    GOALPURPOSE

    OUTPUTS

    INPUTSACTIVITIES

    EVIDENCE BASED STRATEGIESIMPROVING THE HEALTH & WELL-BEING OF THE OROMIA PEOPLE

    MARCH 19, 2012

  • 8/2/2019 16. Foster Log Frame 3 119 2012

    2/57

    Preliminary Planning

    Detailed Design

    Implementation

    Turnover Completed

    Implementation

    Project Life Cycle

    Duration 5 - 7 years

  • 8/2/2019 16. Foster Log Frame 3 119 2012

    3/57

    Unlike Most Project Managers,

    The responsibilities of Managersin International Development

    extend beyondimmediate ProjectImplementation Deliverables.

  • 8/2/2019 16. Foster Log Frame 3 119 2012

    4/57

    The Project

    Sustainable BenefitsImplementation

    Duration 20 - 30 years

    From Project to ProgramLife Cycle

    5 - 7 yrs

    is only an Intermediate Meansto a Higher Level Objective

  • 8/2/2019 16. Foster Log Frame 3 119 2012

    5/57

    CRITERIA PREDICTIVE OFSUSTAINABILITY OF BENEFITS1

    Project duration => then 7 years Closeness of fit of stakeholders

    (government/district/NGO) and partners

    (donor) objectives Increased assumption of costs during life

    of project

    Mutually respectful negotiating process

    1. Tom Bossert Social Science and Medicine review of USAIDprojects 25 years later

  • 8/2/2019 16. Foster Log Frame 3 119 2012

    6/57

  • 8/2/2019 16. Foster Log Frame 3 119 2012

    7/57

    STRATEGY STEPS

    Brain storm a list of potential strategicapproaches for addressing yourindividual issue.

    Rank the potential strategies on thestrategies matrix

    Select 1-2 strategies from the matrixthat meet your criteria of Best Buy

  • 8/2/2019 16. Foster Log Frame 3 119 2012

    8/57

    Strategy Matrix TA______ Name_____ Issue______

    1= Low

    5= HighStrat 1 Strat 2 Strat 3 Strat 4

    Cause Morbidity, Disability,Mortality

    Consistent with EthiopianPriorities & Policies

    Needed & Wanted by

    People

    Culturally Acceptable

    Technically Feasible

    Logistic Feasibility

    Affordable

    Measurable

    Total Score

  • 8/2/2019 16. Foster Log Frame 3 119 2012

    9/57Kenneth F. Smith, PMP

    DCChapter March 20, 2001

    & its use inInternationalDevelopmentProjects

    THE LOGICAL FRAMEWORKLogframe- A Project Scoping& Performance Management Tool

  • 8/2/2019 16. Foster Log Frame 3 119 2012

    10/57

    The LOGFRAME

    The Logframe is a simple but very powerfultool to Summarizethe Scope& Key BuildingBlocksof a proposed Project in an easy-to-understand, structurally-interrelated format.

    Logframe is used initially to Plan & DesignProjects.

    Subsequently, it provides a baseline reference

    for Briefings, Program Monitoring, ProgressReporting and Evaluation

  • 8/2/2019 16. Foster Log Frame 3 119 2012

    11/57

    GOAL

    PURPOSE

    OUTPUTS

    ACTIVITIES

    INPUTS

    DESIGN

    SUMMARY

    INDICATORS

    TARGETS

    HOW

    MONITORASSUMPTIONS

  • 8/2/2019 16. Foster Log Frame 3 119 2012

    12/57

    Log Frame Structure

    Vertical Logic

    Identifies what the project intendsto do and achieve

    Clarifies causal relationships(mean to end)

    Specifies important assumptionsand risks

    Horizontal Logic

    Specifies indicators tomeasure progressIdentifies the sources/means bywhich indicators will be verified

  • 8/2/2019 16. Foster Log Frame 3 119 2012

    13/57

    GOALPURPOSE

    OUTPUTS

    INPUTSACTIVITIES

    The LOGFRAMERows / Levels

  • 8/2/2019 16. Foster Log Frame 3 119 2012

    14/57

    The Logic of theFramework

    INPUTS

    HOW?

    Attain Goal throughPurpose

    Attain Purpose through

    Outputs

    Attain Outputs throughActivities

    Attain Activities throughInputs

    GOALPURPOSEOUTPUTSActivities

    Personnel, Equipment,

    Supplies, Drugs

  • 8/2/2019 16. Foster Log Frame 3 119 2012

    15/57

    GOAL

    Expresses desired end

    Stated as a completedaction in the future

    Uses strong action verb

    Achievable by multipleprojects not just yours

  • 8/2/2019 16. Foster Log Frame 3 119 2012

    16/57

    GOAL

    PURPOSE

    OUTPUTS

    ACTIVITIES

    INPUTS

    Reduce infant ,child, &

  • 8/2/2019 16. Foster Log Frame 3 119 2012

    17/57

    The Logic of theFramework

    INPUTS

    HOW?

