1

7
A (4) D (2) C (5) H (3) Q (5) R (7) L (9) E (8) I (4) F (2) K (7) N P (6) 5 13 13 22 22 3 3 19 22 2 0 1 3 4 6 5 9 7 J M (3) G (2) 8 B (3) 1 5

description

1

Transcript of 1

P (6)5N (3)K (7)86310745201313B (3)I (4)D (2)F (2)J (2)E (8)M (3)R (7)Q (5)H (3)G (2)C (5)A (4)

5

919

22

L (9)

3

223

122

147

0

198

0

145

9

10156

Float: Float (A) = 5 4 0 = 1Float (G) = 8 2 5 = 1Float (M) = 19 3 9 = 7

Float (B) = 3 3 0 = 0Float (H) = 10 3 5 = 2Float (N) = 22 3 14= 5

Float (C) = 6 5 0 = 1Float (I) = 13 4 7= 2Float (P) = 22 6 13= 3

Float (D) = 5 2 3 = 0Float (J) = 10 2 7= 1Float (Q) = 15 5 9 = 1

Float (E) = 13 8 5 = 0Float (K) = 19 7 7 = 5Float (R) = 22 7 - 14= 1

Float (F) = 8 2 3 = 3Float (L) = 22 9 13= 0

Dengan ini, aktiviti kritikal ialah aktiviti B, D, E dan L. Maka laluan kritikalnya ialah B D E L .Masa kritikal pula ialah 22 hari. Oleh itu, tempoh masa tersingkat untuk menyiapkan projek ini ialah 22 hari.

0 2 4 6 8 10 12 14 16 18 20 22

BDEL

CC

A

A

FF

H

H

G

G

K

K

I

I

J

J

M

M

Q

Q

P

R

NR

NP