150250_062421213_101B E_ BRIDGE 3-1

1
18222 9111 9111 648 1302 900 1300 1300 900 900 900 37000 2500 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 2500 648 1302 900 1300 1300 900 900 900 7549 600 800 800 85 1125 3150 565 560 2940 210 1700 4800 4800 4800 4800 4800 4800 4800 1700 PIER "S" PIER "R" SCAFFOLD TUBE 48X3,2 7551 599 2500 1600 1600 0 L PIER R C L PIER R C L PIER S C 7552 600 846 843 847 2600 500 1600 500 47 00 00 00 00 00 00 00 845 500 1600 500 600 13411 18222 9111 9111 648 1302 900 1300 1300 900 900 900 37000 2500 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 2500 648 1302 900 1300 1300 900 900 900 7549 600 800 800 85 1125 3150 565 560 2940 210 1700 4800 4800 4800 4800 4800 4800 4800 1700 PIER "S" PIER "R" SCAFFOLD TUBE 48X3,2 7551 599 2500 1600 1600 00 L PIER R C L PIER R C L PIER S C 7552 600 846 843 847 2600 500 1600 500 47 300 00 300 300 00 00 00 845 500 1600 500 600 13411 PIER "S" PIER "R" 1700 4800 4800 4800 4800 4800 1700 4800 8493 350 2100 300 1697 250 50 MODULE "A" MODULE "A" MODULE "A" MODULE "A" MODULE "A" MODULE "A" MODULE "A" 4800 150 150 MODULE "B" 4803 8640 800 1600 1600 800 150 281 272 262 MODULE "A" MAX 300 2300 1000 1500 3000 MAX 45 CM Concrete blocks by site, Cuplock ledger, Cuplock Post, %UDFLQJ WXEH L VIADUCT C SECTION TYPE "E" 18220 300 1571 229 2100 4750 8720 4750 R7000 R7000 650 1300 900 1300 1300 900 900 900 651 1300 900 1300 1300 900 900 900 1125 3150 170 1125 3150 %UDFLQJ WXEH Jack max 400 mm, Concrete blocks by site, Cuplock forkhead, Jack max 300 mm Railing post SP_ Special Rib VD1 400 400 400 400 400 370 400 400 370 2440 1765 310 1765 2440 300 2300 1000 1500 3001 396 150 SOLDIER MK2, 298 298 PIER "S" PIER "R" 1700 4800 4800 4800 4800 4800 4800 4799 MODULE "A" MODULE "A" MODULE "A" MODULE "A" MODULE "A" MODULE "A" MODULE "A" PIER "R" MODULE "B" 1700 4800 300 drawn: Scale: Client: Name Date worked: Drawing-No.: CAD-File: Project: remark: checked: Via Isonzo 9 , I - 22078 Turate ( CO ) Telefono +39.02.969731 BRAND ITALIA S.p.A. Telefax +39.02.96754099 [email protected] www.beis-italia.it Filiale Centro - Sud Via Volturno 7, int.15 00185 Roma (RM) Telefono +39.06.4885276 Telefax +39.06.4828519 RIYAD METRO PROJECT BRIDGE 3 CUPLOCK, MKII, SPECIAL 150250_062421213_101BE (1/4) VARIES UF 21/04/2016 SIRNA 21/04/2016 LANTICINA 21/04/2016 150250_062421213_101B E_ BRIDGE 3.dwg Shop drawing for construction This drawing is valid only with the associated assembly instructions. Measurements have to be verified on site. Index Revision Date A B worked: checked: drawn: 0 EMISSIONE 24/03/2016 UF GL G.Maran VARIAZIONE COMPOSIZIONE 21/04/2016 UF SIRNA LANTICINA Bracing detail 1 G.Maran Drawing Notes 1. Harsco Infrastructure Copyright This drawing is the copyright of Harsco Infrastructure. No unauthorised use, copy or disclosure is to be made and it is to be returned upon request.The drawing is supplied subject to the company's standard conditions as applicable. Harsco Infrastructure reserves the right to amend drawing details and material components subject to stock availability. 2. Basis of Design This drawing has been prepared from information supplied to us by, or on behalf of the Customer, who should check that we have correctly interpreted his requirements and that all loadings, dimensions, details, erection, pouring and striking sequences etc. are as required and practicable. The following documents have been used to prepare this scheme:- Customer Drawings: .................................................................................... Customer Drawings: .................................................................................... Design Brief: .................................................................................... Customer Method Statement: .................................................................................... Other Information: .................................................................................... This drawing has been prepared in accordance with Harsco Infrastructure Equipment Datasheets, Formwork, A Guide to Good Practice (Concrete Society) 2nd Edition, CIRIA Report 108 Concrete Pressure on Formwork, as well as the relevant statutory provisions and Codes of Practice. To enable us to complete this drawing, we have allowed for the following:- ....................................................................................................................................... ....................................................................................................................................... ....................................................................................................................................... ....................................................................................................................................... The Customer is to check and confirm that we have correctly interpreted his requirements. The Customer is directed to the Members Area of our website where all the latest Product Datasheets, CAD blocks, Animations, and other useful technical information is available to download. Please visit www.harsco-i.com and follow the links for details. 