Daily Work Done DHA Phase II (Sec K, L, M, N) Electrical Dated :- 10 Sep 2015 Residential Description location Activity Planned Actual Remarks Physical %age Physical %age Street Light B-13 Street light till fixtures 100 Nil Nil Nil Earthing B-13 Earthing 100 Nil Nil Nil HT & LT cable laying Street 30 K Nil Nil Exacavation 25 Excavator HT & LTCable laying Street 29 K Nil Nil Exacavation 25 Nil Machinery Deployed Street light till fixtures Transformer , DBs, SLCP & Street Light Pole Earthing Cable Laying HT & LT (Excvation, Laying ,Sand, Bricks & Back Filling Cable Laying HT & LT (Excvation, Laying ,Sand, Bricks & Back Filling

description

XLPE

Transcript of 15 work

Page 1: 15 work

Daily Work Done

DHA Phase II (Sec K, L, M, N)

Electrical Dated :- 10 Sep 2015

Residential

Description location ActivityPlanned Actual Remarks

Physical %age Physical %age

Street Light B-13 Street light till fixtures 100 Nil Nil Nil

Earthing B-13 Earthing 100 Nil Nil Nil

HT & LT cable laying Street 30 K Nil Nil Exacavation 25 Excavator

HT & LTCable laying Street 29 K Nil Nil Exacavation 25 Nil

Machinery Deployed

Street light till fixtures

Transformer , DBs, SLCP & Street Light Pole Earthing

Cable Laying HT & LT (Excvation, Laying ,Sand, Bricks & Back Filling

Cable Laying HT & LT (Excvation, Laying ,Sand, Bricks & Back Filling

Page 2: 15 work

Daily Work Done

DHA Phase II (Sec K, L, M, N)

Electrical, Sui Gas & Water Supply

Electrical

Description location ActivityPlanned

Physical

Street Light B-15 Street light till fixtures

Earthing B-15 Earthing

Street Light B-16 Street light till fixtures

Earthing B-16 Earthing

HT Cable laying K (B-54) Nil

LTCable laying L (D) M-3 Nil

LTCable laying M (C ) -4 Nil

Sui Gas

Sui Gas Pipe Line C-35 Excvation

Sui Gas Pipe Line C-37 NIl

Sui Gas Pipe Line C-36 Nil

Sui Gas Pipe Line C-39 Nil

Sui Gas Pipe Line C-33 Nil

Water Supply

Water suplly Pipe line C-37

Water suplly Pipe line 2" C-32 Nil

Street light till fixtures

Transformer , DBs, SLCP & Street Light Pole Earthing

Street light till fixtures

Transformer , DBs, SLCP & Street Light Pole Earthing

Cable Laying HT (Excvation, Laying ,Sand, Bricks)

Cable Laying LT (Excvation, Laying ,Sand, Bricks)

Cable Laying LT (Excvation, Laying ,Sand, Bricks)

Lay out, Excvation, Pipe Laying ,Back fill

Lay out, Excvation, Pipe Laying ,Back fill

Lay out, Excvation, Pipe Laying ,Back fill

Lay out, Excvation, Pipe Laying ,Back fill

Lay out, Excvation, Pipe Laying ,Back fill

Lay out, Excvation, Pipe Laying ,Back fill & Hydro Testing

Layout to pipe laying

Lay out, Excvation, Pipe Laying ,Back fill & Hydro Testing

Page 3: 15 work

Daily Work Done

DHA Phase II (Sec K, L, M, N)

Electrical, Sui Gas & Water Supply Dated :- 11 Sep 2015

Electrical

Planned Actual Remarks

%age Physical %age

100 Nil Nil Nil

100 Nil Nil Nil

100 Nil Nil Nil

100 Nil Nil Nil

Nil Excvation 25 Nil

Nil 75 Nil

Nil 75 Nil

Sui Gas

50 Nil Nil Nil

Nil Lay out25

Nil Lay out25

Nil Lay out25

Nil Lay out25

Water Supply

60 Nil Nil

Nil0

Machinery Deployed

Exvacation to Sand, Bricks

Exvacation to Sand, Bricks

1/2 Jack Hamber

1 /2 Excavator

Lay out to pipe laying

Page 4: 15 work

Daily Work Done

DHA Phase II (Sec K, L, M, N)

