174208 FM Tuffseal - SISSAC · TuffSeal Junction Box Installation 3 2.0 TuffSeal Junction Box...
Transcript of 174208 FM Tuffseal - SISSAC · TuffSeal Junction Box Installation 3 2.0 TuffSeal Junction Box...
TuffSeal®
Heavy Capacity Junction BoxJB8SP
Installation Manual
PN 174208 Rev A
An ISO 9001 registered company© Rice Lake Weighing Systems. All rights reserved.
Rice Lake Weighing Systems® is a registered trademark of Rice Lake Weighing Systems.
All other brand or product names within this publication are trademarks or registered trademarks of their respective companies.
All information contained within this publication is, to the best of our knowledge, complete and accurate at the time of publication. Rice Lake Weighing Systems reserves the right to
make changes to the technology, features, specifications and design of the equipment without notice.
The most current version of this publication, software, firmware and all other product updates can be found on our website:
www.ricelake.com
Contents
© Rice Lake Weighing Systems. All rights reserved. Printed in the United States of America. Specifications subject to change without notice.
Rice Lake Weighing Systems is an ISO 9001 registered company.June 7, 2017
Technical training seminars are available through Rice Lake Weighing Systems.
Course descriptions and dates can be viewed at www.ricelake.com/trainingor obtained by calling 715-234-9171 and asking for the training department.
1.0 Introduction..................................................................................................................................... 11.1 Safety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21.2 Special Conditions of Use . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
2.0 TuffSeal Junction Box Installation ................................................................................................. 33.0 Wiring the Junction Box ................................................................................................................. 44.0 Trimming Procedure ....................................................................................................................... 6
Contents 1
Rice Lake continually offers web-based video training on a growing selection
of product-related topics at no cost. Visit www.ricelake.com/webinars
2 TuffSeal Heavy Capacity Junction Box
1.0 IntroductionThe TuffSeal® eight-channel signal trim junction box can accommodate up to eight load cells and is used in NTEP required truck scale installations. Additional load cells can be accommodated by wiring multiple junction boxes using the expansion terminal located on the main board.
The junction box has a Prevent® breather vent which inhibits the buildup of pressure caused by sudden temperature or environmental changes. The breather vent inhibits the buildup of pressure caused by sudden temperature or environmental changes. It should be changed every six months to a year as it will become dirty over time. When correctly installed and torqued to 10 lb/in, all models can withstand 900 PSI water pressure.
The TuffSeal junction box will function properly without modification. If needed, load cell output can be individually trimmed with potentiometers. For more information, see Section 4.0 on page 6.
Manuals can be viewed or downloaded from the Rice Lake Weighing Systems website at www.ricelake.com/manuals
Warranty information can be found on the website at www.ricelake.com/warranties
Figure 1-1. TuffSeal Truck Scale Junction Box
Introduction 1
1.1 SafetySafety Signal Definitions:
Indicates an imminently hazardous situation that, if not avoided, will result in death or serious injury. Includes hazards that are exposed when guards are removed.
Indicates a potentially hazardous situation that, if not avoided could result in serious injury or death. Includes hazards that are exposed when guards are removed.
Indicates a potentially hazardous situation that, if not avoided, could result in minor or moderate injury.
Indicates information about procedures that, if not observed, could result in damage to equipment or corruption to and loss of data.
General Safety
Do not operate or work on this equipment unless this manual has been read and all instructions are understood. Failure to follow the instructions or heed the warnings could result in injury or death. Contact any Rice Lake Weighing Systems dealer for replacement manuals.
Failure to heed may result in serious injury or death.
Do not install where water may accumulate; this could cause electric shock and damage to the unit.
Do not use if wiring is frayed or worn.
Do not use if the cover is off or the unit has not been sealed properly.
Do not place fingers into slots or possible pinch points.
Do not use this product if any of the components are cracked.
Do not make alterations or modifications to the unit.
Do not remove or obscure warning labels.
Ensure load cells are correctly wired; incorrect wiring could cause damage to the unit.
1.2 Special Conditions of Use• Clean the J-Box enclosure with a damp cloth only - Electrostatic Charging Hazard.• This equipment was examined and approved for connection to a single Indicator only.
DANGER
WARNING
CAUTION
Important
WARNING
2 TuffSeal Heavy Capacity Junction Box
TuffSeal Junction Box Installation 3
2.0 TuffSeal Junction Box InstallationThe TuffSeal junction box should be mounted in a location that is convenient for servicing and away from standing water. Mount the enclosure in a location so that the load cell cable need not be cut, nor length added. Load cell output is temperature compensated for the supplied cable length; altering the cable length can change the cell's signal output.
Depending on the mounting surface, the enclosure is attached using four pan-head screws, bolts or other suitable fasteners (not included). Figure 2-1 shows the dimensions for mounting the enclosure.