    Attain Goal throughPurpose

    Attain Purpose through

    Outputs

    Attain Outputs throughActivities

    Attain Activities throughInputs

    GOAL

    PURPOSEOUTPUTSActivities

  • 8/2/2019 16. Foster Log Frame 3 119 2012

    18/57

    PURPOSE

    Desired impact of the project

    Each logframe has a single purpose Purpose contributes to the goal

    Beneficiary clearly identified

    Formulated as a completed future action Precisely and verifiably defined in the

    indicator column

  • 8/2/2019 16. Foster Log Frame 3 119 2012

    19/57

    GOAL

    PURPOSE

    OUTPUTS

    ACTIVITIES

    INPUTS

    Reduced Morbidity,Disability, andMortality ofpneumonia

  • 8/2/2019 16. Foster Log Frame 3 119 2012

    20/57

    Goal vs. Purpose

    Goal Think BIG, e.g., MDG

    Think overarching

    Your program is

    contributing to thishigher objective

    Purpose Smaller scale

    Of immediate concernto your project

    Your objectives

    You are responsible

  • 8/2/2019 16. Foster Log Frame 3 119 2012

    21/57

    The Logic of theFramework

    INPUTS

    HOW?

    Attain Goal throughPurpose

    Attain Purpose through

    OutputsAttain Outputs through

    Activities

    Attain Activities throughInputs

    GOAL

    PURPOSEOUTPUTS

    Activities

  • 8/2/2019 16. Foster Log Frame 3 119 2012

    22/57

    OUTPUTS

    Outputs are the project deliverables

    Project accountable for deliverables

    Need to be achieved in order to meetpurpose

    Change in knowledge, attitudes,behaviors or services

    Improvements in performance

  • 8/2/2019 16. Foster Log Frame 3 119 2012

    23/57

    Correct assessment,

    classification,

    & treatment

    of child with cough and fever

    GOAL

    PURPOSE

    OUTPUTS

    ACTIVITIES

    INPUTS

  • 8/2/2019 16. Foster Log Frame 3 119 2012

    24/57

    The Logic of theFramework

    INPUTS

    HOW?

    Attain Goal throughPurpose

    Attain Purpose through

    OutputsAttain Outputs through

    Activities

    Attain Activities throughInputs

    GOAL

    PURPOSEOUTPUTS

    Activities

  • 8/2/2019 16. Foster Log Frame 3 119 2012

    25/57

    ACTIVITIES

    Cluster of actions required to produce each of the

    log frame outputs

    Each output should have one activity cluster

    Each cluster should be a summary of the 5-10activities needed to produce the desired output

    Linked to but separate from the Gant Chart, WorkPlan, or Detailed Implementation Plan

  • 8/2/2019 16. Foster Log Frame 3 119 2012

    26/57

    ASSESSING ACTIVITIES

    Activities summarize the actions needed to

    accomplish each project output

    Relationship between inputs and activities is

    reasonable

    Vertical logic among Activities, Outputs,

    Purposes, and Goal is realistic as a whole.

    Activities identify action required for managingprocesses stated in the Monitoring and Evaluation

    column

  • 8/2/2019 16. Foster Log Frame 3 119 2012

    27/57

    1 Develop logistic system for TBdrugs.

    2. Develop lab system to domicroscopy for TB smears3. Train health staffIn TB diagnosis and treatment4. Develop community outreachfor cough surveillance, sputum

    Collection and DOTS.

    GOAL

    PURPOSE

    OUTPUTS

    ACTIVITIES

    INPUTS

  • 8/2/2019 16. Foster Log Frame 3 119 2012

    28/57

    The Logic of theFramework

    INPUTS

    HOW?

    Attain Goal throughPurpose

    Attain Purpose through

    OutputsAttain Outputs through

    Activities

    Attain Activities throughInputs

    GOAL

    PURPOSEOUTPUTSActivities

  • 8/2/2019 16. Foster Log Frame 3 119 2012

    29/57

    INPUTS

    Human Resources

    Foreign Consultant 1 month per year

    Equipment e.g., cold chain Drugs

    Meeting Space

    Food

  • 8/2/2019 16. Foster Log Frame 3 119 2012

    30/57

    HIV Test KitsTraining MaterialsTrainersCounseling MaterialsNeveripine

    GOAL

    PURPOSE

    OUTPUTS

    ACTIVITIES

    INPUTS

  • 8/2/2019 16. Foster Log Frame 3 119 2012

    31/57

    Key Project Logframe Items

    Project AreaUnder

    ManagementCONTROL

    Project Areabut beyondManagement

    Control

    OUTPUTS

    INPUTS

    GOALlong range

    Purpose to Goal

    Outputs to PurposeActivities to Outputs

    What else is needed?