3. Applied Loads Applied loads (unless otherwise indicated) where applicable:- Falsework Self Weight of Concrete N1Pñ Self Weight of Formwork N1Pð Live Load varies N1Pð WR N1Pð DV SHU %6 Formwork Maximum Concrete Pressure allowed N1Pð Concrete Type (CIRIA 108) ............... Concrete Temperature & Rate of Rise ...............m/hr Access Working Lifts 1R #N1Pð Additional Lifts 1R #N1Pð Hop-Up Brackets 1R #N1Pð Wind Wind loads where applicable, have been calculated in accordance with BS 6399. Max. Design Wind )RUFHN1Pð 4. Timber No timber is supplied by Harsco Infrastructure unless specifically stated. Where Harsco Infrastructure does not supply, the design & supply of timber is the responsibility of the Customer. To enable us to complete this drawing the following properties (based on Formwork, A Guide to Good Practice), have been allowed for as the Customers Timber(s): Main bearers ...................................... Secondary bearers ...................................... Walings ...................................... Other(s) ...................................... Timber Grade allowed ...................................... Plywood ......................................with face grain orientated parallel to span. 5. Formwork THE CUSTOMER IS RESPONSIBLE FOR ENSURING THAT ALL HARSCO INFRASTRUCTURE COMPONENTS THAT COME INTO CONTACT WITH CONCRETE ARE TREATED WITH CHEMICAL RELEASE AGENT PRIOR TO EACH USE. 6. Foundations/Support Unless otherwise noted, no soleplates or other means of spreading the imposed loads are supplied by Harsco Infrastructure. Where Harsco Infrastructure equipment is supported, suspended, anchored or tied to an existing structure or the ground, the Customer must ensure that the structure or ground is adequate to safely support the additional imposed loads. 7. Modification This drawing has been prepared using the Safe Working Loads of the Harsco Infrastructure components specified. No alteration to components, assembly, loading or any other aspect must be made without the expressed written authority from Harsco Infrastructure. 8. Tying & Bracing The Customer is responsible for ensuring all structures remain adequately tied and/or braced to carry the load and ensure stability. No ties or braces are to be removed or altered in any way without the expressed written authority from Harsco Infrastructure. Where Harsco Infrastructure is supplying equipment only, the supply & fixing of all necessary ties is the responsibility of the Customer. 9. Temporary Working Platforms Unless specifically stated it is considered that any other working platforms (for erection or dismantling purposes), will be designed, supplied and fitted by the Customer. 10. Design Output This drawing should be read in conjunction with :- ................................................................................................................................................................................ ................................................................................................................................................................................ Unless indicated otherwise, all loads shown are not factored. Maximum calculated Leg Load =...............kN Lift positions and bracing frequency to be as shown. Maximum calculated Tie Load =...............kN Tie Type :-................................ Tie spacing to be as shown on drawing. Note, method of assessment of loads in tie rods allows for elongation of ties and not continuity. Ref. Formwork, A Guide to Good Practice 2nd Edition 3.8.2. Unless a specification for tolerance has been provided, deflection has been limited to 1/270th of the maximum span of each member. Maximum weight of formwork unit = ................kg Maximum weight of table unit = ................kg 12. Eccentricity All legs are to be erected plumb and loaded concentrically to the general tolerances given in BS5975:2008 section 20 "Work on Site" (unless noted otherwise). 13. Obligation, Responsibilities & CDM This drawing constitutes Harsco Infrastructures Risk Assessment in accordance with Regulation 11 of the current CDM Regulations 2007. The elimination of general risk in the use of temporary works is by use of good practice. Guidance can be found within relevant Codes, HSE publications and Guides. Wherever possible, risk is designed out of this proposal during the design process. ************DO NOT TAKE RISK ! - IF IN DOUBT, ASK************ 236491, 92,93 ,94,95,96 = None Supplied = Read all notes Customer must check and confirm all dimensions All timber work to be designed, supplied and fixed by customer. = 00 0 00 0 = = = = = = = = = = = = pltwood (18mm.) Read all relevant datasheets = 0.0 Scale: 1:100 PLAN VIEW: GENERAL ARRANGEMENT SPAN PIER "S"- PIER "R": CUPLOK/MKII/SPECIAL 800 80 Scale: 1:100 PLAN VIEW: GENERAL ARRANGEMENT SPAN PIER "S"- PIER "R": BEAMS H20/PLYWOOD Scale: 1:100 SECTION B-B: GENERAL ARRANGEMENT SPAN PIER "S"- PIER "R" Scale: 1:30 BRIDGE NR. 3 - SPAN PIER R-S: MODULE A GENERAL ARRANGEMENT Scale: 1:50 TYPICAL SECTION A-A Scale: 1:100 SECTION C-C: GENERAL ARRANGEMENT SPAN PIER "S"- PIER "R" 1600 160 ** NOTE :- All Scaffold Couplers must be tightened up to a torque of 7 kg.m (50ft.lbs) Base & Head Plate with Universal Jack Cuplok Standard Cuplok Ledger Cuplok Ledger Cuplok Std. Cuplok Standard Cuplok Ledger Fixed Forkhead with Universal Jack Clamps to butt against Forkhead MKII Soldier to 186 Forkhead (2No. Universal Clamp) 4751 872 475 SPECIAL RIB MARK VD1 SPECIAL RIB MARK VD1 SOLDIER MK2 SOLDIER MK2 CUPLOK SEE DRAWING 150250_062421213-102A E SEE DRAWING 150250_062421213-103A E SEE DRAWING 150250_062421213-102A E SEE DRAWING 150250_062421213-103A E SOLDIER MK2 H20 BEAM PLYWOOD 18 MM WOOD BOARDS 48 MM A A A A A A A A SEE DRAWING 150250_062421213-102A E SEE DRAWING 150250_062421213-103A E B B C C B Scale: 1:20 Detail 1 Orthogonal coupler ForkHead coupler Screw Jack 3LSH

