Daily Work Done
DHA Phase II (Sec K, L, M, N)
Electrical Dated :- 10 Sep 2015
Residential
Description location ActivityPlanned Actual Remarks
Physical %age Physical %age
Street Light B-13 Street light till fixtures 100 Nil Nil Nil
Earthing B-13 Earthing 100 Nil Nil Nil
HT & LT cable laying Street 30 K Nil Nil Exacavation 25 Excavator
HT & LTCable laying Street 29 K Nil Nil Exacavation 25 Nil
Machinery Deployed
Street light till fixtures
Transformer , DBs, SLCP & Street Light Pole Earthing
Cable Laying HT & LT (Excvation, Laying ,Sand, Bricks & Back Filling
Cable Laying HT & LT (Excvation, Laying ,Sand, Bricks & Back Filling
![Page 2: 15 work](https://reader036.fdocuments.net/reader036/viewer/2022070418/5695d3091a28ab9b029c9fae/html5/thumbnails/2.jpg)
Daily Work Done
DHA Phase II (Sec K, L, M, N)
Electrical, Sui Gas & Water Supply
Electrical
Description location ActivityPlanned
Physical
Street Light B-15 Street light till fixtures
Earthing B-15 Earthing
Street Light B-16 Street light till fixtures
Earthing B-16 Earthing
HT Cable laying K (B-54) Nil
LTCable laying L (D) M-3 Nil
LTCable laying M (C ) -4 Nil
Sui Gas
Sui Gas Pipe Line C-35 Excvation
Sui Gas Pipe Line C-37 NIl
Sui Gas Pipe Line C-36 Nil
Sui Gas Pipe Line C-39 Nil
Sui Gas Pipe Line C-33 Nil
Water Supply
Water suplly Pipe line C-37
Water suplly Pipe line 2" C-32 Nil
Street light till fixtures
Transformer , DBs, SLCP & Street Light Pole Earthing
Street light till fixtures
Transformer , DBs, SLCP & Street Light Pole Earthing
Cable Laying HT (Excvation, Laying ,Sand, Bricks)
Cable Laying LT (Excvation, Laying ,Sand, Bricks)
Cable Laying LT (Excvation, Laying ,Sand, Bricks)
Lay out, Excvation, Pipe Laying ,Back fill
Lay out, Excvation, Pipe Laying ,Back fill
Lay out, Excvation, Pipe Laying ,Back fill
Lay out, Excvation, Pipe Laying ,Back fill
Lay out, Excvation, Pipe Laying ,Back fill
Lay out, Excvation, Pipe Laying ,Back fill & Hydro Testing
Layout to pipe laying
Lay out, Excvation, Pipe Laying ,Back fill & Hydro Testing
![Page 3: 15 work](https://reader036.fdocuments.net/reader036/viewer/2022070418/5695d3091a28ab9b029c9fae/html5/thumbnails/3.jpg)
Daily Work Done
DHA Phase II (Sec K, L, M, N)
Electrical, Sui Gas & Water Supply Dated :- 11 Sep 2015
Electrical
Planned Actual Remarks
%age Physical %age
100 Nil Nil Nil
100 Nil Nil Nil
100 Nil Nil Nil
100 Nil Nil Nil
Nil Excvation 25 Nil
Nil 75 Nil
Nil 75 Nil
Sui Gas
50 Nil Nil Nil
Nil Lay out25
Nil Lay out25
Nil Lay out25
Nil Lay out25
Water Supply
60 Nil Nil
Nil0
Machinery Deployed
Exvacation to Sand, Bricks
Exvacation to Sand, Bricks
1/2 Jack Hamber
1 /2 Excavator
Lay out to pipe laying
![Page 4: 15 work](https://reader036.fdocuments.net/reader036/viewer/2022070418/5695d3091a28ab9b029c9fae/html5/thumbnails/4.jpg)
Daily Work Done
DHA Phase II (Sec K, L, M, N)
Electrical, Sui Gas & Water Supply
Electrical