Figure 2-1. JB8SP Enclosure Dimensions
10.75"
11.50"
8.25"6.00"
5.25"
(8) 3/8" NPT Cord Grips - Cable Diameter 0.157" - 0.314"(2) 1/2" NPT Cord Grips - Cable Diameter 0.272" - 0.472"
Recommended screw size 1/4 - 20NC
With reducing glands, the cable diameter changes to 0.295” - 0.353”.Note
3.0 Wiring the Junction BoxThe TuffSeal junction box is designed to connect and trim up to eight load cells per board. However, it is possible to use this box with two, four, six and eight load cell combinations. Use the expansion port on the main board to connect multiple junction boxes in series to accommodate applications having ten or more load cells.
Figure 3-1. Expansion Port Wiring Location
1. Determine the wiring pattern, then route the load cell cables through the cord grip assemblies. Leave the grips loose until final closure.
2. Strip the wire insulation back 1/4" to expose the wire. The pluggable connector will accommodate 12 to 28 gauge wire.
3. Open each pole with a small screwdriver and insert the appropriate wire into the exposed wire opening.
4. Tighten the end screw with the screwdriver to secure each wire into place.
5. Plug the terminal to the appropriate header socket.
The indicator terminal is used to connect the main cable to the weight indicator. Determine the indicator's load cell input connections from the indicator manual.
R29
R15
R27
WSR2
J8
W6
W1
1
Pb
J7
R47
R18
R36
MH5
WSR1
TH1
R13
TH2
J4
U7
R2
R28
R12
MH9
JP17
JP10
U10
R20
R44
R41
TH4
R33
W15
W18
W8
W20
W9
W14
W13
W3
W21
NUT2
R46
R32
R16
R25
R35
J1
JP18
JP1
6
U2
U8
R31
R5
R43
R17
R8
JP9
R23
J6
W7
JP6
JP12R30W17
R48
R38
J5
W12
W19
W2
W5
W4
W10
NUT1
BOLT1
R52
RICE LAKE
MH6
U11
JP15
R45
U5
R50
R14
JP7
R10
R3
R7
U1
U12
JP19 JP14
R21
R9
JP1
1
U3
JP13
U9
R26
R37
R34
JP8
U4
R40
J3
R51
R22
R19
U6
ASSYPN/Rev
W1
6
R4
JP20
R42
R24
J2
R1
JP21
R11
R39
R6
R49
BOARD
MH7
JP1
JP2
JP5
W1
MH8
JP3
JP4
TH3
EXPANSION/J9
-EX
+EX
+SI
-SI
+SEN
SHD
-SEN
JMP/NEGJMP/POS
INDICATOR/J10
-EX
+SI
-SI
+SEN
SHD
+EX
-SEN
W22
JP22
MH7
MH8
TH3
EXPANSION/J9
-EX
+EX
+SI
-SI
+SEN
SHD
-SEN
INDICATOR/J10
-EX
+SI
-SI
+SEN
SHD
+EX
-SEN
MH9
W21
JP21
JMP/NEGJMP/POS
W22
JP22
Note
4 TuffSeal Heavy Capacity Junction Box
6. Run a cable from the indicator terminal into the junction box through the larger cord grip.
7. Make the connections on the indicator terminal using the same procedure as inserting load cell cables to the appropriate connectors.
If cables could be exposed to water or other liquids, bend a short downward loop in all cables near the cord grips so any fluids draining down the cables will drip off before reaching the junction box.
Figure 3-2. Drip Loop Cable
Note
Wiring the Junction Box 5
4.0 Trimming ProcedureTrimming is a process of equalizing the output from multiple individual load cells. If needed, load cell output can be individually trimmed with potentiometers.
When a substantial amount of trim (more than 7% of normal output), is necessary to equalize output, check for other possible problems. The best trim is always the least amount of trim.
The JB8SP is a signal trimming device with individual and section trimming potentiometers (see Figure 4-1 on page 7).
Use the following steps to properly trim the JB8SP junction box.
If using two junction boxes with an expansion cable between them, make sure to cut the sense trace on the board that has the homerun cable connected to it (see Figure 4-1 on page 7). This ensures sensing out to the furthest junction box within the system. A six conductor cable must be used between the two junction boxes to ensure proper functioning of sense.
1. Determine the number of load cells needed. When section trimming, it is acceptable to use combinations of load cells other than eight, but the combination must be an even number of cells.
2. Turn all the individual cell and section potentiometers clockwise to give maximum signal output from each section. Remove all shunt jumpers of the individual cells that are not used to disable them and ensure the section potentiometer is turned fully.
If desired, all the potentiometers can be adjusted three to five full turns counter-clockwise to allow trim capabilities both positive and negative.
3. Determine the lowest value and turn the potentiometers counter-clockwise to trim all other values to match the lowest value.
4. Remove all weight from the scale and zero the indicator. Place calibrated test weights over each load cell or section. The amount of test weights to be used will depend on the scale configuration. For specific recommendations, refer to the Handbook 44, published by the National Institute of Standards and Technology (NIST).