Electrical, Sui Gas & Water Supply

Electrical

Description Old location Activity

Street Light B-17 St- Street light till fixtures

Earthing B-17 St-

Street Light B-18 St- Street light till fixtures

Earthing B-18 St-

Feeder Duct (2 x 3) D-13 St-

Main Hole for Feeder Duct D-13 St- Exvacation till Pouring

Sui Gas

Sui Gas Pipe Line C-35 St-

Sui Gas Pipe Line C-36 St-

Water Supply

Water suplly Pipe line C-37 St-

Water suplly Pipe line 2" C-32 St-

Revised location

Transformer , DBs, SLCP & Street Light Pole Earthing

Transformer , DBs, SLCP & Street Light Pole Earthing Excavation,Bed Lean PVC 6" dia Pipe Laying 1st layer to 2nd layer P.C.C

Lay out, Excvation, Pipe Laying ,Back fill

Lay out, Excvation, Pipe Laying ,Back fill

Lay out, Excvation, Pipe Laying ,Back fill & Hydro Testing

Lay out, Excvation, Pipe Laying ,Back fill & Hydro Testing

Page 5: 15 work

Daily Work Done

DHA Phase II (Sec K, L, M, N)

Electrical, Sui Gas & Water Supply Dated :- 12 Sep 2015

Electrical

Planned Actual

Physical %age Physical %age

100 Nil Nil Nil

Earthing 100 Earthing Rod Nil Nil

100 Nil Nil Nil

Earthing 100 Earthing Rod Nil Nil

Nil Nil Exavation Nil Nil

Nil Nil Exavation 25 Nil

Sui Gas

Backfill 100 Nil Nil Nil

Pipe Laying 60Nil Nil Nil

Water Supply

Layout to Back fill 80 Nil Nil

Nil Nil 50

Machinery Deployed

Street light till fixtures

Street light till fixtures

Lay out to pipe laying

Page 6: 15 work

Daily Work Done

DHA Phase II (Sec K, L, M, N)

Electrical, Sui Gas & Water Supply Dated :- 12 Sep 2015

Electrical

Remarks

filled

to befilled

Sui Gas

Water Supply

Page 7: 15 work

Daily Work Done

DHA Phase II (Sec K, L, M, N)

Electrical, Sui Gas & Water Supply

Electrical

Description Activity

Street Light B-21 St- Street light till fixtures

Earthing B-21 St-

Street Light B-22 St- Street light till fixtures

Earthing B-22 St-

Feeder Duct (2 x 3) D-13 St-

Main Hole for Feeder Duct D-13 St- Exvacation till Pouring

Sui Gas

Sui Gas Pipe Line C-35 St-

Water Supply

Water supply Pipe line 2" C-32 St-

Water Supply pipe line St-

Previous Location

Revised Loaction

Transformer , DBs, SLCP & Street Light Pole Earthing

Transformer , DBs, SLCP & Street Light Pole Earthing

Excavation,Bed Lean PVC 6" dia Pipe Laying 1st layer to 2nd layer P.C.C

Lay out, Excvation, Pipe Laying ,Back fill

Lay out, Excvation, Pipe Laying ,Back fill & Hydro Testing

1-C (commercial)

Lay out, Excvation, Pipe Laying ,Back fill & Hydro Testing

Page 8: 15 work

Daily Work Done

DHA Phase II (Sec K, L, M, N)