Description Old location Activity
Street Light B-17 St- Street light till fixtures
Earthing B-17 St-
Street Light B-18 St- Street light till fixtures
Earthing B-18 St-
Feeder Duct (2 x 3) D-13 St-
Main Hole for Feeder Duct D-13 St- Exvacation till Pouring
Sui Gas
Sui Gas Pipe Line C-35 St-
Sui Gas Pipe Line C-36 St-
Water Supply
Water suplly Pipe line C-37 St-
Water suplly Pipe line 2" C-32 St-
Revised location
Transformer , DBs, SLCP & Street Light Pole Earthing
Transformer , DBs, SLCP & Street Light Pole Earthing Excavation,Bed Lean PVC 6" dia Pipe Laying 1st layer to 2nd layer P.C.C
Lay out, Excvation, Pipe Laying ,Back fill
Lay out, Excvation, Pipe Laying ,Back fill
Lay out, Excvation, Pipe Laying ,Back fill & Hydro Testing
Lay out, Excvation, Pipe Laying ,Back fill & Hydro Testing
![Page 5: 15 work](https://reader036.fdocuments.net/reader036/viewer/2022070418/5695d3091a28ab9b029c9fae/html5/thumbnails/5.jpg)
Daily Work Done
DHA Phase II (Sec K, L, M, N)
Electrical, Sui Gas & Water Supply Dated :- 12 Sep 2015
Electrical
Planned Actual
Physical %age Physical %age
100 Nil Nil Nil
Earthing 100 Earthing Rod Nil Nil
100 Nil Nil Nil
Earthing 100 Earthing Rod Nil Nil
Nil Nil Exavation Nil Nil
Nil Nil Exavation 25 Nil
Sui Gas
Backfill 100 Nil Nil Nil
Pipe Laying 60Nil Nil Nil
Water Supply
Layout to Back fill 80 Nil Nil
Nil Nil 50
Machinery Deployed
Street light till fixtures
Street light till fixtures
Lay out to pipe laying
![Page 6: 15 work](https://reader036.fdocuments.net/reader036/viewer/2022070418/5695d3091a28ab9b029c9fae/html5/thumbnails/6.jpg)
Daily Work Done
DHA Phase II (Sec K, L, M, N)
Electrical, Sui Gas & Water Supply Dated :- 12 Sep 2015
Electrical
Remarks
filled
to befilled
Sui Gas
Water Supply
![Page 7: 15 work](https://reader036.fdocuments.net/reader036/viewer/2022070418/5695d3091a28ab9b029c9fae/html5/thumbnails/7.jpg)
Daily Work Done
DHA Phase II (Sec K, L, M, N)
Electrical, Sui Gas & Water Supply
Electrical
Description Activity
Street Light B-21 St- Street light till fixtures
Earthing B-21 St-
Street Light B-22 St- Street light till fixtures
Earthing B-22 St-
Feeder Duct (2 x 3) D-13 St-
Main Hole for Feeder Duct D-13 St- Exvacation till Pouring
Sui Gas
Sui Gas Pipe Line C-35 St-
Water Supply
Water supply Pipe line 2" C-32 St-
Water Supply pipe line St-
Previous Location
Revised Loaction
Transformer , DBs, SLCP & Street Light Pole Earthing
Transformer , DBs, SLCP & Street Light Pole Earthing
Excavation,Bed Lean PVC 6" dia Pipe Laying 1st layer to 2nd layer P.C.C
Lay out, Excvation, Pipe Laying ,Back fill
Lay out, Excvation, Pipe Laying ,Back fill & Hydro Testing
1-C (commercial)
Lay out, Excvation, Pipe Laying ,Back fill & Hydro Testing
![Page 8: 15 work](https://reader036.fdocuments.net/reader036/viewer/2022070418/5695d3091a28ab9b029c9fae/html5/thumbnails/8.jpg)
Daily Work Done
DHA Phase II (Sec K, L, M, N)
