HPPCL 450 2018-19

21 Vyasi 2X60=120 MW U- 1 & U- 2 Uttarakhand / UJVNL 120 2018-19

22Koyna Left Bank PSS 2x40= 80 MW

U-1 to U-2 Maharashtra/ WRD, GO Mah. 80 2018-19

23 Nagarujana Sagar TR 2x25= 50 MW U-1 & U-2 Andhra Pradesh / APGENCO 50 2015-16

24 Lower Jurala 6x40= 240 MW U-1 to U-6 Telengana / TSGENCO 160 2015-17

25 Pulichintala 4x30= 120 MW U-1 to U-4 Telengana / TSGENCO 120 2016-17

As on November 2015

Project Reporter • 38 • September 1, 2016

Sr. No.

Name of Project Unit No. State/ Implem. AgencyCapacity

(MW)Likely

Commissioning

26 Pallivasal 2x30= 60 MW U-1 to U-2 Kerala / KSEB 60 2018-19

27 Thottiyar 1x30 + 1x10= 40 MW U-1 to U-2 Kerala / KSEB 40 2018-19

28 New Umtru 2x20= 40 MW U-1& U-2 Meghalaya/ MePGCL 40 2016-17

SUB- TOTAL (STATE) 1832

PRIVATE SECTOR

29 Ratle 4x205+1x30= 850 MW U-1 to U-5Jammu & Kashmir / Ratle Hydro Electric Project Pvt. Ltd.

850 2021-22

30 Sorang 2x50= 100 MW U-1 & U-2Himachal Pradesh/Himachal Sorang Power

100 2015-16

31 Tangnu Romai- I 2x22= 44 MW U-1 to U-2Himachal Pradesh / Tangu Romai Power Generation

44 2018-19

32 Bajoli Holi 3x60= 180 MW U-1 to U-3Himachal Pradesh / GMR Bajoli Holi Hydro Power Pvt. Ltd.

180 2019-20

33 Chanju-I 3x12= 36 MW U-1 to U-3 Himachal Pradesh / IA Energy 362017-18 (Likely to advance to 2016-17)

34 Tidong-I 2x50= 100 MW U-1 to U-2 Himachal Pradesh / M/s NSL Tidong 100 2017-18

35 Phata Byung 2x38= 76 MW U-1 to U-2 Uttarakhand / M/s Lanco 76 2017-18

36 Singoli Bhatwari 3x33= 99 MW U-1 to U-3Uttarakhand/ L&T Uttaranchal Hydro power Limited

99 2019-20

37 Maheshwar 10x40= 400 MW U-1 to U-10 Madhya Pradesh / SMHPCL 400 2017-18

38 Teesta- III 6x200= 1200 MW U-1 to U-6 Sikkim / Teesta Urja Ltd. (*) 1200 2016-17

39 Teesta- VI 4x125= 500 MW U-1 to U-4 Sikkim / LANCO 500 2021-22

40 Rangit-IV 3x40= 120 MW U-1 to U-3 Sikkim /Jal Power corp. Ltd. 120 2018-19

41 Bhasmey 3x17= 51 MW U-1 to U-3` Sikkim / Gati Infrastructure 51 2019-20

42 Tashiding 2x48.5= 97 MW U-1 to U-2 Sikkim/ Shiga Energy Pvt. Ltd. 97 2017-18

43 Dikchu 3x32= 96 MW U-1 to U-3Sikkim/ Sneha Kinetic Power Projects Pvt. Ltd.

96 2019-20

44 Rangit-II 2x33= 66 MW U-1 to U-2 Sikkim/ Sikkim Hydro Power Ltd. 66 2019-20

45 Rongnichu 2x48= 96 MW U-1 to U-2Sikkim/ Madhya Bharat Power Corporation Ltd.

96 2019-20

46 Panan 4x75= 300 MW U-1 to U-4Sikkim/ Himgiri Hydro Energy Pvt. Ltd.

300 2020-21

47 Gongri 2x72= 144 MW U-1 to U-2Arunachal Pradesh/ Diran Energy Pvt. Ltd.

144 2020-21

SUB- TOTAL (PRIVATE): 4555

TOTAL (C.S, +SS.+PS.) 13662

HYDRO PROJECTS

Project Reporter • 39 • September 1, 2016

POWER STATISTICS

# Lakshadweep and Andaman & Nicobar Islands are stand- alone systems, power supply position of these, does not form part of regional requirement and availability.