Electrical, Sui Gas & Water Supply Dated :- 14 Sep 2015

Electrical

Planned Actual

Physical %age Physical %age

100 Nil Nil Nil

Earthing 100 Earthing Rod Nil Nil

100 Nil Nil Nil

Earthing 100 Earthing Rod Nil Nil

Nil Nil Exavation 25 Nil

Nil Nil Exavation 25 Nil

Sui Gas

pipe laying 75 Nil Nil Nil

Water Supply

Nil Nil Nil Excavator

Exavation 67 Nil Nil Nil

Machinery Deployed

Street light till fixtures

Street light till fixtures

Lay out to pipe laying

Page 9: 15 work

Daily Work Done

DHA Phase II (Sec K, L, M, N)

Electrical, Sui Gas & Water Supply Dated :- 14 Sep 2015

Electrical

Remarks

filled

to befilled

Sui Gas

Water Supply

Page 10: 15 work

Daily Work Done

DHA Phase II (Sec K, L, M, N)

Electrical, Sui Gas & Water Supply

Electrical

Description Activity

Street Light B-23 Street light till fixtures

Earthing B-23

Street Light B-24 Street light till fixtures

Earthing B-24

Earthing B-25

Feeder Duct (2 x 3) D-13

Main Hole for Feeder Duct D-13 Exvacation till Pouring

Sui Gas

Sui Gas Pipe Line C-35

Sui Gas Pipe Line C-32

Water Supply

Water supply Pipe line 2" C-32

Water Supply pipe line

Previous location

Previous location

Transformer , DBs, SLCP & Street Light Pole Earthing

Transformer , DBs, SLCP & Street Light Pole Earthing

Transformer , DBs, SLCP & Street Light Pole Earthing

Excavation,Bed Lean PVC 6" dia Pipe Laying 1st layer to 2nd layer P.C.C

Lay out, Excvation, Pipe Laying ,Back fill

Lay out, Excvation, Pipe Laying ,Back fill

Lay out, Excvation, Pipe Laying ,Back fill & Hydro Testing

1-C (Commercial) Lay out, Excvation, Pipe

Laying ,Back fill & Hydro Testing

Page 11: 15 work

Daily Work Done

DHA Phase II (Sec K, L, M, N)

Electrical, Sui Gas & Water Supply Dated :- 15 Sep 2015

Electrical

Planned Actual

Physical %age Physical %age

100 Nil Nil Nil

Earthing 100 Nil Nil Nil

100 Nil Nil Nil

Earthing 100 Nil Nil Nil

Earthing 100 Nil Nil Nil

Nil Nil Exavation 25 Nil

Nil Nil Exavation 25 Nil

Sui Gas

Back fill 100 Nil Nil Nil

Nil Nil Exavation Nil Nil

Water Supply

Nil Nil Nil Excavator

Hydro Testing 100 Nil Nil Nil

Machinery Deployed

Street light till fixtures

Street light till fixtures

Lay out to pipe laying

Page 12: 15 work

Daily Work Done

DHA Phase II (Sec K, L, M, N)

Electrical, Sui Gas & Water Supply Dated :- 15 Sep 2015

Electrical

Remarks

filled

to befilled

Sui Gas

Water Supply

Page 13: 15 work

Daily Work Done

DHA Phase II (Sec K, L, M, N)

Electrical, Sui Gas & Water Supply

Electrical

Description Activity

HT & LT Cable laying Comm-1

Foundation of TF, DBs, SLCP & Pole Comm-1

Foundation of TF, DBs, SLCP & Pole B-64

B-64

Street Light B-64 Street light till fixtures

Earthing B-64

Sui Gas

Sui Gas Pipe Line 1-D

Sui Gas Pipe Line B-63

Water Supply

Water supply Pipe line 3-A

Water supply Pipe line 3-B

Water supply Pipe line C-13

Previous location

Revised location

Layout Excvation cable laying back filling

Foundation of TF, DBs, SLCP & Pole

Foundation of TF, DBs, SLCP & Pole

Transformer , SLCP & DB Installation and Termination

Placying of Transformer, SLCP & DB till Termination

Transformer , DBs, SLCP & Street Light Pole Earthing

Lay out, Excvation, Pipe Laying ,Back fill

Lay out, Excvation, Pipe Laying ,Back fill

Lay out, Excvation, Pipe Laying ,Back fill & Hydro Testing

Lay out, Excvation, Pipe Laying ,Back fill & Hydro Testing

Lay out, Excvation, Pipe Laying ,Back fill & Hydro Testing

Page 14: 15 work

Daily Work Done

DHA Phase II (Sec K, L, M, N)