Transcript of 150250_062421213_101B E_ BRIDGE 3-1

Page 1: 150250_062421213_101B E_ BRIDGE 3-1

18222

9111

9111

648

1302

900

1300

1300

900

900

900

37000

2500 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 2500

648

1302

900

1300

1300

900

900

900

7549

600

800 800

851125

3150

565560

2940

210

170048004800480048004800480048001700

PIER "S"PIER "R"

SCAFFOLD TUBE 48X3,2

7551

599

2500160016001600 L PIER R

C

L PIER R

C

L PIER S

C

7552

600

846

843

847

2600500 1600 500

647

1300

900

1300

1300

900

900

900

845

500 1600 500

600

13411

18222

9111

9111

648

1302

900

1300

1300

900

900

900

37000

2500 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 2500

648

1302

900

1300

1300

900

900

900

7549

600

800 800

851125

3150

565560

2940

210

170048004800480048004800480048001700

PIER "S"PIER "R"

SCAFFOLD TUBE 48X3,2

7551

599

2500160016001600 L PIER R

C

L PIER R

C

L PIER S

C

7552

600

846

843

847

2600500 1600 500

647

1300

900

1300

1300

900

900

900

845

500 1600 500

600

13411

PIER "S"PIER "R"

1700 4800 4800 4800 4800 4800 17004800

8493

350

2100

300

1697

250

50

MODULE "A" MODULE "A" MODULE "A" MODULE "A" MODULE "A" MODULE "A" MODULE "A"

4800

150

150

MODULE "B"

4803

8640

800 1600 1600 800

150

281 272262

MODULE "A"

MAX 300

2300

1000

1500

3000

MAX 45 CM Concrete blocks by site,

Cuplock ledger,

Cuplock Post,

Bracing (tube Ø48),

L VIADUCT

C

SECTION TYPE "E"

18220

300

1571

229

2100

4750 8720 4750

R7000 R7000

650130090013001300900900900 651 1300 900 1300 1300 900 900 900

11253150 170 1125 3150

Bracing (tube Ø48),

Jack max 400 mm,

Concrete blocks by site,

Cuplock forkhead,Jack max 300 mm

Railing post

SP_ Special Rib VD1400 400 400 400 400 370 400 400 370

2440 1765 310 1765 2440

300

2300

1000

1500

3001

396150

SOLDIER MK2,

298 298

PIER "S"PIER "R"

1700 4800 4800 4800 4800 4800 4800 4799

MODULE "A" MODULE "A" MODULE "A" MODULE "A" MODULE "A" MODULE "A" MODULE "A"

PIER "R"

MODULE "B"

17004800

300

drawn:

Scale:Client:

NameDate

worked:

Drawing-No.:CAD-File:

Project:

remark:

checked:

Via Isonzo 9 , I - 22078 Turate ( CO )

Telefono +39.02.969731

BRAND ITALIA S.p.A.