Electrical, Sui Gas & Water Supply Dated :- 14 Sep 2015
Electrical
Planned Actual
Physical %age Physical %age
100 Nil Nil Nil
Earthing 100 Earthing Rod Nil Nil
100 Nil Nil Nil
Earthing 100 Earthing Rod Nil Nil
Nil Nil Exavation 25 Nil
Nil Nil Exavation 25 Nil
Sui Gas
pipe laying 75 Nil Nil Nil
Water Supply
Nil Nil Nil Excavator
Exavation 67 Nil Nil Nil
Machinery Deployed
Street light till fixtures
Street light till fixtures
Lay out to pipe laying
![Page 9: 15 work](https://reader036.fdocuments.net/reader036/viewer/2022070418/5695d3091a28ab9b029c9fae/html5/thumbnails/9.jpg)
Daily Work Done
DHA Phase II (Sec K, L, M, N)
Electrical, Sui Gas & Water Supply Dated :- 14 Sep 2015
Electrical
Remarks
filled
to befilled
Sui Gas
Water Supply
![Page 10: 15 work](https://reader036.fdocuments.net/reader036/viewer/2022070418/5695d3091a28ab9b029c9fae/html5/thumbnails/10.jpg)
Daily Work Done
DHA Phase II (Sec K, L, M, N)
Electrical, Sui Gas & Water Supply
Electrical
Description Activity
Street Light B-23 Street light till fixtures
Earthing B-23
Street Light B-24 Street light till fixtures
Earthing B-24
Earthing B-25
Feeder Duct (2 x 3) D-13
Main Hole for Feeder Duct D-13 Exvacation till Pouring
Sui Gas
Sui Gas Pipe Line C-35
Sui Gas Pipe Line C-32
Water Supply
Water supply Pipe line 2" C-32
Water Supply pipe line
Previous location
Previous location
Transformer , DBs, SLCP & Street Light Pole Earthing
Transformer , DBs, SLCP & Street Light Pole Earthing
Transformer , DBs, SLCP & Street Light Pole Earthing
Excavation,Bed Lean PVC 6" dia Pipe Laying 1st layer to 2nd layer P.C.C
Lay out, Excvation, Pipe Laying ,Back fill
Lay out, Excvation, Pipe Laying ,Back fill
Lay out, Excvation, Pipe Laying ,Back fill & Hydro Testing
1-C (Commercial) Lay out, Excvation, Pipe
Laying ,Back fill & Hydro Testing
![Page 11: 15 work](https://reader036.fdocuments.net/reader036/viewer/2022070418/5695d3091a28ab9b029c9fae/html5/thumbnails/11.jpg)
Daily Work Done
DHA Phase II (Sec K, L, M, N)
Electrical, Sui Gas & Water Supply Dated :- 15 Sep 2015
Electrical
Planned Actual
Physical %age Physical %age
100 Nil Nil Nil
Earthing 100 Nil Nil Nil
100 Nil Nil Nil
Earthing 100 Nil Nil Nil
Earthing 100 Nil Nil Nil
Nil Nil Exavation 25 Nil
Nil Nil Exavation 25 Nil
Sui Gas
Back fill 100 Nil Nil Nil
Nil Nil Exavation Nil Nil
Water Supply
Nil Nil Nil Excavator
Hydro Testing 100 Nil Nil Nil
Machinery Deployed
Street light till fixtures
Street light till fixtures
Lay out to pipe laying
![Page 12: 15 work](https://reader036.fdocuments.net/reader036/viewer/2022070418/5695d3091a28ab9b029c9fae/html5/thumbnails/12.jpg)
Daily Work Done
DHA Phase II (Sec K, L, M, N)
Electrical, Sui Gas & Water Supply Dated :- 15 Sep 2015
Electrical
Remarks
filled
to befilled
Sui Gas
Water Supply
![Page 13: 15 work](https://reader036.fdocuments.net/reader036/viewer/2022070418/5695d3091a28ab9b029c9fae/html5/thumbnails/13.jpg)