5. Record the value displayed on the indicator after the test weight is placed in turn over each load cell, or over each section. Select the load cell or section that has the lowest value as the reference point. This load cell or section will not be trimmed.
6. Place the same test load over each cell or section in turn. Using the corresponding potentiometer, trim each cell or section down to equal the reference point. Check zero after every adjustment to avoid zero shift, as load cell corrections are interactive.
7. Check load cells or sections again and repeat steps 6-8 as needed.
Note
Note
6 TuffSeal Heavy Capacity Junction Box
Figure 4-1. Shunt Locations
8. Pull excess cable out of the enclosure.
9. Using a wrench, tighten the nut until the rubber touches the cable completely.
10. Tighten the nut an additional half turn (180º). To be watertight, each cord grip must be tightened so the rubber sleeve begins to protrude from the hub.
Unused hubs must be properly plugged to prevent moisture entry. Extra hole plugs are provided to seal up any unused hubs.
11. Remove the desiccant from the plastic bag, and insert the desiccant bag into the junction box before closing. Inspect the desiccant during normal service and change as needed.
12. Replace the cover and torque the cover screws in an alternating pattern to 15 in-lb to be certain the gasket is compressed equally in all locations.
JP
TRIM
TRIM
-EX
+EX
+SI
-EX
+EX
+SI
-EX
+EX
1
+SI
-EX
+EX
+SI
JP
JP
SIG
NA
L
SE
CT
#
EA
CH
UN
US
ED
SE
CT
ION
SIG
NA
L
CE
LL#
CE
LL#
CE
LL#
SHD
1
SHD
-SI
1
-SI
SHD
-SI
1
-SI
SHD
SIG
NA
L
SE
CT
#C
ELL#
CE
LL#
SIG
NA
LS
IGN
AL
SIG
NA
L
RIC
E L
AK
E W
EIG
HIN
G S
YS
TE
MS
CE
LL#
SE
CT
#C
ELL#
JP
-EX
+EX
+SI
-EX
+EX
+SI
JP
-EX
+EX
+SI
-EX
+EX
+SI
SE
CT
#
SIG
NA
L
TRIM
TRIM
TRIM
TRIM
TRIM
TRIM
Assembly
-EX
-EX
+EX
+SI
SHD
1
SHD
-SI
1
-SI
1
-SI
SHD
1
-SI
SHD
CONNECT BOTH SHUNTS
TO APPLY CELL SIGNAL
SIG
NA
LS
IGN
AL
SIG
NA
L
CE
LL#
PN Rev.
+SI
-SI
-SI
RE
MO
VE
SH
UN
T T
O D
ISC
ON
NE
CT
SE
CT
#
TURN POT CLOCKWISE FOR MAXIMUM SIGNAL
+SEN
SHD
+SEN
SHD
DISCONNECT BOTH SHUNTS
TO REMOVE CELL SIGNAL
+EX
-SEN
-SEN
R46
R41
R20
JP17
JP7
JP
16
R52
R50
R40
R24
R14
R15
JP20
JP10
JP
11
R26
JP
6
JP
1
R51
R49
R47
R45
R43
JP9
R23
R21
JP8
R17
R38
R36
R34
R33
R32
R30
R28
R10
R8
R7
R4
R2
JP12
JP2
VR
9
JP19R48
VR
7
JP18
R42
R44
R22
R25
R16
R18
VR
2
R19
R39
VR
10
R35
R37
VR
11
R27
R29
R31
R9
R11
R12
R1
R3
R5
VR
5
R6
JP5
VR
8
VR
3
VR
1
VR
12
VR
6
J1
VR
4
J2 R13
EXPANSION/J9
J5
JP4
JP3
JP14
JP15
JP13
J8
J4
J3
J6
J7
INDICATOR/J10
JP
TRIM
-EX
+EX
JP
JP
SIG
NA
L
SHD
SIG
NA
L
SIG
NA
L
CE
LL#
JP
-EX
+EX
TRIM
SHD
CONNECT BOTH SHUNTS
TO APPLY CELL SIGNAL
SIG
NA
L
CE
LL#
DISCONNECT BOTH SHUNTS
TO REMOVE CELL SIGNAL
R52
R50 JP20
R51
R49
R38
R36
R39
R37
VR
8
VR
12
JP15
J8 J6
W21
JP21
JMP/NEGJMP/POS
W22
JP22
WSR2
WSR1
MH9NUT2
NUT1
BOLT1
BOARD
Note
Trimming Procedure 7
8 TuffSeal Heavy Capacity Junction Box
230 W. Coleman St. • Rice Lake, WI 54868 • USA
U.S. 800-472-6703 • Canada/Mexico 800-321-6703 • International 715-234-9171 • Europe +31 (0)26 472 1319
Rice Lake Weighing Systems is an ISO 9001 registered company.
© Rice Lake Weighing Systems Specifications subject to change without notice.
www.ricelake.com
June 7, 2017 PN 174208 Rev A