Electrical, Sui Gas & Water Supply Dated :- 28 Sep 2015

Electrical

Planned Actual

Physical %age Physical %age

Backfilling 100 Nil Nil Nil

Foundation 100 Nil Nil Nil

Foundation 100 Nil Nil Nil

Termination 100 NIl Nil Nil

100 Nil Nil Nil

Earthing 100 Nil Nil Nil

Sui Gas

Excvation 25 Nil Nil Nil

Excvation 50 Nil Nil Nil

Water Supply

Pipe laying 50 Nil Nil Nil

Excvation 20 Nil Nil Nil

Layout 5 Nil Nil Nil

Machinery Deployed

Street light till fixtures

Page 15: 15 work

Daily Work Done

DHA Phase II (Sec K, L, M, N)

Electrical, Sui Gas & Water Supply Dated :- 28 Sep 2015

Electrical

Remarksfilled

to befilled

Sui Gas

27-30

28-30

25-30

27-3Oct

27-20 Nov

Page 16: 15 work

Daily Work Done

DHA Phase II (Sec K, L, M, N)

Electrical, Sui Gas & Water Supply

Electrical

Description Activity

Comm-1

Street Light Comm-1 Street light till fixtures

Earthing

Sui Gas

Sui Gas Pipe Line 1-D

Sui Gas Pipe Line B-63

Water Supply

Water supply Pipe line 3-A

Water supply Pipe line 3-B

Water supply Pipe line C-13

Previous location

Revised location

Transformer , SLCP & DB Installation and Termination

Placying of Transformer, SLCP & DB till Termination

Comm-1 ,Iqbal Road-s along B

47 & B-28Transformer , DBs, SLCP & Street Light Pole Earthing

Lay out, Excvation, Pipe Laying ,Back fill

Lay out, Excvation, Pipe Laying ,Back fill

Lay out, Excvation, Pipe Laying ,Back fill & Hydro Testing

Lay out, Excvation, Pipe Laying ,Back fill & Hydro Testing

Lay out, Excvation, Pipe Laying ,Back fill & Hydro Testing

Page 17: 15 work

Daily Work Done

DHA Phase II (Sec K, L, M, N)

Electrical, Sui Gas & Water Supply Dated :- 29 Sep 2015

Electrical

Planned Actual

Physical %age Physical %age

Termination 100 NIl Nil Nil

100 Nil Nil Nil

Earthing 100 Nil Nil Nil

Sui Gas

Pipe laying 75 Nil Nil Nil

Pipe laying 75 Nil Nil Nil

Water Supply

Backfll 75 Nil Nil Nil

Excvation 30 Nil Nil Nil

Layout 10 Nil Nil Nil

Machinery Deployed

Street light till fixtures

Page 18: 15 work

Daily Work Done

DHA Phase II (Sec K, L, M, N)

Electrical, Sui Gas & Water Supply Dated :- 29 Sep 2015

Electrical

Remarksfilled

to befilled

27-30

28-30

25-30

27-3Oct

27-20 Nov

Page 19: 15 work

Daily Work Done

DHA Phase II (Sec K, L, M, N)