Source: CEA

Peak Demand and Peak Met (Provisional)

State/ System / Region

July, 2016 April, 2016 to July, 2016

Peak Demand Peak Met Surplus / Deficit (-) Peak Demand Peak Met Surplus / Deficit (-)(MW) (MW) (MW) (%) (MW) (MW) (MW) (%)

Chandigarh 303 303 0 0.0 361 361 0 0.0Delhi 6,342 6,261 -81 -1.3 6,342 6,261 -81 -1.3Haryana 9,262 9,262 0 0.0 9,262 9,262 0 0.0Himachal Pradesh 1,297 1,297 0 0.0 1,330 1,330 0 0.0Jammu & Kashmir 2,375 1,942 -433 -18.2 2,478 2,102 -376 -15.2Punjab 11,174 11,174 0 0.0 11,174 11,174 0 0.0Rajasthan 9,288 9,168 -120 -1.3 9,906 9,906 0 0.0Uttar Pradesh 16,123 15,154 -969 -6.0 16,123 15,501 -622 -3.9Uttarakhand 1,972 1,907 -65 -3.3 2,020 1,945 -75 -3.7Northern Region 50,484 49,737 -747 -1.5 53,372 52,612 -760 -1.4Chhattisgarh 3,360 3,321 -39 -1.2 3,875 3,851 -25 -0.6Gujarat 12,692 12,692 0 0.0 14,724 14,708 -16 -0.1Madhya Pradesh 6,671 6,660 -12 -0.2 8,145 8,111 -34 -0.4Maharashtra 16,014 15,997 -17 -0.1 20,057 20,021 -36 -0.2Daman & Diu 327 327 0 0.0 327 327 0 0.0Dadra & Nagar Haveli 745 745 0 0.0 781 781 0 0.0Goa 456 456 0 0.0 497 496 -1 -0.3Western Region 38,999 38,709 -290 -0.7 45,369 44,957 -412 -0.9Andhra Pradesh 7,163 7,163 0 0.0 7,576 7,361 -215 -2.8Telangana 6,856 6,856 0 0.0 6,935 6,894 -41 -0.6Karnataka 8,317 8,302 -15 -0.2 9,980 9,551 -428 -4.3Kerala 3,368 3,368 0 0.0 4,132 3,996 -135 -3.3Tamil Nadu 14,518 14,467 -50 -0.3 14,823 14,823 0 0.0Puducherry 356 351 -5 -1.4 371 368 -3 -0.7Lakshadweep # 8 8 0 0 8 8 0 0Southern Region 36,097 36,097 0 0.0 40,752 40,472 -280 -0.7Bihar 3,926 3,726 -200 -5.1 3,926 3,726 -200 -5.1DVC 2,636 2,636 0 0.0 2,686 2,686 0 0.0Jharkhand 1,101 1,101 0 0.0 1,498 1,498 0 0.0Odisha 3,943 3,943 0 0.0 4,012 4,012 0 0.0West Bengal 7,565 7,543 -22 -0.3 7,665 7,641 -24 -0.3Sikkim 97 97 0 0.0 112 112 0 0.0Andaman-Nicobar # 40 32 -8 -20 40 32 -8 -20Eastern Region 18,617 18,402 -214 -1.2 18,642 18,596 -46 -0.2Arunachal Pradesh 136 135 -1 -0.7 141 139 -2 -1.4Assam 1,591 1,547 -44 -2.8 1,591 1,547 -44 -2.8Manipur 141 141 0 0.0 152 151 -1 -0.7Meghalaya 292 292 0 0.0 311 311 0 0.0Mizoram 80 79 -1 -1.3 88 88 0 0.0Nagaland 120 119 -1 -0.8 120 119 -1 -0.8Tripura 259 258 -1 -0.4 275 273 -2 -0.6North-Eastern Region 2,474 2,391 -83 -3.4 2,487 2,475 -12 -0.5All India 139,686 138,415 -1,271 -0.9 152,974 149,971 -3,003 -2.0