Daily Work Done
DHA Phase II (Sec K, L, M, N)
Electrical, Sui Gas & Water Supply
Electrical
Description Activity
HT & LT Cable laying Comm-1
Foundation of TF, DBs, SLCP & Pole Comm-1
Foundation of TF, DBs, SLCP & Pole B-64
B-64
Street Light B-64 Street light till fixtures
Earthing B-64
Sui Gas
Sui Gas Pipe Line 1-D
Sui Gas Pipe Line B-63
Water Supply
Water supply Pipe line 3-A
Water supply Pipe line 3-B
Water supply Pipe line C-13
Previous location
Revised location
Layout Excvation cable laying back filling
Foundation of TF, DBs, SLCP & Pole
Foundation of TF, DBs, SLCP & Pole
Transformer , SLCP & DB Installation and Termination
Placying of Transformer, SLCP & DB till Termination
Transformer , DBs, SLCP & Street Light Pole Earthing
Lay out, Excvation, Pipe Laying ,Back fill
Lay out, Excvation, Pipe Laying ,Back fill
Lay out, Excvation, Pipe Laying ,Back fill & Hydro Testing
Lay out, Excvation, Pipe Laying ,Back fill & Hydro Testing
Lay out, Excvation, Pipe Laying ,Back fill & Hydro Testing
![Page 14: 15 work](https://reader036.fdocuments.net/reader036/viewer/2022070418/5695d3091a28ab9b029c9fae/html5/thumbnails/14.jpg)
Daily Work Done
DHA Phase II (Sec K, L, M, N)
Electrical, Sui Gas & Water Supply Dated :- 28 Sep 2015
Electrical
Planned Actual
Physical %age Physical %age
Backfilling 100 Nil Nil Nil
Foundation 100 Nil Nil Nil
Foundation 100 Nil Nil Nil
Termination 100 NIl Nil Nil
100 Nil Nil Nil
Earthing 100 Nil Nil Nil
Sui Gas
Excvation 25 Nil Nil Nil
Excvation 50 Nil Nil Nil
Water Supply
Pipe laying 50 Nil Nil Nil
Excvation 20 Nil Nil Nil
Layout 5 Nil Nil Nil
Machinery Deployed
Street light till fixtures
![Page 15: 15 work](https://reader036.fdocuments.net/reader036/viewer/2022070418/5695d3091a28ab9b029c9fae/html5/thumbnails/15.jpg)
Daily Work Done
DHA Phase II (Sec K, L, M, N)
Electrical, Sui Gas & Water Supply Dated :- 28 Sep 2015
Electrical
Remarksfilled
to befilled
Sui Gas
27-30
28-30
25-30
27-3Oct
27-20 Nov
![Page 16: 15 work](https://reader036.fdocuments.net/reader036/viewer/2022070418/5695d3091a28ab9b029c9fae/html5/thumbnails/16.jpg)
Daily Work Done
DHA Phase II (Sec K, L, M, N)
Electrical, Sui Gas & Water Supply
Electrical
Description Activity
Comm-1
Street Light Comm-1 Street light till fixtures
Earthing
Sui Gas
Sui Gas Pipe Line 1-D
Sui Gas Pipe Line B-63
Water Supply
Water supply Pipe line 3-A
Water supply Pipe line 3-B
Water supply Pipe line C-13
Previous location
Revised location
Transformer , SLCP & DB Installation and Termination
Placying of Transformer, SLCP & DB till Termination
Comm-1 ,Iqbal Road-s along B
47 & B-28Transformer , DBs, SLCP & Street Light Pole Earthing
Lay out, Excvation, Pipe Laying ,Back fill
Lay out, Excvation, Pipe Laying ,Back fill
Lay out, Excvation, Pipe Laying ,Back fill & Hydro Testing
Lay out, Excvation, Pipe Laying ,Back fill & Hydro Testing
