BLYTH STREET PIER STREET QUEEN STREET Road resurfacing within Stage 3 extent of works All street trees to be retained COMMONWEALTH BANK BENDIGO BANK CREME RESTAURANT CREME RESTAURANT STELLA RESTAURANT STELLA RESTAURANT SWEENEY REAL ESTATE HARBOUR INN RESTAURANT HOCKING STUART REAL ESTATE MOSAIC RESTAURANT AUSTRALIA POST AUSTRALIA POST COLES SUPERMARKET CONVEYANCING AGENT SALT N PEPA CAFE BAKERS DELIGHT MANCINI REAL ESTATE New street tree planting within Blyth Street Accessible parking space Sections of dark coloured granite paving along key activity areas (i.e. outdoor dining) Remove redundant cross over and reinstate pedestrian paving B T T B B B B B Existing telephone pillar and bollards Removal of garden bed and replacement with trees T B Extent of works Stage 3 Proposed light coloured granite paving Proposed dark coloured granite paving Existing tree to be retained Proposed new street tree planting Existing bus stop and shelter Existing telephone booth Proposed rubbish bin Proposed seat Proposed pedestrian safety barriers Legend 1:400 A3 5m 0 10m Proposed bicycle hoop BH BH BH BH BH BH Outdoor trading zone indicators to demarcate pedestrian clearance zones Proposed trading zone indicators Proposed pedestrian barriers (Pier Street / Blyth Street intersection and north side of Queen Street intersection) Proposed roundabout planting BH BH PIER STREET, ALTONA STAGE 3 REDEVELOPMENT JUNE 2015 FINAL CONCEPT PLAN BH BH

Transcript of 150112 Pier Street - Stage 3 Concept · PDF fileBLYTH STREET PIER STREET QUEEN STREET Road...

Page 1: 150112 Pier Street - Stage 3 Concept · PDF fileBLYTH STREET PIER STREET QUEEN STREET Road resurfacing within Stage 3 extent of works All street trees to be retained COMMONWEAL TH

BLYTH STREET

PIE

R S

TR

EE

T

QUEEN STREET

Road resurfacing within Stage 3 extent of works

All street trees to be retained

COMMONWEALTH BANK

BENDIGO BANK

CREME RESTAURANT

CREME RESTAURANT

STELLA RESTAURANT

STELLA RESTAURANT

SWEENEY REAL ESTATE

HARBOUR INN RESTAURANT

HOCKING STUART REAL ESTATE

MOSAIC RESTAURANT

AUSTRALIA POST

AUSTRALIA POST

COLES SUPERMARKET

CONVEYANCING AGENT

SALT N PEPACAFE

BAKERS DELIGHT

MANCINI REAL ESTATE

New street tree planting within Blyth Street

Accessible parking space

Sections of dark coloured granite paving along key activity areas (i.e. outdoor dining)

Remove redundant cross over and reinstate pedestrian paving

B

T

T

B

B

B

B

B

Existing telephone pillar and bollards

Removal of garden bed and replacement with trees

T

B

Extent of worksStage 3

Proposed light coloured granite paving

Proposed dark coloured granite paving

Existing tree to be retained

Proposed new street tree planting

Existing bus stopand shelter

Existing telephonebooth

Proposed rubbish bin

Proposed seat

Proposed pedestrian safety barriers

Legend

1:400 A35m

0 10m

Proposed bicycle hoop

BH

BH

BH

BH

BH

BH

Outdoor trading zone indicators to demarcate pedestrian clearance zones

Proposed trading zone indicators

Proposed pedestrian barriers (Pier Street / Blyth Street intersection and north side of Queen Street intersection)

Proposed roundabout planting

BH

BH

PIER STREET, ALTONA STAGE 3 REDEVELOPMENTJUNE 2015

FINAL CONCEPT PLAN

BHBH

Page 2: 150112 Pier Street - Stage 3 Concept · PDF fileBLYTH STREET PIER STREET QUEEN STREET Road resurfacing within Stage 3 extent of works All street trees to be retained COMMONWEAL TH

Commonwealth Bank

Post Office

Coles Supermarket

Mancini Real Estate

Sections of light coloured granite paving to:Ÿ provide consistency

with previous sectionsŸ highlight key crossing pointsŸ announce entry to precinctŸ create contrast and legibility

at intersections

Proposed location for pedestrian barriers

The proposed next stage of improvements to Pier Street will include a practical and attractive paving design that addresses the impacts of high use and outdoor dining. The improvements seek to achieve visual consistency with the design of previous stages.

PIER STREET, ALTONA STAGE 3 REDEVELOPMENTJUNE 2015

FINAL CONCEPT PLAN

Perspective:View from Blyth Street looking South

Perspective:View from Queen Street looking North

Page 3: 150112 Pier Street - Stage 3 Concept · PDF fileBLYTH STREET PIER STREET QUEEN STREET Road resurfacing within Stage 3 extent of works All street trees to be retained COMMONWEAL TH

Dark coloured granite pavers in selected high use areas. Layoutto complement northern section

Bonded aggregate (Tree planter bays)

Coloured charcoal concrete kerbs as per previous sections

Light coloured granite ‘Sahara Gold’ in selected low use areas to match previous sections

Paving Palette:

PIER STREET, ALTONA STAGE 3 REDEVELOPMENTJUNE 2015

FURNITURE & MATERIALS

Street Furniture Palette:

Stainless steel binTimber and stainless steel Seat

Stainless steel bike hoop

Proposed pedestrian barrierto direct pedestrians todedicated crossing points