(1/8) J. Mekki RadWG meeting – 03/02/2015 CHARM facility update 03/02/2015.

10
(1/8) J. Mekki RadWG meeting – 03/02/2015 CHARM facility update 03/02/2015

Transcript of (1/8) J. Mekki RadWG meeting – 03/02/2015 CHARM facility update 03/02/2015.

(1/8)J. Mekki RadWG meeting – 03/02/2015

CHARM facility update

03/02/2015

(2/8)J. Mekki RadWG meeting – 03/02/2015

1st year - 2014

(3/8)J. Mekki RadWG meeting – 03/02/2015

Group Technical responsible Equipement

EN/STI

Giovanni Spiezia/Raffaello Secondo/Salvatore Danzeca

RadMON V6

Ruben G, Alia / Slawosz SRAMs

Gilles Foucard/Paul Peronnard JDI tester

IT/CS Alberto Garcia Molero IT beacons

TE/CRG

Nikolaos Trikoupis/ Juan Casas Cubillos Cryogenic electronics crate

LEDs

TE/EPC

Slawosz Uznanski Componentso SRAM RenesasoADS1271 Delta-Sigma ADC

Lionel Foro / Louis de Mallac Components testerComponents(Op-amp, Comparator, power MosFETs etc …)

UM2_EN/STI

Raffaello Secondo Cubesat

Julien Mekki Capa MOS

INFN Massimiliano Fiorini PCB board and wires

10 users

14 equipment

1st year - 2014

(4/8)J. Mekki RadWG meeting – 03/02/2015

1st Run Analysis

Radiation levels at the different locations are being analysed

Benchmarking is being performed between experimental measurements (RadMON / BLM) and Fluka

simulations

Results will be provided to the users as soon as they are availableTID1 MeV

neutron eq. fluence

HEH fluence Thermal neutrons fluence

Dedicated test positionRadiation test period

(5/8)J. Mekki RadWG meeting – 03/02/2015

2nd year - 2015

(6/8)J. Mekki RadWG meeting – 03/02/2015

2nd year - 2015

(7/8)J. Mekki RadWG meeting – 03/02/2015

2nd year - 2015

(8/8)J. Mekki RadWG meeting – 03/02/2015

List of possible users (2015)Group Technical

responsibleEquipement Target

Dose/CriterionComments / Request form

EN/STI

Paul PeronnardComponents(To be defined)

To be defined No request form received yet

Ruben G, Alia SRAMs To be defined Test foreseenNo request form received yet

S, Danzeca Floating Gate sensors To be defined Test foreseenNo request form received yet

TE/EPC

Slawosz Uznanski FGCLite prototype To be defined Test foreseenNo request form received yet

Lionel Foro / Louis de Mallac Components tester (upgrade of the existing one)Components to be tested (op-amp/comparator/Power Mos …)

Test will be 200 Gy / slots Test will be doneNo request form received yet

Vincent Barbet Full power converter To be defined Test foreseenNo request form received yet

TE/MPE

Yan Bastian Remote I/Os interlocks equipment

1 kGyStart: Low Dose Rate 1-2Gy/hAnd 10 Gy/h Estimation: around 15 days at position 15

Test will be doneRequest form received

(9/8)J. Mekki RadWG meeting – 03/02/2015

Group Technical responsible

Equipement Target Dose/Criterion

Comments / Request form

UM2/CERN Raffaello Secondo Cubesat To be defined No request form yet

TE/MPEJens Steckert nDQQDG board Test with blown up beam

To be definedTest in direct beam (another iteration is needed)No request form yet

PH/ESEFrancis Anghinolfi ASICs test Test with

the blown-up beamTo be defined

First discussion already doneNo request form yet

EN/EL

Carl Crommelinck Data concentrator with different I/O

To be defined First discussion already doneNo request form yetResults needed by end of summer

Stephane Delarue Light sytem To be defined Test to be done No request form yet

Vincent Chareyre UPS To be defined Test foreseenNo request form yet

BE/RFWolfgang Hofle High Bandwidth solid state

amplifiersTo be defined Test foreseen

No request form yet

TE/CRG Nikolaos Trikoupis No requirement yet

PH/AIDHartmut Hillemanns MAPS sensor on PCB Test with the blown up

beamTo be defined

Request form received

List of possible users (2015)

Already 16 use

rs

More to

be added

(10/8)J. Mekki RadWG meeting – 03/02/2015

Information