    What can go wrong?

    Activities

    +URPOSE

    ASUMPTIONS

    BeyondProjectArea

  • 8/2/2019 16. Foster Log Frame 3 119 2012

    32/57

    Structure

    Goal

    Purpose

    Output

    Activities

    Assumptions

    Assumptions

    Assumptions

    Pre-Conditions

    Narrative Summary

    IfOutputs are delivered,AndAssumptions hold true,ThenPurpose will be achieved

  • 8/2/2019 16. Foster Log Frame 3 119 2012

    33/57

    TARGETS & INDICATORS

    Simple

    Measurable

    Achievable

    RealisticTime Limited

    S

    MA

    RT

  • 8/2/2019 16. Foster Log Frame 3 119 2012

    34/57

    TARGETS

    Increase/decrease

    Disease/Service

    Where

    From Beginning Level

    In Time Beginning

    To Expected Level

    In Time End

    Increase measles vaccine coverage inJimma zone from 30% in 2010 to 50% in2015.

    Reduced infant D d i f li

  • 8/2/2019 16. Foster Log Frame 3 119 2012

    35/57

    Reduced infant

    Child, &

  • 8/2/2019 16. Foster Log Frame 3 119 2012

    36/57

    DHS2010 & 2015

    GOAL

    PURPOSE

    OUTPUTS

    ACTIVITIES

    INPUTS

    SUMMARY TARGET HOW MEASURE ASSUMPTION

  • 8/2/2019 16. Foster Log Frame 3 119 2012

    37/57

    ASSUMPTIONS

    Assumptions

    Political

    Economic

    Human Resources

    Logistics

  • 8/2/2019 16. Foster Log Frame 3 119 2012

    38/57

    GOAL

    PURPOSE

    OUTPUTS

    ACTIVITIES

    INPUTS

    SUMMARY TARGET HOW MEASURE ASSUMPTION

    Politicalstability

    Gov Supportto Region

    Leadership

    R d d i f

    Decreased infant

  • 8/2/2019 16. Foster Log Frame 3 119 2012

    39/57

    Reduced infantChild, &

  • 8/2/2019 16. Foster Log Frame 3 119 2012

    40/57

    GOAL

    PURPOSE

    OUTPUTS

    ACTIVITIES

    INPUTS

    Reduced Morbidity,

    Disability, andMortality due topneumonia.

  • 8/2/2019 16. Foster Log Frame 3 119 2012

    41/57

    Preventive

    RecognitionTreatment

    GOAL

    PURPOSE

    OUTPUTS

    ACTIVITIES

    INPUTS

  • 8/2/2019 16. Foster Log Frame 3 119 2012

    42/57

    ?

    GOAL

    PURPOSE

    OUTPUTS

    ACTIVITIES

    INPUTS

  • 8/2/2019 16. Foster Log Frame 3 119 2012

    43/57

    ???

    GOAL

    PURPOSE

    OUTPUTS

    ACTIVITIES

    INPUTS

  • 8/2/2019 16. Foster Log Frame 3 119 2012

    44/57

    Government meetsAgreements

    GOAL

    PURPOSE

    OUTPUTS

    ACTIVITIES

    INPUTS

  • 8/2/2019 16. Foster Log Frame 3 119 2012

    45/57

    Immunization

    RecognitionTreatment ?

    ResourcesAvailable

    DHTFunctional

    GOAL

    PURPOSE

    OUTPUTS

    ACTIVITIES

    INPUTS

  • 8/2/2019 16. Foster Log Frame 3 119 2012

    46/57

    1 Develop logistic system for TBdrugs.

    2. Develop lab system to domicroscopy for TB smears3. Train health staffIn TB diagnosis and treatment4. Develop community outreachfor cough surveillance, sputum

    Collection and DOTS.

    GOAL

    PURPOSE

    OUTPUTS

    ACTIVITIES

    INPUTS

  • 8/2/2019 16. Foster Log Frame 3 119 2012

    47/57

    HIV Test KitsTraining MaterialsTrainersCounseling MaterialsNeveripine

    GOAL

    PURPOSE

    OUTPUTS

    ACTIVITIES

    INPUTS

    LOGFRAME MILESTONES

  • 8/2/2019 16. Foster Log Frame 3 119 2012

    48/57

    LOGFRAME MILESTONESDate Task

    March 19 Lecture on Logframes

    March 20/21 Small Group Discussions

    March 27-28

    Presentation of Log Frame toSection mates

    March 30 Strategy Matrix & DraftLogframe to TA by 5 PM

    April 3-4 Log Frame Discussions with TAand Dr. Foster

    April 12 at

    Noon

    Final Logframe due TA File and

    Dr. Foster Mailbox

  • 8/2/2019 16. Foster Log Frame 3 119 2012

    49/57

    The numberingsystem

    (helps you keep track of items, helps us grade

    them)