Lay out, Excvation, Pipe Laying ,Back fill & Hydro Testing
![Page 17: 15 work](https://reader036.fdocuments.net/reader036/viewer/2022070418/5695d3091a28ab9b029c9fae/html5/thumbnails/17.jpg)
Daily Work Done
DHA Phase II (Sec K, L, M, N)
Electrical, Sui Gas & Water Supply Dated :- 29 Sep 2015
Electrical
Planned Actual
Physical %age Physical %age
Termination 100 NIl Nil Nil
100 Nil Nil Nil
Earthing 100 Nil Nil Nil
Sui Gas
Pipe laying 75 Nil Nil Nil
Pipe laying 75 Nil Nil Nil
Water Supply
Backfll 75 Nil Nil Nil
Excvation 30 Nil Nil Nil
Layout 10 Nil Nil Nil
Machinery Deployed
Street light till fixtures
![Page 18: 15 work](https://reader036.fdocuments.net/reader036/viewer/2022070418/5695d3091a28ab9b029c9fae/html5/thumbnails/18.jpg)
Daily Work Done
DHA Phase II (Sec K, L, M, N)
Electrical, Sui Gas & Water Supply Dated :- 29 Sep 2015
Electrical
Remarksfilled
to befilled
27-30
28-30
25-30
27-3Oct
27-20 Nov
![Page 19: 15 work](https://reader036.fdocuments.net/reader036/viewer/2022070418/5695d3091a28ab9b029c9fae/html5/thumbnails/19.jpg)
Daily Work Done
DHA Phase II (Sec K, L, M, N)
Electrical, Sui Gas & Water Supply
Electrical
Description Activity
Earthing
Sui Gas
Sui Gas Pipe Line 1-D
Sui Gas Pipe Line B-63
Water Supply
Water supply Pipe line 3-A
Water supply Pipe line 3-B
Water supply Pipe line C-13
Previous location
Revised location
Iqbal Road-s along B-28 & B-47
Transformer , DBs, SLCP & Street Light Pole Earthing
Lay out, Excvation, Pipe Laying ,Back fill
Lay out, Excvation, Pipe Laying ,Back fill
Lay out, Excvation, Pipe Laying ,Back fill & Hydro Testing
Lay out, Excvation, Pipe Laying ,Back fill & Hydro Testing
Lay out, Excvation, Pipe Laying ,Back fill & Hydro Testing
![Page 20: 15 work](https://reader036.fdocuments.net/reader036/viewer/2022070418/5695d3091a28ab9b029c9fae/html5/thumbnails/20.jpg)
Daily Work Done
DHA Phase II (Sec K, L, M, N)
Electrical, Sui Gas & Water Supply Dated :- 30 Sep 2015
Electrical
Planned Actual
Physical %age Physical %age
Earthing 100 Nil Nil Nil
Sui Gas
Back Fill 100 Nil Nil Nil
Back Fill 100 Nil Nil Nil
Water Supply
Hydro test 100 Nil Nil Nil
Pipe laying 40 Nil Nil Nil
Layout 20 Nil Nil Nil
Machinery Deployed
![Page 21: 15 work](https://reader036.fdocuments.net/reader036/viewer/2022070418/5695d3091a28ab9b029c9fae/html5/thumbnails/21.jpg)
Daily Work Done
DHA Phase II (Sec K, L, M, N)
Electrical, Sui Gas & Water Supply Dated :- 30 Sep 2015
Electrical
Remarksfilled
27-30
28-30
25-30
27-3Oct
27-20 Nov
![Page 22: 15 work](https://reader036.fdocuments.net/reader036/viewer/2022070418/5695d3091a28ab9b029c9fae/html5/thumbnails/22.jpg)
Daily Work Done
DHA Phase II (Sec K, L, M, N)
Electrical, Sui Gas & Water Supply
Electrical
Description Activity
Foundation of TF, DBs & Pole C-2
Feeder Cable Laying D-5 5th Avenue Feeder able Laying
Sui Gas Nil Nil Nil
Water Supply
Water supply Pipe line 3-B