(Figures in MW net)

Project Reporter • 40 • September 1, 2016

ECONOMIC STATISTICS

INDEX OF EIGHT CORE INDUSTRIES (BASE: 2004-05=100) JUNE, 2016

The Eight Core Industries comprise nearly 38 % of the weight of items included in the Index of Industrial Production (IIP). The combined Index of Eight Core Industries stands at 180.4 in June, 2016, which was 5.2 % higher compared to the index of June, 2015. Its cumulative growth during April to June, 2016-17 was 5.4 %.

COAL

Coal production (weight: 4.38 %) increased by 12.0 % in June, 2016 over June, 2015. Its cumulative index during April to June, 2016-17 increased by 5.4 % over corresponding period of previous year.

CRUDE OIL

Crude Oil production (weight: 5.22 %) decreased by 4.3 % in June, 2016 over June, 2015. Its cumulative index during April to June, 2016-17 decreased by 3.3 % over the corresponding period of previous year.

NATURAL GAS

The Natural Gas production (weight: 1.71 %) decreased by 4.5 % in June, 2016 over June, 2015. Its cumulative index during April to June, 2016-17 declined by 6.1 % over the corresponding period of previous year.

REFINERY PRODUCTS (93% OF CRUDE THROUGHPUT)

Petroleum Refinery production (weight: 5.94%) increased by 3.5 % in June, 2016 over June, 2015. Its cumulative index during April to June, 2016-17 increased by 7.1 % over the corresponding period of previous year.

FERTILIZERS

Fertilizer production (weight: 1.25%) increased by 9.8 % in June, 2016 over June, 2015. Its cumulative index during April to June, 2016-17 increased by 11.0 % over the corresponding period of previous year.

STEEL (ALLOY + NON-ALLOY)

Steel production (weight: 6.68%) increased by 2.4 % in June, 2016 over June, 2015. Its cumulative index during April to June, 2016-17 increased by 3.8 % over the corresponding period of previous year.

CEMENT

Cement production (weight: 2.41%) increased by 10.3 % in June, 2016 over June, 2015. Its cumulative index during April to June, 2016-17 increased by 5.7 % over the corresponding period of previous year.

ELECTRICITY

Electricity generation (weight: 10.32%) increased by 8.1 % in June, 2016 over June, 2015. Its cumulative index during April to June, 2016-17 increased by 9.0 % over the corresponding period of previous year.

Note: Data are provisional. Revision has been made based on revised data received for corresponding month of previous year in respect of Coal, Crude Oil, Natural Gas, Refinery Product, Steel, Cement and Electricity. Accordingly, indices for the month June, 2015 have been revised.

Project Reporter • 41 • September 1, 2016

PERFORMANCE OF EIGHT CORE INDUSTRIESYEARLY INDEX & GROWTH RATE

BASE YEAR: 2004-05=100

INDEX

GROWTH RATES (in %)

ECONOMIC STATISTICS

#Refinery Products’ yearly growth rate of 2012-13 is not comparable with other years on account of inclusion of RIL (SEZ) production data since April, 2012.

