P (6)5N (3)K (7)86310745201313B (3)I (4)D (2)F (2)J (2)E (8)M (3)R (7)Q (5)H (3)G (2)C (5)A (4)
5
919
22
L (9)
3
223
122
147
0
198
0
145
9
10156
Float: Float (A) = 5 4 0 = 1Float (G) = 8 2 5 = 1Float (M) = 19 3 9 = 7
Float (B) = 3 3 0 = 0Float (H) = 10 3 5 = 2Float (N) = 22 3 14= 5
Float (C) = 6 5 0 = 1Float (I) = 13 4 7= 2Float (P) = 22 6 13= 3
Float (D) = 5 2 3 = 0Float (J) = 10 2 7= 1Float (Q) = 15 5 9 = 1
Float (E) = 13 8 5 = 0Float (K) = 19 7 7 = 5Float (R) = 22 7 - 14= 1
Float (F) = 8 2 3 = 3Float (L) = 22 9 13= 0
Dengan ini, aktiviti kritikal ialah aktiviti B, D, E dan L. Maka laluan kritikalnya ialah B D E L .Masa kritikal pula ialah 22 hari. Oleh itu, tempoh masa tersingkat untuk menyiapkan projek ini ialah 22 hari.