Water supply Pipe line C-13
Previous location
Revised location
Foundation of TF, DBs, SLCP & Pole
Lay out, Excvation, Pipe Laying ,Back fill & Hydro Testing
Lay out, Excvation, Pipe Laying ,Back fill & Hydro Testing
![Page 23: 15 work](https://reader036.fdocuments.net/reader036/viewer/2022070418/5695d3091a28ab9b029c9fae/html5/thumbnails/23.jpg)
Daily Work Done
DHA Phase II (Sec K, L, M, N)
Electrical, Sui Gas & Water Supply Dated :- 01-Oct- 2015
Electrical
Planned Actual
Physical %age Physical %age
Foundation 100 Nil Nil Nil
Cable Laying 5 Nil Nil Nil
Nil Nil Nil Nil Nil
Water Supply
Pipe laying 60 Nil Nil Nil
Layout 20 Nil Nil Nil
Machinery Deployed
![Page 24: 15 work](https://reader036.fdocuments.net/reader036/viewer/2022070418/5695d3091a28ab9b029c9fae/html5/thumbnails/24.jpg)
Daily Work Done
DHA Phase II (Sec K, L, M, N)
Electrical, Sui Gas & Water Supply Dated :- 01-Oct- 2015
Electrical
Remarksfilled
27-3Oct
27-20 Nov
![Page 25: 15 work](https://reader036.fdocuments.net/reader036/viewer/2022070418/5695d3091a28ab9b029c9fae/html5/thumbnails/25.jpg)
Daily Work Done
DHA Phase II (Sec K, L, M, N)
Electrical, Sui Gas & Water Supply
Electrical
Description Activity
Transformer & DB Installation C-2 Transformer & DB Installation
Feeder Cable Laying D-5 5th Avenue Feeder able Laying
Sui Gas Nil Nil Nil
Water Supply
Water supply Pipe line 3-B
Water supply Pipe line C-13
Previous location
Revised location
Lay out, Excvation, Pipe Laying ,Back fill & Hydro Testing
Lay out, Excvation, Pipe Laying ,Back fill & Hydro Testing
![Page 26: 15 work](https://reader036.fdocuments.net/reader036/viewer/2022070418/5695d3091a28ab9b029c9fae/html5/thumbnails/26.jpg)
Daily Work Done
DHA Phase II (Sec K, L, M, N)
Electrical, Sui Gas & Water Supply Dated :- 02-Oct- 2015
Electrical
Planned Actual
Physical %age Physical %age
Installation 100 Nil Nil Nil
Cable Laying 10 Nil Nil Nil
Nil Nil Nil Nil Nil
Water Supply
Backfill 80 Nil Nil Nil
Layout 20 Nil Nil Nil
Machinery Deployed
![Page 27: 15 work](https://reader036.fdocuments.net/reader036/viewer/2022070418/5695d3091a28ab9b029c9fae/html5/thumbnails/27.jpg)
Daily Work Done
DHA Phase II (Sec K, L, M, N)
Electrical, Sui Gas & Water Supply Dated :- 02-Oct- 2015
Electrical
Remarksfilled
27-3Oct
27-20 Nov
![Page 28: 15 work](https://reader036.fdocuments.net/reader036/viewer/2022070418/5695d3091a28ab9b029c9fae/html5/thumbnails/28.jpg)
Daily Work Done
DHA Phase II (Sec K, L, M, N)
Electrical, Sui Gas & Water Supply
Electrical
Description Activity
Street Light C-2 Street light till fixtures
Earthing C-2
Feeder Cable Laying D-5 5th Avenue Feeder able Laying
Sui Gas Nil Nil Nil
Water Supply
Water supply Pipe line 3-B
Water supply Pipe line C-13
Previous location
Revised location
Transformer , DBs, SLCP & Street Light Pole Earthing
Lay out, Excvation, Pipe Laying ,Back fill & Hydro Testing
Lay out, Excvation, Pipe Laying ,Back fill & Hydro Testing