Telefax +39.02.96754099

[email protected]

www.beis-italia.it

Filiale Centro - Sud

Via Volturno 7, int.15

00185 Roma (RM)

Telefono +39.06.4885276

Telefax +39.06.4828519

RIYAD METRO PROJECT

BRIDGE 3

CUPLOCK, MKII, SPECIAL

150250_062421213_101BE (1/4)

VARIES

UF21/04/2016

SIRNA21/04/2016

LANTICINA21/04/2016

150250_062421213_101B E_ BRIDGE 3.dwg

Shop drawing for construction

This drawing is valid only with the associated assembly instructions. Measurements have to be verified on site.

Index Revision Date

A

B

worked: checked:drawn:

0

EMISSIONE 24/03/2016 UF GL G.Maran

VARIAZIONE COMPOSIZIONE 21/04/2016 UF SIRNA LANTICINA

Bracing detail 1 G.Maran

Drawing Notes

1. Harsco Infrastructure Copyright

This drawing is the copyright of Harsco Infrastructure. No unauthorised use, copy or disclosure is to be made

and it is to be returned upon request.The drawing is supplied subject to the company's standard conditions as

applicable. Harsco Infrastructure reserves the right to amend drawing details and material components subject

to stock availability.

2. Basis of Design

This drawing has been prepared from information supplied to us by, or on behalf of the Customer, who should

check that we have correctly interpreted his requirements and that all loadings, dimensions, details, erection,

pouring and striking sequences etc. are as required and practicable.

The following documents have been used to prepare this scheme:-

Customer Drawings: ....................................................................................

Customer Drawings: ....................................................................................

Design Brief: ....................................................................................

Customer Method Statement: ....................................................................................

Other Information: ....................................................................................

This drawing has been prepared in accordance with Harsco Infrastructure Equipment Datasheets, Formwork,

A Guide to Good Practice (Concrete Society) 2nd Edition, CIRIA Report 108 Concrete Pressure on

Formwork, as well as the relevant statutory provisions and Codes of Practice.

To enable us to complete this drawing, we have allowed for the following:-

.......................................................................................................................................

.......................................................................................................................................

.......................................................................................................................................

.......................................................................................................................................

The Customer is to check and confirm that we have correctly interpreted his requirements.

The Customer is directed to the Members Area of our website where all the latest Product Datasheets, CAD

blocks, Animations, and other useful technical information is available to download. Please visit

www.harsco-i.com and follow the links for details.

3. Applied Loads

Applied loads (unless otherwise indicated) where applicable:-

Falsework Self Weight of Concrete 24.5 kN/m³

Self Weight of Formwork 0.50 kN/m²

Live Load varies 1.50kN/m² to 2.50kN/m² as per BS 5975:2008.

Formwork Maximum Concrete Pressure allowed ...............kN/m²

Concrete Type (CIRIA 108) ...............

Concrete Temperature ...............°C

Rate of Rise ...............m/hr

Access Working Lifts ...............No. @...............kN/m²

Additional Lifts ...............No. @...............kN/m²

Hop-Up Brackets ...............No. @...............kN/m²

Wind Wind loads where applicable, have been calculated in accordance with BS 6399. Max. Design

Wind Force...............kN/m²

4. Timber

No timber is supplied by Harsco Infrastructure unless specifically stated. Where Harsco Infrastructure does not

supply, the design & supply of timber is the responsibility of the Customer. To enable us to complete this

drawing the following properties (based on Formwork, A Guide to Good Practice), have been allowed for as

the Customers

Timber(s):

Main bearers ...................................... Secondary bearers ......................................

Walings ...................................... Other(s) ......................................

Timber Grade allowed ......................................

Plywood ......................................with face grain orientated parallel to span.

5. Formwork

THE CUSTOMER IS RESPONSIBLE FOR ENSURING THAT ALL HARSCO INFRASTRUCTURE

COMPONENTS THAT COME INTO CONTACT WITH CONCRETE ARE TREATED WITH CHEMICAL

RELEASE AGENT PRIOR TO EACH USE.

