CONSULTING ENGINEERS LIMITED
A PRESENTATION OFPROJECT PARIVARTAN
PROGRESS REPORT
Birla Institute of Technology & Science , BITS pilani
![Page 2: 15.PHYSICAL PROGRESS](https://reader038.fdocuments.net/reader038/viewer/2022100513/58abe5c31a28ab212a8b71f7/html5/thumbnails/2.jpg)
CONSULTING ENGINEERS LIMITED
RENOVATION OF FACULTY HOUSING 83
UPCOMING PROJECTS
BUDDHA BHAWAN
GANDHI BHAWAN
NEW MARRIED PHD HOUSING
MESS RM/BD
RECREATION GROUND
FD1 RENOVATIO
N
UTILITY BLOCKS
NON TEACHING STAFF
QUARTERS
NEW FACULTY HOUSING 56
COURTYARD BLDG
ONGOING PROJECTS
UPCOMING PROJECTS
![Page 3: 15.PHYSICAL PROGRESS](https://reader038.fdocuments.net/reader038/viewer/2022100513/58abe5c31a28ab212a8b71f7/html5/thumbnails/3.jpg)
CONSULTING ENGINEERS LIMITED
BUDH MESS
S.NO ACTIVITIES SCOPE(M3)
EXECUTED TILL DATE(M3)
1CONCRETE
PCC RCC
248 M3593 M3
50 M3450 M3
2 SHUTTERING 3559 SQM 2000 SQM
3 STEEL 73 T 55 T
![Page 4: 15.PHYSICAL PROGRESS](https://reader038.fdocuments.net/reader038/viewer/2022100513/58abe5c31a28ab212a8b71f7/html5/thumbnails/4.jpg)
CONSULTING ENGINEERS LIMITED
NON TEACHING STAFF
S.NO ACTIVITIES SCOPE EXECUTED TILL DATE
1CONCRETE
PCCRCC
1073 M35669 M3
155 M3545 M3
2 SHUTTERING 47858 SQM 970 M3
3 STEEL 697 T 41 T
![Page 5: 15.PHYSICAL PROGRESS](https://reader038.fdocuments.net/reader038/viewer/2022100513/58abe5c31a28ab212a8b71f7/html5/thumbnails/5.jpg)
CONSULTING ENGINEERS LIMITED
NFH
S.NO ACTIVITIES SCOPE EXECUTED TILL DATE
1CONCRETE
PCCRCC
895 M34342 M3
126 M3
2 SHUTTERING 30302 SQM
3 STEEL 510 T
![Page 6: 15.PHYSICAL PROGRESS](https://reader038.fdocuments.net/reader038/viewer/2022100513/58abe5c31a28ab212a8b71f7/html5/thumbnails/6.jpg)
CONSULTING ENGINEERS LIMITED
NMPHD
S.NO ACTIVITIES SCOPE EXECUTED TILL DATE
1CONCRETE
PCCRCC
395 M31720 M3
81 M3132 M3
2 SHUTTERING 13660 SQM 200 SQM
3 STEEL 205 T 13 T
![Page 7: 15.PHYSICAL PROGRESS](https://reader038.fdocuments.net/reader038/viewer/2022100513/58abe5c31a28ab212a8b71f7/html5/thumbnails/7.jpg)
CONSULTING ENGINEERS LIMITED
GANDHI BHAWAN
S.NO ACTIVITIES SCOPE(M3)
EXECUTED TILL DATE(M3)
1 PAINTING 32174 SQM 22185 SQM
2 FLOORING 4417 SQM1644 SQM
4141 SQM1605 SQM
3CONCRETE
PCCRCC
649 M3600 M3
154 M3597 M3
4 SHUTTERING 3798 SQM 3793 SQM
5 STEEL 74 T 74 T
![Page 8: 15.PHYSICAL PROGRESS](https://reader038.fdocuments.net/reader038/viewer/2022100513/58abe5c31a28ab212a8b71f7/html5/thumbnails/8.jpg)
CONSULTING ENGINEERS LIMITED
BUDH BHAWAN
S.NO ACTIVITIES SCOPE EXECUTED TILL DATE(M3)
1 PAINTING 36438 SQM 28712 SQM
2 FLOORING 2200 SQM1644 SQM
1999 SQM1604 SQM
3 CONCRETE 57 M3 520 M3
53 M3 519 M3
4 SHUTTERING 3424 SQM 3200 SQM
5 STEEL 68 T 59 T
![Page 9: 15.PHYSICAL PROGRESS](https://reader038.fdocuments.net/reader038/viewer/2022100513/58abe5c31a28ab212a8b71f7/html5/thumbnails/9.jpg)
CONSULTING ENGINEERS LIMITED
RECREATION GROUND
S.NO ACTIVITIES SCOPE EXECUTED TILL DATE (M3)
1 EXCAVATION 57775 SQM 55702 SQM
2 P/L NP2 CLASS PIPE 1202 MTR 1202 MTR
3 S/F GOOD QUALITY EARTH 785 M3 25 M3
4 S/L 150 GSM GEOTEXTILE 4313 M3 1352 M3
5 P/P HYBRID BERMUDA 23688 SQM