150112 Pier Street - Stage 3 Concept · PDF fileBLYTH STREET PIER STREET QUEEN STREET Road...
Transcript of 150112 Pier Street - Stage 3 Concept · PDF fileBLYTH STREET PIER STREET QUEEN STREET Road...
BLYTH STREET
PIE
R S
TR
EE
T
QUEEN STREET
Road resurfacing within Stage 3 extent of works
All street trees to be retained
COMMONWEALTH BANK
BENDIGO BANK
CREME RESTAURANT
CREME RESTAURANT
STELLA RESTAURANT
STELLA RESTAURANT
SWEENEY REAL ESTATE
HARBOUR INN RESTAURANT
HOCKING STUART REAL ESTATE
MOSAIC RESTAURANT
AUSTRALIA POST
AUSTRALIA POST
COLES SUPERMARKET
CONVEYANCING AGENT
SALT N PEPACAFE
BAKERS DELIGHT
MANCINI REAL ESTATE
New street tree planting within Blyth Street
Accessible parking space
Sections of dark coloured granite paving along key activity areas (i.e. outdoor dining)
Remove redundant cross over and reinstate pedestrian paving
B
T
T
B
B
B
B
B
Existing telephone pillar and bollards
Removal of garden bed and replacement with trees
T
B
Extent of worksStage 3
Proposed light coloured granite paving
Proposed dark coloured granite paving
Existing tree to be retained
Proposed new street tree planting
Existing bus stopand shelter
Existing telephonebooth
Proposed rubbish bin
Proposed seat
Proposed pedestrian safety barriers
Legend
1:400 A35m
0 10m
Proposed bicycle hoop
BH
BH
BH
BH
BH
BH
Outdoor trading zone indicators to demarcate pedestrian clearance zones
Proposed trading zone indicators
Proposed pedestrian barriers (Pier Street / Blyth Street intersection and north side of Queen Street intersection)
Proposed roundabout planting
BH
BH
PIER STREET, ALTONA STAGE 3 REDEVELOPMENTJUNE 2015
FINAL CONCEPT PLAN
BHBH
Commonwealth Bank
Post Office
Coles Supermarket
Mancini Real Estate
Sections of light coloured granite paving to:Ÿ provide consistency
with previous sectionsŸ highlight key crossing pointsŸ announce entry to precinctŸ create contrast and legibility
at intersections
Proposed location for pedestrian barriers
The proposed next stage of improvements to Pier Street will include a practical and attractive paving design that addresses the impacts of high use and outdoor dining. The improvements seek to achieve visual consistency with the design of previous stages.
PIER STREET, ALTONA STAGE 3 REDEVELOPMENTJUNE 2015
FINAL CONCEPT PLAN
Perspective:View from Blyth Street looking South
Perspective:View from Queen Street looking North
Dark coloured granite pavers in selected high use areas. Layoutto complement northern section
Bonded aggregate (Tree planter bays)
Coloured charcoal concrete kerbs as per previous sections
Light coloured granite ‘Sahara Gold’ in selected low use areas to match previous sections
Paving Palette:
PIER STREET, ALTONA STAGE 3 REDEVELOPMENTJUNE 2015
FURNITURE & MATERIALS
Street Furniture Palette:
Stainless steel binTimber and stainless steel Seat
Stainless steel bike hoop
Proposed pedestrian barrierto direct pedestrians todedicated crossing points