![Page 29: 15 work](https://reader036.fdocuments.net/reader036/viewer/2022070418/5695d3091a28ab9b029c9fae/html5/thumbnails/29.jpg)
Daily Work Done
DHA Phase II (Sec K, L, M, N)
Electrical, Sui Gas & Water Supply Dated :- 03-Oct- 2015
Electrical
Planned Actual
Physical %age Physical %age
100 Nil Nil Nil
Earthing 100 Nil Nil Nil
Cable Laying 10 Nil Nil Nil
Nil Nil Nil Nil Nil
Water Supply
Hydro Test 100 Nil Nil Nil
Layout 20 Nil Nil Nil
Machinery Deployed
Street light till fixtures
![Page 30: 15 work](https://reader036.fdocuments.net/reader036/viewer/2022070418/5695d3091a28ab9b029c9fae/html5/thumbnails/30.jpg)
Daily Work Done
DHA Phase II (Sec K, L, M, N)
Electrical, Sui Gas & Water Supply Dated :- 03-Oct- 2015
Electrical
Remarksfilled
27-3Oct
27-20 Nov
![Page 31: 15 work](https://reader036.fdocuments.net/reader036/viewer/2022070418/5695d3091a28ab9b029c9fae/html5/thumbnails/31.jpg)
Daily Work Done (Electrical)DHA Phase II (Sec K, L, M, N) 10/13/2015
Description ActivityPlanned Actual
RemarksPhysical %age Physical %age
Street Light C-6A, C-7 100 Nil Nil Nil
Earthing C-6A, C-7 Earthing 100 Nil Nil Nil
Cable Laying C-6A, C-7 Earthing 100 Nil Nil Nil
Earthing B-17 DBs Earthling Nil Nil 3 75 Nil
Previous location
Revised location
Machinery Deployed
Street light till fixtures
Street light till fixtures
Transformer , DBs, SLCP & Street Light Pole Earthing
Transformer , DBs, SLCP & Street Light Pole Earthing
![Page 32: 15 work](https://reader036.fdocuments.net/reader036/viewer/2022070418/5695d3091a28ab9b029c9fae/html5/thumbnails/32.jpg)
Daily Work Done (Electrical)DHA Phase II (Sec K, L, M, N) 10/14/2015
Description ActivityPlanned Actual
RemarksPhysical %age Physical %age
Street Light C-6A 100 Nil Nil Nil
Earthing C-6A Earthing 100 Nil Nil Nil
Cable Laying C-6A Earthing 100 Nil Nil Nil
C-3 Nil Nil 3 40 Nil
Earthing B-17 DBs Earthling Nil Nil 3 75 Nil
Previous location
Revised location
Machinery Deployed
Street light till fixtures
Street light till fixtures
Transformer , DBs, SLCP & Street Light Pole Earthing Transformer , DBs, SLCP & Street Light Pole Earthing
Street Light pole
Street light pole install
![Page 33: 15 work](https://reader036.fdocuments.net/reader036/viewer/2022070418/5695d3091a28ab9b029c9fae/html5/thumbnails/33.jpg)
Daily Work Done (Electrical)
DHA Phase II (Sec K, L, M, N)
15-Oct-15
Description ActivityPlanned Actual
RemarksPhysical %age Physical %age
Street Light C-7 100 Nil Nil Nil
Earthing C-7 Earthing 100 Nil Nil Nil
Cable Laying C-7 Earthing 100 Nil Nil Nil
Street Light pole C-11 Nil Nil 3 100 Nil
Earthing B-16 DBs Earthling Nil Nil 3 75 Nil
Previous location
Revised location
Machinery Deployed
Street light till fixtures Street light till fixtures
Transformer , DBs, SLCP & Street Light Pole Earthing
Transformer , DBs, SLCP & Street Light Pole Earthing
Street light pole install