    Project Description PerformanceIndicators

    Means of Verification Assumptions/ Risks

  • 8/2/2019 16. Foster Log Frame 3 119 2012

    50/57

    Indicators

    1.1 Goal 1.2.1 Indicator 1

    1.2.2 Indicator 2

    1.3.1 Source 1 forindicators

    1.3.2 source 2 forindicator s

    1.4.1 Assumption 1

    1.4.2 Assumption 2

    2.1 Purpose 2.2.1 Indicator

    3.1.1 Output one3.1.2 Output two

    3.2.1 Indicator3.2.1 indicator

    3.3.1 source 1 forindicators

    3.4.1 Assumption 1

    4.1.1 Activity one

    4.1.2 Activity two

    4.2.1 Indicator foractivity

    5.1.1a resource oneneeded for activity 4.1.1

    5.1.1b resource twoneeded for activity 4.1.1

    5.1.2a resource oneneeded for activity 4.1.2

    5.2.1 Indicator

  • 8/2/2019 16. Foster Log Frame 3 119 2012

    51/57

    Q & A

    PLANNING A PROGRAM

  • 8/2/2019 16. Foster Log Frame 3 119 2012

    52/57

    PLANNING A PROGRAM

    Where are we now?

    Issues Papers and Presentations)

    Where are we going?

    Goals

    How are we going to get there? Select Strategies

    Write Log Frame

    Prepare Gant Chart & Budget

    Present Strategy

    How are we going to know we have arrived?

    Monitoring & Evaluation

    Example: Levels of Objectives

  • 8/2/2019 16. Foster Log Frame 3 119 2012

    53/57

    p j Goal

    Purpose

    Outputs

    Activities

    Medium and log-term benefit towhich project contributes

    Eliminate folic acid deficiency

    Specific products and services to be provided by theproject to the project direct beneficiaries for achievingPurpose1. Technical steering committee formed;2. Quality certification of flour takes place;3. In-process quality assurance is being respected;

    What needs to be done to achieve the outputsmaking use of human, technical and financialinputs

    Materials, human resources, community support,

    capacity building, etc.

    Short-term and clearly achievable objectiveEstablish legislation for flour fortification

    Inputs

    LOGFRAME

  • 8/2/2019 16. Foster Log Frame 3 119 2012

    54/57

    LOGFRAMECRITERIA OVERVIEW & COL 1

    Maximum two sides of paper

    Criteria for Log Frame Assessment

    Column internally consistent:

    Inputs lead to Activities;

    Activities lead to Outputs,

    Outputs lead to achievement of Purpose Purpose contributes to achievement of goal

    LOGFRAME

  • 8/2/2019 16. Foster Log Frame 3 119 2012

    55/57

    LOGFRAMECRITERIA HORIZONTAL 1,2,3

    Horizontal row (2nd column) identifies targets(increase x in 200x to y in 200y)

    Targets need to be SMART Simple

    Measurable Achievable Realistic Time Limited

    Column 3 indicates the methods that will beused to collect the data on targets indicatedin column 2

    Log Frame Matrix

  • 8/2/2019 16. Foster Log Frame 3 119 2012

    56/57

    Log Frame Matrix

    Goalhigher objective towhich project willcontribute

    PurposeprojectImmediate impact

    Outputthe projectdeliverables for whichproject can be heldaccountable

    Activities a summaryof the main activities togenerate outputs

    Indicators to measure achievementof the project Goal

    Impact Indicators to measureachievement of project Purpose

    Indicators to measure project Outputs

    Process Indicators to indicateaccomplishment of Activities

    * PSI Logframe Handbook, 2000

    Narrative Summary Objectively VerifiableIndicators

    Inputs- resources that

    go into activities

    Quantifiable monetary, physical andhuman resources required to carry outproject

    L F M t i

  • 8/2/2019 16. Foster Log Frame 3 119 2012

    57/57

    Log Frame Matrix

    The source of data for Goal-level performance

    indicators

    The source of data forPurpose-level performance

    indicators

    The source of data forOutput-level performanceindicators

    The source of data forActivity-level performanceindicators

    Goal to Super GoalRisk regarding strategic

    impact

    Purpose to GoalRisk regarding program-

    level impactOutputs to PurposeRisk regarding designeffectiveness

    Activitiesto OutputsRisk regardingimplementation andefficiency

    Means of Verification Assumptions/Risks

    The source of data forInput-level performance Input to Activities Risk