Sector Weight 2011-12 2012-13 2013-14 2014-15 2015-16 Apr-Jun 2015-16

Apr-Jun 2016-17

Coal 4.379 141.5 148.1 150.0 162.2 169.6 153.1 161.4

Crude Oil 5.216 112.1 111.4 111.2 110.2 108.7 109.6 106.0

Natural Gas 1.708 149.7 128.1 111.5 106.0 101.5 103.8 97.5

Refinery Products 5.939 133.7 172.5 175.0 175.6 182.3 177.1 189.7

Fertilizers 1.254 103.8 100.2 101.8 101.7 113.2 98.2 108.9

Steel 6.684 174.0 181.1 201.9 211.4 208.2 216.7 225.0

Cement 2.406 175.2 188.7 194.5 205.3 215.0 217.6 230.0

Electricity 10.316 149.3 155.3 164.6 178.5 188.1 185.2 201.9

Overall Index 37.903 145.3 154.7 161.2 168.5 173.0 170.9 180.2

Sector Weight 2011-12 2012-13 2013-14 2014-15 2015-16 Apr-Jun 2015-16

Apr-Jun 2016-17

Coal 4.379 1.3 4.6 1.3 8.1 4.6 7.0 5.4

Crude Oil 5.216 1.0 -0.6 -0.2 -0.9 -1.4 -0.8 -3.3

Natural Gas 1.708 -8.9 -14.5 -13.0 -4.9 -4.2 -4.2 -6.1

Refinery Products# 5.939 3.1 29.0 1.5 0.3 3.8 4.2 7.1

Fertilizers 1.254 0.4 -3.4 1.5 -0.1 11.3 2.4 11.0

Steel 6.684 10.3 4.1 11.5 4.7 -1.5 2.1 3.8

Cement 2.406 6.7 7.7 3.1 5.6 4.7 1.4 5.7

Electricity 10.316 8.1 4.0 6.0 8.4 5.4 2.3 9.0

Overall Index 37.903 5.0 6.5 4.2 4.5 2.7 2.5 5.4

Project Reporter • 42 • September 1, 2016

PERFORMANCE OF EIGHT CORE INDUSTRIESMONTHLY INDEX & GROWTH RATE BASE YEAR: 2004-05=100

INDEX

GROWTH RATES (in %)