Electrical, Sui Gas & Water Supply

Electrical

Description Activity

Earthing

Sui Gas

Sui Gas Pipe Line 1-D

Sui Gas Pipe Line B-63

Water Supply

Water supply Pipe line 3-A

Water supply Pipe line 3-B

Water supply Pipe line C-13

Previous location

Revised location

Iqbal Road-s along B-28 & B-47

Transformer , DBs, SLCP & Street Light Pole Earthing

Lay out, Excvation, Pipe Laying ,Back fill

Lay out, Excvation, Pipe Laying ,Back fill

Lay out, Excvation, Pipe Laying ,Back fill & Hydro Testing

Lay out, Excvation, Pipe Laying ,Back fill & Hydro Testing

Lay out, Excvation, Pipe Laying ,Back fill & Hydro Testing

Page 20: 15 work

Daily Work Done

DHA Phase II (Sec K, L, M, N)

Electrical, Sui Gas & Water Supply Dated :- 30 Sep 2015

Electrical

Planned Actual

Physical %age Physical %age

Earthing 100 Nil Nil Nil

Sui Gas

Back Fill 100 Nil Nil Nil

Back Fill 100 Nil Nil Nil

Water Supply

Hydro test 100 Nil Nil Nil

Pipe laying 40 Nil Nil Nil

Layout 20 Nil Nil Nil

Machinery Deployed

Page 21: 15 work

Daily Work Done

DHA Phase II (Sec K, L, M, N)

Electrical, Sui Gas & Water Supply Dated :- 30 Sep 2015

Electrical

Remarksfilled

27-30

28-30

25-30

27-3Oct

27-20 Nov

Page 22: 15 work

Daily Work Done

DHA Phase II (Sec K, L, M, N)

Electrical, Sui Gas & Water Supply

Electrical

Description Activity

Foundation of TF, DBs & Pole C-2

Feeder Cable Laying D-5 5th Avenue Feeder able Laying

Sui Gas Nil Nil Nil

Water Supply

Water supply Pipe line 3-B

Water supply Pipe line C-13

Previous location

Revised location

Foundation of TF, DBs, SLCP & Pole

Lay out, Excvation, Pipe Laying ,Back fill & Hydro Testing

Lay out, Excvation, Pipe Laying ,Back fill & Hydro Testing

Page 23: 15 work

Daily Work Done

DHA Phase II (Sec K, L, M, N)

Electrical, Sui Gas & Water Supply Dated :- 01-Oct- 2015

Electrical

Planned Actual

Physical %age Physical %age

Foundation 100 Nil Nil Nil

Cable Laying 5 Nil Nil Nil

Nil Nil Nil Nil Nil

Water Supply

Pipe laying 60 Nil Nil Nil

Layout 20 Nil Nil Nil

Machinery Deployed

Page 24: 15 work

Daily Work Done

DHA Phase II (Sec K, L, M, N)

Electrical, Sui Gas & Water Supply Dated :- 01-Oct- 2015

Electrical

Remarksfilled

27-3Oct

27-20 Nov

Page 25: 15 work

Daily Work Done

DHA Phase II (Sec K, L, M, N)

Electrical, Sui Gas & Water Supply

Electrical

Description Activity

Transformer & DB Installation C-2 Transformer & DB Installation

Feeder Cable Laying D-5 5th Avenue Feeder able Laying

Sui Gas Nil Nil Nil

Water Supply

Water supply Pipe line 3-B

Water supply Pipe line C-13

Previous location

Revised location

Lay out, Excvation, Pipe Laying ,Back fill & Hydro Testing

Lay out, Excvation, Pipe Laying ,Back fill & Hydro Testing

Page 26: 15 work

Daily Work Done

DHA Phase II (Sec K, L, M, N)

Electrical, Sui Gas & Water Supply Dated :- 02-Oct- 2015

Electrical

Planned Actual

Physical %age Physical %age

Installation 100 Nil Nil Nil

Cable Laying 10 Nil Nil Nil

Nil Nil Nil Nil Nil

Water Supply

Backfill 80 Nil Nil Nil

Layout 20 Nil Nil Nil

Machinery Deployed

Page 27: 15 work

Daily Work Done

DHA Phase II (Sec K, L, M, N)

