17nov themesession2 _seai_marren_wirelite

17
Our mission is to be the leading supplier of integrated wireless demand response management solutions for business customers Wirelite Sensors

description

Presentation from Michael Phelan, (SEAI Wirelite Sensors) - Used at Globe Forum Dublin 2010

Transcript of 17nov themesession2 _seai_marren_wirelite

Page 1: 17nov themesession2 _seai_marren_wirelite

Our mission is to be the leading supplier of integrated wireless demand response

management solutions for business customers

WireliteSensors

Page 2: 17nov themesession2 _seai_marren_wirelite

WireliteSensors

Founded in 2007 Supported by SEAI Developed retrofit energy management

solution with Tyndall Research Retail Customers 2009 Cold store customers 2010 Seed Funding from AIB/EI /Angles Commercial and Industrial Demand

Response Management Systems roll-out

The company

Page 3: 17nov themesession2 _seai_marren_wirelite

WireliteSensors

Our focusHVAC 12% Cold Stores & Fridges 50%

Cooking 10%Lighting 28%

Initial Focus Retail Food Food

Processing Shiftable load Energy bills

€50k-500k pa

NoIntegrated

ControlSystems

Page 4: 17nov themesession2 _seai_marren_wirelite

WireliteSensors

Wirelite’s SystemEnergy Manager

(PM3000)

Gateway Node

Remote AccessWeb Reporting

Lighting

Relay

Network Node

Sub-

met

er (P

A31

0) Control

◦ Scheduled Lighting HVAC Ventilation

◦ Demand HVAC Ventilation

◦ Sensor HVAC Ventilation

HVAC

Relay

Network Node

CO2Sensor

Sub-

met

er (P

A31

0)

Refrigeration

Relay

Network Node

Temp Sensor

Sub-

met

er (P

A31

0)

Page 5: 17nov themesession2 _seai_marren_wirelite

WireliteSensors

Market price for electricity (3/11/10)

Peak Electricity Times

A variable tariff varies daily like the above profile

Electricity prices are more expensive between 5-7pm

Page 6: 17nov themesession2 _seai_marren_wirelite

WireliteSensors

Retail Multi site Benchmark – KWh/sqFt

Comparison of Actual Electricity kWh / SqFt for Selected Sites

- 20.0 40.0 60.0 80.0 100.0 120.0

Northern Cross

Smithfield

Grand Canal

Camden

MACE IFSC

Report covers the period from 1/1/2008 to 11/30/2008.

Page 7: 17nov themesession2 _seai_marren_wirelite

WireliteSensors

Generation Mix Ireland

Page 8: 17nov themesession2 _seai_marren_wirelite

WireliteSensors

Daily Profiles Summer & Winter

Page 9: 17nov themesession2 _seai_marren_wirelite

WireliteSensors

Effect of Wind on Demand

Page 10: 17nov themesession2 _seai_marren_wirelite

WireliteSensors

What is Demand Side Management

Page 11: 17nov themesession2 _seai_marren_wirelite

WireliteSensors

Demand Response Types

Incentive Based DRReliability and Security

Functionality to grid operators

Price Based DRKeeps demand and prices low

EfficiencySaving end users up to 25% on their energy bills

Black and red lines show what happens without interventionGreen is response to intervention

Page 12: 17nov themesession2 _seai_marren_wirelite

WireliteSensors

Wirelite – Demand Response functionality

Eirgrid Calls event 30 Minutes before

required

WirelliteResponds

automatically within 30 minutes

Page 13: 17nov themesession2 _seai_marren_wirelite

WireliteSensors

Demand Response in action

Eirgrid Calls event 30 Minutes before

required

WirelliteResponds

automatically within 30 minutes

20KWFrom HVAC

25KWFrom 25% Lighting

30KW From

Refrigeration WireliteRestores

normal operation

Page 14: 17nov themesession2 _seai_marren_wirelite

WireliteSensors

100 MW

100 MWAggregation of loads

75KW

5MW1MW

300KW

75KW

150KW

75KW

300KW 150

KW

300KW

150KW 75

KW

150KW150

KW

75KW

75KW

75KW

• Advising Clients on their energy usage

• Automation and control of ‘energy assets’

• Aggregation of ‘assets’ • Selling aggregated DR capacity

to the marketAggregate

Commercialise

Identify

Control

Page 15: 17nov themesession2 _seai_marren_wirelite

WireliteSensors

Product Roadmap

Energy ‘Storage’

Capacity Payments

Products

Customers

Proposition

Automated Energy Manager

RetailersCold Stores

Food Processors

Savings (15%-25%)Reduced Footprint

Green Brands

Phase 1

Automated Demand Response

SEMElectricity Supplier

Grid Operator

Reduced CapitalGrid Mgt.

Smart Grid

Phase 2

Capital cost of €8 – €12kAnnual site cost €2-€3k

RoI of 12-24 months

Page 16: 17nov themesession2 _seai_marren_wirelite

WireliteSensors

Demand Response Management Product

Commands

HVAC Refrig Lights

SEMOGrid

GeneratorsLoads

Loads

G1 G2 G3

Aggregation DR

Site

Loads

UtilityBilling

StatusCapacityLocation

Command response

BillingReconciliation

Commands Commands

Data Sets • Interface to/from grid• Interface to/from generators• Interface to/from loads• Interface to/from billing

StatusMeter data

StatusMeter data

Page 17: 17nov themesession2 _seai_marren_wirelite

WireliteSensors

Michael Phelan

Wirelite SensorsTel: 01-5240736

Email : [email protected]: www.wirelitesensors.com

Questions