ECONOMIC STATISTICS

Source: Ministry of Commerce & Industry

Sector Coal Crude Oil Natural Gas

Refinery Products

Fertiliz-ers

Steel Cement Electric-ity

Overall Index

Weight 4.379 5.216 1.708 5.939 1.254 6.684 2.406 10.316 37.903

Jun-15 146.9 109.5 102.8 183.9 105.3 219.7 215.4 183.7 171.4

Jul-15 134.7 110.7 99.0 176.2 111.3 206.3 209.7 190.3 168.0

Aug-15 139.0 112.8 107.2 185.1 119.0 197.5 197.2 194.3 169.6

Sep-15 143.2 107.4 103.9 170.3 119.4 197.5 195.8 194.4 166.8

Oct-15 168.4 111.3 105.6 172.5 122.1 209.4 207.4 201.1 175.4

Nov-15 180.3 107.3 102.6 185.9 118.4 194.6 185.9 174.2 166.8

Dec-15 197.4 108.7 103.4 190.2 122.6 203.6 217.9 182.4 175.7

Jan-16 200.4 107.3 92.5 194.7 118.5 216.7 236.1 187.3 180.7

Feb-16 191.5 102.3 96.9 179.4 113.4 202.6 232.5 181.2 172.2

Mar-16 221.1 108.1 96.0 201.9 119.1 219.7 244.6 196.3 188.0

Apr-16 154.9 104.4 94.0 190.3 94.2 212.3 225.2 203.1 176.4

May-16 164.8 108.7 100.3 188.3 116.9 237.6 227.0 203.9 183.7

Jun-16 164.6 104.8 98.2 190.4 115.6 225.0 237.7 198.6 180.4

Sector Coal Crude Oil Natural Gas

Refinery Products

Fertiliz-ers

Steel Cement Electric-ity

Overall Index

Weight 4.379 5.216 1.708 5.939 1.254 6.684 2.406 10.316 37.903

Jun-15 5.4 -0.7 -6.0 7.5 5.8 4.2 2.9 1.2 3.1

Jul-15 0.3 -0.4 -4.4 2.9 8.6 -2.6 1.3 3.5 1.1

Aug-15 0.4 5.6 3.7 5.8 12.6 -5.9 5.4 5.6 2.6

Sep-15 1.9 -0.1 0.9 0.5 18.1 -2.5 -1.5 10.8 3.2

Oct-15 6.3 -2.1 -1.8 -4.4 16.2 -1.2 11.7 8.8 3.2

Nov-15 3.5 -3.3 -3.9 2.5 13.5 -8.4 -1.8 0.0 -1.3

Dec-15 6.1 -4.1 -6.1 2.1 13.1 -4.4 3.2 2.7 0.9

Jan-16 9.1 -4.6 -15.3 4.8 6.2 -2.8 9.0 6.0 2.9

Feb-16 3.9 0.8 1.2 8.1 16.3 -0.5 13.5 9.2 5.7

Mar-16 1.7 -5.1 -10.5 10.8 22.9 3.4 11.9 11.3 6.4

Apr-16 -0.9 -2.3 -6.8 17.9 7.8 6.1 4.4 14.7 8.5

May-16 5.5 -3.3 -6.9 1.2 14.8 3.2 2.4 4.6 2.8

Jun-16 12.0 -4.3 -4.5 3.5 9.8 2.4 10.3 8.1 5.2

Project Reporter • 43 • September 1, 2016

Road Watch

6 LANING OF CHENNAI - TADA SECTION

Project DetailsSix laning of Chennai to Tada section of NH-5 from km. 11.000 to km 54.400 in the state of Tamil Nadu to be executed as BOT on DBFOT pattern under NHDP phase V.

Name of Authority National Highways Authority of India

Concessionaire L&T Chennai Tada Tollway Ltd

Independent Engineer SNC-Lavalin International-Aarvee Associates (JV)

Project Cost ` 418.75 Crore

Concession Agreement Signing Date 3rd June 2008

Date of Commencement 3rd April 2009

Concession Period 15 Years (Including 912 days of construction period)

Date of Completion 1st October 2011 (27th March 2014 as approved by Executive Committee, NHAI HQ)

Revised Date of Completion 2018

Current Status 55.655 Per Cent work is completed. Due to land acquisition issues project is in delay mode.

ContactsD.Surendra Nath, Project Director, NHAI, Project Implementation Unit-Chennai, Sri Towers, 3rd Floor, DP 34 (SP) Industrial Estate, Guindy, Chennai - 600032, Tamil Nadu. T: 044-22251885, M: 7598677417, [email protected]

ASAPP Info Global Services Pvt. Ltd.

Project Reporter • 49 • July 15, 2016

ASAPP Info Global GroupPresents 3rd Edition of

• Databaseofcompaniesfromthecementsectorcomprising–manufacturers,dealers,suppliers,cementplantmachinery,consultants,cementconcreteblock,RMC,cementproducts,cementstorage/transportandalliedindustries

• Sectoroverview

• Aprofileofthecompanies-theareasofbusiness,keyoperatingunits,subsidiaries,etc

• Namesandcompletecontactdetailsofkeyexecutives

• Vitalsectordataandstatistics• Projectopportunities–around200projects

wherecementrequirementexists

A unique, integrated business directory on Cement Industry

Cement Infobank is a practical database with a wealth of information that includes:

Contact: [email protected]: + 91 22 2419 3000

NOW!ORDER YOUR

COPY

A-303,NavbharatEstate,ZakariaBunderRoad,Sewri(West),Mumbai-400015.Tel.:022-24193000.Fax:022-24175734Email:[email protected]

To order online visit : www.ASAPPinfoGLOBAL.com/Subscribe

®

` 5000/-` 3999/-x

ISSN 2277-6532 Date of Publication: 1st & 15th of Every Month.