Electrical, Sui Gas & Water Supply Dated :- 02-Oct- 2015

Electrical

Remarksfilled

27-3Oct

27-20 Nov

Page 28: 15 work

Daily Work Done

DHA Phase II (Sec K, L, M, N)

Electrical, Sui Gas & Water Supply

Electrical

Description Activity

Street Light C-2 Street light till fixtures

Earthing C-2

Feeder Cable Laying D-5 5th Avenue Feeder able Laying

Sui Gas Nil Nil Nil

Water Supply

Water supply Pipe line 3-B

Water supply Pipe line C-13

Previous location

Revised location

Transformer , DBs, SLCP & Street Light Pole Earthing

Lay out, Excvation, Pipe Laying ,Back fill & Hydro Testing

Lay out, Excvation, Pipe Laying ,Back fill & Hydro Testing

Page 29: 15 work

Daily Work Done

DHA Phase II (Sec K, L, M, N)

Electrical, Sui Gas & Water Supply Dated :- 03-Oct- 2015

Electrical

Planned Actual

Physical %age Physical %age

100 Nil Nil Nil

Earthing 100 Nil Nil Nil

Cable Laying 10 Nil Nil Nil

Nil Nil Nil Nil Nil

Water Supply

Hydro Test 100 Nil Nil Nil

Layout 20 Nil Nil Nil

Machinery Deployed

Street light till fixtures

Page 30: 15 work

Daily Work Done

DHA Phase II (Sec K, L, M, N)

Electrical, Sui Gas & Water Supply Dated :- 03-Oct- 2015

Electrical

Remarksfilled

27-3Oct

27-20 Nov

Page 31: 15 work

Daily Work Done (Electrical)DHA Phase II (Sec K, L, M, N) 10/13/2015

Description ActivityPlanned Actual

RemarksPhysical %age Physical %age

Street Light C-6A, C-7 100 Nil Nil Nil

Earthing C-6A, C-7 Earthing 100 Nil Nil Nil

Cable Laying C-6A, C-7 Earthing 100 Nil Nil Nil

Earthing B-17 DBs Earthling Nil Nil 3 75 Nil

Previous location

Revised location

Machinery Deployed

Street light till fixtures

Street light till fixtures

Transformer , DBs, SLCP & Street Light Pole Earthing

Transformer , DBs, SLCP & Street Light Pole Earthing

Page 32: 15 work

Daily Work Done (Electrical)DHA Phase II (Sec K, L, M, N) 10/14/2015

Description ActivityPlanned Actual

RemarksPhysical %age Physical %age

Street Light C-6A 100 Nil Nil Nil

Earthing C-6A Earthing 100 Nil Nil Nil

Cable Laying C-6A Earthing 100 Nil Nil Nil

C-3 Nil Nil 3 40 Nil

Earthing B-17 DBs Earthling Nil Nil 3 75 Nil

Previous location

Revised location

Machinery Deployed

Street light till fixtures

Street light till fixtures

Transformer , DBs, SLCP & Street Light Pole Earthing Transformer , DBs, SLCP & Street Light Pole Earthing

Street Light pole

Street light pole install

Page 33: 15 work

Daily Work Done (Electrical)

DHA Phase II (Sec K, L, M, N)

15-Oct-15

Description ActivityPlanned Actual

RemarksPhysical %age Physical %age

Street Light C-7 100 Nil Nil Nil

Earthing C-7 Earthing 100 Nil Nil Nil

Cable Laying C-7 Earthing 100 Nil Nil Nil

Street Light pole C-11 Nil Nil 3 100 Nil

Earthing B-16 DBs Earthling Nil Nil 3 75 Nil

Previous location

Revised location

Machinery Deployed

Street light till fixtures Street light till fixtures

Transformer , DBs, SLCP & Street Light Pole Earthing

Transformer , DBs, SLCP & Street Light Pole Earthing

Street light pole install