6. Foundations/Support

Unless otherwise noted, no soleplates or other means of spreading the imposed loads are supplied by Harsco

Infrastructure. Where Harsco Infrastructure equipment is supported, suspended, anchored or tied to an

existing structure or the ground, the Customer must ensure that the structure or ground is adequate to safely

support the additional imposed loads.

7. Modification

This drawing has been prepared using the Safe Working Loads of the Harsco Infrastructure components

specified. No alteration to components, assembly, loading or any other aspect must be made without the

expressed written authority from Harsco Infrastructure.

8. Tying & Bracing

The Customer is responsible for ensuring all structures remain adequately tied and/or braced to carry the load

and ensure stability. No ties or braces are to be removed or altered in any way without the expressed written

authority from Harsco Infrastructure. Where Harsco Infrastructure is supplying equipment only, the supply &

fixing of all necessary ties is the responsibility of the Customer.

9. Temporary Working Platforms

Unless specifically stated it is considered that any other working platforms (for erection or dismantling

purposes), will be designed, supplied and fitted by the Customer.

10. Design Output

This drawing should be read in conjunction with :-

................................................................................................................................................................................

................................................................................................................................................................................

Unless indicated otherwise, all loads shown are not factored.

Maximum calculated Leg Load =...............kN

Lift positions and bracing frequency to be as shown.

Maximum calculated Tie Load =...............kN

Tie Type :-................................

Tie spacing to be as shown on drawing.

Note, method of assessment of loads in tie rods allows for elongation of ties and not continuity. Ref. Formwork,

A Guide to Good Practice 2nd Edition 3.8.2.

Unless a specification for tolerance has been provided, deflection has been limited to 1/270th of the maximum

span of each member.

Maximum weight of formwork unit = ................kg

Maximum weight of table unit = ................kg

12. Eccentricity

All legs are to be erected plumb and loaded concentrically to the general tolerances given in BS5975:2008

section 20 "Work on Site" (unless noted otherwise).

13. Obligation, Responsibilities & CDM

This drawing constitutes Harsco Infrastructures Risk Assessment in accordance with Regulation 11 of the

current CDM Regulations 2007. The elimination of general risk in the use of temporary works is by use of good

practice. Guidance can be found within relevant Codes, HSE publications and Guides. Wherever possible, risk

is designed out of this proposal during the design process.

************DO NOT TAKE RISK ! - IF IN DOUBT, ASK************

236491, 92,93 ,94,95,96

=

None Supplied

=

Read all notes

Customer must check and confirm all dimensions

All timber work to be designed, supplied and fixed by customer.

=

00

0

00

0

= =

= =

= =

=

=

=

=

=

=

pltwood (18mm.)

Read all relevant datasheets

=

0.0

Scale: 1:100PLAN VIEW: GENERAL ARRANGEMENT SPAN PIER "S"- PIER "R": CUPLOK/MKII/SPECIAL

800 80

Scale: 1:100PLAN VIEW: GENERAL ARRANGEMENT SPAN PIER "S"- PIER "R": BEAMS H20/PLYWOOD

Scale: 1:100 SECTION B-B: GENERAL ARRANGEMENT SPAN PIER "S"- PIER "R"

Scale: 1:30BRIDGE NR. 3 - SPAN PIER R-S: MODULE A GENERAL ARRANGEMENT

Scale: 1:50TYPICAL SECTION A-A

Scale: 1:100SECTION C-C: GENERAL ARRANGEMENT SPAN PIER "S"- PIER "R"

1600 160

** NOTE :-

All Scaffold Couplers must be tightened up to a

torque of 7 kg.m (50ft.lbs)

Base & Head Plate

with Universal Jack

Cuplok Standard

Cuplok Ledger

Cuplok

Ledger

Cuplok Std.

Cuplok Standard

Cuplok Ledger

Fixed Forkhead with

Universal Jack

Clamps to butt

against Forkhead

MKII Soldier to 186 Forkhead

(2No. Universal Clamp)

4751

872

475

SPECIAL RIB MARK VD1

SPECIAL RIB MARK VD1

SOLDIER MK2

SOLDIER MK2

CUPLOK

SEE DRAWING 150250_062421213-102A E SEE DRAWING 150250_062421213-103A E

SEE DRAWING 150250_062421213-102A E SEE DRAWING 150250_062421213-103A E

SOLDIER MK2 H20 BEAM PLYWOOD 18 MM WOOD BOARDS 48 MM

A

A

A

A

A

A

A

A

SEE DRAWING 150250_062421213-102A E SEE DRAWING 150250_062421213-103A E

BB

CC

B

Scale: 1:20Detail 1

Orthogonal coupler

ForkHead coupler

Screw Jack

Pipe Ø 48